Spring Green Elementary School 830 Daley St. Spring Green, WI 53588
|
|
- Dina Robinson
- 5 years ago
- Views:
Transcription
1 FACILITIES PLANNING STUDY RIVER VALLEY SOOL DISTRICT Spring Green Elementary School 830 Daley St. Spring Green, WI South Dewey Street Eau Claire, Wisconsin sdsarch.com
2 SPRING General Overview Note: Property lines have been approximated Site Acreage: Approx. 0 Acres Parking Stalls: Approx. 46 Building Area: 42,28 GSF Construc on: Masonry/CMU ES Director: Mr. Jaime Hegland Students: 248 GSF/Student: 171 Grades: K through th Paved Area P.1 Descrip on: Visitor Parking Type: Asphalt Net Area: Approx. 2,160 SF Ra ng: Paved Area P.2 Descrip on: General Parking Type: Asphalt Net Area: Approx. 19,60 SF Ra ng: Paved Area P.3 Descrip on: Play Ground Type: Asphalt Net Area: Approx. 20,400 SF Ra ng: P.2 P.1 P.3 * See the final page of Chapter 1 for ra ng system of paved surfaces. Chapter Page 2 Project No. 121 December 201
3 Site Analysis Code/Safety Issue Site photos Chapter Page 3 Project No. 121 December 201
4 SPRING Building Construction, Remodels and Additions * Fire ra ngs as indica ed by original construc on may currently be compromised by subsequent modifica ons. Year 1988? Project Scope Original Building Construc on Addi on Area 40,8 SF 1,700 SF Legend 1 Founda on: CMU Block Exterior Shell: Brick Cavity Wall R-VALUE: 14.7 Interior: CMU Block 1 Chapter Page 4 Project No. 121 December 201
5 Roof Analysis R.3 Legend BSPM (Ballasted Single Ply EPDM) ASPM (Adhered Single Ply EPDM) R.1 R.2 Roof Area R.1 Roof Type: ASPM Net Area: 31,07 SF Year Installed: 2011 Condi on: Very Good Roof Area R.2 Roof Type: ASPM Net Area: 7,340 SF Year Installed: 1988 Condi on: Poor Roof Area R.3 Roof Type: ASPM Net Area: 1,700 SF Year Installed: Unknown Condi on: Average R.2R.1 Chapter Page Project No. 121 December 201 Roof photos
6 SPRING Room Assignments and Building Use Legend Classroom/Instruc on Athle cs Administra on/conference Food Service STORAGE Music/Arts General/Support Circula on ME. STORAGE KITEN MULTI-PURPOSE 4TH GRADE 4TH GRADE 4TH GRADE SPECIAL EDUCATION S LOCKER ROOMS PHY. ED. OFFICE TH GRADE TH GRADE MUSIC 3RD GRADE ART 2ND GRADE 1ST GRADE IMC TOILETS TOILETS KINDERGARTEN KINDERGARTEN ADMIN/ OFFICES K 4K 4K 1ST GRADE Chapter Page 6 Project No. 121 December 201
7 Floor Plan Analysis Damaged/worn flooring Restroom is not ADA compliant Damaged/worn cabinets/casework Damaged/worn ceiling Damaged/worn plumbing fixtures Door should swing out to meet exi ng/occupancy requirements Locker Room used as an Office Interior Photos Code/Safety Issue Safety/Health Issue ADA/Accessibility Issue Program Related Problem Area Chapter Page 7 Project No. 121 December 201
8 SPRING AC AH Control Air Compressor Air Handling Unit Mechanical Analysis EH Electric Heater Fin Tube Heat EH P P B B 8 B CR CU Boiler Cabinet Unit Heater Condensate Return Sta on Condensing Unit KH Kitchen Hood GS Gas Service MS Mini-Split P Pump CU UH AC AH UH Convector UH Unit Heater AH ED Exhaust Duct UV Unit Ven lator AH Exhaust Fan UH KH 1) Corridors are u lized as return air plenums. 2) The building is served by hea ng only air handling units with constant volume reheat booster coils. Exterior spaces are provided with baseboard radia on to provide addi onal heat. One air handling unit is provided with a remote condensing unit for cooling. The air handling units and reheat coils are in good working condi on, but nearing the end of their useful lives. The condensing unit is past its useful life. Hea ng is provided by two Burnham boilers. The boilers, pumps, valves and accessories are in decent working condi on, but nearing the end of their useful life. Pneuma c controls are used throughout the building. Code/Safety Issue Photos Chapter Page 8 Project No. 121 December 201
9 G TS Electrical Analysis 10 D Data Center EM Electric Meter FA Fire Alarm Control Panel G Generator P C P E MC Master Clock MS Main Service P Panel UT *pad mounted FA P A P MD MS TP 9 PS Paging System SS Security System UT U lity Transformer TP Phone/Data Termina on Port TS Transfer Switch PS TP P D P B1 P B TV Junc on Box 1) Automa c ligh ng control is not present in all required areas of the building. 2) Code required electrical clearances are not met in front of the main electrical equipment. Refer to picture 9. 3) Code required selec ve coordina on and separa on for NEC 700 emergency loads does not appear to be met. LIGHTING 4) Ligh ng generally consists of fluorescent recessed fixtures that are in good working condi on. ) Some recent ligh ng upgrades appear to have taken place and include high bay fluorescent ligh ng in the gym. POWER 6) All electrical equipment appears to be original to the building and is in working condi on. However, this equipment is nearing 30 years old and will be nearing the end of its expected useful life within the next 10 years. Code/Safety Issue Photos Chapter Page 9 Project No. 121 December 201
10 SPRING Plumbing Analysis AB Acid Neutralizing Basin CP Circula on Pump GS Gas Service GI Grease Interceptor LS Li Sta on S Water So ener SE Sewage Ejector SP Sump Pump WH Water Heater WS Water Service WH WH CP GS SE WS 11 S GI WH PLUMBING 1) The domes c water is so ened by a Hellenbrand water so ener and heated by a single A.O. Smith gas fired water heater. The plumbing equipment appears to be in good working condi on. FIRE PROTECTION 2) The building is not provided with fire protec on. Code/Safety Issue Photos Chapter Page 10 Project No. 121 December 201
11 Photographs Chapter Page 11 Project No. 121 December 201
Plain Elementary School 1370 Cherry St. Plain, WI 53577
FACILITIES PLANNING STUDY RIVER VALLEY SCHOOL DISTRICT Plain Elementary School 1370 Cherry St. Plain, WI 53577 7 South Dewey Street Eau Claire, Wisconsin 54701 715.832.1605 sdsarch.com PLAIN General Overview
More informationArena Elementary School 314 Willow St. Arena, WI 53503
FACILITIES PLANNING STUDY RIVER VALLEY SCHOOL DISTRICT Arena Elementary School 314 Willow St. Arena, WI 53503 7 South Dewey Street Eau Claire, Wisconsin 54701 715.83.1605 sdsarch.com ARENA General Overview
More informationRiver Valley High School 660 Varsity Blvd. Spring Green, WI 53588
FACILITIES PLANNING STUDY RIVER VALLEY SCHOOL DISTRICT River Valley High School 660 Varsity Blvd. Spring Green, WI 53588 South Dewey Street Eau Claire, Wisconsin 5401 15.832.1605 sdsarch.com RIVER General
More informationVOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED
Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological
More informationFlorence High School / Middle School Page 1 of 3 Florence, WI
Florence High School / Middle School Page 1 of 3 Florence, WI Plumbing Systems Review: The following report is the result of a site visit by Tim Kehoe of Muermann Engineering, LLC that occurred on October
More informationPLATTEVILLE MIDDLE SCHOOL
Architectural The building has aluminum clad wood awning windows in combination with aluminum fixed glass units. They appear to be exterior glazed with insulated glazing. See photo 2. Platteville Middle
More informationNYC Department of Education
Asset: P.S. 199 ANNEX (@ ST. TERESA'S) - QUEENS, 50-15 44TH STREET, New York, 11377 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-18 11:39 AM 2018-05-14 12:27 PM Asset Data
More informationNYC Department of Education
Asset: P.S. 183 - QUEENS, 2-45 B 79 STREET, New York, 11693 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-02 8:32 AM 2018-05-16 1:44 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 92 - BROOKLYN, 601 PARKSIDE AVENUE, New York, 11226 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 8:31 AM 2017-11-27 11:43 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 194 - MANHATTAN, 244 WEST 144 STREET, New York, 10030 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-12 10:48 AM 2018-01-29 10:54 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 69 - STATEN ISLAND, 144 KEATING PLACE, New York, 10314 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-19 8:39 AM 2018-01-23 4:33 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 86 ANNEX - BRONX, 124 EAMES PLACE, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-05 1:03 PM 2018-04-27 1:35 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 160 - BROOKLYN, 5105 FORT HAMILTON PARKWAY, New York, 11219 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-03 8:01 AM 2018-05-18 1:45 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: P.S. 19 - STATEN ISLAND, 780 POST AVENUE, New York, 10310 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-26 8:58 AM 2017-11-14 1:37 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Mechanical Inspection Asset: P.S. 1 - MANHATTAN, 8 HENRY STREET, New York, 10038 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-09-28 8:39 AM 2017-10-12 5:28 PM Asset Data Are there
More informationNYC Department of Education
Asset: P.S. 29 - STATEN ISLAND, 1581 VICTORY BLVD, New York, 10314 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-10 11:28 AM 2018-01-17 11:37 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 157 - BRONX, 757 CAULDWELL AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-01 8:48 AM 2017-12-06 5:36 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 104 - BROOKLYN, 9115 5TH AVENUE, New York, 11209 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-21 8:55 AM 2018-02-21 1:09 PM Asset Data Are there fuel tanks? Total
More informationMUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross
More informationNYC Department of Education
Asset: P.S. 161 - MANHATTAN, 499 WEST 133 STREET, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-15 8:26 AM 2018-06-08 1:37 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 198 - BRONX, 1180 TINTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:14 AM 2018-01-24 9:32 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: FORSYTH HS (AUXSVC-OLD 91) - M, 198 FORSYTH STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-09-28 8:07 AM 2018-03-20 4:47 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: P.S. 224 ANNEX - QUEENS, 221-21 CORBETT ROAD, New York, 11361 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-28 12:27 PM 2018-04-04 5:15 PM Asset Data Are there fuel tanks?
More informationChariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)
Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15) School/Department FY 16 FY 17 FY18 FY19 FY20 Chariho Regional High School FY 16 FY 17 FY18 FY19 FY20 *Repair Bleachers
More informationNYC Department of Education
Asset: P.S. 78 - QUEENS, 48-09 CENTER BLVD., New York, 11109 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-02 11:40 AM 2018-04-19 9:04 AM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 111 - MANHATTAN, 440 WEST 53 STREET, New York, 10019 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-16 8:47 AM 2018-03-21 8:02 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 253 - BROOKLYN, 601 OCEAN VIEW AVENUE, New York, 11235 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-22 8:34 AM 2018-05-31 5:42 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 32 - BRONX, 690 EAST 183 STREET, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 9:25 AM 2017-11-16 5:46 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 310 - BRONX, 260 WEST KINGSBRIDGE RD, New York, 10463 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-07 8:42 AM 2017-12-13 12:31 PM Asset Data Are there fuel tanks?
More informationHOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District
HOLUM EDUCATION CENTER Architectural The existing building has approximately 41,823 square feet and sets on a lot about 4.14 acres in size. Parking lots are located along the east and west sides of the
More informationNYC Department of Education
Asset: A. PHILLIP RANDOLPH HS - MANHATTAN, 443 WEST 135 STREET, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-02 8:11 AM 2018-06-14 1:21 PM Asset Data Are there
More informationNYC Department of Education
Asset: P.S. 205B (ECF) - BRONX, 2375 SOUTHERN BLVD, New York, 10460 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-12 12:29 PM 2018-01-12 3:14 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: I.S. 45 - BRONX, 2502 LORILLARD PLACE, New York, 10458 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-05 9:14 AM 2017-12-20 11:42 AM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 163 - BRONX, 2075 WEBSTER AVENUE, New York, 10457 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-22 8:33 AM 2018-03-22 3:13 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 188 - MANHATTAN, 442 EAST HOUSTON STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-08 8:52 AM 2018-06-13 5:06 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 841- QUEENS, 48-25 37TH STREET, New York, 11104 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-02 12:54 PM 2018-05-14 12:28 PM Asset Data Are there fuel tanks? Total
More informationState College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More information2014 Bond Project Guide
2014 Bond Project Guide Bush Elementary School Page 1 Instructional Technology Computers, Projectors, Mobile Carts, Document Cameras and Printers Wireless Connectivity New Construction New Tech Center
More informationNYC Department of Education
Asset: P.S. 7 - MANHATTAN, 160 EAST 120 STREET, New York, 10035 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-02 8:44 AM 2018-03-12 10:45 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 128 - MANHATTAN, 560 WEST 169 STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-07 8:50 AM 2018-06-14 1:16 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 11 - MANHATTAN, 320 WEST 21 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-23 8:27 AM 2018-01-23 3:21 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: J.H.S. 216 - QUEENS, 64-20 175 STREET, New York, 11365 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-06 8:51 AM 2017-11-22 10:04 AM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 146 - BRONX, 968 CAULDWELL AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-01 8:57 AM 2018-05-31 2:59 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 73 - BRONX, 1020 ANDERSON AVENUE, New York, 10452 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-16 8:29 AM 2017-11-28 10:59 AM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: I.S. 131 - BRONX, 885 BOLTON AVENUE, New York, 10473 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-17 8:54 AM 2017-12-05 5:41 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: P.S. 2 - MANHATTAN, 122 HENRY STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-05 9:21 AM 2018-01-16 12:15 PM Asset Data Are there fuel tanks? Total
More informationSagebrush Elementary School East Temple Place Aurora, Colorado 80015
Sagebrush Elementary School 14700 East Temple Place Aurora, Colorado 80015 Year Opened 1977 Current Square Footage 57,100 Site Acreage 7.66 sagebrush.cherrycreekschools.org Asphalt and concrete work; electrical
More informationMOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School
MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water
More informationAppendix B. Facilities Assessment Report
Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates
More informationForest Hills Facilities Plan
Forest Hills Facilities Plan Extensive updates to 8 of our 9 schools Replace Wilson Elementary Enhance learning environments across the district Build additional classrooms to accommodate gradual implementation
More informationMID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN
MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,
More informationNYC Department of Education Building Condition Assessment Survey :49AM :00PM
School: InspectionId Asset Data Inspection Type Building Assessment Survey 05-06 P.S. 70 - BROOKLYN, 4 EMERSON PLACE, BROOKLYN, NY, 05 Time In Last Edited 476 MECHANICAL 05-- 08:49AM 05-- 03:00PM Have
More informationNYC Department of Education
Asset: P.S. 22 - STATEN ISLAND, 1860 FOREST AVENUE, New York, 10303 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:51 AM 2017-12-18 4:14 PM Asset Data Are there fuel tanks?
More informationCAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14
2014-2015 CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14 School Item Amount a. Classroom A/R (Increase CR capacity to 804, add l Resource and tutoring spaces needed. Teacher
More informationNYC Department of Education
Asset: UNIVERSITY NEIGHBORHOOD - M, 200 MONROE STREET, New York, 10002 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-02-05 11:56 AM 2018-03-02 7:14 PM Asset Data Are there fuel
More informationMUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY
MUKWONAGO SCHOOL DISTRICT ARCHITECTURE PARK VIEW MIDDLE SCHOOL The original school building was dedicated in 1954 as the High School, with an addition in 1959, a library addition in 1970, and an addition/renovation
More informationSprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS
EXISTING MECHANICAL CONDITIONS SUMMARY The items listed below are based on our site visit on Nov 10, 2016. Our review is based on current conditions and anticipated future use of these building. In the
More informationNYC Department of Education
Asset: MORRISANIA SEC ED COMPLEX-X, 1365 FULTON AVENUE, New York, 10456 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-03 8:53 AM 2017-11-03 5:47 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: P.S. 23 - BROOKLYN, 545 WILLOUGHBY AVENUE, New York, 11206 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-31 8:47 AM 2018-06-05 3:45 PM Asset Data Are there fuel tanks?
More informationMeadow Point Elementary School East Grand Avenue Aurora, Colorado 80015
Meadow Point Elementary School 17901 East Grand Avenue Aurora, Colorado 80015 Year Opened 1982 Current Square Footage 53,100 Site Acreage 7.48 meadowpoint.cherrycreekschools.org $2,081,600 Electrical system,
More informationNYC Department of Education
Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?
More informationFrancis M McKay Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationNYC Department of Education
Asset: P.S. 4 - MANHATTAN, 500 WEST 160TH STREET, New York, 10032 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-08 8:29 AM 2017-12-08 3:44 PM Asset Data Are there fuel tanks?
More informationGreenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111
Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111 Year Opened 1958 Current Square Footage 50,504 Site Acreage 8.53 greenwood.cherrycreekschools.org $220,720 Electrical
More informationNYC Department of Education
Asset: W.E.B. DUBOIS HS - BROOKLYN, 402 EASTERN PARKWAY, New York, 11225 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-04 1:02 PM 2017-12-27 4:16 PM Asset Data Are there fuel
More informationNYC Department of Education
Asset: PRE-K CENTER @ 7401 FORT HAMILTON PARKWAY - BROOKLYN, 7401 FORT HAMILTON PARKWAY, New York, 11228 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-27 11:12 AM 2017-11-27
More informationState College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationNYC Department of Education
Asset: ACHIEVEMENT FIRST ENDEAVOR CHARTER SCHOOL- BROOKLYN, 510 WAVERLY AVENUE, New York, 11238 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-14 8:42 AM 2018-03-23 10:17 AM
More informationNYC Department of Education
Asset: J. K. ONASSIS HS FOR INT CAREERS-M, 120 WEST 46 STREET, New York, 10036 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-11 11:37 AM 2017-12-26 12:18 PM Asset Data Are there
More informationNYC Department of Education
Asset: BAYSIDE AF - QUEENS, 204-29 29TH AVENUE, New York, 11361 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-10-31 9:42 AM 2017-11-20 4:21 PM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S./I.S. 194 - BRONX, 2365 WATERBURY AVENUE, New York, 10462 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:34 AM 2018-02-01 10:02 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: MID MAN ADULT LRNG CTR (81) - M, 212 W 120TH ST, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-17 8:16 AM 2018-01-17 8:17 PM Asset Data Are there fuel
More informationFacilities Master Planning
Facilities Master Planning DeForest Area School District DeForest, WI PRA Project #130343-01 January 13, 2014 DRAFT Table of Contents DeForest Area School District PRA Project # 130217-01 Section 1 Existing
More informationMARY CRAPO CENTER Miller Road, Swartz Creek, Michigan
MARY CRAPO CENTER 8197 Miller Road, Swartz Creek, Michigan MARY CRAPO CENTER 8197 Miller Road, Swartz Creek General Information: - Instructional, Child Care Development Center (West Wing) o (2) Infant/Toddler
More informationNYC Department of Education
Asset: I.S. 2 - BROOKLYN, 655 PARKSIDE AVE, New York, 11226 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-11 9:35 AM 2018-05-22 3:53 PM Asset Data Are there fuel tanks? Total
More informationNYC Department of Education
Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-20 12:04 PM 2018-01-05 5:32 PM Asset Data Are there
More informationCook - Wissahickon Elementary School
Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District
More informationJoseph Brennemann Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING
Mechanical Systems Information The mechanical system at Reed Middle School is comprised of seventy six Trane DX/Gas rooftop units (RTUs). The recommended useful life for DX equipment is 15 years. Seventy
More informationNYC Department of Education
Asset: AUTOMOTIVE TRADES VOC HS - K, 50 BEDFORD AVENUE, New York, 11222 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-01 8:09 AM 2018-05-10 2:18 PM Asset Data Are there fuel
More informationIchabod Crane Central School District 2018 Capital Project Preliminary Estimate
Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED
More information3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades Allowance $300,000 C. Tilden Entrance Upgrades D. Door and Glass Improvements Allowance $500,000 E. Alert
More informationREAR. Exit 5'-9" 6'-1" 8'-3" 6'-1" Freezer Entrance Stall
North Bridges REAR 67' 8' 29' Unit # 120 10955 Jones Bridge Rd. Alpharetta, GA 30022 8' 6'-10" Freezer 7'-1" CONTINENTAL REALTY CORP. 1427 Clarkview Road Suite 500 Baltimore, MD 21209 12' 13'-3" 6' 11'-11"
More informationNYC Department of Education
Asset: JEFFERSON AF - BROOKLYN, 125-08 FLATLANDS AVENUE, New York, 11208 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-07 8:39 AM 2018-05-08 2:04 PM Asset Data Are there fuel
More informationBlue House Site Designs
Conceptual Plans for Ecological Development by Crea ve Residents Oliver Osnoss and Faren Worthington for the North Cascades Ins tute September 2016 Project Overview The Blue House was built in 1912, many
More informationCalmeca Academy of Fine Arts and Dual Language
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationJosefa Ortiz De Dominguez Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationTighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance
Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December
More information2014 Bond District-wide Facility Repairs
Elementary Schools Aloha-Huber Park Fire Detector upgrade Replace electric backboard winches in gym Heating/cooling system controls upgrade Barnes Replace exterior windows Heating/cooling system and controls
More informationSHOE PALACE HUNTINGTON PARK M.200
M.200 SPLIT SYSTEM CONDENSING UNIT SCHEDULE MARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS CAPACITY AMBIENT DB REFRIGERANT LENGTH WIDTH HEIGHT WEIGHT VOLT/PHASE MCA MOP (MBH) (DEG F) (IN)
More informationRichard Henry Lee Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More information2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16
1. General: This summary is offered as a supplement to the 2015 Building Condition Survey being filed with SED on behalf of the District. All cost estimates are preliminary, and should be re-evaluated
More informationAshland School District Facility & Capacity Assessment Report 2005
Ashland School District Facility & Capacity Assessment Report 2005 Briscoe Elementary School (Closed Facility) Address: 265 N Main Street Area: 33,980 square feet Buildings: Original Building 1948 Music
More informationNYC Department of Education
Asset: CLINTON AF - BRONX, 100 W. MOSHOLU PKWY S, New York, 10468 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-20 8:24 AM 2017-12-31 2:04 PM Asset Data Are there fuel tanks?
More informationTRIO TV SERIES VERTICAL IMPACT CRUSHERS. Highly Efficient Crushing Solutions.
TRIO TV SERIES VERTICAL IMPACT CRUSHERS Highly Efficient Crushing Solutions www.trioproducts.com TRIO offers World Class Design, Engineering and Manufacturing to provide high value solu ons for your crushing,
More informationPlot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line
± 4' ± 13' ± 72' Lease Line ± 6' ± 7' Plot # R019A ± 18' Lease Line Site N o : Site N ame: Lo catio n: Submitted B y: D rawn by D ate: 991 Santee Trolley Square Santee, CA ID Plans 11/10/2016 This drawing
More informationJohn Palmer Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationOscar DePriest Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationMaster Facility Planning Update School Board Meeting May 26, 2016
Master Facility Planning Update School Board Meeting May 26, 2016 Master Facilities Committee Overview Reflection of Committee Work Review of District Wide Facility Issues Identified District Wide Facility
More informationDEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students
DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students FACILITY NEEDS THE CHALLENGE Deerfield Middle School/High School building has served the community for
More information