1 DOCUMENT June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION SECTION SSP SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION MISCELLANEOUS PROVISIONS SPECIAL PROVISIONS CONTROL OF PIPING/TUBING/FITTINGS SCHEDULE OF VALUES PROJECT MEETINGS CONSTRUCTION SCHEDULES SHOP DRAWINGS AND SAMPLES TESTING LABORATORY SERVICES TEMPORARY FACILITIES TEMPORARY EROSION AND POLLUTION CONTROL PROJECT CLOSEOUT CLEANING UP PROJECT RECORD DOCUMENTS OPERATING AND MAINTENANCE DATA DIVISION 2 - SITEWORK SECTION SECTION SECTION SECTION SECTION SECTION EARTHWORK WATER DISTRIBUTION BITUMINOUS CONCRETE PAVEMENT CONCRETE PAVEMENTS AND CURBS FOUNDATION DRAINAGE SYSTEMS CHAIN LINK FENCES AND GATES DIVISION 3 - CONCRETE SECTION CAST-IN-PLACE CONCRETE DIVISION 4 - MASONRY SECTION UNIT MASONRY DIVISION 5 - METALS SECTION SECTION SECTION SECTION SECTION SECTION STRUCTURAL STEEL STEEL DECK METAL FABRICATIONS INTERIOR METAL STAIRS EXTERIOR METAL STAIRS GRATINGS DIVISION 0-1 SECTION 00003

2 DIVISION 6 - WOOD AND PLASTICS SECTION SECTION ROUGH CARPENTRY FINISH CARPENTRY DIVISION 7 - THERMAL AND MOISTURE PROTECTION SECTION COMPOSITE SHEET WATERPROOFING SECTION BUILDING INSULATION SECTION FIRESTOPPING SECTION MANUFACTURED ROOF PANELS SECTION MANUFACTURED WALL PANELS SECTION MODIFIED BITUMEN MEMBRANE ROOFING DIVISION 7 THERMAL AND MOISTURE PROTECTION - Continued SECTION SECTION SECTION ROOF ACCESSORIES SPRAYED FIRE-RESISTIVE MATERIALS JOINT SEALANTS DIVISION 8 - DOORS AND WINDOWS SECTION SECTION SECTION SECTION SECTION STEEL DOORS AND FRAMES ACCESS DOORS OVERHEAD COILING DOORS DOOR HARDWARE GLAZING DIVISION 9 - FINISHES SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION GYPSUM BOARD ASSEMBLIES GYPSUM BOARD SHAFT-WALL ASSEMBLIES CERAMIC TILE ACOUSTICAL PANEL CEILINGS RESILIENT TILE FLOORING STATIC-CONTROL RESILIENT FLOOR COVERINGS CARPET CARPET TILE STATIC-DISSIPATIVE CARPET TILE PAINTING DIVISION 10 - SPECIALTIES SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION TOILET COMPARTMENTS ACCESS FLOORING SIGNAGE METAL WARDROBE LOCKERS FIRE EXTINGUISHERS, CABINETS, AND ACCESSORIES WIRE MESH PARTITIONS OPERABLE PANEL PARTITIONS TOILET AND BATH ACCESSORIES TEMPORARY CONTAINMENT MATERIAL DIVISION 11 EQUIPMENT NOT USED DIVISION 0-2 SECTION 00003

3 DIVISION 12 - FURNISHINGS SECTION SECTION SECTION SECTION PLASTIC LAMINATE-FACED CASEWORK VERTICAL LOUVER BLINDS FURNITURE/WORK STATIONS FLOOR MATS AND FRAMES DIVISION 13 - SPECIAL CONSTRUCTION - NOT USED DIVISION 14 - CONVEYING SYSTEMS SECTION SECTION HYDRAULIC PASSENGER ELEVATOR HYDRAULIC FREIGHT ELEVATORS DIVISION 15 - MECHANICAL GENERAL SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION GENERAL REQUIREMENTS, MECHANCIAL DIVISION 15 SPECIFICATIONS STEEL PIPE AND FITTINGS NON-FERROUS PIPE AND FITTINGS CAST IRON PIPE AND FITTINGS DUCTILE IRON PIPE AND FITTINGS PLASTIC PIPE AND FITTINGS STAINLESS STEEL PIPE AND FITTINGS SPECIAL UNDERGROUND PIPING SYSTEMS DIELECTRIC PIPING CONNECTIONS PIPE HANGERS AND SUPPORTS PIPE ANCHORS AND GUIDES PIPING CONSTRUCTION PENETRATIONS GATE VALVES GLOBE VALVES BALL VALVES BUTTERFLY VALVES LUBRICATED PLUG COCKS AND VALVES CHECK VALVES SERVICE DRAINS BALANCING FITTINGS BACKFLOW PREVENTER FLEXIBLE CONNECTORS AND PUMP CONNECTORS PIPELINE STRAINERS AIR VENTS GAUGES AND THERMOMETERS FLUID FLOW-MEASURING SYSTEMS ELECTRICAL COORDINATION IDENTIFICATION SYSTEMS CHEMICAL TREATMENT FOR CLOSED HYDRONIC SYSTEMS CHEMICAL TREATMENT FOR OPEN HYDRONIC SYSTEMS VIBRATION ISOLATION PIPING INSULATION EQUIPMENT INSULATION DUCTWORK INSULATION DIVISION 0-3 SECTION 00003

4 FIRE PROTECTION SYSTEMS SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION FIRE PROTECTION PIPING SYSTEMS SPRINKLER HEADS SPRINKLER SYSTEM ALARM VALVES FIRE DEPARTMENT CONNECTIONS WET-PIPE SPRINKLER SYSTEMS DRY-PIPE SPRINKLER SYSTEM CARBON DIOXIDE FIRE EXTINGUISHING SYSTEMS HOSE RACKS AND CABINETS FIRE PROTECTION SYSTEM AIR COMPRESSORS AND ACCESSORIES PLUMBING SYSTEMS SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION DOMESTIC WATER PIPING SYSTEMS DRAIN, WASTE, AND VENT PIPING SYSTEMS INDUSTRIAL GAS PIPING SYSTEMS FUEL GAS PIPING SYSTEMS SHOCK ABSORBERS HOSE BIBBS FIXED AIR GAPS DOMESTIC HOT WATER REGULATORS PRESSURE CONTROL DEVICES FOR DOMESTIC WATER SYSTEM PLUMBING TRAPS PLUMBING CLEANOUTS ROOF DRAINS FLOOR AREA AND TRENCH DRAINS PLUMBING FIXTURE CARRIERS PLUMBING FIXTURES AND ACCESSORIES ELECTRIC WATER HEATERS, STORAGE TYPE INSTANTANEOUS STEAM WATER HEATERS HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION HYDRONIC PIPING SYSTEMS HYDRONIC SYSTEM ACCESSORIES STEAM AND STEAM CONDENSATE PIPING SYSTEMS SELF-CONTAINED THERMOSTATIC VALVES STEAM TRAPS STEAM VACUUM BREAKERS AND AIR VENTS STEAM PRESSURE REDUCING VALVES STEAM SAFETY VALVES REFRIGERANT PIPING SYSTEMS HORIZONTAL IN-LINE CENTRIFUGAL PUMPS VERTICAL IN-LINE CENTRIFUGAL PUMPS BASE-MOUNTED END SUCTION CENTRIFUGAL PUMPS BASE-MOUNTED DOUBLE SUCTION PUMPS CONDENSATE RETURN PUMPS WATER PRESSURE REDUCING VALVE INDUCED DRAFT COOLING TOWERS REMOTE COOLING TOWER SUMP TANKS CENTRIFUGAL WATER CHILLERS STEAM TO WATER HEAT EXCHANGERS PLATE AND FRAME HEAT EXCHANGERS COMPUTER ROOM AIR CONDITIONING UNITS EVAPORATIVE PAN HUMIDIFIERS FIN TUBE RADIATION UNIT HEATERS CABINET HEATERS PACKAGED HEATING, VENTILATING, AND AIR CONDITIONING UNITS DIVISION 0-4 SECTION 00003

5 SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION June 16, 2005 SMALL CENTRIFUGAL FANS UTILITY FANS IN-LINE CENTRIFUGAL FANS PANEL FANS POWER ROOF VENTILATORS WELDING FUME EXHAUST SYSTEMS AND ACCESSORIES AIR FILTER ASSEMBLIES BENCH TOP (NON PRODUCTION) PAINT EXHAUST BOOTH AND ACCESSORIES METALLIC HVAC DUCTWORK FLEXIBLE DUCTS METALLIC FUME EXHAUST DUCTWORK DUCTWORK CONSTRUCTION PENETRATIONS FIRE AND SMOKE DAMPERS FLEXIBLE CONNECTIONS ROOF CURBS AIR FLOW MONITORING STATIONS INTAKE AND EXHAUST WALL LOUVERS VARIABLE VOLUME REHEAT BOXES GRILLES, REGISTERS, AND DIFFUSERS, GENERAL REQUIREMENTS LOUVER CONE FACE DIFFUSERS TOTAL AIR DIFFUSERS BAR FACE GRILLES AND REGISTERS HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS - Continued SECTION SECTION SECTION PERFORATED PLATE FACE GRILLES DRUM LOUVERS AUTOMATIC TEMPERATURE CONTROL, GENERAL DIVISION 16 - ELECTRICAL SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION GENERAL REQUIREMENTS, ELECTRICAL BASIC MATERIALS AND METHODS CABLE TRAYS MANHOLES DUCTBANK MEDIUM VOLTAGE CABLE VARIABLE FREQUENCY DRIVES MOTOR CONTROL CENTERS GROUNDING ENGINE GENERATOR STANDBY ELECTRICAL DISTRIBUTION EQUIPMENT SECONDARY UNIT SUBSTATION DISTRIBUTION TRANSFORMERS BUSWAY TRANSFER SWITCHES LIGHTING SYSTEMS AND FIXTURES LIGHTNING PROTECTION SYSTEM TRANSIENT VOLTAGE SURGE SUPPRESSION SYSTEM POWER CONDITIONERS FIRE DETECTION AND ALARM SYSTEM PUBLIC ADDRESS SYSTEM INTERCOM SYSTEM MOTOR CONTROLS AND POWER WIRING * * * * * DIVISION 0-5 SECTION 00003

Design Standards Manual

Design Standards Manual Design Standards Manual Table of Contents: Part III (Divisions 1-32) Section No. Title Revision DIVISION 1: GENERAL REQUIREMENTS 01524 Construction Waste Management 05/07 01815 HVAC Commissioning Requirements

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL) Basketball Courts 15 25 Built Improvements Playgrounds, Site Furniture, etc. 20 20 Catch Basin 40 40 Cold Water Lines 40 40 Compactors DHW Supply

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity

More information

SAFETY PLUMBING PACKAGES. Quality Products & Value Packages SUSTAINABILITY. Residential Solutions ANTI-SCALE SYSTEMS FIRE PROTECTION

SAFETY PLUMBING PACKAGES. Quality Products & Value Packages SUSTAINABILITY. Residential Solutions ANTI-SCALE SYSTEMS FIRE PROTECTION Quality Products & Value Packages Residential Solutions FIRE PROTECTION COMFORTSUSTAINABILITYCONTROL PRESSURE REGULATORS TRENCH DRAINSHVAC SYSTEMS SAFETY ANTI-SCALE SYSTEMS HEATING & COOLING CONTROLS PLUMBING

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

INDEX OF VA STANDARD DETAILS AS OF DECEMBER 2014

INDEX OF VA STANDARD DETAILS AS OF DECEMBER 2014 DIVISION 00 SD000115-01 SD000115-02 SD000115-03 SD000115-04 SD000115-05 SD000115-06 SD000115-07 SD000115-08 SD000115-09 SD000115-10 SD000115-11 SD000115-12 SD000115-13 SD000115-14 SD000115-15 SD000115-16

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS SECTION 238126 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS 230500 HVAC BASIC MATERIAL AND METHODS PART 1 GENERAL 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS A. Section 230000 Basic HVAC Requirements B. Section 230523 Valves C. Section 230510 Chilled

More information

A. This Section includes the following domestic water piping specialties:

A. This Section includes the following domestic water piping specialties: SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

CIVIC CONDOMINIUM PREVENTIVE MAINTENANCE SCHEDULE

CIVIC CONDOMINIUM PREVENTIVE MAINTENANCE SCHEDULE Index No. Category/Component DescripCon Doors & Windows DW- 1 Door Hardware & Closers X DW- 2 Exterior Metal Doors X DW- 3 Garage & Loading Ramp Doors DW- 4 Interior Wood & Metal Doors X DW- 5 Storefront

More information

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components. Page 238126-1 SECTION 238126 - This Section includes requirements for the LEED Rating System. However, equipment specified in this Section may not qualify for LEED Rating System prerequisites and credits.

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1 L21366/101 090 00.00/Page 1 HVAC EXECUTIVE SUMMARY The North Middlesex Regional High School has received average maintenance of the HVAC systems over its occupied years. Even with adequate maintenance,

More information

Francis M McKay Elementary School

Francis M McKay Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

HVAC Equipment Access Equipment Location

HVAC Equipment Access Equipment Location City of Lancaster- Building Department 121 East Chestnut Street, Suite 102, Lancaster, Ohio 43130-3825 (740) 687-6649, Fax (740) 681-5030 Web site: www.ci.lancaster.oh.us/dept/building HVAC Heating, Ventilating,

More information

SECTION (15833) - HVAC POWER VENTILATORS

SECTION (15833) - HVAC POWER VENTILATORS PART 1 GENERAL 1.01 SUMMARY SECTION 23 34 23 (15833) - HVAC POWER VENTILATORS A. Section Includes: 1. Centrifugal Roof Ventilators. 2. Up-blast Roof Exhaust Fans (Kitchen Hood Exhaust). 3. Ceiling-Mounted

More information

SECTION Heating, Ventilation & Air Conditioning CONSTRUCTION STANDARDS

SECTION Heating, Ventilation & Air Conditioning CONSTRUCTION STANDARDS PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University for Heating, Ventilating, and Air Conditioning (HVAC). B.

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

Top of the World Tower

Top of the World Tower Workplace Building Preventive Maintenance Checklist conducted for Top of the World Tower Conducted on 22 Oct 2018 11:00 AM Prepared by Greg Langley Location 1247 Dartmouth St, Albany, CA 94706, USA Completed

More information

SECTION COMPUTER ROOM AIR CONDITIONING SYSTEMS

SECTION COMPUTER ROOM AIR CONDITIONING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Specification Sections, apply to this Section. B. Related

More information

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Construction Standards Page 233423-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013 SECTION 15800 - AIR HANDLING EQUIPMENT 1.1 GENERAL A. All air handlers installed shall conform to the University of Rochester specification Guideline for Semi-Custom and Pre-Engineered Air Handling Units.

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - Systems and Equipment. Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross

More information

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE SCHEDULE OF S Penalty Fees. The fee for construction work performed before securing permit(s), where required, may be charged a fee of TWO TIMES THE COST OF THE PERMIT (S). Building Fee Schedule Residential

More information

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. 23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under

More information

AIRPORT PLUMBING DESIGN STANDARDS REV. 3 3/18/2016

AIRPORT PLUMBING DESIGN STANDARDS REV. 3 3/18/2016 1.1 GOALS The goal of this section is to provide guidance in the design of Plumbing and Fire Protection systems to LAWA standards. The LAWA Plumbing Design Standards are a compilation of general design

More information

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED Ashton Elementary School 1 Masonry Repair $ 42,781.50 2 Replace HVAC $ 375,000.00 3 Replace SAT @ Various Locations $ 92,364.00 3 Recoat & Resurface Exterior Paved Play Area $ 135,978.30 3 Various Technological

More information

Your Single Source Partner with Watts for a Comprehensive Suite of Innovative Water Solutions

Your Single Source Partner with Watts for a Comprehensive Suite of Innovative Water Solutions Your Single Source Partner with Watts for a Comprehensive Suite of Innovative Water Solutions WATER UALITY ACKFLOW REVENTION LUMBING & LOW CONTROL OneWattsWater.com Watts is the Smart Choice Foodservice

More information

007100S01 - PROGRAM DESIGN CRITERIA

007100S01 - PROGRAM DESIGN CRITERIA Related Division Contents: 00 PROGRAM DESIGN 01 GENERAL INFORMATION 33 CENTRAL STEAM PIPING AND EQUIPMENT 21 FIRE PROTECTION PIPING AND EQUIPMENT 33 MAIN CAMPUS CENTRAL CHILLED WATER SYSTEM 07 ROOFING

More information

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Number: ADMIN 120A Issued Date: March 21, 2016 Page: 1 of 10 Reference: ADMIN Section 120 LICENSES AND REGISTRATIONS General. There shall be various classes of licenses and an electrical registration,

More information

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan.

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan. Appendix B Symbols for Drawings Table B.1 Air moving devices and ductwork symbols Air Movement Fans Axial flow fan Centrifugal fan Propeller fan Intake roof ventilator (supply) Exhaust roof ventilator

More information

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015 1.1 GOALS The goal of this section is to provide guidance in the design of Plumbing and Fire Protection systems to LAWA standards. The LAWA Plumbing Design Standards are a compilation of general design

More information

Joseph Brennemann Elementary School

Joseph Brennemann Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Design and Construction Standards SECTION PLUMBING EQUIPMENT SECTION 15450 PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES: A. Water heaters. B. Packaged water heating systems. C. Water storage tanks. D. Water softeners. E. Pumps. F. Circulators. 1.2 REFERENCES

More information

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS SECTION 23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

More information

Facilities Management State-Funded and Billable Services

Facilities Management State-Funded and Billable Services Facilities Management State-Funded and Billable Services Facilities Management receives funding to provide maintenance in eligible state-supported areas only, per UCOP guidelines. State-supported areas,

More information

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES SECTION 15830 HEATING & COOLING TERMINAL UNITS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All fan coil units shall be sized to meet design load while operating at medium speed. In extreme noise sensitive

More information

A. This section includes design and performance information for fire protection and suppression systems.

A. This section includes design and performance information for fire protection and suppression systems. SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials

More information

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008 SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section

More information

Agustin Lara Elementary Academy

Agustin Lara Elementary Academy Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

CMHC HOME MAINTENANCE CHECKLIST

CMHC HOME MAINTENANCE CHECKLIST Make sure air vents indoors and outdoors (intake, exhaust and forced air) are not blocked by snow or debris. Check and clean range hood filters on a monthly basis. Test ground fault circuit interrupter(s)

More information

John Palmer Elementary School

John Palmer Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Calmeca Academy of Fine Arts and Dual Language

Calmeca Academy of Fine Arts and Dual Language Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SECTION PLUMBING EQUIPMENT

SECTION PLUMBING EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT

More information

Edward Jenner Elementary Academy of the Arts

Edward Jenner Elementary Academy of the Arts Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical

More information

Facility Improvements

Facility Improvements AP-SI-03 BICYCLE RACK ADDITION AP-SI-05 EXTERIOR BENCH ADDITIONS Installation of bike rack will allow for designated and secure storage of bicycles. Installation of exterior benches will provide an outdoor

More information

Your Single. Source. Partner with Watts Water. for a Comprehensive Suite. of Innovative Water Solutions. OneWattsWater.com

Your Single. Source. Partner with Watts Water. for a Comprehensive Suite. of Innovative Water Solutions. OneWattsWater.com Your Single Source Partner with Watts Water for a Comprehensive Suite of Innovative Water Solutions OneWattsWater.com SINCE 1874 INNOVATIVE SOLUTIONS RESIDENTIAL CONST COMMERCIAL CONSTRUCTION MUNICIPAL

More information

DIVISION 23 HVAC Hydronic Piping Systems

DIVISION 23 HVAC Hydronic Piping Systems General Information Programming/ Design Bidding/ Preconstruction Installation/ Construction Closeout/ Warranty QA/QC Checklist Construction Services DIVISION 23 HVAC 23 21 13 Hydronic Piping Systems 01

More information

MH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee.

MH Non-Residential Permit Fees All Commercial Permit fees require a 3% BBS State Tax and are subject to a plan review and base fee. BUILDING New Building $.45 per sq ft $3,500 Min $.40 per sq ft $1,000 Min $.20 per sq ft $250 Min Demolition $.10 per sq ft $150 Min Accessory Structure (over 200 sq ft) $.40 per sq ft $750 Min Retaining

More information

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

TABLE OF CONTENTS Limitations of Authority...6 Table Swimming Pool, Spa, and Hot Tub Permit Fees...7

TABLE OF CONTENTS Limitations of Authority...6 Table Swimming Pool, Spa, and Hot Tub Permit Fees...7 TABLE OF CONTENTS CHAPTER 1 ADMINISTRATION..............1 101.0 General.......................1 101.1 Title..........................1 101.2 Scope........................1 101.3 Purpose......................1

More information

Josefa Ortiz De Dominguez Elementary School

Josefa Ortiz De Dominguez Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and

More information

Additions to previously issued sections have been underlined. Deletions have been struck out. Design Issue TABLE OF CONTENTS Firm Date VOLUME 1

Additions to previously issued sections have been underlined. Deletions have been struck out. Design Issue TABLE OF CONTENTS Firm Date VOLUME 1 UIC COM PEORIA The following listed documents comprise the project manual for the project listed above. Where numerical sequence of sections is interrupted, such interruptions are intentional. The complete

More information

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems

Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

A. General: Refer to paragraph entitled "SUBMITTAL" in Section Include the following data:

A. General: Refer to paragraph entitled SUBMITTAL in Section Include the following data: SECTION 15860 - FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR MECHANICAL

More information

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services Page 238216-1 Copyright 2003 and 2005 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical

More information

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008 SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section

More information

Campbell County Memorial Hospital Radiology Renovation Addition Gillette, Wyoming

Campbell County Memorial Hospital Radiology Renovation Addition Gillette, Wyoming Campbell County Memorial Hospital Radiology Renovation Addition Schematic Design Systems Narrative April 19, 2013 CTA, Inc. 204-1/2 South Gillette Ave. 82716 (307) 686-7121 CIVIL - SITE Geotechnical The

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

Richard Henry Lee Elementary School

Richard Henry Lee Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Charter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department

Charter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department Charter Township of Flushing Construction Permit Fee Schedule.Construction and Development Services Department 1. CONSTRUCTION PERMIT FEES: A. General: Fee basis/value of construction shall be determined

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 05 93 - TESTING, ADJUSTMENT AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

SECTION CONVECTION HEATING AND COOLING UNITS

SECTION CONVECTION HEATING AND COOLING UNITS PART 1 GENERAL 1.01 SECTION INCLUDES A. Baseboard radiation. B. Finned tube radiation. C. Convectors. D. Unit heaters. E. Cabinet unit heaters. F. Fan-coil units. G. Unit ventilators. H. Blower-coil units.

More information

FACILITY STANDARDS (FS) 2 TABLE OF CONTENTS

FACILITY STANDARDS (FS) 2 TABLE OF CONTENTS FACILITY STANDARDS (FS) 2 TABLE OF CONTENTS FS 2 Orientation and Navigation Volume I- Introduction and Principles A. Overview 1. Guideline Compliance 2. Process B. Economic Impact Program 1. Economic Impact

More information

Estimated Repair, Replacement, and Upgrade Costs

Estimated Repair, Replacement, and Upgrade Costs Description Electrical Attic ventilator-mechanical $250 Baseboard heater (4') $150-$400 Ceiling fan $200 Doorbell system $80-$100 Dryer duct $100-$150 Hardwired smoke detector $60-$120 Exhaust Fan-Bathroom

More information

OKLAHOMA STATE UNIVERSITY - BUILDING DESIGN STANDARDS

OKLAHOMA STATE UNIVERSITY - BUILDING DESIGN STANDARDS Page 1 PART 1 GENERAL 1.1 SUMMARY A. Work of this section includes providing basic mechanical materials including, but not limited to, the following: 1. Valves. 2. Pipe expansion joints. 3. Supports and

More information

SECTION INSPECTION AND TESTING OF WORK

SECTION INSPECTION AND TESTING OF WORK SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section

More information

DeWitt Clinton Elementary School

DeWitt Clinton Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers L#56566/Page 1/May 23, 2017 HVAC Heating Plant The original Town Hall building and Addition building are primarily heated by a gas fired hot water plant that is located in the basement. The boiler plant

More information

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES Below is a list of services delivered by the University s Facilities Services Department. While all of these services are delivered

More information

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS)

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS) EXPRESSION OF INTEREST (EOI) FOR Fire Fighting System (FFS) KWtE-03-PR-EO-ACC-0 Rev01 11 Version: Date: Prepared by: Approved: 01 7/11/18 VMC AMN Page 1 OF 5 1 Project overview ACCIONA s Engineering, Procuring

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

Oscar DePriest Elementary School

Oscar DePriest Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual