COMcheck Software Version

Size: px
Start display at page:

Download "COMcheck Software Version"

Transcription

1 COMcheck Software Version Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 205 IECC Salt Lake City,Utah 5b New Construction Construction Site: 30 North Orange Street Salt Lake City, UT 846 Additional Efficiency Package Owner/Agent: ABI 7583 Main St, Midvale, UT Designer/Contractor: Justin Gibbs PVE Inc. 040 North 2200 West Salt Lake City, UT Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Mechanical Systems List Quantity System Type & Description 6 HVAC System (Single Zone): Heating: each - Duct Furnace,Gas,Capacity = 40 kbtu/h Proposed Efficiency = 95.00% Ec,Required Efficiency = 80.00% Ec Cooling: each - Single Package DX Unit,Capacity = 24 kbtu/h,air-cooled Condenser,No Economizer,Economizer exception: Low Capacity Residential Proposed Efficiency = 4.00 SEER,Required Efficiency = 4.00 SEER Fan System: FAN SYSTEM -- Compliance (Motor nameplate HP method) : Passes Fans: FAN Supply,Constant Volume,800 CFM,0.5 motor nameplate hp,0. fan efficiency 0 HVAC System 2 (Single Zone): Heating: each - Other,Hot Water,Capacity = 8 kbtu/h No minimum efficiency requirement applies Cooling: each - Split System,Capacity = 8 kbtu/h,air-cooled Condenser,No Economizer,Economizer exception: Low Capacity Residential Proposed Efficiency = 4.00 SEER,Required Efficiency = 3.00 SEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 8 Supply,Constant Volume,500 CFM,0.5 motor nameplate hp,0. fan efficiency 89 HVAC System 3 (Single Zone): Heating: each - Central Furnace,Gas,Capacity = 40 kbtu/h Proposed Efficiency = 95.00% Et,Required Efficiency = 80.00% Et Cooling: each - Split System,Capacity = 8 kbtu/h,air-cooled Condenser,No Economizer,Economizer exception: Low Capacity Residential Proposed Efficiency = 4.00 SEER,Required Efficiency = 3.00 SEER Fan System: FAN SYSTEM 3 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 9 Supply,Constant Volume,600 CFM,0.5 motor nameplate hp,0. fan efficiency 40 HVAC System 4 (Single Zone): Heating: each - Central Furnace,Gas,Capacity = 40 kbtu/h Proposed Efficiency = 95.00% Et,Required Efficiency = 80.00% Et Page of 5

2 Quantity System Type & Description Cooling: each - Split System,Capacity = 24 kbtu/h,air-cooled Condenser,No Economizer,Economizer exception: Low Capacity Residential Proposed Efficiency = 4.00 SEER,Required Efficiency = 3.00 SEER Fan System: FAN SYSTEM -- Compliance (Motor nameplate HP method) : Passes Fans: FAN Supply,Constant Volume,800 CFM,0.5 motor nameplate hp,0. fan efficiency 2 HVAC System 5 (Single Zone): Split System Heat Pump Heating Mode: Capacity = 4 kbtu/h, Proposed Efficiency = 9.00 HSPF,Required Efficiency = 8.20 HSPF Cooling Mode: Capacity = 4 kbtu/h, Proposed Efficiency = 5.00 SEER,Required Efficiency = 4.00 SEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 8 Supply,Constant Volume,500 CFM,0.5 motor nameplate hp,0. fan efficiency 2 HVAC System 6 (Unknown): Heating: each - Unit Heater,Electric,Capacity = 2 kbtu/h No minimum efficiency requirement applies Fan System: FAN SYSTEM 4 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 0 Supply,Constant Volume,50 CFM,0.5 motor nameplate hp,0. fan efficiency 4 HVAC System 7 (Unknown): Heating: each - Unit Heater,Electric,Capacity = 2 kbtu/h No minimum efficiency requirement applies Fan System: None Water Heater : Electric Storage Water Heater,Capacity: 5 gallons No minimum efficiency requirement applies 39 Water Heater : Gas Storage Water Heater,Capacity: 50 gallons,input Rating: 60 Btu/h Proposed Efficiency: 0.70 EF,Required Efficiency: 0.53 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 205 IECC requirements in COMcheck Version and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Justin Gibbs - PM Name - Title Signature Date 9/23/206 Page 2 of 5

3 COMcheck Software Version Inspection Checklist Energy Code: 205 IECC Requirements: 7.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section C03.2 [PR2] C03.2 [PR3] C405.7 [PR6] C406 [PR9] Plan Review? Comments/Assumptions Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Group R-2 dwelling units have separate electrical meters. Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Additional Comments/Assumptions: Page 3 of 5

4 Footing / Foundation Inspection? Comments/Assumptions C Radiant heating systems panels [FO2] 3 insulated to >=R-3.5 on face opposite space being heated. Snow/ice melting system sensors for 5, future connection to controls. Freeze protection systems have automatic 6 controls installed. [FO9] 3 See the Envelope Assemblies table for values. Additional Comments/Assumptions: Page 4 of 5

5 C404.5, C404.5., C Plumbing Rough-In Inspection? Comments/Assumptions Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. C404.5.,to pipe length and volume C404.5.,to pipe length and volume C404.5.,to pipe length and volume C404.5.,to pipe length and volume C404.5.,to pipe length and volume C404.5.,to pipe length and volume C404.5.,to pipe length and volume C404.5.,to pipe length and volume Page 5 of 5

6 Plumbing Rough-In Inspection? Comments/Assumptions 04 F. 04 F. Page 6 of 5

7 Plumbing Rough-In Inspection? Comments/Assumptions 04 F. 04 F. 04 F. 04 F. 04 F. Page 7of 5

8 Plumbing Rough-In Inspection? Comments/Assumptions 04 F. 04 F. Additional Comments/Assumptions: Page 8 of 5

9 Mechanical Rough-In Inspection? Comments/Assumptions C [ME4] 3 C [ME65] 3 C [ME7] 2 C [ME7] 2 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. Fans have efficiency grade (FEG) >= 67. The total efficiency of the fan at the design point of operation <= 5% of maximum total efficiency of the fan. Unenclosed spaces that are heated use only radiant heat. C HVAC equipment efficiency verified. [ME55] 2 C [ME59] C [ME5] 3 Demand control ventilation provided for spaces >500 ft2 and >25 people/000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. C Exhaust air energy recovery on [ME57] systems meeting Table C () and C (2). C [ME6] 3 C [ME60] 2 C [ME0] 2 C [ME] 3 Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Ducts and plenums sealed based on static pressure and location. Ductwork operating >3 in. water column requires air leakage testing. Page 9 of 5

10 Mechanical Rough-In Inspection? Comments/Assumptions C [ME] 3 C [ME] 3 C [ME] 3 C [ME] 3 C [ME] 3 C [ME] 3 C403.3 [ME62] C403.3 [ME62] C [ME22] 3 C [ME0] 3 Ductwork operating >3 in. water column requires air leakage testing. Ductwork operating >3 in. water column requires air leakage testing. Ductwork operating >3 in. water column requires air leakage testing. Ductwork operating >3 in. water column requires air leakage testing. Ductwork operating >3 in. water column requires air leakage testing. Ductwork operating >3 in. water column requires air leakage testing. Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provideameanstorelieveexcess outsideairduringoperation. Aireconomizersprovidedwhere required,meettherequirementsfor designcapacity,controlsignal, ventilationcontrols,high-limitshut-off, integratedeconomizercontrol,and provideameanstorelieveexcess outsideairduringoperation. Open- orclosedcircuitcoolingtowers haveaseparateheatexchangerto isolatethecoolingtowerfromthe heatpumploop,andheatlossis controlledbyshuttingdownthe circulationpumponthecoolingtower loop. MultiplezoneVAVsystemswithDDC of individualzoneboxeshavestatic pressuresetpointresetcontrols. C Multiple zone VAV systems with DDC 6 of individual zone boxes have static [ME0] 3 pressure setpoint reset controls. Exception:Requirementdoesnot apply. See the Mechanical Systemslistforvalues. Page 0 of 5

11 Mechanical Rough-In Inspection? Comments/Assumptions C [ME0] 3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. C Multiple zone VAV systems with DDC 6 of individual zone boxes have static [ME0] 3 pressure setpoint reset controls. C Multiple zone VAV systems with DDC 6 of individual zone boxes have static [ME0] 3 pressure setpoint reset controls. C Multiple zone VAV systems with DDC 6 of individual zone boxes have static [ME0] 3 pressure setpoint reset controls. C Multiple zone VAV systems with DDC 6 of individual zone boxes have static [ME0] 3 pressure setpoint reset controls. C Gas-fired water-heating equipment [ME] 2 installed in new buildings: where a singular piece of water-heating equipment >=,000 kbtu/h serves the entire building, thermal efficiency >= 90 Et. Where multiple pieces of water-heating equipment serve the building with combined rating >=,000 kbtu/h, the combined inputcapacity-weighted-average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 00 kbtu/h. C [ME53] 3 Air outlets and zone terminal devices have means for air balancing. Additional Comments/Assumptions: Page of 5

12 C303.3, C [FI8] 3 Final Inspection? Comments/Assumptions Furnished O&M manuals for HVAC systems within 90 days of system acceptance. C [FI27] 3 [FI47] 3 [FI47] 3 [FI47] 3 [FI47] 3 [FI47] 3 [FI47] 3 [FI47] 3 HVAC systems and equipment capacity does not exceed calculated loads. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Heat pump controls prevent. supplemental electric resistance heat [FI42] 3 from coming on when not needed. Thermostatic controls have a 5 F.2 deadband. [FI38] 3 NotApplicable DoesNot NotObservable NotApplicable Exception: Manual changeover thermostats. Page 2 of 5

13 .3 [FI20] 3 Final Inspection? Comments/Assumptions Temperature controls have setpoint overlap restrictions. Each zone equipped with setback 2 controls using automatic time clock or [FI39] 3 programmable control system. Automatic Controls: Setback to 55 F 2., (heat) and 85 F (cool); 7-day clock, 2- hour occupant override, 0-hour 2.2 backup [FI40] [FI4] [FI4] [FI4] [FI4] [FI4] [FI4] 3 C404.3 [FI] 3 C404.3 [FI] 3 C404.4 [FI25] 2 Systems include optimum start controls. Systems include optimum start controls. Systems include optimum start controls. Systems include optimum start controls. Systems include optimum start controls. Systems include optimum start controls. Heat traps installed on supply and discharge piping of non-circulating systems. Heat traps installed on supply and discharge piping of non-circulating systems. All piping insulated in accordance with section details and Table C Page 3 of 5

14 C404.4 [FI25] 2 C [FI28] C [FI3] C [FI0] C [FI32] C [FI29] C [FI7] 3 C [FI43] C [FI30] Final Inspection? Comments/Assumptions All piping insulated in accordance with section details and Table C Commissioning plan developed by registered design professional or approved agency. HVAC equipment has been tested to ensure proper operation. HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Economizers have been tested to ensure proper operation. Preliminary commissioning report completed and certified by registered design professional or approved agency. Furnished HVAC as-built drawings submitted within 90 days of system acceptance. An air and/or hydronic system balancing report is provided for HVAC systems. Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Additional Comments/Assumptions: Page 4 of 5

15 Page 5 of 5

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.4. Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 205 IECC Dallas, Texas 3a New Construction Construction Site: 56

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.9.4 Mechanical Compliance Certificate 01 IECC Section 1: Information Type: Addition Title : Construction Site: Owner/Agent: Designer/Contractor: 3030 North Industrial Way Castle

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2007) Standard HALCYON Bldg. 400 Alpharetta, Georgia 3a

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction

More information

Mechanical Compliance Certificate

Mechanical Compliance Certificate COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Austin, Texas 2a (weather data: TBD) New

More information

COMcheck Software Version Review Mechanical Compliance Certificate

COMcheck Software Version Review Mechanical Compliance Certificate COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 4.0.3.0 Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: AHSC (Asian Heal Service Center

More information

COMcheck Software Version Interior Lighting Compliance Certificate

COMcheck Software Version Interior Lighting Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Type: New Construction COMcheck Software Version 4.0.2.8 Interior Lighting Compliance Certificate Construction Site: Owner/Agent: Designer/Contractor:

More information

COMcheck Software Version Mechanical Compliance Certificate

COMcheck Software Version Mechanical Compliance Certificate COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

COMcheck Software Version Interior Lighting Compliance Certificate

COMcheck Software Version Interior Lighting Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Title: Berry Farms Animal Hospital Project Type: New Construction COMcheck Software Version 4.0.3.0 Interior Lighting Compliance Certificate

More information

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. 2018 NC Energy Conservation Code Commercial Mechanical Module 7 CHAPTER 5 [CE] WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members: SESSION 1-2015 Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE (90.1.2013) ASHRAE Detroit Members: AM Session is eligible for (X) Professional Development

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503 Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too

More information

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007

2006 Washington State Nonresidential Energy Code Compliance Form Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical Summary 2006 Washington State nresidential Energy Code Compliance Form MECH-SUM 2006 Washington State nresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

ASHRAE/IESNA Standard

ASHRAE/IESNA Standard ASHRAE/IESNA Standard 90.1-1999 An inside look at the requirements of Standard 90.1-1999 Energy Standard for Building Except Low-Rise Residential Building Mick Schwedler, PE Sr. Principal Applications

More information

Application of the 2012 North Carolina Energy Conservation Code

Application of the 2012 North Carolina Energy Conservation Code Application of the 2012 North Carolina Energy Conservation Code Commercial Mechanical Presented By: NC Code Officials Qualification Board Office of State Fire Marshal NC Department of Insurance 2012 Modules

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION. Mechanical Designer Information*

ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION. Mechanical Designer Information* ONTARIO BUILDING CODE AND SUPPLEMENTARY STANDARD SB-10 PROJECT INFORMATION Project: Building Permit Application No.: DETAILED FORMS Location: Date: Architectural Designer Information* Mechanical Designer

More information

1 - This title will copy onto other forms Date

1 - This title will copy onto other forms Date 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015

More information

Equipment Specifications and Required Information Quantity Rebate

Equipment Specifications and Required Information Quantity Rebate Rebate not to exceed 50% of the cost of equipment. Recycling rebates qualify for the entire rebate, regardless of the recycling cost. Equipment must be purchased or recycled in 2016. Installed equipment

More information

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC 2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances Rebate not to exceed cost of high efficiency equipment. Equipment must be purchased or recycled in 2015. Installed equipment must be on cooperative's lines. Submit the documentation listed below no later

More information

2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems

2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems 2011 Manitoba Energy Code for Buildings (MECB) PART 5, Heating, Ventilating and Air-conditioning Systems Dieter Bartel, Manitoba Hydro September 17 th, 2014 Outline Scope and compliance Prescriptive path

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

High Performance Building Guide 1

High Performance Building Guide 1 Description This Guide is intended to be used for projects with a Vermont Certified: High Performance energy efficiency goal. This High Performance goal is a whole-building efficiency approach rather than

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

NAHB Green Home Building Guidelines. 3.1 Prerequisites. ResCheck. Energy Efficiency

NAHB Green Home Building Guidelines. 3.1 Prerequisites. ResCheck. Energy Efficiency NAHB Green Home Building Guidelines Energy Efficiency 3.1 Prerequisites 3.1.1 Home is equivalent to the IESS 2003 or local energy code. Conformance shall be based on plan analysis using software. 3.1.2

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

C.E.P., C.E.M, C.I.P.E.

C.E.P., C.E.M, C.I.P.E. Subject What everyone needs to know about ASHRAE 90.1 J. Christopher Larry, P.E., C.E.P., C.E.M, C.I.P.E. Thursday, Joint ASHRAE AEE Meeting Cleveland, Ohio Introduction J. Christopher Larry P.E., C.E.P.,

More information

EnergyGauge USA Release Notes

EnergyGauge USA Release Notes EnergyGauge USA 5.0.02 Release Notes The latest release of EnergyGauge USA, Version 5.0.02, provides new features and bug fixes. This version includes new features for HERS raters. Key features added since

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA CITY OF DANA POINT COMMUNITY DEVELOPMENT, BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248 3594 www.danapoint.org INDOOR AIR QUALITY B011 AIR 2013 CALIFORNIA CODES CODE

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

DUCT LEAKAGE (Page 1 of 3)

DUCT LEAKAGE (Page 1 of 3) (Page 1 of 3) Note: Submit one Certificate of Acceptance for each system that Enforcement Agency Use: Checked by/date must demonstrate compliance. HERS verification required. This form used for duct pressure

More information

August 27, Section 3.2 Definitions. On page 11 delete the following definition:

August 27, Section 3.2 Definitions. On page 11 delete the following definition: ERRATA SHEET FOR THE FIRST PRINTING OF ANSI/ASHRAE/IESNA STANDARD 90.1-2004 (SI edition) Energy Standard for Buildings Except Low-Rise Residential Buildings August 27, 2009 The corrections listed in this

More information

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

2018 International Energy Conservation Code (IECC) Updates

2018 International Energy Conservation Code (IECC) Updates Providing effective energy strategies for buildings and communities 2018 International Energy Conservation Code (IECC) Updates 04.04.2018 12PM CDT Who we are Our goal: Reduce the energy footprint of Illinois.

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

The V in HVAC: Mechanical Ventilation in ENERGY STAR Certified Homes

The V in HVAC: Mechanical Ventilation in ENERGY STAR Certified Homes The V in HVAC: Mechanical Ventilation in ENERGY STAR Certified Homes March 1, 2013 RESNET Building Performance Conference Thomas Anreise, Fluid Market Strategies; Dean Gamble, US EPA; Charlie Haack, ICF

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

Verasys System Operation Overview Technical Bulletin

Verasys System Operation Overview Technical Bulletin Contents subject to change. Verasys System Operation Overview Technical Bulletin Code No. LIT-12012370 Issued January 2016 Refer to the QuickLIT Web site for the most up-to-date version of this document.

More information

Intermediate framed denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation.

Intermediate framed denotes standard framing 16 inches on center with headers insulated with a minimum of R-10 insulation. CITY OF PORT ORCHARD Permit Center Office located at 720 Prospect Street Mailing address: 216 Prospect Street Pt Orchard, WA 98366 (360) 874-5533 permitcenter@cityofptchard.us RESIDENTIAL ENERGY CODE WORKSHEET

More information

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee Gil Rossmiller In the construction industry for over 30 years ICC IRC Plumbing & Mechanical Code Development Committee ICC- IECC Commercial Energy Code Development Committee Building Official Parker, Colorado

More information

HVAC Trajectories toward Zero

HVAC Trajectories toward Zero HVAC Trajectories toward Zero Jon McHugh, McHugh Energy at WCEC Affiliate Forum Western Cooling Efficiency Center Davis, CA May 7, 2013 jon@mchughenergy.com McHugh Energy Consultants CPUC Big Bold EE Strategies

More information

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017 SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017 The Residential Energy Code Worksheet is a tool to help you plan your energy code needs for new or remodeled homes,

More information

Trane Engineers Newsletter Live

Trane Engineers Newsletter Live Trane Engineers Newsletter Live Presenters: John Murphy, Eric Sturm and Jeanne Harshaw (host) Trane program number: APP-CMC061-EN Agenda Trane Engineers Newsletter Live Series Abstract A large number of

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

Building Division WSEC & IRC Ventilation (Effective July 1, 2016) Residential Buildings Prescriptive Compliance Form

Building Division WSEC & IRC Ventilation (Effective July 1, 2016) Residential Buildings Prescriptive Compliance Form Residential Please Energy & Submit IRC Ventilation two (2) Prescriptive copies Compliance Fm Effective 7-1-2016 (F hardcopy submittals: please submit 2 copies) Building Division 801 228 th Ave SE Sammamish,

More information

2013 Building Energy Efficiency Standards Workshop

2013 Building Energy Efficiency Standards Workshop 2013 Building Energy Efficiency Standards Workshop Mazi Shirakh, P.E. Project Manager, Building Energy Efficiency Standards Martha Brook, P.E. Senior Mechanical Engineer Gary Flamm Supervisor, Building

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

2019 Smart Energy Existing Homes Program Manual

2019 Smart Energy Existing Homes Program Manual 2019 Smart Energy Existing Homes Program Manual Reduce the Use: Residential Table of Contents INTRODUCTION... 1-1 1.1 PROGRAM OVERVIEW... 1-1 1.2 PROGRAM ASSISTANT... 1-1 1.3 SANTEE COOPER RESIDENTIAL

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Performance Rating of Unit Ventilators

Performance Rating of Unit Ventilators AHRI Standard 840 (I-P) 1 2015 Standard for Performance Rating of Unit Ventilators Price $10.00 (M) $20.00 (NM) Printed in U.S.A. Office Copyright 2009, by Air-Conditioning and Refrigeration Institute

More information

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals control sequences Table 47: QST / EST Analog Electronic Control Strategies Control Package Number QST EST FS-A-5000 FSE-A-5000 FS-A-5001 FSE-A-5001 FS-A-5002 FSE-A-5002 FS-A-5003 FSE-A-5003 FS-A-5004 FSE-A-5004

More information

ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P Edition) Energy Standard for Buildings Except Low-Rise Residential Buildings.

ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD (I-P Edition) Energy Standard for Buildings Except Low-Rise Residential Buildings. ERRATA SHEET FOR ANSI/ASHRAE/IES STANDARD 90.1-2013 (I-P Edition) Energy Standard for Buildings Except Low-Rise Residential Buildings July 7, 2017 The corrections listed in this errata sheet apply to ANSI/ASHRAE/IES

More information

b) Medium dwelling units that are not included in (a) above {small dwelling}, OR (c) below {large dwelling} Requires 3.5 credits

b) Medium dwelling units that are not included in (a) above {small dwelling}, OR (c) below {large dwelling} Requires 3.5 credits MASON COUNTY DEPARTMENT OF COMMUNITY SERVICES BUILDING DIVISION SHELTON (360) 427-9670 BELFAIR (360) 275-4467 Elma (360) 482-5269 FAX: (360) 427-7798 WEB SITE: www.co.mason.wa.us 615 W ALDER STREET, SHELTON

More information

T7300F Multistage Conventional or Heat Pump Programmable Commercial Thermostat

T7300F Multistage Conventional or Heat Pump Programmable Commercial Thermostat T7300F Multistage Conventional or Heat Pump Programmable Commercial Thermostat 1.0 GENERAL 1.1 Overview GUIDE SPECIFICATION The contractor shall furnish, install, and place in operating condition an HVAC

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager. 10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager 2019 WHEA Webinar Johnson Controls Institute Overview Operation & Maintenance (O&M)

More information

Total Credits 0.00 *Please refer to Table R406.2 for complete option descriptions

Total Credits 0.00 *Please refer to Table R406.2 for complete option descriptions Prescriptive Energy Code Compliance f All Climate Zones in Washington Project Infmation Contact Infmation This project will use the requirements of the Prescriptive Path below and incpate the the minimum

More information

2009 Washington State Energy Code Residential Sections

2009 Washington State Energy Code Residential Sections 2009 Washington State Energy Code Residential Sections Gary Nordeen, Luke Howard, Emily Salzberg (360) 956-2042 energycode@energy.wsu.edu Produced with funding from: 1 WSEC text Washington State University

More information

Designing Energy Efficient Outdoor Air Systems

Designing Energy Efficient Outdoor Air Systems Designing Energy Efficient Outdoor Air Systems Joseph Thorndal Applied Products Sales Manager Greenheck, Schofield, Wisconsin 1 Joseph Thorndal BS Industrial Engineering North Dakota State University Work

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards 2013 Residential Compliance June 2014

Registration Number: Registration Date/Time: HERS Provider: CA Building Energy Efficiency Standards 2013 Residential Compliance June 2014 (Page 1 of 3) A. System Information 01 Space Conditioning System Identification or Name: 02 Space Conditioning System Location or Area Served: 03 Building Type from CF1R 04 05 Verified Low Leakage Ducts

More information

INDEX. ADDITIONS AND ALTERATIONS Defined Requirements ADMINISTRATION AND ENFORCEMENT... Chapter 1 AIR ECONOMIZERS

INDEX. ADDITIONS AND ALTERATIONS Defined Requirements ADMINISTRATION AND ENFORCEMENT... Chapter 1 AIR ECONOMIZERS A ADDITIONS AND ALTERATIONS Requirements........................ 101.4.3 ADMINISTRATION AND ENFORCEMENT..................... Chapter 1 AIR ECONOMIZERS Defined.................................202 Requirements........

More information

Power and Energy Management Solutions

Power and Energy Management Solutions Selection Guide Power and Energy Management Solutions Heating, Ventilating and Air Conditioning (Bulletin 1414) Selection Guide 2 HVAC Selection Guide Instrumentation Selection Checklist Use the following

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 15990 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the Specifier in correctly specifying Mechanical System Testing Adjusting

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

TESTING, ADJUSTING AND BALANCING

TESTING, ADJUSTING AND BALANCING PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction February 1, 2013 Re: Request for Qualifications for Commissioning Services Art Building Replacement Construct New Facility (#0194401) University of

More information

PRE-PRINT APPENDIX E GREEN MECHANICAL CODE SUPPLEMENT

PRE-PRINT APPENDIX E GREEN MECHANICAL CODE SUPPLEMENT GREEN MECHANICAL CODE SUPPLEMENT E 101.0 General. E 101.1 Scope Applicability. The purpose of this appendix is to provide a comprehensive set of technically sound provisions that encourage sustainable

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) CALIFORNIA MECHANICAL CODE MATRIX ADOPTION TABLE APPENDIX E SUSTAINABLE PRACTICES (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority

More information

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment ZonexCommander ZonexCommander(Plus) Network All Your HVAC Equipment Centralized DDC Communications for Stand-Alone HVAC and Zoned Systems Installation and Applications Manual Part #ZCMAN Rev. Oct 2014

More information

2015 & 2012 International Mechanical Code Significant Changes and the PA Uniform Construction Code

2015 & 2012 International Mechanical Code Significant Changes and the PA Uniform Construction Code 2015 & 2012 International Mechanical Code Significant Changes and the PA Uniform Construction Code Welcome! Shawn Strausbaugh Director PMG Technical Resources ICC Government Relations sstrausbaugh@iccsafe.org

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Heat Recovery Ventilator Model PVe Light Industrial Commercial Institutional

Heat Recovery Ventilator Model PVe Light Industrial Commercial Institutional Heat Recovery Ventilator Model PVe Light Industrial Commercial Institutional 1,000-6,000 cfm 2.0 in. wg External Static Pressure Aluminum Plate Heat Exchanger April 2017 Heat Recovery Ventilators Greenheck

More information

Test, Adjust, and Balance Services Submittal

Test, Adjust, and Balance Services Submittal TAB Submittal Alley 111 Test, Adjust, and Balance Services Submittal Page 2 Professional Qualifications Page 4 Applicable Certifications Page 7 MMFS TAB Agenda Page 13 Sample report Page 1 of 44 25 05

More information

Energy-Efficiency Measures List

Energy-Efficiency Measures List Guidelines for Public Agencies Energy-Efficiency Measures List 1.0 Envelope 1.1 Reduce Heat Losses-Ceiling/roof 1.11 Additional Ceiling/Roof Insulation 1.12 Exhaust Attics 1.13 Use Light-Colored Roof Surfaces

More information

Selected Laboratory Energy Efficiency Measures

Selected Laboratory Energy Efficiency Measures Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper

More information

2016 BUILDING ENERGY EFFICIENCY STANDARDS RESIDENTIAL HVAC ALTERATIONS

2016 BUILDING ENERGY EFFICIENCY STANDARDS RESIDENTIAL HVAC ALTERATIONS B 2016 BUILDING ENERGY EFFICIENCY STANDARDS RESIDENTIAL HVAC ALTERATIONS COMMUNITY DEVELOPMENT DEPARTMENT 345 N. EL DORADO STREET STOCKTON, CA 95202 (209) 937-8561 www.stocktongov.com/cdd/building BUSINESS

More information

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.0 GENERAL SECTION 15740 SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.01 DESCRIPTION Item A. Scope This section specifies four sizes of fan coil units designed for hydronic heating and air conditioning.

More information

TO THE FOR PRESCRIPTIVE COMPLIANCE OF FOR RESIDENTIAL ALTERATIONS

TO THE FOR PRESCRIPTIVE COMPLIANCE OF FOR RESIDENTIAL ALTERATIONS TO THE FOR PRESCRIPTIVE COMPLIANCE OF FOR RESIDENTIAL ALTERATIONS The to the 2013 Energy Code for prescriptive compliance for HERS required measures for residential alterations is a guide for those who

More information

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment

ZonexCommander. ZonexCommander(Plus) Installation and Applications Manual. Network All Your HVAC Equipment ZonexCommander ZonexCommander(Plus) Network All Your HVAC Equipment Centralized DDC Communications for Stand-Alone HVAC and Zoned Systems Installation and Applications Manual Part #ZCMAN Rev. July 2010

More information

APPLICATION GUIDE BEAMS

APPLICATION GUIDE BEAMS BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.

More information

SYST0101CW Product Specifications

SYST0101CW Product Specifications SYST0101CW Product Specifications IONt SYSTEM CONTROL NOTE: Iont System Control compatible with Iont System indoor equipment only. US Patents: U.S. Pat No. 7,243,004, U.S. Pat No. 7,775,452, pointsett

More information