TERMO ELECTRIC BOILER INSTALLATION MANUAL OSO TERMO RS -M
|
|
- Berniece Lambert
- 5 years ago
- Views:
Transcription
1 TERMO ELECTRIC BOILER INSTALLATION MANUAL OSO TERMO RS -M
2 Contents 1. Introduction Applicable documents Retention of documents Features & benefits Operation of domestic hot water (where applicable) Suitability Operation on S-plan system Termo M range Key to Termo boilers Technical data Power supply characteristics 240V Installation Content included in delivery Standards & Regulations Physical Installation site Select position for boiler Fitting the boiler hanging bracket General recommendations when handling Removing/fixing the front and top case Plumbing & Heating installation & commissioning Installation Ancilliary components Connection to the electrical mains supply Connecting external controls Connect room thermostat/programmer Connecting external pump on TERMO RS boilers Commissioning Control panel key Protection from freezing Fault finding guide Maintenance Periodic checking After Sales service information Cascade power limiter OSO Hotwater UK Ltd Appendices Termo RS-M with space heating and water heating Hydraulic diagram Termo RS-M Electric diagram Termo RS-M S-plan wiring layout Termo RS space heating only Hydraulic diagram Termo RS-M Electric diagram Termo RS-M S-Plan wiring layout Termo RS-M...18
3 Terminology used in this manual The central heating boiler water circuit is called primary The domestic hot water is called secondary (dhw) 1. Introduction Thank you for purchasing the Oso Termo range electric central heating boiler. To ensure a correct and safe installation and economical use, please read these instructions thoroughly before installation Applicable documents The following additional documents are provided with the appliance: For the owner of the system: Instructions for use Warranty card 1.2. Retention of documents For the qualified technician: Instructions for installation Electrical drawing for the appliance Please pass on this installation manual to the owner of the system. The owner should retain the manuals so that they are available when required Features & benefits TERMO products are modulating and economical central heating boilers that may be used as independent or additional source of heat. The boiler provides wet system central heating by passing the primary water over the immersion heaters. Heating elements are located on under-side of boiler ensuring elements are constantly immersed in heating medium (water with appropriate inhibitor). Power is modulated automatically to control 1, 2 or 3 immersion elements with built in step regulator or manually with switches on the control board. The boiler operates on principle of rapid heating smaller water quantities, energy use is 100% efficient. Power outputs available are 7.2, 10.8, 14.4 kw. The boiler has an automatic pump overrun for both central and water heating that prevents a build up of heat in the boiler. The boiler reservoir is insulated with 19 mm self-extinguishing Armaflex insulating material, which is sufficient to direct the heat only to the heating system. Temperature operation can range from 20 o C to 90 o C Operation of domestic hot water (where applicable) Suitability Termo RS-M boilers are able to heat a central heating system containing space heating and a separate indirect water storage cylinder using an S-plan system. Termo RS-M boilers can also be used in a space heating only situation where water heating can be achieved by a separate stand-alone direct water storage cylinder. OSO believe that this is a simpler system that is more suitable in most domestic circumstances and will allow use of economy electricity tariffs, thus saving on water heating fuel costs Operation on S-Plan system. There is no DHW priority built into the boiler. A standard S-plan system will allow heating and hot water circuits to be heated on demand. If a DHW priority is required, certain central heating programmers will offer this. Recommended temperature inside boiler while heating domestic hot water is 75 o C 80 o C. Observe Honeywell ST6400 manuals for more detailed description of domestic hot water parameters. Page 1
4 2. Termo RS-M 2.1 Key to Termo RS-M 1. Primary flow 7. Control panel 13. Drain valve (not supplied) 2. Primary return 8. Cable entry point 14. Isolation valves (not supplied) 3. External boiler jacket 9. Contactors and RCD switch 15. Manual venting valve (not supplied) 4. Boiler 10. Charge and discharge valve 5. Armaflex Insulation 11. Pocket with temperature probe 6. Immersion heaters 12. Safety valve (supplied loose) Page 2
5 RS - M 2.2 Technical Data For Termo Rs - M Boilers Power kw Capacity Lit. Dimensions mm Weight kg Maximum oprerating pressure Connection Power supply MPa (bar) 7.2 A 330 B C 230 D ,25 (2,5) 3/4 240V N ~ 50/60 Hz 14.4 E 57 F Power supply characteristics 240V POWER nominal current MCB Rated short-circuit breaking capacity I cn (EN 60898) Rated short-circuit breaking capacity I cn (IEC 947-2) Cable size* RCD switch type 7.2 kw 30 A B x 6 mm /0.03 A 10.8 kw 45 A B ka 15 ka 3 x 10 mm /0,03A 14.4 kw 60 A B x 16 mm /0,03A min. conductor's cross-section in mm 2 is based on maximum length of 20 m. Cable sizes must be selected according to latest version of IEE wiring regulations. Page 3
6 3.0. Installation 3.1. Content included in delivery TERMO boilers are delivered pre-assembled. Check that all parts have been delivered intact. For exact list of parts see figure and table below. If parts are damaged or missing, please consult Oso Hotwater UK Ltd. Contents included with delivery Item Description 1 TERMO boiler 2 Instructions Electrical drawing, Warranty card 3 Hanging bracket 4 Safety valve (not fitted to boiler in case of TERMO RS) Table of contents included with delivery 3.2 Standards & Regulations The Oso Termo range of boilers are BEAB approved and CE marked. Health and Safety at Work Act When working with Termo boilers, ensure that protective clothing and equipment is used appropriate to parts that may considered hazardous to health and safety Control of Substances Hazardous to Health (COSHH 1988) - Glues, paints and sealants are used in the manufacture of this product and present no known hazards when used in the manner for which they are intended. The guarantee is only valid if the following the following conditions are observed: The boiler must be installed by a registered engineer to comply with current building regulations, IEE electrical wiring regulations (BS 7671), local authority regulations, water supply regulations and health and safety at work regulations. Other Relevant British/European standards should be adhered to, including BS Specification for forced circulation hot water central heating for domestic premises, BS 7593, treatment of water in domestic hot water central heating systems 3.3. Physical Installation site IMPORTANT - MOVING THE BOILER EXCEEDS THE RECOMMENDED WEIGHT FOR A ONE MAN LIFT. The boiler must be handled and transported carefully and stored in a safe, dry place. TERMO RS-M is designed for wall installation in an upright position. Wall brackets are provided on the back of the boiler. The boiler should be fixed in position on a suitable load-bearing wall prior to pipe connection. The boiler should be fitted in a dry place not subject to extremes of temperature. Cylinder cupboards and kitchens are acceptable but bath or showers rooms are not. Page 4
7 3.3.1 Select position for boiler The boiler should preferably be installed on the lowest point in relation to the installation. This ensures that elements are always immersed in water and there is no danger of burning out. When positioning the boiler, ensure there is adequate space surrounding to allow for pipe connection, ventilation, servicing and replacement of components including the immersion heaters. Refer to diagrams below for guidance. Access is required to the control panel connections at underside of the boiler and the power supply connection, located at left bottom side of boiler. Ensure the boiler is in a location where it will not be affected by water drips or splashing. Ensure that ventilation to the boiler is not impeded by towels, linen etc placed very close to the boiler. Do not place towels or linen on top of the boiler. The figure below shows minimum recommended clearances Recommended minimal distances Fitting the boiler hanging bracket Fix the hanging bracket (see page 9 No. 3) to the wall using suitable plastic plugs and M8 or M10 screws (not supplied). Decide the position of the bottom of the boiler, giving due consideration to the recommended minimum clearance and then drill holes to accept the boiler mounting plate. Screw points should to be drilled 624mm above the bottom of the boiler casing. Note: If the boiler is to be fitted in a timber framed building ensure that the bracket is secured to a substantial part of the timber frame capable of taking the weight of the boiler General recommendations when handling Clear the route before attempting the lift. Ensure safe lifting techniques are used keep back straight bend using legs. Keep load as close to body as possible. Do not twist reposition feet instead. If 2 persons performing lift, ensure coordinated movements during lift. Avoid upper body/top heavy bending - do not lean forward/sideways. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip. Always use assistance if required. Positioning of Appliance for Final Installation Lift up boiler (3) above hanging bracket (2) Gently lean it to the wall (1) Slide it down to hanging bracket (2). Wall mounting Removing/fixing the front and top case 1. Grasp the front case by its sides 2. Pull it towards the front and remove it by lifting it off the unit 3. Push top cover towards back 4. Lift it off the unit. Page 5
8 3.4. Plumbing & Heating installation & commissioning Installation Fit the supplied safety valve to the heating return point on the installation see point 12 page 2 diagram. Ensure that no valve is placed between the safety valve and the boiler. To avoid draining the entire primary system during boiler maintenance it is recommended that isolation valves are fitted to the flow and return pipes immediately below the boiler. Connect the primary flow and return pipes for the central heating system to the labeled connections on the boiler. Connections can be made using wither the top or bottom connections as shown on page 2. Connect the mains water supply via a filling loop to the charge and discharge valve on the boiler incorporating a stop valve and double check valve which must be left disconnected after commissioning. Drain taps must be located in accessible positions which permit the draining of the whole system including the primary and the secondary (dhw) system. Any water loss from the system should be replaced from the filling loop connection. When draining the boiler allow air in using the boiler venting valve. Do not drain the boiler by opening the pressure relief valve. All capillary joints in all DHW pipework must be made with lead free solder. RS-M is a self contained system boiler that manages heating flow to the radiators and/or under floor and also supplies heat to an indirect domestic hot water cylinder via an S-plan system. External motorized valves and an automatic bypass are required for the S-plan system. Termo boilers can also be used on an open vented central heating system. Wherever possible all pipe work should be insulated to help prevent heat loss and possible freezing, particularly where pipes are run through roof spaces and ventilated under-floor spaces Ancilliary components. On RS M boilers a boiler pressure gauge, circulation pump and expansion vessel must be fitted. The expansion vessel should be sized to the total system volume. The water capacity of the boiler itself is 6 litres. Diagram of recommned pump on RS-E for radiator heating Diagram of recommned pump on RS-E for underfloor heating To comply with Part L of building regulations, a room thermostat must be fitted with the boiler. The room thermostat should not be sited over radiator or other heat emitter and should not be in direct sunlight. Thermostatic radiators valves may also be used, but should not be fitted in the same room as the room thermostat. After the central heating circuit has been laid open all service valves, flush pipes through and check for leaks before commissioning and introduce the correct inhibitor for a central heating circuit in accordance with BS7593. Commission the boiler slowly to allow air to escape through the automatic air vent. Remove air from pump using front screw on pumps. Pressurize the system to 1.5 bar. Where the boiler is being retro-fitted to an existing installation, it is equally important to flush the system and commission using inhibitor to BS7593., TERMO boilers are fitted with an automatic and manual air vent. The boilers are also equipped with an airindicator which detects the presence of air in the boiler. If air is detected and It exceeds the permitted level, airindicator switches off immersion heaters and circulation pump remains active, so that air is allowed to escape easily. Once the air is dispelled the immersion heaters will be active. Page 6
9 3.5 Connection to the electrical mains supply Before working with the appliance, turn off the power supply (MCB) and secure against restart. This device must be earthed. Check that the electrical supply to the building has sufficient current and voltage to supply the boiler and other appliances to be used. Miniture circuit breakers (MCB) must be fitted in the wiring prior to the boiler. For MCB ratings see table on page 3. Connect the boiler to the mains using a double pole linked switch with 3mm contact gap in both poles. Measure exact voltage between L and N lines prior to connecting boiler, if it 10% higher than nominal voltage on appliance, appliance itself can be damaged. Central heating control equipment please note that all heating control equipment (programmer, timer, thermostats etc MUST be supplied with power from the boiler connections plate see section 3.6. DO T supply controls with power directly from the mains supply. To connect power supply cable power connection protection cover must be removed by unwinding two nuts M6 and pulling protection cover out. Power cable must be connected directly to RCD, earth must be connected to separate terminal. After connecting power cable and control units, protective cover must be replaced and secured. For 240V power supply RCD switch in boiler from 7.2 up to 14,4 kw is 2-pole Power supply connection RCCB (RCD) connection close-up Power cables must be connected from bottom side of boiler with the use of provided plastic inducer for electric cable. Ensure that the wires are securely fixed. The appliance must be connected to mains electricity and tested according to current IEE regulations. An NICEIC inspection and completion certificate must be issued. The appliance must be connected to mains electricity and tested according to current IEE regulations. An NICEIC inspection and completion certificate must be issued. All exposed pipework must be earthed according to current IEE regulations Page 7
10 3.6. Connecting external controls External controls (Programmer, thermostats, pump, zone valves) must be supplied with power from the green boiler connections plate. See diagram (right) via removable connector as shown below Terminals OUTDOOR TEMP. DOMESTIC WATER, 3 HW ON & HW PUMP are not used. L, N & PE Power supply to control unit - (3 port green) 4 CH ON switched live from external unit for heating & DHW (2 port grey/black) L, N & PE to Central heating pump (3 port grey/black) Connection plate Connect programmer/room thermostat Supply power to central heating programmer/room stat assembly from L, N, PE on connections plate. Use a junction box if necessary. From this point follow thermostat manufacturer s instructions to connect programmer/stat assembly & S-Plan system. The boiler is supplied with a fixed link between L and 4. If an external control device (room thermostat and/or programmer) is used, remove this link. Switched live from room thermostat and water heater thermostat must be connected to 4 CH ON Connecting external pump on TERMO RS boilers TERMO RS boilers do not have inbuilt central heating pump and pump for domestic water cylinder. Empty terminals on connection plate are provided to fit external pumps. Terminal CH PUMP is provided for central heating pump for heating and DHW. Connect pump L, N, PE wires to the appropriate connection ports. Termo RS-M is fitted with an automatic pump overrun.. Factory settings is 3 min 4. Commissioning 4.1. Control panel key 1 Indicator of temperature /pressure in boiler 2 Working thermostat 3 Switch for the 2 nd and 3 rd operation stage 4 Cutout thermostat with manual deactivation (operates at 100 o C) 5 Air Indicator/Low voltage indicator 6 - Switch for ON/OFF and 1 st heating stage 7 Fuse (2.5A) protecting pump and switches 8 Indication of heater operation Page 8
11 Switching boiler on Test the RCD switch by pressing T button on it. Reset the RCD switch. Switch on boiler at switch (6). Switch will illuminate. First power stage activates if there is heating demand. If the boiler is heating, heaters in operation light (8) will illuminate. Switches (3) manually enable activation of second and third immersion heaters in boiler. These switches will illuminate if heating demand activate these heaters. Boilers with 3 stages have soft start for second and third stage and switches (3) have only limiting function. If heaters are not working and boiler is in standby only ON/OFF light is on. Normal practice is to have switches 6 & 3 on and to leave the control system to modulate boiler. Switching off the 2 nd or 3 rd stage will manually limit boiler power and may provide insufficient heat for the property. Adjustment of desired temperature of central heating Select desired temperature in boiler using working thermostat (2). Recommended temperature is about 60ºC (12 clock position). Thermostat range is 20ºC to 90ºC. If boiler is switched on with working thermostat in off position (6 o clock) central heating pump will operate. If working thermostat is turned up and there is no heating demand, pump will stop. If working thermostat is turned up and there is heating demand, pump will continue and immersion heaters will heat as shown on light8. Activation of 2 nd & 3 rd immersion heaters is shown by illumination of their lights 3. Air in the boiler/ Low Voltage (5), red light Light will illuminate red if air appears in the boiler. The boiler shuts down automatically. To continue operation, vent the boiler. When venting is completed the boiler restarts automatically. If the voltage drops below 180V per phase, low voltage protection light (5) illuminates, the boiler automatically switches off in order to protect electronics and contactors inside the boiler. The boiler will automatically restart when the network voltage exceeds 180V. Cutout thermostat - turning on Cutout thermostat (safety thermostat) (4) protects the boiler against rapid increase of temperature above 115 C. The fuse turns off the boiler and trips the RCD switch. To restart boiler. Unscrew protection cover (4) from the cutout thermostat and press the red key. Cut-out cannot be reset until the temperature of the boiler cools. TE: If the room thermostat is fitted, boiler will only operate if thermostat is calling for heat. 4.2 Protection from freezing Freezing protection is dependent on the room thermostats. To protect a property from freezing when the occupiers are away, the boiler must be left in the ON position with the central heating programmer and/or room thermostat set to freezing protection. If there is no preset freezing protection state on the programmer/thermostat, lower the set temperature in the property to 5 C. This will reduce energy consumption whilst offering system freezing protection. Page 9
12 5. Fault finding guide The boiler is not operating or radiators are cold Please check the following before going through fault finding flowchart. Check the installation is correct. All isolating valves are open. The system is full of water (pressurised) and purged of air. Programmer and controls outside of boiler are on. Check the electrical supply is connected correctly and present Is the boiler switched ON? Electrical part of boiler (heater, switch, relay) is faulty Switch boiler ON Switch ON MCB Is the green LED light ON? Are the MCB (on master switch board) and RCD (in boiler and master switch board) switched ON? Switch ON RCD Reset safety thermostat and try again to switch RCD ON RCD can't be switched ON Does DISPLAY show temperature inside boiler? Faulty control panel Is the temperature of water same as desired? Wait for boiler to heat up One or more heaters are faulty Is the room thermostat switched ON? Switch ON room thermostat Check isolation valves Page 10
13 When switched on, switches on control panel show the voltage, however the boiler does not heat Is the RED lamp ''air in the boiler'' illuminated? Check the water pressure and purged of air Please check the following before going through fault finding flowchart. Check the installation is correct. All isolating valves are open. The system is full of water (pressurised) and purged of air. Programmer and controls outside of boiler are on. Check the electrical supply is connected correctly and present Is the limiting thermostat activated? Safety thermostat can be activated if air is present in installation or operation thermostat is faulty or relay is blocked Is the room thermostat too low? Adjust correct temperature Is the operating thermostat defective? Replace the operating thermostat with new Is the voltage present on immersion heaters Replace the immersion heaters Page 11
14 Boiler ''roars'' while heating Central heating system was not vented properly Lower the speed on central heating pump (see guide below) Please check the following before going through fault finding chart: Check the installation is correct. All isolating valves are open. The system is full of water (pressurised) and purged of air. Programmer and controls outside of boiler are on. Check the electrical supply is connected correctly and present Check the water pressure and vent the central heating system Defective immersion heaters - change the heaters RCCB switch cannot be switched ON Check the status of safety thermostat, try to reset it Switch on RCCB switch Please check the following before going through Fault finding chart. Check the installation is correct. All isolating valves are open. The system is full of water (pressurised) and purged of air. Programmer and controls outside of boiler are on. Check the electrical supply is connected correctly and present Check existance of resistance between terminals N,3,5,7 or RCCB switch and PE Find component which has contact between earth (PE) and change it. Change the RCCB switch Page 12
15 Central heating is working but domestic hot water (DHW) is not working Are the parameters for DHW on control panel or/and external programmer correct? Change parameters Please check the following before going through Fault finding chart. Check the installation is correct. All isolating valves are open. The system is full of water (pressurised) and purged of air. Programmer and controls outside of boiler are on. Check the electrical supply is connected correctly and present Is the relay RHW in ON possition? Is the voltage present on terminals a1(l) and a2(n) of relay RHW? Check external programmer Change the relay RHW Is the votage present on DHW pump therminals? Find and restore break of connection Change the DHW pump Page 13
16 Domestic hot water is working but central heating is not working Are the parameters for central heating on control panel or/and external programmer correct? Change parameters Please check the following before going through Fault finding chart. Check the installation is correct. All isolating valves are open. The system is full of water (pressurised) and purged of air. Programmer and controls outside of boiler are on. Check the electrical supply is connected correctly and present Is the relay RCH in ON possition? Is the voltage present on terminals a1(l) and a2(n) of relay RCH? Check external programmer / room thermostat Change the relay RCH Is the votage present on CH pump therminals? Find and restore break of connection Change the CH pump Page 14
17 6. Maintenance 6.1. Periodic checking The safety valve should be checked annually, preferably before the heating season to ensure correct operation and avoid accumulation of lime scale. It is not recommended to annually drain the system to protect the system from freezing as refilling with fresh water will increase the risk of limescale attack We recommend inspection of the boiler once a year by an authorized service engineer. This service is not included in the guarantee. During the inspection all electric and water connections should be tightened, the system should be vented and if necessary filled up, valves and general functionality of the device and safety valves should be checked. When cleaning the product do not use an aggressive liquid as e.g. gasoline, kerosene or solvent. For the external shell and decorative cover, liquid for cleaning plastics or dish washing media may be used. Control panel should be cleaned with dry or moist cloth (not wet). 7. After Sales service information If after using the fault-finding guide above the problem cannot be rectified by the installation engineer on site, a qualified Oso Service Engineer is available during normal office hours to attend a breakdown. A charge will be made if: There is not a fault with the Termo boiler or the breakdown was caused by incorrect installation of the product that does not conform to the installation manual. Components fitted on the system that were not supplied by Oso are preventing the satisfactory operation of the Termo boiler. The terms and conditions of the guarantee have not been satisfied or the warranty period of the Termo boiler has expired. Many boiler manufacturers find that a very large proportion of service calls are not caused by a product fault. Please read the fault finding guide and the other instructions in this manual carefully. Oso will not accept unauthorized invoices from any third party for repair or service work to Termo boilers. 8. Cascade power limiter Where there are other high load electrical appliances e.g. electric ovens, electric showers etc fitted in the property with the boiler there is a possibility of overload on the electrical system. The Oso cascade power limiter is a unique device that continually monitors the electricity consumption of the property and if required will power down the boiler temporarily to prevent overload. 9. OSO Hotwater UK Ltd Oso Hotwater UK Ltd E15, Marquis Court Team Valley Tarding Estate, Gateshead Tyne & Wear NE11 0RU Tel: Fax: technical.uk@oso-hotwater.com sales.uk@oso-hotwater.com spareparts.uk@oso-hotwater.com 10. Appendices Appendices with further technical information are displayed on the following pages. These appendices should be used in conjunction with the information supplied elsewhere in the manual and show additional schematic and electrical diagrams to assist in the installation of Termo boilers into different central heating systems. Advice is given for a variety of standard systems commonly used in the UK, however the list is not exhaustive and OSO Hotwater UK Ltd cannot guarantee that the advice will be correct for any particular system. All diagrams are shown for informational purposes only. Diagrams are not comprehensive and do not show every system detail. Page 15
18 10.1 Termo RS-M with space heating and water heating Hydraulic diagram Termo RS-M Electric diagram Termo RS-M Page 16
19 S-plan wiring layout 10.2 Termo RS space heating only Hydraulic diagram Termo RS-M Page 17
20 Electric diagram Termo RS-M S-Plan wiring layout Termo RS-M Page 18
TERMO ELECTRIC BOILERS MANUAL OSO TERMO RS -E OSO TERMO PLUS - E OSO TERMO PTV E
TERMO ELECTRIC BOILERS MANUAL OSO TERMO RS -E OSO TERMO PLUS - E OSO TERMO PTV E B C Contents 1. Introduction... 1 1.1. Applicable documents... 1 1.2. Retention of documents... 1 1.3. Features and benefits...
More informationTERMO-Blok TERMO-Extra TERMO-Blok PTV TERMO-Mini
ELECTRIC BOILERS FOR CENTRAL HEATING TERMO-Blok TERMO-Extra TERMO-Blok PTV TERMO-Mini INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR INSTALLATION We reserve the right of alternations TMS-UT-0114-T01-4
More informationPLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL
PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION SOLARCYL IM/SC INSTALLATION MANUAL This manual gives detailed advice for installation and should be read carefully prior to fitting any unvented
More informationPLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL
PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION 0 RD 0 RI 0000-06 IM/ IM/a INSTALLATION MANUAL This manual gives detailed advice for installation and should be read carefully prior to fitting
More informationELECTRIC BOILERS FOR CENTRAL HEATING
ELECTRIC BOILERS FOR CENTRAL HEATING TermoMax INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR INSTALLATION We reserve the right of alternations WE ARE NOT LIABLE FOR DAMAGES RESULTING FROM NON- OBSERVING
More informationTERMO-Blok TERMO-Extra TERMO-Blok PTV
ELECTRIC BOILERS FOR CENTRAL HEATING TERMO-Blok TERMO-Extra TERMO-Blok PTV Contents 1. Introduction... 1 1.1. Applicable documents... 1 1.2. Retention of documents... 1 1.3. Introduction... 1 1.4. Heating
More informationINSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION
PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION Ecoline Geo RI HP INSTALLATION MANUAL The Ecoline GEO is an indirect unvented cylinder designed and approved for use with a heat pump. The
More informationUnvented Calorifier Range. Operating and Maintenance Manual. For Models & 500
Unvented Calorifier Range. Operating and Maintenance Manual. For Models 125 300 & 500 Telephone 08456 448802 Fax 08456 448803 Emial info@mhgheating.co.uk Web www.mhgheating.co.uk TABLE OF CONTENTS. Section
More informationCROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15
CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15 COMPACT PLUS 10 and 15 Litre Unvented Under and Over Sink Water Heater INSTALLATION AND USER GUIDE 1 DIMENSIONS 10L - 250mm 15L - 310mm 100mm 80mm 410mm
More informationInstallation, operating and servicing instructions
English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes
More informationSEALED THERMAL STORE
ISSUE 3 0717 INSTALLATION AND USER GUIDE ENERGYMANAGER SEALED THERMAL STORE ADVANCE APPLIANCES LTD PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE. SCHEMATIC DIAGRAM OF ENERYMANAGER THERMAL
More informationTERMO-Blok TERMO-Extra TERMO-Blok PTV
TRGOVINA TERMOSTROJ d.o.o. 10250 Lučko, F. Puškarića 1d Tel/Fax +385 1 6531-008, 6531-015, 6531-016 Eurposka unija e-mail: info@termostroj.com web: http://www.termostroj.com European Union ELECTRIC BOILERS
More informationINSTALLATION & TECHNICAL MANUAL
The COMET Range of Boilers the ultimate solution for central heating INSTALLATION & TECHNICAL MANUAL If you require any further assistance: Telephone: 01698 820533 Fax: 01698 825697 E-mail: info@electric-heatingcompany.co.uk
More informationELECTRIC COMBINATION BOILER. (European Patent No: Design Right Protected.) TH12-450U MRK 2
ELECTRIC COMBINATION BOILER (European Patent : 1757678. Design Right Protected.) TH12-450U MRK 2 INCLUDES THERMAL SOLAR & WOOD BURNING STOVE WITH WATER JACKET APPENDIX This product is suitable for connection
More informationTECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE:
TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE: 560955 CE Directive 2006/95/CEE British Standard EN 60335-1 (C 73800) 1 CONTENTS Page 1) INTRODUCTION 1.1) Description 3 1.2) Dimensions & connections
More informationPOWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual
POWERFLOW Series Unvented Electric Storage Water Heaters Installation & Operating Instructions Manual These Instructions must be left with the user after installation. Version 3.0 June 2009 Hyco POWERFLOW
More informationFITTING, OPERATION, INSTALLATION & SERVICING INSTRUCTIONS
TRIANCO Electric System Boiler KM 59690 FITTING, OPERATION, INSTALLATION & SERVICING INSTRUCTIONS To be retained by the householder HEALTH AND SAFETY INFORMATION FOR THE INSTALLER AND SERVICE ENGINEERS
More informationAlpha CombiMax 350 and 600
Installation and Servicing Instructions Alpha CombiMax 350 and 600 Unvented Hot Water Store for use with the Alpha 240/280 Range of Gas Fired Combination Boilers For Technical help or for Service call...
More informationAquaFlo II. Issue 3 December Please read these instructions carefully before commencing installation of the AquaFlo unvented water heater
Installation, Maintenance and User Instructions AquaFlo II Issue 3 December 2011 Please read these instructions carefully before commencing installation of the AquaFlo unvented water heater Please leave
More informationGB24 & GB30. User Manual
GB24 & GB30 User Manual BOILER OUTPUT To Domestic Hot Water:To Central Heating: GB24/30 Minimum 8.0 kw (27,296 Btu/h) GB24 Maximum 24.2 kw (82,570 Btu/h) GB30 Maximum 30.3 kw (103,384 Btu/h) GB24/30 Minimum
More informationATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL
STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION
More informationADVANCE ECB ELECTRIC COMBINATION BOILER
ISSUE ISSUE 45 0115 0317 INSTALLATION AND USER GUIDE ADVANCE ECB ELECTRIC COMBINATION BOILER ADVANCE APPLIANCES LTD HOUSEHOLDER - PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE 1 SCHEMATIC
More informationPLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL
PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION SLIMLINE INSTALLATION MANUAL This cylinder is manufactured and approved in accordance with EN 897:006. This manual gives detailed advice for
More informationAmptec. Electric flow boiler
Amptec Electric flow boiler the nation s favourite for PLUMBING & HEATING SUPPLIES FREE SHIPPING on all orders over 100 to mainland UK FINANCE AVAILABLE spread the cost with low interest rates SECURE PAYMENTS
More informationINTRODUCTION STORAGE PRIOR TO INSTALLATION. Expansion Vessel Hose. Part No High Flow Rate Inlet Control Set. Part No.
INTRODUCTION The Worcester Greenskies cylinder is a Stainless Steel Unvented Twin Coil Storage vessel specifically designed to be installed in conjunction with the Worcester Greenskies solar package. Should
More informationPowerflow Unvented water heater
Product Instruction Manual Powerflow Unvented water heater 30, 50 and 90 litres v15.6/5 Thank you for purchasing a Powerflow series unvented electric water heater. The Powerflow is suitable for hand washing
More informationAlpha FlowSmart 25 and 50
Installation and Servicing Instructions Alpha FlowSmart 25 and 50 Hot Water System incorporating a Flue Gas Heat Recovery Device, Primary Store and an Alpha CD Condensing Combination Boiler For Technical
More informationFRONT COVER (TOP) OUTLET WARNING LABEL RED IDENT ELECTRICAL CABLE ENTRY POINTS EARTH CLAMP INSULATION SHEET TERMINAL BLOCK FLYING LEAD MAIN PCB
Models: 95 022 001 C-400 GC No.EB-205-06 95 022 002 C-600 GC No.EB-205-02 95 022 003 C-900 GC No.EB-205-03 95 022 004 C-1100 GC No.EB-205-01 95 022 005 C-1200 GC No.EB-205-04 95 022 101 U-401 GC No.EB-205-08
More informationBaxi Maxflow Combi WM
Baxi Maxflow Combi WM Gas Fired Wall Mounted Combination Boiler with Unvented Hot Water Storage Please keep these instructions safe. Should you move house, please hand them over to the next occupier. User
More informationQuantum. Installation, User and Service Manual. Hot Spring
Hot Spring Domestic Hot Water Cylinder Storage Capacities 90, 125, 150, 170, 200, 250 and 300 Litres 1 Important - This Manual should be left with the householder after installation Index Section Page
More informationInstructions for Use Installation and Servicing
0020004886A 18.01.05 Instructions for Use Installation and Servicing To be left with the user 12563 115-150-175-200-250-300 Unvented hot water storage cylinders Glow-worm, Nottingham Road, Belper, Derbyshire.
More informationMikrofill Ethos Condensing combination boiler
Mikrofill Ethos Condensing combination boiler User Instructions 24cc CE Mark Mikrofill gas appliances comply with the requirements contained in CE Mark documents contained with European directives applicable
More informationBaxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler
User s Operating Instructions Baxi System 100 HE Plus Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler Please keep these instructions safe. Should you move house, please hand them
More informationE-COMBI EVO E-SYSTEM EVO
E-COMBI EVO E-SYSTEM EVO User s manual CONDENSING WALL-HUNG GAS BOILER G.C.N.:47-116-68 (24 kw) G.C.N.:47-116-69 (30 kw) G.C.N.:47-116-70 (38 kw) G.C.N.:41-116-39 (24 kw) G.C.N.:41-116-40 (30 kw) Country
More informationUnvented Electric Water Heater 10/15 litre Undersink
Unvented Electric Water Heater 10/15 litre Undersink Fitting Instructions and User Guide 1 CONTENTS SECTION PAGE 1.0 INTRODUCTION 2 2.0 TECHNICAL SPECIFICATION 3 3.0 INSTALLATION 4 4.0 COMMISSIONING 9
More informationZIP Varipoint III. Installation, Maintenance and User Instructions. Models VP303, VP503 VP803, VP953 direct unvented water heaters. Issued August 2008
Varipoint cover qxd:varipoint cover qxd 22/8/08 11:14 Page 1 Installation, Maintenance and User Instructions ZIP Varipoint III Models VP303, VP503 VP803, VP953 direct unvented water heaters Issued August
More informationInstallation Instructions / Operating & Maintenance Manual Ablution Plant Model BTHW-1
Arrow Valves Ltd Operating & Maintenance Manual ABLUTION PLANT Arrow Valves Tel 01442 823 123 Fax 01442 823 234 www.arrowvalves.co.uk Installation Instructions / Operating & Maintenance Manual Ablution
More informationPLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL
PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION 09-0 05-05 INSTALLATION MANUAL This cylinder is manufactured and approved in accordance with EN 897:006. This manual gives detailed advice
More informationINSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION
PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION 142039-02 GEO 9-2015 Ecoline Geo RI HP INSTALLATION MANUAL The Ecoline GEO is an indirect unvented cylinder designed and approved for use with
More informationMEGAFLO HE Iss 1
MEGAFLO HE 1 36 00 5843 Iss 1 Contents Contents SECTION PAGE 1 INTRODUCTION... 3 2 GENERAL REQUIREMENTS... 4 3 INSTALLATION - GENERAL... 5 4 INSTALLATION - DIRECT UNITS... 8 5 INSTALLATION - INDIRECT UNITS...
More informationBath Shower Mixer
86004490 Bath Shower Mixer Installation and operating instructions The showerhead and hose supplied with this product are a safety critical part of your shower. Failure to use genuine Triton parts may
More informationVote for your Installer of the year at HEATSLAVE
Vote for your Installer of the year at www.worcester-bosch.co.uk HEATSLAVE 12/14, 15/19, 20/25, 26/32 FLOOR-STANDING OIL-FIRED COMBINATION BOILERS FOR CENTRAL HEATING AND MAINS-FED DOMESTIC HOT WATER USER
More informationDene Bath Shower Mixer
Dene Bath Shower Mixer Installation and operating instructions The showerhead and hose supplied with this product are an integral part of the safety of your shower. Failure to use genuine Triton parts
More informationBaxi Maxflow Combi FS
Baxi Maxflow Combi FS Gas Fired Floor Standing Combination Boiler with Unvented Hot Water Storage Please keep these instructions safe. Should you move house, please hand them over to the next occupier.
More informationProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.
1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803
More informationUSER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES
24-28Si II SERIES G.C. NUMBERS APPLIANCE NATURAL GAS L.P.G. 24Si II 47 311 65 47 311 66 28Si II 47 311 67 47 311 68 USER INSTRUCTIONS & CUSTOMER CARE GUIDE EXCELLENCE COMES AS STANDARD CONTENTS Page No.
More informationSchuco SS-TC/SC Cylinders
Cylinders Installation, User and Service Domestic Hot Water Cylinder Storage Capacities 90, 125, 150, 170, 200, 250 & 300, Litres Important -This should be left with the Cylinder after Installation Schueco
More informationInstallation and Servicing Instructions. Alpha FlowSmart
Installation and Servicing Instructions Alpha FlowSmart Hot Water System incorporating an Alpha InTec 30/40GS Condensing Combination Boiler with Integrated Flue Gas Heat Recovery Device and wall mounted
More information/2010 US/CA
6 720 646 148-11/2010 US/CA (en) For the user User s Instructions Condensing gas boiler Logamax plus GB162-L.B. 80 kw/100 kw Please read thoroughly before operating This manual is available in the English
More informationInstallation and Commissioning Manual
Manual Advance Buffer Vessels for Ground Source Heat Pump Systems Installation and Commissioning Manual Copyright 2015 Kensa Heat Pumps Ltd Page 1 of 12 Contents Page Section Description Page 1... Safety
More informationHI-LINE LV FAN CONVECTOR MODEL: 7-4.
HI-LINE LV FAN CONVECTOR MODEL: 7-4. INSTALLATION, OPERATING, MAINTENANCE & AFTER SALES MANUAL Product Serial Number: Please leave this manual with the end user. Part Number: 1370058 heatingthroughinnovation.
More informationINSTALLATION & TECHNICAL MANUAL
The FUSION Range of Boilers INSTALLATION & TECHNICAL MANUAL If you require any further assistance: Telephone: 01698 820533 Fax: 01698 825697 E-mail: info@electric-heatingcompany.co.uk Or visit our website
More informationT550i power shower pump Installation and operating instructions
power shower pump Installation and operating instructions Installers please note these instructions are to be left with the user 2180149H March 2008 CONTENTS Page Plumbing and electrical notes...1 Introduction...2
More informationUnvented Direct & Indirect Hot Water Cylinders (400L L)
Unvented Direct & Indirect Hot Water Cylinders (400L - 2500L) Important Please read & understand all these instructions before commencing installation. Please leave this manual with the customer for future
More informationHot Water Energy Storage THE HOT WATER PEOPLE HEAT INTERFACE UNIT ENGINEERED FOR ULTIMATE HEATING COMFORT AND MAXIMUM SYSTEM EFFICIENCY
Hot Water Energy Storage HEAT INTERFACE UNIT ENGINEERED FOR ULTIMATE HEATING COMFORT AND MAXIMUM SYSTEM EFFICIENCY THE HOT WATER PEOPLE Hot Water Energy Storage THE HOT WATER PEOPLE Providing premium hot
More informationInstallation and Servicing Instructions
Installation and Servicing Instructions Alpha HE CB25/33 and HE SY25 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Boiler Range For Technical help or for Service call...
More informationINSTANTANEOUS ELECTRIC SHOWER
GUARANTEE / SERVICE POLICY INSTANTANEOUS ELECTRIC SHOWER GUARANTEE Designa guarantee this DS3000 product for a period of two years, from date of purchase, against mechanical and electrical defects arising
More informationBaxi Combi 133 HE Plus Baxi Combi 100 HE Plus Baxi Combi 80 HE Plus. User s Operating Instructions
User s Operating Instructions Baxi Combi 133 HE Plus Baxi Combi 100 HE Plus Baxi Combi 80 HE Plus Gas Fired Wall Mounted Condensing Combination Boiler Please keep these instructions safe. Should you move
More informationUnvented Direct & Indirect Hot Water Cylinders (400L L)
Unvented Direct & Indirect Hot Water Cylinders (400L - 2500L) Important Please read & understand all these instructions before commencing installation. Please leave this manual with the customer for future
More informationDIGITAL MODULATING BOILERS
DIGITAL MODULATING BOILERS FOR HEATING AND SANITARY HOT WATER CMX15 CMX18 CM15 CM18 INSTALLATI INSTRUCTIS AND USER GUIDE Please read these instructions before installing or using this appliance for the
More informationAIRE. Thermostatic bath shower mixer. Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER
AIRE Thermostatic bath shower mixer Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER 2180427C October 2005 CONTENTS Page Introduction 1 Safety
More informationInstallation and User Instructions HS10U, HS15U.
Installation and User Instructions HS10U, HS15U. MULTIPOINT Please read and understand these instructions before starting work. Please leave this leaflet with the user following installation PACK CONTENTS
More informationAssessment Schedule - TS.6
The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall
More informationADVANCE ELECTRIC THERMAL STORE
ISSUE 13 1118 INSTALLATION AND USER GUIDE ADVANCE ELECTRIC THERMAL STORE ADVANCE APPLIANCES LTD HOUSEHOLDER PLEASE RETAIN AND ENSURE SERVICE RECORDS ARE KEPT UP TO DATE. 2 INTRODUCTION Advance thermal
More informationGEM-C Wireless User & Installation Manual. Revision October Apollo Solar Electric Limited. Documentation
Documentation GEM-C Wireless User & Installation Manual Revision October 2014 Apollo Solar Electric Limited Contents GEM-C Wireless User Manual 3 Important Safety Information 3 Introduction 4 The GEM-C
More informationInstallation, Operation and Maintenance Instructions Electric Flow Heater OM009
Installation, Operation and Maintenance Instructions Electric Flow Heater OM009 Calorifiers Heat Exchangers Pressurisation Units Sales Tel: 01457 835700 Sales Fax: 01457 832700 E-mail: sales@gmsthermal.co.uk
More informationInstallation and Servicing Instructions. Alpha CD24C/32C
Installation and Servicing Instructions Alpha CD24C/32C Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers For Technical help or for Service call...
More informationContents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9
Contents Product Description 2 Approvals 2 Warranty 2 Warnings 2 Technical Specification 3 Installation 4 Location 4 Plumbing Connection 4 Electrical connection 5 Commissioning 6 Operation 6 Routine Preventative
More informationBOILER MODEL m³/h (31.5 ft³/h)
Technical Data BOILER MODEL 30 40 Heat Input 9.6 kw (32,600 Btu/h) 12.7 kw (43,500 Btu/h) Heat Output 80-60ºC 8.1 kw (27,700 Btu/h) 11.0 kw (37,400 Btu/h) Heat Output 60-40ºC 8.8 kw (30,000 Btu/h) 11.7
More informationZIP AquaFlo II. Models: Direct, Indirect and Solar Compatible. Unvented cylinder water heaters
Installation & User Instructions ZIP AquaFlo II Unvented cylinder water heaters Models: Direct, Indirect and Solar Compatible. AquaFlo Installation, Maintenance and User Instructions Page 1 of 28 v 2.04
More informationREDRING POWERSTREAM UNVENTED INSTANTANEOUS WATER HEATER. Installation and User Guide
: GUARANTEE AND CONTACT DETAILS REDRING POWERSTREAM UNVENTED INSTANTANEOUS WATER HEATER Installation and User Guide APPLIED ENERGY PRODUCTS LIMITED MORLEY WAY, PETERBOROUGH PE2 JJ TEL: +44 (0) 844 372
More informationInstallation and Servicing Instructions. Alpha CB50
Installation and Servicing Instructions Alpha CB50 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boiler with Unvented Hot Water Storage For Technical help or for Service call... ALPHA
More informationInstallation & User Instructions
Storage Cylinder Grant DuoWave Plus System Triple Coil Solar Cylinder Range Installation & User Instructions Part. IRL 21. Rev 00. June 2011 Do not fit on a well or borehole supply Contents 1 Introduction
More informationNew Zip AquaFlo. Stainless steel cylinders for mains pressure hot water
New Zip AquaFlo Stainless steel cylinders for mains pressure hot water 2 AquaFlo II Zip AquaFlo II is a range of direct and indirect stainless steel cylinders designed to provide mains pressure hot water
More informationAQUA PREMIER ELECTRONIC ELECTRIC SHOWER. Installation and User Guide
AQUA PREMIER ELECTRONIC ELECTRIC SHOWER Installation and User Guide IMPORTANT: This booklet should be left with the user after installation and demonstration CONTENTS Section Page Section Page Introduction.......................
More informationINSTALLATION AND SERVICING
INSTALLATION AND SERVICING LOGIC HIU (Heat Interface Unit) Indirect 75 Indirect 50 Direct MT Direct HT When replacing any part on this appliance, use only spare parts that you can be assured conform to
More informationPOWER SHOWERS Models 4500M 5002M 4500T 5002T
II POWER SHOWERS Models 4500M 5002M 4500T 5002T Performance Shower Products CUSTOMER SERVICE HELPLINE: 01883 730339 CONTENTS PLEASE READ THESE INSTRUCTIONS CAREFULLY: This booklet covers all models in
More informationUSERS GUIDE. LOGIC+ Combi 24, 30, 35
USERS GUIDE LOGIC+ Combi 24, 30, 35 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use
More informationecotec Instructions for installation and servicing Wall hung room sealed fan assisted condensing boiler For the installer
For the installer Instructions for installation and servicing ecotec Wall hung room sealed fan assisted condensing boiler ecotec plus 6 ecotec plus 65 ecotec plus 68 ecotec plus 64 ecotec plus 630 ecotec
More informationH o t Wa te r Syste m s. Senator Electric Flow Boilers. Making Life Simpler
H o t Wa te r Syste m s Senator Electric Flow Boilers Making Life Simpler Electric Wet Central Heating The Range Senator electric flow boiler is designed to heat re-circulated water used in wet central
More informationAqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND
Aqua Balance AquaBalance TM CONTROL MODULE QUICK START GUIDE 10 1 Domestic Hot Water temperature setpoint decreasing button 2 Domestic Hot Water temperature setpoint increasing button 3 Central Heating
More informationWhere gas is not an option,
Where gas is not an option, the perfect solution is the economical Fusion Boiler the most complete electric boiler on the market it s electric Fusion Electric Boiler provides complete peace of mind for
More informationREDRING POWERSTREAM UNVENTED INSTANTANEOUS WATER HEATER. Installation and User Guide
REDRING POWERSTREAM UNVENTED INSTANTANEOUS WATER HEATER Installation and User Guide IMPORTANT: This booklet should be left with the user after installation and demonstration. It should be kept in a safe
More informationINSTALLATION MANUAL. RD SERIES Digital Electric Water Heater Wall-hung Unvented
INSTALLATION MANUAL RD SERIES Digital Electric Water Heater Wall-hung Unvented WELCOME Dear Customer, Thank you for choosing the RD Series electric water heater, with an exclusive electronic temperature
More informationSUPPLEMENT. Part No. DOC 25 Rev. 09 November SUPPLEMENTARY INSTALLATION and USER INSTRUCTIONS. COMBI 90 OUTDOOR MODULE MkII
SUPPLEMENT Part No. DOC 25 Rev. 09 November 2004 SUPPLEMENTARY INSTALLATION and USER INSTRUCTIONS COMBI 90 OUTDOOR MODULE MkII For use with Kerosene or Gas Oil TO BE READ IN CONJUNCTION WITH THE INSTRUCTION
More informationLogic+ Combi
USER GUIDE Logic+ Combi 24 30 35 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use
More informationOperating instructions
Operating instructions For the operator Operating instructions HOME SYSTEM GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18 0 Fax +49 21 91 18 28 10 info@vaillant.de
More informationMikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc
Mikrofill Ethos Condensing combination boiler Maintenance Instructions 24cc IMPORTANT Benchmark Installation, Commissioning and Service Record Log Book is enclosed in your customer information pack. This
More informationBOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration
in tap Boiling water to in tap sink Drain Valve (as high as possible) REDITAP CONNECTION SUMMARY Amp mains supply cold mains water into in tap optional filter cold water in hot water BOILING UNIT Installation
More informationIMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring
Page 1 of 8 IMAGINATION SOLAR LTD Installation Guide B1 Planning the Plumbing and Wiring Unit 4 Montpelier Central, Station Road Bristol BS6 5EE t: 0117 942 6668 f: 0117 942 8998 e: enquiries@imaginationsolar.com
More informationInstallation and Servicing Instructions. Alpha 240/280. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers
Installation and Servicing Instructions Alpha 240/280 Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers For Technical help or for Service call... ALPHA HELPLINE Tel: (0322)
More informationInstallation and Servicing Instructions. Alpha CD50
Installation and Servicing Instructions Alpha CD50 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency, Condensing Combination Boiler with Unvented Hot Water Storage For Technical help
More informationheat interface units A BOILER WITHOUT A FLAME
A BOILER WITHOUT A FLAME heat interface units Communal Heat Networks A central boiler house will generate heat which is distributed through a network of pipe to each home or apartment in the building.
More informationJANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No
JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No 53 416 06 Publication No. ZZ 180/17 May 2000 These appliances are tested and certified by B G Technology for
More informationUK arotherm Schematics and installation guide
UK arotherm Schematics and installation guide Air to Water Heat Pumps (AWHP) Controls: VRC 700, VR 70, VR 91 The Vaillant heat pump booklet contains documentation to assist in the design, installation
More informationInstructions & Maintenance
Instructions & Maintenance Issue 1 INTRODUCTION The corrosion resistant UVGold Unvented cylinder is made from Duplex Stainless Steel. It is highly insulated with environmentally friendly foam enclosed
More informationENERSTORE. Vented Hot Water Storage System INSTRUCTIONS PLEASE LEAVE WITH HOUSEHOLDER
ENERSTORE Vented Hot Water Storage System INSTRUCTIONS PLEASE LEAVE WITH HOUSEHOLDER Newark Copper Cylinder Co Ltd Brunel Drive Newark Notts. NG24 2EG Tel: 01636 678437 Fax: 01636 678964 Internet: www.newarkcoppercylinder.co.uk
More informationHI-LINE SUPER RC FAN CONVECTOR MODELS: 25-18,
HI-LINE SUPER RC FAN CONVECTOR MODELS: 25-18, 29-20. INSTALLATION, OPERATING, MAINTENANCE & AFTER SALES MANUAL Product Serial Number: Please leave this manual with the end user. Part Number: 1370065 heatingthroughinnovation.
More informationInstallations, User and Service Manual. Section A Domestic Hot Water Cylinder 3C382B 3C510B 3C382HP 3C510HP. Section B Solar 3C Heating System
Version 6.1 14/07/2014 Installations, User and Service Manual Section A Domestic Hot Water Cylinder 3C382B 3C510B 3C382HP 3C510HP Section B Solar 3C Heating System Important -This manual should be left
More informationStored Water District Heating Interface Units. Heat Interface Units
Stored Water District Heating Interface Units Heat Interface Units Why choose Elson Elson are a Heatrae Sadia company, the UK s leading manufacturer of hot water solutions utilising thermal store technology
More information