1 PART 1 - GENERAL SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section " Direct Digital Control Systems for HVAC" for control equipment and devices and for submittal requirements. 1.2 SUBMITTALS A. Submittals are required and shall include detailed descriptions of the proposed sequence of operations for all systems specific to the project. B. The following information shall be submitted as a very minimum to the Engineer: 1. System diagrams denoting the operation of each individual system, folded to an equivalent 8-1/2 inch by 11 inch bound packet. 2. DDC logic diagrams. 3. Written sequences of operation with each specific diagram. 1.3 GENERAL A. The DDC system shall utilize the existing Automated Logic server located at the exisitng High School (connected to the Norton School System Ethernet), where all software, graphics, alarms, and trends shall reside. The DDC System communication protocol shall be BACnet where indicated on the drawings, and MODBUS where indicated on the drawings. The communication protocol between a VAV Box controller and room temp sensor or room combination temp/co2 sensor or room combination temp/relative/relative humidity/co2 sensor can be the DDC system communication standard protocol as long as the communication speed is sufficient to perform all functions described in the Sequence of Operations in a stable manner and must be demonstrated to the satisfaction of the Architect/Engineer. B. DDC System Contractor shall provide temperature differentials and time delays as required to maintain systems stability. C. All Analog Inputs, Analog Outputs, Binary Inputs and Binary Outputs shall be capable of being manually overridden through the graphic display that shows these types of points, and, the graphic display shall display the point has been manually overridden by either changing the color of the point or having text next to the point that states manually overridden. D. DDC system shall be capable of providing alarms of any point within the system. The DDC system shall be capable of trending any point within the system, including software control points calculated by the DDC System, example, heating hot water supply temperature control point that was calculated based on an outdoor air temperature reset schedule.. E. Each graphic display that contains an outdoor air airflow rate shall show the following; outdoor air airflow control point, outdoor air airflow, and shall include on the graphic display; design outdoor air airflow setpoint. Design outdoor air airflow setpoint is defined as the values shown on Drawing M701 within the Air Handling Unit Equipment Schedule. If AHU has CO2 demand control ventilation, design outdoor air airflow setpoint tag shall include value shown on Drawing M701 and the reduced value described herein

2 F. For each graphic display that contains a variable frequency drive (VFD) speed control point, the speed feedback value shall also be displayed. This is show the DDC system commanded speed compared to the actual VFD speed. Speed shall be displayed as percent (%) maximum motor speed. Graphic display shall include the VFD minimum speed that has been programmed into the VFD. Example; VFD has been programmed for minimum speed of 25% to maximum speed of 100%, if graphic display is displaying calculated control point is 10% speed, feedback will display 25% and operator will know that VFD has been programmed for a minimum speed of 25%. G. All graphic displays that contain a Variable Frequency Drive (VFD), shall include a display of each VFD with a hot spot over said VFD that when hit with the mouse shall go to a text screen showing the information obtained from the VFD from the BACnet communication. DDC System Contractor shall provide a list of all points that can be displayed through the communication link to Norton School, and then Norton School shall determine which points are to be displayed. Each display, graphic display, or text display, shall include the associated Room Name, Room Number and Equipment Number. Room Name and Room Number shall be same as displayed at each room, that is, they shall match the installed Room Labels. Equipment Number shall match those shown on the drawings. H. Run Time Accumulation - A re-settable run time accumulation for each Binary Output Object connected to mechanical loads greater than 1 HP, electrical loads greater than 10 KW, or wherever else specified or requested by Norton school shall be provided. I. DDC System Graphics shall consist as a minimum of : 1. Cover Graphic Display showing entire floor plan, with hot spots over descriptions to move to floor plans, heating hot water plant, chilled water plant or the displays screens described below. 2. The first floor plan shall show the entire first and second floor with hot spots to move to individual floor plans that match the drawing floor plans, and each floor plan shall display the room temperature, room relative humidity, CO2 level, status of lighting control occupancy sensor as occupied or unoccupied, and has a hot spot at the room temperature or room relative humidity or CO2 level such that the cursor can be brought to this hot spot and then the graphic display of the FPVAV or VAV box is then displayed. 3. Display of the heating hot water plant. 4. Display of the chilled water plant. 5. Display of each Air Handling Unit, 9 graphic displays, and, all sub-displays (text screens) described herein. Each display shall include the status of the duct smoke detector, and is obtained via the BACnet communication to the Fire alarm Panel. Each display shall also include an off-automatic point so that Norton Maintenance can easily stop the unit. 6. Display of each single duct shutoff type VAV box. 7. Display showing all Desrtatification fans, one display for all Destratification fans. 8. Display of cabinet unit heaters, one display for all cabinet unit heaters. 9. Display of status of all exhaust fans (one or two simple display for all fans) controlled and/or monitored by the DDC system. 10. Display of Cross-Connect Room Temperature, Kitchen Freezer and Kitchen Cooler temperature, all Technology Closet Room Temperature (quantity 6) and Elevator Machine Temperature (quantity 2). 11. Display of Electricity Meter data, include status of surge protector alarm, and all subdisplays (text screens) described herein. 12. Display of main Domestic Water Meter data

3 13. Display of Natural Gas Meter data 14. Display of Domestic Hot Water supply temperature, domestic hot water heaters, recirc pumps, domestic hot water meter, and all sub-displays (text screens) described herein. 15. Display of Domestic Water Booster Pump. 16. Display of Emergency Generator 17. Display of Fire Alarm System. 18. Display for Scheduling Snow Day or Delay Start of School. 19. Display showing all current unacknowledged alarms and past unacknowledged alarms. 20. Provide screens displaying the written out full sequence of operation for each piece of HVAC equipment. Provide a link to the sequence of operation displays on their respective equipment graphics. 1.4 HEATING HOT WATER BOILERS AND ASSOCIATED PUMPS A. The heating hot water boiler system consists of two heating hot water boilers and two circulating pumps (lead/standby) B. One heating hot water pump shall be designated, through the DDC System, as the lead pump (adj.) and other shall be the standby pump. The standby pump shall automatically start on a lead pump failure. The DDC system shall rotate the lead pump and standby pump on a weekly (adj.) basis. C. The DDC System shall enable and disable each boiler and control the firing rate of each boiler. Each boiler controller communicates with the DDC System via MODBUS communication protocol. One heating hot boiler shall be designated as the lead boiler (adj.) and other shall then be the lag boiler. The lag boiler shall automatically start on a lead boiler failure, and the lag boiler shall also operate when the DDC system requires two boilers to operate. The DDC system shall rotate the lead boiler and lag boiler on a weekly basis. D. The DDC System, shall reset the boiler plant heating hot water discharge temperature setpoint, and each boiler controller shall control the operation of the boiler to maintain this setpoint. When the outdoor temperature is between 70F (adj) and 40F (adj), reset shall be based on outdoor air temperature, and shall be linear between setpoints and do not go below or above setpoint limits when the outdoor temperature is above or below the values in the reset schedule; 40F outdoors - 140F heating hot water supply temperature, 70F outdoors - 110F heating hot water supply temperature. When the outdoor air temperature is above 70F (adj), the heating hot water supply temperature shall be maintained at 110F (adj). When the outdoor air temperature is below 40F (adj), the heating hot water supply temperature shall be maintained at 140F (adj). E. When the outdoor temperature is below 35F (adj.), the DDC system shall energize the lead hot water pump to run continuously and enable the boiler plant. When the outdoor temperature is below 55F (adj.) the DDC system shall energize the lead hot water pump to run continuously during occupied periods and during the heating optimal start period (see AHU sequence of operation) and enable the boiler plant. During unoccupied periods when the outdoor air temperature is above 35F (adj) the DDC system shall energize the lead hot water pump to run continuously and enable the boiler plant when there is a demand for heat from any heating coil (AHU, VAV Box, Cabinet Unit Heater, Etc) on the DDC system, and the pump and boiler plant shall be energized/enabled for a minimum 30 minute period. During occupied periods when the outdoor air temperature is above 55F the DDC system shall energize the lead hot water pump to run continuously and enable the boiler plant when there is a demand for heat from any heating coil (AHU, VAV Box, Cabinet Unit Heater, etc) on the DDC system, and the pump and boiler shall be energized/enabled for a minimum 30 minute period

4 F. When the lead boiler is energized by the DDC System, the DDC System shall open the boiler water isolation valve and the boiler shall not be allowed to be enabled until the boiler controller verifies proof of water flow through the boiler by the factor furnished and mounted flow switch located in the boiler water discharge pipe. When a lag boiler is enabled by the DDC System, the DDC System shall open the boiler water isolation valve and the boiler shall not be allowed to be enabled until the boiler controller verifies proof of water flow through the boiler by the factory furnished and mounted flow switch located in the boiler water discharge pipe. G. The DDC System shall sequence and determine the quantity of boilers required to operate to maintain heating hot water supply temperature control point. When a boiler is disabled by the DDC System, the water isolation valve shall remain open for 5 minutes (adj.) to allow the exchanger to cool down, and then this isolation valve shall close. When the DDC System disables the boiler plant, boilers are disabled and the pump is going to be de-energized, the pump shall operate a minimum of 5 minutes (adj.) to allow the boiler heat exchanger to cool down. H. Each heating hot water pump is variable speed and the DDC system shall vary the speed of the pump motor as required to maintain differential pressure setpoint (adj) at both differential pressure sensors. The pump variable speed drive shall be set such that minimum speed is 15 Hz (25%) and maximum speed is 60 Hz (100%). The TAB Contractor shall inform the DDC System Contractor of the differential pressure setpoints required to maintain design flow rate. I. Heating hot water flow is monitored through a flow meter located upstream of the pumps intake. Each boiler requires 25 gpm minimum water flow. The DDC System shall maintain minimum water flow by modulating the bypass valve, when one boiler is energized the minimum water flow is 25 gpm, and when two boilers are energized the minimum water flow is 50 gpm. If minimum water flow falls below setpoint for more than 1 minute, the DDC system shall initiate an alarm. The modulating bypass valve shall be spring return fail open flow through boilers. J. Each boiler has 350 gpm maximum water flow, therefore when one boiler is operating the maximum water flow is 350 gpm through it. When the water flow exceeds 350 gpm (bypass valve fully closed) the DDC System shall override the boiler plant controller and enable a lag boiler and minimum water flow shall be maintained at 50 gpm. If minimum water flow falls below setpoint for more than 2 minutes, the DDC system shall initiate an alarm. The modulating bypass valve shall be spring return fail open flow through boilers. K. Each boiler can be operated in manual mode. Whenever a boiler is to be operated in manual mode, the heating hot water pump must be operating. L. Each heating hot water pump can be operated in manual mode, and the operator must select the pump speed at which the pump is to operate. Note, the pump variable frequency drives do not have a bypass contactor, that is, this variable frequency drive only contains an inverter section which will control the speed of the motor. M. The boilers individual operating and safety controls shall be in place for proper boiler firing. The DDC system shall monitor boiler and pump failures. Should a boiler or pump failure occur, the DDC system shall provide an alarm and indicate the specific alarm. N. Boilers Emergency Shutdown Switch Two manual mushroom style pushbutton switches mounted under plexiglass cover when pushed shall immediately shutdowns boilers B-1 and B-2 burners. Switches are located in Mechanical Room next to man doors leading to North and South Corridors. Reset shall be manual by pulling pushbutton. This is a hardwired interlock. Switch, wiring, conduit, relays, etc. are all furnished and installed by DDC System Contractor. Switch position is also monitored by the DDC System and when either switch is depressed the DDC System shall indicate an alarm. Each switch status shall be displayed on the heating hot water plant graphic display

5 O. The DDC System shall monitor the building heating hot water supply and return temperatures. P. The DDC System shall monitor the each boiler discharge water temperature. Q. The DDC System shall monitor heating hot water supply pressure through a pressure sensor located between the air separator and pump suction, and shall provide an alarm if the suction pressure falls below 10 psig (adj). R. The DDC System shall monitor the heating hot water make-up water meter and display current flow (gpm) and cumulative flow (gallons), and shall provide an alarm if the flow exceeds 25 gallons (adj) in a 5 minute (adj) period. S. Graphic display shall include additional information obtained from each boiler from the MODBUS communication. As a minimum, each boiler status, each boiler supply and return water temperature shall be displayed, each boiler firing rate, and each boiler alarm condition, DDC System Contractor shall provide a list of all points to Norton School that can be displayed through the communication link, and then Norton School shall determine which additional points are to be displayed. T. Heating hot water boiler system (boilers, pumps, global outdoor air sensor, etc.) and all DDC System controls associated with it are on emergency power, powered by the emergency generator, and remain fully operational during an electrical power failure. See electrical drawings for emergency power sources. The direct Digital Control Panels(s) serving the heating hot water boiler system shall also be powered through an uninterruptible power supply (UPS) that can provide backup power for 30 minutes. This is to prevent this (these) Direct Digital Control Panels from going down on a loss of power while waiting for the emergency generator to power it (them). 1.5 AIR COOLED CHILLER AND CHILLED WATER PUMP SEQUENCE OF OPERATION A. The chilled water system consists of one air cooled chiller and two circulating pumps. The air cooled chiller provides chilled water when the outdoor temperature is above 55F. The standalone microprocessor based air cooled chiller control panel shall monitor and control the air cooled chiller as directed by its chiller control software. The air cooled chiller control software shall perform control strategies described herein. B. The Controls Contractor shall be responsible to provide any and all BACnet interface equipment in order to achieve the degree of interface and control as required by these sequences of operation. These interfaces shall include the hardware and software of the temperature control system and the chiller manufacturer as well. C. The DDC system shall energize the chilled water pump and enable the chiller whenever the outdoor air temperature is above 55F and the time schedule indicates occupied period. The DDC system shall enable the chiller whenever there is a call for cooling from any Air Handling Unit and the outdoor air temperature is above 55F during unoccupied periods and during the optimal start period. When the chiller is disabled by the DDC system, the chilled water pump shall operate for 5 minutes before shutting down to remove energy from the evaporator and sufficient chilled water valves shall remain open to aid in removing energy from the evaporator. D. The chiller shall be enabled after chilled water pump flow has been proven. When the chiller is enabled, the DDC system shall reset the chiller discharge temperature based on outdoor air temperature according to the following schedule: Outdoor Air Temp At 55 F (adj.) Chilled Water Supply Temp 50 F (adj.)

6 Above 75 F (adj.) 44 F (adj.) E. Chiller Soft Start and Demand Limit. The chiller control software shall provide a user-adjustable loading time or a chilled water pull down delay program at system start-up. This prevents the unnecessary full load operation of chiller and limits system electrical demand during chilled water loop pulldown. The DDC system shall also demand limit the chiller according to the following schedule; Outdoor Air Temp Chiller Demand Limit At 55 F (adj.) 60% (adj.) Above 75 F (adj.) 100% (adj.) F. The chilled water pump is variable speed and the DDC system shall vary the speed of the pump motor as required to maintain differential pressure at both differential pressure sensors. The pump variable speed drive shall be set such that minimum speed is 15 Hz (25%) and maximum speed is 60 Hz (100%). G. One chilled water pump shall be designated, through the DDC System, as the lead pump (adj.) and other shall be the standby pump. The standby pump shall automatically start on a lead pump failure. The DDC system shall rotate the lead pump and standby pump on a weekly (adj.) basis. However, when the lead pump speed exceeds 60% (adj) the lag pump shall be started and both pumps shall operate in unison until the pumps speed has decreased to 40% (adj), then operation reverts back to one pump. H. Chilled water flow is monitored through a flow meter located upstream of the pump intake. Chiller requires 325 gpm minimum waterflow, and shall be accomplished by utilizing 3-way chilled water control valves on AHU-2, AHU-4 and AHU-6. If water flow falls below 325 gpm for more than 2 minutes, the DDC system shall initiate an alarm. During morning cool-down, the DDC system shall limit the pump speed so that chilled water flow does not exceed 460 GPM, I. The chiller can be operated in manual mode, and each chilled water pump can be operated in manual mode, and the operator must select the pump speed at which the pump is to operate. The pump must be operating before manually starting the chiller and must operate for at least five minutes after the chiller is manually disabled. J. The chiller has an integral outdoor thermostat that senses outdoor air temperature, and when it is below 50F (adj.) outdoors, this outdoor thermostat shall prevent the chiller from operating. This is to prevent chiller operation if the DDC system global outdoor temperature sensor has failed. K. Chiller Status Report. Provide an operating status report for the chiller. The report shall provide the present status of all binary information and for analog information present value, today s average, and the month-to-date average for the following information to provide the operator with critical chiller operating data: 1. Compressor On/Off Status. 2. Compressor Starts/Run hours Compressor A, B. 3. Phase 1/2/3 percent RLA Compressor A, B. 4. Active chiller diagnostics or alarms. 5. Leaving chilled water temperature. 6. Entering chilled water temperature. 7. Chilled water supply temperature setpoint. 8. Percent RLA/Percent current limit. 9. Outdoor air temperature. L. Diagnostic/Protection. The DDC system shall be able to alarm from all sensed points and diagnostic alarms sensed by the chiller controller

7 M. All points and diagnostics shall be made available throughout the building control system. The Controls Contractor shall coordinate with the chiller manufacturer to furnish and install the required hardware and software for the information to be relayed through the building control system. The system shall utilize the industry standard BACnet protocol for all information exchange. N. If the fire alarm system is activated for any reason, such as; smoke detector, pull station, flow switch, etc., the DDC system shall disable the air cooled chiller, and de-energize the chilled water pump, with the time delays described above to remove energy from the chiller exchanger. When the fire alarm system is reset, the DDC system shall automatically restart the chilled water system. 1.6 MECHANICAL ROOM REFRIGERANT MONITORING SYSTEM AND MECHANICAL ROOM EXHAUST FAN A. A refrigerant monitoring system is located within Mechanical Room. The refrigerant monitoring system consists of a monitoring/control panel, 3 refrigerant sensors with the capability to add one sensor in the future and horn/strobes. The monitoring/control panel shall communicate to the DDC controller the following; Refrigerant monitor trouble, Refrigerant monitor alarm, PPM refrigerant sensed by sensor #1, PPM refrigerant sensed by sensor #2 and PPM refrigerant sensed by sensor #3. B. The refrigerant monitor shall provide a warning and alarm signal to the DDC controller as follows; 1. Chillers utilizing Refrigerant R134a; a. Warning if 500 PPM refrigerant is sensed by any refrigerant sensor. b. Alarm if 900 PPM refrigerant is sensed by any refrigerant sensor. C. The alarm shall be a latching alarm in that all actions that occur after an alarm shall not reset until the alarm is acknowledged and reset at the refrigerant monitoring panel. When an alarm condition occurs, the refrigerant monitor shall directly start exhaust fan EF-XX at full speed, open the associated outdoor air intake, energize horn strobes located within the Room and on the entrance side of the entry door to the Room. The refrigerant monitoring system shall indicate and provide a trouble signal to the DDC controller if a trouble conditions occurs. If the refrigerant monitoring panel losses electrical power all relays shall go to the normal position which is starting the exhaust fan, opening the outdoor air intake and activating the horn/strobes. D. DDC System shall monitor Mechanical Room temperature and start exhaust fan EF-XX at 50% speed when room temperature rises above 85F (adj), and open the associated outdoor air intake. Exhaust fan shall not operate for temperature control when the outdoor air temperature is below 35F (adj). 1.7 AIR HANDLING UNIT AHU-1 MAIN GYM A. General Operation 1. The AHU operates as a single zone variable air volume system and consists of; a supply fan with variable frequency drive, exhaust fan with variable frequency drive, variable speed enthalpy energy recovery wheel with outdoor air and exhaust air bypasses, air filters, UVc lights, chilled water cooling coil and pre-heat and reheat heating hot water coils. Note, exhaust fan the variable frequency drive does not have a bypass contactor, that is, this variable frequency drive only contains an inverter section which will control the speed of the motor

8 2. If the supply fan variable frequency drive is to be operated in manual mode or bypass mode, then sufficient number of VAV box supply air dampers must be manually overridden to allow sufficient supply airflow to prevent activating the high pressure static safety switch. 3. The AHU is scheduled for automatic operation through the DDC system on a time of day basis for occupied and unoccupied modes. B. Occupied Mode 1. The supply and exhaust fans run continuously, the outdoor air dampers, return air dampers and supply fan modulate as required to maintain minimum outdoor air control point, The unit is controlled as follows 2. The DDC system shall determine the discharge air temperature control point. On a call for cooling, the discharge air temperature shall be maintained at 55F (adj) and the supply fan speed shall vary between 100% (adj) speed and 50% (adj) speed. As the call for cooling diminishes, the supply fan shall slow down to 50% (adj) speed with the supply air temperature maintained at 55F (adj). When the room temperature is between the room cooling temperature setpoint and heating temperature setpoint, the supply fan operate at 50% (adj) speed with the supply air temperature maintained at 55F (adj). When the room temperature falls below the heating temperature setpoint, the supply fan shall operate at 50% (adj) speed and the discharge air temperature shall reset between 55F (adj) and 90F (adj) as required to maintain room temperature heating setpoint. If additional heating is required, the supply air temperature shall be maintained at 90F (adj) and the supply fan speed shall slowly increase (5% speed per minute up to 100% (adj) speed), and then the reverse occurs when less heating is required. See dehumidification cycle below for additional information. 3. The pre-heat coil shall prevent discharge air from this coil falling below 50F (adj) by modulating the heating hot water control serving this coil. 4. Dehumidification cycle If room relative humidity exceeds 60% (adj) (as sensed by the room sensor) and the outdoor air temperature is above 60F (adj), the system enters dehumidification mode. The AHU cooling coil discharge temperature shall be maintained at 55F (adj.) and the reheat coil shall provide reheat to maintain room temperature. If dehumidification is required while the AHU supply fan is operating between 100% (adj) and 50% (adj) speed, the DDC system shall slowly increase supply fan speed (5% speed per minute up to 100% (adj) speed) and reset discharge air temperature between 55F (adj) and 90F (adj) as required to maintain room temperature cooling temperature setpoint. The system stops dehumidification mode when the room relative humidity falls below 55%. 5. Exhaust fan operation The DDC system shall operate the exhaust fan variable frequency drive. The exhaust fan is interlocked with the supply fan and exhaust damper end switch and shall not operate until supply fan status is proven and the exhaust damper is fully open. Exhaust air airflow is measured and controlled by the DDC system. The exhaust fan speed shall be based on maintaining a 2000 CFM positive differential between outdoor air airflow and exhaust airflow, and the exhaust fan does not start until outdoor air airflow exceeds 3000 CFM. Exhaust fan motor speed shall not fall below 25% rated speed, and shall not exceed 100% rated speed. 6. Energy Recovery Section Operation a. The DDC system shall operate the energy recovery section as required to maximize energy recovery, including varying the speed of the energy recovery wheel to control AHU discharge air temperature. The energy recovery section shall

9 maximize energy recovery prior to allowing the heating coil to operate. The energy recovery section shall maximize energy recovery during mechanical cooling by allowing the cooling coil to operate during economizer. b. Between 65F (adj) and 55F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100% open and the return air bypass dampers are 100% closed, and, the chilled water coil shall provide cooling as required. Above 65F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100% closed, the AHU operates on minimum outdoor air, and the energy recovery wheel operates at 100% speed when the return air temperature exceeds the outdoor air temperature by more than 2F DB (adj). Between 55F (adj) and 38F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100% open, the energy recovery wheel, operates at 100% speed and the return air bypass dampers modulate to maintain unit discharge air temperature and prevent minimum outdoor air from falling below control point, and the heating water coil shall provide additional heat as required. Below 38F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100% closed, the AHU operates on minimum outdoor air, the energy recovery wheel speed varies as required to maintain discharge air temperature, and the heating coil operates to provide additional heat when the energy recovery wheel cannot provide sufficient heat.. c. Self Cleaning - When the rotor has been still for 30 minutes (adj) the self cleaning function begins by rotating the rotor for 10 seconds (adj) at minimum speed, then stopping the rotor. d. The energy recovery section shall include a frost control mode when the outdoor temperature is below 20F (adj), to prevent the energy recovery wheel from accumulating too much frost. The unit monitors the wheel exhaust side discharge air temperature and prevent it from falling below 15F (adj) by varying the speed of the energy recovery wheel to reduce energy recovery to remove frost from the wheel. when the unit is in "frost control", the graphic display shall indicate that is in "frost control" mode. e. Rotation monitoring - The Variable Frequency Drive monitors the rotation of the rotor. If the rotor is not rotating while being commanded to rotate, the DDC System shall provide an alarm. f. During frost control the mixed air temperature sensor shall control the outdoor air and return air dampers to maintain 40F (adj) mixed air temperature, minimum outdoor air control is overridden during frost control. If the DDC system detects the energy recovery wheel is not operating when it should be operating when the outdoor air temperature is below 35F (adj), then the mixed air temperature sensor shall control the outdoor air damper and return air damper to maintain 40F (adj) mixed air temperature. 7. Economizer operation When the outdoor air temperature is below 65F (adj.) economizer operation free cooling shall be allowed. The DDC system shall operate the outdoor air and return air dampers, energy recovery section, heating hot water coil control valve and cooling coil control valve in sequence and without overlap to maintain discharge air temperature, that is, if the energy recovery section cannot provide sufficient energy transfer then heating hot water coil control valve shall modulate as required to provide additional heat to maintain discharge air control point, and if the energy recovery wheel is providing too much heat then the exhaust air bypass damper shall modulate and when this damper is fully open and if the energy recovery wheel still provides too much heat then the outside air bypass dampers shall modulate open as required to maintain

10 discharge air temperature. When the outdoor air temperature is above 65F (adj.), economizer is disabled. During economizer operation, outdoor air airflow rate shall not fall below minimum outdoor air airflow control point. 8. Minimum outdoor air airflow. Outdoor air airflow is measured and controlled by the DDC system. Minimum outdoor airflow setpoint adjustment is through the DDC System. If the room CO2 sensor is reading below 1000 ppm (adj) setpoint, then the outdoor air airflow shall be 25% of the value shown on drawing M-701. If the room CO2 sensor is reading above setpoint, then the DDC controller shall modulate the outdoor air airflow up to 100% of the value shown on Drawing M-701, and the DDC controller shall increase supply fan speed as required to maintain outdoor air airflow control point. If the room CO2 sensor continues to read above setpoint for 10 minutes, the DDC system shall issue an alarm. When the outdoor air is below 5F (ajd) the outdoor air shall be 10% of the value shown on drawing M The UVc lights downstream of the cooling coil are energized only when the AHU supply fan is energized by the DDC System. There is a manual On-Off switch and access door switch on the AHU, and if the access door is opened, the door switch shall de-energize the UVc lights. C. Unoccupied Mode 1. When the AHU is off, the supply fan is off, the exhaust fan is off, the cooling coil control valve if closed, the heating coil control valve modulates to maintain 70F interior temperature as sensed by the discharge air stat, the outdoor air dampers are closed, the return air dampers are open, and the exhaust air dampers are closed. 2. Unoccupied heating - The DDC system shall monitor the room temperature. When the room temperature falls below 60F (adj.), the AHU shall activate to provide heat to the room. When the AHU is activated, the supply fan shall operate at 100% (adj) speed and the AHU discharge air temperature shall be maintained at 90F (adj.), the exhaust fan remains off, the outdoor air dampers remain closed, the return air dampers remain open and the exhaust dampers remain closed. The AHU shall stop when the room temperature rises to 65F (adj). 3. Unoccupied cooling - The DDC system shall monitor the room temperature. When the room temperature rises above 85F (adj.), the AHU shall start, the supply fan shall operate at 100% speed and discharge 55F supply air, the exhaust fan remains off, the outdoor air dampers remain closed, the return air dampers remain open, the exhaust air dampers remain closed. When the room temperature falls below 80F, the AHU shall stop. Note; Economizer operation shall be utilized if the outdoor air temperature is less than the economizer changeover setpoint, see Economizer Operation in Occupied Mode above. 4. Morning warm-up - The DDC system shall monitor the room temperature and outdoor air temperature and automatically start the AHU prior to the occupancy schedule start time based on optimal start time to get the room up to occupied setpoint temperature by occupied start time, and during this period of operation the outdoor air dampers remain closed, the return air dampers remain open, the exhaust fan remains off, and exhaust dampers remain closed. During morning warm-up, the AHU supply fan shall operate at 100% speed and discharge 90F (adj.) supply air. The AHU shall enter occupied mode at occupied period start time. 5. Morning cool-down - The DDC system shall monitor the room temperature and outdoor air temperature and automatically start the AHU prior to the occupancy schedule start time based on optimal start time to get the room down to occupied setpoint temperature by occupied start time, and during this period of operation the outdoor air dampers remain closed, the return air dampers remain open, the exhaust fan remains off, and the

11 exhaust dampers remain closed. During morning cool-down, the AHU supply fan shall operate at 100% speed and shall discharge 55F (adj.) supply air. The AHU shall enter occupied mode at occupied period start time. Note; Economizer operation shall be utilized if the outside air temperature is less than the economizer changeover setpoint, see Economizer Operation in Occupied Mode above. 6. Area relative humidity check - When the outdoor air temperature is above 70F (adj), if the room relative humidity rises above 65% (adj) the AHU supply fan shall operate at 100% speed, the cooling coil shall discharge 55F (adj.) air, the outdoor air dampers remain closed, return air dampers remain open, the exhaust fan remains off, the exhaust air dampers remain closed, and the reheat coil provides reheat as required to maintain unoccupied room temperature setpoint. The AHU stops when the room relative humidity falls below 60%. D. External Safeties 1. Duct smoke detector, supplied by others, installed in the return air duct shall automatically shut-down the AHU when activated. The AHU shall automatically restart after the fire alarm system has been reset. 2. Activation of any fire alarm pull station or fire sprinkler system water flow switch shall automatically shut-down the AHU when activated. The AHU shall automatically restart after the fire alarm system has been reset. 3. The low temperature cutout stat shall activate if a temperature of less than 38F is sensed at any one foot of the sensing element. When the low temperature cutout stat actives, the AHU immediately shuts down, the pre-heat and re-heat heating coils control valves fully opens, and the DDC system provides an alarm that the low temperature cutout stat has activated. The low temperature cutout stat requires a manual reset. 4. Supply fan and exhaust fan status shall be monitored through the current sensor. If supply fan state changes to off when it should be operating, the exhaust fan shall be stopped and the AHU shall go to an off state and the DDC system shall generate an alarm. If the exhaust fan state changes to off when it should be operating, the DDC system generates an alarm and the AHU continues to operate. 5. The DDC system shall monitor the AHU discharge temperature. If the supply air temperature falls below 50F (adj.) the DDC system shall generate an alarm, and if the supply air temperature falls below 45F (adj.) the DDC system shall stop the AHU, generate an alarm and not allow the AHU to restart until the alarm is acknowledged and the unit is manually restarted. If during occupied mode, the supply air temperature rises above 100F (adj.) the DDC system shall generate an alarm, and if during any mode of operation the supply air temperature rises above 110F (adj.) for 5 minutes the DDC system shall stop the AHU, generate an alarm and not allow the AHU to restart until the alarm is acknowledged and the unit is manually restarted. 1.8 AIR HANDLING UNIT AHU-2 (LOCKERS, TOILETS AND GYM CLASSROOMS) A. General Operation 1. The AHU operates as a variable air volume system supplying 100% outdoor air and consists of; a supply fan with variable frequency drive, exhaust fan with variable frequency drive, enthalpy energy recovery wheel with outdoor air and exhaust air bypasses, air filters, UVc lights, heating hot water coil, and chilled water cooling coil. Note, these variable frequency drives have a bypass contactor

12 2. The AHU is scheduled for automatic operation through the DDC system on a time of day basis for occupied and unoccupied modes. B. Occupied Mode 1. The supply and exhaust fans run continuously. The unit is controlled as follows 2. The DDC system shall determine the discharge air temperature control point. When the outdoor air temperature is above 55F (adj.), the supply air temperature will be maintained at 55F (adj.). When the outdoor air temperature is below 55F (adj.), reset between 55F (adj.) to 62F (adj.) based on the zone with the greatest cooling demand. 3. The DDC system shall determine the supply air duct static pressure control point and shall operate the supply fan variable frequency drive. The DDC system shall monitor the damper position of each terminal unit associated with the AHU and shall reset the supply air duct static pressure control point based on the zone requiring the most pressure, that is, the static pressure control point shall be reset lower until one zone damper is nearly wide open, and the duct static pressure shall be limited to operate between 1.5 WC (adj.) and 3.0 WC (adj.) measured 2/3 downstream of the supply fan discharge. Supply fan motor speed shall not fall below 25% rated speed, and shall not exceed 100% rated speed. 4. Heating coil operation note The heating coil has a temperature sensor on the downstream side, and its purpose is to prevent the heating coil discharge temperature from falling below 50F (adj.). 5. Energy Recovery Section Operation a. The DDC system shall operate the energy recovery section as required to maximize energy recovery, including varying the speed of the energy recovery wheel to control AHU discharge air temperature. The energy recovery section shall maximize energy recovery prior to allowing the heating coil to operate. The energy recovery section shall maximize energy recovery during mechanical cooling by allowing the cooling coil to operate during economizer. b. Between 65F (adj) and 55F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100%, and, the chilled water coil shall provide cooling as required. Above 65F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100% closed, and the energy recovery wheel operates at 100% speed when the return air temperature exceeds the outdoor air temperature by more than 2F DB (adj). Below 55F (adj) outdoor air temperature, the energy recovery wheel outdoor air bypass and exhaust air bypass dampers are 100% closed, the energy recovery wheel speed varies as required to maintain discharge air temperature, and the heating coil operates to provide additional heat when the energy recovery wheel cannot provide sufficient heat.. c. Self Cleaning - When the rotor has been still for 30 minutes (adj) the self cleaning function begins by rotating the rotor for 10 seconds (adj) at minimum speed, then stopping the rotor. d. The energy recovery section shall include a frost control mode when the outdoor temperature is below 20F (adj), to prevent the energy recovery wheel from accumulating too much frost. The unit monitors the wheel exhaust side discharge air temperature and prevent it from falling below 15F (adj) by varying the speed of the energy recovery wheel to reduce energy recovery to remove frost from the

13 wheel. when the unit is in "frost control", the graphic display shall indicate that is in "frost control" mode. e. Rotation monitoring - The Variable Frequency Drive monitors the rotation of the rotor. If the rotor is not rotating while being commanded to rotate, the DDC System shall provide an alarm. f. During frost control the mixed air temperature sensor shall control the outdoor air and return air dampers to maintain 40F (adj) mixed air temperature, minimum outdoor air control is overridden during frost control. If the DDC system detects the energy recovery wheel is not operating when it should be operating when the outdoor air temperature is below 35F (adj), then the mixed air temperature sensor shall control the outdoor air damper and return air damper to maintain 40F (adj) mixed air temperature. 6. The UVc lights downstream of the cooling coil are energized only when the AHU supply fan is energized by the DDC System. There is a manual On-Off switch and access door switch on the AHU, and if the access door is opened, the door switch shall de-energize the UVc lights. C. Unoccupied Mode 1. When the AHU is off, the supply fan is off, the exhaust fan is off, the cooling coil control valve if closed, the heating coil control modulates to maintain 70F interior temperature as sensed by the discharge air stat, the outdoor air dampers are closed, the exhaust dampers are closed, the energy recovery wheel bypass dampers are closed. 2. Unoccupied heating When the space temperature falls below 60F (adj.), the AHU shall activate and the supply fan and exhaust fan shall operate, the unit shall operate on 100% return air, and the unit shall operate as described in occupied mode until the space temperature rises above 63F. 3. Unoccupied cooling - When the space temperature rises above 85F (adj.), the AHU shall activate and the supply fan and exhaust fan shall operate, the unit shall operate on 100% return air, and the unit shall operate as described in occupied mode until the space temperature falls below 80F. 4. Morning warm-up and morning cool-down The supply fan and exhaust fan shall operate, the unit shall operate on 100% return air, and the unit shall operate as described in occupied mode until the occupied start time. The unit shall utilize optimum start to determine when to energize to bring the space to occupied setpoint by the occupied start time. 5. Area relative humidity check. If relative humidity sensed by the room sensor (see plans for location) rise above 65% and the outdoor air temperature is above 55F, the AHU shall start and supply 55F supply air until the relative humidity falls below 60%. The supply fan and exhaust fan shall operate, the unit shall operate on 100% return air, and the unit shall operate as described in occupied mode. D. External Safeties 1. Duct smoke detector, supplied by others, installed in the exhaust air duct shall automatically shut-down the AHU when activated. The AHU shall automatically restart after the fire alarm system has been reset

14 E. Other 2. Activation of any fire alarm pull station or fire sprinkler system water flow switch shall automatically shut-down the AHU when activated. The AHU shall automatically restart after the fire alarm system has been reset. 3. The low temperature cutout stat shall activate if a temperature of less than 38F is sensed at any one foot of the sensing element. When the low temperature cutout stat actives, the AHU immediately shuts down, the heating coil control valve fully opens, and the DDC system provides an alarm that the low temperature cutout stat has activated. The low temperature cutout stat requires a manual reset. 4. Supply fan and exhaust fan status shall be monitored through the current sensor. If supply fan state changes to off when it should be operating, the exhaust fan shall be stopped and the AHU shall go to an off state and the DDC system shall generate an alarm. If the exhaust fan state changes to off when it should be operating the DDC system generate an alarm, the exhaust damper shall close and the AHU continues to operate. 5. The DDC system shall monitor the AHU discharge temperature. If the supply air temperature falls below 50F (adj.) the DDC system shall generate an alarm, and if the supply air temperature falls below 45F (adj.) the DDC system shall stop the AHU, generate an alarm and not allow the AHU to restart until the alarm is acknowledged and the unit is manually restarted. If during occupied mode, the supply air temperature rises above 75F (adj.) the DDC system shall generate an alarm, and if during any mode of operation the supply air temperature rises above 100F (adj.) for 5 minutes the DDC system shall stop the AHU, generate an alarm and not allow the AHU to restart until the alarm is acknowledged and the unit is manually restarted. 1. The DDC system shall directly monitor; mixed air temperature, exhaust air temperature, return air temperature, and return air relative humidity. 2. The DDC system shall monitor and display outside air airflow and exhaust air airflow. 3. The DDC system shall directly monitor outside air temperature and relative humidity globally. 4. All safeties shall be wired such that the unit will not start in auto, manual or hand. 1.9 AIR HANDLING UNITS; AHU-3 (CLASSROOMS) AHU-6 (CLASSROOMS) AHU-7 (CLASSROOMS) AHU-8 (CLASSROOMS) AHU-9 (AUDITORIUM) A. General Operation 1. The AHU operates as a variable air volume system and consists of; a supply fan with variable frequency drive, exhaust fan with variable frequency drive, variable speed enthalpy energy recovery wheel with outdoor air and exhaust air bypasses, air filters, heating hot water coils, chilled water cooling coil, and UVc lights. Note, the exhaust fan variable frequency drive does not have a bypass contactor, that is, this variable frequency drive only contains an inverter section which will control the speed of the motor

15 2. If the supply fan variable frequency drive is to be operated in manual mode or bypass mode, then sufficient number of VAV box supply air dampers must be manually overridden to allow sufficient supply airflow to prevent activating the high pressure static safety switch. 3. The AHU is scheduled for automatic operation through the DDC system on a time of day basis for occupied and unoccupied modes. 4. Heating coil operation note The heating coil has a temperature sensor on the downstream side, and its purpose is to prevent the heating coil discharge temperature from falling below 50F (adj.). B. Occupied Mode 1. The supply and exhaust fans run continuously, the outdoor air dampers and return air dampers modulate as required to maintain minimum outdoor air setpoint. The unit is controlled as follows 2. The DDC system shall determine the discharge air temperature control point. When the outdoor air temperature is above 55F (adj.), the supply air temperature will be maintained at 55F (adj.). When the outdoor air temperature is below 55F (adj.), reset between 55F (adj.) to 62F (adj.) based on the zone with the greatest cooling demand. 3. The DDC system shall determine the supply air duct static pressure control point and shall operate the supply fan variable frequency drive. The DDC system shall monitor the damper position of each terminal unit associated with the AHU and shall reset the supply air duct static pressure control point based on the zone requiring the most pressure, that is, the static pressure control point shall be reset lower until one zone damper is nearly wide open, and the duct static pressure shall be limited to operate between 1.5 WC (adj.) and 3.0 WC (adj.) measured 2/3 downstream of the supply fan discharge. Supply fan motor speed shall not fall below 25% rated speed, and shall not exceed 100% rated speed. 4. Economizer operation When the outdoor air temperature is below 65F (adj.) economizer operation free cooling shall be allowed. The DDC system shall operate the outdoor air and return air dampers, energy recovery section, heating hot water coil control valve and cooling coil control valve in sequence and without overlap to maintain discharge air temperature, that is, if the energy recovery section cannot provide sufficient energy transfer then heating hot water coil control valve shall modulate as required to provide additional heat to maintain discharge air control point, and if the energy recovery wheel is providing too much heat then the exhaust air bypass damper shall modulate and when this damper is fully open and if the energy recovery wheel still provides too much heat then the outside air bypass dampers shall modulate open as required to maintain discharge air temperature. When the outdoor air temperature is above 65F (adj.), economizer is disabled. During economizer operation, outdoor air airflow rate shall not fall below minimum outdoor air airflow control point. 5. Energy Recovery Section Operation a. The DDC system shall operate the energy recovery section as required to maximize energy recovery, including varying the speed of the energy recovery wheel to control AHU discharge air temperature. The energy recovery section shall maximize energy recovery prior to allowing the heating coil to operate. The energy recovery section shall maximize energy recovery during mechanical cooling by allowing the cooling coil to operate during economizer

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

American University Design Standards

American University Design Standards 25 95 00 CONTROL SEQUENCES FOR HVAC PART 1. GENERAL 1.01 SECTION INCLUDES A. Description of Work B. Control Sequences General Requirements C. System Specific Control Sequences 1.02 RELATED DOCUMENTS A.

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Verasys System Operation Overview Technical Bulletin

Verasys System Operation Overview Technical Bulletin Contents subject to change. Verasys System Operation Overview Technical Bulletin Code No. LIT-12012370 Issued January 2016 Refer to the QuickLIT Web site for the most up-to-date version of this document.

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Reference Guide for Microprocessor Controller

Reference Guide for Microprocessor Controller Document 483586 Microprocessor Controller for Dedicated Outdoor Air System Reference Guide for Microprocessor Controller Please read and save these instructions for future reference. Read carefully before

More information

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products Document 475595 Microprocessor Controller for Tempered Air Products Reference Guide for the Microprocessor Controller Please read and save these instructions. Read carefully before attempting to operate

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

Reference Guide for Microprocessor Controller

Reference Guide for Microprocessor Controller Document 483232 Microprocessor Controller for Energy Recovery Reference Guide for Microprocessor Controller Please read and save these instructions for future reference. Read carefully before attempting

More information

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT SEQUENCE OF OPERATION GUIDELINE AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT Document: VAV-HTG rev1 Revision: 1.0 Rev. Date: July 22, 2011 NOTES: 1. THIS SEQUENCE

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

SEQUENCE OF OPERATIONS

SEQUENCE OF OPERATIONS SEQUENCE OF OPERATIONS DDC CONTROLLER: Controller with integral LCD readout for changing set points and monitoring unit operation. Provided with required sensors and programming. Factory programmed, mounted,

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE HEATPUMP 100% OUTDOOR AIR VERSION Telephone:

ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE HEATPUMP 100% OUTDOOR AIR VERSION Telephone: ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE HEATPUMP 100% OUTDOOR AIR VERSION 2.0 www.addison-hvac.com Telephone: +1.407.292.4400 1 2 OCCUPIED MODE: When the program control source calls for

More information

Your Home. Jacco & Assoc.

Your Home. Jacco & Assoc. Your Home Fan on with call for heating or cooling Heating on with call from space thermostat Stage as required to maintain The 75F Basics adj. - First stage of heating shall be heat pump Cooling on with

More information

ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE COOLING-ONLY 100% OUTSIDE AIR VERSION Telephone:

ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE COOLING-ONLY 100% OUTSIDE AIR VERSION Telephone: ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE COOLING-ONLY 100% OUTSIDE AIR VERSION 2.0 www.addison-hvac.com Telephone: +1.407.292.4400 1 SEQUENCE OF OPERATION The ALC controller is turned on

More information

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP 100% OUTSIDE AIR

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP 100% OUTSIDE AIR SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP 100% OUTSIDE AIR Printed in the USA ADSOOASHPOA 0117 Orig SEQUENCE OF OPERATION The ALC controller is turned on by a switch located on its front

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

1.0 Digital Controller

1.0 Digital Controller Form CP-AHU D19_D21_D22 (11-17) D303072-A Obsoletes Forms CP-Preeva-D21 (1-16) Doc No 303072, CP-Preeva-D19 (1-16) Doc No 303071 Applies to: Preeva, MAPS, MAPS II, RPB, RPBL & SSCBL Series For Air Handler

More information

I/O ZONE 560/583 USERS GUIDE

I/O ZONE 560/583 USERS GUIDE I/O ZONE 560/583 USERS GUIDE 641-224 641-242 641-237 1 Table of Contents Hot Gas Re-Heat Valve On/Off:... 15 THE ZONE CONTROLLER...4 Modulating Re-Heat Valve:... 16 SPECIFICATIONS...5 CONTROLLER COMPONENTS...6

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

DX-9100 Applications from Engineering Services

DX-9100 Applications from Engineering Services System 9100 Technical Manual 636.4 Application Examples Section Technical Bulletin Issue Date 0896 DX-9100 Applications from Engineering Services Introduction Page 3 Overview 3 Air Handling Unit Applications

More information

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER Printed in the USA ADSOOASHPRAE 0117 Orig SEQUENCE OF OPERATION The ALC controller is turned on by a switch located

More information

Feature Summary. I. System

Feature Summary. I. System I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in

More information

FUNCTIONAL DESIGN SPECIFICATION

FUNCTIONAL DESIGN SPECIFICATION Issue Date: Issued To: Revision: FUNCTIONAL DESIGN SPECIFICATION Specification Number: SP-XXXX Company Name Signature Date Issued By: Manutec Ltd. Approved By: Approved By: Approved By: Approved By: Authorised

More information

Building Automation System (BAS) Design Criteria

Building Automation System (BAS) Design Criteria 25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate

More information

iworx Air Side Application Wiring Guide

iworx Air Side Application Wiring Guide iworx Side Application Wiring uide Pages ASM2 Sequence of peration & ypical Wiring 1 ALM2 Sequence of peration & ypical Wiring 2 U2 Sequence of peration, Flow iagram & ypical Wiring 3 - U3 Sequence of

More information

York 25-Ton VAV Rooftop Unit

York 25-Ton VAV Rooftop Unit HVAC PRO for Windows User s Manual 637.5 OEM Section Technical Bulletin Issue Date 0996 York 25-Ton VAV Rooftop Unit Introduction Page 3 Overview *3 Configuration 5 Sequence of Operation 7 Modes of Operation

More information

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01915 - FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION PART 1 GENERAL 1.1 Section includes:

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

Instrumentation and Control for HVAC

Instrumentation and Control for HVAC 23 09 00 Instrumentation and Control for HVAC 1. All controls to be corporate Trane or Honeywell, no substitutes. 2. Factory Mounted controls to be Trane only, otherwise provide terminal strips for TC

More information

SPECIFICATION GUIDE FLEXAIR. Possibility to add auxiliary heaters: Gas, Electrical Heater, Hot Water Coil Possibility to add Heat Recovery Module

SPECIFICATION GUIDE FLEXAIR. Possibility to add auxiliary heaters: Gas, Electrical Heater, Hot Water Coil Possibility to add Heat Recovery Module SPECIFICATION GUIDE FLEXAIR Air-cooled packaged Rooftop unit Cooling only or Heat Pump Nominal cooling capacity: 85 to 234 kw Nominal heating capacity: 83 to 226 kw Possibility to add auxiliary heaters:

More information

DACC - NMDA BUILDINGS

DACC - NMDA BUILDINGS A PROJECT FOR: LAS CRUCES, NEW MEXICO PROJECT LOCATION LOCATION MAP INDEX OF DRAWINGS: CV001 - COVER SHEET M101 - OVERALL CAMPUS STEAM UTILITY PLAN M102 - DACC DAMA 341 PLAN M103 - DACC LRC & CLASSROOM

More information

Energy Recovery with Cooling and Heating Model ERCH

Energy Recovery with Cooling and Heating Model ERCH Energy Recovery with Cooling and Heating Model ERCH 100% Outdoor Air System Dedicated Outdoor Air System 1,000-10,000 cfm 1.75 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating,

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

MicroTech Self-Contained Air Conditioning System

MicroTech Self-Contained Air Conditioning System Open Protocol Data Information Packet Version 2.3 Group: Controls Date: October 1999 MicroTech Self-Contained Air Conditioning System Open Protocol Data Communications t 2002 McQuay International - C O

More information

Building Automation System

Building Automation System University of New Hampshire University of New Hampshire Scholars' Repository Division 25 Integrated Automation Chapter 5 Technical Construction and Renovation Standards 8-1-2014 250000 - Building Automation

More information

Reference Guide for Microprocessor Controller

Reference Guide for Microprocessor Controller Document 482641 Microprocessor Controller for Make-Up Air Products Reference Guide for Microprocessor Controller Please read and save these instructions for future reference. Read carefully before attempting

More information

1.0 Digital Controller

1.0 Digital Controller 1.0 Digital Controller...1 1.1 Display Function Keys...1 1.2 Thermostat Display...2 1.3 Controller hardware input output points... 4 2.0 Sequence of Operation...5 2.1 States of Operation...5 2.2 Modes

More information

SECTION ENERGY MANAGEMENT SYSTEM (EMS)

SECTION ENERGY MANAGEMENT SYSTEM (EMS) SECTION 13810 ENERGY MANAGEMENT SYSTEM (EMS) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: The energy management system (EMS) including the following major subsystems: HVAC temperature controls, HVAC

More information

Instruction, Operation, and Maintenance: Controls Software Versions: R37+

Instruction, Operation, and Maintenance: Controls Software Versions: R37+ Instruction, Operation, and Maintenance: Controls Software Versions: R37+ VPR Series VPRX Series VPRE Series VPRP Series Version October 2011 Table of Contents Safety... 3 Special Design Requests... 3

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

VariCool VAV Engineering Guide

VariCool VAV Engineering Guide Engineering Guide Effective September 2017 Water-Cooled and Chilled Water, Variable Air Volume Contents Product Features... 3 UNIT FEATURES... 3 Product Features... 4 Marvel Plus Microprocessor Control

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

RCE # April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES

RCE # April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES RCE #12-4181 April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES Commissioning Progress Report The Commissioning Technician returned to visit R2ES and R1ES

More information

1 - This title will copy onto other forms Date

1 - This title will copy onto other forms Date 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc. MISSION CRITICAL Air Conditioning Systems Series 9 Commissioning Checklist S9-CL2017.doc ClimateWorx International Inc. 14 Chelsea Lane, Brampton, Ontario, Canada L6T 3Y4 2 S9-CL2017.doc Commissioning

More information

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals control sequences Table 47: QST / EST Analog Electronic Control Strategies Control Package Number QST EST FS-A-5000 FSE-A-5000 FS-A-5001 FSE-A-5001 FS-A-5002 FSE-A-5002 FS-A-5003 FSE-A-5003 FS-A-5004 FSE-A-5004

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

L SERIES UNITS 505,191M. 4/2006 Supersedes 504,908M

L SERIES UNITS 505,191M. 4/2006 Supersedes 504,908M Litho U.S.A. 26 L SERIES UNITS 55,191M 4/26 Supersedes 54,98M M1 7 VERSION 5.2 INTEGRATED MODULAR CONTROL (IMC) GUIDE TO THE M1 7 VERSION 5.2 INTEGRATED MODULAR CONTROL USED IN L SERIES AND S CLASS 3 THROUGH

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

SA Series Start up Report

SA Series Start up Report SA Series Start up Report Important To ensure warranty validation and continued customer satisfaction, complete this form and return it to Desert Aire immediately after start-up. Validation of this report

More information

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY Date: June 14, 2017 Invitation No: IB-096-17 Title: Student Activity Center Renovation and Addition, Bid Package V Addendum No. Three (3) The following shall

More information

CONTROLS MANUAL For all Innovent and Valent air handling products

CONTROLS MANUAL For all Innovent and Valent air handling products CONTROLS MANUAL For all Innovent and Valent air handling products TABLE OF CONTENTS TABLE OF CONTENTS IMPORTANT INFORMATION Safety information...................................................................................

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

Series PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS. Features:

Series PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS. Features: RZ PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS Features: Air-cooled condenser, water-cooled condenser, or evaporative-cooled condenser packaged rooftop units from 55-240 tons Water-source

More information

Rooftop Ventilator. Models RV and RVE. with Packaged Cooling & Heating

Rooftop Ventilator. Models RV and RVE. with Packaged Cooling & Heating Rooftop Ventilator with Packaged Cooling & Heating Models RV and RVE Institutional Commercial Industrial 800-1,500 cfm.0 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating Packaged

More information

UNT Applications. Using UNT Applications...3. Introduction Key Concepts UNT Controller Applications Fan Coil Units...

UNT Applications. Using UNT Applications...3. Introduction Key Concepts UNT Controller Applications Fan Coil Units... Application Note Issue Date 04/17/08 Supersedes 01/11/01 APPLICATION NOTE Using...3 Introduction... 3 Key Concepts... 4 UNT Controller Applications... 4 Fan Coil Units... 8 Unit Ventilators... 11 Rooftop

More information

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

Your Home. Jacco & Assoc. Fan on with call for heating or cooling Heating on with call from space thermostat Stage as

Your Home. Jacco & Assoc. Fan on with call for heating or cooling Heating on with call from space thermostat Stage as Your Home Fan on with call for heating or cooling Heating on with call from space thermostat Stage as required Controlling to maintain 75F HVAC adj. Systems First stage of heating shall be heat pump Cooling

More information

Marvel S MICROPROCESSOR CONTROLLER. Installation, Operation and Maintenance Manual Effective October 2018 DISCONTINUED. For Reference Only

Marvel S MICROPROCESSOR CONTROLLER. Installation, Operation and Maintenance Manual Effective October 2018 DISCONTINUED. For Reference Only Marvel S MICROPROCESSOR CONTROLLER Installation, Operation and Maintenance Manual Effective October 2018 DISCONTINUED For Reference Only ***Interactive PDF*** Contents General Purpose...3 Standard And

More information

Metasys System Extended Architecture Smoke Control UL 864 UUKL Compliance

Metasys System Extended Architecture Smoke Control UL 864 UUKL Compliance Metasys System Extended Architecture Smoke Control UL 864 UUKL Compliance Checklist Code No. LIT-1201754 Release 1.2 Issued February 10, 2005 Document Introduction.................................................

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency Digital Precise Air Control System D-PAC Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency AAON 24 South Yukon Avenue Tulsa, Oklahoma 747 (918) 583-2266 Fax (918)

More information

Mechanical Compliance Certificate

Mechanical Compliance Certificate COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Austin, Texas 2a (weather data: TBD) New

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Reciprocating Chiller

Reciprocating Chiller HVAC PRO for Windows User s Manual 637.5 OEM Section Technical Bulletin Issue Date 1094 Reciprocating Chiller Reciprocating Chiller Page 3 Description 3 Theory of Operation 5 Overview 5 Control Sequence

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS BULLETIN 20-131.001 Page 1 Copyright 2017 Unico Inc. TABLE OF CONTENTS APPLICATIONS... 3 CABINET CONSTRUCTION... 3 FEATURES AND CONTROLS... 3 DIMENSIONAL

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

AirTrak. Digital Control System. User Manual. Touchscreen Systems

AirTrak. Digital Control System. User Manual. Touchscreen Systems AirTrak Digital Control System User Manual Touchscreen Systems Rev. 10-29-15 1 2 Table of Contents OVERVIEW... 8 NETWORKING... 9 AIRTRAK DEFAULT SETTINGS... 9 Unit Operating Modes... 10 MRT Controls...

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

*IG1583EW* Aurora Touch UPC Kit Instruction Guide. Aurora Touch UPC Kit Instruction Guide

*IG1583EW* Aurora Touch UPC Kit Instruction Guide. Aurora Touch UPC Kit Instruction Guide Aurora Touch UPC Kit Instruction Guide For use in single compressor water-to-air equipment utilizing fi rmware UPCSWASTD01-01 Aurora Touch UPC Kit Instruction Guide *IG1583EW* IG1583EW 08/14 Aurora Touch

More information

SECTION CLIENT-SERVER INFORMATION / DATABASE INTEGRATION

SECTION CLIENT-SERVER INFORMATION / DATABASE INTEGRATION SECTION 25 12 23 CLIENT-SERVER INFORMATION / DATABASE INTEGRATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes the database generation and integration for the DDC system. B. This section defines the

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC PART 1 GENERAL 1.01 RELATED REQUIREMENTS SECTION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC A. Section 26 2717 - Equipment Wiring: Electrical characteristics and wiring connections. 1.02 ADMINISTRATIVE