HVAC Myths and Realities Trane Engineers Newsletter Live Series

Size: px
Start display at page:

Download "HVAC Myths and Realities Trane Engineers Newsletter Live Series"

Transcription

1 HVAC Myths and Realities Trane Engineers Newsletter Live Series

2 AGENDA Low delta T is unavoidable 55 F supply air temperature is adequate for today s loads ASHRAE Standard 15 has to be updated before new refrigerants can be used Single-zone VAV units do not need hot gas reheat VFDs and affinity laws Small changes in pressure can have a huge impact on airflow for flat fan curves and may cause the system to surge New chilled-water systems need to be variable-primary flow System airflow issues are the fans fault Claims to energy savings

3 Myth Number 1 Low delta T is unavoidable.

4 Transport Energy is low delta T unavoidable? Tons= ( T GPM)/24 Solving for gpm GPM= (Tons 24) / T Pumping power Frictional Head Flow 2 Water HP (bhp)= (GPM head (ft))/3960 Water HP Flow 3 Delta T 3

5 Coil Delta T is low delta T unavoidable? AHRI Certified Coil Air Flow (VAV) unloading v ASHRAE Chilled-Water Coil Selection Chilled-water cooling coils shall be selected to provide a 15 F or higher temperature difference between leaving and entering water temperatures and a minimum of 57 F leaving water temperature at design conditions Engineer s Newsletter Live Coil Selection and Optimization

6 Reason 1: 3-Way Control Valves undesirable mixing in variable flow systems 50% Coil Load 1. 3-way control valves Eliminate them! Coil LVG 59 F Coil Delta T = 17 F System Delta T = 8.5 F CHWR 50.5 F Bypass 42 F CHWS 42 F CHWR = [(42 x 50) + (59 x 50)] / 100 = 50.5

7 Reason 2: Supply Air Setpoint Depression overdriving coil capacity 1. 3-way control valves 2. Control setpoint depression Avoid, limit and return 55 LAT = 16 DT 52 LAT = 11 DT 50 LAT = 8.5 DT CHW Delta T leaving air setpoint

8 Reason 3: Warmer Chilled Water Supply reduced heat transfer driving force LMTD 1. 3-way control valves 2. LAT setpoint depression 3. Warmer chilled water Chilled water reset only at part load CHW Delta T CHWS = 16 DT 47 CHWS = 7.5 DT 50 CHWS = 5 DT entering CHW temperature

9 Reason 4: Deficient Control Valves poor flow control at full and part loads 1. 3-way control valves 2. LAT setpoint depression 3. Warmer chilled water 4. Deficient control valves Control Valve Issues 1. Improperly Selected / Oversized 2. Worn-out 3. Unstable control 4. $29.95 (cheap) 5. 3-way valves

10 Reason 4: Deficient Control Valves poor flow control 1. 3-way control valves 2. LAT setpoint depression 3. Warmer chilled water 4. Deficient control valves Specify quality valves specific to use 8 th floor control point 20 ft pd 2 nd floor pressure 90 ft pd

11 Reason 4: Deficient Control Valves poor flow control 1. 3-way control valves 2. LAT setpoint depression 3. Warmer chilled water 4. Deficient control valves Pressure independent valves? (PIV) 1. Mechanical 2. Electronic Pressure independent valves Not required May be beneficial

12 Reason 5: Tertiary Pumping undesirable mixing is hard to prevent 1. 3-way control valves 2. LAT setpoint depression 3. Warmer chilled water 4. Deficient control valves 5. Tertiary pumping / bridge tender circuits Don t mix to the return simply pressure boost CHWS Bypass Valve DP CHWR

13 Design Delta T and Greater is Achievable 1. AHRI certified coil selections 2. AHU set point limits 3. Chilled water reset only at part load 4. Properly selected / high quality valves 5. Pressure boosting no tertiary mixing

14 Myth Number 1 Low Delta T is unavoidable.

15 Myth Number 2 55 F supply air temperature is adequate for today s loads.

16 full load OA 96 F DB, 76 F WB RA 74 F DB, 52% RH MA 80 F DB SA F DB (1,500 cfm) SA RA 80 MA full load OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

17 full load OA 96 F DB, 76 F WB RA 74 F DB, 57% RH MA 86 F DB SA F DB (800 cfm) SA RA' RA 80 MA full load OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

18 full load OA 96 F DB, 76 F WB RA 74 F DB, 52% RH MA 89 F DB SA F DB (630 cfm) SA' SA RA 80 MA full load OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

19 Improving Dehumidification Cool and reheat Face-and-bypass dampers Reduce airflow Dual paths Desiccants

20 full load OA 96 F DB, 76 F WB RA 74 F DB, 52% RH MA 86 F DB SA (55) F DB (800 cfm) SA CA SA' 70 RA 80 MA full load OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

21 Type III Series Desiccant (CDQ) C 50 F DB 97% RH 52 gr/lb CA 55 F DB 64% RH 42 gr/lb (43 F DP) SA 8-12 rph MA' MA 75 F DB 67% RH 87 gr/lb (64 F DP) 80 F DB 50% RH 77 gr/lb (60 F DP) (10,000 cfm)

22 full load OA 96 F DB, 76 F WB RA 74 F DB, 52% RH MA 81 F DB SA F DB (1,350 cfm) SA CA SA' 80 MA' MA RA full load OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

23 Myth Number 2 55 F supply air temperature is adequate for today s loads.

24 Myth Number 3 Single-zone VAV units do not need hot gas reheat.

25 Classroom Example basic CV system peak DB outdoor condition sensible load latent load space SHR supply airflow outdoor airflow space temp supply air temp 96 F DB, 76 F WB 29,750 Btu/h 5,250 Btu/h ,500 cfm 450 cfm 74 F 55.7 F 1,500 cfm = Jacksonville, Florida 29,750 Btu/h (74 F T supply )

26 Example: K-12 Classroom OA RA MA SA CV full load 96 F DBT 68 F DPT (450 cfm) 74 F DBT 52% RH 81 F DBT 55 F DBT (1500 cfm) (4.8 tons) CV part load 84 F DBT 76 F DPT (450 cfm) 74 F DBT 67% RH 77 F DBT 63 F DBT (1500 cfm) SA 60 SA 70 RA 80 RA MA MA peak DPT OA Jacksonville, FL 180 peak DBT OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

27 Example: K-12 Classroom OA RA MA SA CV full load 96 F DBT 68 F DPT (450 cfm) 74 F DBT 52% RH 81 F DBT 55 F DBT (1500 cfm) (4.8 tons) CV part load 84 F DBT 76 F DPT (450 cfm) 74 F DBT 67% RH 77 F DBT 63 F DBT (1500 cfm) (3.7 tons) SA 60 SA MA RA RA MA peak DPT OA Jacksonville, FL 180 peak DBT OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

28 Example: K-12 Classroom peak DPT day zone humidity, %RH 67% cooling load, tons 3.7 fan airflow, cfm 1500 mild/rainy day constant-speed fan zone humidity, %RH 73% cooling load, tons 1.6 fan airflow, cfm 1500

29 Hot Gas Reheat packaged DX units MA evaporator CA reheat coil condenser reheat valve

30 Example: K-12 Classroom constant-speed fan constant-speed fan with hot gas reheat peak DPT day zone humidity, %RH 67% cooling load, tons 3.7 fan airflow, cfm 1500 mild/rainy day zone humidity, %RH 73% cooling load, tons 1.6 fan airflow, cfm 1500 compressor energy 60% % Space humidity is maintained

31 Improved Part-Load Dehumidification EA RA 1050 cfm zone 74 F OA 450 cfm 96 F DBT 68 F DPT 1500 cfm 55 F SA

32 Example: K-12 Classroom OA RA MA SA CV full load 96 F DBT 68 F DPT (450 cfm) 74 F DBT 52% RH 81 F DBT 55 F DBT (1500 cfm) (4.8 tons) CV part load 84 F DBT 76 F DPT (450 cfm) 74 F DBT 67% RH 77 F DBT 63 F DBT (1500 cfm) (3.7 tons) SZVAV part load 84 F DBT 76 F DPT (450 cfm) 74 F DBT 57% RH 79 F DBT 55 F DBT (900 cfm) (4.0 tons) 50 SA 60 SA MA RA RA MA peak DPT OA Jacksonville, FL humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

33 Example: K-12 Classroom peak DPT day constant-speed fan zone humidity, %RH 67% cooling load, tons 3.7 fan airflow, cfm 1500 constant-speed fan with hot gas reheat variable-speed fan 57% mild/rainy day zone humidity, %RH 73% cooling load, tons 1.6 fan airflow, cfm % % %

34 SZVAV Dehumidification Performance VAV may be enough Consider hot gas reheat for: Even lower space humidity levels Widely varying loads Oversized units

35 Example: K-12 Classroom OA RA MA SA SZVAV full load 96 F DBT 68 F DPT (450 cfm) 74 F DBT 52% RH 81 F DBT 55 F DBT (1500 cfm) SZVAV Oversized 96 F DBT 68 F DPT (450 cfm) 74 F DBT 56% RH 80 F DBT 58 F DBT (1750 cfm) SZVAV part load 84 F DBT 76 F DPT (450 cfm) 74 F DBT 59% RH 78 F DBT 58 F DBT (1050 cfm) 50 SA SA 60 SA 70 RA 80 MA RA RA MA MA peak DPT OA Jacksonville, FL 180 peak DBT OA humidity ratio, grains/lb of dry air dry-bulb temperature, F 110

36 Avoid Oversizing! Oversizing supply airflow leads to: Warmer supply-air temperature Less dehumidification (in non-arid climates) Elevated indoor humidity Examples include: Auditoriums Gymnasiums Church sanctuaries Etc.

37 Humidity Control with SZVAV Avoid oversizing equipment Verify proper fan speed and discharge air temperature setpoints Equip the unit with hot gas reheat, if necessary

38 Myth Number 4 Single-zone VAV units do not need hot gas reheat

39 Myth Number 4 Slap on a VFD and you are entitled to get full advantage of the affinity laws. = Speed 3 Savings

40 The Affinity Laws dynamic compression fans/impellers Background: 1. Fans, pump impellers and other dynamic compression devices. 2. Application limited to systems with only frictional flow losses. 3. Ignoring changes in device efficiency at different conditions. If and only if the above are true then: 1. Pressure varies proportionally to the square of the impeller speed. 2. Flow produced varies proportionally to the impeller speed. 3. Power (BHP) required varies in a cubic proportion to the impeller speed.

41 The Affinity Laws Graphically dynamic compression fans/impellers Device performance in frictional pressure loss systems Pressure is proportional to the speed squared Flow is proportional to the speed Power is proportional to the speed cubed flow/pressure/power (%) pressure flow power speed (%)

42 Systems and the Affinity Laws compliant systems Systems that comply Cooling towers Single zone VAV air systems.

43 Cooling Tower Fans affinity laws 100% flow 100% pressure 100% power Cooling Tower OFF 15 kw Cooling Tower 60 HZ speed/pressure/power (%) speed pressure power 85 F 100 F P flow (%)

44 Cooling Tower Fans affinity laws For Free Discharge Fans W2 = W1 x (S2 / S1) 3 W2 = 15 kw x (30 / 60) 3 W2 = 1.88 kw Cooling Tower OFF 1.88 kw Cooling Tower 60 HZ speed/pressure/power (%) speed pressure power 85 F 92.5 F P flow (%)

45 Systems and the Affinity Laws non-compliant systems Systems that don t comply: Chilled water Hot water MultiZone VAV Condenser water HVAC cooling units HVAC heating units (HP) Non-compliant characteristics: Control valves and setpoints Fixed lift Refrigeration lift / heat exchangers / minimum flows

46 VPF Chilled Water Systems systems and the affinity laws Non-compliance factors Pump minimum speed limits speed/pressure/power (%) speed pressure power flow (%)

47 Pump Minimum Speed Impact VPF chilled-water systems Non-compliance factors Pump minimum speed limits 33% minimum speed speed/pressure/power (%) pump min speed pressure power flow (%)

48 Differential Pressure Control Impact VPF chilled-water systems Non-compliance factors Pump minimum speed limits A fixed pressure control setpoint 20 ft. setpoint 80 ft. frictional loss speed/pressure/power (%) DP pressure setpoint speed power flow (%)

49 Heat Exchanger Minimum Flow Impact VPF chilled-water systems Non-compliance factors Pump minimum speed limits A fixed pressure control setpoint Heat exchanger minimum flow limits 50% minimum flow speed/pressure/power (%) HX min flow pressure power flow (%)

50 Combined Limit Power Impact VPF chilled-water systems Non-compliance factors Pump minimum speed limits A fixed pressure control setpoint Heat exchanger minimum flow limits speed/pressure/power (%) Pump min speed HX min flow DP setpoint flow (%) affinity power

51 High HX Minimum Flow Impact VPF chilled-water systems Non-compliance factors Pump minimum speed limits A fixed pressure control setpoint Heat exchanger minimum flow limit 70% speed/pressure/power (%) HX min flow pressure power flow (%)

52 Myth Number 4 Slap on a VFD and you are entitled to get full advantage of the affinity laws. Systems that comply Cooling towers Single zone VAV HVAC systems. Systems that don t comply Chilled water Hot water Condenser water Multi-zone VAV HVAC cooling units HVAC heating units (HP)

53 Myth Number 5 Small changes in pressure can have a huge impact on airflow for flat fan curves and may cause a fan system to surge.

54 Small Changes in Pressure Static pressure inches w.g Forward Curved (FC) Fan Do not select region 1100 RPM 900 RPM 700 RPM 500 RPM 50% WOCFM 60% 70% 80% 90% peak pressure Far from peak some may select here CFM in 1000s

55 Fan Performance Test 7 blocked off 14 total static pressure (in H 2 O) restricted less restricted wide open Brake horsepower (bhp) airflow (cfm) 0

56 Pressure = f(airflow) 6 Forward Curved (FC) Fan 50% WOCFM 60% static pressure inches w.g RPM 900 RPM 700 RPM 70% 80% 90% RPM CFM in 1000s

57 Two Different Systems 6 Forward Curved (FC) Fan 50% WOCFM 60% static pressure inches w.g RPM 900 RPM 700 RPM actual system Design system 70% 80% 90% RPM CFM in 1000s

58 System Fan static pressure inches w.g. Is dependent on the Fan Is dependent on the System CFM

59 System Change: Steep Fan Curve 25-inch steep fan curve 8 45 % WO 50 % WO 7 60 % WO total static pressure (in H 2 O) RPM 1300 RPM 0.5 change RPM 700 RPM 14,500 cfm (vs. 15,000 cfm) 3.3% loss 70 % WO 80 % WO 90 % WO RPM 150 RPM 200 RPM 300 RPM 500 RPM 1750 RPM 1000 RPM 1500 RPM 2000 RPM airflow (cfm)

60 System Change: Flat Fan Curve 25-inch flat fan curve RPM 25 % WO % WO total static pressure (in H 2 O) change RPM 600 RPM 500 RPM 400 RPM 14,500 cfm (vs. 15,000 cfm) 6.7% loss 60 % WO 70 % WO 80 % WO 90 % WO RPM 500 bhp 750 bhp 1000 bhp 1500 bhp 2000 bhp airflow (cfm)

61 Myth Number 6 Small changes in pressure can have a huge impact on airflow for flat fan curves and may cause a fan system to surge.

62 Myth Number 6 A chilled water system needs to be variable primary flow to be efficient.

63 Variable Primary Flow (VPF) Savings First cost: 4-8% Annual energy: 3-8% Life-cycle cost: 3-5% Compared VPF and Primary-Secondary

64 Low Pump Power Install pump VSD Use VSD to set design flow rate Open balancing valve Employ chilled water reset If system is constant flow reduce design flow rate further

65 Design Flow ~ Minimum Flow Chilled water Ts ASHRAE GreenGuide (16-18 F T) Section Coil shall be selected to provide 15 F or higher temperature difference between leaving and entering temperatures. Chillers with limited evaporator choices

66 Design Flow ~ Minimum Flow Flow turndown = Design flow / Minimum flow Single chiller Turndown > 1.3 Two chillers Turndown > 1.5 Consider piping the chillers in series

67 Conversion from Primary-Secondary Convert to VPF If entire plant is being re-piped anyway Additional capacity is needed Install chiller where primary pumps used to be Change to Variable-Primary/ Variable-Secondary Cooling capacity is adequate Piping changes are minimal

68 Convert to Variable Primary/Variable Secondary VFDs DP ΔT = 1 or 2 ºF DP Placeholder for Manifolded P-S System picture (Beth to supply)

69 Plant Operator Doesn t understand the plant Wants to manually control VPF

70 Myth Number 7 A chilled water system needs to be variable primary flow to be efficient.

71 Myth Number 7 Fans often don t deliver the airflow they are supposed to and it s the fan s fault.

72 ANSI/ASHRAE 51 (AMCA ) Figure 12: Outlet Chamber Setup-Multiple Nozzles in Chamber Test chamber

73 System Effect: Developing a Uniform Velocity Profile fan Not enough space to fully develop uniform velocity profile

74 Free and Abrupt Discharge Hidden loss as high as 1.0 inches w.g. OA

75 AMCA Publication 201, Fans and Systems Prediction of common System Effect Factors

76 Common System Effects Open discharge, elbow, branch, turning vanes, or damper located too close to the fan outlet Elbow, turning vanes, air straightener, or other obstruction located too close to the fan inlet Pre-swirling the air prior to it entering the fan wheel Use of an inlet plenum or cabinet

77 Flex Duct Problems Good Bad flex duct

78 Low Airflow Troubleshooting Common problems: Unexpectedly high system pressures Leaks Fan installed or running backwards Close-coupled fittings From A Practical Guide to Noise and Vibration Control for HVAC Systems (M. Schaffer, 1991)

79 Fan Rotation Forward-curved Backward-tended Backward-inclined Backward-curved Airfoil

80 Low Airflow Troubleshooting Over-amping problems: Bad component (motor or bearings) Installation: Wheel-cone overlap Belt tension, belt/shaft alignment Wheel-cone overlap

81 Low Airflow Troubleshooting Uncommon problems: Wrong fan installed Cutoff issues (housed fans only) Software/catalog error Quantum mechanics & string theory Fan cutoff (split in this case)

82 Field Measurements Evaluating the right parameters: Airflow Pressure Speed Power Things to watch out for: VFD settings Damper position (systems with a return or exhaust fan) Parameter measurement error

83 Parameter Measurement Error Your duct system?

84 Parameter Measurement Error AMCA 203 Field Performance Measurement of Fan Systems

85 AMCA Fan Application Manual Publication 201 Fans and Systems Lists possible causes for low flow, including: Improper inlet duct design Improper outlet duct design Improper fan installation Unexpected system resistance characteristics Improper allowance for fan system effect Dirty filters, ducts, coils Performance determined using uncertain field measurement techniques Includes much help for system effect corrections

86 AMCA Fan Application Manual Publication 202 Troubleshooting Lists possible causes for low airflow, including: Improper fan installation or assembly Damage in handling or transit System design error Deterioration of system Faulty controls Poor fan selection Includes detailed troubleshooting checklists

87 Myth Number 8 Fans often don t deliver the airflow they are supposed to and it s the fan s fault.

88 Myth Number 8 You can save (20, 30, 40, 50 80) percent.just by doing this

89 Savings Claims 40 is the new 30!

90 50 is the New 40 improved system efficiency of up to 54%

91 And now from an online brochure

92 Percent Savings: Questions to Ask Compared to what? What is the baseline? What else changed? (particularly for retrofits).

93 Percent Savings: Questions to Ask Compared to what? What is the baseline? What else changed? (particularly for retrofits). Is the comparison valid for Your building? Your application and load profile? Your climate?

94 78.5 Percent Claim Indirect evaporative cooling Compared to compressor cooling Dry climate Water is available Does the solution meet my customers needs?

95 Myth Number 8 You can save (20, 30, 40, 50 80) percent.just by doing this Make sure the baseline and comparison are valid for the specific project Perform an analysis on energy savings, energy cost savings, and ROI Help the client determine if the solution is in both their short-term and long-term interests

96 Myth Number 9 Anti-freeze doesn t have much affect on chilled water systems.

97 Example Fluid Properties and Impacts Fluid Property Compared to Water Impact Result Viscosity Increases Pressure drop increases Pump power increases Film heat transfer coefficient Drops Heat transfer worsens More flow required Specific heat Drops More flow required Pressure drop and pump power increase Specific gravity Rises Less flow required Pressure drop and pump power increase

98 Fluid Properties at 60 F Property Water 25% EG 25% PG Viscosity (lb/hr-ft) Thermal conductivity (Btu/ hr-ft- F) Specific heat (Btu/lb- F) Specific gravity

99 ASHRAE, (2016) ASHRAE Handbook HVAC Systems and Equipment.

100 Antifreeze Affect on the Coil heat transfer capability can change by 40% or more when antifreeze solutions are used consult the manufacturer s rating data in glycol systems.

101 Antifreeze Affect on the Chiller 17% Reduction ASHRAE, (2016) ASHRAE Handbook HVAC Systems and Equipment.

102 Required Flow Tons= 500 gpm T cp /12,000 ( ῤ/ ῤw ɤ ) Tons(water)= gpm T /24 Tons(25% EG)= gpm T /25.5 Tons(25% PG)= gpm T /25

103 Antifreeze Affect Water: 25% EG: 25% PG: gpm = 24 x tons x ΔT gpm = 25.5 x tons x ΔT gpm = 25 x tons x ΔT More flow is required

104 Affect of Antifreeze on Flow ΔP (Flow2 / Flow1) 2 Δ Pump Power (Flow2 / Flow1) 3 Antifreeze Flow increase (%) Pressure drop increase (%) Pump power increase (%) 25% EG % PG

105 Affect of Antifreeze Viscosity Pressure drop increase 25% EG: 9% 25% PG: 17% ASHRAE, (2016) ASHRAE Handbook HVAC Systems and Equipment.

106 Reality: Affects of Antifreeze Capacity Coil Chiller Pump Flow Pressure Power It s all bad except the system doesn t freeze

107 Guidance use the smallest possible concentration to produce the desired antifreeze properties. ASHRAE, (2016) ASHRAE Handbook HVAC Systems and Equipment.

108 Freeze and Burst Protection Burst protection Keep pipes from bursting Crystal formation is ok Use when equipment is not going to run in winter Freeze protection Solution must remain 100% liquid Necessary when equipment operates in freezing conditions

109 Freeze and Burst Protection Ethylene Glycol % Propylene Glycol % Temperature ( F) Freeze Burst Freeze Burst

110 Myth Number 10 Anti-freeze doesn t have much affect on chilled water systems.

Trane Engineers Newsletter Live

Trane Engineers Newsletter Live Trane Engineers Newsletter Live HVAC Myths and Realities Presenters: Systems and Applications Engineers Lee Cline, Dustin Meredith and Mick Schwedler with Jeanne Harshaw (host) Trane program number: APP-CMC062-EN

More information

Fan Laws. Keith Miller. Samuel Tepp Associates. Paul Cenci, P. E.-Principal Brian England-Principal. Samuel Tepp Associates 1/6/10

Fan Laws. Keith Miller. Samuel Tepp Associates. Paul Cenci, P. E.-Principal Brian England-Principal. Samuel Tepp Associates 1/6/10 Fan Laws Keith Miller Samuel Tepp Associates Paul Cenci, P. E.-Principal Brian England-Principal Basic Terms CFM - Cubic Feet per Minute, volume (amount) of air being moved SP - Static Pressure, resistance

More information

EarthWise System Seminar

EarthWise System Seminar EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States

More information

Introduction to Fans. The Basics of Fan Principles and Terminology

Introduction to Fans. The Basics of Fan Principles and Terminology Introduction to Fans The Basics of Fan Principles and Terminology Airflow Principles A fan is a rotating device that creates pressure differential that results in air movement Pressure rise in a fan Downstream

More information

Fan Selection. and Energy Savings

Fan Selection. and Energy Savings Fan Selection and Energy Savings Reducing power consumption by minimizing system pressure loss and choosing the right equipment HBy BRIAN MLEZIVA Greenheck Fan Corp. Schofield, Wis. Power Consumption HVAC

More information

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc. System Components with ` Emphasis on Packaged Rooftop Application and Installation Jerry Cohen President Jacco & Assoc. Agenda Define and relate in practical terms the following components: System Effect

More information

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT

AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT AC SYSTEM CONFIGURATION- CENTRAL CHILLER PLANT Central Chiller Plant (with Cooling Tower and Chilled Water distribution) The other AC configuration is called a Chilled Water or Larger Cooler system. It

More information

Designing Energy Efficient Outdoor Air Systems

Designing Energy Efficient Outdoor Air Systems Designing Energy Efficient Outdoor Air Systems Joseph Thorndal Applied Products Sales Manager Greenheck, Schofield, Wisconsin 1 Joseph Thorndal BS Industrial Engineering North Dakota State University Work

More information

Agenda and Objectives

Agenda and Objectives Agenda and Objectives Trane Engineers Newsletter Live Series Variable-Speed Drives (VSDs) and Their Effect On HVAC System Components Variable-speed drives (VSDs) can save energy, but the savings may not

More information

Technical Development Program

Technical Development Program Technical Development Program COMMERCIAL HVAC CHILLER EQUIPMENT Water-Cooled Chillers PRESENTED BY: Omar Rojas Sales Engineer Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

Chiller Plant Design. Application Guide AG McQuay International. Elevation Difference. Column Height When Pump Is Off

Chiller Plant Design. Application Guide AG McQuay International. Elevation Difference. Column Height When Pump Is Off Application Guide AG 31-003-1 Chiller Plant Design 51.5F Return Water To Chiller Two 400 Ton Chillers Each At 300 Tons (Balanced Load) 51.5F 480 gpm Flow Through Decoupler 44F 54F Building Load 600 Tons

More information

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb

More information

Adding More Fan Power Can Be a Good Thing

Adding More Fan Power Can Be a Good Thing This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of

More information

Summary Comparison of Simulation Program Features

Summary Comparison of Simulation Program Features Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours

More information

APPLICATION GUIDE BEAMS

APPLICATION GUIDE BEAMS BEAMS There is an increasing need for energy efficient air conditioning systems as energy codes become more stringent. Chilled beam systems are one such alternate to traditional all air conditioning systems.

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Method to test HVAC equipment at part load conditions

Method to test HVAC equipment at part load conditions IPLV Method to test HVAC equipment at part load conditions For water cooled chillers: 100% load ( % hrs) + 75% ( Hrs ) + 50% ( Hrs ) + 25% ( Hrs ) = IPLV value Manufacturer can favor this number by tweaking

More information

Agenda and Objectives

Agenda and Objectives Agenda and Objectives Trane Engineers Newsletter Live Series Air-Handling Systems, Energy, and IAQ Air-handling systems are key elements for building comfort and air quality, but they use energy. How much

More information

Pharmaceutical Facility Design

Pharmaceutical Facility Design PhEn-602 Pharmaceutical Facility Design J. Manfredi Notes 9A PhEn-602 J. Manfredi 1 Primary & Secondary HVAC units Primary Primary air handling unit arrangement: One unit is responsible for all of the

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

Technical Development Program

Technical Development Program Technical Development Program PRESENTED BY: James Parker Insert your logo here AIR HANDLERS Coils: Direct Expansion Chilled Water and Heating Menu Section 1 Introduction Section 2 Typical Coil Applications

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

RT-OA TM Rooftop Outdoor-Air (DOAS)

RT-OA TM Rooftop Outdoor-Air (DOAS) RT-OA TM Rooftop Outdoor-Air (DOAS) A/C s & HEAT PUMPS (DX - Air Source Data) Dedicated Outside-Air System (DOAS) Solutions Office Buildings, Schools, Hospitals, Restaurants, Gyms & Fitness Centers, Hotels,

More information

Trane CDQ Desiccant Dehumidification

Trane CDQ Desiccant Dehumidification Engineering Bulletin Trane CDQ Desiccant Dehumidification September 2004 CLCH-PRB020-EN Preface This engineering bulletin presents the Trane CDQ desiccant dehumidification system. It explains the features

More information

Appendices. Included in this section are

Appendices. Included in this section are Appendices Included in this section are Appendix A Building Overview Appendix B Alternative Mechanical Designs Appendix C Integration of Structural System and Constructability 68 Appendix A Building Overview

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

To Keep Docs Cool, Dry and Happy

To Keep Docs Cool, Dry and Happy To Keep Docs Cool, Dry and Happy David N. Schurk DES., CEM., LEED-AP., CDSM., SFP., CWEP. Director of Healthcare Accounts for Heat Transfer Solutions in Houston, TX. Learning Objectives 1. Understand the

More information

HVAC Systems What the Rater Needs to Know in the Field CALCS-PLUS

HVAC Systems What the Rater Needs to Know in the Field CALCS-PLUS HVAC Systems What the Rater Needs to Know in the Field This presentation used CASE* studies from the following *CASE Copy And Steal Everything HVAC Systems - What the Rater Needs to Know in the Field This

More information

AHRI 920 & ASHRAE 90.1

AHRI 920 & ASHRAE 90.1 AHRI 920 & ASHRAE 90.1 Optimizing Solutions through Superior Dehumidification Technology SM 1 About the Presenter Paul Stewart Education: BSGE University of Illinois Work History: Johnson Controls Inc.

More information

Redesign of Bennett Hall HVAC System

Redesign of Bennett Hall HVAC System MEE 488 April 18, 2006 Redesign of Bennett Hall HVAC System Greg Andreasen Michael Chicoine Florent Hohxa Jason Jacobe Mechanical Engineering, University of Maine, Orono ME 04473, USA ABSTRACT Our task

More information

Presented By: John Dolan, P.E.

Presented By: John Dolan, P.E. Variable Speed Compressor Technologies Presented By: John Dolan, P.E. President - Thermosystems, Inc. BS in Mechanical Engineering from UIUC 29 years HVAC Equipment Application Experience jdolan@thermohvac.com

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

RT-OA TM Rooftop Outdoor-Air (DOAS)

RT-OA TM Rooftop Outdoor-Air (DOAS) RT-OA TM Rooftop Outdoor-Air (DOAS) A/C s & HEAT PUMPS Dedicated Outside-Air System (DOAS) Solutions Office Buildings, Schools, Hospitals, Restaurants, Gyms & Fitness Centers, Hotels, Retail Stores...!

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

Energy Recovery with Cooling and Heating Model ERCH

Energy Recovery with Cooling and Heating Model ERCH Energy Recovery with Cooling and Heating Model ERCH 100% Outdoor Air System Dedicated Outdoor Air System 1,000-10,000 cfm 1.75 in. wg External Static Pressure Indirect Gas, Hot Water, Electric Heating,

More information

Fans: Features and Analysis

Fans: Features and Analysis Technical Development Program COMMERCIAL HVAC EQUIPMENT Fans: Features and Analysis PRESENTED BY: Michael Ho Version 1.2 Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section

More information

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges.

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges. Service Literature The LGH/LCH high and standard efficiency 5, 0, 5 and 50 ton (, 0.7, 58. and 75.9 kw) units, are configure to order units (CTO) with a wide selection of factory installed options. The

More information

Energy Recovery with Cooling and Heating

Energy Recovery with Cooling and Heating Energy Recovery with Cooling and Heating VersiVent - Model VER Commercial Institutional 2,000-10,000 cfm 3.0 in. wg external static pressure Configurable September 2008 Page The VersiVent Header Model

More information

Best Practices for Applied Rooftop ` Systems, Applications and. Jerry Cohen President Jacco & Assoc. Installation

Best Practices for Applied Rooftop ` Systems, Applications and. Jerry Cohen President Jacco & Assoc. Installation Best Practices for Applied Rooftop ` Systems, Applications and Jerry Cohen President Jacco & Assoc. Installation Established 1968 Hudson, Ohio Columbus, Ohio Toledo, Ohio Focused on the Engineered Environment

More information

Trane Engineers Newsletter Live

Trane Engineers Newsletter Live Trane Engineers Newsletter Live Presenters: John Murphy, Dustin Meredith and Jeanne Harshaw (host) Trane program number: APP-CMC059-EN Agenda Trane Engineers Newsletter Live Series Abstract The Air Movement

More information

Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae

Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 Prepared by: psuae APPENDIX C Air System Sizing Summary for Lobby System Project Name: Existing Lobby 04/04/2005 12:56PM Air System Information Air System Name Equipment Class Air System Type Lobby System CW AHU SZCAV Number

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March GENERAL: 1. This section provides criteria for the design and installation of air handling units. DESIGN GUIDELINES: Design General 1. Location 1.1. For new construction, and existing buildings where possible,

More information

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled

More information

Mechanical Systems Design

Mechanical Systems Design Mechanical Systems Design After much deliberation and a long process of brainstorming ideas for potential mechanical system designs for the, it was finally decided to design a central chilled water plant

More information

CTI Sponsored Educational Program

CTI Sponsored Educational Program Presented By: Kent Martens SPX Cooling Technologies, Inc. Slide No.: 1 CTI Mission Statement To advocate and promote the use of environmentally responsible Evaporative Heat Transfer Systems (EHTS) for

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island

Session: HVAC 101 HVAC 101. Steve Sain Sain Engineering Associates, Inc. August 9, Rhode Island Convention Center Providence, Rhode Island Session: HVAC 101 HVAC 101 Steve Sain Sain Engineering Associates, Inc. August 9, 2016 Rhode Island Convention Center Providence, Rhode Island Why? 2 Acknowledgements 3 Disclaimer I m gonna shoot down

More information

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.

More information

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION ENERGY EFFICIENT DEHUMIDIFICATION PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM Provides a very high degree of latent cooling using only a minimal amount of conventional cooling input Substantial energy

More information

Partial Load Performance Of Refrigeration System

Partial Load Performance Of Refrigeration System Chapter 11 Partial Load Performance Of Refrigeration System Copy Right By: Thomas T.S. Wan 温到祥著 Sept. 3, 2008 All rights reserved Hot Gas Bypass & Liquid Injection: When the compressor is under surge condition,

More information

BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application

BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application 1 BRINE CIRCULATED ICE THERMAL STORAGE SYSTEM DESIGN - CASE ILLUSTRATION - Partial Ice Storage for Air Conditioning Application By: T. S. Wan Date: Oct. 7, 1995 Copy Right 1995 by T. S. Wan All rights

More information

Best Practices for Condensing Boilers

Best Practices for Condensing Boilers ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal at www.cleaverbrooks.com. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For

More information

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency

AHRI 920 Performance Rating and Comparisons of DX-DOAS Unit Efficiency Application Note 24 AHRI 920 Performance Rating and Comparisons I NTRODUCTION In 2015, the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) introduced a performance rating for dedicated outside

More information

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency Digital Precise Air Control System D-PAC Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency AAON 24 South Yukon Avenue Tulsa, Oklahoma 747 (918) 583-2266 Fax (918)

More information

Ducted Propeller. Airflow Volume

Ducted Propeller. Airflow Volume Total Pressure Radial-Blade Centrifugal Tubeaxial Backward-inclined Airfoil Centrifugal Forward-curved Centrifugal Ducted Propeller Airflow Volume Figure 2: Forward-Curved Centrifugal Fan

More information

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3 Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located

More information

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,

More information

Description of All Alternatives Considered-

Description of All Alternatives Considered- Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142

More information

Air Conditioning Clinic

Air Conditioning Clinic Air Conditioning Clinic Psychrometry One of the Fundamental Series D C B A C B D A July 2012 TRG-TRC001-EN Psychrometry One of the Fundamental Series A publication of Trane Preface Psychrometry A Trane

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1

More information

terminal units only provide sensible cooling, a separate dehumidification system is usually needed.

terminal units only provide sensible cooling, a separate dehumidification system is usually needed. providing insights for today s hvac system designer Engineers Newsletter volume 44 3 Dual-Temperature Chiller Plants This Engineers Newsletter describes several dual-temperature configurations that can

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 23 0594 - TESTING, ADJUSTING, AND BALANCING (TAB) PART 1 - GENERAL 1.1 SUMMARY A. This Section includes testing, adjusting and balancing HVAC systems to provide design conditions as indicated by

More information

Math. The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb.

Math. The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb. HVAC Math The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb. Math F. to C. Conversion = (f-32)*(5/9) C. to F. Conversion = C * 9/5 +

More information

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Technical Development Program COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction System

More information

Building Systems: HVAC

Building Systems: HVAC Building Systems: HVAC Committee on Microbiomes of the Built Environment June 21, 2016 Washington DC Dennis Stanke (dstanke47@gmail.com) Retired rane (IR) Outline Ventilation Systems Moisture sources Low

More information

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I.

Air System Sizing Summary for AHU/CU-1 Project Name: Wilton Manors Fire Station#16 06/26/2016 Prepared by: L.N.I. Air System Sizing Summary for AHU/CU-1 AHU/CU-1 Floor Area 1678.0 ft² Central Cooling Coil Total coil load 4.8 Tons Total coil load 57.8 MBH Sensible coil load 41.8 MBH Coil CFM at Jul 1500 1909 CFM Max

More information

Best Practices for Applied Rooftop ` Systems - Application and. Jerry Cohen President Jacco & Assoc. Installation

Best Practices for Applied Rooftop ` Systems - Application and. Jerry Cohen President Jacco & Assoc. Installation Best Practices for Applied Rooftop ` Systems - Application and Jerry Cohen President Jacco & Assoc. Installation Who is Jacco Established 1968 Hudson, Ohio Columbus, Ohio Toledo, Ohio Systems Knowledgeable

More information

Selecting the Correct Fan

Selecting the Correct Fan Selecting the Correct Fan Ryan B. Johnson Air Purification Company Sales Engineer Member, ASHRAE Pikes Peak Chapter rjohnson@airpurificationcompany.com 1 Your Speaker circa 1998 Fan Types Applications

More information

ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes

ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes In Humid Climates BY DAVID A. JOHN, P.E., MEMBER ASHRAE; DREW ELSBERRY, MEMBER ASHRAE Designing g a building s HVAC system requires designers

More information

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC VOLUME ONE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Part-Load Strategies Why they re important.......... 1 What Things

More information

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South

Update Dedicated Heat Recovery Chiller Technology. Don Frye. Gulf South 3/5/2018 1 Update Dedicated Heat Recovery Chiller Technology Don Frye Gulf South Good design is an intentional act Begin with the end in mind Basic Bldg Tenants IAQ (low VOC & CO 2 ) Controlled Temp &

More information

Service Step by Step Trouble-Shooting Check-List

Service Step by Step Trouble-Shooting Check-List WARNING: Only Data Aire trained technician or experience technicians should be working on Data Aire Equipment. Protect yourself at all times and work safe. Date: Dates at the job site: From: to Job#: Serial#:

More information

A/C Cooling Load calculation and measurement

A/C Cooling Load calculation and measurement Testo Inc. 40 White Lake Rd. Sparta NJ 07871 (800) 227-0729 A/C Cooling Load calculation and measurement When we talk about sizing an air conditioning appliance (tons of cooling, BTU/h or KW), we are specifying

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Performance Rating of Computer and Data Processing Room Air Conditioners

Performance Rating of Computer and Data Processing Room Air Conditioners ANSI/AHRI Standard 1360 (I-P) with Addendum 1 2013 Standard for Performance Rating of Computer and Data Processing Room Air Conditioners Approved by ANSI on November 8, 2013 WITH ADDENDUM 1, PERFORMANCE

More information

Mechanical Engineering Laboratory

Mechanical Engineering Laboratory Mechanical Engineering Laboratory MEE 416 Professor H. Ezzat Khalifa Syracuse University http://lcs.syr.edu/faculty/khalifa/mee416/ MEE416 1 A. Experiment 1 Air-Conditioning: Air-side Experiment 0031 Link

More information

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001 This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.

More information

Standards and Guidelines. Presented by: Aric Murray December 12, 2014

Standards and Guidelines. Presented by: Aric Murray December 12, 2014 TDSHS Ventilation Standards and Guidelines Presented by: Aric Murray December 12, 2014 Agenda 1. What are the TDSHS ventilation 1. What are the TDSHS ventilation requirements? 2. Pressure relationships.

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

ASHRAE S DOAS WEBCAST: A DEEPER EXAMINATION OF THE ROLE OF HEAT PIPES

ASHRAE S DOAS WEBCAST: A DEEPER EXAMINATION OF THE ROLE OF HEAT PIPES INTRODUCTION ASHRAE S DOAS WEBCAST: A DEEPER EXAMINATION OF THE ROLE OF HEAT PIPES Tom Brooke MBA, PE, CEM May 25, 212 On April 19, 212, ASHRAE conducted a webcast to publicize the concept of Dedicated

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

THE ULTIMATE ROOFTOP SOLUTION

THE ULTIMATE ROOFTOP SOLUTION Configured Packaged Rooftop Solutions Specializing in Dedicated Outdoor Air Systems (DOAS) Capacities from 6 to 90 Tons Available in 208, 230, 460 and 575 Volts THE ULTIMATE ROOFTOP SOLUTION Service Friendly

More information

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing

More information

Multi-Path RTU-TYPE 2

Multi-Path RTU-TYPE 2 ALDI # CITY, STATE SUPERMARKET MultiPath RTUTYPE 2 (RTU1) CESMPU025RHVAV2 Date: February 17, 201 2013 Consolidated Energy Solutions, Inc. UNIT FEATURES CES TYPE VAV2 Unit features include: 25 Ton MultiPath

More information

VertiCool Aurora Engineering Guide

VertiCool Aurora Engineering Guide Engineering Guide Effective August 2016 Air-Cooled, Water-Cooled and Water Source Heat Pump Contents Product Features... 3 Options... 4 Physical Data...5-6 Air-Cooled Performance Data (a) (b) (c)...7-8

More information

Agenda and Objectives

Agenda and Objectives Agenda and Objectives Trane Engineers Newsletter Live Series Rooftop variable-air-volume (VAV) systems are used to provide comfort in a wide range of building types and climates. This ENL discusses HVAC

More information

C13-Series Engineering Guide

C13-Series Engineering Guide Engineering Guide Effective January 2018 Horizontal Air-Cooled, Water-Cooled, Chilled Water and Heat Pump Contents Product Features............................... 3 Product Options................................

More information

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION 100 TON AIR-COOLED SCROLL PACKAGED SPECIFICATIONS Call us today! (800)341-4297 Trane Portable Packaged Air Conditioner units contain the best compressor technology available, in order to achieve the highest

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark

Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark Commercial Buildings Chilled water systems efficiency By Jens Nørgaard, Senior Application Manager, Grundfos, Denmark Introduction: Energy use is the single largest operating expense in commercial office

More information

2. CURRICULUM. Sl. No.

2. CURRICULUM. Sl. No. . CURRICULUM Sl. No. Code Title No. of Lecture Hours 1 RAC 001 Fundamentals of Refrigeration and Air 60 conditioning RAC 00 Psychrometry, Heat load Estimation for 70 Air conditioning and Refrigeration

More information

R7DA Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. 6 and 7 ½ Ton DOAS Packaged Gas/Electric Units

R7DA Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. 6 and 7 ½ Ton DOAS Packaged Gas/Electric Units TECHNICAL SPECIFICATIONS R7DA Series 6 and 7 ½ Ton DOAS Packaged Gas/Electric Units 5.4 ISMRE Commercial System 81% Steady State Efficiency Standard Features Fits Pre-Existing Curbs High-Efficiency Low

More information