THE GRONG SCHOOL...2

Size: px
Start display at page:

Download "THE GRONG SCHOOL...2"

Transcription

1 1 Content 1 THE GRONG SCHOOL DESCRIPTION OF THE PROJECT School and Community House Plan principle...3 THE ENERGY SAVING CONCEPT AND THE TECHNOLOGIES Solar heating Daylighting Ventilation ENERGY SAVINGS AND REDUCED EMISSIONS Recorded energy supply CO 2 emissions...9 EVALUATION OF INDOOR ENVIRONMENT Air quality and thermal comfort Daylight conditions COSTS CONCLUSIONS AND LESSONS LEARNED Ventilation Daylighting...12 KEY PROJECT DATA REFERENCES...13

2 2 1 The Grong School Author: Karin Buvik. SINTEF Dep. of Architecture and Building Technology. N-7465 Trondheim, Norway. NORWAY Fig. 4.1 Photo from September Description of the project The energy conservation and solar strategies in the Norwegian MEDUCA project was: Use of solar energy for space heating and pre-heating of ventilation air. Use of daylight to reduce the consumption of electric energy for artificial lighting. Separately operating zones for artificial lighting, and control by daylight sensors contribute to energy efficiency. Use of natural driving forces for ventilation, buoyancy and wind, result in a minimum of fan power. Further, airflow controlled by CO 2 sensors, heat recovery, and low-emitting building materials contribute to energy efficiency. The new wing is a one-story school building. Classrooms are situated on the northern side of a central circulation spine. Common rooms, rooms for group activities, storage rooms, and locker rooms are located on the south side. On the top of the building, in the attic, there is a solar collector (sunspace), which gives light to the classrooms, heat to the exhaust air and thereby extra driving forces for the ventilation air, plus heat to the intake air via the heat recovery system. North facing classrooms have no need for glare reduction devices or shading systems, but have low heat gains and thus increased need for heating during winter. To increase solar gains the exhaust air chamber (top of the building) is designed as a solar collector (sun space), which gives heat to the fresh air via the heat recovery in the exhaust tower, and also gives some sunlight into the classrooms. The internal walls of the sunspace are glazed in order to allow daylight to reach the back of the classrooms. The roof monitor (sunspace) design optimises passive solar heating and even distribution of daylight on the workplaces. The new building was completed in August 1998.

3 School and Community House The building complex is going to be renewed and extended. A task was to find suitable solutions for co-ordinated use between the school and the community house. Many rooms are planned for social and cultural activities, as well as for teaching and learning. 1 main entrance 2 vestibule 3 exhibition 4 wardrobe 5 café 6 homemaking 7 amphitheatre 8 library 9 administration years old years old years old 13 swimming pool 14 gym/assembly hall 15 hall Fig After renovation. Project Plan principle Homebases for the primary and lower secondary school contains classrooms, activity rooms, rooms for small groups and entrances. An objective was to create a flexible area, which may be divided into landscapes. Rooms for gatherings are obtained by the possibility of opening up between classrooms and activity rooms. North 1 entrances 2 wardrobes 3 activity rooms 4 groups 5 training (ADL) 6 classes. Fig Plan of the new wing

4 4 1.2 The energy saving concept and the technologies Fig South fasade. Primary and lower secondary school to the right Fig North fasade. Primary and lower secondary school to the left Solar heating A sunspace runs along the entire ridge of the building. The tilted south facing glazing was designed to optimise the use of incident solar energy over the year. The sunspace also functions as a roof monitor that transmits daylight into the classrooms; and it serves as a ventilation air exhaust chamber as well. The sunspace (solar air collector) is expected to allow for a high fraction of usable solar heat contribution. Heat loss to ventilation air represents a large portion of the heating energy requirement in cold climates. A system of indirect ventilation air pre-heating is employed. Solar radiation incident on the south facing glass of the sunspace will cause the temperature of the exhaust air to rise. The heat is recovered at the exhaust tower and exchanged to the fresh air at the underground air intake tunnel Daylighting The internal walls of the sunspace are glazed in order to allow daylight to reach the back of the classrooms. Three different methods were used to simulate the daylight levels in the classrooms. The selected roof monitor (sunspace) design optimises passive solar heating and even distribution of daylight on the workplaces. Model studies A model of a typical section of the building is analysed, using an artificial sky. The classrooms are located on the northern side of a central circulation spine. Rooms for group activities, storage rooms, restrooms, and locker rooms are located on the south side. North facing classrooms have no need for glare reduction devices or shading systems, but have low heat gains and increased heat losses during winter.

5 5 base case SP1 SP2 SP3 SP4 SP1 SP2 SP3 SP4 alternative 1 Alternative Daylighting Designs Daylighting analysis was integrated with passive solar heating analysis, using an analysis model based on monthly average temperature and global radiation data. Three alternative designs were compared. First the impact on the annual combined lighting and auxiliary heating energy demand of alternative daylighting designs was investigated. In order to do a cost-benefit analysis, it was necessary to analyse the utilisation of daylight for the illumination of interior spaces. An analysis of passive solar heating to reduce the auxiliary heating energy demand was also required. Finally, an analysis of clear-day room temperatures was performed in order to produce indicators of the thermal comfort levels of the alternative designs as compared to the base case. Based on the findings from the analysis, alternative 2 was incorporated into the final design. SP1 SP2 SP3 SP4 alternative 2 Different design alternatives showing view of the sky from four station points. North is to the right. Artificial Lighting Controls Separately operating zones of artificial lighting is implemented in order to reduce uneven lighting levels and contribute to energy savings. Timers and daylight sensors are used to control the artificial lighting Ventilation An air inlet tower is located outside the building. The air is brought into the building through an underground tunnel that connects the air intake tower to a distribution chamber below the central circulation spine. Exhaust air is extracted through the exhaust chamber (sunspace) above the circulation spine. A centrally located exhaust tower at the top of the building provides the necessary stack effect. Fig Section of the new wing The underground supply air duct provides for pre-heating of ventilation air in the winter season through ground coupling; and precooling of the air during the summer. Increased nighttime ventilation

6 6 during overheated periods provides a significant amount of cooling energy to the building with an estimated 12-hour time lag. The supply air, which is distributed in the classrooms by displacement ventilation, is introduced at floor level through low-velocity diffusers. Warm and contaminated air rises and leaves the room at ceiling level, through controllable dampers, into the exhaust chamber. Sunspaces in the attic The following modes have been identified: Winter day - regular school day: Air preheated in underground duct, by heat recovery and by hydronic coil. Perimeter heaters on when needed. Room exhaust dampers controlled by CO2-level Winter night - school closed: Perimeter heaters on when temperature gets below 15 C Mid-season day: Same as winter day Mid-season night: Same as winter night Summer day: Exhaust fan starts and exhaust dampers open in situations of unsatisfactory indoor air quality or temperature level above set point. Exhaust air is led around exhaust air heat exchanger. Summer night: Night ventilation through underground supply air duct in order to chill it s thermal mass, which will provide precooling for the supply air on the following day; high airflow rate when high temperatures are expected. Wardrobes and toilets are provided with overflow air, and the exhaust air is being mechanically extracted from the toilets. In order to reduce air contamination by source, low-emitting materials has been used predominantly. Lower emissions from materials allows for a substantial reduction of the air change rate, which in turn promises a decrease in the heat loss to ventilation air during the heating season. The sunspace/exhaust air chamber was designed to assist the movement of air. The driving force represented by the hot air in the exhaust chamber reduces the need for fan assistance. This is particularly important in summer season when increased ventilation air volume is used to cool the building. Fan Assisted Supply and Extract Fans are installed both at the supply side and the exhaust side. The supply fan is supposed to ensure a steady air flow into the building, while the exhaust fan is used to achieve forced ventilation for cooling during summer when buoyancy forces are insufficient. A preliminary study indicated that wind-driven natural ventilation could not provide satisfactory ventilation at all times. Calm periods of 5-7 days have been reported at the site. Buoyancy-driven ventilation is considered reliable for the coldest part of the heating season, but it may not work sufficiently for summer conditions and for some periods during spring and fall. Additionally, the installed filters and heat exchangers cause an airflow pressure drop. Hence, fan-assisted buoyancy driven ventilation strategy was employed in the final design. Heating and Cooling To day the school has an electric and oil fuelled hot water heating. Connection to a planned biomass fuelled district heating system is intended. Pre-heating of supply air during the winter occurs in three steps: First by the thermal mass in the underground supply air duct, then by a heat exchanger providing heat from the heat recovery system, and finally by a hydronic coil heat exchanger.

7 7 The building itself is considered as light, but brick walls between the classrooms and the circulation space, and the concrete floors, provide some thermal mass. The solar gains from the sunspace will also add heat to the heat recovery system during spring and fall. On cold days, a net heat loss from the exhaust airflow through the glazed areas will contribute to an expected decrease in the stack effect by less than 10 %. Since the temperature of the basement distribution chamber is set at 19 C, it can be claimed that the central corridor of the building has a kind of passive radiant floor heating system. The underground supply air duct will also provide a considerable precooling of the air during the summer. However, with a design summer temperature of 23 C, the cooling demand is relatively low. Pre-cooled ventilation air may still be called for, particularly in early fall when low sun angles and predominantly clear skies could occasionally Placing the exhaust tower The exhaust tower was constructed in a workshop and tested to secure a low pressure-drop in the airflow through heat recovery and damps. The tower was transported to Grong and placed on the school building. Patented dampers A wind resistant exhaust damper has been designed by ROOMVENT DESIGN dr.ing. Per O. Tjelflaat. The exhaust damper uses a windshield combined with self-adjusting vanes and a Venturi geometry. The design has been patented. The wind resistant exhaust damper is available through: Auranor AS, P.O. Box 100, N 2712 Brandbu, Norway d/auranor.html Heat Recovery Heat is recovered from the exhaust air in the exhaust tower by the use of a heat exchanger. The recovered energy is then used to heat the supply air via another heat exchanger placed between the underground supply air duct and the distribution chamber. A water-glycol loop conveys the heat between the heat exchangers. The expected heat recovery rate is some %. Expected pressure losses are 25 Pa for the inlet air exchanger and 28 Pa for the exhaust air exchanger. A considerable pre-heating of the air will also occur in the underground supply air duct, before the heat recovered from the exhaust air is added. During periods when heat recovery is not needed, the exhaust air bypasses the heat exchanger in order to avoid creating a pressure drop. Filters and Fans A mosquito net is installed in the air intake tower. Fine filter is installed at the end of the underground air inlet duct, just before the inlet heat exchanger unit. The pressure loss through it is substantial, about 20 Pa for a new filter. It is assumed that large particles will be deposited in the underground supply air duct, before reaching the fine filter. Fans are of the propeller type, having a diameter close to the inner diameter of the duct. The supply fan, which is placed in the air inlet tower, has the ability to enhance the pressure by some 70 Pa. The exhaust fan, which is placed at the lower end of the exhaust tower, will add a pressure of about 35 Pa to the system.

8 8 Controls CO 2 sensors control the airflow through the exhaust valves mounted in the glass wall between the classrooms and the sunspace. Temperature sensors for control of the heating system are installed. Perimeter radiant heaters are engaged during cold periods to prevent the temperature to drop below 15 C. 1.3 Energy savings and reduced emissions Energy Building performance - Calculated values Electrical Energy Savings Compared to a Conventional Building Avoided use of high grade electrical energy due to daylight responsive controls of artificial lighting: 10.2 kwh/m 2 -year. Avoided use of electricity for ventilation fans due to natural ventilation: 9.2 kwh/m 2 -year. SUM: Reduced use of electricity: app. 20 kwh/ m 2 -year. Thermal Energy Savings Compared to a Conventional Building Reduced auxiliary heating energy demand due to the incorporation of a sunspace roof monitor: 6.9 kwh/ m 2 -year. Reduced demand for heating energy due to low energy windows, low emitting materials, and demand controlled, hybrid ventilation: 8.7 kwh/ m 2 -year. SUM: Reduced demand for heating energy: app. 16 kwh/ m 2 -year Recorded energy supply Recording Period: 1 st August th November 2000 (close to 27 months) Electric energy consumption: 46,458 kwh Delivered energy as hot water from neighbour building: 175,302 kwh The average annual energy use Electric: 46,458. (12/27) = 20,648 kwh Oil: 175,302. (12/27)/0.9 = 86,669 kwh An oil-fired boiler produces the hot water, and the efficiency is taken as 0.9. The specific energy use The gross useful area in the school building is 1001 m 2. The heated culvert area and the exhaust duct (sunspace) area are 160 m 2 each, but are not considered useful for occupants. Electric: 20,648/1001 = 20.6 kwh/(m 2. year) Oil: 86,669/1001 = 86.5 kwh/(m 2. year) Comments to the energy consumption Electrical energy consumption is 20,648 kwh over a year. The predicted value is 12,400 kwh. Lighting is assumed to make the major part (80%). More hours of occupancy than assumed in the prediction may be a cause for the higher consumption. The BEMS make the fans run without any need for ventilation as explained below. The yearly consumption of hot water for heating is 86, = 78,002 kwh. The predicted value is 55,800 kwh. The reason for the higher consumption can probably be found in: The faulty CO 2 -sensor in room 125 makes the BEMS believe that there is a high level of CO 2 in the room, and the system run the fans at full speed to supply more fresh air to the room. This process goes on even at night, and demands more energy to heat the supply air. The prediction has been carried out for a simplified scenario. Not accounted for are: infiltration (rather exfiltration) above 0.01 ach., thermal bridges in the envelope, heat loss from air exhausted from

9 9 the restrooms and directly to outside, and heat loss from the heated part of the ventilation culvert. Actual hours and intensity for use of the building may be different to what is assumed. The heat gain and the heat loss from the glazed areas on the roof (sunspace) have been accounted for in a way that is not expected to give very accurate results. Several minor faults with the building itself and with the ventilation system, leading to discomfort for occupants and excessive energy consumption, were corrected in 1998/99. * Progress report The long-term measurement logging of data from outdoor and indoor climate and from HVAC system parameters was delayed due to problems with BEMS. New software for the BEMS has been funded by NVE, and was installed in December Long-term monitoring started in January A recent review of data, collected for the period 7 March till 10 April, shows that the demand-controlled ventilation has worked very well. The energy consumption for the first 3 months of 2002 has been reduced, compared to Total consumption for the period in 2001 was 84,600 kwh while it is 65,600 in The reduction is found in the consumption of hydronic heating; a reduction from 74,400 kwh to 54,000 kwh, i.e. 27 % reduction. There seems to be a reduction in degree-days (Trondheim) of about 14 % this year compared to last year (degree-days for January and February only available at this time) that counts for a good share of the reduction in consumption. The rest of the reduction is probably due to the good functioning of the demand-controlled ventilation since December CO2 emissions The electrical energy is provided by hydro power, which has no CO2 emissions. The thermal energy is today provided by oil, but the oil will in the future be replaced by biomass, which is CO2 neutral. The yearly consumption of oil corresponds to a volume of: 86, /41.8/920 = 8.1 m Evaluation of indoor environment The leakage of the building envelope has been measured by using the supply fan of the building. The building is considered fairly airtight compared to requirements for similar buildings. Air leakage data: 0.83 ACH@50 Pa. Estimated after test at 10 Pa overpressure in building at T=20 C inside and outside, and no wind.

10 10 The ventilation system is very easy to inspect and to clean, and a long life can be expected for the system. No shoes that are used outside the building are allowed in the classrooms Air quality and thermal comfort The building, including the ventilation system, is capable of giving users acceptable air quality and thermal comfort in the heating season. For the summer season (cooling season), measurements have not been taken yet. However, no complaints were registered for the years 1999 and Test temperature measurement show that the intake air culvert has a cooling effect. The reading of some of the CO 2 meters in the building has been compared to the reading of a very accurate analyser. The meters in the building show generally higher values than the analyser does. Some values are more than 150 PPM higher. A difference within 50 PPM was expected. The southern wall with the clerestory windows. The picture shows ventilation supply and extract devices. It has been observed that use of asthma medicine among the pupils has diminished when the new school was taken into service Daylight conditions The building has secondary windows on the opposite wall to the window wall. The secondary windows are designed as a horizontal strip, situated just beneath the roof. They have lower transmission factor than the main windows, such that they do not dominate the room during overcast sky conditions. On sunny days they enable sunshine to enter the classroom, a very nice effect during wintertime. If sunlight penetrates the room too much, it can be diffused using the vertical louvers. The lager part of the solar radiation is then utilised for preheating the ventilation air. The distribution of daylight in the classrooms under the conditions of overcast sky is very even. A large southern part of the room has a high daylight factor of about 3 %. In the areas near the north-facing windows the daylight factor is between 8 and 9 %. The users are very happy with the daylighting conditions in the classrooms. The teachers who work in those classrooms evaluated daylighting in the classrooms as very bright and very even. They did not notice any veiling reflexes or shadows that could disturb the visual environment in the classrooms. Solar glare was experienced only in one classroom, where the mechanism for adjusting the louvers did not function properly. The colours were evaluated as rather natural and the colour temperature as neutral.

11 11 In spite of the fact that the sunshading used in the Grong school is very easy to use, it happens that it covers the south-facing windows unnecessarily in periods when the sun disappears but nobody changes the position of louvers or moves them to the side. Therefore, the daylight factor measurements were made a second time with vertical louvers covering the windows and adjusted to reflect sunlight back to the duct at the middle of the day. The results show that the daylight level is lower than for clear windows, but the mean daylight level is still higher than the level recommended by the Norwegians building code. As can be expected, the louvers shade mostly the southern part of the classroom. 1.5 Costs The total building costs are close to the average, normal costs. Building: NOK in 1998, i.e. ~ EURO. Floor area: m 2 Computer simulation Simulated daylight levels for the classrooms were calculated using the SUPERLIGHT computer program developed by the Lawrence Berkeley National Laboratory. The calculated values came close to the measurements of daylight factors derived from actual measurements of illuminance levels in a model, which was placed under an artificial sky. HVAC system including BEMS, concrete culverts and intake- and exhaust tower: NOK, i.e. ~ EURO. Conventional ventilation ductwork has been avoided. That may not only reduce the pollution level in supply air to rooms, but it may also reduce cleaning costs. The low velocities in airflow paths and in components such as air filter and heat exchangers, results in high component costs compared to conventional ventilation systems. On the other side, fan costs are lower due to less power demand for assisted natural ventilation. A very low consumption of electrical energy for the fans is achieved. Low fan power does result in low noise production that is another important benefit compared to conventional systems. Long underground ducts may be an extra cost, but used in an area with no infiltration of moisture and radon, it will be a great advantage on hot summer days. In addition, it seems like such ducts will reduce the power installation needed for supply air heating. The duct is also used for distribution of water end electricity. 1.6 Conclusions and lessons learned Ventilation A ventilation system design has been developed that works at times when stack-effect is insufficient. The largest problem for naturally ventilated buildings seems to be heat recovery from exhaust air along with low pressure-drop in the airflow. The heat-recovery units chosen for this building is a compromise between installation cost and pressure-drop. The units could have been reconsidered to allow for smaller pressure-drop, for example by

12 12 using convectors located in the end of the underground intake duct that is closer to the building. Need for research and development There is clearly a need for design guidelines for natural ventilation design in Nordic countries. Case studies should be presented, and recommendations should be given along with such guidelines. All components in the airflow path should be dealt with; also the design of underground air intake ducts and exhaust towers. In addition, there is a need for air handling equipment. Some of the existing ventilation system components should be tested for low pressure drop in order to learn their characteristics for design. There is also a need for developing components especially for natural or hybrid ventilation. Typically, there is a need for fans for installation in intake ducts and in exhaust towers to assist natural ventilation. As there is no demand for very compact heat exchangers in natural ventilation systems, new heat exchangers with the focus on low pressure drop and low cost should be developed. Demand controlled ventilation is even more needed in natural ventilation systems than in conventional ventilation systems as heat recovery from exhaust air is less efficient. Especially, correct placement of sensors in rooms is crucial to achieve effective and efficient climatization Daylighting There is a balanced usage of daylighting apertures in the classrooms, which allow daylight to penetrate into the rooms from to sides. The northern windows, which give a cool, bluish skylight, are clearly the primary daylight sources. The daylight level in the window zone is also highest. The clerestory windows have a secondary function. Since they are placed very high in the southern wall, they distribute daylight evenly over a large part of the room, without compete with the main windows. In spite of the fact that the sunshading used in the Grong school is very easy to use, it happens that it covers the clerestory windows unnecessarily in the periods when the sun disappears but nobody changes the position of louvers or moves them to the side. A better solution for the sunshading problem could be horizontal blinds. During sun hours, the unwelcome sunlight could be reflected

13 13 to the ceiling. During overcast sky hours, the horizontal blinds covering the windows would enable the skylight to penetrate the room much more than the vertical louvers do. As a result, the daylight level in the southern part of the room could be higher. Contact persons Karin Buvik, Project leader R&D SINTEF, Dep. of Architecture and Building Technology Karin.J.Buvik@sintef.no Per Olaf Tjelflaat Professor HVAC, NTNU per.o.tjelflaat@kkt.ntnu.no Kåre Herstad Letnes Architects kaare@letnesark.no Torbjørn Landsem HVAC consultant Fax: Key project data Location: Mediå, the centre of Grong municipality, in the middle of Norway, about 65 degrees north Site and surroundings: Semi-urban with low-rise buildings. Flat Owner: Research project: Architect: HVAC engineer: Electrical engineer: Structural engineer: Contractor: Construction work: The municipality of Grong SINTEF and NTNU, Trondheim Letnes Arkitektkontor A/S, Verdal PlanConsult VVS, Namsos Ryjord AS Nord, Steinkjer Planstyring AS, Steinkjer Cost Total building: 14,0 million NOK Cost HVAC: 1,5 million NOK Tor Nykvist & Søn AS, Namsos Started in September Completed in August 1998 Gross floor area: 1001 m 2 Number of storeys: 1, plus distribution ducts in basement and attic Floor to ceiling height: m (sloped roof) Personnel load: Outdoor climate: Heating: Heat recovery: 200 pupils + teachers and staff Summer design temperature: 23 C. Winter design temperature -23 C Unsteady wind speed and directions, relatively long calm periods. Periods with dust and pollen from agriculture. Particles from oil and wood burning during winter. Hot water convectors. Hydronic coil ventilation air pre-heating Glycol run-around system that pre-heats ventilation air 1.8 References Lerum, Vidar, Matusiak, Barbara, and Thyholt, Marit.

14 14 Daylighting Design for Grong Primary School. The SINTEF Group, STF22 A98509 Tjelflaat, Per Olaf, and Rødahl, Eystein. Design of Fan-Assisted Natural Ventilation. General Guidelines and Suggested Design for Energy-Efficient Climatization-System for Grong Primary School. The SINTEF Group, STF22 A97557

nzeb office building

nzeb office building nzeb office building Ympäristötalo in Helsinki, Finland City of Helsinki has taken the exemplary role of the public sector seriously. The latest proof is the Environment Centre building Ympäristötalo completed

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

GROUND COOLING OF VENTILATION AIR FOR ENERGY EFFICIENT HOUSE IN MALAYSIA: A CASE STUDY OF THE COOLTEK HOUSE

GROUND COOLING OF VENTILATION AIR FOR ENERGY EFFICIENT HOUSE IN MALAYSIA: A CASE STUDY OF THE COOLTEK HOUSE Conference on Sustainable Building South East Asia, -7 November 27, Malaysia GROUND COOLING OF VENTILATION AIR FOR ENERGY EFFICIENT HOUSE IN MALAYSIA: A CASE STUDY OF THE COOLTEK HOUSE G. REIMANN IEN Consultants,

More information

Buidling 661 Annual Daylight Performance Modeling Studies

Buidling 661 Annual Daylight Performance Modeling Studies Buidling 661 Annual Daylight Performance Modeling Studies A Report for GPIC Task 2.2 Compiled by Richard G. Mistrick, Ph.D., P.E., FIES Associate Professor of Architectural Engineering The Pennsylvania

More information

- Murdoch University, Western Australia.

- Murdoch University, Western Australia. The use of Solectair will almost totally alleviate the need to use conventional heating during autumn and spring with a reduced need for conventional heating during winter - Murdoch University, Western

More information

Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates

Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 2014 Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for

More information

Museum of Bavarian History Regensburg, Germany

Museum of Bavarian History Regensburg, Germany Museum of Bavarian History Regensburg, Germany Dipl.-Ing. Raphaël Vibert, Herz & Lang GmbH Key Facts Client: Public building authorities of Regensburg Architect: Wörner Traxler Richter Planungsgesellschaft

More information

ABOUT THE SITE CITY PLAN LOCATION:NOIDA,SEC-59

ABOUT THE SITE CITY PLAN LOCATION:NOIDA,SEC-59 ABOUT THE SITE CITY PLAN LOCATION:NOIDA,SEC-59 N ABOUT THE BUILDING Pearl Academy is a private higher education institute in India-offering undergraduate, postgraduate and diploma courses in design, fashion

More information

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from

More information

ENERGY EFFICIENCY BRIEF REPORT

ENERGY EFFICIENCY BRIEF REPORT ENERGY EFFICIENCY BRIEF REPORT 1 Odooproject s energy efficient building design was mainly formed by the tight interaction of students from the Faculty of Architecture and the Faculty of Mechanical Engineering

More information

The Corbioli House is a single-family house situated

The Corbioli House is a single-family house situated All-in-one high-performing system for ZEB houses Maria Ferrara Grant researcher TEBE Research Group Energy Department Politecnico di Torino at Turin, Italy maria.ferrara@polito.it Frederic Kuznik Full

More information

Figure 1: Low energy dwellings testsite

Figure 1: Low energy dwellings testsite Seventh International IBPSA Conference Rio de Janeiro, Brazil August 13-15, 2001 SIMULATION OF DEMAND CONTROLLED VENTILATION IN A LOW-ENERGY HOUSE Netherlands Energy Research Foundation J.C. Römer P.O.

More information

VENTILATIVE COOLING CONTROL STRATEGIES APPLIED TO PASSIVE HOUSE IN ORDER TO AVOID INDOOR OVERHEATING

VENTILATIVE COOLING CONTROL STRATEGIES APPLIED TO PASSIVE HOUSE IN ORDER TO AVOID INDOOR OVERHEATING VENTILATIVE COOLING CONTROL STRATEGIES APPLIED TO PASSIVE HOUSE IN ORDER TO AVOID INDOOR OVERHEATING Rebeca Barbosa 1, Martin Barták 1, Jan L. M. Hensen 1, 2, Marcel G. L. C. Loomans 2 1 Czech Technical

More information

Adelaide Homes Design Guide 4 - Winter warming

Adelaide Homes Design Guide 4 - Winter warming Adelaide Homes Design Guide 4 - Winter warming Adelaide's temperate climate means home warming is required during winter. There are many efficient heating systems. The most economical method, however,

More information

Windows Influence on Room Daylighting in Residential Buildings

Windows Influence on Room Daylighting in Residential Buildings Journal of Civil Engineering and Architecture 9 (2015) 291-299 doi: 10.17265/1934-7359/2015.03.007 D DAVID PUBLISHING Windows Influence on Room Daylighting in Residential Buildings Haşim Altan 1 and Jitka

More information

PASSIVE AND ACTIVE FIRE PROTECTION OF THE AIR HEATED SOLAR HOUSES

PASSIVE AND ACTIVE FIRE PROTECTION OF THE AIR HEATED SOLAR HOUSES PASSIVE AND ACTIVE FIRE PROTECTION OF THE AIR HEATED SOLAR HOUSES Tibor Harsányi and Lajos Takács Department of Building Structures, Technical University of Budapest, 1-3 Mûegyetem rakpart, 1111 - Budapest,

More information

THE FACTOR 9 HOME: A NEW PRAIRIE APPROACH

THE FACTOR 9 HOME: A NEW PRAIRIE APPROACH 1 2 3 4 5 6 7 8 9 10 ABSTRACT THE FACTOR 9 HOME: A NEW PRAIRIE APPROACH Robert Dumont and Tara Morin Building Performance Business Unit, Saskatchewan Research Council 15 Innovation Boulevard, Saskatoon,

More information

EXCELSIOR SINHGAD COLLEGE OF ENGINEERING, PUNE PAPER PRESENTATION

EXCELSIOR SINHGAD COLLEGE OF ENGINEERING, PUNE PAPER PRESENTATION EXCELSIOR SINHGAD COLLEGE OF ENGINEERING, PUNE PAPER PRESENTATION ON SOLAR CHIMNEY BY MALAV R. MEHTA ANUJ K. SADANI (3 RD YEAR CMPS) (3 RD YEAR IT) GCOE AMRAVATI GCOE AMRAVATI E-MAIL:malav123_mehta@rediffmail.com

More information

OCCUPANT INTERACTION WITH VENTILATION SYSTEMS 7th AIC Conference, Stratford-upon-Avon, UK

OCCUPANT INTERACTION WITH VENTILATION SYSTEMS 7th AIC Conference, Stratford-upon-Avon, UK OCCUPANT INTERACTION WITH VENTILATION SYSTEMS 7th AIC Conference, Stratford-upon-Avon, UK 29 September - 2 October 1986 PAPER 9 USER CONTROLLED EXHAUST FAN VENTILATION IN ONE-FAMILY HOUSES Ake Blomsterberg

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

Villa Bagatelle Technical Report

Villa Bagatelle Technical Report Downloaded from orbit.dtu.dk on: Dec 27, 2018 Villa Bagatelle Technical Report Cox, Rimante Andrasiunaite Publication date: 2015 Document Version Publisher's PDF, also known as Version of record Link back

More information

A full list of energy conservation opportunities (ECO) for air-conditioned buildings

A full list of energy conservation opportunities (ECO) for air-conditioned buildings A full list of energy conservation opportunities (ECO) for air-conditioned buildings Team France (Project coordinator) Armines - Mines de Paris Austria Austrian Energy Agency Belgium Université de Liège

More information

MECHANICAL VENTILATION

MECHANICAL VENTILATION MECHANICAL VENTILATION Natural and Mechanical Systems Four (4) possible combinations of natural and mechanical ventilations tions are as follows; Natural inlet and outlet; utilizing open able windows,

More information

Performance of Heat Recovery Ventilation System with Ground Source Brine Heat Exchanger Pre- Heating System in the Context of nzeb

Performance of Heat Recovery Ventilation System with Ground Source Brine Heat Exchanger Pre- Heating System in the Context of nzeb Performance of Heat Recovery Ventilation System with Ground Source Brine Heat Exchanger Pre- Heating System in the Context of nzeb Kalle Kuusk 1, Jaanus Hallik 2, Targo Kalamees 3, Tõnu Mauring 4, 1,3

More information

Simplified Space-Heating Distribution using Radiators in Super-Insulated Apartment Buildings

Simplified Space-Heating Distribution using Radiators in Super-Insulated Apartment Buildings Simplified Space-Heating Distribution using Radiators in Super-Insulated Apartment Buildings L. Georges*, K. Wen*,c, M.J. Alonso b, M. Berge*, J. Thomsen b and R. Wang c *Energy and Process Engineering

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

DIVISION 23 - HVAC HVAC

DIVISION 23 - HVAC HVAC DIVISION 23-23 00 00 PART 1 - GENERAL 1.01 GENERAL CRITERIA A. The heating system typical set point shall be 70 F inside. 1. The winter outdoor design temperature for most systems shall be -6 F. 2. The

More information

CLASSIFICATION AND EXPERIMENTATION FOR THE DEVELOPMENT OF DAYLIGHTING SYSTEMS IN COLD AND SNOWY REGIONS

CLASSIFICATION AND EXPERIMENTATION FOR THE DEVELOPMENT OF DAYLIGHTING SYSTEMS IN COLD AND SNOWY REGIONS CLASSIFICATION AND EXPERIMENTATION FOR THE DEVELOPMENT OF DAYLIGHTING SYSTEMS IN COLD AND SNOWY REGIONS Masaya Saito*, Satoshi Nasu*, Moto Nakano** and Kouko Miyakawa*** *Sapporo School of The Arts Geijustu-no-mori

More information

Temperature Distribution of Rotary Heat Recovery Units

Temperature Distribution of Rotary Heat Recovery Units Temperature Distribution of Rotary Heat Recovery Units Bjørn R. Sørensen, dr.ing. Narvik University College, P.O.Box 385, N-8505 Narvik, Norway Corresponding email: brs@hin.no SUMMARY This paper deals

More information

Solar Heating and Cooling Systems

Solar Heating and Cooling Systems Solar Heating and Cooling Systems Presented by: Dr. Georgios Florides Solar Space heating and Cooling A solar space heating and Cooling system can consist of a passive system, an active system, or a combination

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance

8 5.11: Finned-Tube Coils and Heat Exchangers : Humidifiers and Water Spray Systems : Access for Inspection, Cleaning, and Maintenance Table of Contents 3 Executive Summary 4 Building Overview 5 Mechanical Systems Overview 6 ASHRAE Standard 62.1 2013 Evaluation 6 Section 5: Systems and Equipment 6 5.1: Ventilation Air Distribution 6 5.2:

More information

Mechanical Ventilation with Heat Recovery: Designing and implementing a robust and effective ventilation system

Mechanical Ventilation with Heat Recovery: Designing and implementing a robust and effective ventilation system Viewpoint August 2012 Mechanical Ventilation with Heat Recovery: Designing and implementing a robust and effective ventilation system Dr Sarah Price and Helen Brown Summary Mechanical Ventilation and Heat

More information

DESCRIPTION OF TECHNOLOGY

DESCRIPTION OF TECHNOLOGY March 2009 Underfloor Air Distribution INTRODUCTION Copyright 2009 Glumac. All rights reserved. While this Green Paper discusses primarily the use of raised access floors for air distribution, HVAC integration

More information

Performance of the Low-energy House in Sisimiut

Performance of the Low-energy House in Sisimiut Performance of the Low-energy House in Sisimiut Carsten Rode 1,*, Jesper Kragh 2, Egil Borchersen 1, Petra Vladykova 1, Simon Furbo 1 and Janne Dragsted 1 1 Technical University of Denmark 2 Danish Building

More information

incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks

incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks Car park ventilation What are the regulations? Ventilation of car

More information

Strategies for Building Energy Efficiency

Strategies for Building Energy Efficiency Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting

More information

The Use Of Attic Space For Cooling and Dehumidification

The Use Of Attic Space For Cooling and Dehumidification Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2002 The Use Of Attic Space For Cooling and Dehumidification H. F. Abaza Virginia

More information

Systems engineering Slide 1

Systems engineering Slide 1 Slide 1 Overview / Calculation energy flow control / emission distribution building energy use (conditioning boundary) storage generation balance boundary primary energy delivered energy (building boundary)

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 2) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Contextual Reminder All-air systems Single zone Terminal reheat Multi-zone Dual-duct VAV Combinations

More information

DAYLIGHT AS A VISUAL EXPERIENCE

DAYLIGHT AS A VISUAL EXPERIENCE DAYLIGHT AS A VISUAL EXPERIENCE Anahita Anandam The project described is the Simmons Hall designed by the well-known architect Steven Holl. The Simmons Hall is an undergraduate dormitory at the Massachusetts

More information

Small Building Program Design Phase Assistance

Small Building Program Design Phase Assistance Small Building Program Design Phase Assistance Customer s Facility/Project Location XXXX/YYY, MA Project Team (if selected) Contact Firm Phone Email Customer: Electric PA: Gas PA: PAs s Technical Consultant:

More information

Passivhaus. sally godber MEng CEng MIMechE WARM: Low Energy Building Practice. The first 3 in the UK.

Passivhaus. sally godber MEng CEng MIMechE WARM: Low Energy Building Practice. The first 3 in the UK. Passivhaus The first 3 in the UK sally godber MEng CEng MIMechE www.peterwarm.co.uk Intro to me/warm Mechanical Engineer Background in building services Set up WARM Jan 2009 Involved in 5 Passivhaus schools

More information

SOLAR THERMAL HEATING: ALIVE AND WELL

SOLAR THERMAL HEATING: ALIVE AND WELL Michael E Dion michael.dion@stiebel-eltron-usa.com SOLAR THERMAL HEATING: ALIVE AND WELL Donavin A Gratz donavin.gratz@stiebel-eltron-usa.com E Christopher Wetherby chris.wetherby@stiebel-eltron-usa.com

More information

COST EFFECTIVE PASSIVE SOLAR FOR NEW HOME CONSTRUCTION

COST EFFECTIVE PASSIVE SOLAR FOR NEW HOME CONSTRUCTION COST EFFECTIVE PASSIVE SOLAR FOR NEW HOME CONSTRUCTION Steve Kawell Durango Solar Homes, LLC 310 Craig Lane Durango, CO 80303 E-mail: solar@stevekawell.com ABSTRACT As the owner of a design/ build firm

More information

Appendix C House models for Dymola to be used in connection with the OPSYS test rig and annual simulations of the performance of heat pumps

Appendix C House models for Dymola to be used in connection with the OPSYS test rig and annual simulations of the performance of heat pumps Appendix C House models for Dymola to be used in connection with the OPSYS test rig and annual simulations of the performance of heat pumps Søren Østergaard Jensen February 2017 1 Preface The present document

More information

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248 3594 www.danapoint.org INDOOR AIR QUALITY B011 AIR 2013 CALIFORNIA CODES CODE

More information

Chapter 10. Passive Cooling Contents

Chapter 10. Passive Cooling Contents Chapter 10. Passive Cooling Contents 10.1 Introduction to Cooling 10.2 Historical and Indigenous Use of Passive Cooling 10.3 Passive Cooling Systems 10.4 Comfort Ventilation VS Night Flush Cooling 10.5

More information

Environmentally Sound Solutions for Ventilation

Environmentally Sound Solutions for Ventilation NATO/CCMS Sustainable Building for Military Infrastructure Environmentally Sound Solutions for Ventilation Hans Martin Mathisen Energy Processes 2005-09-21 Outline of presentation Ventilation principles:

More information

Des Places Residence Hall

Des Places Residence Hall Senior Thesis Presentation Duquesne University Pittsburgh, PA Project Team Owner: Duquesne University Architect: WTW Architects Mechanical/Electrical Engineer: CJL Engineering Structural Engineer: Barber

More information

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) February, 2017 Contents Clauses Page 1. Basic Concepts 1 2. Design Considerations 1 3. Car Parks Ventilation 2 4. Kitchen

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Connect North and South Korean Separated Families Higher Comfort Lower Energy

Connect North and South Korean Separated Families Higher Comfort Lower Energy Transsolar Academy 2016-2017 Final Project Summary Connect North and South Korean Separated Families Higher Comfort Lower Energy SUIN KIM 1, ELMIRA REISI 2 1 Transsolar Academy, Transsolar Energietechnik

More information

DESIGN OF AIR-CONDITIONING SYSTEM FOR SARS WARDS. By Yuguo Li and SARS Busters * Background

DESIGN OF AIR-CONDITIONING SYSTEM FOR SARS WARDS. By Yuguo Li and SARS Busters * Background DESIGN OF AIR-CONDITIONING SYSTEM FOR SARS WARDS By Yuguo Li and SARS Busters * Background The hospital care workers (HCWs) have been the most severely affected professions during the SARS epidemics in

More information

Vernonia K-12 School: Thermal Comfort in Passively-Cooled Zones

Vernonia K-12 School: Thermal Comfort in Passively-Cooled Zones Vernonia K-12 School: LEED Indoor Environmental Quality Credit 7.1 28 July 2011 Test zones in the context of simplified geometry: Southwest Level 2 Classroom, Level 2 Administrative Area, Science Laboratory,

More information

Passive Solar Home Design

Passive Solar Home Design Passive Solar Home Design Your home's windows, walls, and floors can be designed to collect, store, and distribute solar energy in the form of heat in the winter and reject solar heat in the summer. This

More information

Library of Birmingham integrated with The REP

Library of Birmingham integrated with The REP 0123456789 Birmingham City Council Library of Birmingham integrated with The REP Environmental Statement Chapter 9 Shadowing 9 Shadowing Chapter Summary Key features A private amenity garden is located

More information

Residential ventilation concepts based on the idea of displacement airflow distribution

Residential ventilation concepts based on the idea of displacement airflow distribution A strategy for reducing energy demand Student: Aris Gkitzias (I.D:4180380) Mentors: Dr. Regina Bokel, Ir. John van der Vliet MSc graduation project Department of Building Technology, faculty of architecture

More information

NAHB Green Home Building Guidelines. 3.1 Prerequisites. ResCheck. Energy Efficiency

NAHB Green Home Building Guidelines. 3.1 Prerequisites. ResCheck. Energy Efficiency NAHB Green Home Building Guidelines Energy Efficiency 3.1 Prerequisites 3.1.1 Home is equivalent to the IESS 2003 or local energy code. Conformance shall be based on plan analysis using software. 3.1.2

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

Passivhaus school kitchens

Passivhaus school kitchens Passivhaus school kitchens Alan Clarke & Nick Grant, The Woodlands, Whitecroft, Lydney, GL15 4PL, UK 1 Introduction Schools in the UK provide a mid-day meal, usually cooked at the school. Accommodating

More information

17 Interior Climate Control

17 Interior Climate Control 17 Interior Climate Control 17.1 Air is leaking through or around windows and/or exterior doors. Windows and doors shall be installed to minimize air leakage in accordance with the Alberta Building Code.

More information

AERECO DEMAND CONTROLLED VENTILATION COMBINING INDOOR AIR QUALITY AND ENERGY SAVINGS

AERECO DEMAND CONTROLLED VENTILATION COMBINING INDOOR AIR QUALITY AND ENERGY SAVINGS AERECO DEMAND CONTROLLED VENTILATION COMBINING INDOOR AIR QUALITY AND ENERGY SAVINGS INNOVATION THAT EXCELS IN AIR QUALITY AND ENERGY SAVINGS Aereco demand controlled ventilation Combining indoor air quality

More information

IT S HOT UP HERE! A STUDY OF THERMAL COMFORT IN THE LILLIS BUSINESS COMPLEX 4TH FLOOR OFFICES

IT S HOT UP HERE! A STUDY OF THERMAL COMFORT IN THE LILLIS BUSINESS COMPLEX 4TH FLOOR OFFICES IT S HOT UP HERE! A STUDY OF THERMAL COMFORT IN THE LILLIS BUSINESS COMPLEX 4TH FLOOR OFFICES Martha Bohm M.Arch Candidate 2006 University of Oregon Eugene, OR 97403 Will Henderson M.Arch Candidate 2006

More information

QUALITY CONTROL Passive House Checklist

QUALITY CONTROL Passive House Checklist 09.01 QUALITY CONTROL - PH Checklist 09.01_PH-SUMMER SCHOOL QUALITY CONTROL Passive House Checklist Composition: Passive House Institut, Darmstadt (DE), Date: 2007-07-03 This presentation is being used

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

Smart Green Roofs: Cooling with variable insulation

Smart Green Roofs: Cooling with variable insulation Smart Green Roofs: Cooling with variable insulation PABLO LA ROCHE 1, ERIC CARBONNER 2, CHRISTINA HALSTEAD 3 1 HMC Architects, Ontario, California, USA & Cal Poly Pomona University, California, USA 2 HMC

More information

Raised Access Floor - (AE Breadth Area)

Raised Access Floor - (AE Breadth Area) Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an

More information

City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation

City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation City of Green Administration Building Brian Koze November 12, 2010 Lighting Schematic Design Presentation Building Statistics Location City of Green, Ohio Occupant City of Green Administration Size 53,671

More information

Everything you need to know about Radiant Heating but didn t dare ask

Everything you need to know about Radiant Heating but didn t dare ask Decorative radiators Comfortable indoor ventilation Heating and cooling ceiling systems Clean air solutions Everything you need to know about Radiant Heating but didn t dare ask Introduction Radiant heating

More information

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9

More information

Riverdale NetZero Project Summary of Costs and Expected Performance

Riverdale NetZero Project Summary of Costs and Expected Performance Riverdale NetZero Project Summary of Costs and Expected Performance Natural Resources Canada Sustainable Buildings and Communities Edmonton, Ottawa 2009 January 07 Gordon Howell, P.Eng. 2008-2009 Progressively

More information

Typologies of Hybrid Ventilation in Schools

Typologies of Hybrid Ventilation in Schools Typologies of Hybrid Ventilation in Schools Peter van den Engel Delft Technological University, the Netherlands Corresponding email: p.vd.engel@deerns.nl SUMMARY This article is the result of a study on

More information

Integrated Building Environmental Design Case Study: Beijing Parkview Green

Integrated Building Environmental Design Case Study: Beijing Parkview Green Integrated Building Environmental Design Case Study: Beijing Parkview Green The 7th International Energy Agency Annex 44 Forum 24 October 2007 Dr Raymond Yau Director Ove Arup & Partners Hong Kong Ltd.

More information

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM

UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM Page 1 UNDERSTANDING AND USING THE HVAC DESIGN REVIEW FORM Each of the 38 points of requested information is discussed, and references to the supporting manual are given to substantiate the requirement.

More information

INFLUENCE OF SOLAR RADIATION AND VENTILATION CONDITIONS ON HEAT BALANCE AND THERMAL COMFORT CONDITIONS IN LIVING-ROOMS

INFLUENCE OF SOLAR RADIATION AND VENTILATION CONDITIONS ON HEAT BALANCE AND THERMAL COMFORT CONDITIONS IN LIVING-ROOMS INFLUENCE OF SOLAR RADIATION AND VENTILATION CONDITIONS ON HEAT BALANCE AND THERMAL COMFORT CONDITIONS IN LIVING-ROOMS Staņislavs GENDELIS, Andris JAKOVIČS Laboratory for mathematical modelling of environmental

More information

ASHRAE/IESNA Standard

ASHRAE/IESNA Standard ASHRAE/IESNA Standard 90.1-1999 An inside look at the requirements of Standard 90.1-1999 Energy Standard for Building Except Low-Rise Residential Building Mick Schwedler, PE Sr. Principal Applications

More information

University of Illinois at Urbana-Champaign Small Homes Council-Building Research Council COUNCIL NOTES ~,.Q. ::s C2.3 ILLINOIS LO-CAL HOUSE

University of Illinois at Urbana-Champaign Small Homes Council-Building Research Council COUNCIL NOTES ~,.Q. ::s C2.3 ILLINOIS LO-CAL HOUSE University of Illinois at Urbana-Champaign Small Homes Council-Building Research Council COUNCIL NOTES N ~,.Q El ::s z C2.3 ILLINOIS LO-CAL HOUSE THE "ILLINOIS LO-CAL HOUSE" ~~ - The increasing scarcity

More information

Authority - City Engineer Effective August 2, 2011 Amended November 1, 2011, November 1, 2012 and December 11, 2013

Authority - City Engineer Effective August 2, 2011 Amended November 1, 2011, November 1, 2012 and December 11, 2013 City of Vancouver Planning - By-law Administration Bulletins Planning and Development Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7000 fax 604.873.7060 planning@vancouver.ca NEIGHBOURHOOD

More information

Desiccant Dehumidifier

Desiccant Dehumidifier Since the 1950s Desiccant Dehumidifier Dry Spaces With NO Added Heat BMIL Technologies, LLC 4915 Arendell St., #313 Morehead City, NC 28557 PH 252-727-0994 FAX 252-727-0996 WWW.BMIL.COM Product Description

More information

save I have the power to A helpful guide to making your home wattsmart _RMP_wattsmart Handbook_Resize_5.5x7.75_F2.indd 1

save I have the power to A helpful guide to making your home wattsmart _RMP_wattsmart Handbook_Resize_5.5x7.75_F2.indd 1 save I have the power to A helpful guide to making your home wattsmart 17645-64_RMP_wattsmart Handbook_Resize_5.5x7.75_F2.indd 1 5/21/18 1:05 PM table of contents Preface...ii How you use electricity...1

More information

THE GLARE EVALUATION METHOD FOR CIVIL AIRPLANE FLIGHT DECK

THE GLARE EVALUATION METHOD FOR CIVIL AIRPLANE FLIGHT DECK 28 TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES THE GLARE EVALUATION METHOD FOR CIVIL AIRPLANE FLIGHT DECK Ma Zhi, Zhang Wei, Li Hui School of Aeronautics, Northwestern Polytechnical University

More information

SEISCO APPLICATIONS & DIAGRAMS

SEISCO APPLICATIONS & DIAGRAMS ALICATIONS & DIAGRS A. Seisco Selection Criteria B. Residential Floor lan Diagrams 1. Standard One Story Home Options 2. Standard Two Story Home Options 3. One Story Booster for Quicker Response C. Application

More information

Adsolair 56/58. Comfort air conditioning unit with double plate heat exchanger and adiabatic evaporative cooling system

Adsolair 56/58. Comfort air conditioning unit with double plate heat exchanger and adiabatic evaporative cooling system Comfort air conditioning 56/58 Comfort air conditioning unit with double plate heat exchanger and adiabatic evaporative cooling system 58 3 0 - simplified illustration Automatically selects the most economical

More information

HEAT RECOVERY VENTILATION For healthy, energy efficient ventilation

HEAT RECOVERY VENTILATION For healthy, energy efficient ventilation HEAT RECOVERY VENTILATION For healthy, energy efficient ventilation Heat Recovery Ventilation (HRV) is an integral part of the Passive House approach to achieving ultra-low energy houses. In the UK, HRV

More information

2013 innovation. Room-by-room demand controlled heat recovery ventilation

2013 innovation. Room-by-room demand controlled heat recovery ventilation 2013 innovation Room-by-room demand controlled heat recovery ventilation 2 Revolution in the world of heat recovery ventilation Through its new ventilation system, which combines heat recovery and room-by-room

More information

NRG SYSTEMS, HINESBURG, VT

NRG SYSTEMS, HINESBURG, VT Daylighting Case Studies NRG SYSTEMS, HINESBURG, VT Project Highlights Daylight windows separated from view windows Advanced daylightredirecting blinds Low partitions, with desks oriented at right angles

More information

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools Heat Recovery Dehumidification (HRD) system Designed for municipal swimming pools A dehumidification and ventilation system with dynamic heat pump heat recovery to swimming pool water and air ENVIRONMENTAL

More information

MICROCLIMATE SYSTEMS CHARACTERISTICS OF A THREE FLOOR HOTEL IN VILNIUS

MICROCLIMATE SYSTEMS CHARACTERISTICS OF A THREE FLOOR HOTEL IN VILNIUS VILNIAUS GEDIMINAS TECHNICAL UNIVERSITY FACULTY OF ENVIRONMENTAL ENGINEERING DEPARTMENT OF BUILDING ENERGETICS David Santiago Escribano MICROCLIMATE SYSTEMS CHARACTERISTICS OF A THREE FLOOR HOTEL IN VILNIUS

More information

UFAD and Displacement Ventilation. Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas

UFAD and Displacement Ventilation. Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas UFAD and Displacement Ventilation Dan Int-Hout, FASHRAE Chief Engineer Krueger Richardson, Texas UFAD and DV Systems, Objectives: Understand Differences between: Well Mixed, Partially Stratified and Fully

More information

Minimal Invasive Ventilations Systems with Heat Recovery for Historic Buildings

Minimal Invasive Ventilations Systems with Heat Recovery for Historic Buildings Minimal Invasive Ventilations Systems with Heat Recovery for Historic Buildings Rainer Pfluger #1, Kai Längle #2 # Energy Efficient Buildings, University of Innsbruck Technikerstr. 13, 6020 Innsbruck,

More information

Residential Energy Efficiency Measures

Residential Energy Efficiency Measures Residential Energy Efficiency Measures Introduction There are a number of cost-effective energy saving technologies, design strategies, construction methods and operational techniques to optimize the energy

More information

Energy-Efficiency Measures List

Energy-Efficiency Measures List Guidelines for Public Agencies Energy-Efficiency Measures List 1.0 Envelope 1.1 Reduce Heat Losses-Ceiling/roof 1.11 Additional Ceiling/Roof Insulation 1.12 Exhaust Attics 1.13 Use Light-Colored Roof Surfaces

More information

1 Exam Prep Energy Efficient Building Construction in Florida Questions

1 Exam Prep Energy Efficient Building Construction in Florida Questions 1 Exam Prep Energy Efficient Building Construction in Florida Questions 1. What activates the pump on a thermosiphon solar hot water heating system? A. Holding tank sensor B. Collector sensor C. The difference

More information

Appendix A. Glossary of Common Terms

Appendix A. Glossary of Common Terms Glossary of Common Terms Glossary of Common Terms Absorption chiller A refrigeration machine using heat as the power input to generate chilled water. Adjustable speed drive A means of changing the speed

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

Measuring And Understanding Energy Efficiency

Measuring And Understanding Energy Efficiency 28Mar2011 www.fahrenergy.co.uk P: 1 Measuring And Understanding Energy Efficiency Knowledge makes the difference. It is the base for improvements. INSTRUMENTS NEEDED... 1 INTRODUCTION... 2 ENERGY RECOVERY

More information

Executive Summary

Executive Summary Prepared by: Proctor Engineering Group, Ltd. San Rafael, CA 94901 (415) 451-2480 Investigation of Coil Failures - A Whole Systems Approach Prepared for: Geothermal Heat Pump Consortium Final Report July

More information

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Trane Performance Climate Changer Air Handlers. An air handler for every need. Trane Performance Climate Changer Air Handlers An air handler for every need. Trane Performance Climate Changer air handlers: designed to optimize your HVAC system. Trane Performance Climate Changer air

More information