Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Size: px
Start display at page:

Download "Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc."

Transcription

1 M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

2 Overview Measurement & Verification (M&V) Plan for New Construction M&V - Design Specifications M&V - Construction and CX Requirements M&V - Case Study

3 Why M&V? Many LEED buildings are not achieving anticipated energy savings Source: New Buildings Institute and U.S. Green Building Council

4 EA Credit 5 for New Construction IPMVP Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003 Option D: Calibrated Simulation (Energy Estimation Method) Suitable for building with large number of ECMs or interacting systems Option B: Energy Conservation Measure Isolation Small and simple projects ECMs have insignificant or no interaction

5 EA Credit 5 for New Construction M&V Plan minimum requirements Table or listing of the project s energy end use Method used to model the baseline energy consumption Model calibration method and party responsible Baseline conditions Data collection method/frequency Corrective action strategies if data deviates M&V must cover a minimum of one year post-occupancy

6 M&V Team Who should write the Plan? M&V Agent Develop M&V Plan Design, submittal and installation reviews Cx the M&V system Assemble M&V data set(s) Troubleshoot M&V report Owner training Energy Engineer/Modeler Create energy model Calibrate models to sub-meter & weather data Owner Ensure M&V data continues to be collected Continuous education Utilization of data

7 M&V Plan Getting Started The M&V Approach document M&V Workshop What information is needed to write the plan? Modeled energy cost by end-use List of Energy Conservation Measures Estimate of M&V implementation costs

8 Energy End-Use Cost Table ENERGY COST TOTAL COST OF ENERGY BY END-USE Equipment Lighting Water Heating Heating Cooling Fans Pumps Total Jan $1,024 $683 $23 $628 $2 $376 $37 $2,772 Feb $995 $621 $22 $560 $2 $355 $31 $2,587 Mar $1,051 $612 $26 $475 $6 $344 $33 $2,546 Apr $1,069 $498 $26 $245 $93 $363 $26 $2,320 May $1,051 $465 $24 $133 $261 $317 $28 $2,279 Jun $1,125 $506 $25 $91 $360 $369 $28 $2,501 Jul $1,129 $507 $25 $42 $461 $411 $31 $2,604 Aug $1,116 $515 $23 $54 $458 $420 $30 $2,614 Sep $1,111 $522 $21 $106 $377 $443 $28 $2,608 Oct $1,060 $505 $21 $219 $112 $458 $28 $2,402 Nov $1,000 $502 $19 $340 $67 $459 $27 $2,413 Dec $1,060 $715 $23 $578 $3 $371 $30 $2,780 Annual $12,789 $6,651 $278 $3,470 $2,203 $4,687 $356 $30,433 % of Annual 42% 22% 1% 11% 7% 15% 1% -

9 Assessing Performance Risk The cost of an M&V program must be balanced against the added energy cost of a poorly performing building High Risk High % of annual energy costs Daylight Dimming Control CO 2 Ventilation Control VAV Air Handlers Condensing Boilers Under Floor Air Distribution Solar Thermal Systems Economizer Free Cooling Low Risk Low % of annual energy costs Exhaust Fans Heat Recovery Ventilators Single-Zone RTUs Non-Condensing Boilers Elevators Photovoltaic Systems Service Water Heating

10 M&V Plan Getting Started Encourage load segregation on electric panels. Does specified equipment have energy monitoring options?

11 M&V Plan Getting Started Minimize the number of sub-meters. Source: EnergySM

12 M&V Plan Getting Started Using your Building Automation System (BAS) for M&V Snow-melt System Example:

13 M&V Plan Getting Started Using your Building Automation System (BAS) for M&V VAV Electric Reheat Example:

14 M&V Plan - Data Point Matrix Equipment Point Description Source Type Typical Unit Type(s) BAS I / O Notes: BAS Calculation Elec Bldg Electrical Energy Electric Meter kw/kwh AI Sub-meter or main breaker provides both kw and kwh to BAS for entire building. Record at minimum 5 min intervals. - Gas Bldg Gas Energy Utility Bill therms Manual Owner to input into BAS at GUI. TC to Input provide input fields (Dates and therms) - Boilers Building Heating Energy Gas Submeters intervals BAS records therms at minimum 5 minute therms AI BAS Outdoor Air Temp Temp Sensor(s) F AI Provide for each OAT sensor. If multiple devices, provide average of sensor values. RTU-1 Return Air CO2 CO2 sensor ppm AI - - RTU-1 Return Air Temp Temp Sensor F AI - - RTU-1 Exhaust Fan Energy VFD Output or Current xfmr kw / kwh AI BAS records kw at 5 min intervals. kwh calculated as average of hourly kw readings. RTU-1 Exhaust Fan Speed Setpt BAS Command % or Hz AO - - RTU-1 OA Damper Position BAS Command % AO - - RTU-1 OA Airflow AFMS CFM AI - - RTU-1 Mixed Air Temp Temp Sensor F AI - - RTU-1 Supply Fan Energy VFD Output or Current xfmrs kw / kwh AI BAS records kw at 5 min intervals. kwh calculated as average of hourly kw readings. RTU-1 Supply Fan Speed Setpt BAS Command % or Hz AO - - RTU-1 Heating Valve Position BAS Command % AO - RTU-1 Discharge Air Temp Temp Sensor F AI - - RTU-1 Discharge Air Setpt BAS Command F AO - -

15 M&V Plan M&V Operator Interface To facilitate ongoing energy management, include pre-programmed energy summary graphics.

16 M&V - Design Specifications Pre-Plan Effort Ensure that M&V is covered in your contract! Determine the E.T.A of the official M&V Plan. Deliverables Prior to the M&V Plan? Ensure that these deliverables (Planning Scope, SD Narratives, Pricing Documents, etc ) include an initial, if only ball-park, estimate of the M&V design requirements. Attempt to be clairvoyant about what will be in the M&V Plan cover this information.

17 M&V - Design Specifications Plan Creation Effort It is ok for the Design team to Review and Comment on the written M&V Plan. It isn t written in stone. Keep the following in mind when reviewing: What data are we trying to measure? What are the various ways that we can obtain this or similar data? What is the best way to obtain this information? Buying more meters isn t always the best solution. Weigh: dollars, accuracy, % of the energy pie, etc Don t spend $$$$ tracking down the energy use of a small domestic hot water system will this effort pay back?

18 M&V - Design Specifications Post-Plan Effort, i.e. implementing the plan direction. The M&V Plan should outline what is required for: Drawings & Specifications Critical Control Interface Requirements Big Picture, the M&V Plan can be broken down into energy utilities This allows for distribution among the design team who is covering what systems These energy utilities can be further broken down into system uses

19 M&V - Design Specifications Starting Simple moving towards the more complicated Water Domestic Water Use Process Use (cooling towers, etc ) Irrigation Gas (or Propane) Gas Heating Domestic Hot Water Process (kitchen, autoclaves, etc ) Electric Power Lighting Plug loads Major Mechanical

20 M&V - Design Specifications Water: Domestic Water Use Only: Normally this information can be obtained from utilities. If that is all you have you are done. Process Use, example Cooling Tower The cooling tower use can be measured by providing a sub-meter on the cooling tower feed. This amount can be tracked via the BAS. This amount can be taken from the utility total thus giving an indication of the normal domestic water use.

21 M&V - Design Specifications Gas (or Propane): Gas has a low performance risk Propane on the other hand has a HIGH Performance Risk Heating use Only: Furnaces or Heating Boilers Normally this information can be obtained from utilities. No short term requirements, just monthly therm use If that is all you have you are done. One might consider providing a meter on this system if there are numerous gas uses.

22 M&V - Design Specifications Gas (or Propane) - Continued: Complicated Gas Heating Systems, Example Central Boiler Plant: Serving terminal heating, outside air heating, snowmelt, domestic hot water generator, etc These individual uses can be measured using BTU Meters on the hydronic side. The total of the BTU Meters should be equivalent to the gas utility measurements

23 M&V - Design Specifications Gas (or Propane) - Continued: What does that look like?

24 M&V - Design Specifications Gas (or Propane) - Continued: What does that look like?

25 M&V - Design Specifications Gas (or Propane) - Continued: What does that look like?

26 M&V - Design Specifications Gas (or Propane) - Continued: What does that look like?

27 M&V - Design Specifications Gas (or Propane) - Continued: Domestic Hot Water Gas Fired: Small use is a low performance risk Little to gain by monitoring $100 to $500/yr of water heating Larger Domestic Hot Water Systems, Example: Commercial Kitchen or Laundry Provide a gas meter at the water heater(s) This amount can be tracked via the BAS. This amount can be taken from the utility total thus giving an indication of the normal domestic water use.

28 M&V - Design Specifications Electric Power 3 Major Categories Lighting

29 M&V - Design Specifications Electric Power 3 Major Categories Plug loads

30 M&V - Design Specifications Electric Power 3 Major Categories Major mechanical

31 M&V - Design Specifications Electric Power Continued: Perfect World Basic Approach: Even more Perfect World we would monitor energy use at every circuit in the building!

32 M&V - Design Specifications Electric Power Continued: We live in a Non-Perfect World and need to think outside the box. What are some other approaches? For Plug there isn t a lot other than a meter OR subtraction: For Lighting we can Monitor run-time for fixed output lamps. Interface via the BAS to the lighting control system and pull usage.

33 M&V - Design Specifications Electric Power Continued: For Major Mechanical we can Pull kw usage directly from major components, i.e. Chillers Pull kw usage directly from VFDs NOTE: You must ensure this kw point is actually pulled to the BAS and is available from the VFD. Pull Amps using a current transducer, convert to kw Pull run time using a current switch for fixed output devices. Flow and temperature change calculations also work. However you must specify the components and specify what needs to be pulled by the BAS.

34 M&V - Design Specifications Electric Power Continued: Difficult Mechanical Components To Look Out For Fan Powered VAV Boxes Split Systems CRAC Units Terminal Heaters Electric OR Hydronic Exhaust Fans Etc.Pretty much any item that is distributed out in the building. Asses the Performance Risk of these difficult components Implement different approaches accordingly

35 M&V - Design Specifications We have determined how to get information NOW we must collect, store, access and interpret All of this requires controls A few things to keep in mind The controls contractor cannot read your mind! You must tell them what you want, for instance: Grab a particular piece of data Record that piece of data at this interval Store that piece of data for this long. Make the following computations with that data Report the results of these computations and data streams You must tell them what to do to meet the M&V plan requirements.

36 M&V - Design Specifications Control Point Matrix Example Point Water Heater Gas Meter Collected Data Calculated Data Trend Interval Storage Timeframe Reporting CFH Therms Hourly 24 Months Daily Use, 3 Month Interval

37 M&V - Construction and CX Requirements Design Team Role Submittal Phase Verify that the design specifications for M&V are covered by the various contractors: mechanical, electrical, controls, etc Pay close attention to special requirements on individual pieces of equipment, examples: Does the chiller have an electrical meter submitted with it? Is this meter being picked up by the controls contractor? Did you specify any special requirements with the VFDs? Are these picked up by the controls contractor? Design Team Role Construction Observation Verify that the design specification for the M&V are being installed. Again pay close attention to special details, example: Are water meters being installed for cooling tower feed or direct/indirect AHUs?

38 Construction Cx of M&V M&V Agent Role Submittal Phase Confirm all measuring devices submitted Submitted equipment meets the M&V Plan Intent M&V Agent Role Construction Phase Commission devices Verify trends and interval rates Confirm data archiving and backup M&V Agent Role Occupancy Phase Reconfirm data collection Data Analysis

39 Case Study Supermarket in Maine Energy conservation Measures: Refrigeration Heat Recovery Dual-Path Dehumidification Tubular Daylight Devices & Daylight Dimming Controls Low-Heat Refrigerated Case Doors Floating-Head Condenser Control Glass-Door Medium Temperature Cases

40 Case Study Supermarket in Maine kwh is 95% of energy costs Focus on Daylighting & Dual Path HVAC Trended HVAC, lighting, and refrigeration data August 2011 Sub- Meter kwh % of Total kwh Sub-Meter Data Source House Electric Meter 310, % Meter Bldg Gas Meter 7,830 Meter Water Meter 1,628 Meter Sales Area Lighting 0% Circuit-1 32,509 10% Meter Circuit-2 10,482 3% Meter Exterior Lights 3,007 1% Meter Warehouse Lighting 10,439 3% Fixture kw & Run Time Other Space Lighting 15,714 5% Fixture kw & Run Time Sales AHUs & CUs DPAH-1 8,327 3% Meter DPAH-2 14,985 5% Meter DPAH-CU-1 29,091 9% Meter DPAH-CU-2 22,157 7% Meter Other HVAC Systems 6,849 2% Fan & CU run times Misc Process Loads 24,000 8% Assumed Refrigerated Cases 57,110 18% Meter Compressor Rack-1 17,931 6% Meter Compressor Rack-2 8,797 3% Meter Compressor Rack-3 17,454 6% Meter Compressor Rack-4 19,019 6% Meter

41 Case Study Supermarket in Maine

42 Case Study - Supermarket

43 Case Study Supermarket in Maine Model Calibration Performance Issues Daylighting controls not performing correctly Dual path dehumidification poorly controlled Modeling Issues Store operating hours modified Warehouse is not cooled Anti-sweat heater use over predicted

44 Case Study Supermarket in Maine

45 Case Study Office Energy conservation measures: High-Efficient Lighting Daylight dimming controls Demand Controlled Ventilation Variable Refrigerant Flow / Volume Underfloor Air Distribution Heat Recovery Ventilator

46 Case Study - Office Energy End Use Lighting (Interior and Exterior) Space Heating/Cooling (VRF) Ventilation - Heating (Gas) Ventilation - Cooling (Evap) Domestic Water Heating (Gas) Fans Pumps Plug Loads Measurement Method Electric Sub-meter Electric Sub-meter Monthly Utility Meter Data Water sub-meter None VFD Outputs None Estimated by Subtraction

47 Case Study - Office Lighting Controls Cx identified 12 deficiencies. Contractor maintained installation, is per design.

48 Case Study High-Rise Office Energy conservation measures: Spectrally Selective Glazing High-Efficient Lighting Daylight dimming controls Demand Controlled Ventilation Frictionless Centrifugal Chillers 92% Efficient Condensing Boilers 50 F delta T Heating System Energy Star Office Equipment

49 Case Study High-Rise Office Energy End Use Lighting (Interior and Exterior) Cooling Fans Pumps Domestic Water Heating (Gas) Space Heating (Gas) Space Heating (Elec) Plug Loads Measurement Method Central Lighting Control System BAS interface with Chiller controls and Cooling Tower VFDs BAS interface with fan VFDs BAS interface with pump VFDs None Utility s Energy Meter Data Calculated from VAV box trend data Sub-meter on bus duct serving office floors less lighting and electric reheat energy

50 Thank you!

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

High Performance Building Guide 1

High Performance Building Guide 1 Description This Guide is intended to be used for projects with a Vermont Certified: High Performance energy efficiency goal. This High Performance goal is a whole-building efficiency approach rather than

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

End-Use Data Collection Requirements Data Trend Type

End-Use Data Collection Requirements Data Trend Type End-Use Data Collection Requirements Data Trend Type Building Electrical: building electrical (main bldg. feed) HVAC Cooling: Total building electrical consumption data shall be submetered through the

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

Auburn University Basketball Arena:

Auburn University Basketball Arena: Auburn University Basketball Arena: How Building Data Analytics Achieved Energy and O&M Savings While Improving Comfort and Sustainability Eric Moore, PE, CEM, Auburn University Hadas Webb, CEM, Cimetrics

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

The Ed Roberts Campus Berkeley, CA

The Ed Roberts Campus Berkeley, CA The Ed Roberts Campus Berkeley, CA Anderson Clemenceau Mechanical Option Penn State A.E. Senior Thesis April 14, 2015 Leddy Maytum Stacy Architects, Photo by Tim Griffith ASHRAE Climate Zone 3C 99.6% Heating

More information

2016 Title 24 HVAC Topics. June 4, 2013

2016 Title 24 HVAC Topics. June 4, 2013 1 2016 Title 24 HVAC Topics June 4, 2013 CEC 2016 Title Introduction 24 Schedule Jun 2013- Apr 2014 CEC develop foundation. IOUs: research, costeffectiveness analysis, stakeholder meetings Mar 2015 Efficiency

More information

Energy & Water Savings in Commercial Food Service

Energy & Water Savings in Commercial Food Service Energy & Water Savings in Commercial Food Service Don Fisher Manager Food Service Technology Center 925-866-5770 dfisher@fishnick.com The Food Service Technology Center (FSTC) program is funded by California

More information

The Importance of Integrated Design, Commissioning, and Building Tuning: A Grocery Store Case Study

The Importance of Integrated Design, Commissioning, and Building Tuning: A Grocery Store Case Study The Importance of Integrated Design, Commissioning, and Building Tuning: A Grocery Store Case Study Jonathan Heller and David Baylon, Ecotope, Inc. ABSTRACT Significant savings in heating energy can be

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

On Balance: Heat Rejection Control a Packaged Solution

On Balance: Heat Rejection Control a Packaged Solution On Balance: Heat Rejection Control a Packaged Solution Echelon Americas Channel Partner Conference March 11, 2005 Presented by Doug Scott VaCom Technologies La Verne, California Opportunity An integrated

More information

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report East Liberty Presbyterian Church 14 009 For: By: East Liberty Presbyterian Church Jeffery Ison, James Construction Date: October

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated

More information

New and Emerging HVAC Technologies. Rod Rhoads, GDS Associates Dave McCullaugh, Mitsubishi Electric Trane HVAC US Dave Binz, Cambridge Engineering

New and Emerging HVAC Technologies. Rod Rhoads, GDS Associates Dave McCullaugh, Mitsubishi Electric Trane HVAC US Dave Binz, Cambridge Engineering New and Emerging HVAC Technologies Rod Rhoads, GDS Associates Dave McCullaugh, Mitsubishi Electric Trane HVAC US Dave Binz, Cambridge Engineering Rod Rhoads, Leidos Custom for non standard projects» Custom

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.com Gary Klein, 2012 Efficiency

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects

Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects Presented by: Warren (Trey) Austin, PE, CEM, CGD, LEED-AP Geo-Energy Services,

More information

An HVAC Audit of the Canberra Institute of Technology

An HVAC Audit of the Canberra Institute of Technology An HVAC Audit of the Canberra Institute of Technology 30 th November 2016 Amnon Holland amnon.holland@esbsconsult.com.au www.esbsconsult.com.au Agenda Overview CIT and various other sites The sites Type

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

This is only the scope of work for the project. For more information, interested parties should contact Procurement at "This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a

More information

Summary Comparison of Simulation Program Features

Summary Comparison of Simulation Program Features Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours

More information

Designing and Operating an Energy Efficient Foodservice Facility March 12, 2014 Winnipeg, MB

Designing and Operating an Energy Efficient Foodservice Facility March 12, 2014 Winnipeg, MB Designing and Operating an Energy Efficient Foodservice Facility March 12, 2014 Winnipeg, MB Don Fisher, P. Eng. Fisher Consultants PG&E Food Service Technology Center 925-866-5770 dfisher@fishnick.com

More information

Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering

Case Study: New York Marriott Marquis BAS & Commissioning. Bill Michell, RPA, FMA, CEOE Director of Engineering Case Study: New York Marriott Marquis BAS & Commissioning Bill Michell, RPA, FMA, CEOE Director of Engineering Retro-Commissioning ( 05-06) NYSERDA co-funded study Re-Commissioning of all major mechanical,

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity

More information

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC 2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

Energy-Efficiency Measures List

Energy-Efficiency Measures List Guidelines for Public Agencies Energy-Efficiency Measures List 1.0 Envelope 1.1 Reduce Heat Losses-Ceiling/roof 1.11 Additional Ceiling/Roof Insulation 1.12 Exhaust Attics 1.13 Use Light-Colored Roof Surfaces

More information

Technical Assignment 3

Technical Assignment 3 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

Data driven insights from the nation s deepest ever customer energy research

Data driven insights from the nation s deepest ever customer energy research Pecan Street Research Institute Pike Powers Lab and Center for Commercialization Data driven insights from the nation s deepest ever customer energy research Change in peak load 70,000 by customer class

More information

Energy Management Wiring Guide

Energy Management Wiring Guide Energy Management Wiring Guide Runestone Electric Association 6839 Power Lane SW Alexandria, MN 56308 (320) 762-1121 or (800) 473-1722 Fax: (320) 763-4149 www.runestoneelectric.com Table of Contents Basic

More information

Welsh Commissioning Group, Inc.

Welsh Commissioning Group, Inc. Ongoing Commissioning with Building Automation System and Data Loggers Bryan W. Welsh, P.E. President Welsh Commissioning Group, Inc. AIA Quality Assurance Learning Objectives 1. General understanding

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

Preparing the Next Generation of Building Technicians

Preparing the Next Generation of Building Technicians Preparing the Next Generation of Building Technicians Laney's Model for Advanced Curriculum and Laboratory Requirements In some cases defining the new technician Green Collar Job Training at Laney College

More information

Dehumidification: Energy Efficiency Comparisons

Dehumidification: Energy Efficiency Comparisons Fourth Annual Energy Management Workshop Cocoa, Florida February 10-11, 2003 Dehumidification: Energy Efficiency Comparisons Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting,

More information

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page

More information

Heat Pumps and Public Swimming Pools, a Perfect Match

Heat Pumps and Public Swimming Pools, a Perfect Match TOPICAL ARTICLE Heat Pumps and Public Swimming Pools, a Perfect Match M. Zuliani, P. Pattijn - Belgium Public swimming pools have a very high energy consumption, due to high demands of heating and climatisation

More information

Energy Management and Controls

Energy Management and Controls As with the Chapter Review Tests and the Final Exam, the tests your understanding of the materials underlying the learning objectives. After you ve reviewed your answers to the Chapter Review Tests, try

More information

CHART PERUVIAN TECHNICAL STANDARDS

CHART PERUVIAN TECHNICAL STANDARDS CHART PERUVIAN TECHNICAL STANDARDS Peruvian Technical Standards Elaborated by the Normative Technical Committee Rational Use of Energy and the Energy Efficiency - (December 2007) Electric Motors Industrial

More information

HVAC DISTRIBUTION and DELIVERY SYSTEMS

HVAC DISTRIBUTION and DELIVERY SYSTEMS HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that

More information

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the

More information

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

Strategies for Building Energy Efficiency

Strategies for Building Energy Efficiency Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

MEASURED PERFORMANCE DATA FOR

MEASURED PERFORMANCE DATA FOR MEASURED PERFORMANCE DATA FOR HOUSE #4 INVERNESS GARDENS MILLER HOMES FEBRUARY 2013 Submitted to: NYSERDA 17 Columbia Circle Albany, NY 12203 Submitted by: HOMEPIC Team CDH Energy Corp. PO Box 641 Cazenovia,

More information

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01915 - FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION PART 1 GENERAL 1.1 Section includes:

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

ASHRAE/IESNA Standard

ASHRAE/IESNA Standard ASHRAE/IESNA Standard 90.1-1999 An inside look at the requirements of Standard 90.1-1999 Energy Standard for Building Except Low-Rise Residential Building Mick Schwedler, PE Sr. Principal Applications

More information

Bergen Community College 400 Paramus Road Paramus, NJ 07652

Bergen Community College 400 Paramus Road Paramus, NJ 07652 Steven Winter Associates, Inc. 293 Route 18, Suite 330 Telephone (866) 676-1972 Building Systems Consultants East Brunswick, NJ 08816 Facsimile (203) 852-0741 www.swinter.com June 9, 2010 Local Government

More information

ASHRAE Guideline 36 Advanced HVAC Control Sequences

ASHRAE Guideline 36 Advanced HVAC Control Sequences ASHRAE Guideline 36 Advanced HVAC Control Sequences Rick Stehmeyer - Senior Engineer Matt Napolitan, P.E., CCP, CPMP, LEED AP BD+C - Principal Image Source: http://worldatdistance.com/2013/10/07/the-complete-noobs-guide-to-making-a-website//

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

Performance of Solar Water Heating Systems in the United States

Performance of Solar Water Heating Systems in the United States Performance of Solar Water Heating Systems in the United States Danny Parker & Camilo Gil Florida Solar Energy Center ACEEE Hot Water Forum June 2009, Asilomar,, California Rebate situation in Florida

More information

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign Dept of Mechanical & Industrial Engineering 1206 WGreen St Urbana,

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting

More information

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

This is only the scope of work for the project. For more information, interested parties should contact Procurement at "This is only the scope of work for the project. For more information, interested parties should contact Procurement at purchasing@stpgov.org to ensure receipt of a full bid package, to be listed as a

More information

Special Topics on Residential HVAC

Special Topics on Residential HVAC Special Topics on Residential HVAC by Armin Rudd USDOE Building America Program for EEBA Conference 2002 Phoenix, Arizona 10 October 2002 Page 1 of 25 Two Main Topics: 1. Cyclical trade-offs between building

More information

Site Evaluation. for. Oregon School for the Deaf. 999 Locust Street Northeast Salem, OR BE15178

Site Evaluation. for. Oregon School for the Deaf. 999 Locust Street Northeast Salem, OR BE15178 Site Evaluation for Oregon School for the Deaf 999 Locust Street Northeast Salem, OR 97301-0999 BE15178 Sponsored by: Energy Trust of Oregon Existing Buildings Program Submitted by: ATAC Contact Information

More information

about your house Before You Start an Energy-Efficient Retrofit Mechanical Systems

about your house Before You Start an Energy-Efficient Retrofit Mechanical Systems about your house CE 28i Before You Start an Energy-Efficient Retrofit Mechanical Systems One of the best ways to make your home more comfortable, healthier and less expensive to operate is to upgrade the

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,

More information

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN Brown University Department of Facilities Management Design & Construction Standards 26 09 01 Campus Central Metering System Design SECTION 26 09 01: CAMPUS CENTRAL METERING SYSTEM DESIGN 1. GENERAL A.

More information

EarthWise System Seminar

EarthWise System Seminar EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States

More information

ENERGY EFFICIENCY IN HOSPITALS- A CASE STUDY

ENERGY EFFICIENCY IN HOSPITALS- A CASE STUDY ENERGY EFFICIENCY IN HOSPITALS- A CASE STUDY B V Suresh Babu Sr. Consultant, Certified Energy Auditor 23-02-2010 Thiruvananthapuram Introduction This case study is from a Hospital located in Kerala. This

More information

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A Nicholas Thornton, CEM 1 Overview Today s Goals Introductions HVAC Electrical Technology Q&A 2 1 Today s Goals An overview, a crash course Maybe a few tangents (ASK QUESTIONS!) Show typical arrangements

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Cork County Energy Agency

Cork County Energy Agency Cork County Energy Agency Energy Audit Midleton Area Office December 2009 Table of Contents 1. Introduction...1 2. Site description...2 3. On site energy use...3 3.1 Energy management...3 3.2 Breakdown

More information

HEAT LOAD AND SOLAR GAIN PREDICTION FOR SOLID WALL DWELLINGS RETROFITTED WITH TRIPLE VACUUM GLAZING FOR SELECTED WINDOW TO WALL AREA RATIOS

HEAT LOAD AND SOLAR GAIN PREDICTION FOR SOLID WALL DWELLINGS RETROFITTED WITH TRIPLE VACUUM GLAZING FOR SELECTED WINDOW TO WALL AREA RATIOS HEAT LOAD AND SOLAR GAIN PREDICTION FOR SOLID WALL DWELLINGS RETROFITTED WITH TRIPLE VACUUM GLAZING FOR SELECTED WINDOW TO WALL AREA RATIOS Saim Memon & Philip C. Eames Centre for Renewable Energy Systems

More information

Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate

Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate American Council for an Energy Efficient Economy ACEE Hot Water Forum Nov. 4-5, 2013 Carlos J. Colon

More information

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION DIGI-ACC Digi-ACC is a control kit for air cooled chiller systems, optimizing both chiller and pumps thereby reducing consumption

More information

MSP WRAP-AROUND MULTIPLE SMALL PLATE DEHUMIDIFICATION TECHNOLOGY VS. CONVENTIONAL DEHUMIDIFICATION IN DEDICATED OUTDOOR AIR SYSTEMS (DOAS)

MSP WRAP-AROUND MULTIPLE SMALL PLATE DEHUMIDIFICATION TECHNOLOGY VS. CONVENTIONAL DEHUMIDIFICATION IN DEDICATED OUTDOOR AIR SYSTEMS (DOAS) MSP WRAP-ARUND MULTIPLE SMALL PLATE DEHUMIDIFICATIN TECHNLGY VS. CNVENTINAL DEHUMIDIFICATIN IN DEDICATED UTDR AIR SYSTEMS (DAS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

Study Final Report. Priority Cool Refrigerant Study

Study Final Report. Priority Cool Refrigerant Study Refrigerant Study Study Final Report Prepared for: Greenway Solutions Company, Inc. 120 Bethpage Road, Suite 304 Hicksville, New York 11801 Prepared by: WSP Flack + Kurtz 512 Seventh Avenue New York, NY

More information

Sivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5

Sivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5 Sivu 1/8 Design of a heat pump heating system with Aquarea Designer Project: Suomi 1 Date: Created by:?, (no data provided), (no data provided) Phone: (no data provided) Email: (no data provided) Building

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2007) Standard HALCYON Bldg. 400 Alpharetta, Georgia 3a

More information

Power and Energy Management Solutions

Power and Energy Management Solutions Selection Guide Power and Energy Management Solutions Heating, Ventilating and Air Conditioning (Bulletin 1414) Selection Guide 2 HVAC Selection Guide Instrumentation Selection Checklist Use the following

More information

Heating and Hot Water

Heating and Hot Water Heating and Hot Water Funding Funding for this class was provided by the Alaska Housing Finance Corporation (AHFC). This course is designed to empower homeowners with the knowledge to live in and maintain

More information

InterNACHI Home Energy Inspection for th Street

InterNACHI Home Energy Inspection for th Street InterNACHI Home Energy Inspection for 1750 30th Street Estimated Yearly Energy Costs: $1,491 per year Dear Client, This house has been scored on a scale of 1 to 100. A 100 would represent a home with perfect

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

(2.1) Design Conditions...5 (2.2) Ventilation Requirements..5 (2.3) Heating and Cooling Loads...6

(2.1) Design Conditions...5 (2.2) Ventilation Requirements..5 (2.3) Heating and Cooling Loads...6 TECHNICAL REPORT 3 MECHANICAL SYSTEMS EXISTING CONDITIONS EVALUATION New Braunfels Regional Rehabilitation Hospital Adam Bernardo Mechanical Option Faculty Advisor: Dr. William Bahnfleth Date Submitted:

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report 3. Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report 3 Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department of Architectural Engineering Pennsylvania

More information