1 2x58 MW Coal Fired Power Plant at Mauritius The coal-fired power plant produces electricity by the burning of coal and air in a Circulating Fluidized Bed Combustion Boiler (CFBC), where it heats water to produce high pressure and high temperature steam. The steam flows through steam turbine which spins an electrical generator to produce electricity. The exhaust steam from the turbine is cooled in an air cooled condenser, condensed back into water, and returned through regenerative heaters to the steam generator to start the process over. Following is the flow processes Coal is transported form coal jetty using an external pipe conveyor to crusher house. 1. Coal is conveyed through coal conveyor from crushed stock pile to coal bunkers. 2. This crushed coal is then fed to the CFBC boiler where it rapidly ignites. 3. Water required for steam generation and other uses is generated in an water treatment plant which uses the water discharged from the Motagne Jacquot sewage treatment plant of Mauritius. 4. Demineralized Water of required purity (from demineralised plant) flows vertically up the tube-lined walls of the boiler, where it turns into steam, 5. The steam is piped to the steam turbine where it rotates the blades of the turbine and is coupled on the same shaft to a three-phase electrical generator which generates electricity at an intermediate level voltage (11 kv). 6. The exiting steam from the steam turbine is condensed in an air cooled condenser. 7. The condensed steam goes to the regenerative cycle through two low pressure heaters, deaerator, boiler feed pumps and high pressure heaters back to the boiler. 8. The generator transformer steps up the electricity generated in the Generator to a voltage (66 kv) suitable for transmission and sent out onto the three-phase transmission system through a gas insulated switchyard (GIS). 9. Exhaust gas (flue gas) from the boiler is drawn by the induced draft fan through a bag filter and is then vented out into the atmosphere through the chimney. 10. The fly ash obtained after burning the coal is transported through trucks and bottom ash also in trucks into the ash pond. Please refer Enclosed Process Flow Diagram (Annexure-1 to Attachment-4) and Schematic Block Diagrams (Annexure-2 to Attachment-4) depicting the process. Page 1 of 6

2 DESCRIPTION OF THE NEW TECHNOLOGY PROPOSED 1. The main pieces of equipment forming part of the Facility and their expected characteristics are: 1.1. Steam Generator There are two boilers manufactured by Bharat Heavy Electricals Ltd, India (BHEL). Each boiler shall be of natural circulation, single drum, outdoor type, designed for firing coal as the principal fuel. The complete furnace section is of water cooled weld wall type, arranged as a gas and pressure tight envelope. Details of the operating parameters of each boiler at 100% Boiler Maximum Continuous Rating ( BMCR ) condition are as follows: (a) Superheater ( SH ) Steam flow: 239 t/h (b) Superheated Steam Pressure at Main Steam Stop Valve MSSV: 106 kg/sq. cm (g) (103.9 bara) (c) Superheated Steam Temperature at SH outlet: 540 deg C (+/- 5 deg. C) (d) Feed water Temperature at economizer inlet: 237 deg C (e) Stability at Lowest Load: minimum 30 % of BMCR THE SALIENT DESIGN FEATURES OF THE BOILER ARE AS FOLLOWS: - Balanced draft furnace at furnace outlet - High Efficiency Cyclones - Natural circulation - Front Bunker arrangement - Suitable for dry ash handling system for furnace bottom, Economizer - Air heaters and Bag/Fabric filters hoppers - Variable Frequency Drive controlled Drag Link Feeders. - Horizontal Tubular Air preheater - Radial Forced Draft /Secondary Air fans with silencer - Radial Primary Air fans with silencer - Radial Induced Draft fans with hydraulic coupling drives. Page 2 of 6

3 - Light Diesel Oil pumping unit with firing capacity of 30% Boiler Maximum Continuous Rating The long residence time along in combination with temperature allow both the decomposition of limestone and the subsequent capture of sulphur and formation of gypsum which results reduction of SO 2 : 200 mg / Nm3 at Chimney outlet. Staged combustion, at controlled low temperatures (900 Deg. C), effectively suppresses NOx formation which results in reduction of NO x : 200 mg / Nm3 at Chimney outlet. Fabric Filter shall be designed to meet the Particulate Matter: <30 mg/nm3 with all compartments in service at Chimney outlet. To measure the above parameters necessary analyzers shall be provided. SO 2, NO x and PM shall be maintained in-line with EIA Licence conditions Noise Level Noise level inside the plant shall be maintained at mtr which in-turn meets the noise level requirement of 70dB at plant boundary. The two boilers use a common Reinforced Cement Concrete ( RCC ) chimney with twin steel flue. Each boiler has its own flue or sleeve within the chimney. The height of the chimney is approx. 110 m Codes and Regulations for boiler All the pressure parts of the main boiler sections of this proposal will be designed in accordance with the current applicable ASME Standards. For the main boiler pressure part section, the materials used shall be in accordance with ASME Materials and ASME published stress values. For the non-pressure parts, internationally acceptable codes and standards shall be used. All materials used for non-pressure parts will conform to ASME or Indian Standards or equivalent International Standards. Page 3 of 6

4 The manufacture of the equipment will be done as per ASME. The shop inspection and all NDE tests will be carried out as per ASME. 1.2 Steam Turbine and Alternators Steam Turbine Two numbers regenerative, condensing Steam Turbine shall be driving the Alternator. Technical Specification of the Steam Turbine is as follows: (a) Type of steam turbine : regenerative condensing Steam Turbine (b) Inlet Steam Pressure and Temperature: 106 ata & 535 Deg.C (c) Exhaust Steam Pressure : 0.11 ata at 27 Deg.C (Ambient Temperature) (d) Vacuum steam extraction. : Steam Ejector Steam Turbines shall meet the specifications and heat rates as set out in Annexure 1 of this Appendix 4A Alternators Two alternators manufactured by Bharat Heavy Electricals Ltd. Each includes a multi-stage regenerative steam turbine and a 11kV alternator, running at 3000 rpm with a name plate rating of 72.5 MVA for each unit. Technical Specification of the Alternators are as follows: Type : CACW Rated Power : 58 MW Rated Voltage : 11 kv Power Factor : 0.80 (lag.) Rated Frequency : 50Hz Number of Phase : 3- phase Mode of Excitation : Brushless Excitation The design of turbine & alternator shall be in accordance to DIN and IEC Page 4 of 6

5 2. TECHNICAL DESCRIPTION OF FABRIC FILTER 2.1. FILTER CHAMBER: The Fabric Filter selected for the given gas parameters will have four chambers in total, arranged as per the enclosed sketch. The raw gas coming through the inlet duct manifold enters the raw gas chambers of the Fabric Filters and clean gas leaves the Fabric Filter through outlet duct manifold. The gas is distributed among all chambers simultaneously. The chambers are made up of mild steel material. Each compartment comprises of three segments viz. clean gas chamber, raw gas chamber and hopper. The general arrangement sketch is enclosed herewith TUBE SHEET: Each chamber is partitioned into raw gas chamber and clean gas chamber by providing a horizontal plate, known as tube sheet. The tube sheet has got a number of circular holes in the longitudinal and transverse direction with constant pitch. The tube sheet is of mild steel and supports the cages & bags FILTER BAGS & CAGES: The bags are made out of suitable bag material. The bags will be of cylindrical shape, with nominal diameter of 150 mm and length of 7000 mm. The bags are hung vertically from the tube sheet. In order to ensure verticality and retain the cylindrical shape of the bag, the cage fabricated from carbon steel wires is inserted inside the bag. The snap rings provided at the bag top hold the bag in place in the tube sheet, providing a gas tight seal between the raw gas and clean gas sections of the system HOPPER: There will be four hoppers - one below each raw gas chamber. The hoppers are fabricated from 5 mm thick carbon steel. The bottom portion of the hopper walls is provided with heating chamber along with tubular type electrical heaters. One number of ash level indicators is envisaged in each hopper to indicate the high level of ash in the hopper. The bottom of hopper will be provided with a square flange of 400 x 400mm opening for connection to dust disposal system DAMPERS: At inlet and outlet opening provided in the duct manifolds for each chamber, there will be two dampers with pneumatic actuator to isolate the chamber in case of need PULSING SYSTEM: The pulsing system consists of a set of blow pipes for each compartment, one air distributor for each compartment, solenoid operated diaprahgm type pulse valve for each blow pipe, compressed air line from storage vessels. The storage vessel is connected to the air distributors through mild steel pipelines. One blowpipe feeds Page 5 of 6

6 pulse cleaning air to all the bags arranged in one row, at a time. The air from the air distributor is allowed to the blowpipe through the pulsing valve, which is opened for a short duration automatically at a preset internal of time Fabric filter by-pass is provided during oil firing (initial cold start) to prevent possible damage to fabric filter PLC: The Programmable Logic Controller (PLC) supplied for the Fabric Filter will take care of the operation of pulse valves during pulse cleaning and control of Motor Control Centre (MCC) feeders while MCC feeders selected in auto. The PLC has provision to connect to Distributed Control System (DCS) through communication to know the status of applicable Fabric Filter parameters. 3.0 Air cooled Condenser (ACC) The ACC unit is designed in multiple modules. Each module consists of a number of finned tube bundles. The bundles are arranged in A-Frame shape. Each module is served by one axial flow fan driven by an electrical motor via a gearbox. The mechanical equipment is located underneath the tube bundles, delivering cooling air in forced draft mode. The steam from the turbine exhaust flows through the duct, riser/s to the manifold at top of the tube bundles. The steam enters the primary modules first. The uncondensed steam enters the secondary modules from the bottom header, operating in reflex mode. The non-condensable are removed at the top of the secondary modules. The condensate is drained from the bottom headers through condensate drain lines to the Condensate Storage Receiver (CSR). The condensate is pumped back to the deaerator by condensate extraction pumps. Semi-Automatic Fin cleaning system is provided to maintain the heat transfer efficiency. The Wind wall is provided to arrest cross winds & avoid recirculation. Page 6 of 6

Boiler Technical Specifications (2013)

Boiler Technical Specifications (2013) ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)

More information

CHP-turbine room. CHP can capture almost EXTRACTED STEAM 20 PSI HIGH-PRESSURE STEAM 1250 PSI HEAT EXCHANGER HOT WATER SUPPLY F

CHP-turbine room. CHP can capture almost EXTRACTED STEAM 20 PSI HIGH-PRESSURE STEAM 1250 PSI HEAT EXCHANGER HOT WATER SUPPLY F 5 6 HIGH-PRESSURE STEAM is routed from the wood-chp boiler to the turbine. TURBINE BLADES spin at nearly 00 revolutions per second. Steam acting on the turbine blades creates mechanical energy in the TURBINE.

More information

Boiler Basics. Design and operation

Boiler Basics. Design and operation Boiler Basics Design and operation A boiler is an enclosed vessel that provides a means for combustion heat to be transferred into water until it becomes heated water or steam. The hot water or steam under

More information

AUTOMATION OF BOILERS USING LABVIEW

AUTOMATION OF BOILERS USING LABVIEW I J L S C M 4(1), 2012, pp. 49-53 AUTOMATION OF BOILERS USING LABVIEW A. MICHAEL SIDDHARTHA AND S. NAVEEN KUMAR Under Graduate Student, Department of Electronics and Communication Engineering Thiagarajar

More information

When you complete this module you will be able to: Describe various watertube boiler designs, including large generating units.

When you complete this module you will be able to: Describe various watertube boiler designs, including large generating units. Watertube Boilers Learning Outcome When you complete this module you will be able to: Describe various watertube boiler designs, including large generating units. Learning Objectives Here is what you will

More information

Unit Design Data. Fossil Steam

Unit Design Data. Fossil Steam Fossil Steam Units Appendix E Unit Design Data Forms Unit Design Data Fossil Steam Instructions Use these forms to report design and installed equipment information for FOSSIL (steam) units. FOSSIL units

More information

LIMESTONE HANDLING AND LIME MILLING SYSTEM

LIMESTONE HANDLING AND LIME MILLING SYSTEM LIMESTONE HANDLING AND LIME MILLING SYSTEM PURPOSE TO REDUCE THE SOx LEVEL AS PER STATUTARY REQUIREMENT TO REDUCE CORROSION EFFECT ON APH TUBES AND FLUE GAS PATH TO FEED THE LIME POWDER TO BUNKER AFTER

More information

Pulse Jet Baghouse ASTEC PULSE JET BAGHOUSE. for Asphalt Facilities

Pulse Jet Baghouse ASTEC PULSE JET BAGHOUSE. for Asphalt Facilities Pulse Jet ASTEC PULSE JET BAGHOUSE for Asphalt Facilities ASTEC PULSE JET BAGHOUSE FOR ASPHALT MIXING PLANTS Astec baghouses deliver superior performance and efficiency, while helping your plant meet

More information

The equipment and materials shall be designed and constructed in accordance with the ASME code section I 2001 ED A02 and Chinese Standards.

The equipment and materials shall be designed and constructed in accordance with the ASME code section I 2001 ED A02 and Chinese Standards. Steam Boiler Type S50-3.82/450 Traveling grate stoker 50t/h x 3.82 pa x 450 Degree C 1. Basic use of the boiler The boiler can be used for industrial power generation, or thermal power station for enterprises

More information

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME: (For Vendor Registration Purpose) SHEET 1 of 6 1.00.00 GENERAL INFORMATION 1.01.00 The general guidelines as illustrated in the subsequent clauses of this section shall be applicable for air cooled condenser

More information

Boiler Draft Equipment

Boiler Draft Equipment Boiler Draft Equipment Learning Outcome When you complete this module you will be able to: Discuss, sketch and describe the basic equipment used to supply combustion air to a boiler furnace. Learning Objectives

More information

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4. CASE STUDIES OF STEAM SYSTEM AUDIT IN SOME PLANTS By K.K.Parthiban, Venus Energy Audit System Introduction This article outlines the outcome of auditing of steam system conducted in process Industries.

More information

Unit Design Data. Fossil Steam (Voluntary Reporting) Unit name: Location of unit (State): Energy Information Administration (EIA) Number:

Unit Design Data. Fossil Steam (Voluntary Reporting) Unit name: Location of unit (State): Energy Information Administration (EIA) Number: Unit Design Data Fossil Steam (Voluntary Reporting) (Note: The NERC Board of Trustees approved the GADS Task Force Report (dated July 20, 2011) i, which states that design data collection outside the required

More information

MILL IN SERVICE FIRST COAL FIRES AT MEDUPI

MILL IN SERVICE FIRST COAL FIRES AT MEDUPI Smoke from Chimney Tuesday 2 nd December 2014 MILL IN SERVICE FIRST COAL FIRES AT MEDUPI First Coal Fires On Thursday 27 th November the team at Medupi successfully brought the first mill into service

More information

WATER TUBE SOLID FUEL SERIES YOSHIMINE CO., LTD

WATER TUBE SOLID FUEL SERIES YOSHIMINE CO., LTD YOSHIMINE WATER TUBE BOILERS SOLID FUEL SERIES YOSHIMINE CO., LTD Yoshimine Boilers Proven Quality Worldwide Since its foundation in 1937, Yoshimine has been specializing in the development and manufacture

More information

MODEL ANSWER FOR ELEMENTS OF MECH.ENGG.(17413) 1) steam boiler- It is a closed vessel in which steam is produced from water by combustion of fuel.

MODEL ANSWER FOR ELEMENTS OF MECH.ENGG.(17413) 1) steam boiler- It is a closed vessel in which steam is produced from water by combustion of fuel. MODEL ANSWER FOR ELEMENTS OF MECH.ENGG.(17413) Q 1. a) 1) steam boiler- It is a closed vessel in which steam is produced from water by combustion of fuel. 2) steam turbine- It is a device that extract

More information

Solution of I Mid Term Steam Engineering 6ME5A

Solution of I Mid Term Steam Engineering 6ME5A 1(a) Discuss the working principle of LaMont high pressure boiler This boiler works on basic principle of forced convection. If the water is circulate by a pump inside the tube, the heat transfer rate

More information

AIM OF THE EXPERIMENT:- Study of boilers (fire tube, water tube) APPARATUS REQUIRED: - SL.NO NAME OF THE APPARATUS SPECIFICATION QUANTITY 01 Fire tube

AIM OF THE EXPERIMENT:- Study of boilers (fire tube, water tube) APPARATUS REQUIRED: - SL.NO NAME OF THE APPARATUS SPECIFICATION QUANTITY 01 Fire tube LABORATORY MANUAL ON STUDY OF FIRE TUBE AND WATER TUBE BOILERS Prepared By Prof. (Dr.) M. K. Roul Professor and Principal, Gandhi Institute for Technological Advancement (GITA), Bhubaneswar 752054 June

More information

Boiler drum level controller using Microcontroller

Boiler drum level controller using Microcontroller ISSN:2348-2079 Volume-6 Issue-1 International Journal of Intellectual Advancements and Research in Engineering Computations Boiler drum level controller using Microcontroller E.K.Arulkarthick 1,M.Santhosh

More information

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Boiler Piping System 0500-0620 Condensing System 3110-3199 Circulating Water Systems 3210-3285 Waste Water (zero discharge) 3290-3299 Condensate

More information

Annex A-7 FOSSIL STEAM UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Annex A-7 FOSSIL STEAM UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER Boiler Fuel Supply to Bunker 0010-0129 Boiler Fuel Supply from Bunkers to Boiler 0200-0480 Boiler Piping System 0500-0799 Boiler Internals and Structures 0800-0859 Slag and Ash Removal 0860-0920

More information

BHEL Steam Generators Material Selection Overview by Veerendar Aluvala DM/BHEL/Trichy

BHEL Steam Generators Material Selection Overview by Veerendar Aluvala DM/BHEL/Trichy BHEL Steam Generators Material Selection Overview by Veerendar Aluvala DM/BHEL/Trichy Presentation Summary Pulverised Coal Combustion (PCC) Design Aspects Boiler Parameters Drum Type Boilers OTSC Boilers

More information

Unit Design Data FLUIDIZED BED COMBUSTION (VOLUNTARY REPORTING)

Unit Design Data FLUIDIZED BED COMBUSTION (VOLUNTARY REPORTING) Appendix E - Unit Design Data Forms Unit Design Data FLUIDIZED BED COMBUSTION (VOLUNTARY REPORTING) (Note: The NERC Board of Trustees approved the GADS Task Force report (dated July 20, 2011 - http://www.nerc.com/filez/gadstf.html)

More information

ANNEXURE-A SPECIFICATIONS FOR HOT MIX PLANT

ANNEXURE-A SPECIFICATIONS FOR HOT MIX PLANT ANNEXURE-A SPECIFICATIONS FOR HOT MIX PLANT COLD AGGREGATE BIN FEEDER FEEDING HOPPERS Four Nos. Cold aggregates hopper with a heaped capacity of approx. 52 T. Wide opening bin width to accommodate different

More information

Unit Design Data. Fluidized Bed Combustion (Voluntary Reporting) Unit name: Location of unit (State): Energy Information Administration (EIA) Number:

Unit Design Data. Fluidized Bed Combustion (Voluntary Reporting) Unit name: Location of unit (State): Energy Information Administration (EIA) Number: Unit Design Data Fluidized Bed Combustion (Voluntary Reporting) (Note: The NERC Board of Trustees approved the GADS Task Force Report (dated July 20, 2011) i, which states that design data collection outside

More information

Boiler. Fire tube Boiler:

Boiler. Fire tube Boiler: Boiler What is Boiler? A closed metallic vessel in which the water is heated beyond the boiling temperature by the application of heat by the combustion of fuels to convert it into steam. The function

More information

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES SOLAR ENERGY GATHERING EQUIPMENT Solar Field 6500-6559 Thermal Storage 6570-6589 Operational Problems 6590-6599 STEAM TURBINE

More information

INTRODUCTION TO SOLAR THERMAL POWER STATIONS We shall look at some of the different methods of supplying solar energy to the power stations.

INTRODUCTION TO SOLAR THERMAL POWER STATIONS We shall look at some of the different methods of supplying solar energy to the power stations. SOLAR THERMAL POWER PLANTS There are different types of solar thermal power stations where the energy from the sun is collected by an arrangement of mirrors. These rotate or tilt to follow the suns arcing

More information

Biomass Drum Dryer LMK 2000 Model

Biomass Drum Dryer LMK 2000 Model Biomass Drum Dryer LMK 2000 Model Drum dryer of sawdust and biomass SPB5, SPB10, SPB20, SPB30 versions The equipment is designed to dry material of vegetable and biological origin e.g. wood sawdust, wood

More information

LIQUID RING PUMPS FOR THE POWER INDUSTRY

LIQUID RING PUMPS FOR THE POWER INDUSTRY LIQUID RING PUMPS FOR THE POWER INDUSTRY VACUUM SOLUTIONS FOR THE POWER PLANT for The Power Industry 334 Shop online at shop.edwardsvacuum.com Contact our customer service team for the Power Industry 333.

More information

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By the Authority Vested By Part 5 of the United States Code 552(a) and Part 1 of the Code of Regulations 51 the attached document has

More information

Appendix B Index to System/Component Cause Codes

Appendix B Index to System/Component Cause Codes Appendix B Index to System/Component Cause Codes Using This Appendix This appendix contains system/component cause codes to use when completing GADS Event Report (07). For ease of use, it is divided into

More information

ENERGY RECOVERY SOLUTIONS. Recover wasted energy to increase efficiency and save money immediately.

ENERGY RECOVERY SOLUTIONS. Recover wasted energy to increase efficiency and save money immediately. ENERGY RECOVERY SOLUTIONS Recover wasted energy to increase efficiency and save money immediately. Cleaver-Brooks Engineered Boiler Systems Manufacturers of HRSGs, Waste Heat Recovery Units, and Waste

More information

Köllemann GmbH Page 1 / 16

Köllemann GmbH Page 1 / 16 Köllemann GmbH Page 1 / 16 Our Design Features Pressure-Shock resistant Explosion-proof Wide range of materials available Forced cleaning (Self-cleaning) Zero-Gap-Design available Suitable for vacuum applications

More information

ROTARY DRYER CONSTRUCTION

ROTARY DRYER CONSTRUCTION ROTARY DRYER The Rotary Dryer is a type of industrial dryer employed to reduce or to minimize the liquid moisture content of the material it is handling by bringing it into direct contact with a heated

More information

Annex A-6 FLUIDIZED BED COMBUSTION UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Annex A-6 FLUIDIZED BED COMBUSTION UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Annex A-6 FLUIDIZED BED COMBUSTION UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER Boiler Fuel Supply to Bunker 0010-0129 Sorbent Supply (FBC) 0130-0156 Bed Material Preparation System (FBC) 0160-0174

More information

PLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK

PLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK PLASMAC Ltd. Units 11&12 Aylesbury Business Centre Chamberlain Road Aylesbury Bucks. HP19 8DY. UK Phone +44 (0)1296 398 698 Fax +44 (0)1296 395 110 Web www.plasmac.co.uk E-Mail sales@plasmac.co.uk Plasmac

More information

Appendix B9 Geothermal Unit Cause Codes

Appendix B9 Geothermal Unit Cause Codes Appendix B9 Geothermal Unit Cause Codes GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES (Unit Codes 800 899) Cause Code BOILER Ranges Page No. Boiler Piping System 0500-0620 B-GE-2 BALANCE OF PLANT

More information

BHA Powerwave Acoustic Cleaning Systems Powerful cleaning to help increase performance

BHA Powerwave Acoustic Cleaning Systems Powerful cleaning to help increase performance BHA Powerwave Acoustic Cleaning Systems Powerful cleaning to help increase performance BHA Powerwave acoustic cleaning systems can significantly improve the cleaning process for air pollution control equipment

More information

PERFORMANCE EVALUATION AND RECURRING JAMMING PROBLEM ANALYSIS OF AIR PREHEATER IN COAL-FIRED POWER PLANTS

PERFORMANCE EVALUATION AND RECURRING JAMMING PROBLEM ANALYSIS OF AIR PREHEATER IN COAL-FIRED POWER PLANTS PERFORMANCE EVALUATION AND RECURRING JAMMING PROBLEM ANALYSIS OF AIR PREHEATER IN COAL-FIRED POWER PLANTS M.Srinivasa Rao M.Tech Student, Department of Mechanical Engineering, GMRIT, Srikakulam, AP, India.

More information

2 X 1996 Wartsila 18V mw Each 50hz HFO Generator Sets

2 X 1996 Wartsila 18V mw Each 50hz HFO Generator Sets 2 X 1996 Wartsila 18V26 5.125mw Each 50hz HFO Generator Sets The responsibility for any and all additional charges is the purchasers. 2 x WARTSILA 5 MW Power plant 2 Units of Wartsila 18V26 @ 5 MW each,

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

Appendix B2 System/Component Cause Codes

Appendix B2 System/Component Cause Codes Appendix B2 System/Component Cause Codes FLUIDIZED BED COMBUSTION UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES (Unit Codes 650-699) Cause Code BOILER Ranges Page No. Boiler Fuel Supply to Bunker 0010-0129

More information

Document Code: 1 (15) Issuing date: Status:

Document Code: 1 (15) Issuing date: Status: Document Code: 1 (15) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Language: HSK Document title: SYSTEM DESCRIPTION BOILER WATER SYSTEM Submitted for: Customer reference: Other information:

More information

WHAT IS A BOILER? BOILER IS AN EQUIPMENT WHICH PRODUCES STEAM AT THE REQUIRED PRESSURE AND TEMPERATURE. BOILER DESIGN, MANUFACTURE & INSTALLATION ARE

WHAT IS A BOILER? BOILER IS AN EQUIPMENT WHICH PRODUCES STEAM AT THE REQUIRED PRESSURE AND TEMPERATURE. BOILER DESIGN, MANUFACTURE & INSTALLATION ARE Your Logo Here TRAINING ON BOILERS PRESENTED AT M/S. MAGADI SODA COMPANY, MAGADI, KENYA LIMITED 1 WHAT IS A BOILER? BOILER IS AN EQUIPMENT WHICH PRODUCES STEAM AT THE REQUIRED PRESSURE AND TEMPERATURE.

More information

Document Code: 1 (13) Issuing date: Status:

Document Code: 1 (13) Issuing date: Status: Document Code: 1 (13) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Language: JJA Document title: SYSTEM DESCRIPTION REHEAT STEAM SYSTEM Submitted for: Customer reference: Other information:

More information

FLUIDIZED BED BOILERS

FLUIDIZED BED BOILERS FLUIDIZED BED BOILERS Proven technology for burning fuels on solid grate with a fountain fluidized layer; The possibility of burning a wide variety of solid fuels - with large heated value range coal,

More information

MELAMINE DRYERS PRESENTATION MELAMINE DRYERS

MELAMINE DRYERS PRESENTATION MELAMINE DRYERS MELAMINE DRYERS INSTRUMENT AIR MELAMINE DRYER TYPICAL FLOW DIAGRAM FABRIC FILTER MP STEAM ROTARY VALVE EXHAUST FAN STEAM HEATER INTAKE FAN WET MELAMINE CONDENSATE LP STEAM STEAM DRYER SCREW FEEDER DRIED

More information

Efficient CHP-plant 150 kw

Efficient CHP-plant 150 kw www.vep.at PROJECT DESCRIPTION Efficient CHP-plant 150 kw Our pilot plant near Tulln Our custom-made solution for decentralized energy supply with steam technology! V. E. P. Fördertechnik GesmbH Guntramser

More information

Efficient Steam System Design

Efficient Steam System Design Efficient Steam System Design The word Efficient is often used to describe the general performance of a system. However it is important to distinguish between efficiency and effectiveness. Efficiency is

More information

ELECTRO STATIC PRECIPITATOR [ESP]

ELECTRO STATIC PRECIPITATOR [ESP] ELECTRO STATIC PRECIPITATOR [ESP] Fußzeilentext 1 Controlling Air Pollution Clean Air is an essential resource to the people surrounding the industrial belts. Air pollution is one of the major contributor

More information

ProcessBarron is a leader in the design, fabrication, installation, maintenance, and repair of air, flue gas and bulk materials handling system

ProcessBarron is a leader in the design, fabrication, installation, maintenance, and repair of air, flue gas and bulk materials handling system Mechanical ProcessBarron is a leader in the design, fabrication, installation, maintenance, and repair of air, flue gas and bulk materials handling system equipment. From our production facilities near

More information

Centrifugal Fans, Non-Overloading, Backward Inclined

Centrifugal Fans, Non-Overloading, Backward Inclined BACKWARD INCLINED CENTRIFUGAL FANS Centrifugal Fans, Non-Overloading, Backward Inclined MVA, MVZ, MVX & MVW Series with laminar blades MAVA, MAVZ & MAVX Series with aerofoil blades Features The combination

More information

BIOMASS COMBUSTION BOILERS

BIOMASS COMBUSTION BOILERS General description of the boilers As a common feature, each type of boiler system consists of a combustion chamber placed above an overfeed stoker, underfeed stoker or a solid grate, and a vertical or

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product

More information

CHAPTER 3 BASIC STEAM CYCLE

CHAPTER 3 BASIC STEAM CYCLE CHAPTER 3 BASIC STEAM CYCLE To understand steam generation, you must know what happens to the steam after it leaves the boiler. A good way to learn the steam plant on your ship is to trace the path of

More information

SKYPAK II, 3 Ton Series, gives you a

SKYPAK II, 3 Ton Series, gives you a SKYPAK II 3 ton Heating And Cooling self-contained Package SKYPAK II, 3 Ton Series, gives you a complete air-conditioning and heating system as an all in one package unit. Designed for convenient through-the-wall

More information

BASIL 6000 TUNNEL CAGE WASHER

BASIL 6000 TUNNEL CAGE WASHER BASIL 6000 TUNNEL CAGE WASHER APPLICATION For thorough, efficient cleaning of cages, debris pans, bottles, feeder bowls, and miscellaneous items used in the care of laboratory animals. DESCRIPTION The

More information

FUEL-FIRED VERTICAL TUBELESS BOILERS

FUEL-FIRED VERTICAL TUBELESS BOILERS FUEL-FIRED VERTICAL TUBELESS BOILERS 4 60 P orizontal and Vertical Feedwater / Condensate Return Systems and Blow-down Tanks FULTON FUEL-FIRED VERTICAL TUBELESS BOILERS FULTON: AN INDUSTRY LEADER SINCE

More information

ecodry Figure 1 - Process Diagram ecodry B General Process Description

ecodry Figure 1 - Process Diagram ecodry B General Process Description ecodry The process principal of the ecodry system is centered around the concept of drying in a closed steam loop, with a process-integrated thermal oxidation. The separation of flue gas from the drying

More information

ENVIRO INTERNATIONAL CORPORATION

ENVIRO INTERNATIONAL CORPORATION ENVIRO INTERNATIONAL CORPORATION Air Pollution Control System,Ventilation System and Dust Suppression System, Enviro International is a project based company with a prime interest in Air pollution Equipment,

More information

Industrial Dust Aspiration Solutions. For optimal protection of plant and environment.

Industrial Dust Aspiration Solutions. For optimal protection of plant and environment. Bühler GmbH DE-92339 Beilngries Deutschland T + 49 8461 701 0 F +49 8461 701 133 grain-logistics@buhlergroup.com Buhlergroup.com/grain-logistics GL_CB_Dust_Aspriation_Systems_EN_14004_02 Dust Aspiration

More information

STEAM & POWER ENGINEERS

STEAM & POWER ENGINEERS Page 1 STEAM & POWER ENGINEERS Project Site: M/s. Jamkhandi Sugars Ltd. INDIA.(Karnataka) Boiler Capacity: 90 TPH X 72.4 kg/cm2 Traveling Grate Boiler Resister Office Address: A-4/306, Rakshak Nagar Gold,

More information

mith Mills Smith Mills 6500A 6500A-4 OIL OR GAS CAST IRON BOILER/BURNER CAST IRON

mith Mills Smith Mills 6500A 6500A-4 OIL OR GAS CAST IRON BOILER/BURNER CAST IRON mith Mills Mills 00A OIL OR GAS CAST IRON BOILER/BURNER Smith CAST IRON 00A- - Gas I=B=R Ratings: Gross Output 7,19 to 1, FRONT VIEW WITH INDUS COMB BURNER SIDE VIEW WITH INDUS COMB BURNER SIDE VIEW -

More information

Biomass. Biomass solid fuel boiler range

Biomass. Biomass solid fuel boiler range Biomass Biomass solid fuel boiler range Biomass Fuelling positive change For more than150 years, Baxi has been at the forefront of heating technology Baxi leads the way with new and pioneering heating

More information

NOx REDUCTION EXPERIENCE ON NATURAL GAS FIRED TURBO FURNACES

NOx REDUCTION EXPERIENCE ON NATURAL GAS FIRED TURBO FURNACES NOx REDUCTION EXPERIENCE ON NATURAL GAS FIRED TURBO FURNACES by D. E. Dorman, Staff Engineer DB Riley, Inc. Presented at the International Joint Power Generation Conference Miami Beach, Florida July 23-25,

More information

CONTINUOUS OPEN-WIDTH BLEACHING RANGES (PRE-TREATMENT RANGES)

CONTINUOUS OPEN-WIDTH BLEACHING RANGES (PRE-TREATMENT RANGES) CONTINUOUS OPEN-WIDTH BLEACHING RANGES (PRE-TREATMENT RANGES) Range Commissioned in 2005 Swastik Premises, Amraiwadi, Ahmedabad - 30 02. INDIA Tel. : (+91)(79) 2274 3553, 2274 90, 2274 551, 5543 5017 Fax

More information

Quality Construction Equipment

Quality Construction Equipment Quality Construction Equipment ASPHALT BATCH MIX PLANT ANP Series - 60 to 240 tph ASPHALT BATCH MIX PLANT Apollo has always been proactive in rising to customer demands and expectations by providing quality

More information

SKYPAK II, 3 Ton Series, gives you a

SKYPAK II, 3 Ton Series, gives you a SKYPAK II 3 ton Heating And Cooling self-contained Package SKYPAK II, 3 Ton Series, gives you a complete air-conditioning and heating system as an all in one package unit. Designed for convenient through-the-wall

More information

ASSSIGNMENT 3. Textbook Assignment: Boilers, chapter 4, pages 4-1 through 4-15, and Steam Turbines, chapter 5, pages 5-1 through 5-1.

ASSSIGNMENT 3. Textbook Assignment: Boilers, chapter 4, pages 4-1 through 4-15, and Steam Turbines, chapter 5, pages 5-1 through 5-1. ASSSIGNMENT 3 Textbook Assignment: Boilers, chapter 4, pages 4-1 through 4-15, and Steam Turbines, chapter 5, pages 5-1 through 5-1. 3-1. What is the function of a boiler in the steam cycle? 1. To convert

More information

LEAD RECYCLING PLANT. Battery Machine Manufacturers: Since 1989

LEAD RECYCLING PLANT. Battery Machine Manufacturers: Since 1989 Battery Machine Manufacturers: Since 1989 LEAD RECYCLING PLANT We provide TURNKEY SOLUTIONS for used lead-acid battery recycling that includes, Project Feasibility studies, Specification developments,

More information

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION CHAPTER 23.20 LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION SECTIONS 23.20.100 Local Amendments To The International Mechanical Code, 2000 Edition 23.20.202 Definitions 23.20.301.14

More information

VARIO eco Dust Collector. For the highly effective, energy efficient collection of dust from industrial processes. Standard for clean air

VARIO eco Dust Collector. For the highly effective, energy efficient collection of dust from industrial processes. Standard for clean air VARIO eco Dust Collector Standard for clean air For the highly effective, energy efficient collection of dust from industrial processes The VARIO eco series is known for low filter resistance with very

More information

Additional Cooling Stage (FT174-43) Adds the location points and plumbing for a fourth heat exchanger.

Additional Cooling Stage (FT174-43) Adds the location points and plumbing for a fourth heat exchanger. Modules, Options and Accessories Options (to be defined at time of order) Flowmeter Option (FT174-40) The standard unit displays an estimated flow rate calculated from the feed pump speed. This is accurate

More information

FIELD OF OPERATION. Multi cyclones Bag filter Flue gas fan Rotary locks Conveying systems Accessories for dust collection plants

FIELD OF OPERATION. Multi cyclones Bag filter Flue gas fan Rotary locks Conveying systems Accessories for dust collection plants CATALOGUE No: 4 2 develops as well as manufactures equipment for dust collection, mainly flue gas cleaning. FIELD OF OPERATION Multi cyclones Bag filter Flue gas fan Rotary locks Conveying systems Accessories

More information

APPLICATION PROFILE EXPLOSIONS IN CEMENT PLANTS EXPLOSIONS IN CEMENT PLANTS CEMENT PLANT EQUIPMENT WITH HIGHEST EXPLOSION POTENTIAL. Form No.

APPLICATION PROFILE EXPLOSIONS IN CEMENT PLANTS EXPLOSIONS IN CEMENT PLANTS CEMENT PLANT EQUIPMENT WITH HIGHEST EXPLOSION POTENTIAL. Form No. APPLICATION PROFILE EXPLOSIONS IN CEMENT PLANTS Cement manufacturing is one of the largest mineral commodity industries in the United States, with an estimated production capacity of greater than 73 million

More information

TECHNICAL DATA MOBILE WASTE INCINERATOR

TECHNICAL DATA MOBILE WASTE INCINERATOR TECHNICAL DATA MOBILE WASTE INCINERATOR 1 SYSTEM DESCRIPTION Design and operating Cases: The Incinerator and its accessories shall be designed for the maximum medical, biohazardous or any type of waste

More information

A FREAK INCIDENT OF A BED SUPERHEATER FAILURE

A FREAK INCIDENT OF A BED SUPERHEATER FAILURE A FREAK INCIDENT OF A BED SUPERHEATER FAILURE Case studies are interesting. This case is very interesting one. The customer had a bed SH failure. At the time of the visit, the failed bed SH tube was not

More information

PIPING SYSTEM EQUIPMENTS

PIPING SYSTEM EQUIPMENTS PIPING SYSTEM EQUIPMENTS Introduction Equipments are devices that provide power, process and store materials. Equipments in piping systems depend on the specific industries using them. Specialized equipment

More information

CASE STUDY ON EFFICIENCY & AVAILABILITY DETERIORATION IN AN AFBC BOILER

CASE STUDY ON EFFICIENCY & AVAILABILITY DETERIORATION IN AN AFBC BOILER CASE STUDY ON EFFICIENCY & AVAILABILITY DETERIORATION IN AN AFBC BOILER By K.K.Parthiban / Venus Energy Audit System & Sri Devi Boiler Equipment and Spares. Introduction This case study is about various

More information

Fuel-Fired Vertical Tubeless Boilers

Fuel-Fired Vertical Tubeless Boilers Fuel-Fired Vertical Tubeless Boilers Fulton Classic (4-60P), The EDGE (6-30P) orizontal and Vertical Feedwater / Condensate Return Systems and Blow-down Separators FULTON FUEL-FIRED VERTICAL TUBELESS BOILERS

More information

THERMAL TREATMENT PLANTS BIOMASS AND WASTE

THERMAL TREATMENT PLANTS BIOMASS AND WASTE THERMAL TREATMENT PLANTS BIOMASS AND WASTE Table of contents... 2 Introduction... 3 Flow diagram... 6 Waste bunker and grab... 8 Waste feeding... 9 Incineration grate... 10 Boiler... 11 Planning and production

More information

Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful

Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful Harnessing Energy Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful Vapor Power Cycle The vast majority of electrical generating plants are variations of vapor power

More information

Biomass Energy Systems

Biomass Energy Systems Biomass Energy Systems Direct Fired Furnaces Dieffenbacher USA has developed direct fired biomass combustion systems for dryers, lumber dry kilns, steam boilers, and thermal oil heaters. The conservative

More information

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents Boiler specifications A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents Burner General: Q. Burner and burner safeguards shall comply with the CGA

More information

B.Tech. First Semester Examination Basics of Mechanical Engineering (ME-101F)

B.Tech. First Semester Examination Basics of Mechanical Engineering (ME-101F) B.Tech. First Semester Examination Basics of Mechanical Engineering (ME-101F) Q. 1. (a) Differentiate between water tube boiler and fire tube boiler. Ans. Comparison Between 'Fire-tube and Water tube'

More information

Cement Quality Enhancement with Multi Channel Burner in Kiln- Department. Shrinath Bhosle

Cement Quality Enhancement with Multi Channel Burner in Kiln- Department. Shrinath Bhosle e t International Journal on Emerging Technologies (Special Issue on NCRIET-2015) 6(2): 377-386(2015) ISSN No. (Print) : 0975-8364 ISSN No. (Online) : 2249-3255 Cement Quality Enhancement with Multi Channel

More information

Design and analysis of the piping systems

Design and analysis of the piping systems Design and analysis of the piping systems Over all schematic diagram of the total system along with equipment and connecting piping is shown in Fig.. Different piping systems are described as follows:.

More information

LIGNO LIGNO DEDUST PRO EXPERT SYSTEM SOLUTIONS

LIGNO LIGNO DEDUST PRO EXPERT SYSTEM SOLUTIONS LIGNO LIGNO DEDUST PRO EXPERT SYSTEM SOLUTIONS CONTROL WITH STYLE SIMPLE, STRAIGHTFORWARD, EFFICIENT BASIC In order to provide simple and efficient operation, all dedusters in the DeDust Pro range are

More information

Glass Wool Production Line

Glass Wool Production Line Glass Wool Production Line Glass wool is a kind of insulation materials which is made of natural ores, such as quartzite, dolomite, feldspar, limestone and so on. With the features of low density, convenient

More information

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating

High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW. Pellet Boilers. Future of Ecological Heating Pellet Boilers High Performance Electronic Modulation Automatic Cleaning Easy Installation 4 Power Levels: 9,15,25,42kW Future of Ecological Heating Why choose an Ekoheat boiler? Ekopower is an innovative

More information

M E M O R A N D U M. The Technical Correlating Committee on Boiler and Combustion Systems Hazards

M E M O R A N D U M. The Technical Correlating Committee on Boiler and Combustion Systems Hazards M E M O R A N D U M TO: FROM: The Technical Correlating Committee on Boiler and Combustion Systems Hazards Jeanne Moreau DATE: June 22, 2010 SUBJECT: NFPA 85 TCC Report on Comments Letter Ballot (F10)

More information

Power Flame Incorporated

Power Flame Incorporated Power Flame Incorporated SUGGESTED SPECIFICATION FOR MODEL NVC ULTRA LOW NOx GAS BURNERS SUB 9 PPM NOx THE POWER TO MANAGE ENERGY 2001 South 21st Street, Parsons, Kansas 67357 Telephone: 620-421-0480,

More information

Ashirwad Carbonics (India) Private Limited

Ashirwad Carbonics (India) Private Limited Ashirwad Carbonics (India) Private Limited Co2 Production Plant Technical Literature Our precision engineered range of CO2 Generation Plant is available in various capacities and models as per the clients

More information

INNER SEPARATION CFB. Energy-saving,Efficient, Environmental

INNER SEPARATION CFB. Energy-saving,Efficient, Environmental THREE VORTEX INNER SEPARATION CFB BOILER Energy-saving,Efficient, Environmental SINCE 5 A Hundred Years Centuries Bridge Company profile Zhengzhou Boiler Co., Ltd., founded in 5, has been through 72 years'

More information

Variable speed hydraulic coupling and drive unit of hydraulic coupling

Variable speed hydraulic coupling and drive unit of hydraulic coupling Variable speed hydraulic coupling and drive unit of hydraulic coupling I. Model designation YO / / / Modificait on code Output speed of drive unit (r/min) Input speed of coupling or drive unit (r/min)

More information

COOPERATIVE PATENT CLASSIFICATION

COOPERATIVE PATENT CLASSIFICATION CPC F COOPERATIVE PATENT CLASSIFICATION MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING (NOTE omitted) LIGHTING; HEATING F28 HEAT EXCHANGE IN GENERAL (NOTES omitted) F28D HEAT-EXCHANGE APPARATUS,

More information

Industrielle Elektrowärme GmbH. OhmEx. Company Presentation. Dipl.-Ing. Wolfgang Vogler (GM)

Industrielle Elektrowärme GmbH. OhmEx. Company Presentation. Dipl.-Ing. Wolfgang Vogler (GM) Company Presentation Dipl.-Ing. Wolfgang Vogler (GM) 1 Main Competence is recognised as a professional and competitive company in design and manufacture of electric process heaters and assosiated thyristor

More information

HCLEARFIRE. High-efficiency, modular steam boiler HP

HCLEARFIRE. High-efficiency, modular steam boiler HP HCLEARFIRE High-efficiency, modular steam boiler 10-60 HP High-Efficiency, Low-Emission Steam Boiler in a Compact Footprint The ClearFire -H compact, gas-fired horizontal boiler is designed specifically

More information

Forced Draft Boiler Flue Gas Venting: Problems & Solutions. Presented by Steve Connor and Patrice Gouin January 27, 2016

Forced Draft Boiler Flue Gas Venting: Problems & Solutions. Presented by Steve Connor and Patrice Gouin January 27, 2016 Forced Draft Boiler Flue Gas Venting: Problems & Solutions Presented by Steve Connor and Patrice Gouin January 27, 2016 What Will We Be Covering Today? Pressurized Non-condensing Vent Systems Venting s

More information