1 FAARM-Underground Facility Conceptual Design Review Mechanical Systems Prepared by: Dunham Associates, Inc. April 17, 2012 Dunham Project Number: Dunham Associates Inc. Page 1 of 8

2 Mechanical Systems A. GENERAL 1. Overview a. This mechanical system design narrative describes the requirements of the mechanical systems for a new underground cavern area of an existing underground cavern located in the either The Homestake Mine in Lead, South Dakota or Soudan Mine in Soudan, Minnesota. 2. Equipment Redundancy a. Equipment shall be defined only for critical equipment systems serving the new clean room areas and back of house spaces. B. DESIGN CONDITIONS 1. Outside Design Conditions: based on composite data from various sites with similar latitude, elevation and longitude as per the 2009 ASHRAE Handbook- Fundamentals: a. Site elevation is ft below the surface but at 650 ft above sea level (Homestake Mine) or below the surface and -689 ft below sea level (Soudan Mine). b. Outside Design Temperatures 1. Cooling = 90.8 F db/58.4 F wb 2. Dehumidification = 90.8 F db/59.0 F dew point 3. Heating = F c. Ventilation Air (w/drift Air) (Temps defined by SDSTA or Soudan) 1. Cooling = To be determined 2. Heating = To be determined 2. Indoor Design Conditions a. Class 2000 Clean Room 1. Summer = 65 F DB/50% RH 2. Winter = 65 F DB 3. Clean Room ACH = Gowning Room ACH = 80 b. Class Clean Room 1. Summer = 68 F DB/50% RH 2. Winter = 68 F DB 3. Clean Room ACH = Gowning Room ACH = 20 c. Back of House Spaces 1. Summer = 70 F DB/50% RH Dunham Associates, Inc. Page 2/8

3 2. Winter = 70 F DB 3. ACH = 15 d. Mechanical/Electrical Rooms 1. Summer = 80 F DB 2. Winter = 80 F DB e. Process Spaces (Water Purification Rm) 1. Summer = 85 F DB 2. Winter = 85 F DB f. Indoor Air Quality 1. All spaces will be designed to meet ASHRAE standard. 2. Process Spaces will be provided with filtered ventilation air drawn from the adjacent drift. 3. Cooling Load Design Considerations a. Internal Heat Gains 1. Clean Room a. People = 260 BTUH Sens.; 310 BTUH Latent b. Lights = 4 Watts/sq. foot in clean room. 3.0 Watts/sq. foot in gowning area. c. FAARM Appliance = KW (Torus) (Equipment diversity allows for 50% of total.) 2. All other spaces a. People = 260 BTUH Sens.; 310 BTUH Latent b. Lights = 2.5 Watts/sq. foot; 80% to space c. FARRM Appliance = KW )Per Summary Table For FAARM) 3. Equipment & Process Spaces a. Lights = 1.0 Watts/sq. foot; 80% to space FAARM Appliance = 10 KW (Water Perification Room) (Per Summary Table For FAARM) C. SITE UTLITIES 1. The following will be provided by the site to the entrance of the new facility: domestic cold water, non-potable industrial cold water, sanitary waste (forced main), sanitary vent, hazardous waste, outside ventilation air, smoke exhaust, general and hazardous exhaust, supply and return chilled water and fire sprinkler water. The exact size of each utility main remains unresolved. D. PLUMBING SYSTEMS 1. Potable Domestic Water: a. Potable domestic water will be piped from the 4 utility stub provided at the entrance to the new facility. b. A 50 gallon electric water heater w/domestic hot water recirculator. c. Emergency eyewash/shower units with individual tempering valves (Physics & Chemistry Area, Machine Shop). d. Domestic hot and cold water are required to serve the new lavatories, janitor sink and water closet. Dunham Associates, Inc. Page 3/8

4 2. High Purity Water: a. Pre-treatment consisting of a water softener will be provided for the DI system fill and make-up water. Water for the system will be piped from the 4 utility stub provided at the entrance to the new facility. b. The DI plant will include as an option the pretreatment of carbon filters and RO skid. The base polishing system will include a polishing loop including mixed bed deionizers, UV lights, filters and DI storage tank. 3. Waste & Vent Piping a. Waste piping and venting for floor drains, lavatories, water closet and janitor sink located in the new space. Provide drains for the AHU's condensate drains. b. All new waste piping will terminate at a duplex sewage ejector. Pumped waste will be directed to the 4 sanitary waste utility stub provided at the entrance to the new facility. c. All new vent piping will be directed to the 2 vent utility stub provided at the entrance to the new facility. 4. Indirect Condensate Waste System a. An indirect waste system including condensate pumps carrying cooling coil condensate shall be provided to pump condensate from the air handling units which have cooling coils installed to the 4 mine waste water system utility stub provided at the entrance to the new facility. 5. Plumbing Piping Insulation a. Domestic cold water, hot water and recirculated hot water piping shall be insulated with fiberglass insulation with all service jacket and PVC fitting covers. 6. Plumbing Materials a. Domestic water and tempered water piping: Type L copper with 95/5 soldered joints. b. Sanitary waste and vent: Service weight cast iron with no-hub couplings above grade and hub-and-spigot joints below grade. c. Cooling coil condensate piping: DWV copper. d. High purity piping system will be (PVDF) polyvinylidene fluoride or high purity polypropylene (PP) with (BCF) bead and crevice free. E. FIRE PROTECTION SYSTEMS 1. Fire Protection System: a. A wet pipe sprinkler system shall be provided to protect all new Dunham Associates, Inc. Page 4/8

5 and remodeled spaces within the entire facility. New 4 zone piping will extend from the utility stub provided at the entrance to the new facility. The system characteristics remain unresolved. b. Up-right type fire sprinkler heads will be provided in all areas without ceilings. Semi-recessed Pendent type heads will be provided in all non-clean spaces with ceilings. Fully concealed, gasketed heads will be provided in all clean spaces with ceilings. c. Class 1 standpipes will be provided as per NFPA. F. CHILLED WATER COOLING SYSTEM 1. Chilled Water System: a. New chilled water supply and return piping will extend from the 4 utility stubs provided at the entrance to the new facility. The system characteristics require 150 GPM at 45 F EWT and 10 F delta. 2. Chilled Water Piping a. System piping shall be rolled grooved pipe with grooved couplings and fittings. b. Provide valving as required. 3. Chilled Water System Insulation a. Provide fiberglass insulation with thickness to meet applicable energy codes but a minimum thickness of 1". G. AIR HANDLING UNIT SYSTEMS 1. Cooling Air Handling Unit AHU-1 (Class 2000 Spaces) a. A 9200 CFM constant volume, variable temperature, air-handling unit will be provided to meet the air requirements for the class 2000 clean rooms and also to provide positive pressurization in the clean room spaces based on the classification of the space. The unit will be designed for indoor installation, being floor set. It will be fitted with MERV 8 pre-filter section, belt driven, smoke rated supply air fan and high efficiency motor, smoke rated dampers, a chilled water cooling coil w/stainless steel drain pan, electric reheat coil, 65 % efficient final filter section and a discharge plenum. The unit will be provided with insulated, double wall, water tight construction. Acceptable manufacturers are McQuay, Trane, Carrier and York. b. A 9200 CFM, smoke rated return/relief/exhaust fan will be provided (RF-1). Acceptable manufacturers are McQuay, Trane, Carrier and York. c. Variable speed drives will be provided for both AHU-1 and RF-1. d. The building automation system vendor will provide new unit controls. e. For fan sizing purposes, fan external static pressure shall be 3.5 of water column and total loaded filter pressure drop shall be 5.75 of water column. f. Chilled Water Cooling coil shall have an entering temperature of 67.5F db/53.8f wb and leaving temp of 54.5F db/48.9f wb. Dunham Associates, Inc. Page 5/8

6 g. Electric duct reheat coil heating coil shall be provided to heat the air from 55 to 70 deg F. using multi-stage electric resistance. It shall be located downstream of the cooling coils. h. Building Automation System Controls: Provide controls to modulate chilled water control valves as required to maintain discharge air temperature based on set point, which is adjusted, based on space relative humidity sensors. i. Ceiling mounted 99.9 % efficient HEPA filters will be provided in all Class 2000 spaces. 2. Cooling Air Handling Unit AHU-2 (Class 10,000 Spaces) a. A CFM constant volume, variable temperature, air-handling unit will be provided to meet the air requirements for the clean room and also to provide positive pressurization in the clean room spaces based on the classification of the space. The unit will be designed for indoor installation, being floor set. It will be fitted with 2-30% throw-away pre-filter section, belt driven smoke rated supply air fan and high efficiency motor, smoke rated dampers, 100% economizer section, chilled water cooling coil w/stainless steel drain pan, 99.9 % efficient HEPA final filter section and a discharge plenum. The unit will be provided with insulated, double wall, water tight construction. Acceptable manufacturers are McQuay, Trane, Carrier and York. b. A smoke rated CFM return/relief/exhaust fan will be provided (RF-2). Acceptable manufacturers are McQuay, Trane, Carrier and York. c. Variable speed drives will be provided for both AHU-2 and RF-2. d. The building automation system vendor will provide unit controls. e. For fan sizing purposes, fan external static pressure shall be 3.5 of water column and total loaded filter pressure drop shall be 5.75 of water column. f. Chilled Water Cooling coil cooling coil shall have an entering temperature of 71.4F db/57.5f wb and leaving temp of 55.0F db/51f wb. g. Electric duct reheat coils heating coils shall be provided to heat the air from 55 to 75 deg F. using multi-stage electric resistance. They shall be zoned and located out in the ductwork system. h. Building Automation System Controls: Provide controls to measure supply air flow, modulate the chilled water control valves, step the reheat coil to maintain discharge air temperature based on set point, which is adjusted, based on space relative humidity sensors. 3. Fan Coil Unit FC-1 and FC-2 a. The unit will be designed for indoor installation, hung from above. It will be fitted with 1-30% throw-away pre-filter section, belt driven supply air fan and high efficiency motor, chilled water cooling coil w/stainless steel drain pan and a discharge plenum. The unit will be provided with insulated, water tight construction. Acceptable manufacturers are McQuay, Trane and Carrier. Dunham Associates, Inc. Page 6/8

7 4. Outside/Relief/Smoke Exhaust Air Systems a. All new outside air ductwork will be drawn from the 30 Ø outside air utility duct stub provided at the entrance to the new facility. b. All new relief/smoke Exhaust air will be directed to the 30 Ø relief/smoke exhaust utility duct stub provided at the entrance to the new facility. 5. Exhaust Air Systems a. A 200 CFM constant volume, toilet exhaust fan will be provided to exhaust shower, toilet and janitor rooms. b. An 800 CFM lab hood exhaust fan will be provided. c. A 1000 CFM shop exhaust fan will be provided. d. A 500 CFM general exhaust serving the Physics & Chemistry area will be provided. e. All new lab exhaust will be directed to the 10 Ø exhaust utility duct stub provided at the entrance to the new facility. f. All new toilet exhaust will be directed to the 8 Ø toilet utility duct stub provided at the entrance to the new facility. g. All new general exhaust will be directed to the 16 Ø general utility duct stub provided at the entrance to the new facility. H. SMOKE CONTROL SYSTEM 1. Clean Room Unit AHU-1 (Class 2000) a. Smoke Control: During pressurization mode, the unit shall go to 100% economizer opening to full the outside air intake damper. The mixing damper shall close and the return/exhaust damper shall open fully. b. Smoke Control Dampers: various motorized smoke control dampers and two position VAV boxes within the supply and return ductwork shall modulate as required depending on if the mode is pressurization or exhaust. During exhaust mode, the exhaust air shall be diverted to the Class 2000 AHU return/exhaust ductwork. 2. Clean Room Unit AHU-2 (Class 10000) a. Smoke Control: During pressurization mode, the unit shall go to 100% economizer opening to full the outside air intake damper. The mixing damper shall close and the return/exhaust damper shall open fully. b. Smoke Control Dampers: various motorized smoke control dampers and two position VAV boxes within the supply and return ductwork shall modulate as required depending on if the mode is pressurization or exhaust. During exhaust mode, the exhaust air shall be diverted to the Class AHU return/exhaust ductwork. Dunham Associates, Inc. Page 7/8

8 I. SUPPLY/RETURN VENTILATION SYSTEM 1. Supply and return ductwork shall be galvanized sheet metal. Duct construction for recirculation units shall be designed per SMACNA standards for low-pressure duct systems and medium pressure duct systems for the make-up air-handling unit. Overall duct leakage in supply systems shall be design for less than 5% at 2 WC positive pressure. 2. Supply and return ductwork within the Torus shall be 316/304 stainless steel. Duct construction for recirculation units shall be designed per SMACNA standards for low-pressure duct systems and medium pressure duct systems for the make-up air-handling unit. Overall duct leakage in supply systems shall be design for less than 5% at 2 WC positive pressure. 3. Insulation on air supply and return duct shall be 2 thick, batt insulation. No insulation shall be required on exposed ductwork within the Torus. J. TEMPERATURE CONTROLS 1. Provide DDC control system for HVAC systems on this project. Controls shall be as indicated above and as follows: a. Hardware 1. DDC custom programmable controllers 2. DDC Temperature Sensors (plus or minus 1 degree F accuracy) 3. DDC Relative Humidity Sensors (plus or minus 1% accuracy) 4. Water Control Valves with electronic actuators (Belimo or equal) 5. Motorized dampers with electronic actuators (Belimo or equal). b. Acceptable Equipment Manufacturers: 1. Johnson Controls International. 2. Honeywell 3. Allerton 4. Automated Logic Dunham Associates, Inc. Page 8/8

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

Pharmaceutical Facility Design

Pharmaceutical Facility Design PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the

More information

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. 23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS

PITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY

Cleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY PART I - GENERAL 1.1 SUMMARY A. This section addresses the general requirements for air handling distribution systems, including air handlers, ductwork, ductwork accessories, terminal units, air devices,

More information

DESIGN GUIDELINES SECTION HVAC

DESIGN GUIDELINES SECTION HVAC 3/15/17 Cooling Methodology Chiller Plants Configurations monitoring Preferred DESIGN GUIDELINES SECTION 15700 HVAC Air-cooled chillers < or = 300 tons; water-cooled chillers > 300 tons Variable volume

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems 233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

SHOE PALACE HUNTINGTON PARK M.200

SHOE PALACE HUNTINGTON PARK M.200 M.200 SPLIT SYSTEM CONDENSING UNIT SCHEDULE MARK SERVICE MODEL NO. COOLING DIMENSIONS ELECTRICAL REMARKS CAPACITY AMBIENT DB REFRIGERANT LENGTH WIDTH HEIGHT WEIGHT VOLT/PHASE MCA MOP (MBH) (DEG F) (IN)

More information

DIVISION 23 - HVAC HVAC Air Distribution

DIVISION 23 - HVAC HVAC Air Distribution PART 1 - GENERAL 1.01 GENERAL CRITERIA A. General Design Criteria 1. System standards require that buildings be fully ducted (supply, exhaust and return air). 2. Provide positive exhaust ventilation for

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

DADANCO Technical Paper

DADANCO Technical Paper DADANCO Technical Paper 260 North Elm Street Westfield, MA 01085 Phone: (413) 564-5657 Fax: (413) 568-2969 March 2013 CLASSROOM SOLUTION USING ACTIVE CHILLED BEAMS (Note: This technical paper assumes the

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

EXHAUST FAN SCHEDULE

EXHAUST FAN SCHEDULE DUCTWORK SCHEDULE CONCEALED SUPPLY AIR RECTANGULAR, RTU CONCEALED SUPPLY AIR RECTANGULAR, ERV CONCEALED SUPPLY AIR ROUND, RTU CONCEALED SUPPLY AIR ROUND, ERV EXPOSED SUPPLY AIR ROUND RUNOUTS RETURN AIR

More information

Designing Energy Efficient Outdoor Air Systems

Designing Energy Efficient Outdoor Air Systems Designing Energy Efficient Outdoor Air Systems Joseph Thorndal Applied Products Sales Manager Greenheck, Schofield, Wisconsin 1 Joseph Thorndal BS Industrial Engineering North Dakota State University Work

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Coil Unit with Enhanced Humidity Control

VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Coil Unit with Enhanced Humidity Control VH Series B ENVIRO-STAC Vertical Hi-Rise Fan Unit with Enhanced Humidity Control Motorized Bypass Damper Temperature and Humidity Controller Reheat Control Elastomeric Foam Insulation High Efficiency,

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:

More information

SECTION DUCTWORK

SECTION DUCTWORK SECTION 15890 DUCTWORK PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 07270 - Firestopping and Fire and Smoke Barrier Caulking. 2. 15260 - Vibration Isolation. 3. 15280 - Thermal Insulation (HVAC).

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services Page 238216-1 Copyright 2003 and 2005 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

DIVISION 23 - HVAC HVAC Air Distribution

DIVISION 23 - HVAC HVAC Air Distribution PART 1 - GENERAL 1.01 GENERAL CRITERIA A. General Design Criteria 1. System standards require that buildings be fully ducted (supply, exhaust and return air). 2. Provide positive exhaust ventilation for

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

DCC Commercial. Submittal Data Form. 7½ - 12½ Ton Packaged Air Conditioners Up to 11.3 EER Cooling Capacity: 88, ,000 BTU/h

DCC Commercial. Submittal Data Form. 7½ - 12½ Ton Packaged Air Conditioners Up to 11.3 EER Cooling Capacity: 88, ,000 BTU/h Submittal Data Form Job Name Purchaser Order No. Engineer Unit No. Model No. Unit Designation Performance Data Certified By: DCC Commercial 7½ - 12½ Ton Packaged Air Conditioners Up to 11.3 EER Cooling

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

AIRSIDE COMPONENTS AND SYSTEMS

AIRSIDE COMPONENTS AND SYSTEMS Ventilation: Outdoor air (OA) ventilation shall be introduced into each occupied building space in compliance with ASHRAE Standard 62. Adequate additional OA capability is needed to keep buildings under

More information

Active Chilled Beams. Technical Data Bulkhead-Mounted Concealed Model With Horizontal Coil and Auxiliary Drain Pan

Active Chilled Beams. Technical Data Bulkhead-Mounted Concealed Model With Horizontal Coil and Auxiliary Drain Pan Active Chilled Beams ACB10 Bulkhead-Mounted Concealed (Horizontal discharge) Technical Data Bulkhead-Mounted Concealed Model With Horizontal and Auxiliary Drain Pan APPLICATION CONSIDERATIONS The general

More information

DCC Series. Submittal Data Form. 7½- to 12½-Ton Three-Phase Packaged Air Conditioners Up to 11.3 EER

DCC Series. Submittal Data Form. 7½- to 12½-Ton Three-Phase Packaged Air Conditioners Up to 11.3 EER DCC Series Submittal Data Form Job Name 7½- to 12½-Ton Three-Phase Packaged Air Conditioners Up to 11.3 EER Purchaser Order No. Engineer Unit No. Model No. Unit Designation Performance Data Certified By:

More information

DCC Series. Submittal Data Form. 7½- to 12½-Ton Three-Phase Packaged Air Conditioners

DCC Series. Submittal Data Form. 7½- to 12½-Ton Three-Phase Packaged Air Conditioners DCC Series Submittal Data Form Job Name Purchaser Order No. Engineer Unit No. Model No. Unit Designation Performance Data Certified By: 7½- to 12½-Ton Three-Phase Packaged Air Conditioners Up to 11.3 EER

More information

Modular Active. Chilled. Beams

Modular Active. Chilled. Beams Modular Active Chilled Beams How Twa MAC Beams Work Primary air (100% outside air) is dehumidified to between 50-57 F dew point and is used to: control the latent requirements of the space, provide fresh

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

Mechanical Inspection Plumbing

Mechanical Inspection Plumbing 0811 Fixtures Sinks, drinking fountains, water closets, showers, etc. Classroom Sinks. Classroom sinks (19) are enameled cast iron self rimming side ledge with gooseneck faucet trim with index handles,

More information

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents for mechanical and plumbing systems. 2.0 General Requirements A. Warranty and Guarantee 1. Specifications

More information

62DA,DB,DC,DD,DE,DF07-38

62DA,DB,DC,DD,DE,DF07-38 62D-3SB 62DA,DB,DC,DD,DE,DF07-38 DEDICATED VERTICAL OR HORIZONTAL 100% OUTDOOR AIR UNIT PERFORMANCE DATA UNIT DIMENSION PRINTS ACCESSORY DIMENSION PRINTS Copyright 2011 Carrier Corporation Syracuse, New

More information

AIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.

AIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork. SECTION 15855 AIR HANDLING UNITS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15885 - Air Filtration Equipment. 3. 15890 - Ductwork. 1.02 REFERENCES A. Air Moving

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

BUILDING DESIGN STANDARDS. AIR CONDITIONING DIVISION 23 Heating, Ventilation and Air Conditioning

BUILDING DESIGN STANDARDS. AIR CONDITIONING DIVISION 23 Heating, Ventilation and Air Conditioning Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or

More information

Architectural Engineering Senior Thesis Mechanical System Redesign

Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

Ventilation for New Low-Rise Residential Buildings July 20, 2015

Ventilation for New Low-Rise Residential Buildings July 20, 2015 Ventilation for New Low-Rise Residential Buildings July 20, 2015 BSC Standard 01 2015 Building Science Corporation 3 Lan Drive, Suite 102 Westford, MA 01886 www.buildingscience.com Contents 1. PURPOSE...3

More information

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used by

More information

TECHNICAL REPORT 3: Mechanical Systems and Existing Conditions. Michael Morder Mechanical Option Advisor: Dr. William Bahnfleth

TECHNICAL REPORT 3: Mechanical Systems and Existing Conditions. Michael Morder Mechanical Option Advisor: Dr. William Bahnfleth TECHNICAL REPORT 3: Mechanical Systems and Existing Conditions Michael Morder Mechanical Option Advisor: Dr. William Bahnfleth INOVA South Patient Tower Falls Church, VA November 16, 2011 Table of Contents

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.

More information

THE RIGHT SPEC. RIGHT NOW.

THE RIGHT SPEC. RIGHT NOW. THE RIGHT SPEC. RIGHT NOW. 6-12.5 TONS R7DA Gas/Electric Packaged DOAS System MADE FOR THOSE WHO RESPECT THE SPEC. Reznor light commercial packaged rooftops are highly configurable at the factory, so consultant

More information

Modular Supply Make-Up Air Unit

Modular Supply Make-Up Air Unit Modular Supply Make-Up Air Unit Model MSX Flexible Design Factory Assembled Heating Options Hot Water Steam Electric Cooling Options Evaporative Direct Expansion Chilled Water November 2009 Product Features

More information

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March GENERAL: 1. This section provides criteria for the design and installation of air handling units. DESIGN GUIDELINES: Design General 1. Location 1.1. For new construction, and existing buildings where possible,

More information

1. Use air systems in combination with perimeter radiation. Perimeter radiation shall be capable of being operated independent of the air system.

1. Use air systems in combination with perimeter radiation. Perimeter radiation shall be capable of being operated independent of the air system. DIVISION 23 00 00 23 01 00 OPERATION AND MAINTENANCE OF HVAC SYSTEM Page 1 of 12 23 01 00 OPERATION AND MAINTENANCE OF HVAC SYSTEM 23 01 01 GENERAL REQUIREMENTS General System Design 1. Use air systems

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

Scholar III Unit Ventilator

Scholar III Unit Ventilator Scholar III Unit Ventilator 800 to 2000 CFM Models SVI 1000-2000 General Description The Scholar III unit ventilator is designed to provide comfortable, quiet and efficient heating and cooling for school

More information

TYPICAL CPA SPECIFICATIONS

TYPICAL CPA SPECIFICATIONS TYPICAL CPA SPECIFICATIONS 4/10/2017 UNIT CONSTRUCTION: Casing: The exterior casing of the unit shall be constructed of 18-gauge, G235 galvanized steel (optional stainless steel or aluminum), unpainted.

More information

Hood Depot Internatioonal, Inc., Phone S. Powerline Road, Deerfield Beach, FL

Hood Depot Internatioonal, Inc., Phone S. Powerline Road, Deerfield Beach, FL The Kitchen Cool by Hood Depot is a conditioned make up air unit design with flexibility, form and function kept in mind. Our unit offers a variety of configurations that allow the customer to customize

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise Modular Climate Changer Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise Modular Climate Changer Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 08:50:16 AM Job Name: EarthWise Modular Climate Changer Full Spec Location: Any Town, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SUBMITTALS Submittals

More information

Standards and Guidelines. Presented by: Aric Murray December 12, 2014

Standards and Guidelines. Presented by: Aric Murray December 12, 2014 TDSHS Ventilation Standards and Guidelines Presented by: Aric Murray December 12, 2014 Agenda 1. What are the TDSHS ventilation 1. What are the TDSHS ventilation requirements? 2. Pressure relationships.

More information

PLUMBING REQUIREMENTS

PLUMBING REQUIREMENTS PLUMBING REQUIREMENTS This handout is a compilation of the standard requirements based on the State Plumbing Code and City Ordinance for projects of this type. This information sheet does not contain all

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

Description of All Alternatives Considered-

Description of All Alternatives Considered- Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 22 40 00 - PLUMBING FIXTURES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Faucets for lavatories, bathtubs, bathtub/showers, showers and sinks. 2. Flushometers. 3. Toilet

More information

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.0 GENERAL SECTION 15740 SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.01 DESCRIPTION Item A. Scope This section specifies four sizes of fan coil units designed for hydronic heating and air conditioning.

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

TECHNICAL CRITERIA THE PLACE TO SHOP SCOTTSDALE FASHION SQUARE

TECHNICAL CRITERIA THE PLACE TO SHOP SCOTTSDALE FASHION SQUARE TECHNICAL CRITERIA THE PLACE TO SHOP ADDENDUM LOG May, 2008 Entire Criteria Manual February, 2009 Full Layout/Content Revision May, 2009 Revision of full update June, 2009 Revision to current Technical

More information

IAQ Building Education and Assessment Model (I-BEAM)

IAQ Building Education and Assessment Model (I-BEAM) Heating, Ventilation, and Airconditioning (HVAC) Text Modules IBEAM IAQ in L... http://www.epa.gov/iaq/largebldgs/ibeam/text/hvac.html Page 1 of 6 10/21/08 IAQ in Large Buildings http://www.epa.gov/iaq/largebldgs/ibeam/text/hvac.html

More information

Mechanical Compliance Certificate

Mechanical Compliance Certificate COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Austin, Texas 2a (weather data: TBD) New

More information

Alpha Aire. Dedicated Outdoor Air System, VAV, Air-Source Heat Pump with Energy Recovery. Engineering Guide Effective February 2018

Alpha Aire. Dedicated Outdoor Air System, VAV, Air-Source Heat Pump with Energy Recovery. Engineering Guide Effective February 2018 Alpha Aire Dedicated Outdoor Air System, VAV, Air-Source Heat Pump with Energy Recovery Engineering Guide Effective February 018 CONTENTS PRODUCT FEATURES.......................... OPTIONS.....................................

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

Q-TEC QC-Series Chilled Water Air Conditioner

Q-TEC QC-Series Chilled Water Air Conditioner Cooling Capacities: 13,3 to 49,3 BTUH (Based on EWT, GPM & CFM) Q-TEC QC-Series Chilled Water Air Conditioner The Q-TEC Series self-contained packaged chilled water air conditioner is designed to be installed

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

General Catalogue. FORM SSI - G.C (94)

General Catalogue. FORM SSI - G.C (94) FORM SSI - G.C (94) www.ssi.co.ir General Catalogue INDEX 09CDF 16DNS 16DES 16JBP 16JBP Air Cooled Condenser Air Cooled Condenser Absorption Chiller Double Effect Direct Fired Absorption Chiller Double

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS Single Package Rooftop Gas Heating/Electric Cooling Unit Two Stage Cooling Capacity Control with Puronr (R---410A) Refrigerant Sizes: 17, 20, 24, 28, 30 Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION

More information

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc. System Components with ` Emphasis on Packaged Rooftop Application and Installation Jerry Cohen President Jacco & Assoc. Agenda Define and relate in practical terms the following components: System Effect

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems. 15855 AIR HANDLING UNITS SPECIFIER: CSI MasterFormat 2004 number: 237313 PART 1 GENERAL 1.1 SUMMARY A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution

More information

Temperature. In the HVAC area, we talk about two kinds of temperatures.

Temperature. In the HVAC area, we talk about two kinds of temperatures. HEATING and COOLING HEATING and COOLING PSYCHROMETRIC CHART Temperature In the HVAC area, we talk about two kinds of temperatures. One is called dry bulb (DB) temperature, a fancy name for the reading

More information

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000

Dates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000 Executive Summary The Milton S. Hershey Medical Center Academic Support Building is located on The Pennsylvania State University's campus in Hershey, PA. The building is owned by The Pennsylvania State

More information

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio

TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare

More information

DCG Commercial. Submittal Data Form

DCG Commercial. Submittal Data Form DCG Commercial Submittal Data Form 15-25 Tons Packaged Gas / Electric Units 15 Tons Cooling Capacity: 180,000 BTU/h 20 Tons Cooling Capacity: 240,000 BTU/h 25 Tons Cooling Capacity: 290,000 BTU/h 15 Tons

More information

DCC Series. Submittal Data Form 15- & 20-TON, THREE-PHASE PACKAGED AIR CONDITIONERS UP TO 11 EER

DCC Series. Submittal Data Form 15- & 20-TON, THREE-PHASE PACKAGED AIR CONDITIONERS UP TO 11 EER DCC Series Submittal Data Form Job Name Purchaser Order No. Engineer Unit No. Model No. Unit Designation Performance Data Certified By: 15- & 20-TON, THREE-PHASE PACKAGED AIR CONDITIONERS UP TO 11 EER

More information