1 Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks
2 How much is too much? Most buildings can cut total energy use by 5-30% while fully maintaining or improving both comfort and function Energy/Facilities Connections
3 Better Building Performance Ways to Improve and Maintain Building Performance Da aily Enhanced O&M Expand routine actions and practices Adopt preventative maintenance routines Improve and sustain building performance over time Lock-in gains made through other activities Pe eriodic Building Tune-Up Equipment Replacement Improve systematic problem diagnosis Identify and implement cost-effective operational improvements and equipment fixes Prudent upgrades to building infrastructure to improve efficiency Capture benefits of new technologies Align equipment assets with anticipated tenant needs
4 The Tune-Up Process The steps in a building tune-up are: Assemble the project team Complete basic maintenance Review data Interview occupants and building engineers Conduct the initial on-site inspection Diagnose performance problems Make an action plan
5 BetterBricks.com
6 Common Opportunities: The Top Four
7 Top Four Opportunity Areas for a Building Tune-Up Equipment Scheduling Sensor Error Simultaneous Heating and Cooling Outside Air Usage
8 Equipment Scheduling The easiest way to save equipment energy is to turn it off! Also, longer operating hours : Result in shorter equipment life Increase the frequency of parts replacement Cause the need for more frequent cleaning (chiller bundles, boiler tubes, fan coils, etc.) A good first step is to walk through the building when it is unoccupied.
9 Lighting and Plug Load Scheduling Some things to look for: Does the custodial staff turn off lights after hours as they go through the building? Does a lighting g time clock account for weekends and holidays? Do the lights actually turn off as programmed? Have special event schedules been reprogrammed back to normal? Is there a system in place to make sure computer power saving modes are enabled?
10 HVAC Load Scheduling Do programmed schedules for fans, pumps and other equipment match requirements? (and is the schedule being implemented?) Is optimum start and stop programming being used? If fan-powered boxes or baseboards can operate independently from the air handler, are they yprogrammed to match occupancy? Do the chiller and boiler have lockouts based on outside air temperature? Are the chiller and boiler prevented from operating at the same time? Are DHW circulating pumps scheduled d off?
11 Sensor Error Calibration Critical control sensors should be calibrated at least twice a year Incorrectly placed Failed
12 Sensor Error Critical control sensors include: Mixed air temperature Return air temperature Outside air temperature Supply air temperature Chilled water temperature Hot water temperature Carbon dioxide Sensor Issues in Disguise Loads not met Economizer not working Equipment on when not needed Simultaneous heating and cooling
13 Case Study: County Office Building 141,000 sqft High usage EUI of kbtu/sqft 20% over expected VAV rooftop air handling units 3 water-cooled chillers / hydronic reheat In-house staff with maintenance outsourced
14 Case Study: County Office Systems operating 24/7 to maintain comfort Duct static difficult to maintain at peak Chiller operation all year Boiler operation all year Numerous cold draft complaints Discharge air cannot reach 55 F Full economizer at 81 F ambient Perimeter heating on at 55 F ambient Major finding: 6 F difference in mixed vs. OSA at 100% economizer mode
15 Case Study: County Office Energy Recommendations Calibrate temperature sensors Optimize discharge air reset schedules Implement On/Off scheduling and lockout of chillers and boilers Reinitiate heat recovery chiller operation Modify mixed air control Go back to reset of chilled water supply temp.
16 Case Study: County Offices Tune-Up Results Annual savings of 1.1 Million kwh Annual savings of 30,800 therms Capital cost of $600 Investigation cost of $5, year payback Very happy building owner
17 Simultaneous Heating and Cooling Two examples: Supply air temperature is lower than it needs to be causing more reheat A water control valve is leaking, allowing hot and cold water to mix Equipment capacity is lowered, occupants are uncomfortable, energy use increases and maintenance increases.
18 Outside Air Usage Economizers = Free cooling But: If you have one, it s probably not working! Failed outside air sensor Incorrect thermostat Incorrect control logic Broken linkages Etc.
19 Outside Air Usage Other typical problems with outside air Minimum ventilation rate never adjusted for a change in occupancy Minimum ventilation rate is set by damper positions rather than by measured air flow Damper leaks when closed during unoccupied times CO2 sensor is improperly located
20 Digging Deeper Check out the BetterBricks Symptom Diagnosis Tool BetterBricks.com
21 Symptom Diagnosis Tool Currently list contains 68 symptoms each related to one or more of 11 systems, e.g., chillers, cooling towers or air distribution Symptom points to the possibility of an energy performance problem Symptoms could be observed by building operators or a contractor responsible for operations and maintenance, such as: o Boiler starts and stops frequently o Chiller operates when outside air temperature is low o Equipment operates during unoccupied hours o Exterior doors are hard to open or don't close securely o Mixed-air temperature is near outside-air temperature during heating mode o Return and/or exhaust fan does not shut off with supply fan o Space is too warm or cool o Static pressure in duct varies significantly during occupied hours o Supply-air temperature is high during warm weather o VSD does not vary the discharge-air fan speed
22 Example : MAT near OSAT while system in heating mode If the system is working properly, the Mixed Air Temperature (MAT) should normally be closer to the Return Air Temperature (RAT) (which is warmer) than to the Outside Air Temperature (OSAT). A depressed MAT as described above can force the heating system to expend more energy to reach the required SAT. The heated air available from the return air system is wasted to the outside. RA OSA MA Supply Air
23 Example : Possible problems Type Explanation Explanation Explanation Problem Problem Problem Problem Problem Problem Problem Problem Description System is controlling for humidity Normal condition during periods of low system air flow Normal condition if the system has a high percentage of OSA as part of the design SAT setpoints are overridden Miscalibrated or improperly located MAT sensor. Failed damper or actuator Stratified air in the mixed air plenum Return airpath is restricted by a mechanical or fire damper being closed Return air fan is not on or not operating at expected conditions Building is under negative pressure due to excessive exhaust or stack effect Building is under positive pressure due to failed AHU return fan
24 Example : Diagnostic steps Inspect the dampers and their operators when the condition occurs. Cycle the dampers via the DDC system and make sure they are responding properly and do not bind.
25 Example : Confirming the problem % 90 90% 80 80% 70 70% % 50% 40% Temperature ( F) Damper Position 30 30% 20 20% 10 10% 0 0% 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 Time MAT SAT OSAT RAT OSA Damper (%)
26 Example : Confirming the solution 100 Normal Operation % 90% 80% 70% Temperature ( F) Damper Positio n % 50% 40% 30% 20% 10% 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 Time MAT SAT OSAT RAT OSA Damper (%) 0%
27 Example : Chiller operating while OSAT is low Energy is wasted operating the chilled water system when airside economizers can be used for free cooling. This also reduces the life span of all operating equipment. Low loads on chillers can also cause refrigerant slugging within a chiller, which can ruin it, resulting in large repair charges.
28 Questions? BetterBricks Building Operations Program
29 The Goal: A Cycle of Continuous Improvement
HVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,
More informationHVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in
More informationRetrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
More informationAIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS
AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The
More informationINTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings
INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,
More informationA. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.
SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate
More informationState of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney
Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled
More informationAn HVAC Audit of the Canberra Institute of Technology
An HVAC Audit of the Canberra Institute of Technology 30 th November 2016 Amnon Holland amnon.holland@esbsconsult.com.au www.esbsconsult.com.au Agenda Overview CIT and various other sites The sites Type
More informationIAQ: Re-tuning Commercial Buildings
IAQ: Re-tuning Commercial Buildings A low-cost path to improved air quality and energy efficiency. B y S c o t t G o r d o n, C M All images courtesy of Johnson Controls Service. 10 RSES Journal FEBRUARY
More informationOSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon
OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113 Introduction: Glumac was engaged by
More informationFAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney
FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1
More informationINTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012
HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
More informationBAS Point Trend Data Guidance
BAS Point Trend Data Guidance Rev. 3, January 2018 Introduction The Building Automation System (BAS also, referred to as a DDC system, or a Direct Digital Control system) at your building has been set-up
More informationb.) Technical Information:
Section VI- Strategies a.) Summary: It is important for new construction designers to consider the heating, ventilation, and air conditioning needs within a building. There are many different systems,
More informationHVAC 101. The Basics of Heating, Ventilation and Air Conditioning
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort
More informationContinuous Commissioning: A Valuable Partner to Retrofit Projects
Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles
More informationPaul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA
Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationAHU Air Handling Unit Fundamentals. j.ilangumaran
AHU Air Handling Unit Fundamentals j.ilangumaran Objectives Review primary components of an AHU Understand the basic progression and advantages of advanced AHU control Understand the basic control sequences
More informationNEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80
NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationSelected Laboratory Energy Efficiency Measures
Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationTechnical Report Three
Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3
More informationCivil Engineering Building
Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationStrategies for Building Energy Efficiency
Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationCOMcheck Software Version Review Mechanical Compliance Certificate
COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project
More informationASHRAE JOURNAL ON REHEAT
Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide
More informationRE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana
ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum
More informationJob Name Control Systems Description Date
Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In
More informationBES-TECH TECHNOLOGY & SYSTEM INTEGRATION
BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION DIGI-ACC Digi-ACC is a control kit for air cooled chiller systems, optimizing both chiller and pumps thereby reducing consumption
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationDigital Precise Air Control - DPAC
Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options
More informationSYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC
VOLUME ONE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Part-Load Strategies Why they re important.......... 1 What Things
More informationASHRAE Guideline 36 Advanced HVAC Control Sequences
ASHRAE Guideline 36 Advanced HVAC Control Sequences Rick Stehmeyer - Senior Engineer Matt Napolitan, P.E., CCP, CPMP, LEED AP BD+C - Principal Image Source: http://worldatdistance.com/2013/10/07/the-complete-noobs-guide-to-making-a-website//
More informationThe M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO
The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting
More informationHVAC Mandatory Provisions Part II, Page 1
HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More information1 - This title will copy onto other forms Date
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationFeature Summary. I. System
I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationREPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop
Energy-Savings Strategies for Rooftop VAV Systems Occupied set-point temperature Unoccupied set-point temperature Rooftop variable-air-volume (VAV) s are used to provide comfort in a wide range of building
More informationSECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL
SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationVariable Speed Drives: Reducing the energy costs of commercial HVAC systems
Variable Speed Drives: Reducing the energy costs of commercial HVAC systems Factsheet Using Variable Speed Drives (VSDs) to reduce the cost of heating, ventilation and air conditioning (HVAC) systems in
More informationEarthWise System Seminar
EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States
More informationAppendix 13. Categories of Cooling and Heating systems
EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01
More informationSequence of Operations (excerpt)
Sequence of Operations (excerpt) Chilled Water System Consists of one (1) 600 cooling ton Trane CVHE 3 stage centrifugal chiller, with associated chilled water pumps, condenser water pumps and one (1)
More informationCustom Air Handler Solutions Custom Units to Meet Your Unique Design Needs
Custom Units to Meet Your Unique Design Needs Engineered for flexibility and performance Contents Horizontal Configuration....1 Horizontal with Standard Economizer Configuration...2 Stacked Configuration...3
More informationSubmitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner
ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas
More informationAPPLICATION GUIDE BEAMS
BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.
More informationGeneral HVAC Recommendations
General HVAC Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT HVAC SYSTEMS Thank you for your interest in energy efficiency! Energy efficient heating, ventilation, and air conditioning (HVAC) equipment
More informationEnergy Management and Controls
As with the Chapter Review Tests and the Final Exam, the tests your understanding of the materials underlying the learning objectives. After you ve reviewed your answers to the Chapter Review Tests, try
More informationAnalyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM
Analyzing Air Handling Unit Efficiency Michael Rosenberg, PE, CEM Analyzing Air Handling Unit Efficiency Introduction...1 Air Handlers and Energy...2 Air Handler Case Study...7 Optimizing Economization
More informationAir Conditioning Clinic
Air Conditioning Clinic VAV Systems One of the Systems Series July 2012 TRG-TRC014-EN VAV Systems One of the Systems Series A publication of Trane Preface VAV Systems A Trane Air Conditioning Clinic Figure
More informationComputing Services Center
Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationInspection Phase Three. Mechanical, Electrical & Plumbing Section 503
Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too
More informationArchitectural Engineering Senior Thesis Mechanical System Redesign
Saint Joseph Medical Center Architectural Engineering Senior Thesis Mechanical System Redesign Chris Nicolais Building Description Existing Mechanical System Proposed Redesign Alternative Option Emergency
More informationDESIGNING MODULAR VAV SYSTEMS
FORM 5.2 REV 0905 THERMA-FUSER THERMALLY POWERED VAV DIFFUSER DESIGNING MODULAR VAV SYSTEMS MODULAR VAV SYSTEMS The Therma-Fuser diffuser is a simple stand alone device that provides VAV control when supplied
More informationDehumidifying with Dedicated Outdoor Air
Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,
More informationCARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.
Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationImpacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation
Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Mingsheng Liu, Ph.D., P.E. Energy Systems Laboratory Texas A&M University College Station, Texas
More information2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC
2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter
More informationENGINEERING. Edition No. 13 October 2002
Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more
More informationHVAC System Consideration$ 05/14/2012 SAVING MONEY IN HVAC SYSTEMS
SAVING MONEY IN HVAC SYSTEMS Rod Rhoads, GDS Associates Inc HVAC System Consideration$ What percent of a commercial business s energy usage comes from their HVAC system? How much money do commercial facilities
More informationSubmitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas
More informationMechanical Compliance Certificate
COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Austin, Texas 2a (weather data: TBD) New
More informationCxA to Answer this Section
EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place
More informationApplication of Direct Digital Temperature Control Systems for Maximum System Efficiency on VAV Systems
Application of Direct Digital Temperature Control Systems for Maximum System Efficiency on VAV Systems Frank W. Mayhew, EC/TC Consulting The acceptance of direct digital temperature control technology
More informationModeling projects that require very tight space temperature control
Modeling projects that require very tight space temperature control Whereas space temperature controls for maintaining human thermal comfort typically have a deadband of several degrees between heating
More informationV4 15JUNE2016 (COPYRIGHT: DEPARTMENT OF INDUSTRY)
V4 15JUNE2016 (COPYRIGHT: DEPARTMENT OF INDUSTRY) ACN 114 572 084 "Driving Sustainability through Teamwork" e: pcthomas@teamcatalyst.com.au m: 0417 405 478 CALCULATING COOL USER GUIDE V4 15JUNE2016 Page
More informationDaikin Blueprint: Delivering Hot Water with a Chiller
Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications
More informationSECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of
More informationEngineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.
VAV Diffusers lease refer to the rice Engineer s HVAC Handbook for more information on VAV Diffusers. Diffuser Types Ceiling Diffusers Conventional air distribution systems typically group several rooms
More informationSeptember 19, 20, 2009 Fort Lee, VA
International Energy Agency Energy Conservation in Buildings and Community Systems (ECBCS) Programme Annex 46, U.S. Army Installations Management Command (IMCOM), US Department of Energy, Ft. Lee and The
More informationHigh Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO
High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the
More informationMatt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.
M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New
More informationPrescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates
Prescriptions for Critical Healthcare Cx John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. Medical Industry Changes and how they impact Design, Construction,
More informationSEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER
SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER Printed in the USA ADSOOASHPRAE 0117 Orig SEQUENCE OF OPERATION The ALC controller is turned on by a switch located
More informationAMCA Webinar High Performance Air Systems Presented by:
AMCA Webinar High Performance Air Systems Presented by: Wade Smith, Executive Director Michael Ivanovich, Director of Strategic Energy Initiatives Hide or reveal Control Panel Status of your microphone.
More informationEADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationSESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:
SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development
More informationEnergy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE
This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission
More informationHigh-Performance VAV Systems
This article was published in ASHRAE Journal, October 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not
More informationProduct Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT )
Product Data 33CS Carrier Comfort System Variable Volume and Temperature (VVT ) The VVT Comfort System provides the following features and benefits: 365-day scheduling, daylight savings compensation, and
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 4.0.3.0 Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: AHSC (Asian Heal Service Center
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction
More informationUrbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.
Urbana Free Library HVAC Analysis Prepared for the Urbana Free Library Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Report Dated August 8, 2016 1. Introduction The Urbana Free Library is
More informationRaised Access Floor - (AE Breadth Area)
Raised Access Floor - (AE Breadth Area) Currently, the Plaza has a raised access flooring system on both the 7 th and 8 th floors. The 8 th floor is designed with an independent HVAC system utilizing an
More informationSPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview
SPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview As in residential buildings the purpose of mechanical conditioning and ventilation is to maintain air quality and thermal comfort in buildings, with
More information2009 IECC Commercial Mechanical Requirements
BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(
More information2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems
2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems Dieter Bartel, Manitoba Hydro September 17 th, 2014 Outline Scope and compliance Prescriptive path
More informationMadeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)
Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2007) Standard HALCYON Bldg. 400 Alpharetta, Georgia 3a
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More information