1 Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory March 15, 2006

2 Executive Summary The building assessed in this report is the Civil Engineering building. It is a 2-story building plus a basement consisting of offices, labs, and classrooms located on the main campus of Texas A&M University. The HVAC system is a single duct VAV system with terminal reheat, which incorporates 12 air handling units, 38 terminal units, 8 exhaust fans, and 5 supply fans. The chilled water system is two-way with a 10 hp pump motor running at a constant speed; the bypass valve has been removed. The heating water system is also two-way with a 5hp pump motor which runs at constant speed with the bypass valved off. A combination of pneumatic and Siemens DDC systems operate the building equipment. The continuous commissioning measures that were implemented include: 1) extension of the unoccupied mode of operation during nights, 2) a night reset of static pressure for the operation of air handler units TA-1B and TA-2A, 3) shut down of TA-B8 during unoccupied times, 4) resetting valve operating pressures for all basement air handling units, and 5) modified outside air (OA) intake to improve CO 2 levels. These measures were implemented in the time period between February and March, Furthermore, several measures are proposed that have yet to be implemented: 1) replace the control valve, repair the differential pressure sensor and install a variable frequency drive (VFD) on the building chilled water system to allow lower chilled water differential pressure set points during periods of low load, 2) open heating water bypass to decrease building heating water usage during low heating demand and control the building heating loop based on temperature, 3) install control hardware and programming for control of AHU-2, 4) replace the heating water valves on TAB4 and zone 3 of TA-B6 (these valves are not closing completely resulting in excess heating water usage), and 5) the CO 2 readings gathered indicate that portions of the first and second floor were receiving inadequate outside air. Subsequent investigation found the outside air intake grill to TA- 1A was clogged and the linkage to TA-1B outside air damper is broken. Additionally, the TA-2A outside air duct filters were completely clogged which allowed only minimal air flow. It is recommended that these measures will be implemented to maximize the amount of savings that can be achieved and complete this phase of the continuous commissioning process for this building. The comfort issues which were observed and discussed during the kick-off meeting included occupant complaints of being too cold during cooling periods and too hot during heating periods. These complaints hold true throughout the building, except in the computer labs where the highest heat loads are found and dirty coils cause year round comfort problems.

3 Acknowledgements The Continuous Commissioning (CC ) process detailed in this report was a collaborative effort among the Energy Office, Area Maintenance, and the Energy Systems Laboratory at Texas A&M University. Many persons from each entity are responsible for the work done in the building, from the field and comfort measurements and CC measures determination, to the maintenance and controls items implemented. This document is designed to serve as a deliverable from the Energy Systems Laboratory to the Energy Office, and primarily details the CC activities and measures in which the Energy Systems Laboratory has been involved. For information concerning the Office of Energy Management please contact Homer L. Bruner, Jr. at (979) The lead CC investigator for this building was Arthur Stringer. For additional information regarding the information in this report or the overall Continuous Commissioning program at the Energy Systems Laboratory, please contact Song Deng at (979) i

4 Table of Contents I. Introduction... 1 II. Facility Information... 1 A. General Building Description... 1 B. HVAC Description... 2 III. Continuous Commissioning Activities... 5 A. Existing Building Conditions (Pre-CC) Existing HVAC Conditions Existing Comfort/Indoor Air Quality Conditions Existing HVAC control... 8 B. Continuous Commissioning Measures Implemented Measures Proposed Measures IV. Requested Action V. Building Comfort Improvements VI. Savings Analysis VII. Retrofit Recommendations VIII. Conclusions Appendices ii

5 List of Figures and Tables Figure 1: Civil Engineering Building Figure 2. Civil Engineering Building location... 2 Table 1. Building chilled and heating water information Table 2. Fan Schedule... 4 Table 3. AHU design information Table 4. Measured AHU system airflow information Table 5. Comfort measurements performed in the building... 8 Table 6. Summary of implemented CC measures in building... 9 Table 7. Summary of example potential savings for TA-B Table 8. AHU valve measurements and adjustments Table 9. Summary of proposed CC measures that have not been implemented in the building and their estimated potential savings Table 10. CFM Measurements taken on AHU-2A iii

6 I. Introduction Since 1997, more than 70 TAMU - College Station buildings have been commissioned, resulting in energy savings to the University of millions of dollars. For the fiscal year 2006, 25 buildings (totaling 2.5 million square feet) have been identified to be commissioned, of which the Civil Engineering building is the tenth. This building was identified as a prime candidate due to its high energy cost per square foot and frequent comfort problems. Commissioning began in February, 2006 and was completed in March, This report will document the measures implemented and recommended during this commissioning. II. Facility Information A. General Building Description Figure 1: Civil Engineering Building. 1

7 Figure 2. Civil Engineering Building location. The Civil Engineering building, pictured above in Figure 1, was constructed in 1937 and is located on the main campus of Texas A&M University at the location shown in Figure 2 above. It is home to the Civil Engineering department and consists primarily of offices, classrooms, and labs. The building has 2 floors and a basement for a total area of 56,537 square feet. It is generally occupied from 8:00AM to 10:00 PM with computer labs open 24/7. The building underwent a major renovation in June B. HVAC Description The building s chilled water system utilizes one 10 hp, 340 GPM pump. The control valve, which is currently disconnected, is pneumatically controlled with the signal converted to digital for Siemens control. Siemens operates this valve based upon the differential pressure of the secondary supply and return piping. The piping system is two-way constant speed flow without a bypass. The heating water system utilizes one 5 hp, 145 GPM pump. The heating water control valve is also pneumatic with signal converted to digital and is controlled based upon differential pressure. The piping system is two-way constant speed flow with bypass. The bypass valve is currently valved off. A summary of the building information is shown below in table 1. 2

8 Table 1. Building chilled and heating water information. CW System HW System Number of pumps 1 1 Pump speed control Constant Constant Bldg Valve control method DP DP Piping system type Two-way constant speed flow loop without bypass Two-way constant speed flow loop with bypass which is valved off Control valve type Pneumatic to digital Pneumatic to digital Nameplate GPM Nameplate Head (ft) Nameplate HP 10 5 Nameplate RPM During the building s last major renovation in 1983, the total design air flow was approximately 67,000cfm, of which 13,225cfm is outside air, which was accomplished by 12 air handling units and 7 fume hood make-up fans. The total design exhaust flow was specified as 7,902 cfm, and was achieved with 7 fume hoods and 4 exhaust fans. Today, the building does not operate as designed with 2 exhaust and 2 supply fans disconnected and four of the five fume hoods exhaust fans seldom used. One of the remaining exhaust fans is utilized by the lavatories and janitor closets. The other has no motor. Table 2 below gives an overview of the units comprising the building s fans with design information. 3

9 Table 2. Fan Schedule Fan Type Serves HP Intake Exhaust F-1 Fume Hood Room 131 1/ F-2 Fume Hood Room 210 1/ F-3 Fume Hood Room 133 1/ F-4 Fume Hood Room 018A 1/ F-5 Fume Hood Room 018B 1/ F-6 Fume Hood Room 018D 1/ F-7 Fume Hood Make-up Room 133 1/ F-8 Fume Hood Make-up Room 131 1/ F-9 Fume Hood Make-up Room 210 1/ F-10 Fume Hood Make-up Room 018D 1/ F-11 Fume Hood Make-up Room 211 1/ F-12 Fume Hood Room 211 1/ F-13 Fume Hood Room 16 1/ F-14 Fume Hood Room 214 1/ F-15 Fume Hood Make-up Room 16 1/ F-16 Fume Hood Make-up Room 214 1/ F-17 Exhaust Lavatories/ Janitorial 1/ F-18 Exhaust Room 25 N/A The basement HVAC consists of 8 air handling units. Units TA-B1 thru TA-B5 and TA- B7 and TA-B8 are constant volume single zone units with heating and chilled water being couple controlled by pneumatic actuators. Unit TA-B2 has a three-way chilled water piping system. The eighth unit, TA-B6, is also a constant speed unit with 4 zones utilizing bypass dampers and reheat coils in each zone. The chilled water valve is controlled independently. All basement air handling units have TEC space sensors. The space in Lecture hall 110 is conditioned by AHU-2 which operates on local 4

10 pneumatic control. The thermostat hangs by a wire in the return air chase and there is no control for the outside air damper. The remainder of the first floor and the second floor units are single duct VAV with reheat. These areas are served by 3 air handling units, TA-1A, TA1B and TA-2A. Each unit is commanded by a static pressure controlled VFD supplying air to 38 pneumatic controlled terminal boxes. The terminal boxes are governed by pneumatic thermostats. Table 3 below gives an overview of the units comprising the building s fans with design information. Table 3. AHU design information. Unit Function Service Supply cfm OA cfm TA-B1 Supply Basement TA-B2 Supply Basement TA-B3 Supply Basement TA-B4 Supply Basement TA-B5 Supply Basement TA-B6 Supply Basement TA-B7 Supply Basement TA-B8 Supply Basement TA-1A Supply 1st Floor TA-1B Supply 1st Floor TA-2A Supply 2 nd Floor AHU 2 Supply 1 st Floor III. Continuous Commissioning Activities A. Existing Building Conditions (Pre-CC) The initial IAQ walk-through measurements indicated immediately there were CO 2 problems indicated by high readings on the second floor. Additionally, some corridor areas were very warm while others were breezy and cool. In research areas, diffusers were covered with paper preventing air movement; it was explained that the space was too cold in those areas causing comfort problems. Computer rooms were uncomfortably warm; windows were found to be opened by occupants complaining the air conditioning did not work. Conditioned space temperature readings were not available due to the windows being open with the cool outside climate. Several problems were found in the chilled and heating water pumping systems. The building chilled water control valve is stuck open and the temperature and differential pressure sensors have failed. As noted previously, the chilled water building bypass line 5

11 and valve have been removed while the pump is run at constant speed. Two bypass valves are located on air handling units TA-2A and TA-B2 prevent dead-heading of the pump. The heating water system also has a failed differential pressure sensor. The manual heating water building bypass valve has been closed while the pump is still constant speed. 1. Existing HVAC Conditions Measurements and observations taken indicated several problems with the air handling units: o TA-1A was not maintaining the static pressure set point of 1.0 W.C. and the unit s VFD was running at a 34% speed, indicating a control problem. o The measurements taken of the couple controlled actuators indicated the operation ranges on some were too close for best operation and two air handling units had the actuators with control ranges which were overlapping causing simultaneous use of both heating and chilled water. A complete list of values for coupled control actuators can be found in Table 7, page 10, along with their corrected ranges. o The measurements taken showed also that heating water valves on TA-B4 and zone 3 of TA-B6 are not fully closing. o AHU-2 has no EMCS to regulate the unit s use. This unit is running 24/7 in lecture room 110 which is only used 8:00 a.m. to 5:00 p.m. daily. o Outside air damper actuator linkage is broken at TA-1B. The measured air handling unit system information is summarized below in Table 4. 6

12 Table 4. Measured AHU system airflow information. Building Name: Civil engineering Total Area: 56,537 ft^2 Unit Function Service Supply Outside Air Note TA-B1 Supply Basement * * common return TA-B2 Supply Basement * * common return TA-B3 Supply Basement No OA supply TA-B4 Supply Basement ** ** common return TA-B5 Supply Basement ** ** common return TA-B6 Supply Basement TA-B7 Supply Basement TA-B8 Supply Basement TA-1A Supply 1 st Floor TA-1B Supply 1 st Floor TA-2A Supply 2 nd Floor AHU 2 Supply 1 st Floor Existing Comfort/Indoor Air Quality Conditions As stated, the initial walk through of the building collecting CO 2 and temperature readings indicated that an outside air problem existed within the building. In the basement the CO 2 measurements indicated that there is a surplus of outside air being brought in. The measurements also indicated insufficient ventilation to parts of the 1 st floor and the entire 2 nd floor. Other comfort issues noted in the building included: o The basement east hallway and offices were hot or cold and the temperature poorly controlled. o The first floor west hallway is drafty caused by exiting air from lecture hall 110 o The second floor computer lab rooms 215 and 220 were hot due to dirty coils. o Also, it has been noted that the IT personnel report that all the computer labs remain hot most of the time causing the occupants to open windows. Table 5 below is a summary of the comfort measurements performed in the building during commissioning. 7

13 Table 5. Comfort measurements performed in the building CIVIL ENGINEERING INITIAL READINGS ROOM # DEG F CO 2 ppm %RH AIR FLOW cfm COMMENTS BASEMENT LAVATORY N/A N/A HALL(25) N/A 104 N/A N/A N/A 2025** CALIBRATED THERMOSTAT 110* N/A 136* ** HALL(139) N/A 203 N/A N/A N/A 1740** * ** 216* N/A N/A N/A 623** 219* N/A 220 N/A N/A N/A 720** THERMOSTAT BROKEN * Indicates the room was occupied at the time of measurements. ** Testing CFM flow measurements 3. Existing HVAC control The control programming for this building has an unoccupied schedule that starts at 11:45PM and continues to 4:00AM daily. The heating and cooling mode is only based upon outside air temperature. The occupied/unoccupied mode controls the air handling units and outside air dampers. When the program changes heating/cooling mode, the point value changes drastically and creates comfort problems. This causes the unit to flood the areas with hot or cold air causing discomfort in the space. Furthermore, one of the three variable speed air handling units has an unoccupied static pressure reset; the others do not. Nor is there a shut down schedule for the air handling units. And finally, 8

14 the chilled and heating water pumps are run 24/7 at a constant speed with no valve operation to control water flow, therefore savings is only recognized through electricity reduction at the air handling units. B. Continuous Commissioning Measures To resolve the problems described in the previous section, a number of Continuous Commissioning measures have already been implemented in the building. Due to various reasons other measures are proposed and are awaiting implementation 1. Implemented Measures While measurements were being taken of the air handling units, an observation was made of TA-1A. Although the unit had a VFD, it was not varying to maintain static pressure set point of 1.0 W.C. After further investigation the controller DPV was found to be faulty and was replaced solving this problem. The air handling units have both a heating water valve and a chilled water valve that should function at two different air pressure ranges from a coupled source of control air. The measurements taken of the valve actuators indicated the operation ranges on some were too close for best operation and two units were overlapping causing simultaneous use of both heating and chilled water resulting in a large waste of energy. A summary of these CC measures is listed in table 6 below. Table 6. Summary of implemented CC measures in building. Category CC Measure Result Mechanical Repair controller DPV Electricity savings from VFD operation. Mechanical Mechanical Balance valve operation on TA-B2 and TA-B4. Repair linkage to OA damper on TA-B8 Reduction of heating and chilled water usage, Improve comfort. Control OA air to basement An example of this is TA-B2. The initial valve actuator operating ranges were taken of 4-10 psig for the normally open heating water valve and 2-8 psig for the normally closed chilled water valve. This resulted in the valves operating simultaneously during two thirds of the pressure range. The chilled water flow for this unit is scheduled at 16.3 gal/min and the heating water at 7.7 gal/min. Assuming: 1) chilled water was being called for two-thirds of the year and heating water at the remaining third. 2) When the valve control ranges overlap 50%, there is a chilled water flow of 50% (or 8.15 gpm) and 9

15 heating water flow of 50% (or 3.85 gpm); and 3) The ΔT of heating water is 20 F and the ΔT of chilled water is 16.2 F. 4) The calculations use scheduled numbers. The resulting waste is indicated in table 7 below. Table 7. Summary of example potential savings for TA-B2 % of time valves overlapped HW MMBTU CHW MMBTU $ USED $ $1, $2, $2, Adjustments were made to all of these valve actuators providing a proper operating range to each set. Table 8 summarizes the valve pressure measurements. Table 8. AHU valve measurements and adjustments. Initial operating pressure range Final Pressure Range AHU Chilled water Heating water Initial operating pressure range TA-B1 2-way way TA-B2 3-way way TA-B3 2-way way TA-B4 2-way way TA-B5 2-way way TA-B7 2-way way TA-B8 2-way way AHU-2 3-way way Final Pressure Range 2. Proposed Measures Several Continuous Commissioning measures are proposed that have not been implemented. Table 9 below is a summary of those measures with an estimation given of how much each measure would save if implemented. Their implementation would complete this phase of Continuous Commissioning for this building, and would correct the remaining problems with building performance. 10

16 Table 9. Summary of proposed CC measures that have not been implemented in the building and their estimated potential savings. Category CC Measure Purpose AHU Replace heating water valves on TA-B4 and zone 3 of TA-B6 reheat Reduce heating water usage Pumping Install VFD drive on chilled water pump and replace failed sensors Reduce electricity and chilled water usage Open heating water building Pumping AHU Programming Programming Programming Programming bypass Install controls for AHU-2 and add to Apogee Change control program of AHU set points to table Extend unoccupied time schedule Reduce TA-1B and TA-2A night static pressure set point. Shut down TA-B8 Reduce heating water usage Control unit with set-points and scheduling for savings Better comfort control Savings of electricity, heating water and chilled water. Reduced chilled and heating water usage and electric consumption. Reduced chilled and heating water usage and electric consumption. The first proposed measure is to replace the heating water valves on TA-B4 and zone 3 of TA-B6. These valves are not closing completely resulting in excess heating water usage. The second proposed measure is to replace the failed temperature and differential pressure sensors on the chilled water pumping system. It is recommended to follow this with installation of a VFD drive for the pumping motor. This will allow for a reduction in chilled water usage and electricity during low load time and during night modes. The third proposed CC measure is to replace the differential pressure sensor and open the building heating water bypass valve. By opening the bypass, the return valve can be modulated to control the amount of heating water used from the campus loop based upon ΔP. This will show cost reduction even without the installation of a VFD. The fourth proposed measure is to install control hardware for air handling unit 2 and add this unit to Apogee. Currently, the unit operates 24/7, yet the space it serves is only occupied weekdays 8:00 a.m. to 5:00 p.m. With the added controls, unit 2 can be added to the occupancy schedule and allow shutdown during nights and weekends creating savings. The fifth proposed measure is to change the basement air handling unit temperature set points. They are being changed based on weather conditions and a time schedule. This 11

17 change was causing comfort problems due to abrupt changes in the supply temperature when the external temperature changed. A table within the control program to use more incremental temperature changes provides better comfort. This would resolve the hot and cold issues in the basement areas. The last 3 proposed measures are: 6) to reduce energy levels, the extension of the unoccupied time schedule from 11:45PM through 4:00AM should be extended to 10:00PM through 6:00AM. 7) the static pressure set point for units TA-1B and TA-2A should be reset during this time and finally, 8) TA-B8 can be shut down, again to provide economic savings without affecting comfort levels. IV. Requested Action In order to maximize the performance of the building and its potential energy savings, it is requested that a number of maintenance and controls issues be addressed in the building. These include issues that need resolving in order to implement the proposed Continuous Commissioning measures, as well as general deferred maintenance issues. To be able to implement the proposed measure to optimize the outside air intake, the outside air intake grills need cleaning and the filters need to be replaced. Also, the damper actuator to the outside air intake at TA-1B needs to be repaired. AHU-2 should have the thermostat moved from hanging in the return air to a location in room 110. To maximize air flow in the trouble spots the reheat coils in the VAV terminal boxes in rooms 215 and 216 need cleaning and airflow calibrated. Air flows were measured for TA-2A serving these rooms. At the time of the measurements the VFD was operating at 34 Hz. This is approximately 57% of full capacity. As indicated by the results shown in table 10, rooms 215 and 216 measurement show a significantly lower readings than those obtained in room 210 which has significantly higher measurements at the controlled static pressure. The results of the CFM measurements support the conclusion that the reheat coils are clogged in rooms 215 and 216. Additionally, all other boxes in the building should be checked. Furthermore, the thermostat in room 220 needs to be replaced. 12

18 Table 10. CFM Measurements taken on AHU-2A AHU-2A DIFFUSER CFM MEASUREMENTS DESIGN ROOM CFM MEASURED CFM 57% OF DESIGN Moreover, some measures are recommended to possibly reduce future comfort problems and increase energy efficiency. Check bearings on blower at air handler unit 1A. Chilled water valves at air handler units TA-B1 and TA-B8 are leaking at stems. V. Building Comfort Improvements As mentioned earlier, one of the primary objectives of Continuous Commissioning is to improve occupant comfort levels in buildings. As noted, some of the major comfort issues that this building experienced before commissioning included high CO 2 readings, basement east hallway and offices hot or cold, first floor west hallway windy, second floor room 215 hot, and lab 220 hot. It is recommended that the mechanical issues previously mentioned be addressed to provide the completion of the CC measures outlined within this document. This will not only provide better comfort conditions for the building occupants but will provide the University with economic savings in the future. VI. Savings Analysis At this point in the commissioning process, post-cc data is unavailable and thus savings cannot be determined. These values will be given at a later date by the ESL data analysis group. 13

19 Estimated savings analysis is incomplete at the time of this report s submission. VII. Retrofit Recommendations After assessing the building, we recommend a retrofit of DDC control to AHU-2 and the outside air intake damper. The unit is located in room 222A and serves room 110 lecture hall. Additionally, it is recommended that the return air duct and the outside air duct be connected directly to the units return air grill for better control of mixed air to the area. The purpose of this is to have control to the unit for better comfort purposes and the ability to regulate the equipment s operation for energy savings. This measure will resolve the unwanted draft in the first floor west wing and contribute toward a stable air temperature throughout the first floor. The cost of this retrofit is estimated at $ and would produce a simple payback of 3 years. VIII. Conclusions The Civil Engineering Building has been a part of the A&M system since High energy consumption and comfort problems in the building made it a good candidate for Continuous Commissioning. The process was performed in a period of two months. It is believed that the measures that have been implemented up to this time will save energy costs, in addition to improving comfort in the building. Additionally, a major retrofit of the DDC controls for AHU-2 is recommended. Increased energy efficiency will occur in the building, as well as, an increase in the productivity of occupants who will be more comfortable in their working environment. A number of issues have been identified that need to be addressed in order that the proposed Continuous Commissioning measures be able to be implemented. An additional list of deferred maintenance issues that need to be resolved has been generated. It is recommended that the proposed issues be resolved and the proposed measures be implemented to maximize the value of the Continuous Commissioning of this building, and most importantly, to maximize energy savings and comfort levels in the building. In this way, the Texas A&M University campus can move forward in its quest for energy efficiency, and the Continuous Commissioning process will have been beneficial in aiding in this endeavor. 14

20 Appendices 15

21 Appendix A: Summary of requested actions needed before implementing proposed CC measures. Requested Action Related CC Measure Status Replace AO Filters Optimize OA intake schedule. Pending Clean OA intake louvers on all units Optimize OA intake schedule. Pending TA-1B room OAD in need of repair Optimize OA intake schedule. Pending VAV boxes serving rooms 215 and 216 need cleaning Optimize air flow Pending Replace thermostat in room 220 Optimize air balance Pending Replace frozen CHW control Valve CHW use optimization Pending TA-B1 HW 2 way N.O. valve leaking by Optimize AHU efficiency Pending TA-B2 NC 3 way CHWV wrong control range Optimize AHU efficiency Completed TA-B4 Replace HWV, Leaking through Optimize AHU efficiency Pending AHU-2 Move thermostat from ductwork to classroom Optimize AHU efficiency Pending AHU-2 Return air grill clogged Optimize AHU efficiency Pending Install controls to AHU-2 located in Rm. 222A serving 110 lecture hall Optimize AHU efficiency Pending Install controls to OAD at AHU- 2 Optimize OA intake schedule. Pending Calibrate all terminal box thermostats Optimize AHU efficiency Pending Repair CHWS temp sensor. Optimize chilled water system. Pending Install VFD to CHW pump Optimize chilled water system Pending Replace HW DP sensor. Optimize heating water system. Pending Install VFD to HW pump Optimize heating water system Pending 16

22 Appendix B: Diagrams & Measurements AHUs B1, B2, B3, B4, B5, B7, B8, 2 Return Air Filter 1 2 Supply Air Fan C H C C 3 Discharge B1 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (RA) X (MA) X (SA) N/A N/A N/A (OA) X5 735 B2 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (RA) X (MA) (SA) N/A N/A N/A (OA) X5 735 B3 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (RA) x (MA) (SA) x (OA)

23 B4 Location Temperature RH Pressure Velocity Duct Size Flow Comments ( F) % in.h2o fpm (L x W) CFM 1 (RA) X6 * 2 (MA) (SA) X (OA) B5 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (RA) X9.5 * 2 (MA) 3 (SA) X (OA) ** open B7 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (RA) X (MA) X (SA) X (OA) 141 B8 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (RA) 2 (MA) X (SA) X (OA) Location Temperature RH Pressure Velocity Duct Size Flow Comments ( F) % in.h2o fpm (L x W) CFM 1 (OA) (RA) (MA) 18

24 AHU-B6 RA Zone 1 Zone 2 Zone 3 Zone 4 OA 2 C H SA H H H C C B6 Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (OA) (RA) 72 N/A 3 (MA) (Zone 1) X (Zone 2) X (Zone 3) X (Zone 4) X AHUs 1A, 1B, 2A RA Fresh Air 1 Filter Supply Air Fan 2 C C Discharge 19

25 1-A Temperature RH Pressure Velocity Duct Size Flow Location ( F) % in.h2o fpm (L x W) CFM Comments 1 (OA) (RA) (MA) B Location Temperature RH Pressure Velocity Duct Size Flow Comments ( F) % in.h2o fpm (L x W) CFM 1 (OA) X11 2 (RA) X12(X2) 3 (MA) X X A Location Temperature RH Pressure Velocity Duct Size Flow Comments ( F) % in.h2o fpm (L x W) CFM 1 (OA) X (RA) X25 3 (MA) X X

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Harrington Tower Building

Harrington Tower Building Continuous Commissioning Report For the Harrington Tower Building Building #435 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Continuous Commissioning Report

Continuous Commissioning Report Continuous Commissioning Report for the Bush Academic Facility (Bldg. 1607) Submitted to: Office of Energy Management Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Physical Plant Complex

Physical Plant Complex Continuous Commissioning Report For the Physical Plant Complex Building #1156 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

Continuous Commissioning Report

Continuous Commissioning Report ontinuous ommissioning Report for the Price Hobgood Building (Bldg. 1507) Submitted to: Office of Energy Management Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

Continuous Commissioning SM Report. For. Wing 86, Chemistry Complex (Building # 376) Hui Chen Song Deng Homer L. Bruner, Jr., CEM.

Continuous Commissioning SM Report. For. Wing 86, Chemistry Complex (Building # 376) Hui Chen Song Deng Homer L. Bruner, Jr., CEM. Continuous Commissioning SM Report For Wing 86, Chemistry Complex (Building # 376) By Hui Chen Song Deng Homer L. Bruner, Jr., CEM Contact: Song Deng (979-862-1234) Homer L. Bruner, Jr. (979-862-7185)

More information

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Continuous Commissioning of Commercial Kitchen and Dining Facilities Case Study

Continuous Commissioning of Commercial Kitchen and Dining Facilities Case Study The 7 th International onference for Enhanced Building Operations (IEBO 2007) ontinuous ommissioning of ommercial Kitchen and Dining Facilities ase Study Hui Li, hen Xu, Qiang hen and Song Deng Energy

More information

Song Deng, P.E. Assistant Director Energy Systems Laboratory Texas A&M University College Station, TX

Song Deng, P.E. Assistant Director Energy Systems Laboratory Texas A&M University College Station, TX Room Temperature ontrol during Season Switchover with Single Duct Variable Air Volume System without Reheat henggang Liu Research Associate Song Deng, P.E. Assistant Director Homer L. Bruner, Jr., EM Mechanical

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY

MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing

More information

The Temperature and Relative Humidity Control in Cushing Library

The Temperature and Relative Humidity Control in Cushing Library The Temperature and Relative Humidity Control in Cushing Library Chenggang Liu Research Associate Song Deng Assistant Director Homer L. Bruner, Jr., CEM Mechanical Systems Specialist Utilities Office of

More information

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113 Introduction: Glumac was engaged by

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

DIGI-VAV APPLICATIONS

DIGI-VAV APPLICATIONS DIGI-VAV DIGI-VAV APPLICATIONS Digi-VAV: An optimization kit for Variable Air Volume Air Handling Units (VAV AHU) that ensures individual zone indoor air quality (IAQ), and minimizes system energy consumption.

More information

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Selected Laboratory Energy Efficiency Measures

Selected Laboratory Energy Efficiency Measures Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

APPLICATION GUIDE BEAMS

APPLICATION GUIDE BEAMS BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.

More information

EarthWise System Seminar

EarthWise System Seminar EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology

More information

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY Page 1 of 9 004 Harry Griffith Hall AHU 1 OUTSIDE AIR TEMPERATURE 1 OA T AT LEAST ONE HARDWIRED OA SENSOR PER BUILDING HOT DUCT SUPPLY AIR TEMPERATURE 1 HD T 1ST FLOOR HOT DUCT STATIC PRESSURE 2 HD PRESS*

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while

More information

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,

More information

DX-9100 Applications from Engineering Services

DX-9100 Applications from Engineering Services System 9100 Technical Manual 636.4 Application Examples Section Technical Bulletin Issue Date 0896 DX-9100 Applications from Engineering Services Introduction Page 3 Overview 3 Air Handling Unit Applications

More information

Implementation of the Laboratory Air Handling Unit Systems (LAHU)

Implementation of the Laboratory Air Handling Unit Systems (LAHU) University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Architectural Engineering -- Faculty Publications Architectural Engineering 2003 Implementation of the Laboratory Air Handling

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001 This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.

More information

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Mingsheng Liu, Ph.D., P.E. Energy Systems Laboratory Texas A&M University College Station, Texas

More information

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers. VAV Diffusers lease refer to the rice Engineer s HVAC Handbook for more information on VAV Diffusers. Diffuser Types Ceiling Diffusers Conventional air distribution systems typically group several rooms

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

Auburn University Basketball Arena:

Auburn University Basketball Arena: Auburn University Basketball Arena: How Building Data Analytics Achieved Energy and O&M Savings While Improving Comfort and Sustainability Eric Moore, PE, CEM, Auburn University Hadas Webb, CEM, Cimetrics

More information

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated

More information

ASHRAE JOURNAL ON REHEAT

ASHRAE JOURNAL ON REHEAT Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide

More information

TEC Controller VAV 0-10V Fan Control with Hot Water Heat, Application Application Note Building Technologies

TEC Controller VAV 0-10V Fan Control with Hot Water Heat, Application Application Note Building Technologies TEC Controller VAV 0-10V Fan Control with Hot Water Heat, Application 2236 Application Note 140-1228 Building Technologies Table of Contents Overview... 4 Hardware Inputs... 10 Hardware Outputs... 10

More information

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET Design Standard Detailed specifications follow. PART 1 CHW AND HHW SUPPLY TEMPERATURE RESET 1.1 The Utilities & Energy Services Department (UES) at Texas A&M University is actively identifying and implementing

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop Energy-Savings Strategies for Rooftop VAV Systems Occupied set-point temperature Unoccupied set-point temperature Rooftop variable-air-volume (VAV) s are used to provide comfort in a wide range of building

More information

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC VOLUME ONE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Part-Load Strategies Why they re important.......... 1 What Things

More information

Memorial Student Center Complex (Bldg. 454)

Memorial Student Center Complex (Bldg. 454) ontinuous ommissioning Assessment eport For Memorial Student enter omplex (Bldg. 5) By henggang Liu David E. laridge, Ph.D., P.E. omer L. Bruner, Jr., EM ontact: David E. laridge (979-85-80) omer L. Bruner,

More information

Power and Energy Management Solutions

Power and Energy Management Solutions Selection Guide Power and Energy Management Solutions Heating, Ventilating and Air Conditioning (Bulletin 1414) Selection Guide 2 HVAC Selection Guide Instrumentation Selection Checklist Use the following

More information

2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems

2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems 2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems Dieter Bartel, Manitoba Hydro September 17 th, 2014 Outline Scope and compliance Prescriptive path

More information

Benefits Offered by Passive Dehumidification Wheel Speed Control

Benefits Offered by Passive Dehumidification Wheel Speed Control Benefits Offered by Passive Dehumidification Wheel Speed Control White paper By John Fischer Benefits Offered by Passive Dehumidification Wheel Speed Control The most significant advantage of the Pinnacle

More information

Product Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT )

Product Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT ) Product Data 33CS Carrier Comfort System Variable Volume and Temperature (VVT ) The VVT Comfort System provides the following features and benefits: 365-day scheduling, daylight savings compensation, and

More information

Existing Mechanical System Operation

Existing Mechanical System Operation majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable

More information

Displacement Ventilation

Displacement Ventilation Displacement Ventilation Displacement Ventilation Displacement Ventilation vs. Dilution Ventilation Characteristics Design Considerations Layout and Selection Product Overview Casino Case Study Dilution

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

Ventilation System Description. September 8, 2000 HETA

Ventilation System Description. September 8, 2000 HETA September 8, 2000 HETA 99-0250 Harry Enoch, Ph.D. Director, Environmental Health and Safety University of Kentucky 252 East Maxwell Street Lexington, KY 40506-0314 Dear Dr. Enoch: On June 7, 1999, the

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS PART 1 - GENERAL 1.01 General: A. Laboratory ventilation system will ensure the health and safety of laboratory occupants. B. Room pressurization control will utilize airflow tracking to vary the volume

More information

Pharmaceutical Facility Design

Pharmaceutical Facility Design PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

BAS Point Trend Data Guidance

BAS Point Trend Data Guidance BAS Point Trend Data Guidance Rev. 3, January 2018 Introduction The Building Automation System (BAS also, referred to as a DDC system, or a Direct Digital Control system) at your building has been set-up

More information

1.0 Digital Controller

1.0 Digital Controller Form CP-AHU D19_D21_D22 (11-17) D303072-A Obsoletes Forms CP-Preeva-D21 (1-16) Doc No 303072, CP-Preeva-D19 (1-16) Doc No 303071 Applies to: Preeva, MAPS, MAPS II, RPB, RPBL & SSCBL Series For Air Handler

More information

Guide To Troubleshooting INEFFICIENT COOLING FANS

Guide To Troubleshooting INEFFICIENT COOLING FANS Guide To Troubleshooting INEFFICIENT COOLING FANS TABLE OF CONTENTS Introduction Enclosure Cooling Basics Key Attributes of Enclosure Cooling Symptoms of Poor Enclosure Cooling Typical Cooling Fan Problems

More information

FAN TERMINAL UNITS Constant Volume (Series Flow), Standard Design

FAN TERMINAL UNITS Constant Volume (Series Flow), Standard Design FAN TERMINAL UNITS Constant Volume (Series Flow), Standard Design Fan motor (PSC or ECM). UL Listed 1 insulation conforms to UL Test 181 and NFPA 90A. Plenum air filter rack. (Filter Optional) Casing has

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

2 Existing Mechanical System

2 Existing Mechanical System 2 Existing Mechanical System 2.1 Design Objectives and Requirements The Gossett Field House project consists of a 25,000 sqft addition and a 40,000 sqft renovation of the existing facility for the University

More information

Raised Access Floor - (AE Breadth Area)

Raised Access Floor - (AE Breadth Area) Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an

More information

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing

More information

DIVISION 23 - HVAC HVAC

DIVISION 23 - HVAC HVAC DIVISION 23-23 00 00 PART 1 - GENERAL 1.01 GENERAL CRITERIA A. The heating system typical set point shall be 70 F inside. 1. The winter outdoor design temperature for most systems shall be -6 F. 2. The

More information

Your Home. Jacco & Assoc.

Your Home. Jacco & Assoc. Your Home Fan on with call for heating or cooling Heating on with call from space thermostat Stage as required to maintain The 75F Basics adj. - First stage of heating shall be heat pump Cooling on with

More information

Verasys System Operation Overview Technical Bulletin

Verasys System Operation Overview Technical Bulletin Contents subject to change. Verasys System Operation Overview Technical Bulletin Code No. LIT-12012370 Issued January 2016 Refer to the QuickLIT Web site for the most up-to-date version of this document.

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction

More information

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Zoning System Design Manual

Zoning System Design Manual Zoning Made Effortless 70-2321-03 Introduction The Concept of Zoning The basic principle of forced air zoning is to allow one HVAC system to be controlled by multiple thermostats, heating and cooling a

More information

Technical Assignment 3

Technical Assignment 3 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products Document 475595 Microprocessor Controller for Tempered Air Products Reference Guide for the Microprocessor Controller Please read and save these instructions. Read carefully before attempting to operate

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2007) Standard HALCYON Bldg. 400 Alpharetta, Georgia 3a

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

TESTING, ADJUSTING AND BALANCING

TESTING, ADJUSTING AND BALANCING PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information