Analyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM

Size: px
Start display at page:

Download "Analyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM"

Transcription

1 Analyzing Air Handling Unit Efficiency Michael Rosenberg, PE, CEM

2 Analyzing Air Handling Unit Efficiency Introduction...1 Air Handlers and Energy...2 Air Handler Case Study...7 Optimizing Economization Conditions...8 Mixed Air Temperature Control...10 Carbon Dioxide Control...11 Discharge Air and Pre-heat Temperature Control...12 Zone temperature Control...14 Supply Fan Speed Control...15 Return/Relief Fan Speed Control...16 Calibration, Commissioning, and Balancing...17 References LOGGERS Analyzing Air Handling Unit Efficiency

3 Introduction According to the US Department of Energy, in 2009 the commercial sector spent $192.3 billion on energy; $80.7 billion of that (41.9%) was spent on HVAC operations. Operating a heating, ventilation and air conditioning (HVAC) system at optimum efficiency in a commercial setting is complicated, to say the least. There is a very real chance that any number of setpoints, levels and feedbacks at boilers, chillers, pumps, fans, air delivery components, and more can cause costly inefficiencies. According to the US Department of Energy, in 2009 the commercial sector spent $192.3 billion on energy; $80.7 billion of that (41.9%) was spent on HVAC operations. This cost is only going to rise as energy prices climb, and it s in the interest of many facilities engineers, managers and owners to examine their HVAC systems and consider recommission. Cost payoff for tightening up can be huge. This guide explores the analyses and steps taken that realized more than $50,000 in annual savings for an office building in the Midwestern US. There are other rewards for fine-tuning as well, including increased occupant comfort and productivity, greater real estate marketability, and enhanced company or industry image, both internal and external. This guide will focus on air handling units (AHUs) in particular, which, along with their associated air distribution systems, bring conditioned (heated, cooled, moisture-controlled) air to building occupants and contents. AHUs have their own subset of variables, originating from fans, vents, filters, sound attenuators, cooling and heating coils and more. In an office setting, the AHU system might be responsible for maintaining a comfortable working environment for dozens to thousands of people, along with providing the cooling and humidification necessary to relieve computer data centers of excess heat. In other instances of public or academic buildings, comfort and air quality must be maintained for spaces that are variously occupied and have many people continuously entering and exiting. At the start of any fine-tuning, recommissioning or verification project, you need to collect data. Portable data loggers are small, rugged, reusable devices that are low cost and allow for time-stamped collection of data for just about any component of an AHU system. The battery-powered logger itself typically has one or more internal sensors, as well as several data ports for incorporating external sensors. With data loggers, you can easily monitor temperature, relative humidity, motor on/off, CO 2, and more, without having to invest in costly permanent metering. When the monitoring period is complete, data is downloaded easily to a computer via wireless or cellular networks, or manually by plugging the logger into the USB port. Then data can be analyzed and formatted using the logger software, or exported to a spreadsheet application. In this publication, Michael Rosenberg, a Senior Integration Engineer with Glenmount Global Solutions, will guide you through an intimate exploration of the air handling system of an office building, and you will learn how the data gathered helped provide insight into optimizing overall air handling operation. 1 Analyzing Air Handling Unit Efficiency

4 Air Handlers and Energy Air handling units are components in a mechanical system used to condition and circulate air as part of a heating, ventilating and air conditioning (HVAC) system. An air handler typically contains a fan, heating coils, cooling coils, a filter section, sound attenuators, dampers, actuators and controls, depending on the particular design. Air handlers are usually connected to a system of ductwork that distributes the conditioned air through the building. The intake side of the AHU typically has a return path for the air to be re-conditioned and mixed with outside air. Several types of air handler designs are available, including variable air volume, dual duct (hot deck/cold deck), multi-zone, and make-up air units that provide 100% outdoor air. The basic design type reviewed in this best practices guide is a variable volume AHU. Significant improvements have been made to the design of air handlers, their associative distribution systems, and their control systems. Improvements in air handler and system designs, controls, and, equally important, operations have provided improvements in temperature control and energy savings. Figure 1 provides the energy usage profile of a typical office building. Air ventilation, space heating, and cooling represent the energy components typically associated with operating an air handler. This best practices guide will highlight control methods for optimizing energy efficiency in an office building through the use of data logger and building automation system trend logs. The demonstration of these best practices will be shown through a case study of an air handler sequence of operations that would be considered non-optimized. Figure 1 Office building energy distribution Portable data loggers provide a comprehensive toolset for equipment and energy diagnostics. Proper instrumentation of an air handler requires an understanding of the system functionality, how the various components, devices and flow paths interact with one another, and the results one wants to obtain. Data loggers provide for the collection of several types of data, depending on the unit. They are available in a variety of communication types, from popular stand-alone data loggers to wireless data nodes to web based monitoring systems that permit instantaneous real-time analysis to a computer. Portable data logger external sensors are typically programmable and scalable through the unit s software, allowing the logger to be used for a wide range of processes and operations. Some external sensors include: a 4-20mA input cable that can be connected to any analog output signal on a variable frequency device (VFD) or digital control panel; carbon dioxide sensor; differential pressure sensor; as well as additional temperature and relative humidity input probes. Small, inexpensive, and reusable data loggers and sensors will provide all of the points of analysis that an effective energy study requires LOGGERS Analyzing Air Handling Unit Efficiency 2

5 Figure 2 shows a typical air handler in a Midwest building during the month of August. Performance of the building s air handlers was monitored by using one temperature/humidity logger to log general outdoor air conditions, and a single four channel logger with external temperature probes. Measure of return air temperature (RAT), discharge supply air temperature (DAT) and, two mixed air temperatures (MAT) (to simulate mixed air averaging) were attained using several different length temperature probes connected to the fourchannel logger. OAT RAT MAT x2 DAT Figure 2 Four-channel logger deployment for ventilation air control verification 3 Analyzing Air Handling Unit Efficiency

6 The value of using the four-channel loggers along with the low-cost temperature probes is that it saved money, as individual loggers in each independent airstream would have been expensive. There is also value in the time-saving benefit of multi-channel loggers as they enable a single setup and a single data offload. Two of the challenges of effective equipment benchmarking and energy analysis are the period of analysis and the season of the trending period. For example, the building in this case study was evaluated during the winter period. Based on that data, it was possible to ascertain some potential cooling-related operations without actually providing trends during the cooling season. The trends in the previous figures were from the strictly cooling mode of operation, without any economizer operation. In another building located in Glendale, CA, portable data loggers were used extensively to analyze the operations of approximately 400 water source heat pumps. This building was operating an older DOS-based automation system with very limited trending capability. In pursuit of LEED certification, the energy team turned to portable data loggers to analyze the operations of their heat pumps and make decisions on how the new automation system would be used to improve energy efficiency. The deployment strategy here was similar to the previous example. Several heat pumps were instrumented with fourchannel loggers placed in the ceiling plenum near the unit. A temperature probe was directed through the ceiling and toward the heat pump s thermostat for space temperature monitoring. One probe was placed in the discharge air side of the heat pump and one in the rear of the heat pump where duct outside air mixes with plenum/return air for reconditioning. The final input was connected to an external amperage probe to measure the load on the heat pump s compressor as it cycles through its cooling mode. An additional temperature and relative humidity logger was placed on the roof in a sheltered area to obtain a reference of outdoor air ambient conditions during the trending period LOGGERS Analyzing Air Handling Unit Efficiency 4

7 Figure 3 Heat pump deployment and trend log Again, as with the air handler monitoring example above, the value of using the four-channel logger model and lower cost temperature probes allowed for an investment in fewer loggers. Another deployment example is for a data center located in Northern Virginia. The facility had multiple rooftop air handlers (RTUs) that served a large data center space followed by power distribution units (PDU) located on a mezzanine level in the air pathway back to the RTUs. HOBO data loggers 5 Analyzing Air Handling Unit Efficiency

8 were deployed at strategic locations along the airflow pathway to obtain a measure of the thermal conditions of the air. Those conditions include the supply air plenum, the data center space (where server equipment added heat to the airflow), the mezzanine level (where the PDUs added heat) and the mixed air section prior to the air being reconditioned through the RTU chilled water coils. The data loggers installed were combination temperature/ humidity models except for the supply air, where temperature probes were placed into discharge air registers. The particular information sought was to establish the type of cooling processes; sensible or latent cooling. The data loggers have the internal capability to provide calculated dewpoint temperature which was used to evaluate the absolute humidity levels at each step in the thermal process along the airflow path. In this particular example, we demonstrate how HOBO loggers can be deployed to analyze a thermal process at multiple locations and evaluate the psychometric conditions as air is heated and cooled. Figure 4 Temperature, Dewpoint, Relative Humidity distribution Figure 4 demonstrates that as drybulb temperature increases along the air path, and relative humidity experiences an associated reduction, the dewpoint levels, and therefore, absolute humidity levels remain relatively constant indicating a sensible cooling process without dehumidification and latent cooling. In this particular example, we demonstrate how HOBO loggers can be deployed to analyze a thermal process at multiple locations and evaluate the psychometric conditions as air is heated and cooled. Our case study that follows, used data logger and Building Automated System (BAS) trend data. However, data loggers and the wide range of plug-in devices can be used extensively in analysis applications, as indicated in a potential deployment shown in Figure 5, showing a fully monitored air handler, including temperature, humidity, CO 2, duct static pressure, VFD analog output using a 4-20 ma cable, and amperage CT LOGGERS Analyzing Air Handling Unit Efficiency 6

9 VFD 4-20 ma C02 RAT & RA%RH OAT & OA%RH VFD MAT x2 Preheat DAT Duct Static Figure 5 Graphic of case study air handling unit Air Handler Case Study The building evaluated in this case study is a 100,000 sq. ft., three-story midwest office building with approximately 400 people, and contains three mechanical rooms housing five air handling units. The mechanical systems are controlled through a building automation system integrated with an original pneumatic control system. Each penthouse unit has exterior walk-in access to the following sections: Minimum outside air intake section Mixed air outside air intake section Return air plenum section Relief air discharge section Mixed air section (prior to pre-heat) Mixed air section (post pre-heat) Discharge air section Filter section Chilled water coil section Supply fan Return fan 7 Analyzing Air Handling Unit Efficiency

10 Air-side economizers save energy by using cooler outside air as a means of conditioning the indoor space. Figure 6 Air handler graphic This building is part of a campus system with a central chilled water plant and a central steam plant. Utility charges are assessed based on building BTU meters on the chilled water and steam piping; therefore, any reduction in chilled water or steam usage had a direct cost-reduction to operations. Several operational deficiencies were identified during a retro-commissioning investigation of the building s AHUs. Those deficiencies included nonoptimized economizer control, inoperative demand control ventilation control of minimum outside air dampers, excessive pre-heat load caused by ineffective mixed air temperature, and suboptimal supply and return/relief fan control. The charts in this case study were developed through a combination of data available through the building s Building Automation System (BAS) and supplemental data loggers. This data shows how relatively straightforward control processes can have an interrelated impact on other control processes. The charts and analysis will show how trend logs can be used to analyze air handler operations and the several interrelated control processes, and will show their impact on energy. In this particular case study the resulting retro-commissioning opportunities provided relatively modest sequencing modifications at a comparatively low cost, and greater than $50,000 in annual energy savings. Optimizing Economization Conditions Air-side economizers save energy by using cooler outside air as a means of conditioning the indoor space. When the outside air is both sufficiently cool and possessing lower energy content than the indoor space, the air handler s dampers can be controlled to take advantage of that lower-energy outdoor air. There are a few methods to initiate economizer operations, and the two most common are drybulb temperature and enthalpy. The preferred method is usually dependent on the particular climate of the building. Dryer, more arid climate economization can be achieved with simplified drybulb control, LOGGERS Analyzing Air Handling Unit Efficiency 8

11 whereas more humid climates are best served by using enthalpy control. Between those two methods, the conditions that initiate economization can sometimes be based on a comparison between outdoor air and interior conditions, or based on a fixed outdoor air condition. The control system that was investigated provided two settings to initiate the economizer sequence: drybulb temperature and enthalpy. The drybulb economizer enable was based on a fixed outside air temperature of 55 F, and the enthalpy economizer enable was based on a fixed outside air enthalpy of 23 Btu/lb. Through various functional tests it was determined that the economizer control was based on outside air dry bulb temperature only, and that the enthalpy capability was not active. As part of the energy study for this project, a temperature bin analysis was performed. Figure 7 provides a comparison between the current economizer control and the area of lost economization by enabling economization based on comparative enthalpy. The bin chart shows that the fixed 55 F outside air temperature economizer enable setpoint fails to take advantage of approximately 300 hours of annual economization through the use of comparative enthalpy. The chart also shows that economizer control based on a comparison between outdoor air and return air dry bulb temperature would result in inefficient economizer operations; due to the outdoor enthalpy in the coincident outdoor air temperature range of F being greater than the return air enthalpy. Therefore, the most effective economizer control, for this environment, would be based on enthalpy. Figure 7 Economizer optimization Considerations in evaluating optimized economizer operations include not only the economizer initiation setpoints, but also the control of the mixed air dampers to maintain mixed air temperature, sensor calibration, sensor 9 Analyzing Air Handling Unit Efficiency

12 placement, and balancing the economizer thermal savings with the relief fan power, economizer lockouts and unintended heating loads. Considerations toward dewpoint temperature of the airstream and temperature of the chilled water coil are also important. Economizer control can be a complex study of psychometrics that is outside of the scope of this guide. Portable data loggers provide the tools necessary to evaluate effective economizer operations. Portable data loggers provide the tools necessary to evaluate effective economizer operations. Best Practice Tip: 1. Optimize the economizer control based on the environment. In areas where moisture levels in the air are prevalent, use an enthalpy type control. Dryer environments can be achieved with drybulb. 2. The effects of inefficient economizer, mixed air damper and minimum outside air control have clear impacts on cooling and heating. The case study also demonstrates fan power issues associated with outside air damper control, showing a correlation to relief fan speed and power consumption. 3. Maintain an outside air limit on economization. Excessive ventilation air can result in excessive relief fan energy and filter usage. Using a direct comparison of enthalpy may not always be the most economical. With regard to the case study, the recommended programming modification is to include an enthalpy comparison and raise the dry bulb limit setpoint from 55ºF outside air temperature to 65ºF. 4. Sensor calibration and placement can be the number-one issue affecting effective economizer control. Regularly calibrate the critical process-related BAS system sensors for effective economization. Mixed Air Temperature Control Mixed air temperature control is intended to supplement economizer control by adjusting the proportion of outside air with building return air as outside air conditions get colder, providing a means to exit economizer control. Figure 8 shows the economizer mixed air damper controlling to maintain a 55 F mixed air temperature setpoint. During this period of trending the outdoor air temperature ranged between 10 F and 30 F. The objective of using a 55 F mixed air temperature setpoint is to provide cooler air for cooling space with internal heat gains, while other zones are provided heat through local variable air volume (VAV) reheat control. We will see through further review of this case study how that temperature control philosophy actually increases energy consumption. Best Practice Tip: 5. The preferred method of control for the mixed air dampers is based on an adjustable mixed air temperature setpoint that should track with the discharge air temperature setpoint LOGGERS Analyzing Air Handling Unit Efficiency 10

13 Figure 8 Mixed air temperature control Carbon Dioxide Control Figure 8 above and the following Figure 9 show that the minimum outside air damper command is 100% open during the entire period of occupied control. However, our trend log, as shown in Figure 9, indicates that CO2 levels are never greater than 525 ppm during occupied periods and 420 ppm during unoccupied periods. Current ASHRAE ventilation Standard provides appropriate ventilation guidelines of 20 CFM per person and sets the maximum CO2 level in commercial buildings at 1000 ppm. Combined with the fixed 55 F mixed air temperature control of the mixed air dampers and the full capacity of the minimum outdoor air damper, we are starting to see a practice of unnecessarily cool mixed air temperature and excessive fresh air levels as indicated by relatively low CO2 levels. Best Practice Tip: 6. Coupled with improved control over the economizer mixed air damper, further reductions in ventilation airflow delivery through effective CO2 control will facilitate decreased cooling and heating loads during non-economization and mixed air modes of operation. 11 Analyzing Air Handling Unit Efficiency

14 Figure 9 Carbon dioxide control of minimum outside air damper Discharge Air and Pre-heat Temperature Control We observed the control of the economizer dampers maintained a fixed 55 F mixed air temperature. By itself, that control sequence may seem acceptable based on the objective of tempering internal loads. However, through further investigation and trend log analysis, we observed some additional operations that were inefficient and inconsistent with best practices. The AHUs had a sequence of control to enable a pre-heat valve based on an outside air temperature at 35 F. The intent of the pre-heat enable is for freeze protection. This is an arbitrary value in that with effective mixed air control, mixing the warmer return air temperature with the colder outside air temperature will result in mixed air temperature greater than freezing. In the current sequence that mixed air temperature is 55 F. In addition to the arbitrary pre-heat valve outdoor air temperature enable setpoint, the control of the pre-heat valve is also, arbitrarily, commanded fully open without any temperature control. During cooling mode the discharge air temperature setpoint for the air handlers is a fixed 58ºF. Similar to the pre-heat valve, the chilled water valve on the AHUs was also provided with an outdoor air temperature disable. Although our investigation was conducted during a heating mode of operation, we were still able to evaluate some cooling mode conclusions, ironically, through the operation of the pre-heat valve. The chart in Figure 10 shows that with the chilled water valve closed and the pre-heat valve full-open, the measured discharge air temperature was generally 62-65ºF with a fixed mixed air temperature of 55 F. Controlling the mixed air to 55 F and then raising the discharge air temperature with steam heat is not intuitive and energy inefficient LOGGERS Analyzing Air Handling Unit Efficiency 12

15 Figure 10 Pre-heat temperature control Best Practice Tip: 7. Maintain an adjusted discharge air temperature setpoint, also known as discharge air temperature reset. As load requirements result in an increasing discharge air temperature, the mixed air temperature setpoint will track the discharge air temperature, resulting in more efficient mixed air temperature control. 8. Coupled with the improvements to mixed air temperature control and minimum outside air damper control, the modifications to the pre-heat control is intended to minimize the use of pre-heating energy toward either freeze protection or conditions of extreme cold ambient conditions in which the mixed air temperature is not strictly maintainable through damper control. A discharge air temperature reset strategy was based on outside air temperature or zone feedback. The discharge air temperature reset is necessary for successful operation of the mixed air control strategy. This control strategy will force the mixed air damper control to a more closed position during colder ambient conditions and reduce air handler heating loads and relief fan power consumption. In one discharge air temperature reset control scheme, the BAS polled VAV zone damper positions as an indication of building load. Alternatively, if the building s control system lacks the capability to provide feedback on zone loading, the supply temperature is often reset based on either return air temperature or outside air temperature. An example might be of an old building with a direct digital control (DDC) controlling the major HVAC equipment but maintaining VAV control through an older pneumatic system. The goal of discharge air reset is to minimize the simultaneous cooling and heating or, in this case, the use of heating to offset inefficient outside air damper control. However, resetting the discharge air temperature not only impacts the cooling and heating energy consumption, but also has the potential to impact supply fan power consumption or indoor air humidity problems, or result in a fan power consumption penalty. In optimizing the 13 Analyzing Air Handling Unit Efficiency

16 discharge air temperature reset logic consideration toward minimizing the overall heating energy, cooling energy and fan power consumption must be evaluated. Zone Temperature Control The zone thermostats for this case study provided tenants with local temperature override capability. The typical zone temperature setpoint on the thermostats was 72 F. However, the zones were provided the ability to adjust the local temperature by +/- 5.0 F. With full local adjustment at the thermostats, the maximum cooling setpoint places an excessive cooling load on the system and forces the air handling unit to work harder to maintain duct static pressure. On the heating side, the effective temperature setpoint risked the greater energy usage through the VAV hot water reheat valves. The wide range of control over the zone thermostats makes effective control of the air handling units difficult to maintain. An extremely important point with regards to VAV operations is that VAVs are, essentially, part of the air handling system. Inefficiencies in the operation of VAVs can impact the airflow, heating and cooling requirements of the air handler, and fan energy. An extremely important point with regards to VAV operations is that VAVs are, essentially, part of the air handling system. Inefficiencies in the operation of VAVs can impact the airflow, heating and cooling requirements of the air handler, and fan energy. With integrated DDC control in buildings, the operational status of VAVs is used to drive reset sequence of operations such as static pressure and discharge air temperature control. Without tight temperature control, a routine temperature calibration check and validation of proper functionality, the operation of the network of VAVs can have untold impact on the operation of the air handling unit. As an example of VAV impact on air handling units, another building investigated in the same Midwest climate as the current case study had the same type of zone thermostats. This building had several courtrooms, many of which were frequently unoccupied. In several of those courtrooms the local thermostat adjustment had been set for the maximum level of cooling, driving the VAVs serving those courtrooms into full cooling. Although those VAVs accounted for 10% of the full design capacity of the associate air handling unit(s), the static pressure sensor for the air handler supply fan VFD control had typically been located very close to those VAVs. With those VAVs in full cooling continuously, the system static was impacted, resulting in the supply fan VFD operating at a higher speed and power usage than would be otherwise necessary. Best Practice Tip: 9. Modify the override capability in the zones to prevent wide swings in VAV operations and uncontrollable air handler fan speeds. Establish rules for zone temperature setpoint overrides by the building s tenants. Balance comfort considerations with energy efficient operations. Remember, a single VAV can be the proverbial tail wagging the dog, significantly impacting energy of an entire air handling system LOGGERS Analyzing Air Handling Unit Efficiency 14

17 During the T&B process, the duct static pressure setpoint is determined based upon pressure and airflow requirements to establish the air handler and air delivery system for design conditions, i.e., cooling. Supply Fan Speed Control Figure 11 shows the control of the supply fan speed to maintain a fixed design duct static pressure setpoint. The period of trending shown is during cold outside air temperatures with VFD speed operating in the range of %. This operating condition was typical of most of the building s air handling units. Figure 11 Discharge air static pressure control It is not uncommon for the static pressure setpoint for supply fan control of an air handler to be this high. The static pressure setpoint is typically arbitrary, based on an expected design condition and established during the test and balance (T&B) process. During the T&B process, the duct static pressure setpoint is determined based upon pressure and airflow requirements to establish the air handler and air delivery system for design conditions, i.e., cooling. The airflow requirements for the individual VAVs during full cooling mode are typically greater than during minimum airflow or heating mode. During part load operations, the supply fan VFD is designed to modulate to a reduced speed and power consumption as VAVs control to a reduced airflow. Fan savings will be realized, but they will still be controlling to maintain the elevated duct static pressure setpoint established for design cooling conditions. The operating conditions show that the supply fan speed is higher than would be otherwise expected during a heating mode of control. The high supply fan VFD speeds in Figure 11 indicate that VAV boxes may not functioning properly, temperature sensor may be off calibration, or zone temperature setpoints are too broad to prevent effective VAV modulation. 15 Analyzing Air Handling Unit Efficiency

18 Best Practice Tip: 10. For additional fan savings, the duct static pressure setpoint should be incrementally adjusted downward or upward. This control sequence is known as static pressure reset. This sequence of control will regularly adjust the static pressure setpoint based on the demand requirements of the network of VAVs. 11. Balancing system airflow requirements to match the zone level airflow requirements should be the objective of an efficient air delivery system. Static pressure reset will help facilitate this objective. Return/Relief Fan Speed Control In this case study the supply fan and relief fan airflows are measured through pressure across the fan inlet and discharge with a calculated airflow. The return fan is controlled to maintain a fixed airflow offset between the measured supply fan airflow equivalent to the design outside airflow rate. The merit of this method of control is debatable; nonetheless, high motor power consumption at higher supply fan speed will also result in excessive return fan operating speeds and motor power consumption as shown in Figure 12. Any means implemented to reduce supply fan speeds and motor usage will have a correlating reduction in return fan speeds and power usage. Figure 12 Supply and return fan operating characteristics Another observation from the trending charts is that with an increased rate of outside air into the building has an associative increase in the power consumption on the relief fan, as shown in Figure 13. Therefore, any opportunity to reduce building ventilation rates will not only have the benefit of thermal savings, but also fan energy associated with purging the building of outside air LOGGERS Analyzing Air Handling Unit Efficiency 16

19 Figure 13 Relationship between outside air and relief fan kw Calibration, Commissioning, and Balancing Previously in this case study it was noted that outside air temperature was the driving factor for several processes of control: chilled water valve enable; preheat valve enable; and economizer (both drybulb and, indirectly, enthalpy). As part of this case study a newly calibrated wireless temperature node was placed near the outdoor air temperature device associated with the building management system (BMS). Both the BMS outside air and logger outside air temperatures were logged for 24 hours and a deviation in the measurements was noted up to 20%. Figure 14 outside air temperature comparison The outdoor air temperature is the driving factor for several sequences. Even with a perfect sequence of operations, a deviation of this critical sensor will have obvious ramifications to efficient operations of all the off-the-building 17 Analyzing Air Handling Unit Efficiency

20 air handlers. Additional consideration toward device placement must also be evaluated. For example, placement of the static pressure transmitter in a turbulent zone in the main supply air trunk can have an impact on effective and efficient supply fan control. As another example, placement of the mixed air temperature sensor in contact with a chilled water coil can impact process control through the radiation of coldness of the coil onto the sensor, impacting the measured value of the mixed air temperature. Best Practice Tip: 12. Regular calibration of this and other critical process-related control variables must be performed regularly. It is important to minimize the potential for flow variation due to varying static pressure requirements in the different flow paths as the economizer system modulates from full return to full relief. The particular dampers installed in this case study lacked the linearity necessary to achieve consistent static pressures through all combinations of mixed air damper positions from full economization to minimum outside air mode. The result of the non-linear relationship between damper command and airflow percentage mismatch was resulting in fan starvation, during mixed air control mode, and excessive fan speeds in order to maintain duct static pressure. Understanding the overall process of control of the entire system sequence of operations provides an overall system corrective strategy. This requires a thorough commissioning or retro-commissioning process with functional performance testing and extensive trending analysis. Damper linearity issues are only one example of an air handler component level issue that can have an impact on effective temperature and pressure control in an air handler. Best Practice Tip: 13. Validating the most effective sequence of control for an air handling unit requires a rigorous commissioning process. Proper air balancing is also a critical step in achieving energy efficient operations. This case study demonstrates that an air handler s sequence of operations can be highly interrelated with regards to operations and energy consumption. In an expansion of this type of investigation it can be shown that operational or control deficiencies can have an integrated response on other system control sequences. In this case study it was examined how VAV operations have a direct impact on air handler operations. An expanded investigation will demonstrate the interrelated impact of air handler operations on central plant pumping and chillers and boiler operations. Understanding the overall process of control of the entire system sequence of operations provides an overall system corrective strategy. This requires a thorough commissioning or retro-commissioning process with functional performance testing and extensive trending analysis. Trending multiple processes and evaluating the interactive impacts requires an integrated approach toward retro-commissioning. Portable data loggers are costeffective, reusable, valuable tools in such an endeavor, and can be used in data-gathering and verification LOGGERS Analyzing Air Handling Unit Efficiency 18

21 References Taylor, Steven T., P.E., Economizer high limit controls and why enthalpy economizers don t work. ASHRAE Journal. Nov Acronyms/Abbreviations AHU air handling unit ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers BAS building automation system BMS building management system BTU british thermal unit CT current transducer DAT discharge air temperature DDC direct digital control MAT mixed air temperature OAT outside air temperature RAT return air temperature T&B test and balance VAV variable air volume VFD variable frequency drive 19 Analyzing Air Handling Unit Efficiency

22 Other informational resources available from Onset: Finding Hidden Energy Waste with Data Loggers: 8 Cost-Saving Opportunities The first step to reducing building energy costs is identifying energy waste. Statistics on utility bills or name plates on equipment, while useful, are not enough to identify what practices and equipment are contributing to high energy use. Portable data loggers can be used to obtain critical energy use information in a wide range of commercial building types from manufacturing plants to office buildings. Monitoring HVAC Performance with Data Loggers Building operators and managers have the difficult job of providing comfortable working conditions and coaxing aging mechanical equipment to operate at peak performance while minimizing energy costs. If the mechanical equipment is old or has inadequate controls, maintaining comfort at a reasonable cost may prove difficult or impossible. Although energy costs typically represent only 1% of a building s operating expense when occupant salaries are included, they are easily managed expenses. Energy cost savings flow directly to the bottom line as increased profits. The Energy Professional s Guide to Data Loggers & Building Performance This 30-page guide, developed in conjunction with Stetz Consulting LLC, details how portable data loggers can be applied in a number of building monitoring applications, such as HVAC systems monitoring, commissioning, Measurement & Verification, and load profiling. The guide offers practical tips and techniques on a range of topics, including data logger installation, monitoring plan development, safety, and data interpretation. Monitoring Geothermal Heat Pump Performance This paper discusses how portable data logging technology can be used to measure, record, and document the performance of geothermal heat pumps, and provides specific case study examples of how the technology is being applied in geothermal system monitoring applications. Optimizing Solar Thermal Performance with Data loggers This paper discusses how solar thermal systems, with the help of portable data loggers, can be optimized to deliver the financial benefits residential and commercial users hope to achieve through their investments. The paper shows installers and engineers how portable data logging devices can be used to measure performance of solar thermal systems, pinpoint any defects or inefficiencies, and optimize performance for greater return on investment. Measurement & Verification: Tapping into ARRA Stimulus Funds This paper provides guidance on identifying potential sources of ARRA stimulus funding for energy performance monitoring projects. It details new programs from the ARRA, explains the growing importance of Measurement Verification (M&V) services, and discusses specific ways ESCOs can apply portable data logging technology to document building energy savings. Using Data Loggers to Meet LEED Existing Building Certification Credits This paper provides information about how data loggers can make it simple to satisfy many LEED Existing Buildings Operations & Maintenance credits. It discusses how the devices can help with the certification process and documenting performance improvements for submission to the U.S. Green Building Council. Air Compressor Energy Savings: Finding the Low- Hanging Fruit This paper discusses different ways to measure compressed air system performance and identify savings opportunities. It provides insight into how portable data loggers can be used to monitor compressor power, and references various compressed air upgrade funding programs throughout the United States. Data Logger Essentials for Building Commissioning This paper provides building owners, building commissioners, performance contractors, HVAC engineers, and others with valuable tips and advice on effectively using data loggers to analyze building performance. Evaluating and Applying Data Loggers for Pharmaceutical Monitoring This paper provides quality assurance managers, regulatory compliance specialists, engineers, and others with valuable tips on evaluating data loggers for pharmaceutical monitoring. It discusses how portable data loggers can be used in a broad range of projects, from analyzing temperatures in an incubation chamber to monitoring packaging and shipping conditions. Validating Comfort Complaints with Data Loggers This paper provides facility managers, HVAC contractors, and others with valuable tips on how low-cost data loggers can be used to validate temperature-related comfort complaints. Using Data Loggers For Energy Management & IAQ This paper provides HVAC engineers, facility managers, and others with useful information on how low-cost data loggers can be used to identify and document energy savings in buildings while improving occupant comfort. Access our full resources library at: LOGGERS Analyzing Air Handling Unit Efficiency 20

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC VOLUME ONE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Part-Load Strategies Why they re important.......... 1 What Things

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop Energy-Savings Strategies for Rooftop VAV Systems Occupied set-point temperature Unoccupied set-point temperature Rooftop variable-air-volume (VAV) s are used to provide comfort in a wide range of building

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

BAS Point Trend Data Guidance

BAS Point Trend Data Guidance BAS Point Trend Data Guidance Rev. 3, January 2018 Introduction The Building Automation System (BAS also, referred to as a DDC system, or a Direct Digital Control system) at your building has been set-up

More information

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

Feature Summary. I. System

Feature Summary. I. System I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in

More information

Energy Management and Controls

Energy Management and Controls As with the Chapter Review Tests and the Final Exam, the tests your understanding of the materials underlying the learning objectives. After you ve reviewed your answers to the Chapter Review Tests, try

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

SEQUENCE OF OPERATIONS

SEQUENCE OF OPERATIONS SEQUENCE OF OPERATIONS DDC CONTROLLER: Controller with integral LCD readout for changing set points and monitoring unit operation. Provided with required sensors and programming. Factory programmed, mounted,

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

Displacement Ventilation in Classrooms

Displacement Ventilation in Classrooms TWO DIFFUSERS, THE WHITE COLUMNS ON EACH SIDE OF THE WHITEBOARD, PROVIDE COOL SUPPLY AIR TO THE DEMONSTRATION DV CLASSROOM. THE DV CLASSROOM DEMONSTRATION FEATURED A CUSTOMIZED ROOFTOP HVAC UNIT. Displacement

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113 Introduction: Glumac was engaged by

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

Your Home. Jacco & Assoc.

Your Home. Jacco & Assoc. Your Home Fan on with call for heating or cooling Heating on with call from space thermostat Stage as required to maintain The 75F Basics adj. - First stage of heating shall be heat pump Cooling on with

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

ASHRAE JOURNAL ON REHEAT

ASHRAE JOURNAL ON REHEAT Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide

More information

DIGI-VAV APPLICATIONS

DIGI-VAV APPLICATIONS DIGI-VAV DIGI-VAV APPLICATIONS Digi-VAV: An optimization kit for Variable Air Volume Air Handling Units (VAV AHU) that ensures individual zone indoor air quality (IAQ), and minimizes system energy consumption.

More information

IAQ: Re-tuning Commercial Buildings

IAQ: Re-tuning Commercial Buildings IAQ: Re-tuning Commercial Buildings A low-cost path to improved air quality and energy efficiency. B y S c o t t G o r d o n, C M All images courtesy of Johnson Controls Service. 10 RSES Journal FEBRUARY

More information

General HVAC Recommendations

General HVAC Recommendations General HVAC Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT HVAC SYSTEMS Thank you for your interest in energy efficiency! Energy efficient heating, ventilation, and air conditioning (HVAC) equipment

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,

More information

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency Digital Precise Air Control System D-PAC Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency AAON 24 South Yukon Avenue Tulsa, Oklahoma 747 (918) 583-2266 Fax (918)

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting

More information

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New

More information

Air Conditioning Clinic

Air Conditioning Clinic Air Conditioning Clinic VAV Systems One of the Systems Series July 2012 TRG-TRC014-EN VAV Systems One of the Systems Series A publication of Trane Preface VAV Systems A Trane Air Conditioning Clinic Figure

More information

SPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview

SPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview SPACE CONDITIONING IN COMMERCIAL BUILDINGS Overview As in residential buildings the purpose of mechanical conditioning and ventilation is to maintain air quality and thermal comfort in buildings, with

More information

IDL20e (2 way discharge) IDS60e (4 way discharge) Inffusers. UDI (vertical discharge) Frequently Asked Questions

IDL20e (2 way discharge) IDS60e (4 way discharge) Inffusers. UDI (vertical discharge) Frequently Asked Questions IDL20e (2 way discharge) IDS60e ( way discharge) Frequently Asked Questions UDI (vertical discharge) Inffusers INFFUSER FREQUENTLY ASKED QUESTIONS The following are frequently asked questions (FAQ s) on

More information

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT SEQUENCE OF OPERATION GUIDELINE AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT Document: VAV-HTG rev1 Revision: 1.0 Rev. Date: July 22, 2011 NOTES: 1. THIS SEQUENCE

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

High-Performance VAV Systems

High-Performance VAV Systems This article was published in ASHRAE Journal, October 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not

More information

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012) Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

RSES Technical Institute Training Manual 3 72 hours, 72 NATE CEHs, 7.2 CEUs

RSES Technical Institute Training Manual 3 72 hours, 72 NATE CEHs, 7.2 CEUs Lesson 1 - Basic Heat Pump Theory (Part 1) Describe the basic operation of a heat pump. Explain the function of various heat pump controls. Interpret the wiring diagrams and performance data provided by

More information

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager. 10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager 2019 WHEA Webinar Johnson Controls Institute Overview Operation & Maintenance (O&M)

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Selected Laboratory Energy Efficiency Measures

Selected Laboratory Energy Efficiency Measures Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper

More information

terminal units only provide sensible cooling, a separate dehumidification system is usually needed.

terminal units only provide sensible cooling, a separate dehumidification system is usually needed. providing insights for today s hvac system designer Engineers Newsletter volume 44 3 Dual-Temperature Chiller Plants This Engineers Newsletter describes several dual-temperature configurations that can

More information

To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014.

To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014. To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE CC: Tim Ellingson, CEE Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014 Re: MSU Mankato Verification State PBEEEP Executive Summary

More information

ENGINEERING. Edition No. 13 October 2002

ENGINEERING. Edition No. 13 October 2002 Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

An HVAC Audit of the Canberra Institute of Technology

An HVAC Audit of the Canberra Institute of Technology An HVAC Audit of the Canberra Institute of Technology 30 th November 2016 Amnon Holland amnon.holland@esbsconsult.com.au www.esbsconsult.com.au Agenda Overview CIT and various other sites The sites Type

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products Document 475595 Microprocessor Controller for Tempered Air Products Reference Guide for the Microprocessor Controller Please read and save these instructions. Read carefully before attempting to operate

More information

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates Prescriptions for Critical Healthcare Cx John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. Medical Industry Changes and how they impact Design, Construction,

More information

L CONNECTION NETWORK Commercial Controls

L CONNECTION NETWORK Commercial Controls L CONNECTION NETWORK Commercial Controls SIMPLIFIED, CENTRAL CONTROL Simplified Control for Your Facility The L Connection Network not only enhances comfort and energy-efficiency throughout your facilities,

More information

Terminal. Las Vegas, NV. Technical

Terminal. Las Vegas, NV. Technical McCarran International port Terminal 3 Technical Assignment 3 Mechanical System Existing Conditions Evaluation December 3, 2007 Prepared By: Faculty Advisor: Dr. William Bahnfleth, Ph.D., P..E. Table of

More information

product application data PERFECT HUMIDITY DEHUMIDIFICATION SYSTEM

product application data PERFECT HUMIDITY DEHUMIDIFICATION SYSTEM product application data PERFECT HUMIDITY DEHUMIDIFICATION SYSTEM 551B 581B DuraPac Plus Series Sizes 036-150 3to12 1 / 2 Tons Cancels: New PAD 551B.36.2 10/1/04 CONTENTS Page INTRODUCTION.................................

More information

Verasys System Operation Overview Technical Bulletin

Verasys System Operation Overview Technical Bulletin Contents subject to change. Verasys System Operation Overview Technical Bulletin Code No. LIT-12012370 Issued January 2016 Refer to the QuickLIT Web site for the most up-to-date version of this document.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY

ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY SUPERIOR IAQ LOW FIRST COST BEST ROI ENERGY EFFICIENCY WITH SUPERIOR INDOOR AIR QUALITY Pinnacle manages 100% of a building s ventilation and indoor humidity load in a single package. Chilled beams have

More information

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION ENERGY EFFICIENT DEHUMIDIFICATION PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM Provides a very high degree of latent cooling using only a minimal amount of conventional cooling input Substantial energy

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

Trane. Solutions for Retail Environments

Trane. Solutions for Retail Environments Trane Solutions for Retail Environments Right for retail. In a retail setting, the reliability and consistency of HVAC equipment has a direct impact on sales. A room that is too hot or too cold, too humid

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.

More information

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,

More information

Zone. In the. Contractors and technicians may often find themselves. In today s wired world, zoning has evolved from wired to wireless.

Zone. In the. Contractors and technicians may often find themselves. In today s wired world, zoning has evolved from wired to wireless. In the Zone How zoning is changing the way contractors do business. B y J o r d a n B r a n d e s a n d L o r i K a s a l l i s All images courtesy of Jackson Systems LLC. 12 RSES Journal SEPTEMBER 2013

More information

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION DIGI-ACC Digi-ACC is a control kit for air cooled chiller systems, optimizing both chiller and pumps thereby reducing consumption

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

Reference Guide for Microprocessor Controller

Reference Guide for Microprocessor Controller Document 483232 Microprocessor Controller for Energy Recovery Reference Guide for Microprocessor Controller Please read and save these instructions for future reference. Read carefully before attempting

More information

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation

Mechanical Technical Report 1. ASHRAE Standard 62.1 Ventilation Compliance Evaluation Mechanical Technical Report 1 Standard 62.1 Ventilation Compliance Evaluation Lutheran Theological Seminary at Philadelphia The New Learning Center Prepared For: William P. Bahnfleth, Ph.D., P.E. Department

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members: SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development

More information

York 25-Ton VAV Rooftop Unit

York 25-Ton VAV Rooftop Unit HVAC PRO for Windows User s Manual 637.5 OEM Section Technical Bulletin Issue Date 0996 York 25-Ton VAV Rooftop Unit Introduction Page 3 Overview *3 Configuration 5 Sequence of Operation 7 Modes of Operation

More information

DEMAND CONTROLLED VENTILATION WITHOUT WIRES

DEMAND CONTROLLED VENTILATION WITHOUT WIRES DEMAND CONTROLLED VENTILATION WITHOUT WIRES With increased demand for intelligent climate control systems, more and more HVAC installations deploy VAV/VAQ terminals that allow temperature control in such

More information

Product Data. Features/Benefits. AirManager Control. 33AM Comfort System

Product Data. Features/Benefits. AirManager Control. 33AM Comfort System Product Data 33AM Comfort System AirManager Control CV CONTROL BOX VAV CONTROL BOX AirManager brings precise, intelligent control to your air handler operating component and function needs, including:

More information

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas

More information

ASHRAE Guideline 36 Advanced HVAC Control Sequences

ASHRAE Guideline 36 Advanced HVAC Control Sequences ASHRAE Guideline 36 Advanced HVAC Control Sequences Rick Stehmeyer - Senior Engineer Matt Napolitan, P.E., CCP, CPMP, LEED AP BD+C - Principal Image Source: http://worldatdistance.com/2013/10/07/the-complete-noobs-guide-to-making-a-website//

More information

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001 This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.

More information

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Urbana Free Library HVAC Analysis Prepared for the Urbana Free Library Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Report Dated August 8, 2016 1. Introduction The Urbana Free Library is

More information

HVAC Design Overview of Variable Air Volume Systems

HVAC Design Overview of Variable Air Volume Systems PDHonline Course M252 (4 PDH) HVAC Design Overview of Variable Air Volume Systems Instructor: A. Bhatia, B.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers. VAV Diffusers lease refer to the rice Engineer s HVAC Handbook for more information on VAV Diffusers. Diffuser Types Ceiling Diffusers Conventional air distribution systems typically group several rooms

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

b.) Technical Information:

b.) Technical Information: Section VI- Strategies a.) Summary: It is important for new construction designers to consider the heating, ventilation, and air conditioning needs within a building. There are many different systems,

More information

Zoned Rooftop Systems. Light commercial packaged rooftop systems from Trane

Zoned Rooftop Systems. Light commercial packaged rooftop systems from Trane Zoned Rooftop Systems Light commercial packaged rooftop systems from Trane Trane Zoned Rooftop Systems Components of Trane Zoned Rooftop Systems p. 3 Zoned Rooftop System Configurations p. 4 Systems comparison

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

Custom Air Handler Solutions Custom Units to Meet Your Unique Design Needs

Custom Air Handler Solutions Custom Units to Meet Your Unique Design Needs Custom Units to Meet Your Unique Design Needs Engineered for flexibility and performance Contents Horizontal Configuration....1 Horizontal with Standard Economizer Configuration...2 Stacked Configuration...3

More information

Harrington Tower Building

Harrington Tower Building Continuous Commissioning Report For the Harrington Tower Building Building #435 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory