and Installation Instructions The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack.

Size: px
Start display at page:

Download "and Installation Instructions The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack."

Transcription

1 Technical Guide and Installation Instructions MKS / MUS Steel boiler kw The installation instructions for the Unit pressure jet oil burner is included in the pressure jet oil burner pack. The control unit installation and service instructions included in the control unit pack. Wolf GmbH Mainburg Postfach 1380 Telephone /74-0 Fax / Part no /03 TV GB 1

2 Oil- and gas-fired steel boiler for pressure jet combustion in accordance with EN 303 and EC Directive 90/396/EEC (gas consuming equipment), 73/23/EEC (Low Voltage Directive), 89/336/EEC (EMC Directive), 92/42/EEC (Hot Water Boiler Efficiency) and 93/ 68/EEC (Identification Directive) for heating systems with heating circuit pumps and flow temperatures up to 110 C and 4 bar permissible operating pressure in accordance with DIN 4751 and max. DHW cylinder pressure 10 bar in accordance with DIN The NO x limits required by the 1st BImSchV 7(2) are maintained. Suitable for heating systems in accordance with DIN 4751 part 1 and 2 with maximum flow temperatures up to 120 C. Oil- and gas-fired steel boilers Type MKS Oil-fired Unit steel boilers with two-stage pressure jet oil burner Type MUS 2

3 Specification Boiler type MUS MKS Output range oil/gas (MKS) kw Recommended range (MKS) kw Upper range oil (MUS) kw Set output UNIT burner MUS kw Flue gas temperatures 1) from/to C st stage flue gas temperature C Flue gas mass flow rate 1) Fuel oil EL CO 2 =13% kg/h Flue gas mass flow rate 1) Natural gas E CO 2 =9.5% kg/h Flue gas mass flow rate 1) Natural gas LL CO 2 =9.0% kg/h Flue gas mass flow rate 1) LPG CO 2 =11% kg/h Relative standby loss q B % Total weight MKS kg Total weight MUS kg Boiler dim. Width mm Height 2) mm Length MKS mm Length MUS mm Flue pipe Ø mm Burner aperture MKS mm ) 245 3) 305 3) 305 3) 305 3) Minimum blast tube length MKS mm Foundation / plinth Height mm 80/80 80/80 80/80 80/80 80/80 80/- 80/- 80/- Width mm 800/ / / / / /- 1100/- 1100/- Length mm 1360/ / / / / /- 2000/- 2000/- Boiler flow (flange) DN Safety flow, air-vent valve (male thread) R 1¼" 1¼" 1¼" 1½" 1½" 2" 2" 2" Boiler return (flange) DN Filling, draining, safety return (male thread) R 1½" 1½" 1½" 1½" 1½" 1½" 1½" 1½" Boiler water content l Boiler gas content l Heating surface m Flue gas resistance 1) mbar Heating water resistance (at Dt=20K) 1) mbar Combustion cham. dia. Length mm Diameter mm Type approval ID ÖVGW-Reg.-Nr. G2,416 CE designation CE-0085AR0034 Electrical connection 230V / 50Hz / 10A Max. perm. temperature 4) C 120 Max. boiler pressure bar 4 1) At a mean boiler water temperature of 60 C for the upper and lower output of the recommended range. 2) Including control unit 3) Plain burner plate, drill on-site. 4) Adjustable high limit safety cut-out: 120/110/100 C at R31 STAV, R32, R33 and R33/4 (not applicable to installations in Austria). The chimney stack dimensions must be calculated in accordance with DIN 4705, or local regulations. For flue gas temperatures below 160 C, combustion equipment must be connected to highly insulated chimney stacks (heat conductivity resistance class I acc. to DIN T1) or use suitable, moisture-resistant, type-tested, flue gas systems. 3

4 Safety instructions General These installation instructions apply exclusively to WOLF oil- and gas-fired boilers as well as to WOLF Unit steel boilers. Authorised personnel should read these instructions before any installation, commissioning or maintenance work. Adhere to the instructions given in this document. Non-adherence to these installation instructions voids WOLF warranty. Reference symbols Please note: The following symbols and references are used in these installation instructions: Non-observance of these references can put individuals at risk. Non-observance of these references can lead to damage to the oil/gas-fired boiler or the Unit boiler. In addition to the installation instructions, operating instructions and adhesive labels are included or fitted to the boiler. These must also be observed. Observe the enclosed references for heating system installers. Safety instructions Only qualified and trained personnel may install, commission and maintain these boilers. In accordance with VDE 0105 part 1, work on electrical components (e.g. control unit) may only be carried out by qualified electricians. The regulations of VDE/ÖVE and those of your local electricity supplier as well as all other local regulations are apply to electrical installation work. Only operate the boiler within its output range which is stated in the specification supplied by WOLF. Appropriate use of the boiler refers to the exclusive use in hot water heating systems in accordance with DIN Never remove, bypass or otherwise disable any safety and monitoring equipment. Only operate the boiler in perfect technical condition. Any faults and damage with a potential impact on safety, which might limit the safe use of the equipment, must be remedied immediately by a qualified contractor. Replace faulty components or equipment only with original WOLF spare parts. Standards and regulations The boilers described in these installation instructions are low-temperature boilers according to HeizAnlV and 92/42/EEC (Hot Water Boiler Efficiency). In accordance with the Heating System Order, heating systems above 70 kw may not be operated in single stage mode. Retain the enclosed operating instructions clearly visible in the boiler room. Insert all further documentation in a clear wallet and clip to the boiler side casing. Your boiler and burner should be maintained and cleaned on an annual basis by a heating contractor, to ensure the reliable and economic function of your heating system. We would recommend a maintenance contract. Boilers may only be installed and operated in boiler rooms which are suitable according to the Landes-FeuVo [or local regulations]. 4

5 Positioning Installation references The boiler should be installed on a level surface which is substantial enough to carry its weight. It is recommended to place the boiler on a foundation or plinth. For dimensions see the specification. During the boiler installation observe all building regulations, the FeuVo and VDI 2050 [in Germany] and local regulations, particularly regarding the size of the boiler room, the fresh air and exhaust air ventilation as well as the chimney stack connection. Please note: Please note: Only install the boiler in boiler rooms which are free from frost and where adequate ventilation is ensured. Drain the boiler, the DHW cylinder and the entire heating system if there is a danger of frost, if the system has been shut down. Position the boiler horizontally or slightly rising towards the back to ensure adequate venting of any trapped air. Boilers should not be installed in areas subject to aggressive vapours or very dusty/ highly humid conditions (workshops, washrooms, hobby rooms etc). The combustion air must be free from halogenated hydrocarbons (e.g. as contained in sprays, solvents and cleaning fluids, paints and adhesives) and high dust concentration. Clearances towards walls and combustible materials must comply with local fire regulations. The above clearances are recommended. Keep the flue pipe connection as short as possible and inclined towards the chimney stack. Thoroughly seal-in the flue pipe. Use flue pipe bends with clean-out covers to facilitate the cleaning of the flue pipe. Repositioning the fixing screws enables the boiler door to be opened in the opposite hand. 5

6 Casing installation Control unit cable Boiler sensor 2 nd stage 1 st stage Burner cables 1 Thermal insulation: Position (overlapping) around the boiler block and secure with spring clips. 2 Spacers: Secure on the boiler with nuts enclosed. (MKS-85 to 500) Four spacers at the real panel. (MKS-85 to 140) Two bottom spacers per side. (MKS-190 to 500) Three bottom spacers per side and one central top spacer. 3 Thermal insulation: Loosely fitted to the rear boiler wall. 4 Rear panels: Centrally locate both parts and secure with self-tapping screws and with the screws (M8x16) supplied on the rear boiler wall spacers. 5 Thermal insulation: Insert from the top between door and boiler front and locate on the boiler front. 6 Thermal insulation: Fit loosely to the boiler front and secure with spring clips. 7 Thermal insulation: Fit loosely to the boiler front and secure with adhesive strips. 8 Side panels: Push the l.h./r.h. casing over the rear panel and secure with the screws (MUS-85 to 100 / MKS-85 to 140) (M8x16) supplied to the lower two spacers. 8 Side panels: Secure the l.h./r.h. front and rear panels with screws (M6x10) then push over the rear panel (MKS-190 to 500) and secure with the screws (M8x16) supplied on the lower three spacers. 9 Wolf label: Hook into the front panel lid (10). 10 Front panel lid: Locate and click into the panel with fitted control unit. Only complete the fitting of the casing after the control unit has been installed (page 7). 10 Panel lid l.h. rear: Locate on the panel and click into place. 10 Panel lid r.h. rear: Locate on the panel and click into place. 13 Type plate: Affix to the boiler in a clearly visible position. Accompanying documentation: Affix with the clips supplied to the side of the boiler. 6

7 Control unit installation High limit safety cut-out Please note: Ensure, during the control unit installationthat the sensor capillaries are not kinked or twisted and have only been pulled out of the boiler casing as far as necessary. Do not route on-site cables for outside temperature and flow temperature sensors together with mains power cables. Electrical wiring in accordance with the wiring diagram enclosed. Ensure that cables which are not required are secured against contact. Observe the respective installation and operating instructions for R32, R33 and R33/4 control units. R31-STAV control unit 1 st stage Burner cable 2 nd stage Boiler sensor Mains supply cable Heating circuit pump cable Loading pump cable DHW cylinder cable Control unit Guide the cable through the casing lid cut-out, and secure the control unit housing on the casing lid with the self-tapping screws supplied. Guide the burner cables through the boiler front cut-out. Push the boiler sensors in any order into the boiler sensor well. Guide the mains supply cable, and the heating circuit pump cable through the boiler back cut-out. Guide the loading pump cable (for DHW cylinder connection accessories) through the boiler back cut-out. Guide the DHW cylinder cable (for DHW cylinder connection accessories) through the boiler back cut-out. Adjusting the boiler thermostat If necessary, the boiler thermostat can be adjusted from 80 C to 90 C. To do this, turn the boiler thermostat clockwise to its end-stop (80 C); pull out the rotary selector approx. 3 mm and continue to turn clockwise to its end-stop (90 C). Please note: The boiler thermostat must not be set to 90 C if the high limit safety cut-out has been adjusted to 100 C. Changing the setting of the high limit safety cut-out (STB) for R31-STAV The high limit safety cut-out (STB) is factory-set to 120 C. Change the setting of the STB, if required. Such changes are irreversible. Disconnect the control unit from its power supply. Remove the control unit lid with a screwdriver. Unscrew the plastic cap and locking nut. Remove the high limit safety cut-out. Adjust the setscrew in accordance with the scale. Install in reverse order. Control accessories Please note: Installation and electrical wiring according to the wiring diagram supplied with the control accessories. If Wolf boilers are equipped with control units not supplied by Wolf or if technical modifications are carried out on Wolf control units, Wolf will not be liable for any consequential losses which may occur. 7

8 Installation / maintenance Connections Venting Safety flow Boiler flow Boiler return Flue pipe connection Draining, filling Pipework Central heating boiler Connect the heating flow and return to the respective boiler fittings. For connections, see above. Install a check valve behind the boiler circuit pump(s) to prevent incorrect circulation. Install a safety equipment assembly. Please note: The pipework between the boiler and the safety valve must not be able to be shut off. Connect underfloor heating via a four-way mixer. Provide system separation by means of a heat exchanger, when using pipes which are not impermeable to oxygen. Filling the heating system The boiler and central heating system may only be filled, if a type-tested safety valve (opening pressure max. 3 bar) has been installed at the "ventilation connection of the boiler. Install a filling/drain valve to fill the central heating system at the "drain, filling connection, and connect a water hose. Observe the pressure gauge in the safety equipment assembly when filling the system with water. Check the safety valve function. Ventilate the boiler (automatic air-vent valve). Draining the heating system Shut down the heating system and let it cool down. Open the drain valve on the boiler. Open the radiator bleed valves. 8

9 Minimum return temperatures / return temperature raising facility Minimum return temperatures To prevent falling below the dewpoint, the following measures for raising the return temperature are required in order to maintain the minimum temperatures t Rmin listed in the table. System Fuel Oil Gas Control unit R31, R32 R31, R32 R33, R33/4 R33, R33/4 Radiator central heating t Kmin C less than 20l/kW t Rmin C Design 80/60 Return temp. raising 1-3 2/3 acc. to sys. example Low-temp. central heating t Kmin C with less than 20l/kW; t Rmin C Design temperature Return temp. raising 1-3 2/3 55/45 and above acc. to sys. example Systems with more than t Kmin C l/kW underfloor/ t Rmin C low-temp. central heating Design temperature Return temp. raising 2/3 2/3 under 55/45 acc. to sys. example t Kmin = min. boiler temperature t Rmin = min. return temperature Please note: A weather-compensated control unit is equipped with soft boiler start, which prevents condensate being formed during the start-up phase. Sizing shunt pump The flow rate of shunt pump V is calculated according to the following formula: V Q N c p ρ W Q N x 3600 V = in m 3 /h c p x t x ρ W = Shunt pump volume flow in m³/h = Rated boiler output in kw = Specific energy 4.2 kws/kgk = Specific weight of water 1000 kg/m³ t = Temperature differential between the flow temperature and bypass temperature (recommended design temperature differential 30k) The shunt pump head results from the boiler pressure loss at the selected volume flow, the pipework pressure loss as well as all individual boiler circuit pressure losses. System example A return temperature limit stat T switches the shunt pump ON, when the permissible return temperature is no longer maintained. A return temperature limit stat T1 switches the shunt pump ON, when the minimum return temperature is no longer maintained. If the return temperature falls further, the return temperature limit stat T2 signals to the control unit R, which throttles the heat transfer via one or several mixers M in the heating circuit. A return temperature limit stat T regulates a distribution valve M, so that if the permissible return temperature is no longer maintained, the heating circuit flow will be partially or fully closed. After the boiler has been heated up, the distribution valve M will open as wide as the permissible return temperature requires. The distribution valve M, can also be installed as mixer into the return. 9

10 Fill water / burner connection Fill water Water guidelines for heating systems in accordance with VDI 2035 at operating temperatures up to 100 C: Group Total of rated boiler output Q Filling and top-up water Heating water kw *) for exceptions see VDI 2035 (+) may be required, see VDI 2035 Total alkaline earths in mol/m³ ph value Diamide Na 2 SO 3 Excess in mg/kg 0 Q 100 -*) < Q to 3 8 to < Q to 2 8 to to 5(+) 5 to 20(+) Water guidelines for heating systems in accordance with VdTÜV guidelines at operating temperatures above 100 C: Filling and top-up water Circulating water Residual hardness p value ph value Diamide Na 2 SO 3 mval/kg mval/kg Excess in mg/kg < Burner connection Observe the TRD 411 (oil combustion) and TRD 412 (gas combustion) guidelines. The gas installation and operation of heating systems must comply with the DVGW Code of Practice "Gas" and the technical connection conditions of your gas supply company and/all local regulations. Burner size MKS Acc. to EN 226 adjustable to burner size connection MKS Burner plate in acc. with blast tube dia. MKS-500 cut-out and tap thread. Match the door insulation to the blast tube diameter of the burner. The blast tube must protrude into the combustion chamber at least 25 mm beyond the door installation. Use fixing screws for the burner flange, which cannot the inserted into the boiler door more than 15 mm. Connect the ventilation fitting at the sight glass with the burner fitting. After the control unit installation, plug the burner cable into the burner. Ensure that the combustion output matches the rated boiler output. Observe the details provided by the burner supplier. Minimum boiler output To prevent the system falling below the dewpoint, the following minimum boiler output for two-stage burners are required for the first stage: MKS MUS Type Output range kw Min. boiler output burner stage 1 kw

11 Electrical connection Electrical connection Connect the heating circuit pump(s), the return shunt pump and the DHW cylinder loading pump(s) on-site via contactors, if: - three-phase pumps (400 V) are connected. - burner and pump draw more than 2 A each. - the total control unit power consumption is exceeded. Mains power connection 230V 50 Hz 10 A Heating circuit pump(s) / return shunt pump connection To the control unit To the control unit 3 x Return limit thermostat 3 x ye/gn PE br L1 bl N bl N ye/gn PE br L1 PE L1 N Heating system emergency stop switch (on site) Heating circuit pump on-site Return shunt pump Burner two-stage without socket part To the control unit To the control unit 7 x x Burner with socket part Burner plug plug into the control unit Burner plug on the control unit blk ye/gn blu br w gr r x x blk ye/gn bl br w gr r Burner connection Remove the burner plug from the control unit, connect the black to the brown core and connect the white core to the burner phase. Burner socket part Burner socket part 1 st stage 2 nd stage Connection for on-site safety equipment To the control unit blk y blk y To the burner y blk y blk Terminals for low water indicator Control unit junction box Terminals for safety pressure switch Terminals for remote pressure monitoring 11

12 Safety equipment Safety equipment acc. to DIN 4751 part 1 Scope: Open and sealed, physically protected heat generator systems with flow temperatures up to 100 C. Fresh air ventilation/ exhaustion Thermometer Safety valve Expansion vessel Test line Heat consumer Cap valve Shut-off valve Boiler fill and drain valve Safety valve Expansion vessels of sealed heating systems are provided with a standpipe as safety equipment in accordance with DIN 4750 or a safety valve in accordance with TRD 721. Expansion vessels Install an expansion vessel compliant with DIN 4807 T2 for each boiler system at its highest point. Thermometer A thermometer with sensor well is fitted to the flow of each boiler. Water level indicator Each boiler is equipped with a water level indicator which is visible from the boiler control position, which enables the static pressure of the heating system to be checked that any time. Mark the lowest permissible water level on the water level indicator. Please note: The pipework between the boiler, the expansion vessel and the safety valve must not be able to be shut off. A valve which has been protected against unauthorised closure, e.g. a cap valve, would also be acceptable. The system diagram only indicates the safety requirements but is not a recommendation for specific types of heating network control. 12

13 Safety equipment Safety equipment acc. to DIN 4751 part 2 Scope: Sealed, thermostatically protected heat generator systems with flow temperatures up to 120 C. Thermometer Heat. circ. pump Safety valve Open flash trap Low water indicator Maximum pressure limiter Pressure gauge Heat consumer External pressure monitoring Fresh air ventilation/ exhaustion Cap valve Expansion vessel Drain valve Minimum pressure switch Boiler fill and drain valve Safety valve Every boiler must be protected against exceeding the permissible operating pressure by a diaphragm safety valve or other spring-biased safety valves. Safety valves must comply with TRD 721. A maximum of three safety valves may be applied to each heat generator. A flash trap must be installed immediately next to each safety valve for boilers with a rated output in excess of 350 kw. The installation of flash traps is not required for hot water heating systems, if each heat generator is equipped with one or an additional STB and one or an additional pressure switch. Sizes and internal diameters of diaphragm safety valves, dimensions of supply lines and blow-off lines. Diaphragm safety valve Blow-off output in kw Size, internal diameter, DN Fitting thread for supply line G ½" G ¾" G 1" G 1¼" G 1½" Fitting thread for blow-off line G ¾" G 1" G 1¼" G 1½ G 2" Expansion vessels The water and gas chamber of pressure expansion valves must be calculated in accordance with DIN 4807 part 2. If the permissible operating pressure is lower than the highest working pressure of the pressure dwell valve, protect the expansion vessel by suitable type-tested safety valves against excessive pressures. Size open expansion vessels for a minimum pressure of 2 bar. Arrange all expansion vessels with shut-off facilities towards the heating system. Ensure that the shut-off equipment is sufficiently protected against unintentional closure (e.g. cap valve protected with a wire and seal). Low water indicator Equip each boiler with a type-tested low-water indicator. A low-water indicator is not required for boilers up to 350 kw, since excessive heating at low water conditions is prevented. This was verified as part of the type testing of the STB installed in the control unit. 13

14 Safety equipment Thermometer Install a temperature indicator and a facility for checking the flow temperature into the boiler flow line, so that the actual heating water flow temperature can be recorded. The permissible flow temperature must be permanently marked on the display scale. Pressure gauge The boiler must be equipped with a pressure gauge with immediate connection to the water chamber or in immediate proximity of the flow, as well as a suitable connection for the pressure testing device according to DIN or DIN The response pressure of the boiler safety valve and the minimum system pressure must be permanently marked on the display scale. Equip every boiler, which is protected above 3 bar or which has a rated output higher than 350 kw, with a maximum pressure switch (type-tested according to VdTÜV Code of Practice Issue 100/l). External pressure monitoring Monitor the operating pressure of hot water heat generator systems with a minimum pressure switch, type-tested in accordance with the VdTÜV Code of Practice Issue 100/I, in order to prevent water evaporating inside the heating system as a result of insufficient external pressure. Please note: Install a check valve downstream of the boiler circuit pump to prevent incorrect circulation. The pipework between the boiler, the safety valve and the low-water indicator must not be able to be shut off. The system diagram only indicate the safety requirements, but is not a recommendation for specific types of heating network control. 14

15 Approximate sizing of chimney cross-sections Approximate calculation: Circular cross-sections Required chimney diameter in cm Rated output in kw Effective chimney height in m Square cross-sections Required chimney size in cm x cm Rated output in kw Effective chimney height in m Please note: We recommend that you let your chimney manufacturer design the chimney. 15

16 Part numbers 1 Thermal insulation 2 Spacers 3 Thermal insulation 4 Back panels 5 Thermal insulation 6 Thermal insulation 7 Thermal insulation 8 Side panels 9 Wolf label 10 Front panel lid 11 Left-hand rear panel lid 12 Right-hand rear panel lid 13 Type plate Steel boiler MKS / MUS 70 up to 550 kw Part no Packing cord for boiler door, 3200 mm long X X X X X X X X Gasket for clean-out aperture X X X X X X X X Flat seal/flue gas collector box to approx. 3 rd quarter of X X X Flat seal/flue gas collector box to approx. 3 rd quarter of X X - - Flat pack./flue gas collector box to approx. 3 rd quarter of X X X Sight glass flat packing X X X X X X X X Cleaning brush X X Cleaning brush X Cleaning brush X X Cleaning brush X X X Sight glass X X X X X X X X Sensor well (up to model M 2850) X X X X X X X X Sensor well (from model M 2851) X X X X X X X X Turbulators X X Turbulators X Turbulators X X Turbulators X X X Jamb brick X X X Jamb brick X X Jamb brick X X X Casing and insulation from approx. 3 rd quarter of X X Casing and insulation from approx. 3 rd quarter of X Casing and insulation from approx. 3 rd quarter of X X Casing and insulation from approx. 3 rd quarter of X X X MKS 16

17 Troubleshooting Fault Cause Remedy Burner does not start No voltage present Check fuse, electrical connections, position of ctrl.unit, or enters fault state ON/OFF switch and heat. system emerg. stop switch Oil tank empty / Fill oil tank / Gas supply line shut off Open gas supply line Burner fault High limit safety cut-out has switched OFF Oil filter clogged Press the reset button at the boiler control unit (see burner installation instructions) Press the reset button on the control unit. Replace oil filter Heating circuit System in summer mode Check summer/winter switch position pump does not start Heating circuit pump locked up Turn the pump shaft with a screwdriver Heating circuit pump faulty Replace the heating circuit pump Cylinder loading pump DHW cylinder thermostat faulty Check the DHW cyl. thermostat and replace, if nec. does not run DHW loading pump locked up Turn the pump shaft with a screwdriver Cylinder loading pump faulty Replace the DHW loading pump The heating system operates, Maximum boiler temperature Raise maximum boiler temperature. but room temp. too low set too low 17

18 18 Notes

19 Notes 19

20 Declaration of Conformity in accordance with the 97/23/EC Pressure Device Directive Appendix VII Product designation: Applied conformity assessment procedure: Steel boiler type MKS, MUS Module B + C1 Name and address TÜV Süddeutschland Bau und Betrieb GmbH of the named body: Westendstraße Munich ID of the named body: CE 0036 Applied standards TRD 702 and specifications: DIN EN 297 and 656 We, Wolf GmbH, Industriestraße 1, Mainburg, hereby declare that the above boiler complies with the appropriate regulations laid down in the 97/23/EC Directive, when the safety temperature has been set to > 110 C. This declaration loses its validity, if the product is modified without our express permission. Observe the safety instructions in the documentation and the operating instructions. Mainburg, pp. Steppe 20

Installation and maintenance instructions

Installation and maintenance instructions Technology serving Mankind Installation and maintenance instructions ComfortLine FunctionLine Steel boilers up to 63 kw Wolf GmbH Postfach 1380 84048 Mainburg Tel. +49 8751/74-0 Fax +49 8751/741600 Internet:

More information

VIESMANN VITOROND 100. Datasheet Part numbers and prices: see pricelist VITOROND 100. Cast iron low temperature oil and gas fired boiler.

VIESMANN VITOROND 100. Datasheet Part numbers and prices: see pricelist VITOROND 100. Cast iron low temperature oil and gas fired boiler. VIESMANN VITOROND 100 Cast iron low temperature oil and gas fired boiler 40 to 100 kw Datasheet Part numbers and prices: see pricelist File in: Vitotec folder, register 1 VITOROND 100 Type VR2B Cast iron

More information

VIESMANN. Datasheet VITOMAX 200-WS. Hot water boiler for permissible flow temperatures up to 110 C 1.75 to MW

VIESMANN. Datasheet VITOMAX 200-WS. Hot water boiler for permissible flow temperatures up to 110 C 1.75 to MW VIESMANN VITOMAX 200-WS Hot water boiler for permissible flow temperatures up to 110 C 1.75 to 11.63 MW Datasheet Part no.: see pricelist, prices on request VITOMAX 200-WS Type M250 Oil/gas fired hot water

More information

VIESMANN. VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW.

VIESMANN. VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW. VIESMANN VITOMAX 200-LW Low pressure hot water boiler for permissible flow temperatures up to 120 C Rated heating output 8.0 to 20.0 MW Datasheet Part no. and prices on request VITOMAX 200-LW Type M64A

More information

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw

VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw VIESMANN VITOCROSSAL 300 Gas condensing boiler 187 to 635 kw Datasheet Part no. and prices: see pricelist VITOCROSSAL 300 Type CT3B Gas condensing boiler for natural gas E, LL and LPG With modulating MatriX

More information

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Service instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler For applicability, see the last page VITORONDENS 200-T 6/2011 Please keep safe. Safety

More information

VIESMANN. VITOMAX 200-WS Rated heating output 1.75 to MW. Datasheet. VITOMAX 200-WS Type M250

VIESMANN. VITOMAX 200-WS Rated heating output 1.75 to MW. Datasheet. VITOMAX 200-WS Type M250 VIESMANN VITOMAX -WS Rated heating output 1.75 to 11.63 MW Datasheet VITOMAX -WS Type M250 Oil/gas low pressure hot water boiler CE designation in accordance with the Gas Appliances Directive Permissible

More information

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit Service instructions for contractors VIESMANN Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit VITOLADENS 300-T 1/2007 Please keep safe. Safety instructions Safety instructions

More information

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Installation instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler VITORONDENS 200-T 6/2011 Dispose after installation. Safety instructions Please

More information

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors Installation instructions for contractors VIESMANN Vitomax 200-HW Type M238 Oil/gas fired high pressure hot water boiler Combustion output 4.0 to 18.2 MW VITOMAX 200-HW 6/2007 Dispose after installation.

More information

VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw

VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw VIESMANN VITOCROSSAL 300 Gas condensing boiler 787 to 1400 kw Datasheet Part no. and prices: see pricelist VITOCROSSAL 300 Type CR3B Gas condensing boiler for natural gas E, LL and LPG 9/2011 Benefits

More information

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Installation instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler VITORONDENS 200-T 5/2013 Dispose after installation. Safety instructions Please

More information

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors Service instructions for contractors VIESMANN Vitocell 300-B Type EVB DHW cylinder, 300 and 500 l Vitocell 300-V Type EVI DHW cylinder, 200 to 500 l For applicability, see the last page VITOCELL 300-B

More information

VIESMANN. Installation instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner

VIESMANN. Installation instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner Installation instructions for contractors VIESMANN Vitocrossal 300 Type CM3 Gas condensing boiler with MatriX radiant burner VITOCROSSAL 300 2/2013 Dispose after installation. Safety instructions Please

More information

VIESMANN. Installation instructions VITOCROSSAL 200. for contractors. Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner

VIESMANN. Installation instructions VITOCROSSAL 200. for contractors. Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner Installation instructions for contractors VIESMANN Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner VITOCROSSAL 200 2/2007 Dispose after installation. Safety instructions

More information

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler Service instructions for contractors VIESMANN Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler For applicability, see the last page VITORONDENS 200-T 2/2013 Please keep safe. Safety

More information

The competent brand for energy saving systems NEW. Gas-combi boiler CGG-1K-24/28

The competent brand for energy saving systems NEW. Gas-combi boiler CGG-1K-24/28 The competent brand for energy saving systems NEW Gas-combi boiler CGG-1K-24/28 Gas-combi boiler CGG-1K Technical data room sealed fannned flue model gas combi boiler for low temperature heating and d.h.w.

More information

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA

VIESMANN. Installation and service instructions VITOCELL 340-M/360-M. for contractors. Vitocell 340-M/360-M Type SVKA Type SVSA Installation and service instructions for contractors VIESMANN Vitocell 340-M/360-M Type SVKA Type SVSA Combi cylinder 750 and 950 litre capacity VITOCELL 340-M/360-M 4/2009 Please keep safe. Safety instructions

More information

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l Installation instructions for contractors VIESMANN Vitocell 300-B Type EVBA-A Dual mode DHW cylinder, 300 and 500 l VITOCELL 300-B 1/2017 Dispose after installation. Safety instructions Please follow these

More information

WOLF GAS CONDENSING BOILERS COMFORTLINE

WOLF GAS CONDENSING BOILERS COMFORTLINE WOLF GAS CONDENSING BOILERS COMFORTLINE CGB-35/50 / CGB-75/100 30m 3 /h THE EXTENSIVE EQUIPMENT RANGE from system supplier WOLF offers the ideal solution for commercial and industrial buildings, new build

More information

VIESMANN. Service instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CR3 and CR37, 787 and 978 kw Gas condensing boiler

VIESMANN. Service instructions VITOCROSSAL 300. for contractors. Vitocrossal 300 Type CR3 and CR37, 787 and 978 kw Gas condensing boiler Service instructions for contractors VIESMANN Vitocrossal 300 Type CR3 and CR37, 787 and 978 kw Gas condensing boiler For applicability, see the last page VITOCROSSAL 300 4/2009 Please keep safe. Safety

More information

Operating instructions Oil condensing boiler

Operating instructions Oil condensing boiler Operating instructions Oil condensing boiler COB COB-CS Boiler for heating Boiler with stratification cylinder Wolf GmbH Postfach 1380 D-84048 Mainburg Tel. +49-8751/74-0 Fax +49-8751/741600 Internet:

More information

VIESMANN. Installation instructions VITODENS 200-W. for contractors

VIESMANN. Installation instructions VITODENS 200-W. for contractors Installation instructions for contractors VIESMANN Vitodens 200-W Type WB2C, 45 and 60 kw Wall mounted gas condensing boiler Natural gas and LPG version VITODENS 200-W 1/2010 Dispose after installation.

More information

Operating instructions

Operating instructions Operating instructions Gas-fired condensing boiler Logano plus GB312 For the user Please read carefully before use 7 747 009 296-01/2007 EN Contents 1 For your safety..............................................

More information

VIESMANN. Operating instructions VITODENS 100-W. for the system user

VIESMANN. Operating instructions VITODENS 100-W. for the system user Operating instructions for the system user VIESMANN Heating system with control unit for constant temperature or weather-compensated mode VITODENS 100-W 1/2012 Please keep safe. Safety instructions For

More information

VIESMANN. Operating instructions VITODENS 111-W. for the system user

VIESMANN. Operating instructions VITODENS 111-W. for the system user Operating instructions for the system user VIESMANN Heating system with control unit for constant temperature or weather-compensated mode VITODENS 111-W 4/2012 Please keep safe. Safety instructions For

More information

Installation and maintenance instructions

Installation and maintenance instructions 6304 4995 0/004 GB For installer Installation and maintenance instructions Flue gas heat exchanger WT50/60 Please read thoroughly prior to installation and maintenance. Summary About this manual This equipment

More information

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A Installation instructions for contractors VIESMNN Vitocell 300-V/W Type EVI- DHW cylinder with internal indirect coil 160 to 500 l VITOCELL 300-V/W 3/2017 Dispose after installation. Safety instructions

More information

Installation and maintenance manual

Installation and maintenance manual Installation and maintenance manual Warm air heater WS/WO (Copy of the original version) Wolf GmbH D-84048 Mainburg Postfach 1380 Telefon +498751/74-0 Telefax +498751/741600 Internet: www.wolf-heiztechnik.de

More information

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A cod. 6272262A GENERAL DATA Heating Data Heat Output Input (Adjustable) (Adjustable) Format 34i 11.2 34KW 45 145MJ/hr Format 34e 11.2 34KW 45 145MJ/hr General Specifications FORMAT 34i 34e Main burner injectors

More information

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE INSTRUCTION MANUAL INSTALLATION AND SERVICING AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE About this manual These installation and maintenance instructions contain important information

More information

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit Operating instructions for the system user VIESMANN With constant temperature or weather-compensated control unit VITODENS 050-W 9/2014 Please keep safe. Safety instructions For your safety Please follow

More information

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw atural gas Class D oil Dual Fuel 350 kw to 500 kw Clyde CK40 Cast Iron Boiler Contents Page General information Dimensions 3 Technical data 3 Installation requirements 4 & 5 Boiler control panel 6 Wiring

More information

Uni 3000 F Output range 420 to 1850 kw. Oil/gas boiler. Installation and maintenance instructions for the contractor (2014/10) UK

Uni 3000 F Output range 420 to 1850 kw. Oil/gas boiler. Installation and maintenance instructions for the contractor (2014/10) UK 6 720 806 032-00.2ITL Oil/gas boiler Output range 420 to 850 kw Installation and maintenance instructions for the contractor UK 2 Contents Contents Key to symbols and safety instructions...................

More information

VIESMANN. Installation and service instructions VITODENS 111-W. for contractors

VIESMANN. Installation and service instructions VITODENS 111-W. for contractors Installation and service instructions for contractors VIESMANN Vitodens 111-W Type B1LA, 6.5 to 35.0 kw Gas condensing storage combi boiler Natural gas and LPG version Gas Council no.: 47-819-23; 47-819-24;

More information

VIESMANN VITOLADENS 300-C Oil condensing boiler 12.9 to 28.9 kw

VIESMANN VITOLADENS 300-C Oil condensing boiler 12.9 to 28.9 kw VIESMANN VITOLADENS 300-C Oil condensing boiler 12.9 to 28.9 kw Datasheet Part no. and prices: see pricelist VITOLADENS 300-C Type BC3 Oil condensing boiler, with two- Compact blue flame burner (12.9 to

More information

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation.

Installation instructions PYROMAT ECO. for contractors PYROMAT ECO GB 8/2012 Dispose after installation. Installation instructions for contractors PYROMAT ECO PYROMAT ECO 8/2012 Dispose after installation. Safety instructions Please follow these safety instructions closely to prevent accidents and material

More information

Installation, operating and servicing instructions

Installation, operating and servicing instructions English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes

More information

VIESMANN. Datasheet For part no. and prices: see pricelist VITOLIGNO 300-P. Pellet boiler 4to48kW. Vitotec folder, register 12. File in: Type VL3B

VIESMANN. Datasheet For part no. and prices: see pricelist VITOLIGNO 300-P. Pellet boiler 4to48kW. Vitotec folder, register 12. File in: Type VL3B VIESMANN VITOLIGNO 300-P Pellet boiler 4to48kW Datasheet For part no. and prices: see pricelist File in: Vitotec folder, register 12 VITOLIGNO 300-P Type VL3B Boiler for wood pellets 8/2007 Product information

More information

for contractors Vitoplex 200 Type SX2A For applicability, see the last page Please keep safe.

for contractors Vitoplex 200 Type SX2A For applicability, see the last page Please keep safe. Service instructions for contractors VIESMANN Vitoplex 200 Type SX2A, 90 to 560 kw Oil/gas boiler For applicability, see the last page VITOPLEX 200 3/2013 Please keep safe. Safety instructions Safety instructions

More information

VIESMANN. Installation instructions. Mixer extension kit. for contractors. Mixer extension kit. For one heating circuit with mixer

VIESMANN. Installation instructions. Mixer extension kit. for contractors. Mixer extension kit. For one heating circuit with mixer Installation instructions for contractors VIESMANN Mixer extension kit For one heating circuit with mixer Mixer extension kit 5/2017 Safety instructions Please follow these safety instructions closely

More information

VIESMANN. Operating instructions VITODENS VITOPEND. for the system user. Heating system with Vitotronic 100 control unit for constant temperature mode

VIESMANN. Operating instructions VITODENS VITOPEND. for the system user. Heating system with Vitotronic 100 control unit for constant temperature mode Operating instructions for the system user VIESMANN Heating system with Vitotronic 100 control unit for constant temperature mode VITODENS VITOPEND 4/2007 Please keep safe. Safety instructions For your

More information

Light oil / kerosene burner

Light oil / kerosene burner Installation, use and maintenance instructions Light oil / kerosene burner One stage operation CODE MODEL TYPE 374445 G5 444T50 290238 (5) - 05/20 TECHNICAL DATA Thermal power output 28 60 kw 2.3 5 kg/h

More information

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB 6 720 648 662-00.1T UNI 7000 F Operating instructions For the user AU/G 2 Contents Contents Contents 2 1 Safety information and explanation of symbols 3 1.1 For your safety 3 1.2 Explanation of symbols

More information

INSTALLATION AND MANINTENANCE INSTRUCTIONS

INSTALLATION AND MANINTENANCE INSTRUCTIONS INSTALLATION AND MANINTENANCE INSTRUCTIONS Appr. Nr. A 9503 T - 0085 AQ 0765 PEGASUS F2 T HIGH EFFICIENCY GAS-FIRED CAST-IRON BOILERS Models 51-68 - 85-102 2 Contents 1. General technical data 2. Dimensional

More information

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model Calder Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing Outputs 70-3500 kw Calder Model 70-1300 Calder Model 1400-3500 Calder - Steel Hot Water Boiler The Calder

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en 8 716 473 216-00.3O Gas boiler WBN 6000-30-H-E-N/L-S2400 Operating instructions for the end customer en 2 Contents Contents 1 Key to symbols and safety instructions................... 2 1.1 Key to symbols..................................

More information

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc Mikrofill Ethos Condensing combination boiler Maintenance Instructions 24cc IMPORTANT Benchmark Installation, Commissioning and Service Record Log Book is enclosed in your customer information pack. This

More information

VIESMANN VITOCELL 300-V Vertical DHW cylinder 130 to 500 l capacity

VIESMANN VITOCELL 300-V Vertical DHW cylinder 130 to 500 l capacity VIESMANN VITOCELL 300-V Vertical DHW cylinder 130 to 0 l capacity Datasheet Part no. and prices: see pricelist VITOCELL 300-V Type EVA and EVI Vertical DHW cylinder made from stainless steel 5/2012 Product

More information

Installation and maintenance instructions

Installation and maintenance instructions 6304 4994 03/2006 GB For installer Installation and maintenance instructions Flue gas heat exchanger WT30/40 Please read thoroughly prior to installation and maintenance. Contents Contents Contents 2 1

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions HOME SYSTEM GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18 0 Fax +49 21 91 18 28 10 info@vaillant.de

More information

Operating Instructions

Operating Instructions Operating Instructions P4 Pellet 8-60 Read and follow the operating instructions and safety information. Subject to technical change. July 2009 Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse

More information

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book USER GUIDE IMAX XTRA EL 320-620kW For Installation Guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance

More information

AGS 5/5E, AGS 10/10E INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER

AGS 5/5E, AGS 10/10E INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS SOLAR PUMP STATIONS AGS 5/5E, AGS 0/0E FOR SEALED SOLAR HEATING SYSTEMS AND INDIRECT FED DOMESTIC HOT WATER 7747006489.00-.SD CONTENTS CONTENTS Safety instructions

More information

VIESMANN. Operating instructions VITODENS 100. for system users. Heating system with control unit for constant temperature operation

VIESMANN. Operating instructions VITODENS 100. for system users. Heating system with control unit for constant temperature operation Operating instructions for system users VIESMANN Heating system with control unit for constant temperature operation VITODENS 100 2/2005 Please keep safe Safety instructions For your safety Please follow

More information

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND Aqua Balance AquaBalance TM CONTROL MODULE QUICK START GUIDE 10 1 Domestic Hot Water temperature setpoint decreasing button 2 Domestic Hot Water temperature setpoint increasing button 3 Central Heating

More information

Operating instructions

Operating instructions Operating instructions Gas condensing boiler WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

More information

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80 EN OPERATING MANUAL OIL HEATER TRT-BA-IDE20-30-50-60-80-TC-001-EN Table of contents Information on the use of this manual... 1 Scope of delivery... 1 General safety...

More information

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use GB122 Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C For trade use Please read thoroughly before attemting to diagnose fault 7217 4900 (03/2010) GB/IE List of contents

More information

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model Calder Plus High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing Outputs 70-3500 kw Calder Plus Model 70-1300 Calder Plus Model 1400-3500 Calder Plus - High Efficiency

More information

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use GB122 7210 1300-12/2002 GB(EN) For trade use Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C Please read thoroughly before attempting to diagnose fault List of contents

More information

Technical documentation. ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW

Technical documentation. ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW Technical documentation ComfortLine gas condensing boilers CGB-2(K) CGW-2 CGS-2 CSZ-2 NEW ComfortLine gas condensing boilers Benefits of the WOLF gas condensing boilers up to 24 kw CGB-2(K) / CGW-2 / CGS-2

More information

TERMO Combi Cylinder TECHNICAL INFORMATION

TERMO Combi Cylinder TECHNICAL INFORMATION TECHNICAL INFORMATION TERMO Combi Cylinder Tank-In-Tank System using solar energy for hot water and heating support. For integration into the heating circuit as return flow booster or hydraulic compensator.

More information

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

Technical information. Remeha P200. Pressurized boiler. Heat output: kw Technical information Remeha P200 R e m e h a P 2 0 0 Pressurized boiler Heat output: 59-256 kw Remeha P 200 CONTENTS Preface 3 1. Description of the unit 4 1.1 General 4 1.2 Burners 4 2. Construction

More information

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual POWERFLOW Series Unvented Electric Storage Water Heaters Installation & Operating Instructions Manual These Instructions must be left with the user after installation. Version 3.0 June 2009 Hyco POWERFLOW

More information

Installation and service instructions for contractors Logano plus SB625. Burner shroud not available in UK and Ireland

Installation and service instructions for contractors Logano plus SB625. Burner shroud not available in UK and Ireland Floor standing condensing boiler 6 720 804 349-00.1ITL Installation and service instructions for contractors Logano plus SB625 6 720 806 339 (2013/07) GB Burner shroud not available in UK and Ireland Read

More information

VIESMANN VITOLADENS 300-C Oil condensing boilers 12.9 to 28.9 kw

VIESMANN VITOLADENS 300-C Oil condensing boilers 12.9 to 28.9 kw VISMANN VITOLADNS 00-C Oil condensing boilers 12.9 to 28.9 kw Datasheet Part no. and prices: see pricelist VITOLADNS 00-C Type BC Oil condensing boiler With two-stage Compact blue flame burner (12.9 to

More information

Installation and maintenance instructions

Installation and maintenance instructions Installation and maintenance instructions Oil and gas-fired special boilers Logano G5 WS For heating engineers Please read carefully prior to installation and maintenance. 6 70 67 76 (0/00) GB Contents

More information

Installation and maintenance instructions

Installation and maintenance instructions Installation and maintenance instructions Gas condensing boiler Logano plus GB402 For contractors Read carefully prior to installation and maintenance. 6 720 646 410 (10/2010) GB Contents Contents 1 Explanation

More information

VIESMANN. Installation and service instructions VITOTROL 300A. for contractors. Vitotrol 300A. Remote control, part no

VIESMANN. Installation and service instructions VITOTROL 300A. for contractors. Vitotrol 300A. Remote control, part no Installation and service instructions for contractors VIESMANN Vitotrol 300A Remote control, part no. 7438 364 VITOTROL 300A 3/2010 Please keep safe. Safety instructions Safety instructions Please follow

More information

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A

Remeha. Fuel oil/gas boilers P 520. Installation and Service Manual A Remeha Fuel oil/gas boilers EN Installation and Service Manual 300016859-001-A 63115 Declaration of conformity The appliance complies with the standard model described in declaration of compliance. It

More information

Installation, operation and care Wall-mounted electric boiler MP THL nr. - rev 02

Installation, operation and care Wall-mounted electric boiler MP THL nr. - rev 02 Installation, operation and care Wall-mounted electric boiler MP 4 150206 THL nr. - rev 02 Contents Notes... 3 Safety and handling... 4 Operation... 5 Technical data... 6 Pipe installation... 8 System

More information

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS G 2000-S 25-35 - 45-55 60-70 - 100 (V13) 1 Index WARNINGS GAS FLOW RATE DIMSIONS SETTINGS PARAMETERS SERVICING THE URNER 3 8 13 OPERATING DESCRIPTION

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45 U tube models PTU 09, 2, 5, 25, 30, 35, 40, 45 & single linear tube models PTS 09, 2, 5, 25, 30, 35, 40, 45 installation, servicing & operating instructions INSTALLATION, SERVICING AND OPERATING INSTRUCTIONS

More information

TH100 Three in One Instant Hot Water Tap

TH100 Three in One Instant Hot Water Tap TH100 Three in One Instant Hot Water Tap Installation, Use and Maintenance Customer Care Department The Group Ltd. Harby Road Langar Nottinghamshire NG13 9HY T : 01949 862 012 F : 01949 862 003 E : customer.care@cda.eu

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL INSTALLATION AND OPERATION MANUAL PRESSURISED STEEL BOILERS AR 30 AR 1000 RADIALAND - BOILER's INSTALLATION MANUAL version 1.0 / 15-02-2008 The company E. is outstanding in the field of central heating

More information

Trumatic E. Trumatic E 2400 (Australia) Operating instructions Page 4 Installation instructions Page 7. To be kept in the vehicle!

Trumatic E. Trumatic E 2400 (Australia) Operating instructions Page 4 Installation instructions Page 7. To be kept in the vehicle! Trumatic E 7 7 2 9 9 4 Trumatic E 2400 (Australia) Operating instructions Page 4 Installation instructions Page 7 To be kept in the vehicle! Trumatic E 2400 (Australia) Table of contents Installation example...

More information

Installation instructions. For the competent person. Installation instructions VRT 350 VRT 350 GB, IE

Installation instructions. For the competent person. Installation instructions VRT 350 VRT 350 GB, IE Installation instructions For the competent person Installation instructions VRT 350 VRT 350 GB, IE Legal information Document type: Product: VRT 350 Target group: Language: Installation instructions Authorised

More information

Operating instructions

Operating instructions Operating instructions For the operator Operating instructions ecotec plus Gas-fired wall-hung high-efficiency boiler GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Telefon

More information

A/23 MFFI - A/27 MFFI

A/23 MFFI - A/27 MFFI A/23 MFFI - A/27 MFFI G.C.N. 47-6-0 / 47-6-2 Servicing Instructions Type C Boilers LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER TABLE OF CONTENTS Page No.. SERVICING INSTRUCTIONS. Replacement of

More information

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A... 70 80 99-00-O Residential Gas Condensing Boiler ZBR//8/35/4-3A... ZWB8/35/4-3A... 70 80 993 (03/03) CA/US Operating Instructions Contents Contents Key to symbols and safety instructions............................

More information

Parts Available from

Parts Available from Montage und Bedienungsanleitung Manuel d entretien Installation, use and maintenance instructions Installatie-, gebruiks- en onderhoudsvoorschriften Oδηγίες εγκατάστασης, χρήσης και συντήρησης D F GB NL

More information

Glass and Dishwashers AMX / AUX Series

Glass and Dishwashers AMX / AUX Series Glass and Dishwashers AMX / AUX Series INSTALLATION OPERATION REV. 8.xx 04.07.2005 Installation and Operation Instructions for Models of AMX / AUX Series Content Page 1 Installation... 3 2 Connections...

More information

Propane Heater REMKO PGM 30 REMKO PGM 60

Propane Heater REMKO PGM 30 REMKO PGM 60 Propane Heater REMKO PGM 30 REMKO PGM 60 Operation Technology Spare Parts Edition GB L07 REMKO strong as a bear. Operating instructions Make sure to read these instructions carefully before starting/using

More information

BM Programming Module. For the heating engineer Installation instructions

BM Programming Module. For the heating engineer Installation instructions For the heating engineer Installation instructions BM Programming Module WOLF GmbH Postfach 1380 84048 Mainburg Tel. 08751/74-0 www.wolf-heiztechnik.de Document no.: 3062612_201509 Subject to modifications

More information

VIESMANN. Service instructions VITODENS 200-W. for contractors

VIESMANN. Service instructions VITODENS 200-W. for contractors Service instructions for contractors VIESMANN Vitodens 200-W Type WB2B, 4.8 to 35.0 kw Wall mounted gas fired condensing boiler Natural gas and LPG version For applicability, see the last page VITODENS

More information

Installation and maintenance instructions

Installation and maintenance instructions 600 965 0/006 GB For the installer Installation and maintenance instructions Logano GE5 Cast iron sectional boiler for oil or gas pressure jet burners Please read thoroughly prior to installation and maintenance

More information

Manual. Above-counter dispenser for hot drinks OTHG /12

Manual. Above-counter dispenser for hot drinks OTHG /12 Manual Above-counter dispenser for hot drinks OTHG 105 1 It is in your own interests to observe all the hazard and safety information. This helps you to prevent accidents and technical malfunctions. Only

More information

Servicing Instructions Type C Boilers G.C.N: LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER

Servicing Instructions Type C Boilers G.C.N: LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER Servicing Instructions Type C Boilers G.C.N: 4-6-0 47-6-08 47-6-09 47-6-3 LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER TABLE OF CONTENTS Page No.. SERVICING INSTRUCTIONS. Replacement of Parts 3.2

More information

RL/1 SERIES. One Stage Light Oil Burners FIRING RATES LIGHT OIL RL 34/1 MZ kw

RL/1 SERIES. One Stage Light Oil Burners FIRING RATES LIGHT OIL RL 34/1 MZ kw The RL/1 burners series covers a firing range from 107 to 398 kw, and it has been designed for use in low or medium temperature hot water boilers, hot air or steam boilers, diathermic oil boilers. Optimisation

More information

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION SOLARCYL IM/SC INSTALLATION MANUAL This manual gives detailed advice for installation and should be read carefully prior to fitting any unvented

More information

Operating instructions

Operating instructions Operating instructions Capriz 2 24c 28c GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information... 4 2 Notes on the documentation...

More information

/2010 US/CA

/2010 US/CA 6 720 646 148-11/2010 US/CA (en) For the user User s Instructions Condensing gas boiler Logamax plus GB162-L.B. 80 kw/100 kw Please read thoroughly before operating This manual is available in the English

More information

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INSTALLATION AND OPERATING INSTRUCTIONS HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS INDEX 1. Technical information... page 3 2. Dimensional and technical characteristics... page 3 3. Packing

More information

Installation and maintenance instructions

Installation and maintenance instructions Installation and maintenance instructions Gas condensing boiler Logano plus GB312 For contractors Read carefully prior to installation and maintenance. 6 720 644 531 (08/2010) GB/IE Contents Contents 1

More information