GENERAL PLUMBING NOTES

Size: px
Start display at page:

Download "GENERAL PLUMBING NOTES"

Transcription

1 GENERAL SYMBOLS GENERAL PLUMBING NOTES PLUMBING LEGEND ABBREVIATIONS N PLAN OR DETAIL NO SHEET NUMBER KEYED NOTE TO PLAN REVISION NUMBER NORTH ARROW. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS USED CERTAIN ABBREVIATIONS, CONVENTIONS, AND SYMBOLS, THE MEANING OF WHICH ARE ILLUSTRATED AND EXPLAINED WITHIN THE LEGEND.. PLANS ARE DIAGRAMMATIC ONLY. THEY ARE INTENDED TO INDICATE CAPACITY, SIZE, LOCATION, DIRECTION AND GENERAL ARRANGEMENT, BUT NOT EXACT DETAILS OF. THE FACT THAT ONLY CERTAIN FEATURES OF THE INSTALLATION ARE INDICATED MUST NOT BE TAKEN TO MEAN THAT OTHER FEATURES WILL NOT BE REQUIRED. 3. COORDINATE WITH THE OTHER TRADES TO ENSURE THAT EACH TRADE SHALL HAVE SUFFICIENT SPACE TO INSTALL THEIR EQUIPMENT (DUCTWORK, PIPING, ELECTRICAL WORK, ETC.). 4. ONCE THE PIPING HAS ENTERED EACH UNIT FROM BELOW THE FLOOR SLAB, PIPING SHALL BE RUN ABOVE THE CEILING IN EACH UNIT UNLESS NOTED OR INDICATED OTHERWISE. 5. VERIFY ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND FIELD DIMENSIONS. 6. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN. 7. PROVIDE STOP OR ANGLE VALVES ON EACH WATER CONNECTION TO EACH PLUMBING FIXTURE. 8. PROVIDE ALL STRUCTURAL MEMBERS, SPORT BRACKETS, FLASHING, HARDWARE, ETC. REQUIRED TO INSTALL A COMPLETE SYSTEM. 9. PROVIDE CHROME PLATED ESCUTCHEON PLATES AT ALL EXPOSED WALL PENETRATIONS AND CEILING PENETRATIONS. 0. PROVIDE CLEANOUTS ON SANITARY LINES AND CONDENSATE DRAIN LINES AS REQUIRED BY CODE.. PROVIDE ACCESS PANELS FOR ALL SHUT-OFF VALVES LOCATED ABOVE GYPSUM BOARD CEILINGS. COORDINATE WITH GENERAL CONTRACTOR. COLD WATER PIPE HOT WATER PIPE HOT WATER RETURN PIPE EXISTING COLD WATER PIPE EXISTING HOT WATER PIPE EXISTING HOT WATER RETURN PIPE SOIL OR WASTE PIPE EXISTING SOIL OR WASTE PIPE VENT PIPE EXISTING VENT PIPE CHILLED WATER RETURN PIPE CHILLED WATER SPLY PIPE CONDENSER WATER PIPE COOLING WATER RETURN PIPE COOLING WATER SPLY PIPE STORM FIRE TURNED TURNED DOWN A/C AFF AFG BFF BFG BTU CO CONN CW DFU ED EX FU FL FCO GPM GC GCO GW HW HWR IN MIN PC SAN OR S SSD ABOVE CEILING ABOVE FINISHED FLOOR ABOVE FINISHED GRADE BELOW FINISHED FLOOR BELOW FINISHED GRADE BRITISH THERMAL UNIT CLEANOUT CONNECTION COLD WATER DOWN DRAINAGE FIXTURE UNIT EQUIPMENT DRAIN EXISTING FIXTURE UNIT FLOOR FLOOR CLEANOUT GALLONS PER MINUTE GENERAL CONTRACTOR GRADE CLEANOUT GREASE WASTE HOT WATER HOT WATER RETURN INCHES MINIMUM PLUMBING CONTRACTOR SANITARY SECONDARY STORM DRAIN 635 West Trade Street, Suite A Charlotte, North Carolina 86 T: F: c 07 T&P ED TEE, OUTLET DOWN TEE, OUTLET TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING EMERGENCY DRAIN PAN PIPING SD V VTR WCO W WTR WSFU STORM DRAIN VENT VENT TO ROOF WALL CLEANOUT WASTE WATER WATER SPLY FIXTURE UNIT GATE VALVE W/ WITH PRESSURE RELIEF VALVE W/O WITHOUT BALL VALVE FIXTURE PLUMBING FIXTURE DESIGNATION (UNDER LINED) EXISTING MEDICAL GAS PIPE NATURAL GAS PIPE COMPRESSED AIR PIPE NITROUS OXIDE PIPE NITROGEN PIPE OXYGEN PIPE VACUUM PIPE 6//08 5:: PM C:\RevitLocal06\CLT803 TH-MEP-06_dwolford@mcveighmangum.com.rvt 933 R.G. Skinner Parkway NOTES & LEGENDS /9/8 P00

2 PLUMBING FIXTURE SCHEDULE - TOWNHOME DESIGNATION MANUFACTURER MODEL # FIXTURE DESCRIPTION P- ProFlo STANDARD 6 /" HIGH VITREOUS CHINA WATER CLOSET FLUSH TANK (.6 GPF) SEAT - STANDARD PLASTIC SEAT MOUNT FLUSH CONTROL ON WIDE SIDE OF STALL CONNECTION SCHEDULE WASTE VENT CW HW 3" " /" West Trade Street, Suite A Charlotte, North Carolina 86 T: F: P- KOHLER ARCHER K-355 VITREOUS CHINA UNDER COUNTER-MOUNT LAVATORY FAUCET - PHISTER ARITEK LG49-LPMC POLISHED CHROME TRAP - /4" CAST BRASS WITH C.O. PLUG SPLY - 3/8" ANGLE-TYPE WITH STOPS " /4" /" /" c 07 P-A KOHLER PINOIR K VITREOUS CHINA WALL MOUNTED LAVATORY FAUCET - AMERICAN STANDARD GPM SENSOR FAUCET TRAP - /4" CAST BRASS WITH C.O. PLUG SPLY - 3/8" ANGLE -TYPE WITH STOPS " /4" /" /" STERLING "x36"x8" SHOWER W/TILED WALLS BY OTHERS, SEE ARCHITECTURAL DRAWINGS. (SHAW TGL8/TGL84) VALVE/HEAD: PHISTER ARITEK G89-7LPMC POLISHED CHROME PRESSURE BALANCING CYCLING IN-WALL VALVE (SOLD SEPARATELY) ASSEMBLY, MAX FLOW-.0 GPM DRAIN: SIOUX CHIEF 8-00P W/ 4-/4" NICKALOY STRAINER TOP HEAD TO BE MOUNETD AT 7'-" AFF " /" /" /" STANDARD STAINLESS STEEL SINK, DOUBLE BOWL (ADA) FAUCET - PHISTER G-59-PFCC CHROME PULL OUT INTEGRAL SPOUT C STRAINERS - ELKAY LK-35 SPLY - 3/8" ANGLE-TYPE WITH STOPS TRAP - /" CAST BRASS WITH C.O. PLUG " /" /" /" P-4B GE GFC35V GARBAGE DISPOSER, /3 HP, PH, RESIDENTIAL WHEN LOCATED IN AN ISLAND, PNEUMATIC PUSH BUTTON IN COUNTERTOP TO OPERATE DISPOSAL /" /" P-5 SIOUX CHIEF MF ICE MAKER BOX W/ WATER HAMMER ARRESTER /" -- P-6 SIOUX CHIEF WF WASHING MACHINE BOX WITH /4 TURN VALVES AND WATER HAMMER ARRESTORS " /" /" /" EWH- BRADFORD WHITE RE5OL6 47-GALLON ELECTRIC WATER HEATER (LOWBOY) 4.5 KW, ,.6 AMPS SET WATER TEMP. CONTROL TO 0 F; PROVIDE FF ADAPTER AND CORRUGATED STAINLESS STEEL SPLY LINES WITH DIELETRIC NIPPLES AAV STUDOR MINI - VENT AIR ADMITTANCE VALVE - /" SA ZURN Z-700 SERIES WATER HAMMER ARRESTOR. SIZE PER P.D.I. WH-0 VERIFY THAT COMPONENT IS ACCESIBLE //08 5:: PM C:\RevitLocal06\CLT803 TH-MEP-06_dwolford@mcveighmangum.com.rvt WATER METER MASTER METER FLEXIBLE AXIS METER MULTI-JET WATER METER CONFORMING TO STANDARD AWWA C-708 PROVIDE INOVONICS DATA MONITOR FOR REMOTE READING R.G. Skinner Parkway SCHEDULES /9/8 P00

3 CLEANOUT AND ACCESS COVER. TOP OF COVER TO BE FLUSH WITH TOP OF FLOOR UNIONS AT INLET AND OUTLET CONNECTIONS (TYP) EXPANSION TANK EQUAL TO AMTROL /8 BEND NOTE: FLOOR CLEANOUT (FCO CLEANOUT NOT TO BE LOCATED IN CARPETED AREA. BALANCE OF PIPING SAME AS CLEANOUT TO GRADE CLEANOUT AND ACCESS /8 BEND BALANCE OF PIPING SAME AS CLEANOUT TO GRADE WASTE STACK/ STORM LEADER CLEANOUT (VERTICAL) COLD WATER ''DIP'' TUBE WITH HOLE AT THE TOP INSULATED HOT WATER LINE 6" HEAT TRAP WATER HEATER SHUT-OFF VALVE TO BE SAME SIZE AS THE PIPE IT SERVES COLD WATER LINE. SEE DRAWINGS FOR SIZE AND SPECIFICS A.S.M.E. RATED PRESSURE & TEMP RELIEF VALVE 635 West Trade Street, Suite A Charlotte, North Carolina 86 T: F: BRASS CLEANOUT PLUG WITH COUNTER SUNK HEAD PIPE P&T RELIEF VALVE DWV COPPER FULL SIZE TO OUTSIDE OF c 07 /8 TEE CLEANOUT AND ACCESS WASTE STACK/ STORM LEADER CLEANOUT (HORIZONTAL) FINISHED GRADE 6'' SQUARE CONCRETE PAD TROWEL SMOOTH AND EDGE CONCRETE 4" DEEP WITH WWF REINFORCEMENTS /8 BEND /8 BEND IF CLEANOUT OCCURS AT END OF LINE CLEANOUT TO GRADE (COTG) WASTE LINE; LENGTH TO SUIT WASTE LINE WATER HEATER - SEE FIXTURE SCHEDULE PROVIDE A '' HIGH PLASTIC SAFEPAN FOR ALL WATER HEATERS '' SAFEPAN DRAIN, PIPE TO FLOOR DRAIN WATER HEATER PIPING DETAIL CLEANOUT DETAILS SINK COUNTER STUDOR FLOW P-TRAP SANITARY PIPE FLOOR BALL VALVE WATER METER EQUAL TO BADGER C700 SERIES WITH RTR; RADIO TRANSMITTER BY METER READER SERVICER CONTRACTOR/OWNER 4 WATER METER ASSEMBLY DETAIL NOTES:. THE AIR ADMITTANCE VALVE SHALL BE LOCATED A MINIMUM OF 4" ABOVE THE HORIZONTAL BRANCH DRAIN OR FIXTURE DRAIN BEING VENTED.. ACCESS SHALL BE PROVIDED AT ALL AIR ADMITTANCE VALVES. THE VALVE SHALL BE LOCATED WITHIN A VENTILATED SPACE THAT ALLOWS AIR TO ENTER THE VALVE. 3. THE AIR ADMITTANCE VALVE SHALL BE RATED IN ACCORDANCE WITH THE STANDARD FOR THE SIZE OF THE VENT TO WHICH THE VALVE IS CONNECTED. 6//08 5:: PM C:\RevitLocal06\CLT803 TH-MEP-06_dwolford@mcveighmangum.com.rvt 3 AIR ADMITTANCE VALVE DETAIL 933 R.G. Skinner Parkway DETAILS /9/8

4 635 West Trade Street, Suite A Charlotte, North Carolina 86 T: F: c 07 KEYNOTES TO PLAN PROVIDE SHUT-OFF VALVE AND WATER METER FOR EACH UNIT. PROVIDE /" HW TO DISHWASHER. PROVIDE TEE ON TAILPIECE OF DRAIN FOR DISWASHER DISCHARGE. 5 TERRACE 59 P-A /" PWDR. 74 P P- /" P- FAMILY 39 WORKSPACE 85 /" CW TO P- 6//08 5:: PM C:\RevitLocal06\CLT803 TH-MEP-06_dwolford@mcveighmangum.com.rvt P- P P- P- P- P- STORAGE 64 Room 75 LAUNDRY 7 3 C L/W-THIRD FLOOR PLAN - DOM. WATER P00 SCALE: /4" = '-0" P-6 /" CW/HW TO /" CW/HW TO KITCHEN 4 /" CW/HW TO P- /" CW/HW TO P- /" DINING 40 /" CW/HW TO P- /" CW/HW TO P- /" CW TO P- /" CW/HW TO P-6 /" /" /" " /" /" P-5 /" CW HW C L/W-SECOND FLOOR PLAN - DOM. WATER P00 SCALE: /4" = '-0" P00 SCALE: /4" = '-0" CAR GARAGE 83 /" EWH- /" /" CW HW C L/W-FIRST FLOOR PLAN - DOM. WATER 933 R.G. Skinner Parkway UNIT C FLOOR PLANS /9/8 P00

5 635 West Trade Street, Suite A Charlotte, North Carolina 86 T: F: c 07 KEYNOTES TO PLAN PROVIDE TEE ON TAILPIECE OF DRAIN FOR DISHWASHER DISCHARGE. 3" SAN 3" SAN 5 " VTR " V TERRACE 59 P-A " V PWDR. 74 P- /4" V 3 84 P- P- /4" V WORKSPACE 85 FAMILY 39 P- P- 73 3" SAN 3" SAN P- 6//08 5::3 PM C:\RevitLocal06\CLT803 TH-MEP-06_dwolford@mcveighmangum.com.rvt P P- P- STORAGE 64 3" WASTE. ROUTE VENT VTR ON TOP. " VTR " VTR 3" WASTE. ROUTE VENT VTR ON TOP. /4" VTR /4" V LAUNDRY 7 3 C L/W-THIRD FLOOR PLAN - SANITARY/VENT P0 SCALE: /4" = '-0" P-6 KITCHEN 4 P-4B AAV 3" SAN DINING 40 " SAN /4" V C L/W-SECOND FLOOR PLAN - SANITARY/VENT P0 SCALE: /4" = '-0" CAR GARAGE 83 " SAN TO HD EWH- C L/W-FIRST FLOOR PLAN - SANITARY/VENT P0 SCALE: /4" = '-0" 933 R.G. Skinner Parkway UNIT C FLOOR PLANS /9/8 P0

GENERAL PLUMBING NOTES 6. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN

GENERAL PLUMBING NOTES 6. ALL RISES AND DROPS IN PIPING ARE NOT NECESSARILY SHOWN FIXTURE SCHEDULE DESIGNATION MANUFACTURER MODEL # FIXTURE DESCRIPTION P- AMERICAN STANDARD. P-A AMERICAN STANDARD. " HIGH VITREOUS CHINA WATER CLOSET W/ ELONGATED BOWL LOW CONSUMPTION FLUSH TANK (. GPF)

More information

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS. ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE

More information

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS. ELECTRIC WATER HEATER SCHEDULE DESIGNATION MODEL MANUFACTURER STORAGE RECOVERY TEMPERATURE LEAVING ELECTRICAL CHARACTERISTICS REMARKS/SPECIAL INSTRUCTIONS NUMBER GALLONS RATE RISE WATER K.W. VOLTAGE PHASE

More information

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type. PART 1 - GENERAL 1.1 Toilet rooms and utility rooms to have floor drains at lowest point. 1.2 Utilize Exposed Flushometers. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

More information

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point. PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

More information

B. Shop Drawings: Include diagrams for power, signal, and control wiring.

B. Shop Drawings: Include diagrams for power, signal, and control wiring. SECTION224213.13 -COMMERCIAL WATERCLOSETS PART 1- GENERAL 1.1 SUMMARY Section Includes: 1. Water closets. 2. Flushometer valves. 3. Toilet seats. 1.2 ACTION SUBMITTALS Product Data: For each type of product.

More information

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION

TRUMAN STATE UNIVERSITY PRESIDENT S RESIDENCE RENOVATION SECTION 224100 - RESIDENTIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

University of Rochester October 17, 2008 Brooks Landing Business Center

University of Rochester October 17, 2008 Brooks Landing Business Center SECTION 224200 COMMERCIAL PLUMBING FIXTURES PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, equipment and services to perform operations required for the complete installation and related

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 22 40 00 Plumbing Fixtures 1. General A. Definitions 1. Section includes a. Water closets and urinals b. Lavatories, sinks, and service sinks c. Electric water coolers, drinking fountains, d. Showers

More information

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer. ICP Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A 1 inch diameter faucet, where the inside edge of the spout opening is 2.5 inches away

More information

APPENDIX J ILLUSTRATIONS

APPENDIX J ILLUSTRATIONS The following figures have been included in the 1994 edition of the Standard Plumbing Code to aid in interpreting this code. The figures are not to be construed as superseding the written text, but merely

More information

SECTION PLUMBING

SECTION PLUMBING SECTION 22 10 00 PLUMBING PART 1 GENERAL 1.1 WORK INCLUDED A. Furnish all labor, material and equipment necessary for the complete installation of the sanitary sewer system (including soil and vent piping),

More information

SPRINGS AT HAMMOCK COVE

SPRINGS AT HAMMOCK COVE PLUMBING SPECIFICATIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY FITTINGS AS REQUIRED BY ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. WORK COVERED BY THIS DOCUMENT INCLUDES LABOR,

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 22 40 00 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Faucets for lavatories, bathtubs, bathtub/showers, showers and sinks. 2. Flushometers. 3. Toilet

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables iii. 01 81 00 Facility Performance

More information

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures

2). Crane Co. 4). Kohler Co. 5). Universal-Rundle Corp. Revised September 29, 2017 Commercial Plumbing Fixtures PART 1: GENERAL A. This Section provides design standards for plumbing fixtures and trim. Certification of compliance with specified ANSI, UL, and ASHRAE Standards will be required, as appropriate, for

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Plumbing Standards Date Description of Change Pages / Sections Modified ID 8/5/17 Entire document - mgl PART 1 - INTRODUCTION 1.1 This section applies to Plumbing for campus institutional facilities. A. Purpose: Yale University

More information

SECTION PLUMBING FIXTURES

SECTION PLUMBING FIXTURES CSUEB Pioneer Heights Phase r 15410 Page 1 SECTION 15410 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015

G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015 DRAWING INDEX GENERAL G0 PLUMBING P00 P0A P0B P0C P0A P0A P0B COVER SHEET PLUMBING LEGEND AND GENERAL NOTES PLUMBING PLAN PLUMBING PLAN PLUMBING PLAN PLUMBING ROOF DEMOLITION PLAN PLUMBING ROOF REMODEL

More information

WATER HAMMER ARRESTORS & MISC. SPECIALTIES

WATER HAMMER ARRESTORS & MISC. SPECIALTIES TABLE OF CONTENTS Pictorial Index Water Hammer Arrestors Certification Sizing & Placement Backwater Valves Typical Installations Trap Seal Primers Compliance Pressure & Flow Characteristics Typical Installations

More information

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R

CHAPTER 31. VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R CHAPTER 31 VENTS Reserved 2003 INTERNATIONAL RESIDENTIAL CODE 425R This page left intentionally blank. 426R 2003 INTERNATIONAL RESIDENTIAL CODE For SI: PIPE SIZE (inches) TABLE P3107.3 COMMON VENT SIZES

More information

McLean Overlake New Home Features

McLean Overlake New Home Features These included features have been carefully chosen to complement the unique environment of McLean with all the quality and style you ve come to expect from Evans Coghill Homes McLean Overlake New Home

More information

McLean Overlake New Home Features

McLean Overlake New Home Features These included features have been carefully chosen to complement the unique environment of McLean with all the quality and style you ve come to expect from Evans Coghill Homes McLean Overlake New Home

More information

DRAWING SCHEDULE TAB REQUIREMENTS BY EQUIPMENT TYPE TYPE OF EQUIPMENT DESCRIPTION COMPONENT TAB REQUIREMENTS

DRAWING SCHEDULE TAB REQUIREMENTS BY EQUIPMENT TYPE TYPE OF EQUIPMENT DESCRIPTION COMPONENT TAB REQUIREMENTS DRAWING SCHEDULE NUMBER TITLE M0-1 MECHANICAL NOTES AND LEGEND M1-0 MECHANICAL FLOOR PLAN M4-0 MECHANICAL SCHEDULES M4-1 MECHANICAL LOAD CALCULATIONS M5-0 MECHANICAL DETAILS M8-0 TCS BASYS CONTROLS DRAWINGS

More information

A. Section Joint Sealants: Seal fixtures to walls and floors.

A. Section Joint Sealants: Seal fixtures to walls and floors. SECTION 224000 - PLUMBING FIXTURES PART 1 GENERAL 1.1 SECTION INCLUDES A. Water closets. B. Urinals. C. Lavatories. D. Sinks. E. Service sinks. F. Showers. G. Wash fountains. H. Eye wash fountains. 1.2

More information

SHOE PALACE HUNTINGTON PARK M.200

SHOE PALACE HUNTINGTON PARK M.200 M.200 SPLIT SYSTEM CONDENSING UNIT SCHEDULE MARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS CAPACITY AMBIENT DB REFRIGERANT LENGTH WIDTH HEIGHT WEIGHT VOLT/PHASE MCA MOP (MBH) (DEG F) (IN)

More information

DOMESTIC WATER PACKAGED BOOSTER PUMPS

DOMESTIC WATER PACKAGED BOOSTER PUMPS DIVISION 22 PLUMBING 22 11 16 DOMESTIC WATER PIPING 22 11 19 DOMESTIC WATER PIPING SPECIALTIES 1. To facilitate landscape and other maintenance operations, exterior hose bibs shall be provided at 150 foot

More information

Sunset Point Building 2 BRUSHED NICKEL UPGRADE CONTEMPORARY PACKAGE. Christine Mullineaux th St. North Pinellas Park, FL

Sunset Point Building 2 BRUSHED NICKEL UPGRADE CONTEMPORARY PACKAGE. Christine Mullineaux th St. North Pinellas Park, FL Sunset Point Building 2 BRUSHED NICKEL UPGRADE CONTEMPORARY PACKAGE Christine Mullineaux 6600 49th St. North Pinellas Park, FL 33781 727-521-2691 TABLE OF CONTENTS Master Bath 3 Guest Bath 1 6 Guest Bath

More information

McLean Overlake New Home Features

McLean Overlake New Home Features These included features have been carefully chosen to complement the unique environment of McLean with all the quality and style you ve come to expect from Evans Coghill Homes McLean Overlake New Home

More information

STACKS AND STACK VENTS

STACKS AND STACK VENTS CHAPTER 9 VENTS SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of vent systems. 901.2 Trap seal protection. The plumbing

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS 1. GENERAL A. Related sections: i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables

More information

Chapter 4: Fixtures, Faucets & Fittings:

Chapter 4: Fixtures, Faucets & Fittings: Table of Contents Chapter 1 Administration 0 Chapter 2 Definitions 0 Chapter 3 General Regulations 0 Chapter 4 Fixtures, Fau & Fit. 12 Chapter 5 Water Heaters 14 Chapter 6 Water Supply & Dist. 10 Chapter

More information

MATERIALS Traps TRAPS. No. IPC IRC Description

MATERIALS Traps TRAPS. No. IPC IRC Description MATERIALS Traps TRAPS MAX " MAX 0" No. IPC IRC Description 00. P0.6 00. P0.6 00. P0. 00. () P0.6 Exc. Vertical distance from fixture to the trap weir can not exceed ". Horizontal distance from the fixture

More information

Sunset Point Building 2 BRUSHED NICKEL TRADITIONAL UPGRADE PACKAGE. Christine Mullineaux th St. North Pinellas Park, FL

Sunset Point Building 2 BRUSHED NICKEL TRADITIONAL UPGRADE PACKAGE. Christine Mullineaux th St. North Pinellas Park, FL Sunset Point Building 2 BRUSHED NICKEL TRADITIONAL UPGRADE PACKAGE Christine Mullineaux 6600 49th St. North Pinellas Park, FL 33781 727-521-2691 TABLE OF CONTENTS Master Bath-whitebn 3 Guest Bath 1 6 Guest

More information

APPENDIX L ALTERNATE PLUMBING SYSTEMS

APPENDIX L ALTERNATE PLUMBING SYSTEMS ALTERNATE PLUMBING SYSTEMS L 1.0 General. L 1.1 Applicability. The intent of this appendix is to provide clarification of procedures for the design and approval of engineered plumbing systems, alternate

More information

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point. PART 1 - GENERAL 1.01 Toilet rooms and utility rooms to have floor drains at lowest point. 1.02 Utilize Exposed Flushometers. 1.03 Utilize wall hung toilet room fixtures. Urinals for handicapped may be

More information

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Ohio Administrative Code Rule Number OPC Section IPC origin Reason for proposed 4101:3-2-01 Alternate on-site 2015 Added definition

More information

Gulfport, Mississippi 21 May 2007

Gulfport, Mississippi 21 May 2007 G PLUMBING GENERAL REQUIREMENTS The D-BC shall design the plumbing system to comply with this criteria and the Plumbing Code. Piping shall be shown on the same plan as the fixtures being served. Pipe size

More information

SECTION DOMESTIC WATER PIPING SPECIALTIES

SECTION DOMESTIC WATER PIPING SPECIALTIES SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

B E ROUTE DUCT BEHIND BOOKSHELF. GRILLE MOUNTED ON TOP OF BENCH. BOOK CASE WALL 12x8 8x5 I 8"Ø 7"Ø 125 CFM I D M FLOOR SIDE WALL VENT 6x5 160 CFM 6"Ø 6"Ø 8x10 J C G 1 Section M-1 NOT TO SCALE Project No

More information

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB

TUBS & SURROUNDS FIBERGLASS TUB STANDARD FIBERGLASS GARDEN TUB TUBS & SURROUNDS FIBERGLASS TUB STANDARD One-piece design for a clean, simple design; left, right, or center drain. 309525 54 x 28 Center White 309530 54 x 28 Center Bone 309535 54 x 28 LH Bone 309540

More information

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

CHAPTER VI BUILDING PLUMBING

CHAPTER VI BUILDING PLUMBING CHAPTER VI BUILDING PLUMBING 6.1. INTRODUCTION The chapter covers questions related to water demand, distribution and drainage. The basic principles for planning and installing common plumbing systems

More information

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

PLUMBING CURRICULA OUTLINE

PLUMBING CURRICULA OUTLINE PLUMBING CURRICULA OUTLINE CORE CURRICULUM 2015 Basic Safety (Construction Site Safety Orientation) (12.5 Hours) (Module ID 00101-15) Presents basic jobsite safety information to prepare workers for the

More information

A. This Section includes the following domestic water piping specialties:

A. This Section includes the following domestic water piping specialties: SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Level I Chapter 1 Worksheet

Level I Chapter 1 Worksheet Chapter 1 Worksheet 1. For applicability requirements of the Plumbing Code, refer to: a. Building Code b. Administration and Enforcement Code c. Plumbing Code d. Residential Code 2. The provisions of the

More information

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GRILLE, REGISTER AND DIFFUSER SCHEDULE ROOFTOP UNIT SCHEDULE (NATURAL GAS HEAT) MARK MANUFACTURER MODEL SUPPLY FAN COOLING COIL HEAT EXCHANGER MIN. MIN. MCA MOCP V/PH WEIGHT NOTES FAN CFM MIN ESP REFR. TH SH EAT LAT MIN. OUTPUT MIN. EFF. NOM.

More information

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof.

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof. CHAPTER 9 VENTS SECTION 90 GENERAL run undiminished in size and as directly as possible from the building drain through to the open air above the roof. 90. Scope. The provisions of this chapter shall govern

More information

SECTION PLUMBING SPECIALTIES

SECTION PLUMBING SPECIALTIES DIVISION 22 PART 1 GENERAL 1.01 SCOPE SECTION 22 0430 PLUMBING SPECIALTIES A. Domestic water, sewer, roof drainage and condensate drains, including piping, equipment and all necessary accessories as designated

More information

Sanitary Drainage Systems

Sanitary Drainage Systems 11.1 MATERIALS See Section 3.1. Sanitary Drainage Systems 11.2 BUILDING SEWERS AND BUILDING DRAINS 11.2.1 Sewer or Drain in Filled Ground Chapter 11 Building sewers or building drains that are installed

More information

Fixtures Installation

Fixtures Installation Youth Explore Trades Skills Description Students will learn to install a toilet and lavatory basin. Lesson Outcomes The student will be able to: Install a toilet Install a lavatory basin Assumptions The

More information

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING. Test Code: 5924 Version: 01

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING. Test Code: 5924 Version: 01 CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING Test Code: 5924 Version: 01 Specific competencies and skills tested in this assessment: Safety Follow rules for fire safety Follow rules for housekeeping

More information

Land Use and Environmental Service Agency (Code Enforcement) Plumbing 2010

Land Use and Environmental Service Agency (Code Enforcement) Plumbing 2010 General: 1) (Q) Who enforces the cutting and notching requirements found in the plumbing code? (A) The plumbing inspector would question the contractor initially. A building inspector would either take

More information

DIVISION 22: PLUMBING DESIGN STANDARDS TABLE OF CONTENTS

DIVISION 22: PLUMBING DESIGN STANDARDS TABLE OF CONTENTS DIVISION 22: PLUMBING DESIGN STANDARDS TABLE OF CONTENTS I. PURPOSE II. III. IV. GENERAL A. DESIGN DOCUMENTS B. INSPECTIONS C. CLOSE-OUT Project Record Documentation Training D. ENERGY USE E. LABELING

More information

PROPOSED NEW BUILDING

PROPOSED NEW BUILDING HYDRAULIC DRAWINGS MATERIALS SERVICES TO BE CONSTRUCTED FROM MATERIAL AS LISTED BELOW UNLESS NOTED OTHER WISE SHOWN ON DRAWINGS. SERVICE MATERIAL REMARKS SEWER DRAINAGE upvc SOLVENT WELDED JOINTS SEWER

More information

1. Division 22 Section "Emergency Plumbing Fixtures." 2. Division 22 Section "Drinking Fountains and Water Coolers."

1. Division 22 Section Emergency Plumbing Fixtures. 2. Division 22 Section Drinking Fountains and Water Coolers. Page 224000-1 SECTION 224000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CHILD DEVELOPMENT & LITERACY CENTER H17-N104-CB SGA 17002

CHILD DEVELOPMENT & LITERACY CENTER H17-N104-CB SGA 17002 SECTION 22 05 00 COMMON WORK RESULTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The drawings and general provisions of the Contract, including General and Supplementary Conditions, General

More information

ProVent Systems Plumbing Fundamentals. Educational Literature. Comparison of ProVent Design Rules and The International Plumbing Code

ProVent Systems Plumbing Fundamentals. Educational Literature. Comparison of ProVent Design Rules and The International Plumbing Code ProVent Systems Plumbing Fundamentals Educational Literature Comparison of ProVent Design Rules and The International Plumbing Code Guide to Contents Topics and Descriptions Page Interior views of the

More information

Nims Village New Home Features

Nims Village New Home Features These included features have been carefully chosen to complement the unique environment of Nims Village with all the quality and style you ve come to expect from Evans Coghill Homes Nims Village New Home

More information

ASME STANDARDS IN MODEL CODES

ASME STANDARDS IN MODEL CODES STANDARDS IN MODEL CODES ASME Name Model Code With Year of Referenced IPC IRC UPC 2009 NSPC A112.1.2 Air Gaps in Plumbing 2004 2004 2004 2004 A112.1.3 Air Gap Fittings For Use With Plumbing, Appliances

More information

1 Exam Prep Plumber s Handbook Tabs and Highlights

1 Exam Prep Plumber s Handbook Tabs and Highlights 1 Exam Prep Plumber s Handbook Tabs and Highlights These 1 Exam Prep Tabs are based on the Plumber s Handbook Revised 2006. Each Tabs sheet has five rows of tabs. Start with the first tab at the first

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#58619/Page 1/November 1, 2017 PLUMBING Executive Summary: Presently, the Plumbing Systems serving the building are cold water, hot water, sanitary, waste and vent system, storm drain piping, and natural

More information

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER G T D-X 000/000 DOMESTIC COLD WATER PIPE DOMESTIC HOT WATER PIPE DOMESTIC HOT WATER RETURN PIPE NATURAL GAS PIPE SANITARY VENT PIPE SANITARY PIPE DUCT SMOKE DETECTOR RELAY COIL THERMOSTAT TEMPERATURE SENSOR

More information

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

PLUMBING DESIGN GUIDELINES SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS The Design Guidelines, which follow, are intended to supplement the Educational Specifications and State Requirements for Educational Facilities (SREF). Note: All fittings shall be installed by no less

More information

CHAPTER 9 VENTS SECTION

CHAPTER 9 VENTS SECTION CHAPTER 9 VENTS SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of vent systems. 901.2 Trap seal protection. The plumbing

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 2 x 1.5 Phase 5-8 Unit Number 11 Units Total 1) 4200C 2) 4200K 3) 4500D 4) 4500G 5) 4500H 6) 5400A

More information

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS City of Redwood City Community Development Department Building and Inspection Department 1017 Middlefield Road Redwood City, CA 94063 Phone (650) 780-7350 2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY

More information

QUESTIONS AND RESPONSES. Question No. 1: Looks like there are four (4) doors on this project. Who is responsible for the electrified locking hardware?

QUESTIONS AND RESPONSES. Question No. 1: Looks like there are four (4) doors on this project. Who is responsible for the electrified locking hardware? Addendum No. 2 CHALK BLUFF IMPROVEMENTS PROJECT PART A OPERATIONS BUILDING AND PROJECT PART B UPS UPGRADES PWP Bid No.: WA-207-008 TMWA Capital Project No.: -000 October 8, 206 The following information,

More information

Read Only Document Not For Distribution

Read Only Document Not For Distribution Chapter 5 Traps, Cleanouts and Backwater Valves 5.1 SEPARATE TRAPS FOR EACH FIXTURE a. Plumbing fixtures shall be separately trapped by a water seal trap placed as close as possible to the fixture outlet.

More information

2016 Plumbing Supplemental Plan Review List

2016 Plumbing Supplemental Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Plumbing Supplemental Plan Review List POTABLE WATER SYSTEM P1. Specify which fixtures are for private use and which are for

More information

PRELIMINARY BROCHURE. Welcome

PRELIMINARY BROCHURE. Welcome Welcome Builder s Story In 1959, Kevork S. Hovnanian envisioned a homebuilding company whose homes would provide lasting value and reward the people who owned them for many years to come. For nearly 50

More information

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer. IPC Plumbing Exam Name: Date: Score: Carefully read each question and then circle the letter of the best answer. 1. A vent stack handling 25 dfu s with a developed length of 35 feet shall be inches minimum

More information

B. Shop Drawings: Include diagrams for power, signal, and control wiring.

B. Shop Drawings: Include diagrams for power, signal, and control wiring. SECTION 224213.13 - COMMERCIAL WATER CLOSETS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

8 Kitchen Gooseneck. 4 Lavatory/Shower. 8 Shower. Adjustable Garden Tub. Diverter Spring & Spool Diverter Knob Plastic Aerator Speedy Locknut

8 Kitchen Gooseneck. 4 Lavatory/Shower. 8 Shower. Adjustable Garden Tub. Diverter Spring & Spool Diverter Knob Plastic Aerator Speedy Locknut 8 Kitchen 8 Kitchen Gooseneck 4 Kitchen 10979 Chrome 10991 Chrome 10991W White 10987 Chrome 4 Lavatory 4 Lavatory/Shower 8 Tub/Shower 10983 Chrome 10983W White 10988 Chrome 10981 Chrome 4 Tub/Shower 8

More information

Matrix of changes for the National Standard Plumbing Code July 2013

Matrix of changes for the National Standard Plumbing Code July 2013 Matrix of changes for the National Standard Plumbing Code July 2013 Item # Section Number Person Submitting Change Committee Action 10-77 10.20.8 and Table 3.1.3 XI Certification 10-82 12.16 Size and Lengths

More information

Read Only Document Not For Distribution

Read Only Document Not For Distribution Chapter 9 Indirect Waste Piping and Special Wastes 9.1 INDIRECT WASTES 9.1.1 General Drains from fixtures, fixture compartments, equipment, appliances, appurtenances, and other devices requiring protection

More information

MAXI-VENT Air Admittance Valve

MAXI-VENT Air Admittance Valve MAXI-VENT Air Admittance Valve Manufacturer: Studor, Inc. Connec on Size: 3 or 4 Model #: MAXI VENT Item #: 20302 An air admittance valve shall be acceptable as a vent termination for any individual vent,

More information

PLUMBING INSTALLATIONS

PLUMBING INSTALLATIONS PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT PLUMBING INSTALLATIONS A homeowner guide to plumbing requirements for single-family dwellings November 2017 contents Permit Requirements... 3 Inspection Requirements...

More information

A. All fixtures shall meet the requirements of ANSI A117.1, ANSI Z124.2 and the State of Texas Accessibility Standards (TAS).

A. All fixtures shall meet the requirements of ANSI A117.1, ANSI Z124.2 and the State of Texas Accessibility Standards (TAS). PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

LIVE WORK SHOP PLAY WESTGATE AT THE GLEN

LIVE WORK SHOP PLAY WESTGATE AT THE GLEN WESTGATE ROWHOMES WESTGATE AT THE GLEN If you seek the best of everything Glenview has to offer, you ve come to the right place. Steps from the Metra, minutes from shopping, movie theaters, golf courses

More information

The most advanced Supply Box System from Oatey - the choice of plumbing professionals.

The most advanced Supply Box System from Oatey - the choice of plumbing professionals. T MT M INFINITE SOLUTIONS The most advanced Supply Box System from Oatey - the choice of plumbing professionals. UNIVERSAL SINGLE BOX PLATFORM SNAP-LOCK DESIGN INSTALLATION VERSATILITY Oatey 2017 Oatey

More information

PARTS STOCKED REPLACEMENT FAUCET BIBB SCREWS... SCREW ASSORTMENT MISC. 3 /8" BIBB LOC SCREW 1 /2" BIBB SCREW 1 /2" BIBB LOC SCREW 3 /8" BIBB SCREW

PARTS STOCKED REPLACEMENT FAUCET BIBB SCREWS... SCREW ASSORTMENT MISC. 3 /8 BIBB LOC SCREW 1 /2 BIBB SCREW 1 /2 BIBB LOC SCREW 3 /8 BIBB SCREW January 1, 2001 STOCKED REPLACEMENT FAUCET BIBB SCREWS... Parts-5L 3 /8" BIBB SCREW 6-32 GAUGE CHROME 35138- No. 1 3 /8" BIBB SCREW 10-24 GAUGE CHROME 35153- No. 16 3 /8" BIBB SCREW 8-32 GAUGE CHROME 35141-

More information

A. General: comply with appropriate standards. 1. International Association of Plumbing and Mechanical Officials: IAPMO. 2. California State AB 1953.

A. General: comply with appropriate standards. 1. International Association of Plumbing and Mechanical Officials: IAPMO. 2. California State AB 1953. SECTION 22 40 00 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Water closets. 2. Urinals. 3. Lavatories. 4. Sinks. 5. Service sinks. 6. Electric water coolers. 7. Wash fountains.

More information

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18

PERFORMANCE TECHNICAL SPECIFICATION *************************************************************************** SECTION D20 PLUMBING 02/18 NAVFAC PTS-D20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-D20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION D20 PLUMBING 02/18 NOTE: This section

More information

Savannah Station Price List

Savannah Station Price List Savannah Station Price List Standard ONLY 3 Standard Lots Left Lot 105* Shenandoah (1301) $153,500.00 Lot 72** Georgian (1409) $164,900.00 Lot 82*** Georgian (1409) $166,900.00 Premium Shenandoah (1301)

More information

c. Direct or indirect?

c. Direct or indirect? ~ \ 1.) GENERAL a. Definitions: Chapter B Code References (1) Air-break Comm 81.01 (5) (2) Air-gap, drain system Comm 81.01 (6) (3) Flood level rim Comm 81.01(102) (4) sink Comm 81.01(105) (5) Indirect

More information

GENERAL PLUMBING REQUIREMENTS

GENERAL PLUMBING REQUIREMENTS 22 00 00 GENERAL PLUMBING REQUIRMENTS i. 00 00 07 Design Professional Design Process Requirements ii. 00 00 08 Design Professional Documentation Requirements and Deliverables iii. 00 00 13 Designing Learning

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 3A x 1.5 Phase 5-8 Unit Number 4 Units Total 1) 6600F 2) 6800K 3) 7600G 4) 7900H SCOPE OF WORK A-108-E

More information

Test Code: 8117 / Version 1

Test Code: 8117 / Version 1 Pennsylvania Customized Assessment Blueprint Plumbing Technology/Plumber PA Test Code: 8117 / Version 1 Copyright 2012. All Rights Reserved. General Assessment Information Plumbing Technology/Plumber PA

More information

SECTION PLUMBING FIXTURES AND TRIM. A. Types of plumbing fixtures required for the project include the following:

SECTION PLUMBING FIXTURES AND TRIM. A. Types of plumbing fixtures required for the project include the following: SECTION 15440 PART I - GENERAL 1.01 WORK INCLUDED A. Types of plumbing fixtures required for the project include the following: 1. Water Closets 2. Urinals 3. Lavatories 4. Mop Sink 5. Sinks 6. Electric

More information

FAIRA TRANSPARENCY REPORTS Alaskan Way, 514, Seattle, WA 98101

FAIRA TRANSPARENCY REPORTS Alaskan Way, 514, Seattle, WA 98101 608 State St. South Kirkland, WA 98033 www.faira.com hello@faira.com +1.800.571.FAIR FAIRA TRANSPARENCY REPORTS 1900 Alaskan Way, 514, Seattle, WA 98101 Thank you for your interest in this Faira Certified

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 4 x 2.5 Phase 5-8 Unit Number 1 Unit Total 1) 7400B SCOPE OF WORK A-112-C 4 Bedroom 2 Bath 2 Half

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 2A x 1 Phase 5-8 Unit Number 13 Units Total 1) 4400C 2) 4400G 3) 4400K 4) 4900C 5) 5000C 6) 5100K 7)

More information

Taylor Oaks. Architecturally Enhanced Exterior Features: Efficient Kitchens Designed for the Gourmet Chef or the Busy Family: Luxurious Master Suites:

Taylor Oaks. Architecturally Enhanced Exterior Features: Efficient Kitchens Designed for the Gourmet Chef or the Busy Family: Luxurious Master Suites: Taylor Oaks DISTINCTIVE FEATURES AND AMENITIES Architecturally Enhanced Exterior Features: Architecturally enhanced exterior elevation designs Eagle roof tile pre-selected to enhance the architectural

More information

SECTION Page 1 of 6

SECTION Page 1 of 6 SECTION 15400 - Page 1 of 6 SECTION 15400 PLUMBING PART1 GENERAL 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 1.1.11 1.1.12 1.1.13 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 SECTION INCLUDES

More information

Willoughby Industries - Security Products

Willoughby Industries - Security Products TOILET WASTE LOCATION (ECW)- WALL OUTLET (ECF)- FLOOR OUTLET TOILET ORIENTATION (L)- ANGLED LEFT (L)- OFFSET LEFT (R)- ANGLED RIGHT (R)- OFFSET RIGHT (C)- CENTER FIXTURE MOUNTING (OF)- OFF FLOOR (ON)-

More information

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 2 x 1.5 TH Phase 4 Unit Number 17 Units Total 1) 29B 2) 30H 3) 31E 4) 31F 5) 32F 6) 32H 7) 33A 8) 33D

More information

DESIGN AND CONSTRUCTION STANDARDS July 2011

DESIGN AND CONSTRUCTION STANDARDS July 2011 PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design for new construction and renovations.

More information