Element Z General Design Requirements Existing Facilities Information
|
|
- Clinton Lang
- 6 years ago
- Views:
Transcription
1 Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical design criteria related to general building components, requirements for preparation of Project Manuals, and for additional MD Anderson standards and other requirements. C. Refer to the Owner s Master Construction Specifications for product and construction execution requirements. D. Information provided within this document is intended to familiarize the A/E with the facility. The A/E must field verify existing conditions that are relevant to the project. PART 2 - BUILDING OCCUPANCY 2.01 OVERVIEW A. The Charles M. LeMaistre Clinic building is number 100P, the building is designed to house clinical space. PART 3 - EXISTING SYSTEMS AND ASSEMBLIES 3.01 ARCHITECTURAL AND GENERAL CONSTRUCTION A. The Charles M. LeMaistre Clinic building was constructed in The present twelve story building contains approximately 169,605 gross square feet and is built with steel reinforced concrete pan structure. B. Due to a mismatch in coordinating floor levels with Love Clinic, the LeMaistre Building does not have a named fourth floor; which would be called Level 5 since the Ground floor is named as Level one with the first floor named as Level 2 and so on STRUCTURAL SYSTEMS A. The floor to floor heights as follows: 1. Basement to Level 1: 15' 2. Level 1 - Level 5: Level 5 to Level 6: 13-6' 4. Level 6 to Level 7: Level 8 - Level 12: 13 ODG OF 6
2 Charles M. LeMaistre 6. The building s penthouse is located at Level 12. B. The depths of the reinforced concrete beams vary from 18 to 36 inches with the majority of beam depths measuring between 24 and 30 inches from the top of the floor slab FIRE SUPPRESSION SYSTEMS A. The building utilizes a wet pipe system PLUMBING SYSTEMS A. Water Distribution System: 1. Domestic water connects to a water softener system that provides soft water for make-up to the building hot water systems and the building chilled water system. Two redundant 100 percent capacity domestic hot water heaters located in the basement utilize low pressure (15psig) steam. There are five (5) electric, 6 gallon capacity hot water heaters rated at 3 kw each. B. Sanitary System: 1. The sanitary system drains through an 8 inch sanitary sewer pipe exiting the building through a wall penetration located at the northwest corner of the basement. A sanitary sewer ejector pump transfers waste from the basement sanitary sewer piping. C. Storm System: 1. There are three 8 inch storm drain risers that connect to a twelve (12) inch storm sewer that exits the northeast corner of the basement toward MD Anderson Boulevard. This building drains by gravity except for the basement. 2. There is a sump pump which serves the sub-soil drainage system located in the basement mechanical room. The 12 inch pipe size is adequate for the present building function. The piping material is cast iron. One duplex storm sump pump station is located in the basement of the building. D. High Purity Water System: 1. Not located or routed through this building. E. Medical Vacuum System: 1. The medical vacuum system utilizes four vacuum pumps. Two redundant vacuum pumps are used for purely medical service, and the remaining two redundant vacuum pumps are used for medical evacuation of anesthesia gases serving the clinic areas. The piping is copper. F. Lab Vacuum System: 1. The lab vacuum system has two redundant vacuum pumps serving the clinic areas. The piping is copper. ODG OF 6
3 Charles M. LeMaistre G. Medical Air System: 1. The medical air compressor is a duplex system consists of two (2) oil free compressors located in the basement mechanical room. The piping used on the medical air system is copper. H. Oxygen Gas System: 1. Oxygen tap is located north of the Clark Clinic building and is routed through Love Clinic via a ¾ inch copper distribution piping to the LeMaistre clinic s patient treatment rooms. I. Natural Gas System: 1. No natural gas in the building HVAC AND INTEGRATED AUTOMATION SYSTEMS A. Chilled Water System: 1. The LeMaistre building is supplied chilled water from TECO. Ten inch supply and return chilled water pipes from TECO are routed from the basement of the Love Clinic to basement of the LeMaistre Building. 2. TECO chilled water circulates through three (3) plate and frame heat exchangers to transfer heat from the building s chilled water system. The redundant pumps and the plate and frame heat exchangers are sized for 50 percent capacity of the system design cooling load requirement. 3. Two piping risers distribute chilled water to the stacked mechanical rooms located on the south side of the building. B. Steam System: 1. The LeMaistre building is supplied with high pressure steam from TECO. The high pressure (250psig) steam supplied by TECO is reduced to (70 psig) medium pressure steam by pressure reducing station located in this building's for mechanical equipment rooms. The low pressure steam is provided to the building s water heaters, and medium pressure (28 psig) steam preheats coils. Steam condensate is returned to TECO from two condensate receiver units. 2. The building has two redundant hot water pumps and tube shell heat exchangers each sized for 100 percent capacity of the buildings system design heating load requirement. C. Air Handling System: 1. Mechanical rooms are located in the basement, on Level 4, and on the roof in the penthouse structure. 2. The mechanical room in the basement contains two dual duct VAV air handlers with chilled water coils and hot water heating coils and fan-coil units. Two outside air pretreatment units are connected respectively with the dual duct air handlers. The ODG OF 6
4 Charles M. LeMaistre pretreatment units are equipped with two rows of chilled water cooling coils and steam pre-heat coils. 3. The two (2) dual duct air handlers serve separate floors. AHU B-1 provides conditioned air for Levels 1, 4, 5 and 6. AHU B-2 serves Levels 1, 2 and 3. AHU P-1 provides conditioned air for Levels 7, 8, and 9 and AHU P-2 serves Level The mechanical room in the Penthouse Level 11 contains two (2) dual duct VAV air handlers, outside air pretreatment units and fan coil units. The air handling units in the penthouse are arranged the same as those in the basement. The pedestrian bridges are served by fan-coil units. 5. Three (3) new secondary (building) side chilled water and two (2) new hot water pumps are located on Level 4, above the 500-year flood elevation. The three (3) primary chilled water pumps and the three (3) frame plate heat exchangers remain in the basement. A new control air compressor is located on Level 4 to supply air HVAC system control panels and control valves. 6. Computer room air handling units are located in rooms CS02.018, CS02.037, CS02.047, and CS These units use chilled water for the cooling medium and have electric heating coils. The humidifier is an infrared type. D. Exhaust and Relief Air Fans: 1. General exhaust air fan EFP-1 serves the basement, and Level 1 through Level 6 and EFP-2 serves Level 7 through Level This building has a stairwell pressurization fan and it also has a smoke removal fan that serves the basement up to Level ELECTRICAL SYSTEMS A. Normal Power System: 1. Main power boards are located in the basement, however, the power distribution and lighting panels required for normal operations are located on Level 2. B. Emergency Power System: 1. All emergency power and power distribution panels associated life safety are located on Level 2. C. Fire Detection and Alarm System: 1. Fire detection from ceiling smoke detectors and smoke detectors located in each of the HVAC systems serving the clinic COMMUNICATION SYSTEMS A. Fire alert audible alarms and nurse call systems. ODG OF 6
5 Charles M. LeMaistre 3.08 EXTERIOR IMPROVEMENTS AND LANDSCAPING A. None at this time CIVIL/SITE UTILITIES A. TECO Chilled Water, TECO Steam, City of Houston potable water, and sewer, electrical power, and communications telephone, and cable. PART 4 - PROPOSED SYSTEM CONCEPTS 4.01 OVERVIEW A. New controls are to be fully electronic with electronic sensors, thermostats, and electric actuators for terminal units, valves, and isolation and control air dampers to interface with the Siemens Apogee BAS. PART 5 - PRODUCTS 5.01 OVERVIEW A. Equipment Components: 1. To meet FEMA flood requirements, all electrical panels, medical air, vacuum pumps cold and hot domestic water pumps, and domestic hot water heaters are new and located in rooms above the basement of the building DIVISION 09 FINISHES A. Refer to Interior Finishes Standards DIVISION 22 PLUMBING 5.04 DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING 5.05 DIVISION 25 INTEGRATED AUTOMATION 5.06 DIVISION 26 ELECTRICAL ODG OF 6
6 Charles M. LeMaistre PART 6 - EXISTING DOCUMENTATION 6.01 OVERVIEW A. Design Guideline Elements, Master Construction Specifications, and other supplemental resources needed for design may be downloaded from MD Anderson s Facilities Management internet website at the following address 6.02 DRAWINGS 1. A. Request existing construction drawings and project as-built drawings from Capital Planning and Management, Data Management Group. B. For facilities located within the Main Building 1515 Holcombe Boulevard, note the floor Level designation is originally noted as ground, Level 1, etc. All floors are now designated as Level 1, Level 2, etc STUDIES A. Heat Recovery Chiller Feasibility Study dated May PART 7 - DOCUMENT REVISION HISTORY Issue Date Revision Description Reviser Initial Adoption of Element Rev. 1 Rev. 2 Rev. 3 Rev. 4 Rev. 5 END OF ELEMENT ODG OF 6
Element Z General Design Requirements Existing Facilities Information
PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical
More informationDIVISION 23 - HVAC HVAC
DIVISION 23-23 00 00 PART 1 - GENERAL 1.01 GENERAL CRITERIA A. The heating system typical set point shall be 70 F inside. 1. The winter outdoor design temperature for most systems shall be -6 F. 2. The
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationCENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN
Page 1 of 11 CENTRAL STATE HOSPITAL PLAN SUBJECT: PLANT OPERATIONS UTILITIES MANAGEMENT PLAN ANNUAL REVIEW MONTH: RESPONSIBLE FOR REVIEW: March CSH Safety Officer LAST REVISION DATE: November 2003 I. SCOPE:
More information21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device
DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity
More informationDESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES
2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationA. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.
SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationMechanical System Description
1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure
More informationElement D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section includes criteria for the design of building heat generating systems including all isolation valves and steam piping and fittings, steam specialties, control
More informationElement D Services Electrical
PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as a Specification.
More informationProject Description Clinical Research Building (CRB) Animal Area Renovation
Table of Contents INTRODUCTION... 3 PROJECT OVERVIEW... 4 CONSTRUCTION SYSTEMS AND ASSEMBLIES... 10 SPECIAL ISSUES AND CONSIDERATIONS... 19 PRODUCTS... 20 Issued: June 22, 2012 1 OF 24 Issued: June 22,
More informationRE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana
ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum
More informationSITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)
SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply
More informationTechnical Assignment 3
0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative
More informationFAARM-Underground Facility. Conceptual Design Review. Mechanical Systems. Dunham Associates, Inc.
FAARM-Underground Facility Conceptual Design Review Mechanical Systems Prepared by: Dunham Associates, Inc. April 17, 2012 Dunham Project Number: 0412145-000-00 Dunham Associates Inc. Page 1 of 8 Mechanical
More information1.1 This section applies to air handling units for HVAC Systems.
AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling
More informationArchitectural Engineering Senior Thesis Mechanical System Redesign
Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency
More informationExisting Mechanical System Operation
majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationDOCUMENT TABLE OF CONTENTS
DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026
More informationSCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE
SCHEDULE OF S Penalty Fees. The fee for construction work performed before securing permit(s), where required, may be charged a fee of TWO TIMES THE COST OF THE PERMIT (S). Building Fee Schedule Residential
More informationTechnical Report Three
Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3
More informationElement D Services Heating, Ventilating, and Air Conditioning
Air Handling Distribution PART 1 - GENERAL 1.01 OVERVIEW A. This section describes criteria for design of facility air handling distribution systems, including air handlers, ductwork, ductwork accessories,
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationCleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY
PART I - GENERAL 1.1 SUMMARY A. This section addresses the general requirements for air handling distribution systems, including air handlers, ductwork, ductwork accessories, terminal units, air devices,
More informationTechnical Assignment 3 11/15/04. Executive Summary
Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria
More informationCharter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department
Charter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department 1. CONSTRUCTION PERMIT FEES: A. General: Fee basis/value of construction shall be determined
More informationS AGE E NGINEERING A SSOCIATES, LLP
S AGE E NGINEERING A SSOCIATES, LLP 1211 Western Avenue Albany, NY (518) 453 6091 F (518) 453 6092 Kingston Library Mechanical and Electrical Systems Field Report Date of Visits: Mechanical - September
More informationVirginia Tech Standards for Building Automation System
March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia
More informationHEAT GENERATION 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. B. Section HVAC Basic Materials and Methods
230520 HEAT GENERATION Cornell s Design and Construction Standards provide mandatory design constraints and acceptable or required products for all construction at Cornell University. These standards are
More informationSECTION : MEPS IDENTIFICATION & LABELING
SECTION 01 70 10: MEPS IDENTIFICATION & LABELING 1. GENERAL A. The intent of this section is to define the labeling and identification requirements for building mechanical, electrical, plumbing, and specialty
More informationCook - Wissahickon Elementary School
Cook - Wissahickon Elementary School 201 E. Salaignac St., Philadelphia, PA 19128 HVAC Replacement Project Scope Determination Report May 10, 2018 Prepared by: G.P. Lamina, Jr., P.E., MBA School District
More informationDemonstration and Training of MEP Systems Page 1 of 15
Page 1 of 15 Last Update: May 17, 2018 A. General: 1. Demonstrations and Training of various MEP and other systems is very important to BSU Facilities, especially on new building or major renovation projects.
More informationSECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS
SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from
More informationTighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance
Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December
More informationSenior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1
Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9
More informationCONNECTICUT. Downloaded
Housekeeping/Laundry/Maintenance J. Laundry. CONNECTICUT Downloaded 01.15.11 (1) This service, if provided, shall be used exclusively for laundry and shall be remote from resident and food service areas,
More informationSECTION INSPECTION AND TESTING OF WORK
SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section
More informationAndrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3
Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located
More information4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.
From: Jian Zhang Sheet: 1 of 8 Date of Visit: 12/7/10 Coach House: Plumbing Systems b) All original building storm piping shows significant signs of aging. b) All original building sanitary piping shows
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationD. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:
PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of Sam Houston State University for the design and construction of standpipe systems to include combination standpipe
More informationFacility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building
Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6
More informationAppendix B. Facilities Assessment Report
Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates
More informationDates of Construction Construction Start 2/28/1999 Date of Completion 4/2000 Occupancy 5/2000
Executive Summary The Milton S. Hershey Medical Center Academic Support Building is located on The Pennsylvania State University's campus in Hershey, PA. The building is owned by The Pennsylvania State
More information$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition
2015 SCHEDULE COMMUNITY DEVELOPMENT DEPT. ENGINEERING PLAN REVIEW Single Family New Construction All Other Plan Reviews Minimum Engineering Fee Planned Unit Development - PUD: Step #1: Step #2: See Site
More informationPITTSBURG STATE UNIVERSITY. HVAC and BUILDING AUTOMATION SYSTEM STANDARDS
PITTSBURG STATE UNIVERSITY HVAC and BUILDING AUTOMATION SYSTEM STANDARDS CHILLERS In new construction, liquid-cooled models are preferred for systems larger than 100 ton. o Trane, York and McQuay brands
More informationElement D Services Electrical ODG010107
Element D Services Electrical ODG010107 D5090 Other Electrical Systems Part 1. General This section includes design standards and requirements for other electrical systems. This is a design standard and
More informationAppendix 13. Categories of Cooling and Heating systems
EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01
More informationCHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES
CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES Where to Install Pipe Temperature Sensors for Freeze Protection 1 WHICH PIPES SHOULD I MONITOR FOR FREEZE
More informationPackaged Semi-Instantaneous Steam Fired Water Heater
MODEL STX Packaged Semi-Instantaneous Steam Fired Water Heater Shell and Tube Style Heater Features Reliable Only high grade materials used in construction to ensure long operating life Heat exchange pressure
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationTechnical Assignment 1
0 Technical Assignment 1 ASHRAE Standard 62.1 Ventilation and Standard 90.1 Energy Design Evaluations Compliance Analysis David H. Koch Institute for Integrative Cancer Research Massachusetts Institute
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More informationUniversity of Houston Master Construction Specifications Insert Project Name
SECTION 23 05 93 - TESTING, ADJUSTMENT AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationFLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK
FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated
More information9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A
Nicholas Thornton, CEM 1 Overview Today s Goals Introductions HVAC Electrical Technology Q&A 2 1 Today s Goals An overview, a crash course Maybe a few tangents (ASK QUESTIONS!) Show typical arrangements
More information2016 Plumbing Supplemental Plan Review List
Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Plumbing Supplemental Plan Review List POTABLE WATER SYSTEM P1. Specify which fixtures are for private use and which are for
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationGeneral Catalogue. FORM SSI - G.C (94)
FORM SSI - G.C (94) www.ssi.co.ir General Catalogue INDEX 09CDF 16DNS 16DES 16JBP 16JBP Air Cooled Condenser Air Cooled Condenser Absorption Chiller Double Effect Direct Fired Absorption Chiller Double
More informationTechnical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: ,
Purpose 355 West Queens Road Technical Criteria for District Energy Ready Buildings Master Requirement ENG 108 Building Department: 604-990-2480, building@dnv.org The purpose of this document is to provide
More informationAlex Masterton, PE Electrical Engineer Reviewer AHCA Neal Boothe, PE Electrical Engineer/Principal
Alex Masterton, PE Electrical Engineer Reviewer AHCA Neal Boothe, PE Electrical Engineer/Principal FBC 419.3.15.6 All low-voltage system main or branch circuits entering or exiting the structure shall
More informationC13-Series Engineering Guide
Engineering Guide Effective January 2018 Horizontal Air-Cooled, Water-Cooled, Chilled Water and Heat Pump Contents Product Features............................... 3 Product Options................................
More informationAHU Air Handling Unit Fundamentals. j.ilangumaran
AHU Air Handling Unit Fundamentals j.ilangumaran Objectives Review primary components of an AHU Understand the basic progression and advantages of advanced AHU control Understand the basic control sequences
More informationDesign & Construction Standards, Revised January
PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for the design and construction of standpipe systems to include combination standpipe
More informationTopic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline
ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces
More informationCUFFED FAST-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY
TM READ AND SAVE THESE INSTRUCTIONS CUFFED FAST-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY INSTALLATION AND ASSEMBLY INSTRUCTIONS Fig. 1 Flex connectors (by PURE) AHU/duct casing Injection tube Stainless
More informationNC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements
1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents for mechanical and plumbing systems. 2.0 General Requirements A. Warranty and Guarantee 1. Specifications
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationSECTION Heating, Ventilation & Air Conditioning CONSTRUCTION STANDARDS
PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University for Heating, Ventilating, and Air Conditioning (HVAC). B.
More informationNYC Department of Education
Asset: P.S. 92 - BROOKLYN, 601 PARKSIDE AVENUE, New York, 11226 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-13 8:31 AM 2017-11-27 11:43 AM Asset Data Are there fuel tanks?
More informationNYC Department of Education
Asset: P.S. 310 - BRONX, 260 WEST KINGSBRIDGE RD, New York, 10463 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-12-07 8:42 AM 2017-12-13 12:31 PM Asset Data Are there fuel tanks?
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationVentilation System Description. September 8, 2000 HETA
September 8, 2000 HETA 99-0250 Harry Enoch, Ph.D. Director, Environmental Health and Safety University of Kentucky 252 East Maxwell Street Lexington, KY 40506-0314 Dear Dr. Enoch: On June 7, 1999, the
More informationAIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems
233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section
More informationSECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL
SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationFHCRC/SCCA Facility Design Manual
Number Div Title Buildings Comment Documents ARCHITECTURAL 810 02 Landscaping Rain Water Sensor: Include rain water sensor feature to reduce unnecessary water use. 000 04 Masonry Chases: chases shall be
More informationMECHANICAL SERVICES 101. Ian White
MECHANICAL SERVICES 101 Ian White Contents 1. Ventilation 2. Heat Gains & Losses 3. Heating Ventilation Air Conditioning (HVAC) Systems What are Building Services Building Services incorporate all aspects
More informationMOUNT MIGUEL COVENANT VILLAGE - EMERGENCY PREPAREDNESS PROGRAM SECTION G: DISASTER RECOVERY PLAN
MOUNT MIGUEL COVENANT VILLAGE - EMERGENCY PREPAREDNESS PROGRAM SECTION G: DISASTER RECOVERY PLAN October 2017 DISASTER RECOVERY PLAN TABLE OF CONTENTS Recovery Plan Overview... Damage and Operational Assessments...
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationNYC Department of Education
Asset: P.S. 29 - STATEN ISLAND, 1581 VICTORY BLVD, New York, 10314 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-10 11:28 AM 2018-01-17 11:37 AM Asset Data Are there fuel tanks?
More informationTechnical Report #3 Mechanical Systems Existing Conditions Evaluation
Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents
More informationINSTY-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY
Read and Save These Instructions Sheet No. EMIP INSTY-PAC EXTERNAL MOUNT MULTIPLE TUBE ASSEMBLY INSTALLATION AND ASSEMBLY INSTRUCTIONS Fig. 1 Tube support AHU/duct Injection tube Typ. centers Flexible
More informationCxA to Answer this Section
EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place
More informationState College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationEADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationIntroduction to Supermarket Vacuum Condensate Drainage Systems by AcornVac, Inc.
What is Vacuum Drainage? Vacuum Condensate Drainage Systems are simply a viable alternative to underground piping that uses the combined energies of vacuum pressure and gravity for the collection and disposal
More informationBuilding Automation System (BAS) Design Criteria
25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate
More informationJob Name Control Systems Description Date
Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In
More informationCOMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:
Planning/Building Department 115 Ramsdell Street Fircrest WA 98466 (253) 564-8902 COMMERCIAL PERMIT APPLICATION AND CHECKLIST Depending on the scope of your project, the following submittal requirements
More informationNYC Department of Education
Asset: P.S. 69 - STATEN ISLAND, 144 KEATING PLACE, New York, 10314 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-19 8:39 AM 2018-01-23 4:33 PM Asset Data Are there fuel tanks?
More informationMadeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)
Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085
More informationCultivator & Hybrid Cultivator
Cultivator & Hybrid Cultivator Precision Temperature & Humidity Packaged Unit INTRODUCTION The Cultivator Series package unit is the industry s MOST ENERGY EFFICIENT and HIGHEST capacity dehumidifier on
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationNORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan
NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan PBA Project No. 2014.0137.00 Prepared By: Wayne Kerbelis Terry Cleis September
More informationSubmitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas
More information