G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015

Size: px
Start display at page:

Download "G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015"

Transcription

1 DRAWING INDEX GENERAL G0 PLUMBING P00 P0A P0B P0C P0A P0A P0B COVER SHEET PLUMBING LEGEND AND GENERAL NOTES PLUMBING PLAN PLUMBING PLAN PLUMBING PLAN PLUMBING ROOF DEMOLITION PLAN PLUMBING ROOF REMODEL PLAN PLUMBING ROOF PLAN PLUMBING ROOF PLAN P0C MECHANICAL M00 MD0A MD0C M0A M0B M0C M0A M0B M0C MECHANICAL LEGEND AND GENERAL NOTES MECHANICAL ROOF DEMO. PLAN MECHANICAL ROOF DEMO. PLAN MECHANICAL PLAN MECHANICAL PLAN MECHANICAL PLAN MECHANICAL ROOF PLAN MECHANICAL ROOF PLAN MECHANICAL ROOF PLAN MECHANICAL SCHEDULES, CONTROLS AND DETAILS M0 ELECTRICAL E0. E. E. E. SYMBOLS, SCHEDULES AND NOTES ELECTRICAL PLAN- ELECTRICAL PLAN- ELECTRICAL PLAN- UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UTAH 80 7 WEST 00 SOUTH SUITE#0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) S PROJECT ENGINEER: HAL ABERCROMBIE CELL: (80) habercrombie@dljeng.com PROJECT INFORMATION REVISION: DLJ PROJECT NUMBER: 0 I:\JOBS0\0\CAD\CUG0.dwg, /0/07 :9: PM, taargyle MARCH, 07 G0

2 . THE CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION.. THE CONTRACTOR SHALL TAKE OUT PERMITS, PROCURE CERTIFICATES AND PAY FEES CONNECTED THEREWITH. PLUMBING GENERAL NOTES 9. PLUMBING/PIPING IS SHOWN SCHEMATICALLY FOR VIEWING PURPOSES ONLY; DURING INSTALLATION FIELD MODIFICATIONS TO ROUTING MAY BE REQUIRED. 0. INSTALL ALL REQUIRED CLEANOUTS TO CLEAR EQUIPMENT AND FIXTURES. WALL CLEAN OUT CLEAN OUT SYMBOL WCO CO PLUMBING LEGEND DOMESTIC COLD WATER PIPING INDUSTRIAL COLD WATER PIPING NOTE: NEW ITEMS SHOWN DARK, EXISTING ITEMS SHOWN LIGHT. ALL ITEMS MAY NOT APPEAR ON DRAWINGS. SYMBOL ICW 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) BIDDERS SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS SURROUNDING THE PROJECT PRIOR TO BIDDING.. ALL WORK SHALL BE PROPERLY TESTED, BALANCED AND CLEANED AND DISINFECTED. PROVIDE A ONE YEAR WARRANTY FROM OF FINAL INSPECTION ON ALL PARTS AND LABOR. CLEAN OUT TO GRADE FLOOR CLEAN OUT COTG FCO SOFT COLD WATER PIPING DOMESTIC HOT WATER PIPING SCW. THE CONTRACTOR IS REFERRED TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL PLANS AND SPECIFICATIONS. SUCH PLANS AND SPECIFICATIONS ARE CONTRACT DOCUMENTS.. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATIONS.. ALL PLUMBING WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF THE PREVAILING STATE MECHANICAL/PLUMBING AND BUILDING CODES AS WELL AS ALL REGULATIONS THAT MAY APPLY. IN CASE OF CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE THE MORE STRINGENT STANDARD SHALL APPLY. 7. NO PIPING SHALL RUN EXPOSED IN FINISHED AREAS UNLESS NOTED OTHERWISE. 8. RUN-OUT SIZES TO INDIVIDUAL PLUMBING FIXTURES TO BE EQUAL TO ROUGH-IN SIZE NOTED IN THE PLUMBING FIXTURE SCHEDULE.. TERMINATE PLUMBING VENTS AT A MINIMUM OF 0' FROM ALL AIR HANDLING EQUIPMENT INTAKE VENTS.. CONTRACTOR SHALL VERIFY LOCAL CODE REQUIREMENTS FOR INDIRECT CONNECTIONS FOR FOOD PREP AREAS. CONNECTIONS SHALL BE PROVIDED WITH A MINIMUM " AIR GAP, UNLESS OTHERWISE NOTED.. PRESSURIZED PIPING SHALL NOT BE RUN IN ANY AREA SUBJECT TO FREEZING.. PRIOR TO INSTALLING ANY PIPING, VERIFY DEPTH OF CONNECTION POINTS OF GRADE DEPENDENT PIPING AND CONFIRM IN WRITING TO ENGINEER.. WHERE RATED ASSEMBLIES ARE PENETRATED BY DUCTS, PIPES OR OTHER ITEMS, THE "F" AND "T" RATING SHALL BE MAINTAINED WITH REQUIRED UL LISTED ASSEMBLIES OR SEALANT AS REQUIRED BY THE APPLICABLE CODE OR AUTHORITY HAVING JURISDICTION. DROP RISE CAPPED PIPE PIPE REDUCER BALL VALVE GATE VALVE AUTOMATIC TWO-WAY VALVE AUTOMATIC THREE-WAY VALVE TEMPERING VALVE UNION TWS INDUSTRIAL HOT WATER PIPING SOFT HOT WATER PIPING DOMESTIC HOT WATER RECIRCULATION PIPING DOMESTIC TEMPERED WATER VENT PIPING ACID VENT PIPING WASTE PIPING (ABOVE GRADE OR FLOOR) WASTE PIPING (BELOW GRADE OR FLOOR) ACID WASTE PIPING (ABOVE GRADE OR FLOOR) ACID WASTE PIPING (BELOW GRADE OR FLOOR) IHW SHW TWS AV AW AW GAS COCK VALVE GREASE WASTE PIPING (ABOVE GRADE OR FLOOR) GW PRESSURE REGULATOR GREASE WASTE PIPING (BELOW GRADE OR FLOOR) GW STRAINER HAMMER ARRESTOR CHECK VALVE CIRCUIT SETTER BUTTERFLY VALVE BACKFLOW PREVENTOR RELIEF VALVE MANUAL AIR VENT THERMOMETER FLEXIBLE PIPING INLINE PUMP DIRECTION OF SLOPE FLOW DIRECTION ACCESS DOOR FLOW METER R FM PROCESS WASTE PIPING (ABOVE GRADE OR FLOOR) PROCESS WASTE PIPING (BELOW GRADE OR FLOOR) ROOF DRAIN PIPING (ABOVE GRADE OR FLOOR) ROOF DRAIN PIPING (BELOW GRADE OR FLOOR) SECONDARY ROOF DRAIN PIPING GAS PIPING COMPRESSED AIR PIPING CARBON DIOXIDE PIPING NITROGEN PIPING NITROUS OXIDE PIPING OXYGEN PIPING VACUUM PIPING DEIONIZED WATER PIPING DRAIN PIPING FIRE SPRINKLER PIPING KEYED NOTE PW PW RD RD SRD G A C0 N NO O VAC DIW D F # UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 WATER METER W PLUMBING FIXTURE CALLOUT P-?? DEVICE IN DROP DETAIL NUMBER SHEET DETAIL APPEARS EQUIPMENT CALLOUT LARGE SCALE NUMBER SHEET LARGE SCALE APPEARS SECTION LETTER SHEET NUMBER ROOM NAME ROOM NUMBER X S# X-# TOP BOT ROOM N0 # S# MARCH, 07 0 I:\JOBS0\0\CAD\CUP00.DWG I:\JOBS0\0\CAD\CUP00.dwg, /0/07 :9:7 PM, taargyle REVISION DELTA NEW CONNECTION # PLUMBING LEGEND AND GENERAL NOTES P00

3 KEYED NOTES FOR SHEET P0A EXISTING /" COPPER DOMESTIC COLD WATER PIPING UP THROUGH ROOF AT THIS LOCATION. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) GYM MEDIA CENTER I:\JOBS0\0\CAD\CUP0A.dwg, /0/07 :9:0 PM, taargyle 7 WALK-IN COOLER SERVING -/" /" WALK-IN COOLER " OFFICE 8 FAN ROOM ELEC. ROOM COMP. LAB 9 /" UP BREAKROOM HEALTH 0 SCALE: /8"='0" HEALTH TEACHERS WORK ROOM PLUMBING PLAN ADMINISTRATION. NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 MARCH, 07 0 I:\JOBS0\0\CAD\CUP0A.DWG PLUMBING PLAN P0A

4 KEYED NOTES FOR SHEET P0B EXISTING /" COPPER DOMESTIC COLD WATER PIPING UP THROUGH ROOF AT THIS LOCATION. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) OFFICE TEACHERS WORK ROOM COMPUTER LAB A B 0 /" UP 0 0 OFFICE AFTER HOURS CAFETERIA UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 A 7A CL I:\JOBS0\0\CAD\CUP0B.dwg, /0/07 :9: PM, taargyle PLUMBING PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, COAT ROOM MARCH, 07 0 I:\JOBS0\0\CAD\CUP0B.DWG PLUMBING PLAN P0B

5 KEYED NOTES FOR SHEET P0C EXISTING /" COPPER DOMESTIC COLD WATER PIPING UP THROUGH ROOF AT THIS LOCATION. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) /" UP SERVER ROOM UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 I:\JOBS0\0\CAD\CUP0C.dwg, /0/07 :9: PM, taargyle PLUMBING PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, MARCH, 07 0 I:\JOBS0\0\CAD\CUP0C.DWG PLUMBING PLAN P0C

6 KEYED NOTES FOR SHEET P0A REMOVE EXISTING DOMESTIC WATER LINE SHOWN HATCHED. FOR REMOVAL OF EVAPORATIVE COOLER. EXISTING EVAPORATIVE COOLER. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) /" DOWN /" SLOPE /8". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 MARCH, 07 0 I:\JOBS0\0\CAD\CUP0A.DWG I:\JOBS0\0\CAD\CUP0A.dwg, /0/07 :9:7 PM, taargyle PLUMBING ROOF DEMOLITION PLAN SCALE: /8"='0" PLUMBING ROOF DEMOLITION PLAN P0A

7 KEYED NOTES FOR SHEET P0A EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN LOCATION (TYPICAL). CONNECT /" BLACK POLY TUBING TO EXISTING /" COPPER PIPING AT THIS LOCATION. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) I:\JOBS0\0\CAD\CUP0A.dwg, /0/07 :9:9 PM, taargyle EC- /8" /8" EC- /8" /8" /" DOWN /" SLOPE /" EC- /8" /8" /8" EC- EC- PLUMBING ROOF REMODEL PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 MARCH, 07 0 I:\JOBS0\0\CAD\CUP0A.DWG PLUMBING ROOF REMODEL PLAN P0A

8 KEYED NOTES FOR SHEET P0B EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN LOCATION (TYPICAL). CONNECT /8" BLACK POLY TUBING TO EXISTING COPPER PIPING AT THIS LOCATION. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) /8" /8" SLOPE /" /8" /" DOWN /" SLOPE /" /8" /8" EC- /8" EC- UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 /8" I:\JOBS0\0\CAD\CUP0B.dwg, /0/07 :0:0 PM, taargyle EC- EC- SCALE: /8"='0" EC- PLUMBING ROOF PLAN. NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, EC- MARCH, 07 0 I:\JOBS0\0\CAD\CUP0B.DWG PLUMBING ROOF PLAN P0B

9 KEYED NOTES FOR SHEET P0C EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN LOCATION (TYPICAL). CONNECT /8" BLACK POLY TUBING TO COPPER PIPING AT THIS LOCATION. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) EC- EC- EC- /8" /8" EC- /" EC- /8" /8" EC- /" /" DOWN /" /8" EC- /8" EC- /8" EC- UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 I:\JOBS0\0\CAD\CUP0C.dwg, /0/07 :0:0 PM, taargyle PLUMBING ROOF PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, MARCH, 07 0 I:\JOBS0\0\CAD\CUP0C.DWG PLUMBING ROOF PLAN P0C

10 . CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION.. THE CONTRACTOR SHALL TAKE OUT PERMITS, PROCURE CERTIFICATES AND PAY FEES CONNECTED THEREWITH.. BIDDERS SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS SURROUNDING THE PROJECT PRIOR TO BIDDING.. THE CONTRACTOR IS REFERRED TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL PLANS AND SPECIFICATIONS. SUCH PLANS AND SPECIFICATIONS ARE CONTRACT DOCUMENTS.. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATIONS.. ALL MECHANICAL HVAC WORK SHALL BE PREFORMED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF THE PREVAILING STATE MECHANICAL/PLUMBING AND BUILDING CODES AS WELL AS ALL REGULATIONS THAT MAY APPLY. IN CASE OF CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE THE MORE STRINGENT SHALL APPLY. 7. DIFFUSER RUN OUTS SHALL BE THE SAME AS LISTED DIFFUSER NECK SIZE, UNLESS OTHERWISE NOTED. HVAC GENERAL NOTES 8. COORDINATE EXACT LOCATION OF AIR DISTRIBUTION DEVICES WITH CEILING GRID AND LIGHT FIXTURE LAYOUT. 9. ALL RECTANGULAR SUPPLY DUCT ELBOWS SHALL HAVE TURNING VANES. 0. RECTANGULAR DUCT SIZES SHOWN INDICATE REQUIRED AIRFLOW SIZES. SHEETMETAL CONTRACTOR SHALL INCREASE SIZES TO ALLOW FOR LINER.. NO DUCTWORK SHALL BE FABRICATED WITHOUT FIRST FIELD VERIFYING THAT THE AVAILABLE SPACE UNDER ACTUAL JOB CONDITIONS WILL PERMIT INSTALLATION OF THE DUCTWORK WITHOUT STRUCTURAL OR OTHER CONFLICTS. DUCT SIZES THAT REQUIRE ON THE JOB MODIFICATION DUE TO UNFORESEEN OBSTRUCTIONS SHALL BE MADE WITHOUT ANY ADDITIONAL COST TO THE OWNER.. MAINTAIN A 0'-0" BETWEEN OUTSIDE AIR INTAKES AND PLUMBING/EXHAUST VENTS.. WHERE RATED ASSEMBLIES ARE PENETRATED BY DUCTS, PIPES OR OTHER ITEMS, THE "F" AND "T" RATING SHALL BE MAINTAINED WITH REQUIRED UL LISTED ASSEMBLIES OR SEALANTS AS REQUIRED BY THE APPLICABLE CODE OR AUTHORITY HAVING JURISDICTION. SYMBOL AUTOMATIC -WAY VALVE AUTOMATIC -WAY VALVE AUTOMATIC BALL FLOAT VENT BALL VALVE CAPPED END W/BALL VALVE CHECK VALVE COMBINATION BALANCING VALVE/ SHUTOFF DEVICE IN DROP DIRECTION OF SLOPE FLANGED BUTTERFLY VALVE MECHANICAL LEGEND SYMBOL IMMERSION WELL INLINE PUMP MANUAL VENT WITH BALL VALVE P & T PLUG IN IMMERSION WELL PIPE DROP PIPE INLINE DROP PIPE INLINE RISE PIPE RISER PNEUMATIC -WAY VALVE PRESSURE GUAGE NOTE: NEW ITEMS SHOWN DARK, EXISTING ITEMS SHOWN LIGHT. ALL ITEMS MAY NOT APPEAR ON DRAWINGS. SYMBOL BRANCH DUCT TAKE-OFF WITH MANUAL DAMPER DUCT FLEXIBLE CONNECTION TURNING VANES DUCT TEE CONNECTION DUCT TRANSITION SQUARE TO ROUND DUCT TRANSITION AUTOMATIC DAMPER VOLUME DAMPER 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) FLANGED ECCENTRIC REDUCER PRESSURE GAGE W/BALL VALVE BD BACK-DRAFT DAMPER FLANGED UNION R RELIEF VALVE DUCT ACCESS DOOR FLEXIBLE CONNECTION SCREWED CONCENTRIC REDUCER RETURN AIR, RISE AND DROP FM RL RS F FLOW DIRECTION FLOW METER GATE VALVE GLOBE VALVE REFRIGERANT PIPING - LIQUID REFRIGERANT PIPING - SUCTION REFRIGERANT SHUT-OFF VALVE EXPANSION VALVE MOISTURE INDICATING SIGHT GLASS FLEXIBLE CONNECTION FILTER DRIER PIPE SUPPORT WFS CWS CWR CHWS CHWR HWS STEAM TRAP STRAINER THERMOMETER THREADED HOSE CONNECTION UNION VENTURI WATER FLOW SWITCH CONDENSER WATER SUPPLY CONDENSER WATER RETURN CHILLED WATER SUPPLY CHILLED WATER RETURN HOT WATER HTG. SUPPLY θ OR FO T S J X-# X-# # # FD FSD SUPPLY AIR, RISE AND DROP EXHAUST AIR, RISE AND DROP OUTSIDE AIR, RISE AND DROP RELIEF AIR, RISE AND DROP ROUND DUCT, RISE AND DROP FLAT OVAL DUCT, RISE AND DROP FLAT OVAL DUCT FIRE DAMPER FIRE SMOKE DAMPER THERMOSTAT SENSOR J-BOX AIR DEVICE AIR DEVICE CFM KEYED NOTE UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 EXTERIOR PIPE SUPPORT HWR HOT WATER HTG. RETURN X-# EQUIPMENT CALLOUT S L EXTERIOR PIPE SUPPORT DIRECTION OF SLOPE DOWN SUCTION LINE LIQUID LINE TRAP. ONE PIECE FACTORY FABRICATED HPS LPS LPC GHS GHR HIGH PRESSURE STEAM PIPING LOW PRESSURE STEAM PIPING LOW PRESSURE CONDENSATE PIPING GLYCOL HEATING SUPPLY PIPING GLYCOL HEATING RETURN PIPING X S# TOP BOT ROOM N0 # S# DETAIL NUMBER SHEET DETAIL APPEARS LARGE SCALE NUMBER SHEET LARGE SCALE APPEARS AIR FLOW DIRECTION SECTION LETTER SHEET NUMBER ROOM NAME ROOM NUMBER MARCH, 07 0 I:\JOBS0\0\CAD\CUM00.DWG I:\JOBS0\0\CAD\CUM00.dwg, /0/07 :9:8 PM, taargyle # REVISION DELTA NEW CONNECTION ACCESS DOOR MECHANICAL LEGEND AND GENERAL NOTES M00

11 KEYED NOTES FOR SHEET MD0A EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN (TYPICAL). EXISTING ROOFTOP UNIT. REMOVE EXISTING EVAPORATIVE COOLER AND ROOF CURB. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 MARCH, 07 0 I:\JOBS0\0\CAD\CUMD0A.DWG I:\JOBS0\0\CAD\CUMD0A.dwg, /0/07 :9: PM, taargyle MECHANICAL ROOF DEMOLITION PLAN SCALE: /8"='0" MECHANICAL ROOF DEMO. PLAN MD0A

12 KEYED NOTES FOR SHEET MD0C EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN (TYPICAL). REMOVE EXISTING EVAPORATIVE COOLER AND ROOF CURB. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 I:\JOBS0\0\CAD\CUMD0C.dwg, /0/07 :9: PM, taargyle MECHANICAL ROOF DEMOLITION PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, MARCH, 07 0 I:\JOBS0\0\CAD\CUMD0C.DWG MECHANICAL ROOF DEMO. PLAN MD0C

13 KEYED NOTES FOR SHEET M0A EXISTING EVAPORATIVE COOLER DIFFUSER. NEW BMS CONTROLS CABINET, DIVISION TO PROVIDE 0 VOLT CIRCUIT. PROVIDE COUNTER BALANCED BACKDRAFT DAMPER IN SUPPLY DUCT. POSITION WALL SWITCH FOR EVAPORATIVE COOLER - SEE CONTROLS DETAIL. TIE EXISTING EVAPORATIVE COOLER INTO NEW DDC CONTROLS, SEE DETAIL. WIRE EXISTING POSITION WALL SWITCH TO NEW EVAPORATIVE COOLER. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) GYM MEDIA CENTER I:\JOBS0\0\CAD\CUM0A.dwg, /0/07 :9: PM, taargyle WALK-IN COOLER SERVING 7 D- WALK-IN COOLER OFFICE 0"X0"UP 8 FAN ROOM ELEC. ROOM COMP. LAB $ 9 BREAKROOM HEALTH 0 HEALTH TEACHERS WORK ROOM $ $ $ $ D- 0"X0"UP D- 0"X0"UP SCALE: /8"='0" ADMINISTRATION (TYP) MECHANICAL PLAN D- 0"X0"UP. NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 MARCH, 07 0 I:\JOBS0\0\CAD\CUM0A.DWG MECHANICAL PLAN M0A

14 KEYED NOTES FOR SHEET M0B EXISTING EVAPORATIVE COOLER DIFFUSER. EXISTING SPLIT SYSTEM. NEW BMS CONTROLS CABINET, DIVISION TO PROVIDE 0 VOLT CIRCUIT. PROVIDE COUNTER BALANCED BACKDRAFT DAMPER IN SUPPLY DUCT. POSITION EVAPORATIVE COOLER WALL SWITCH. SEE CONTROLS DETAIL. TIE EXISTING EVAPORATIVE COOLER INTO NEW DDC CONTROLS. SEE DETAIL. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) $ TEACHERS WORK ROOM COMPUTER LAB A B OFFICE $ $ $ $ $ $ OFFICE AFTER HOURS $ (TYP) 0"X0"UP D- D- CAFETERIA 0"X0"UP $ UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 A 7A I:\JOBS0\0\CAD\CUM0B.dwg, /0/07 :9: PM, taargyle D- 0"X0"UP D- 0"X0"UP D- 0"X0"UP MECHANICAL PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, D- 0"X0"UP COAT ROOM MARCH, 07 0 I:\JOBS0\0\CAD\CUM0B.DWG MECHANICAL PLAN M0B

15 KEYED NOTES FOR SHEET M0C EXISTING EVAPORATIVE COOLER DIFFUSER. NEW BMS CONTROLS CABINET, DIVISION TO PROVIDE 0 VOLT CIRCUIT. PROVIDE COUNTER BALANCED BACKDRAFT DAMPER IN SUPPLY DUCT. POSITION EVAPORATIVE COOLER WALL SWITCH. SEE CONTROLS DETAIL. ADD DDC CONTROLS TO EXISTING EVAPORATIVE COOLER. SEE DETAIL. WIRE EXISTING POSITION WALL SWITCH TO NEW EVAPORATIVE COOLER. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) D- 0 0"X0"UP $ 9 D- 0"X0"UP D- 0"X0"UP D- 0"X0"UP 8 $ $ $ $ $ D- 0"X0"UP D- 0"X0"UP $ $ $ D- 0"X0"UP SERVER ROOM (TYP) UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 I:\JOBS0\0\CAD\CUM0C.dwg, /0/07 :9: PM, taargyle MECHANICAL PLAN SCALE: /8"='0" $. NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, MARCH, 07 0 I:\JOBS0\0\CAD\CUM0C.DWG MECHANICAL PLAN M0C

16 KEYED NOTES FOR SHEET M0A EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN (TYPICAL). EXISTING ROOFTOP UNIT. INSTALL NEW EVAPORATIVE COOLER AND ROOF CURB. CONNECT TO EXISTING DUCTWORK AND TRANSITION TO NEW COOLER IF REQUIRED. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) I:\JOBS0\0\CAD\CUM0A.dwg, /0/07 :9:8 PM, taargyle EC- EC- EC- EC- EC- MECHANICAL ROOF PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 MARCH, 07 0 I:\JOBS0\0\CAD\CUM0A.DWG MECHANICAL ROOF PLAN M0A

17 KEYED NOTES FOR SHEET M0B EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN (TYPICAL). EXISTING ROOFTOP UNIT. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) EC- EC- UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 I:\JOBS0\0\CAD\CUM0B.dwg, /0/07 :9:0 PM, taargyle EC- EC- SCALE: /8"='0" EC- MECHANICAL ROOF PLAN. NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, EC- MARCH, 07 0 I:\JOBS0\0\CAD\CUM0B.DWG MECHANICAL ROOF PLAN M0B

18 KEYED NOTES FOR SHEET M0C EXISTING EVAPORATIVE COOLER. EXISTING SKYLIGHT (TYPICAL). EXISTING ROOF DRAIN (TYPICAL). INSTALL NEW EVAPORATIVE COOLER AND ROOF CURB. CONNECT TO EXISTING DUCTWORK AND TRANSITION TO NEW COOLER IF REQUIRED. 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) EC- EC- EC- EC- EC- EC- EC- EC- EC- UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 I:\JOBS0\0\CAD\CUM0C.dwg, /0/07 :9: PM, taargyle MECHANICAL ROOF REMODEL PLAN SCALE: /8"='0". NEW EVAPORATIVE COOLER DIFFUSER SHALL BE INSTALLED. SOME CEILING ACCESS DOORS EXIST IN EXISTING HARD. PATCH ALL HOLES OR DAMAGE TO EXISTING WALLS, MARCH, 07 0 I:\JOBS0\0\CAD\CUM0C.DWG MECHANICAL ROOF REMODEL PLAN AREA C M0C

19 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) WALL SWITCH FOR EVAPORATIVE COOLER 0 VAC BY DIV. RELAY BACNET COMMUNICATION CURRENT SENSOR AI DO ENABLE / DISABLE RELAY 0 VAC SCALE: N.T.S. SUPPLY DIFFUSER DDC CONTROLLER (QTY. AS NEEDED) EVAPORATIVE COOLER CONTROL DIAGRAM TYPICAL EVAPORATIVE COOLER SEQUENCE OF OPERATIONS: (TYPICAL). THE FACTORY CONTROLS SYSTEM SHALL PROVIDE THE USER WITH POSITION SWITCH (OFF, PUMP, LOW VENT, HIGH VENT, LOW COOL & HIGH COOL).. THE BAS SYSTEM SHALL DETERMINE THE OCCUPIED AND UNOCCUPIED MODE TIME FRAMES OF THE SPACE(S) BEING SERVED. WHEN IN THE OCCUPIED MODE, THE EVAPORATIVE COOLER SERVING THE SPACE SHALL BE ENABLED FOR THE USE BY THE USER. EVAPORATIVE COOLER UPGRADE - PROJECT # 0 NORTH 0 WEST SUNSET, UT 80 X TREATED WOOD ROOF CURB X FASTENED TO X AND EXISTING ROOF DECKING " MIN. GA GALVANIZED FULLY SOLDERED METAL FLASHING FASTENED TO ROOF CURB NEW ROOF MEMBRANE FULLY ADHERE TO CURB AND EXISTING ROOF MEMBRANE X CANT STRIP FASTENED TO X EXISTING ROOF MEMBRANE TIE NEW ROOF MEMBRANE INTO EXISTING ROOF MEMBRANE IN THIS LOCATION MARCH, 07 0 I:\JOBS0\0\CAD\CUM0.DWG I:\JOBS0\0\CAD\CUM0.dwg, /0/07 :9: PM, taargyle EVAPORATIVE COOLER ROOF CURB DETAIL SCALE: NONE EXISTING ROOF INSULATION EXISTING ROOF DECKING MECHANICAL SCHEDULES, CONTROLS AND DETAILS M0

20 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) South State Street Salt Lake City, Utah 8 P:80..9 F:80..0 BNAwww.bnaconsulting.com CONSULTING SALT LAKE ST.GEORGE 07 BNACONSULTING 0 NORTH 0 WEST SUNSET, UT 80 MARCH, BNA SV SYMBOLS, SCHEDULES AND NOTES E0.

21 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) South State Street Salt Lake City, Utah 8 P:80..9 F:80..0 BNAwww.bnaconsulting.com CONSULTING SALT LAKE ST.GEORGE 07 BNACONSULTING ETERIA WALK-IN COOLER WALK-IN COOLER OFFICE FAN ROOM ELEC. ROOM S COMP. LAB BREAKROOM TEACHERS WORK ROOM ADMINISTRATION 0 NORTH 0 WEST SUNSET, UT 80 SERVING HEALTH HEALTH S MARCH, BNA SV COAT ROOM ELECTRICAL PLAN E.

22 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) South State Street Salt Lake City, Utah 8 P:80..9 F:80..0 BNAwww.bnaconsulting.com CONSULTING SALT LAKE ST.GEORGE 07 BNACONSULTING OFFICE AFTER HOURS S TEACHERS WORK ROOM COMPUTER LAB S S S S S S OFFICE S CAFETERIA S 0 NORTH 0 WEST SUNSET, UT 80 COAT ROOM MARCH, BNA SV ELECTRICAL PLAN E.

23 7 WEST 00 SOUTH SUITE #0 BOUNTIFUL, UTAH 800 PHONE: (80) FAX: (80) South State Street Salt Lake City, Utah 8 P:80..9 F:80..0 BNAwww.bnaconsulting.com CONSULTING SALT LAKE ST.GEORGE 07 BNACONSULTING S S S S S S S S S 0 NORTH 0 WEST SUNSET, UT 80 SERVER ROOM S MARCH, BNA SV ELECTRICAL PLAN E.

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan.

Appendix B. Symbols for Drawings. Table B.1. Air moving devices and ductwork symbols. Air Movement. Fans. Axial flow fan. Appendix B Symbols for Drawings Table B.1 Air moving devices and ductwork symbols Air Movement Fans Axial flow fan Centrifugal fan Propeller fan Intake roof ventilator (supply) Exhaust roof ventilator

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

EXHAUST FAN SCHEDULE

EXHAUST FAN SCHEDULE DUCTWORK SCHEDULE CONCEALED SUPPLY AIR RECTANGULAR, RTU CONCEALED SUPPLY AIR RECTANGULAR, ERV CONCEALED SUPPLY AIR ROUND, RTU CONCEALED SUPPLY AIR ROUND, ERV EXPOSED SUPPLY AIR ROUND RUNOUTS RETURN AIR

More information

HVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION

HVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION GENERAL NOTES SPECIFICATIONS LEGEND SYMBOL DESCRIPTION ABBREV. SYMBOL DESCRIPTION ABBREV. SYMBOL DESCRIPTION ABBREV. ABBREVIATIONS PLUMBING LEGEND SYMBOL DESCRIPTION ABB. SYMBOL DESCRIPTION ABB. SYMBOL

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

900 N. Via Piemonte Ontario, CA

900 N. Via Piemonte Ontario, CA 2 3 L 8 5'-0" 6'-1" 5'-0" 4'-0" 2'-0" D.5 6" 9'-9" K 2 1 2 " 5'-0" 2'-0" 1'-2" 8" 4 4.3 7'-0" C.6 1'-8 1 2 " 7'-0" 8" 10'-6" 5'-0" 8" 6" 6'-6" 6'-3" PLUMBING SCOPE OF WORK - DRAINS 7'-3" 6'-8" KEC TO PROVIDE:

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

FRESH FROM THE KITCHEN FRESH FROM THE KITCHEN

FRESH FROM THE KITCHEN FRESH FROM THE KITCHEN PLUMBING SCOPE OF WORK - DRAINS KEC TO PROVIDE: - ALL TWIST WASTE VALVES & BASKET DRAINS, AS REFLECTED ON EQUIPMENT SCHEDULE, - PIPE CONDENSATE DRAIN FOR WALK IN COOLER WITH 3/4" COPPER TUBING, WITH NECESSARY

More information

GENERAL PLUMBING NOTES

GENERAL PLUMBING NOTES GENERAL SYMBOLS GENERAL PLUMBING NOTES PLUMBING LEGEND ABBREVIATIONS N PLAN OR DETAIL NO SHEET NUMBER KEYED NOTE TO PLAN REVISION NUMBER NORTH ARROW. IN THE PREPARATION OF THESE PLANS, THE ENGINEER HAS

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

A. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards:

A. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards: SECTION 11 53 53 BIOLOGICAL SAFETY CABINETS PART 1 - GENERAL 1.1 QUALITY ASSURANCE A. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards:

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Codes and Standards: A. Plumbing Code Compliance: Comply with applicable portions of National Standard Plumbing Code pertaining to selection and installation of Plumbing materials

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

A. This Section includes the following domestic water piping specialties:

A. This Section includes the following domestic water piping specialties: SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

PROJ. NO SECTION REFRIGERANT PIPING

PROJ. NO SECTION REFRIGERANT PIPING SECTION 23 23 00 REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. 23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

PLAN REVIEW SUBMITTAL GUIDE

PLAN REVIEW SUBMITTAL GUIDE PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work. Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED

More information

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings 1 T Consultant: NOTES, SYMBOLS & ABBREVIATIONS - MECHANICAL Number Description M001 Vestibule 117 LAN/IT Coffee 115 116 Mail Room 118 114 113 112 Scanning 119 Open Office 101 FIRST FLOOR PLAN - MECHANICAL

More information

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008 SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

PROPOSED NEW BUILDING

PROPOSED NEW BUILDING HYDRAULIC DRAWINGS MATERIALS SERVICES TO BE CONSTRUCTED FROM MATERIAL AS LISTED BELOW UNLESS NOTED OTHER WISE SHOWN ON DRAWINGS. SERVICE MATERIAL REMARKS SEWER DRAINAGE upvc SOLVENT WELDED JOINTS SEWER

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

SECTION (15530) - REFRIGERANT PIPING

SECTION (15530) - REFRIGERANT PIPING SECTION 23 23 00 (15530) - REFRIGERANT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. 3. Joining Materials. 4. Specialties. B. Related Sections: 1. Section 07 92 00 (07920)

More information

REFRIGERANT PIPING

REFRIGERANT PIPING SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008 SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Air separators B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS A. Section - Plumbing Piping Specialties B. Section

More information

SECTION DUCTWORK

SECTION DUCTWORK PART 1 GENERAL 1.1 REFERENCES SECTION 23 31 00 DUCTWORK A. ASHRAE - Handbook, Duct Design B. ASHRAE - Handbook, Duct Construction C. ASTM A90/A90M - Standard Test Method for Weight (Mass) of Coating on

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21 Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.

More information

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER G T D-X 000/000 DOMESTIC COLD WATER PIPE DOMESTIC HOT WATER PIPE DOMESTIC HOT WATER RETURN PIPE NATURAL GAS PIPE SANITARY VENT PIPE SANITARY PIPE DUCT SMOKE DETECTOR RELAY COIL THERMOSTAT TEMPERATURE SENSOR

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

WineZone Ceiling Mount Ductless Split 15

WineZone Ceiling Mount Ductless Split 15 WineZone Ceiling Mount Ductless Split 15 Requires an HVAC technician to install and charge with R-22 refrigerant. Easy to install. Unit plugs into wall outlet. Industrial grade unit for longer life. Indoor

More information

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device DIVISION 23800 APPENDIX A ASHTABULA CAMPUS: 1. Air Handling Equipment And Appurtenances 2. Exhaust Fans 3. Fume Hood Exhaust Fans 4. Fume Hood monitoring devices and annual certification of face velocity

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

Modular Heating & Ventilating Unit Model IGX-HV

Modular Heating & Ventilating Unit Model IGX-HV Modular Heating & Ventilating Unit Model IGX-HV Indirect Gas-Fired Heating Evaporative Chilled Water DX Cooling October 2008 Product Features Model IGX-HV Indirect Gas-Fired Heating and Ventilating Unit

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

Modular Supply Make-Up Air Unit

Modular Supply Make-Up Air Unit Modular Supply Make-Up Air Unit Model MSX Flexible Design Factory Assembled Heating Options Hot Water Steam Electric Cooling Options Evaporative Direct Expansion Chilled Water November 2009 Product Features

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS PART 0 A/E INSTRUCTIONS 0.01 Design Requirements A. Pumping system design 1. A primary-secondary pumping system is preferred. Redundant pipes are required for chillers and boilers. 2. Select pumps to operate

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

A. This Section includes the following emergency plumbing fixtures:

A. This Section includes the following emergency plumbing fixtures: Page 224500-1 SECTION 224500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,

More information

Experienced Worker Assessment Blueprint HVAC - Heating, Ventilation and Air Conditioning

Experienced Worker Assessment Blueprint HVAC - Heating, Ventilation and Air Conditioning Blueprint HVAC - Heating, Ventilation and Air Conditioning Test Code: 0144 / Version: 02 Specific Competencies and Skills Tested in this Assessment: Electricity Demonstrate understanding of basic AC/DC

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties: SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Backwater valves. 2. Cleanouts. 3. Floor

More information

Indirect Gas-Fired Make-Up Air

Indirect Gas-Fired Make-Up Air Indirect Gas-Fired Make-Up Air Model IG 800 to 7,000 cfm Up to 400,000 Btu/hr Multiple Furnace Control Options Optional Evaporative Cooling May 20041 Product Features Model IG Indirect Gas-Fired Make-Up

More information

SAFETY PLUMBING PACKAGES. Quality Products & Value Packages SUSTAINABILITY. Residential Solutions ANTI-SCALE SYSTEMS FIRE PROTECTION

SAFETY PLUMBING PACKAGES. Quality Products & Value Packages SUSTAINABILITY. Residential Solutions ANTI-SCALE SYSTEMS FIRE PROTECTION Quality Products & Value Packages Residential Solutions FIRE PROTECTION COMFORTSUSTAINABILITYCONTROL PRESSURE REGULATORS TRENCH DRAINSHVAC SYSTEMS SAFETY ANTI-SCALE SYSTEMS HEATING & COOLING CONTROLS PLUMBING

More information

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS SECTION 22 20 00 LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements",

More information

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH 318 MHNCCX NOMENCLATURE BREAKDOWN 4-Pipe Heat/Cool Ceiling Concealed Fan Coil MHNCCW- XX - XX Ceiling Concealed

More information

SECTION DOMESTIC WATER PIPING SPECIALTIES

SECTION DOMESTIC WATER PIPING SPECIALTIES SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler SECTION 15181 - HYDRONIC SPECIALTIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler B. Expansion tanks C. Pump accessories 1.2 RELATED SECTIONS

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

INSTALLATION MANUAL. Manufactured by AQUA-AIR MANUFACTURING. (801) or (800) FAX (801)

INSTALLATION MANUAL. Manufactured by AQUA-AIR MANUFACTURING. (801) or (800) FAX (801) INSTALLATION MANUAL Manufactured by AQUA-AIR MANUFACTURING 542 W. 47 Confluence East 800 South, Ave., Salt Ivins, Lake Utah City, 84738 Utah 84123 (801) 265-9699 or (800) 916-5777 FAX (801) 268-3856 (435)

More information

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual Standard Evaporative Cooler CELDEK Evaporative Cooler RECEIVING AND INSPECTION Upon receiving unit, check

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

SAS Steadyair Make-Up Air Units Technical Guide

SAS Steadyair Make-Up Air Units Technical Guide TGSAS-3 SAS Steadyair Make-Up Air Units Technical Guide A COMPLETE AIR TEMPERING PACKAGE FOR COMMERCIAL, INSTITUTIONAL, AND INDUSTRIAL APPLICATIONS S ince 1875, the L.J. Wing Company has been a leader

More information

FCC Fan-Coil Units High-Performance, Vertical

FCC Fan-Coil Units High-Performance, Vertical FCC Fan-Coil s High-Performance, Vertical Model FCC construction features Piping and supply-duct connections are from top of unit, eliminating the need for side or back access Right or left-hand configurations

More information

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - Systems and Equipment. Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12 12 24 SOUTH TEJON ST., SUITE 00 COLORADO SPRINGS, CO. 00 TELE.: FAX: WALL ESCUTCHEON PACK ANNULAR SPACE WITH MINERAL WOOL GENERAL NOTES. THIS PROJECT INCLUDES THE DESIGN AND PROVISION OF A NEW WET SPRINKLER

More information

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

IMC Significant Changes Summary Tier I

IMC Significant Changes Summary Tier I 2009-2015 IMC Significant Changes Summary Tier I 202 Environmental Air The definition of environmental air has been expanded through the addition of parking garage exhaust. 306.1 Access More than just

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0593 TESTING, ADJUSTING, AND A. Testing, adjustment, and balancing of air systems. B. Testing, adjustment, and balancing of hydronic, steam, and refrigerating

More information

SECTION (15530) - REFRIGERANT PIPING

SECTION (15530) - REFRIGERANT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. SECTION 23 23 00 (15530) - REFRIGERANT PIPING 3. Joining Materials. 4. Specialties. B. Related Sections: 1.02 REFERENCES 1. Section

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

SECTION HUMIDITY CONTROL EQUIPMENT

SECTION HUMIDITY CONTROL EQUIPMENT SECTION 23 84 00 HUMIDITY CONTROL EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE

More information

HVAC Equipment Access Equipment Location

HVAC Equipment Access Equipment Location City of Lancaster- Building Department 121 East Chestnut Street, Suite 102, Lancaster, Ohio 43130-3825 (740) 687-6649, Fax (740) 681-5030 Web site: www.ci.lancaster.oh.us/dept/building HVAC Heating, Ventilating,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 23 0594 - TESTING, ADJUSTING, AND BALANCING (TAB) PART 1 - GENERAL 1.1 SUMMARY A. This Section includes testing, adjusting and balancing HVAC systems to provide design conditions as indicated by

More information

TESTING, ADJUSTING AND BALANCING

TESTING, ADJUSTING AND BALANCING PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components

More information

SECTION AIR DOORS

SECTION AIR DOORS SECTION 23 34 33 AIR DOORS Berner Series VSA air doors are designed for openings up to 12 ft for environmental separation and up to 10 ft for insect control. Berner Series VSB air doors are designed for

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 841- QUEENS, 48-25 37TH STREET, New York, 11104 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-04-02 12:54 PM 2018-05-14 12:28 PM Asset Data Are there fuel tanks? Total

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

NEW CHILLER SCHEDULE

NEW CHILLER SCHEDULE TITLE: REPLACE CHILLER MACC MAXIMO # 4542690 PROJECT # 14M108CN MACC # 14-0459 ATTACHMENTS: 1. MAXIMO Equipment update form SCOPE OF WORK: The contractor shall provide all material, labor, equipment, and

More information

COMcheck Software Version Interior Lighting Compliance Certificate

COMcheck Software Version Interior Lighting Compliance Certificate Section 1: Project Information Energy Code: 2009 IECC Project Title: Berry Farms Animal Hospital Project Type: New Construction COMcheck Software Version 4.0.3.0 Interior Lighting Compliance Certificate

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES ADMINISTRATIVE SERVICES 4202 E. FOWLER AVENUE, FPC110 PHONE: (813) 974-2625 FACILITIES PLANNING & CONSTRUCTION TAMPA, FLORIDA 33620-7550 WEBSITE: USF.EDU/FPC DESIGN & CONSTRUCTION GUIDELINES DIVISION 21

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements

NC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents for mechanical and plumbing systems. 2.0 General Requirements A. Warranty and Guarantee 1. Specifications

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM SECTION 23 81 06 - PACKAGED ROOFTOP AIR CONDITIONING UNITS - CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. This Section includes equipment types that contain all the components of the refrigeration process within

More information

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15732 - PACKAGED ROOFTOP AIR CONDITIONING UNITS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Package roof top unit. B. Heat exchanger. C. Refrigeration components. D. Unit operating controls. E. Roof

More information

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM # ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM DETAIL Labor Material FURNACE COMPONENTS 1 Furnish & Install Sight-Impaired Thermostat For Heating and Cooling

More information

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING SECTION 15990 PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING PROJECT NO. ####### PART I - GENERAL 1.01 WORK INCLUDED A. Final test and balance of air distribution systems. B. Final test and balance

More information