Materials Housing plastic: Front display lights: Transformer voltage: Electrical switch rating, ZR/ZC, DHW, XX:

Size: px
Start display at page:

Download "Materials Housing plastic: Front display lights: Transformer voltage: Electrical switch rating, ZR/ZC, DHW, XX:"

Transcription

1 A10333 Z-one Relay Multi-Zone Valve Control Copyright 2014 Caleffi ZVR10X series Function The ZVR series is a multi-zone zone valve and boiler operating control for multiple zone hydronic heating or cooling systems. The ZVR series interfaces with low voltage thermostats, or any other low voltage controllers having a switching action. The ZVR series controls up to 3, 4, 5 or 6 zones, depending on model selected. In addition, a system circulator and secondary is turned on whenever any zone calls for heat. ED indicators provide functional status and easy system troubleshooting. The ZVR series is a perfect match with Caleffi s Z-one motorized zone valves. Compatible with low voltage 2, 3, or 4 wire thermostats R, W, C and TT Comm dual labeling at thermostat terminals Z-oneink unlimited zone expansion Selectable priority with 1 hour time-out feature System status selectable during priority Circulator will start only after the zone valve end switch is closed Dry contacts for DHW (ZR/ZC), capable of switching line voltage arge terminal connections High Capacity 40 VA Transformer standard for 3 and 4 zone models-expandable to 80 VA, and 80 VA for the 6 zone model Automatic resettable fuse Controls system, secondary, and priority Front ED ights 100% Factory tested with 3 year warranty ET Approved Product Range Technical specifications Code ZVR103 Z-one Relay switching relays...three zone Code ZVR104 Z-one Relay switching relays...four zone Code ZVR106 Z-one Relay switching relays...six zone Materials Housing plastic: Front display lights: Electrical Knockouts: Performance Power supply: Transformer voltage: Maximum transformer load: Electrical switch rating: Electrical switch rating, ZR/ZC, DHW, XX: Electrical switch rating s: Resettable Fuse: Maximum temperature: Maximum humidity: Approvals: ABS CD (12) 1/2" size 120 VAC, 50/60 Hz 24 VAC 40 VA (ZVR103/4), 80 VA (ZVR106) 20A Max Combined 120 VAC, 2A each 120 VAC, 5A each automatic 110 F (43 C) 90% non-condensing Certified to CSA C22-2 o.24 Conforms to U Standard 873

2 Conforms to U 873 Milwaukee, WI USA T-STAT CA ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 VAVE OPE Dimensions POWER ZVR106 Six zone switching - Input: 120VAC 50/60Hz 20A MAX CAUTIO: RISK OF EECTRIC SHOCK - DISCOECT A IPUT POWER PRIOR TO SERVICIG A B C C Code Zones A B C Wgt. (lbs) ZVR /4" 11" 3" 3.2 ZVR /4" 11" 3" 3.2 ZVR /4" 11" 3" 3.2 SAFETY ISTRUCTIO This safety alert symbol will be used in this manual to draw attention to safety related instructions. When used, the safety alert symbol means ATTETIO! BECOME AERT! YOUR SAFETY IS IVOVED! FAIURE TO FOOW THESE ISTRUCTIOS MAY RESUT I A SAFETY HAZARD. CAUTIO: All work must be performed by qualified personnel trained in the proper application, installation, and maintenance of systems in accordance with all applicable codes and ordinances. CAUTIO: Electrical shock hazard. Disconnect power before installation to prevent electrical shock or equipment damage. Make sure all connections are in accordance with the electrical wiring diagram and in accordance with national and local electrical codes. WARIG: Avoid electrical noise interference. Do not install near large conductors, electrical machinery, or welding equipment. Avoid locations where excessive moisture, corrosive fumes, vibration, or explosive vapors are present. Caleffi shall not be liable for damages resulting from misapplication or misuse of it products.

3 Installation Inspection Inspect packages for damage. If damaged, notify the appropriate carrier immediately. If undamaged, open the package and inspect the device for obvious damage. Return damaged products. Use only copper conductor supply wire suitable for at least 105 C All circuits must have a common disconnect and be connected to the same pole of the disconnect Maintenance and Repair The Caleffi Z-one multi-zone valve control comes with a resettable fuse and requires no maintenance. If control fails or is damaged, replace control with functional one. Mounting Mount the Caleffi Z-one switching relay box to a suitable surface. Slotted holes are provided for mounting purposes. Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. It is not suitable for installation in hazardous locations and should not be placed close to any electromagnetic fields. Cover removal Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward, cover should release from base. Roll cover off base.

4 Transformer Installation Mount box on stable surface using level. Remove transformer(s) from packaging. Slide bottom end of transformer into bottom latch. Snap top of transformer into latch arms. Feed wiring through hole near the top of the transformer and insert transformer plug into the socket. Repeat process for 2nd transformer if six valve relay box.

5 The jumpers on the ZVR series can be positioned for the following operations. Priority O / Priority OFF: When priority jumper is O, upon demand, zone 1 will operate as priority and all other zones are O OFF C R temporarily W Cswitched R off W(with 1 Chour Rtime-out). W When C priority R W C STATUS D P OM T mode T is COM OFF, any T zones T that COM were active T when T COM zone 1 was T T COMDURIG COMMS switched on will remain on. 2 T-STAT Status During 3 Priority T-STAT O / Status 4 During T-STAT Priority OFF: 5 When T-STAT 6 P status jumper is O, the system will continue to operate O OFF R W during C priority. R W C R W C R W C R W C D P T T Master COM / Slave: T allows T COM for unlimited T expansion T COM to Tadditional T ZVR COM T T COM relays. MASTER SAVE COMMS T-STAT 2 Jumper set up T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 Wiring terminals MASTER SAVE ATUS RIG IORITY OFF TEM MP X X DHW R W C ZR/ZC T T COM ZVR106 6 Zone T-STAT 1 R W C T T COM T-STAT 2 R W C T T COM T-STAT 3 R W C T T COM T-STAT 4 When a zone has a demand from a thermostat (T T or R W) the control will send 24 VAC to the corresponding zone valve. When the zone valve end switch closes, the primary will switch on and the (X X) dry contacts will close to signal the boiler of a heating demand. Zone 1 can be used for priority (either a priority or valve). When the priority jumper is O, a demand from T-Stat1 will activate 24VAC to valve 1 and the priority will switch on after the end switch closes (requires a jumper in the end switch terminals if a valve is not used). The DHW (ZR/ZC) dry contact will also close. Depending upon "Status During Priority" jumper, the system will O OFF either be O or OFF. ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR S arge screw terminals connections makes wiring easy with three screw terminal connections. Pump terminals connection have 120 VAC outputs for simplified connections. Zone valve connections can be 2, 3 or 4 wire. C COM 3 Z-oneink unlimited expansion allows adding addition ZVR series relay controls to a Master ZVR. Communication is accomplished by connecting three wires (bell or thermostat wire) to the communication terminals located in the upper R right Whand corner. C RThe jumper W is Cpositioned R to Master W C/ Slave T position. T COM A demand Tfor heat T from COM any zone T will Tfire the COM boiler and start the. T-STAT 4 T-STAT 5 T-STAT 6 D P COMMS PWR ZOE

6 VET Example Wiring Diagram Please reference Z-one Relay wiring guide for complete listing of wiring diagrams. ModCon boiler with Primary/Secondary mod/con! boiler ZV1 ZV2 ZV3 ZV4 ZV5 ZV6! SECODARY! X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 ZVR106 6 Zone MASTER SAVE TSAT2 ZOE2 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH SECODARY!! ZV1 ZV2 ZV3 ZV4 ZV5 ZV6

7 VET oncondensing boiler with outdoor reset and indirect DHW SYSTEM! ZV2 ZV3 ZV4 ZV5 ZV6 ZV1 DHW! aquastat low flow resistance boiler indirect DHW tank DHW! aquastat space heating thermostats space heating demand domestic water heating demand G boiler! reset! controller outdoor! temperature! sensor ZC ZR T T DHW R W C R W C R W C R W C R W C R W C D P X X PWR ZR/ZC T T COM T T COM T T COM T T COM T T COM T T COM COMMS THM 1 THM 2 THM 3 THM 4 THM 5 THM 6 Master/Slave THM1 ZOE1 ZRV106 6 Zone Z6V set to O STATUS DURIG POWER I SEC SYSTEM ZOE 1 ZOE 2 MOTOR SWITCH MOTOR SWITCH THM2 ZOE2 THM3 ZOE3 THM4 ZOE4 THM5 ZOE5 THM6 ZOE6 ZOE 3 ZOE 4 ZOE 5 ZOE 6 MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH G SYSTEM! ZV1 ZV2 ZV3 ZV4 ZV5 ZV6

8 O OFF O OFF MASTER SAVE O OFF O OFF MASTER SAVE Modern boiler with Primary/Secondary and two secondary s "A"! "B"! A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 SYSTEM! X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 TSAT1 ZOE1 TSAT2 ZOE2 TSAT2 ZOE2 ZVR106 6 Zone TSAT3 ZOE3 TSAT4 ZOE4 ZVR106 6 Zone TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG TSAT5 ZOE5 TSAT6 ZOE6 STATUS DURIG TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH "B"! SYSTEM! "A"! A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 CAEFFI Caleffi orth America, Inc West Milwaukee Road Milwaukee, WI T: F:

9 WIRIG GUIDE The ZSR101 is a versatile single relay control with two outputs for operating a 120 VAC with boiler enable, or two 120 VAC devices without boiler enable. Features include rear knock outs for 4x4 junction box mounting, convenient pre-installed jumper for operation, and 10 amp total load rating. The ZSR Series of controls is for zoning using s. Up to 6 zone s (model dependent) along with a primary can be operated. Zone priority is selectable with 1-hour time-out feature. Other features include exercising, selectable post purge, and 3 ground terminals for simplified wiring. The ZVR Series of controls is for zoning using zone valves. Up to 6 valves (model dependent), along with a system, secondary (s), and primary can be operated. Zone priority is selectable with 1-hour time-out feature. System status (on\off) during priority is also selectable. Replaceable snap-fit 40 VA transformer standard for 3 & 4 zone models expandable to 80 VA with 2nd transformer. 6 zone model has two 40 VA (80 VA) transformers Certified to CSA C22-2 o.24 Conforms to U Standard 873 Form rev.1

10 2

11 IDEX Z-one Relay thermostat connections Thermostat wiring... 3 ZSR101 - single zone relay Product overview... 4 Operation and cover removal...5 A1 - Single thermostat...6 A2 - Multiple thermostats...8 A3 - Single master thermostat, with TRVs, variable speed ZSR103, ZSR104 & ZSR106 - multi-zone relay Product overview Circuit board Cover removal Product details B1 - Mod/Con boiler, hydro separator or buffer tank, zone s B2 - Traditional boiler, indirect DHW w/ priority, zone s B3 - Mod/Con boiler, primary loop, closely spaced tees, zone s ZVR103, ZVR104 & ZVR106 - multi-zone valve control Product overview Circuit board Cover removal, Transformer Installation...24 Product details C1 - Mod/Con boiler, hydro separator, zone valves C2 - Mod/Con boiler, indirect DHW on primary side of hydro sep, zone valves C3 - Mod/Con boiler, indirect DHW on load side of hydro sep, zone valves C4 - Mod/Con boiler, indirect DHW on primary side of hydro sep, master and slave control C5 - Traditional boiler, indirect DHW (no priority) with valve C6 - Traditional boiler with reset control, priority indirect DHW with valve C7 - Mod/Con boiler, hydro separator, zone valve (more than 6), multiple secondary s Caleffi shall not be liable for damages resulting from misapplication or misuse of it products. 3

12 Z-one Thermostat Connections 2-Wire Thermostats 4-Wire Thermostats 4 All Caleffi Z-one controls use the same interface to connect to thermostats. This interface is very flexible and allows many different types of thermostats to be connected to the control including 2, 3 and 4 wire versions. In addition, any type of switching device can be used to signal a heat demand by connecting the R & W (T & T) terminals together. The terminals are dual labeled to help simplify wiring. Z-one T-stat interface R W C T T COM T-STAT 1 R W C T T COM T-STAT 2 R W C T T COM T-STAT 3 R W T T C T-STAT Description R = 24 VAC Supply W = Heat Call C = 24 VAC Common Function R&W: When connected, signals a heat demand. R&C: Provides 24 VAC to powered thermostats. There are a few different types of 2 wire thermostats including bi-metallic, power stealing and battery powered. All of these thermostats connect in the same manner to the Caleffi Z-one series of controls. Connect R to R and W to W. See below. To connect a 4-wire thermostat to the Z-one series controls, connect R to R, W to W and C to C. A jumper in the thermostat is also required between R & Rh as shown below. Similar to a 3-wire thermostat, R & C from the Z-one Control supply constant 24 VAC to the thermostat. C R Rh W1 DHW R W C R W C R W C R W C R W C R W C D P X X ZR/ZC T T COM T T COM T T COM T T COM T T COM T T COM COMMS W C R W C R W C R W C R W CTHM 1 D THM P 2 THM 3 THM 4 THM 5 THM 6 T COM T T COM T T COM T T COM T T COM COMMS THM 2 THM 3 THM 4 THM 5 THM 6 3-Wire Thermostats TRASFORMER Three wire thermostats 12/20VA get their power from the control they are connected to. R & C from the Z-one Control supply 24 VAC to the thermostat at all times while the W lead signals a heat demand. POWER I GROUDS 1 6 Zone Z6P 2 Dry Contacts DipSwitches PWR ZOE1 ZOE2 Master Slave A heat demand Priority OFF can Priority O also be initiated by any type Primary OFF Primary O Exercise OFF Exercise O of device that Post Purge OFF has Post dry Purge Ocontacts (dry contacts are a set of contacts that open and close but do not have any voltage present until supplied from an outside source). The end switch on a Z-one series zone valve is an example of a dry contact. Using PRIMARY a dry 3 contact 4 to connect 5 6 R to W will initiate a heat demand. ZOE3 ZOE4 ZOE5 ZOE6 WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply SAFETY ISTRUCTIO This safety alert symbol will be used in this manual to draw attention to safety related instructions. When used, the safety alert symbol means ATTETIO! BECOME AERT! YOUR SAFETY IS IVOVED! FAIURE TO FOOW THESE ISTRUCTIOS MAY RESUT I A SAFETY HAZARD. CAUTIO: All work must be performed by qualified personnel trained in the proper application, installation, and maintenance of systems in accordance with all applicable codes and ordinances. DHW R W C W C R W C R W C R W C R W C D P ZR/ZC T T COM T COM T T COM T T COM T T COM T T COM COMMS THM 1 THM 2 THM 3 THM 4 THM 5 THM 6 4 Master Priority OFF Primary OFF Exercise OFF Post Purge OFF DipSwitches 5 X X Slave Priority O Primary O Exercise O Post Purge O POWER I 6 R W C R W C R W C R W C R W C D P T PWR T COM T T COM T T COM T T COM T T COM COMMS THM 2 THM 3 THM 4 THM 5 THM 6 ZOE1 Always refer to the thermostat manufacturer s instructions. ZOE2 DipSwitches Master Slave TRASFORMER ZOE3 6 Zone Priority OFF Priority O Primary OFF Primary O 12/20VA CAUTIO: Electrical shock hazard. Disconnect Exercise OFF power Exercise before O installation to prevent Post Purge OFF Post Purge O electrical shock or ZOE4 equipment Z6P damage. Make sure all connections are in accordance with the electrical wiring diagram and in accordance with national and local electrical codes. ZOE5 ZOE6 CAUTIO: Avoid electrical noise interference. Do not install near PRIMARY large conductors, GROUDS electrical machinery, or welding equipment. Avoid locations where excessive moisture, corrosive fumes, vibration, or explosive vapors are present. P ZO ZO ZO ZO ZO ZO Caleffi shall not be liable for damages resulting from misapplication or misuse of it products.

13 Wiring of 2 wire or 3 zone valve to Caleffi Z-one Relay Wiring a 2 wire zone valve to Caleffi Z-one Relay Since a two wire actuator does not have an end switch for feedback to the relay box, the end switch terminals must have a jumper to simulate the end swith. If the end switch jumper is not installed, no demand will be sent to the boiler and the s will not turn on. Wiring a 3 wire zone valve to Caleffi Z-one Relay The Taco 570 zone valve presents a unique wiring challenge. When connecting the Taco 570 zone valve to the Caleffi Z-one Relay, the wiring of this valve can only be done in one way. The left motor terminal on the ZVR series control must be connected to terminal 2 on the zone valve. The right motor terminal must be connected to terminal 1 on the zone valve. astly, the left end switch terminal must be connected to terminal 3 on the zone valve. Failure to follow schematic will lead to damage of product. 6 Zone TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 MOTOR SWITCH ZOE 2 MOTOR SWITCH ZOE 3 MOTOR SWITCH ZOE 4 MOTOR SWITCH ZOE 5 MOTOR SWITCH ZOE 6 MOTOR SWITCH M

14 Certified to CSA C22-2 o.24 Conforms to U Standard 873 ZSR101 - Single Zone Switching Relay Overview Compatible with 2, 3 and 4-wire thermostats or other low voltage controllers with switching action 120 VAC input Heavy duty, sealed, DPDT, fuse protected relay (with spare fuse) Two dry contact outputs (Relay 1 and Relay 2) for operating 120 VAC with boiler enable or two devices without boiler enable 5 A capacity each relay - 10 A total Rear knock-outs for mounting onto 4 x4 junction box High capacity 6VA transformer Simplified wiring with pre-installed jumper 100% factory tested with 3 year warranty ET certified See technical brochure A for more product information.

15 Operating Principles When a zone has a demand from a thermostat (TT or R W) the relay will close sending 120 VAC to Relay #1 O terminal R and switching the on, and the C to O dry contact on relay #2 closes, signaling the boiler of a heating demand. W C T T COM 6 VA Transformer. Dual labeled T-stat terminals. Compatible with 2, 3 and 4 wire T-stats. Replaceable fuses. R, W, C and T T Comm dual labeling at thermostat terminals. Compatible with low voltage 2, 3, or 4 wire thermostats or any other low voltage devices having a switching action. Supply 120 VAC hot to terminal and 120 VAC neutral to. A factory installed jumper from terminal to the C terminal of Relay 1 is supplied for simplified connection. POWER I REAY #1 REAY #2 C O C C O C 120VAC input power connection If dry contacts are desired from relay #1, remove the factory installed jumper between and C. Cover removal Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward. Turn box and repeat inserting screwdriver and pushin tab inward on opposite side, cover should release from base. Keyhole mounting which fits a 4X4 junction box. Pre-installed jumper. Slide cover off base. Rear knockout for 4X4 junction box. Mounting: Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. Use only copper conductor supply wire suitable for at least 105 C. All circuits must have a common disconnect and be connected to the same pole of the disconnect. It is not suitable for installation in hazardous locations. 7

16 A1 - Single thermostat 8 R W C T T com power zone transformer Caleffi! single zone relay REAY 1 REAY 2 C /O /C C /O /C T T Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

17 Description of terminals C O C = Ground = eutral (Common leg of 120 VAC) = ine (live leg of 120 VAC) = Common terminal = ormally Open terminal = ormally Closed terminal ote: There is a factory installed jumper between the 120 VAC line () and the common terminal of relay #1 (C). Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Sequence of Operation / Settings A demand occurs and closes RW (TT) Relay #1 and relay #2 both fire connecting the common terminal to the O terminal. If the factory installed jumper has not been removed, the O terminal of relay #1 will deliver the hot leg of 120 VAC. Relay #2 has dry contacts. The zone ED illuminates. The demand is satisfied and opens RW (TT). The relay contacts return to their normal position (common to normally closed). The zone ED turns off. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 9

18 A2 - Multiple thermostats 10 End switch wires transformer R W C T T com power zone Caleffi! single zone relay R W 4-wire zone valve 4-wire zone valve R W R W 4-wire zone valve REAY 1 REAY 2 C /O /C C /O /C 24 VAC T T Hydronic diagram is for illustration purposes only and could be missing system components.

19 Description of terminals C O C = Ground = eutral (Common leg of 120 VAC) = ine (live leg of 120 VAC) = Common terminal = ormally Open terminal = ormally Closed terminal ote: There is a factory installed jumper between the 120 VAC line () and the common terminal of relay #1 (C). Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings There is a demand by one of the t-stats which sends power to the corresponding zone valve. When the zone valve opens, its end switch contacts close and signal a demand to the RW (TT) contacts on the single zone relay control. Relay #1 and relay #2 fire If the factory installed jumper has not been removed, the O terminal of relay #1 will deliver the hot leg of 120 VAC thus firing the. Relay #2 closes the TT contacts on the boiler signally a demand. The Zone ED illuminates. When the last of the T-stats is satisfied, the corresponding zone valves closes which opens the end switch contacts. The relay contacts return to their normal position turning off power to the system and opening the RW (TT) contacts. The Zone ED turns off. 11

20 A3 - Single master thermostat, panel radiators with TRVs, variable speed 12 TRV TRV thermostatic! radiator valves! (TRV) on each! radiator TRV TRV TRV TRV buffer tank R W C T T com power transformer zone Caleffi! single zone relay REAY 1 REAY 2 C /O/C C /O/C T T Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

21 Description of terminals C O C = Ground = eutral (Common leg of 120 VAC) = ine (live leg of 120 VAC) = Common terminal = ormally Open terminal = ormally Closed terminal ote: There is a factory installed jumper between the 120 VAC line () and the common terminal of relay #1 (C). Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings A single master thermostat is wired to the ZSR101 control. The master thermostat is set to a slightly higher set point than the desired room temperatures on the thermostatic radiator valves. When the temperature drops below the thermostat s set point, a heat demand is initiated by closing the R & W terminals. Relay #1 and relay #2 both fire. If the factory installed jumper has not been removed, the O terminal of relay #1 will deliver 120 VAC line to the variable speed circulator. Relay #2 closes the TT contacts on the boiler signaling a demand. The Zone ED illuminates. Using an outside air sensor and system temperature sensor located in the buffer tank, the boiler determines if the water in the boiler meets the target temperature based off the outside air reset curve. As long as the master thermostat is calling, the boiler will maintain the buffer tank to the target temperature. The thermostatic radiator valves modulate the flow through the panel radiators because the variable speed circulator is enabled. When the master thermostat reaches set point, the master thermostat will open the contact between R & W. The relay contacts return to their normal position turning off power to the variable speed circulator and opening the RW (TT) contacts. Both the boiler and are no longer enabled. The Zone ED turns off. 13

22 Certified to CSA C22-2 o.24 Conforms to U Standard 873 ZSR10X - Multi-Zone Pump Control Overview Compatible with low voltage 2, 3, or 4 wire thermostats R, W, C and TT Comm dual labeling at thermostat terminals Z-oneink unlimited zone expansion 120 VAC outputs Selectable priority with 1 hour time-out feature Selectable post purge and exercise Dry contacts for DHW (ZR/ZC), capable of switching line voltage High capacity transformer arge terminal connections Simplified wiring with extra ground terminals Heavy duty sealed relays Fuse protected (with spare fuse) Front ED lights 100% Factory tested with 3 year warranty ET approved See technical brochure A for more product information.

23 XX Closes for heat demand and DHW demand. Rated for 120 VAC, 2 amps. DHW (ZR/ZC) closes only during priority call. Rated for 120 VAC, 2 amps. Dual labeled T-stat terminals. Compatible with 2, 3 and 4 wire T-stats. Selectable DIP switches. 3 wire communications to expansion board. Power O ED. ED for each zone. 120 VAC input power connection Multiple ground connections for easy wiring. Replaceable fuses (2 extra included under cover). 120 VAC zone outputs. 120 VAC primary output. 15

24 Cover removal 16 Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward, cover should release from base. Roll cover off base. Mounting: Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. Use only copper conductor supply wire suitable for at least 105 C. All circuits must have a common disconnect and be connected to the same pole of the disconnect. It is not suitable for installation in hazardous locations.

25 X Maintenance and Repair: The Caleffi Z-one multi-zone control The DIP Switches on the ZSR series ZR/ZC T T COM T T COM T T COM T T COM T T COM T T COM COMMS comes with two spare fuses. If control fails or is damaged, replace control with can be positioned for the following DipSwitches functional one. T-STAT 1 T-STAT operations. 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 Master Slave Master / Slave: allows 6 Zone Priority OFF Priority O TRASFORMER for unlimited Primary R OFF Primary O W C R W C R W Exercise OFF Exercise O expansion to additional relays. Post Purge T OFFT COMPost Purge T OT COM T T Boiler connections: Priority OFF / Priority ZSR106 O: When XX = Dry contacts rated up to 120 VAC, 2 Amps. T-STAT 4 T-STAT 5 T-ST priority mode is O, upon demand, Closes when any zone calls including priority. Typically DHW zone 1 will operate as priority and DipSwitches all other zones are temporarily switched off connected to TT on boiler control. X X ZR/ZC (with 1 hour time-out). When priority Master mode Slave is OFF, all zones remain active. 6 Zone Priority OFF Priority O DHW (ZR/ZC) = Dry contacts rated up TRASFORMER Primary OFF Primary O to 120 VAC, 2 Primary OFF / Primary O: When primary Exercise OFF Exercise mode O is O, the primary will Post Purge OFF Post Purge O Amps. Closes only when priority is enabled and calling. continue to operate during priority. DHW R W C R W C R W C R W C R W C R W C D P Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler Exercise ZSR106 OFF / Exercise O: When exercise mode is DipSwitches PWR O, each circulator is ZR/ZC T T COM T T COM T T COM T T COM T T COM T T COM COMMS Master Slave controls equipped with these features. switched on for 30 seconds following 72 hours of inactivity. Priority OFF Priority O P T-STAT 1 T-STAT 2 T-STAT 3 T-STAT TRASFORMER 4 T-STAT 5 T-STAT 6 Primary OFF Primary O POWER I GROUDS Post Purge 1 OFF / Post 2 Purge O: 3 When post 4purge is O, 5Exercise the OFF priority 6 Exercise O Post Purge OFF Post Purge O Communication connections: continues operating for 2 minutes ZSR106 after the priority zone ZOE1 is switched off. Connect terminals to matching terminal of slave boards D to D, P to P, Ground to Ground Primary output: ZOE2 6 Zone ZSR106 TRASFORMER Input Power: = ine (hot leg) of 120 VAC supply = eutral of 120 VAC = Ground ote: when connecting 2 or more Z-one controls, all controls must be powered by the same 120 VAC circuit. POWER I X X POWER I DHW GROUDS D P COMMS POWER I Primary runs when any zone runs. Its status DipSwitches during priority (on\off) can be programmed using the DIP Master Slave switches. ZOE3 Priority O Primary O = Exercise ine O (hot leg) of 120 VAC to power the Post Purge O GROUDS = eutral leg of 120 VAC to power the ZOE4 Priority OFF Primary OFF Exercise OFF Post Purge OFF Zone outputs: Zone s GROUDS run when corresponding thermostat initiates a demand. GROUD = Connect the ground from the to the ground terminal. = Runs when zone #1 calls. Can be programmed to be the priority zone. = ine (hot leg) of 120 VAC to power the = eutral leg of 120 VAC to power the R W C R W 1 C 5 R W C R W C R W 3 4 ZOE5 ZOE6 5 WARIG: When PRIMARY connecting 2 or more Z-one controls, all controls must be powered by the same VAC circuit. C R W C D PRIMARY WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply. WARIG: When replacing fuses, make sure power is disconnected to control box. P 6 17

26 B1 - Mod/con boiler, hydro separator or buffer tank, zone s 18 Pump 1 Pump 2 Pump 3 Pump 4 Buffer tank- Optional hydraulic separator X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR ZOE1 ZOE2 TRASFORMER 6 Zone ZSR106 DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O ZOE3 ZOE4 ZOE5 ZOE6 POWER I GROUDS PRIMARY Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

27 Description of terminals = Ground = eutral (Common leg of 120 VAC) = ine (Hot leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler controls equipped with these features. Dip switch description Master / Slave: Used when joining 2 or more controls together. Only one Master per group Priority OFF / Priority O: Used to set Zone #1 as the priority zone. All other zones will hold off during priority. Priority has a one hour time out feature to prevent freeze up. Primary OFF / Primary O: Sets the status of the primary when there is a priority call. This allows the DHW to be on either side of a hydro separator. Exercise OFF / Exercise O: When enabled the s will rub for 30 seconds after 72 hours without a demand. Post Purge OFF / Post Purge O: Allows the DHW to run for 2 minutes after the DHW demand has been satisfied. Sequence of Operation / Settings Priority switch: OFF Master / Slave switch: Master Status During Priority switch: OFF A demand occurs from any T-stat (T-stat closes TT terminals). The O ED illuminates for that zone. ZSR control sends 120 VAC to the corresponding zone and the primary outputs, XX contacts close to signal boiler of a demand. When the demand from the last T-stat calling is satisfied (T-stat opens TT terminals), the XX contacts are opened, the O ED turns off and the 120 VAC to the zone and primary outputs are dropped. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 19

28 B2 - Traditional boiler, indirect DHW w/ priority, zone s 20 Pump 2 Pump 3 Pump 4 Pump 5 Pump 6 boiler! high limit! control Pump 1 DHW! aquastat DHW! aquastat X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS THM 1 THM 2 THM 3 THM 4 THM 5 THM 6 PWR ZOE1 ZOE2 ZC ZR T T TRASFORMER 12/20VA 6 Zone ZSR106 Z6P DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O ZOE3 ZOE4 ZOE5 ZOE6 outdoor! temperature! sensor POWER I GROUDS PRIMARY Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

29 Description of terminals = Ground = eutral (Common leg of 120 VAC) = ine (Hot leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler controls equipped with these features. Dip switch description Master / Slave: Used when joining 2 or more controls together. Only one Master per group Priority OFF / Priority O: Used to set Zone #1 as the priority zone. All other zones will hold off during priority. Priority has a one hour time out feature to prevent freeze up. Primary OFF / Primary O: Sets the status of the primary when there is a priority call. This allows the DHW to be on either side of a hydro separator. Exercise OFF / Exercise O: When enabled the s will rub for 30 seconds after 72 hours without a demand. Post Purge OFF / Post Purge O: Allows the DHW to run for 2 minutes after the DHW demand has been satisfied. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Priority switch: O (Zone #1 becomes priority) Master/Slave switch: Master Primary Status During Priority switch: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6. The O ED illuminates for that zone. ZSR control sends 120 VAC to the corresponding zone terminals to fire the zone and closes the XX contacts to signal a heat demand to the boiler. The PRIMARY output will also deliver 120 VAC even if no is connected. When the demand from the T-stat is satisfied (T-stat opens TT terminals), the O ED turns off. 120 VAC is dropped from the corresponding zone terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the DHW aquastat (zone #1), The O ED illuminates for Zone #1. If any other zone was calling (Zones 2 thru 6) when Zone #1 called, power (120 VAC) is dropped to those zone s. The XX and DHW contacts close. The contacts deliver 120 VAC Once the Zone #1 DHW demand is satisfied, power to the is dropped, the DHW contacts open. If a demand from zones 2 thru 6 is present, 120 VAC is delivered to the corresponding zone (s) and the O ED for those zones will illuminate. The XX contacts close to signal a heat demand to the boiler. When all zones are satisfied, the XX contacts open and power (120 VAC) is turned off to all of the zone s. DHW Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the DHW contacts and turn off power to the DHW. If a heating demand is present from Zones #2-6, the control will satisfy those demands before going back to the DHW call. After the heating demands are met, the control will go back to DHW and re-set the one hour timer. 21

30 B3 - Mod/Con boiler, primary loop, closely spaced tees, zone s 22 Pump 1 Pump 2 Pump 3 boiler Primary X X DHW ZR/ZC R W C T T COM T-STAT 1 R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR ZOE1 ZOE2 TRASFORMER 36 Zone ZSR106 3 DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O ZOE3 ZOE4 ZOE5 ZOE6 POWER I GROUDS PRIMARY Primary boiler Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

31 Description of terminals = Ground = eutral (Common leg of 120 VAC) = ine (Hot leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler controls equipped with these features. Dip switch description Master / Slave: Used when joining 2 or more controls together. Only one Master per group Priority OFF / Priority O: Used to set Zone #1 as the priority zone. All other zones will hold off during priority. Priority has a one hour time out feature to prevent freeze up. Primary OFF / Primary O: Sets the status of the primary when there is a priority call. This allows the DHW to be on either side of a hydro separator. Exercise OFF / Exercise O: When enabled the s will rub for 30 seconds after 72 hours without a demand. Post Purge OFF / Post Purge O: Allows the DHW to run for 2 minutes after the DHW demand has been satisfied. Sequence of Operation / Settings Priority switch OFF Master / Slave switch: Master Status During Priority switch: OFF A demand occurs from any T-stat (T-stat closes TT terminals). The O ED illuminates for that zone. ZSR control sends 120 VAC to the corresponding zone and the primary outputs, XX contacts close to signal boiler of a demand. When the demand from the T-stat is satisfied (T-stat opens TT terminals), the XX contacts are opened, the O ED turns off and the 120 VAC to the zone and primary outputs are turned off. ATERATE WIRIG: The boiler can be controlled by the Mod/Con boiler if equiped to do so. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 23

32 Certified to CSA C22-2 o.24 Conforms to U Standard 873 ZVR10X - Multi-Zone Valve Control Overview Compatible with low voltage 2, 3, or 4 wire thermostats R, W, C and TT Comm dual labeling at thermostat terminals Z-oneink unlimited zone expansion Selectable priority with 1 hour time-out feature System status selectable during priority Pump will start only after the zone valve end switch is closed Dry contacts for DHW (ZR/ZC), capable of switching line voltage arge terminal connections High capacity 40 VA transformer standard for 3 and 4 zone models-expandable to 80 VA, and 80 VA for the 6 zone model Automatic resettable fuse Controls system, secondary, and priority Front ED ights 100% Factory tested with 3 year warranty ET approved See technical brochure A for more product information.

33 XX Closes for heat demand and DHW demand. Rated for 120 VAC 2 amps. DHW (ZR/ZC) closes only during priority call. Rated for 120 VAC, 2 amps. Dual labeled T-stat terminals. Compatible with 2, 3 and 4 wire T-stats. Master/Slave jumper. 3 wire communications to expansion board. Power O ED. Transformer connections. ED illuminates when end switch closes. 120 VAC input power connection. 120 VAC output to s. System (boiler ) status during priority can be changed with jumper. ZOE #1 priority. Zone valve motor connections. Zone valve end switch connection. ED illuminates with call for heat. 25

34 Cover removal 26 Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward, cover should release from base. Roll cover off base. Transformer Installation Mount box on stable surface using level. Remove transformer(s) from packaging. Slide bottom end of transformer into bottom latch. Snap top of transformer into latch arms. Mounting: Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. Use only copper conductor supply wire suitable for at least 105 C. All circuits must have a common disconnect and be connected to the same pole of the disconnect. It is not suitable for installation in hazardous locations. Feed wiring through hole near the top of the transformer and insert transformer plug into the socket. Repeat process for 2nd transformer if using six valve relay box.

35 T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 T Maintenance and Repair: The Caleffi Z-one multi-zone valve relay comes with a resettable fuse and requires no maintenance. If control fails or is damaged, replace control with functional one. The ZVR series of controls is programmed by positioning a series of jumpers. Example photo to right shows jumper in off position (left photo) and on position (right photo). Jumpers are used for the following operations. Y Priority O / Priority OFF: When priority jumper is O, upon demand, zone 1 will POWER I operate as priority and all other zones are O OFF temporarily switched off (with 1 hour timeout). When priority mode is OFF, any zones STATUS that were active when zone 1 was switched W C R W C R W C R W C DURIG on will remain on. TStatus COMDuring T Priority T COMO / TStatus T During COM T T COM Priority OFF: T-STAT When 4status T-STAT jumper is 5O, T-STAT 6 O OFF the system will continue to operate during priority. Master / Slave: allows for unlimited expansion to additional ZVR relays. MASTER SAVE -STAT 3 SEC Boiler Connections XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler controls equipped with these features. Communication connections Connect terminals to matching terminal of W slave C boards R W C R W C R W C D P T D COM to D, T P to T P, COM Ground T to T Ground COM T T COM COMMS -STAT Use 3 18 T-STAT gauge 4 thermostat T-STAT 5 wire. T-STAT Wire 6 should be shielded if located in close proximity to high voltage wiring. Thermostat connections T R = 24 VAC. DHW R W C R W C R W C R W C R X X W = Heat call ZR/ZC T T COM T T COM T T COM T T COM TT ZVR106 C = Common of 24 VAC R W C R W C T-STAT R W 1 T-STAT 2 T-STAT 3 T-STAT 4 T 6 Zone Heat demand is initiated by closing R T T COM T T COM T T T to W. T-STAT 1 T-STAT 2 T-STA STATUS 24 VAC is always present between R DURIG & C. T DHW R W C R W C R W C R W C R W C ZR/ZC T T COM T T COM T T COM T T COM T T COM Dip O OFF Mas T-STAT 1 T-STAT 2 T-STAT 36 T-STAT Zone4 T-STAT Priority 5 T O Zone valve O OFF TRASFORMER connections Primary O Exercise O Motor = 24 VAC to power the zone Post Purge O SYSTEM ZOE 1 ZOE 2 ZOE valve 3 motorzoe ZSR106 4 ZOE 5 ZOE MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH End Switch MOTOR= Connects SWITCH MOTOR to end SWITCH switch MOTOR S on zone valve. Must be jumpered if using a 2 wire zone valve. D P ZVR106 COMMS Input power P = ine 6 (hot Zone leg) of 120 VAC supply POWER I GROUDS P = eutral of 120 VAC = Ground X X POWER I PWR ZOE1 STATUS DURIG O OFF MASTER Pump outputs O OFF SYSTEM = Runs when any SEC SYSTEM zone ZOE calls 1 for heat. ZOEWhen 2 priority ZOEis 3 enabled, the status of the (on\ MOTOR SWITCH MOTOR SWITCH MOTOR off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a for DHW. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply. WARIG: When connecting 2 or more Z-one controls, all controls must be powered by the same 120 VAC circuit. SAVE SWITCH M Zone DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O ZOE2 ZOE3 27

36 C1 - Mod/Con boiler, hydro separator, zone valves 28 mod/con! boiler ZV1 ZV2 ZV3 ZV4 ZV5 ZV6 SYSTEM! SECODARY! X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 ZVR106 6 Zone MASTER SAVE TSAT2 ZOE2 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 MOTOR SWITCH ZOE 2 MOTOR SWITCH ZOE 3 MOTOR SWITCH ZOE 4 MOTOR SWITCH ZOE 5 MOTOR SWITCH ZOE 6 MOTOR SWITCH Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

37 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. Sequence of Operation / Settings Priority Jumper: OFF Master / Slave Jumper: Master Status During Priority: OFF A demand occurs from any T-stat (T-stat closes TT terminals). The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is turned off to the SEC and SYSTEM and the XX contacts are opened. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 29

38 C2 - Mod/Con boiler, priority indirect DHW on primary side of hydro sep, zone valves 30 mod/con! boiler ZV2 ZV3 ZV4 ZV5 ZV6 DHW! aquastat! SYSTEM! SECODARY! DHW! AQUASTAT X X DHW ZR/ZC R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 ZVR106 6 Zone MASTER SAVE TSAT2 ZOE2 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH MOTOR SWITCH Buffer tank- Optional hydraulic separator! SECODARY! ZV2 ZV3 ZV4 ZV5 ZV6 SYSTEM! Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

39 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Priority Jumper: O (Zone #1 becomes priority) Master/Slave Jumper: Master Status During Priority: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the DHW aquastat (zone #1), The T-STAT CA ED illuminates for Zone #1 and the VAVE OPE ED will illuminate. (When using a DHW, a jumper must be installed on Zone #1 end switch terminals.) If any other zone was calling (Zones 2 thru 6) when Zone #1 called, power (24 VAC) is dropped to those zones. The XX and DHW contacts close. The contacts deliver 120 VAC The SEC and SYSTEM are off. Once the Zone #1 DHW demand is satisfied, power to the is dropped, the DHW contacts open. If a demand from zones 2 thru 6 is present, 24 VAC is delivered to the corresponding zone valve(s) and the T-STAT CA ED s illuminate. When the zone valve end switch closes, the VAVE OPE ED illuminates, the XX contacts close, the SEC and SYSTEM terminals deliver 120 VAC. DHW Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the DHW contacts and turn off power to the DHW and Zone Valve #1. If a heating demand is present from Zones #2-6, the control will satisfy those demands before going back to the DHW call. After the heating demands are met, the control will go back to DHW and re-set the one hour timer. 31

WIRING GUIDE. Form rev.1. Certified to CSA C22-2 No.24 Conforms to UL Standard 873

WIRING GUIDE. Form rev.1. Certified to CSA C22-2 No.24 Conforms to UL Standard 873 WIRIG GUIDE The ZSR101 is a versatile single relay control with two outputs for operating a 120 VAC with boiler enable, or two 120 VAC devices without boiler enable. Features include rear knock outs for

More information

Z-one Relay Multi-Zone Pump Control. ZSR10X series.

Z-one Relay Multi-Zone Pump Control. ZSR10X series. A10334 G2 Z-one Relay Multi-Zone Pump Control Copyright 2015 Caleffi www.caleffi.com ZSR10X series Function The ZSR series is a multi-zone and boiler operating control for multiple zone hydronic heating

More information

TAC Erie VL500. Application. Features. Zone Valve Control Center General Instructions

TAC Erie VL500. Application. Features. Zone Valve Control Center General Instructions TAC Erie VL500 Zone Valve Control Center General Instructions Application The VL500 zone control system provides control of up to five zone valves, a circulator and boiler control in a multi-zone hydronic

More information

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC Viega Zone Control Applications The Viega Zone Control is a wiring and switching center for individual and / or multi- room control. The Zone Control simplifies wiring between Thermostats and Powerheads.

More information

Erie WA300. Application. Features. Two Zone Hydro-Air Relay General Instructions

Erie WA300. Application. Features. Two Zone Hydro-Air Relay General Instructions Building Systems - Americas Invensys Energy Solutions 354 lifford Avenue (Zip 6) P.O. Box 940 Loves Park, IL 63-940 United States of America www.ies.invensys.com Erie A300 wo Hydro-Air elay eneral Instructions

More information

ARM SERIES Switching Relays With Priority

ARM SERIES Switching Relays With Priority Models ARM-2P ARM-3P ARM-4P ARM-6P AD-1 AD-4 ARM SERIES Switching Relays With Priority INSTALLATION, OPERATION & MAINTENANCE MANUAL ARM-2P ARM-4P AD-1 ARM-3P ARM-6P AD-4 Information and specifications

More information

Instruction manual. WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules

Instruction manual. WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules Instruction manual WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules This manual must only be used by a qualified heating installer/service technician.

More information

Outdoor Reset IQ Option Card, p/n

Outdoor Reset IQ Option Card, p/n Outdoor Reset IQ Option Card, p/n 102723-01 Instruction Sheet CONTENTS Application... 1 General... 2 How it Works... 3 Installation.... 5 Wiring... 7 User Interface... 10 Using IQ Option Panel Display...

More information

GRUNDFOS INSTRUCTIONS UPZCP-3, 4, 6. Multi-zone pump control. Installation and operating instructions

GRUNDFOS INSTRUCTIONS UPZCP-3, 4, 6. Multi-zone pump control. Installation and operating instructions GRUDFOS ISTRUTIOS UPZP-3, 4, 6 Multi-zone pump control Installation and operating instructions English (US) English (US) Installation and operating instructions Original installation and operating instructions.

More information

AR861-2II AR822-II AR861-3II. ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501

AR861-2II AR822-II AR861-3II. ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 AR822-II AR861-2II AR861-3II (Corporate Sales) 85 Middle Road Dunkirk, NY 14048 www.argoindustries.com An ISO 9001-2000 Certified Company P/N

More information

Outdoor Reset IQ Option Card, p/n

Outdoor Reset IQ Option Card, p/n Outdoor Reset IQ Option Card, p/n 102723-01 Instruction Sheet CONTENTS Application... 1 General... 2 How it Works... 3 Installation.... 5 Wiring... 7 User Interface... 10 Using IQ Option Panel Display...

More information

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 INSTALLATION, OPERATION & MAINTENANCE MANUAL ARH-1 ARH-2 ARH-3 ARGO 2201 Dwyer Avenue Utica, NY 13501 www.argocontrols.com An ISO 9001-2000 Certified Company

More information

HPS Controls Ltd. Series 100 LTV / CTV Zone Control Stations. Heating and Radiant Floor Zone Control Stations. Installation Instructions

HPS Controls Ltd. Series 100 LTV / CTV Zone Control Stations. Heating and Radiant Floor Zone Control Stations. Installation Instructions Series 100 LTV / CTV Zone Control Stations Heating and Radiant Floor Zone Control Stations Installation Instructions Thank you for purchasing the finest in heating and radiant floor Control Stations. We

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Keep these instructions with the boiler at all times. BOYERTOWN FURNACE CO. PO Box 100 BOYERTOWN, PA 19512 1-610-369-1450 www.boyertownfurnace.com 5-25-12 2 Danger Warning Caution

More information

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 INSTALLATION, OPERATION & MAINTENANCE MANUAL ARH-1 ARH-2 Manufactured by: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com

More information

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road Dunkirk, NY ARH-1 ARH-2 ARH-3

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road Dunkirk, NY ARH-1 ARH-2 ARH-3 ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road Dunkirk, NY 14048 www.argoindustries.com ARH-1 ARH-2 ARH-3 An ISO 9001-2000 Certified Company P/N 240005131,

More information

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS LCB-I-O Rev B MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS Models: KB 81-286, KBXL 400-801, WB 51-211, and WH 55-399 IMG00116 WARNING This manual must only be used by a qualified heating installer

More information

ARGO AR SERIES CONTROLS

ARGO AR SERIES CONTROLS ARGO AR SERIES CONROLS AR822-II, AR861-2II, AR861-3II INSALLAION, OPERAION & MAINENANCE MANUAL AR861-2II AR822-II AR861-3II Information and specifications outlined in this manual in effect at the time

More information

Installation & Operation Manual

Installation & Operation Manual tekmarnet 2 House Control 400 Installation & Operation Manual D 400 09/10 HVAC Systems Replaces: 01/10 Introduction The House Control 400 is designed to operate as part of a complete hydronic heating system

More information

HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations

HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations Series 600 LFI / CFI Series 700 HFS Zone Control Stations Heating and Radiant Floor Zone Control Stations Installation Instructions Thank you for purchasing the finest in heating and radiant floor Control

More information

Installation & Operation Manual

Installation & Operation Manual tekmarnet 2 House Control 402 Installation & Operation Manual D 402 09/10 HVAC Systems Replaces: 01/10 Introduction The House Control 402 is designed to operate as part of a complete hydronic heating system

More information

- Data Brochure Boiler Control 274

- Data Brochure Boiler Control 274 - Data Brochure Boiler Control 274 274_D 03/17 The Boiler Control 274 operates up to four on/off boilers to provide outdoor reset operation, domestic hot water and setpoint operation with priority. When

More information

Hydronic Mechanical Panels

Hydronic Mechanical Panels Hydronic Assemblies Inc. 56 Horse Hill Rd Concord NH 2015-2016 Hydronic Mechanical Panels Contact 4805 Main St. Waitsfield, Vermont 05673 Phone : 802-583-5500 WWW.Houseneeds.com Hydronic Assemblies Inc.

More information

AQ250 Series Hydronic Control Panels

AQ250 Series Hydronic Control Panels AQ50 Series Hydronic Control Panels PRODUCT DATA Need new photo of AQ50 PRODUCT DESCRIPTION The AQ50 easily converts a single-zone heating system into a room-by-room comfort control system, or upgrades

More information

- Data Brochure Universal Reset Module 422

- Data Brochure Universal Reset Module 422 - Data Brochure Universal Reset Module 422 D 422 08/07 1 Information Brochure Choose controls to match application Application Brochure Design your mechanical applications 2 3 Rough-in Wiring Rough-in

More information

Installation & Operation Manual

Installation & Operation Manual tekmarnet 2 House Control 400 Installation & Operation Manual D 400 09/13 HVAC Systems Replaces: 09/10 Introduction The tn2 House Control 400 is designed to operate all of the mechanical equipment in a

More information

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS LCB-I-O Rev D MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS Models: KB 81-286, KBXL 400-801, WB 51-211, FTX 400-850 and WH 55-399 WARNING This manual must only be used by a qualified heating installer

More information

- Data Brochure D 260. Boiler Control /09

- Data Brochure D 260. Boiler Control /09 - Data Brochure Boiler Control 260 D 260 03/09 The Boiler Control 260 is designed to control a single stage heat source in order to provide outdoor reset or Domestic Hot Water () operation. The control

More information

- Application A Boiler Control 262 & One Stage Setpoint Control 150. Mechanical Remote Display Module (D1) 040 MODE 1

- Application A Boiler Control 262 & One Stage Setpoint Control 150. Mechanical Remote Display Module (D1) 040 MODE 1 - Application Boiler Control & One Stage Setpoint Control 150 A -1 07/99 echanical Remote Display odule () 040 Outdoor Sensor () 070 150 ODE 1 Class II Transformer 120 V (ac) 24 V (ac) R1 A2 Z1 Z2 Z3 T1

More information

Installation & Operation Manual

Installation & Operation Manual tekmarnet 2 House Control 403 Installation & Operation Manual D 403 07/11 HVAC Systems Replaces: 09/10 Introduction The House Control 403 is designed to operate as part of a complete hydronic heating system

More information

Boiler Demand Mix 1 Demand Mix 2 Demand DHW Demand Setpoint Demand

Boiler Demand Mix 1 Demand Mix 2 Demand DHW Demand Setpoint Demand Date Code - Data Brochure Universal Reset Control 374 D 374 10/03 The tekmar Universal Reset Control 374 is designed to maximize the comfort and effi ciency provided by a hydronic heating system. The control

More information

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control.

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control. Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA 02717 The first totally integrated multiple boiler management control. USING THIS MANUAL USING THIS MANUAL A. INSTALLATION SEQUENCE Follow

More information

WWSD. Power. DHW Demand. Maximum. Supply. Minimum Boiler DHW. Zone 1 / Cooling. Pump / Vlv. System Pump. UnOccupied. of full output NRTL/C LR 58223

WWSD. Power. DHW Demand. Maximum. Supply. Minimum Boiler DHW. Zone 1 / Cooling. Pump / Vlv. System Pump. UnOccupied. of full output NRTL/C LR 58223 Dial the desired duration of the period. Press start button at the time of day you want the UnOcc. period to begin. light turns on. 0 = always = always Pump / Vlv System Pump Zone / Cooling NRTL/C LR 58

More information

Instruction Sheet. Press & Hold: Item, to view settings, to test. 24 V ±10% 50/60 Hz 3 VA 120 V (ac) 5 A 1/6 hp pilot 240 VA 20 to 260 V (ac) 2 VA

Instruction Sheet. Press & Hold: Item, to view settings, to test. 24 V ±10% 50/60 Hz 3 VA 120 V (ac) 5 A 1/6 hp pilot 240 VA 20 to 260 V (ac) 2 VA Instruction Sheet PC2 1 Two Stage Reset & Control SUPERSEDES : 102-106, dated June 1, 2000 EFFECTIVE: March 1, 2004 Plant ID# 9300-1059 Item 102-106 The PC2-1 is a microprocessor-based control designed

More information

Dual Mixing Application

Dual Mixing Application HBX MIXING APPICATION The CPU-000 configured as a Mixing Control allows for mixing of hitemp boiler (supply) water with lower temp system water, bringing several benefits to a hydronic design and installation.

More information

Product Instructions. Hydronic Mixing Block Version Wiring Terminal Block Pressure/Temperature Sensor Delivery Fitting (3) Display Screen

Product Instructions. Hydronic Mixing Block Version Wiring Terminal Block Pressure/Temperature Sensor Delivery Fitting (3) Display Screen Hydronic Mixing Block Version 1.104 The Hydronic Mixing Block is a mixing device and boiler control, with a built in circulator and system controller. The block can provide either a fixed or reset water

More information

Schneider Electric Erie T155 Series

Schneider Electric Erie T155 Series Schneider Electric Erie T Series Non-Digital, On/Off Thermostat General Instructions Application The T series thermostat provides on/off control for low voltage and line voltage valves, relays and fan

More information

- Data Brochure Mixing Control 361

- Data Brochure Mixing Control 361 TIME PRGM 1 2 AMPM UN OVR S M T W T F S - Data Brochure Mixing Control 361 D 361 05/00 The Mixing Control 361 is designed to control the supply water temperature to a hydronic system in order to provide

More information

MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL

MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL 5CIM2-0413 W30-AC0056 MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL Multi-zone Hydronic Chiller Interface Module SECTION 1: INTRODUCTION Unit description... 5 Location... 5 Handling... 5

More information

TMC. Installation and Operation Manual TMC. Temperature and Pressure Monitoring for Heating and Cooling Applications. Temperature Monitoring Control

TMC. Installation and Operation Manual TMC. Temperature and Pressure Monitoring for Heating and Cooling Applications. Temperature Monitoring Control Installation and Operation Manual Temperature and Pressure Monitoring for Heating and Cooling Applications Temperature Monitoring Control VALVE OPEN ALARM System= 128 o F Alarm At= 130 o F RESET /BACK

More information

AQ252 Universal Injection/Mixing Boiler Reset Control Panels

AQ252 Universal Injection/Mixing Boiler Reset Control Panels AQ252 Universal Injection/Mixing Boiler Reset Control Panels FEATURES PRODUCT DATA PRODUCT DESCRIPTION The AQ252 family of AQUATROL Universal Injection/Mixing Boiler Reset Controls provides simplified,

More information

- Data Brochure Universal Reset Module 423

- Data Brochure Universal Reset Module 423 - Data Brochure Universal Reset Module 423 D 423 08/07 1 Information Brochure Choose controls to match application Application Brochure Design your mechanical applications 2 3 Rough-in Wiring Rough-in

More information

HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations

HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations Series 600 LFI / CFI Series 700 HFS Zone Control Stations Heating and Radiant Floor Zone Control Stations Installation Instructions Thank you for purchasing the finest in heating and radiant floor Control

More information

Instruction Sheet. Variable Speed - Outdoor Reset (00-VR) 00 Cartridge Circulator

Instruction Sheet. Variable Speed - Outdoor Reset (00-VR) 00 Cartridge Circulator Instruction Sheet Variable Speed - Outdoor Reset (00-VR) 00 Cartridge Circulator The Variable Speed - Outdoor Reset 00 Cartridge Circulator (00-VR) is a microprocessor-based pump designed to regulate the

More information

PLL. Pump-Lead-Lag. Provides Pump Rotation, Auxiliary Pump Activation, and Pump Failure Alarm Control. Installation and Operation Manual

PLL. Pump-Lead-Lag. Provides Pump Rotation, Auxiliary Pump Activation, and Pump Failure Alarm Control. Installation and Operation Manual Installation and Operation Manual Provides Pump Rotation, Auxiliary Pump Activation, and Pump Failure Alarm Control Pump-Lead-Lag Warning This Heat-Timer control is strictly an operating control; it should

More information

BB3000 Series. Application. Features. Injection Pump Control General Instructions

BB3000 Series. Application. Features. Injection Pump Control General Instructions BB3000 Series Injection Pump Control General Instructions Application The TAC Erie BB3000 Injection Pump Control with outdoor reset provides accurate control of the water temperature in the secondary (radiant)

More information

- Data Brochure Universal Reset Control 364

- Data Brochure Universal Reset Control 364 70 7 8 9 - Data Brochure Universal Reset Control 364 D 364 07/01 The Universal Reset Control 364 is designed to maximize the comfort and efficiency provided by a hydronic heating system. The control automatically

More information

Better Design, Better Control, Better Systems.

Better Design, Better Control, Better Systems. Product Catalog Better Design, Better Control, Better Systems. At tekmar Control Systems, we believe the indoor comfort of a building depends on the performance of its heating, ventilating & air conditioning

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3250-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Operating Voltage PATENT. 8,931,708; 8,844,834; 7,891,572; others pending INSTALLATION INSTRUCTIONS and OPERATING

More information

- Data Brochure Mixing Control 360

- Data Brochure Mixing Control 360 - Data Brochure Mixing Control 360 D 360 03/09 The Mixing Control 360 is designed to control the supply water temperature to a hydronic system in order to provide outdoor reset or setpoint operation. The

More information

The Universal Reset Control 363 is a microprocessor based control designed to maximize the comfort and efficiency provided by a hydronic

The Universal Reset Control 363 is a microprocessor based control designed to maximize the comfort and efficiency provided by a hydronic R Vie Menu % % 1 2 Item F! WWS Vie Menu % % 1 2 Item F! WWS 70 LR 58233 E150539 Universal Reset Control 363 - Data Brochure D 363 12/08 The Universal Reset Control 363 is a microprocessor based control

More information

BGH Series Hot Surface Ignition Control

BGH Series Hot Surface Ignition Control Installation Instructions BGH Series Issue Date April 14, 2011 BGH Series Hot Surface Ignition Control Application The BASO Gas Products BGH Series Hot Surface Ignition (HSI) control is microprocessor

More information

Variable Speed Outdoor Reset 00 Circulator (00-VR)

Variable Speed Outdoor Reset 00 Circulator (00-VR) Taco Radiant ade Easy Application Guide Variable Speed Reset 00 Circulator () EFFECTIVE: arch, 2004 Products & Applications PA03 SUPERSEDES: New OVERVIEW Variable Speed Reset 00 Circulator () The is a

More information

MODEL EM-10 ELECTRIC BOILER CONTROL OPERATION AND INSTRUCTION MANUAL

MODEL EM-10 ELECTRIC BOILER CONTROL OPERATION AND INSTRUCTION MANUAL MODEL EM-10 ELECTRIC BOILER CONTROL OPERATION AND INSTRUCTION MANUAL The EM-10 Boiler Temperature Control (BTC) is an efficient boiler operator with a digital LCD display with backlight, a boiler pump

More information

"Best Practices in Modern Hydronic Heating - THE DETAILS

Best Practices in Modern Hydronic Heating - THE DETAILS "Best Practices in Modern Hydronic Heating - THE DETAILS 190 supply water temperature (ºF) 170 150 130 110 90 fin-tube convector (RR=1.38) panel radiator (RR=1.0) thin slab rad. floor (RR=0.69) slab r

More information

prestige Control Application Supplement - TriMax

prestige Control Application Supplement - TriMax prestige Control Application Supplement - TriMax L I S T E D WARNING This document is intended to be used by a factory trained and qualified heating contractor or service technician only. Read all instructions

More information

TRUERH Series HE-67xx Humidity Element with Temperature Sensor

TRUERH Series HE-67xx Humidity Element with Temperature Sensor Installation Instructions HE-67xx Issue Date 0501 TRUERH Series HE-67xx Humidity Element with Temperature Sensor Installation IMPORTANT: The HE-67xx Series Humidity Element with Temperature Sensor is designed

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3200-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Input / 24 VAC Burner Circuit PATENT. 7,891,572 INSTALLATION INSTRUCTIONS and OPERATING MANUAL Saves Fuel Features

More information

- Application Boiler Control 260

- Application Boiler Control 260 - Application Control A -1 03/09 echanical Outdoor Sensor (S2) 070 120 V (ac) 24 V (ac) T3 T2 T1 Sensor (S1) 082 Electrical = Pump S1 = Sensor 082 S2 = Outdoor Sensor 070 T1,..., T3 = Thermostats U1 =

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3150 Combination Low Water Cut-Off & Universal Temperature Limit Control for Oil-Fired Boilers 120 VAC Operating Voltage PATENT S. 7,891,572; 8,931,708 INSTALLATION INSTRUCTIONS and OPERATING MANUAL

More information

Installation & Operation Manual

Installation & Operation Manual tekmarnet 2 House Control 406 Installation & Operation Manual 406_D 11/12 Alternative Energy Replaces: 12/11 Introduction The tn2 House Control 406 is designed to operate the equipment in a 2-pipe, single

More information

DHW / Setpoint Demand WWSD Modulation Boiler Output (x10,000 BTU/hr) External Input Signal Offset / Priority Override

DHW / Setpoint Demand WWSD Modulation Boiler Output (x10,000 BTU/hr) External Input Signal Offset / Priority Override Date Code - Data rochure oiler Control 265 D 265 10/03 The tekmar oiler Control 265 can control the supply water temperature on up to three modulating boilers based on outdoor temperature or setpoint requirements.

More information

- Data Brochure Boiler Control 264e

- Data Brochure Boiler Control 264e - Data Brochure Boiler Control 264e D 264e 09/09 The kanmor Boiler Control 264e can control the supply water temperature from up to 4 on / off stages based on outdoor temperature, control for Domestic

More information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-226(A) Series 69 Low Water Cut-Offs For Steam Boilers

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-226(A) Series 69 Low Water Cut-Offs For Steam Boilers Series Low Water Cut-Offs F Steam Boilers Applications: F residential and commercial boilers of any steaming capacity. McDonnell & Miller Installation & Maintenance Instructions MM-6(A) Series WARIG CAUTIO!

More information

Caleffi Hydronic Solutions Contact: Rex Gillespie, Director of Marketing Phone: (414)

Caleffi Hydronic Solutions Contact: Rex Gillespie, Director of Marketing Phone: (414) Caleffi North America, Inc. 3883 W. Milwaukee Road Milwaukee, WI 53208 T: 414.238.2360 F: 414.238.2366 LITERATURE RELEASE Caleffi Hydronic Solutions June 10, 2010 Contact: Rex Gillespie, Director of Marketing

More information

Hydronic & HVAC Control Systems

Hydronic & HVAC Control Systems tekmar 218 Full Line Catalog Hydronic & HVAC Control Systems HVAC Multi-Staging Alternative Energy Zoning Snow Melting Setpoint tekmarcontrols.com tekmarcontrols.com Better Design, Better Control, Better

More information

Product Number L4006A1017 L4006A1132 L4006A1967 L4006A2007 L4006B1007 L4006B1155 L4006B1163 3/4 (19) L4006H1004

Product Number L4006A1017 L4006A1132 L4006A1967 L4006A2007 L4006B1007 L4006B1155 L4006B1163 3/4 (19) L4006H1004 L4006; L6006 Aquastat Controller Aquastat Controllers are immersion type devices for limiting or regulating the temperature of liquids in boilers, storage tanks, and other applications where temperature

More information

TWZ/CT/ODV Series. Oil-Fired Hot Water Boilers (Less Tankless Heater) These instructions must be affixed on or adjacent to the boiler

TWZ/CT/ODV Series. Oil-Fired Hot Water Boilers (Less Tankless Heater) These instructions must be affixed on or adjacent to the boiler D E S I G N E D T O L E A D TWZ/CT/ODV Series Oil-Fired Hot Water Boilers (Less Tankless Heater) Installation Supplement for boilers equipped with honeywell L7248L 2012 Compliant boiler control These instructions

More information

Climate Cŏntrol Multifunction Hydronic Control Installation and Operation Manual. Uponor Radiant Heating and Cooling Systems

Climate Cŏntrol Multifunction Hydronic Control Installation and Operation Manual. Uponor Radiant Heating and Cooling Systems Uponor Radiant Heating and Cooling Systems CLIMATE CŎ NTROl M u l t i f u n c t i o n Hydronic Control INSTALLATION AND OPERATION MANUAL Climate Cŏntrol Multifunction Hydronic Control Installation and

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3200-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Input / 24 VAC Burner Circuit PATENT. 8,931,708; 8,844,834; 7,891,572; others pending INSTALLATION INSTRUCTIONS

More information

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS Z-4C / Z-6C ZE VLVE CLS SLL L D EG SCS G (echnical Support) 2201 Dwyer venue tica, Y 13501 (Corporate Sales) 85 iddle oad Dunkirk, Y 14048 www.argocontrols.com n S 9001-2000 Certified Company / 240005386,

More information

LFL Series Burner Flame Safeguard Control

LFL Series Burner Flame Safeguard Control LFL Series Burner Flame Safeguard Control Technical Instructions Document No. 74US LFL Rev. 2 November, 2004 The LFL is a compact electro-mechanical primary flame safeguard control designed to provide

More information

Tankless On Demand Electric Water Heater

Tankless On Demand Electric Water Heater ECO FRIENDLY 98% EFFICIENT ENERGY & WATER SAVING Model MTX Tankless On Demand Electric Water Heater Available Up To 54 KW in Single or Three Phase Voltages Marine Approvals American Bureau of Shipping

More information

Circulators high efficiency ECM Circulators

Circulators high efficiency ECM Circulators Circulators high efficiency ECM Circulators Circulators high efficiency ECM Circulators Small ECM circulators now available in North America Grundfos Alpha: Provides constant and proportional differential

More information

AQ475A Aquatrol Outdoor Temperature Compensator for Boilers

AQ475A Aquatrol Outdoor Temperature Compensator for Boilers A Aquatrol Temperature Compensator for s Features PRODUCT DATA Adjustable settings for boiler maximum temperature, boiler minimum temperature and outdoor low (design) temperature. Selectable Warm Weather

More information

Hydraulic Separation Moving Beyond Priamry / Secondary Piping...

Hydraulic Separation Moving Beyond Priamry / Secondary Piping... Hydraulic Separation Moving Beyond Priamry / Secondary Piping... load! #1 load! #2 load! #3 primary! circulator presented by: John Siegenthaler, P.E. Appropriate Designs Holland Patent, NY www.hydronicpros.com

More information

Control Application. Supplement - ACVMax

Control Application. Supplement - ACVMax prestige Control Application Supplement - ACVMax L I S T E D WARNING This document is intended to be used by a factory trained and qualified heating contractor or service technician only. Read all instructions

More information

CommStat 6. Controller for Redundant HVAC Systems PRODUCT DATA SHEET

CommStat 6. Controller for Redundant HVAC Systems PRODUCT DATA SHEET CommStat 6 Controller for Redundant HVAC Systems PRODUCT DATA SHEET General Description The CommStat 6 HVAC controller is designed for controlling up to six redundant air conditioners in an E-House or

More information

UFH Wiring Centre. Installation and Maintenance Instructions. Reliance Water Controls Ltd Worcester Road, Evesham, Worcester, WR11 4RA, UK

UFH Wiring Centre. Installation and Maintenance Instructions. Reliance Water Controls Ltd Worcester Road, Evesham, Worcester, WR11 4RA, UK Installation and Maintenance Instructions Reliance Water Controls td Worcester Road, Evesham, Worcester, WR 4RA, UK UFH Wiring Centre Tel: +44 (0)386 7 400 Fax: +44 (0)895 7 40 www.rwc.co.uk Reliance Water

More information

TC-5231 Series, TC-5232, & TC-5241 Series

TC-5231 Series, TC-5232, & TC-5241 Series TC-5231 Series, TC-5232, & TC-5241 Series Low Temperature Thermostats General Instructions Application The TC-5231, TC-5232, and TC-5241 low temperature thermostats are used to control temperature in air

More information

- Data Brochure Boiler Control 268

- Data Brochure Boiler Control 268 - Data Brochure Boiler Control 268 D 268 11/10 The tekmar Boiler Control 268 can control the supply water temperature from up to 9 on / off stages based on outdoor temperature, control for Domestic Hot

More information

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual We manage heat MANUAL Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual 1850 N Sheridan Street South Bend, Indiana 46628 (574) 233-1202 or (800) 234-4239

More information

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS AMB4/AMB8 MULTIPLE BOILER SEQUENCERS INSTALLATION MANUAL AND OPERATING INSTRUCTIONS ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road An ISO 9001-2000 Certified

More information

Electro-HELPS XV ELECTRO-BOILER SPECIFICATIONS. A complete product line to fi t all your application needs. Made in USA

Electro-HELPS XV ELECTRO-BOILER SPECIFICATIONS. A complete product line to fi t all your application needs. Made in USA Electro-HELPS XV Made in USA ELECTRO-BOILER SPECIFICATIONS A complete product line to fi t all your application needs The Electro-Boiler has been heating America s homes and businesses since 980. We take

More information

MR3CCUHV Temperature/Defrost Control

MR3CCUHV Temperature/Defrost Control Master Catalog 125 Temperature Controls Section A Product/Technical Bulletin Issue Date 0401 MR3CCUHV Temperature/Defrost Control The MR3CCUHV Temperature/Defrost Control is designed to control the temperature

More information

B-40/B-41 Modulating Temperature Controller

B-40/B-41 Modulating Temperature Controller INSTALLATION & OPERATING INSTRUCTIONS B-40/B-41 Modulating Temperature Controller For Raytherm Boilers & Water Heaters H2 514-4001 WH2 2100-4001 Catalog No. 5000.70 Effective: 12-21-11 Replaces: NEW P/N

More information

Instruction Sheet 00 Variable Speed Delta T (00-VDT)

Instruction Sheet 00 Variable Speed Delta T (00-VDT) Instruction Sheet 00 Variable Speed Delta T (00-VDT) 102-359 SUPERSEDES: January 1, 2010 EFFECTIVE: May 1, 2010 Plant ID# 001-3927 The Variable Speed Delta T 00 Cartridge Circulator (00-VDT) is a microprocessor-based

More information

BHSAPPMAN 08/00 USA. Applications Manual. Ecomatic / Logamatic Controls. Save These Instructions!

BHSAPPMAN 08/00 USA. Applications Manual. Ecomatic / Logamatic Controls. Save These Instructions! BHSAPPMAN 08/00 USA Applications Manual Ecomatic / Logamatic Controls Save These Instructions! TABLE OF CONTENTS 1 2 3 4 5 6 7 8 Introduction 1 Terms 2-4 Description of Wiring Terminals 5-7 Application

More information

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual MANUAL Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual Model FPT 130 Single Point Freeze Protection Heat Trace Control Table of Contents SCFP-CO-F130 Overview... 3 Installation...

More information

prestige Control Application Supplement - TriMax

prestige Control Application Supplement - TriMax prestige Control Application Supplement - TriMax L I S T E D WARNING This document is intended to be used by a factory trained and qualified heating contractor or service technician only. Read all instructions

More information

Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER

Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER This manual has been prepared for use with the appropriate Installation, Operation and Maintenance Manual. For use with CCB/CHB Boilers ONLY. Manufactured

More information

Table of Contents. Installation, Operation, and Maintenance Manual ELBPxx

Table of Contents. Installation, Operation, and Maintenance Manual ELBPxx Series ELBP8/ELBP30 FUSE C 4Vac R NC NO 0 min 5 Delay Off Actuator GROUND NEUTRAL LIVE Reset R CAUTION 5 VOLTS ONLY 3 4 5 6 7 8 8 Zone Wired Module 4038 Dry Contacts Pump Boiler ELBP50 GROUND NEUTRAL Reset

More information

Greentrol Automation, Inc.

Greentrol Automation, Inc. Model GA-100 Technical Manual GreenAlert 100 Series Greentrol Automation, Inc. Installation, Operation and Maintenance Technical Manual GA-100 Document Name: TM_GA-100_R1C TM_GA-100_R1C Part Number: 960--0000

More information

SC-9 Controller INSTALLATION AND OPERATING INSTRUCTIONS. SC-9 Applications CONTENTS

SC-9 Controller INSTALLATION AND OPERATING INSTRUCTIONS. SC-9 Applications CONTENTS SC-9 Controller MODULAR BOILER CONTROLLER SERIES INSTALLATION AND OPERATING INSTRUCTIONS SC-9 Applications Space heat systems with outdoor reset Constant temperature setpoint control Any of these in combination

More information

Energy Manager INSTALLATION INSTRUCTIONS. Keep these instructions with the boiler at all times for future reference

Energy Manager INSTALLATION INSTRUCTIONS. Keep these instructions with the boiler at all times for future reference INSTALLATION INSTRUCTIONS Energy Manager Keep these instructions with the boiler at all times for future reference BOYERTOWN FURNACE CO. PO Box 100 BOYERTOWN, PA 19512 1-610-369-1450 www.boyertownfurnace.com

More information

Interrupted Ignition Series Oil Primary Control

Interrupted Ignition Series Oil Primary Control Interrupted Ignition Series Oil Primary Control Application Guide & Installation Instruction for ICM1511*, ICM1512*, ICM151*, ICM1514* For more information on our complete range of American-made products

More information

ECO1ZN3P, ECO2ZN4P ECO

ECO1ZN3P, ECO2ZN4P ECO WARNING HOT This product may have hot fluid circulating through it. DO NOT TOUCH! SOME UNION NUTS MAY BECOME LOOSE AND CONSEQUENTLY LEAK THROUGH TRANSPORTATION VIBRATION AND HANDLING. DO NOT OVERTIGHTEN

More information

ARGO DPM-2 OUTDOOR TEMPERATURE SETBACK CONTROL

ARGO DPM-2 OUTDOOR TEMPERATURE SETBACK CONTROL ARGO OUTDOOR TEMPERATURE SETBACK CONTROL INSTALLATION, OPERATION & MAINTENANCE MANUAL Information and specifications outlined in this manual in effect at the time of printing of this manual. ECR International,

More information

CAH SERIES INSTALLATION & MAINTENANCE MODELS CAH CAH

CAH SERIES INSTALLATION & MAINTENANCE MODELS CAH CAH CAH SERIES INSTALLATION & MAINTENANCE MODELS CAH 33-44-50 CAH 49-54-70 CAH VARIABLE SPEED AIR HANDLERS DIMENSIONS... 3 TECHNICAL SPECS... 4 INSTALLATION DON TS... 5 INSTALLATION DO S... 6 FREEZE STAT REQUIRED

More information

evohome Sundial pack Thermostat

evohome Sundial pack Thermostat evohome Sundial pack Thermostat Installation Overview Honeywell is providing two pre-configured packs: Sundial pack and evotouch Thermostat. evohome Sundial pack This pack is suitable for S plan and Y

More information