chaffoteaux ltd. CORVEC 28 BF CORVEC 28 OF OF GC No BF GC No installation servicing requirements

Size: px
Start display at page:

Download "chaffoteaux ltd. CORVEC 28 BF CORVEC 28 OF OF GC No BF GC No installation servicing requirements"

Transcription

1 chaffoteaux ltd. CORVEC 28 OF CORVEC 28 BF BF GC No OF GC No installation servicing requirements Leave these instructions at or near the service Gas Meter.

2 contents Page 3 : TECHNICAL DATA Pages 4, 5, 6, 7, 8, 9,10,11 and 12 : INSTALLATION Pages 13 and 14 Page3 15 Pages 17 : SERVICING REQUIREMENTS : FAULT FINDING CHART : SHORT LIST The CORVEC 28 is a wall mounted, low water content boiler available in both balanced flue and ouen flue versions. The boiler is rated at 4 kw (13660 Bt&h) 6.5 kw (22350 Btu/h) or 8.2 kw (28000 btu/h). The boiler is designed for use with Natural Gas only, unless otherwise stated. A pump must be installed in the water circulation system irrespective of whether the system is of the open or sealed type. The CORVEC 28 balanced flue version is supplied in two cartons, one containing the boiler and the other containing the balanced flue set. The CORVEC 28 open flue version is supplied in one carton. The guarantee on this is voidable if it is not installed in accordance with the recommendations made herein or in a manner approved by the manufacturer. CORVEC 28 BF water CORVEC 28 OF A 200 B 80 C 269 D 100 E 960 F 55 G 600 H 65 I dnnemmminm.m 7

3 technical data OF MODEL BF MODEL HEAT OUTPUT HEAT INPUT SETHNG PRESSURE RESTRImOR SIZE GAS RATE kw Btulh kw Btu/h mbar in w.g. mm dia f&h m3/h , , , , , , , , , , , , N.B. - These boilers are supplied with the 8.kW (28000 Btu/h) output restrictor fitted. Other restrictors are in an accompanying carton. See 6.5 CLEARANCE FOR INSTALLATION AND SERVICING,alanced flue version : Sides mm (1 ins) Top mm (3 ins) Bottom mm (5 ins) Front....: mm (23.6 ins) Open flue version : Sides mm (3 ins) Top mm (3 ins) Bottom (5ins) Front mm (23.6 ins) FLUE CONNECTION Balanced flue version : Open flue version : Flue set requires a hole in the wall 125 mm high x 240 mm wide (6.9 ins x 9.4 ins) Requires a nominal 100 mm (4 in) flue pipe. No split collar is required. Draught diverter is integral. GAS CONNECTION : R l/2 in. (112 in. BSP taper male) WATER CONNECTIONS : Flow : R BSP on left hand side of boiler viewed from front. Return : R /4 BSP. he open flue version has male threads (R 3/4), the balanced flue, female threads (Rc 3/4). MINIMUM WATER FLOW RATE : 450 L/hr gpm. MINIMUM STATIC HEAD AT BOILER : 0.15 Metre (6 ins) See section 5. MAXIMUM STATIC HEAD AT BOILER : 30 Metres (98 ft). ELECTRICAL CONNECTIONS : None on the boilers (all control via pump etc.) DIMENSIONS Balanced flue version : Open flue version : 600 mm high x 269 mm wide x 218 mm deep 600 mm high x 269 mm wide x 218 mm deep (23.6 ins x 10.6 ins x 8.6 ins) (23.6 ins x 10.6 ins x 8.6 ins) WEIGHT : 13.6 kg (30 lbs) WATER CAPACITY : litres (0.04 gals) A 6 blade Chaffoteaux burner is used fitted with 1.18 mm dia injectors. The non-adjustable permanent pilot is manually ignited by a piezo ignitor. The flow temperature is controlled by a non-adjustable thermostat at a nominal 82 C (ISO F). 3

4 &INSTALLATION REQUIREMENTS. General The installation of the boiler must be in accordance with the Gas Safety Regulations, Building Regulations, I.E.E. Regulations and the Byelaws of the local Water Undertaking. It should be in accordance also with BS Codes of Practice and the British Gas Publication. Material and Installation Specification for Domestic Central Heating and Hot Water, and any relevant requirements of the local Gas Region and Local Authority Location The position chosen for the boiler should permit the provision of a satisfactory flue termination. The position should also provide adequate space for servicing and air circulation around the boiler. Where installation will be in an unusual position, special procedures may be necessary, and BS 5376 : 2 gives detailed guidance on this aspect. A cupboard or compartment used to enclose the boiler must be designed and constructed specifically for this purpose. An existing cupboard or compartment may be used provided that it is modified for the purpose. Details of essential features of cupboard/compartment design are given in BS 5376 : Gas Supply The gas installation should be in accordance with CP 331 : 3. The meter to be used must be of adequate capacity to meet the total gas load, i.e. boiler plus other gas applian- CeS. Ensure that the pipework from the meter to the boiler is of adequate size. Do not use pipes of a smaller size than the boiler gas connection. The compiete installation must be tested for soundness as described in the above Code Fiueing Detailed recommendations for flueing are given in BS5440: 1. The following notes are for general guidance only Balanced Flue Version The boiler must be installed so that the flue terminal discharges directly into the external air. Termination should be on a clear expanse of wall; the terminal being preferably not less than 600 mm (2 ft) from a corner, recess or projection. (a) Within 300 mm (1 ft), measured vertically, from the bottom of an openable window, air vent or any other ventilation opening. (b) Less than 300 mm (1 ft) from ground level. (cl Less than 600 mm (2 ft) from any surface facing the terminal. (4 Immediately beneath eaves or a balcony. installation 4 Where the terminal is less than 2 m (6.6 ft) above the level of any ground, balcony, flat roof or place to which people have access, the terminal must be protected by a guard of suitable material. Where a terminal guard has not been supplied (optional extra) with the boiler, one may be obtained from Chaffoteaux Limited. The air inlet/products outlet duct and the terminal should be no closer than 50 mm (2 in) to combustible material. Detailed recommendations on protection of combustible material are given in BS 5440 : Open Flue Version The boiler should be sited such that the maximum possible length of the flue system.can be contained within the building and that the route of the flue rises continuously to the terminal and is as direct as praticable. Where 600 mm (2 ft) of flue pipe should rise vert ically from the draught diverter connection before the use of any bends or elbows. Horizontal or shallow angle runs, right angled bends and mitred elbows should be avoided. Where an existing brick chimney is to be used, it should be swept thoroughly before connection of the new boiler, and the chimney should be lined. An approved British Gas terminal must be fitted and the terminal sited at the adjacent roof edge, and where possible above the ridge line. The flue must not be terminated at or adjacent to a wall face Air Supply Detailed recommendations for air supply are given in BS 5440 : 2. The following notes are intended to give general guidance Balanced Flue Version The room in which a balanced flued boiler is installed does not require a purpose provided air vent. Where a balanced flued boiler is installed in a cupboard or compartment, air vents are required (for cooling purposes) in the cupboard or compartment at high and low level. These air vents may communicate with a room or direct to outside air. The minimum effective area requirement of cupboard/compartment air vents are as follows. Position of air vents High Level Low Level Air from room 90 cmz 14 it? 90 cm1 14 in Air direct from outside 45 cm 7 in2 45 cm 7 in3 Note - Both air vents must communicate with the same room, or must be on the same. waii to outside air.

5 installation Open Flue Version Room or Internal Space Air Supply Where the boiler is to be installed in a room or internal space, the boiler requires the room or internal space containing it to have a permanent air vent. This vent must be either direct to outside air or to an adjacent room or internal space which must itself have a permanent air vent of at least the saae size direct to outside air. The minimum effective area of the permanent air vent (s) is related to the maximum rated input of the boiler and should be 15 cm (2 in ) Cupboard or Compartment Air Supply Where the boiler is to be installed in a cupboard or compartment permanent air vents are required (for combustion, flue dilution and cooling purposes) in the cupboard or compartment at high and low level. These air vents must either communicate with a room or internal space or be direct to outside air. The minimum effective areas of the permanent air vents required in the cupboard or compartment are specified below and are related to the maximum rated heat input of the boiler. POSITION AIR VENT AREAS OF Air from room Air direct from AIR VENTS or internal space outside High 90 cm2 45 cm2 Level 14 in2 7 in2 Low 180 cm 90 cm2 Level 28 in2 14 in* Note : Both air vents must communicate with the same room or internal space or must both be on the same wall to outside air. Where cupboard or compartment air vents communicate with a room or internal space, the room or internal space must itself a permanent air vent (s) as specified in Effect of an Extract Fan If there is any type of extract fan fitted in the premises, there is a possibility that if adequate air inlet area from outside is not provided, spillage of the products from the boiler flue could occur when the extract fan is in operation. Where such installations occur, a spillage test as detailed in BS 5440 : 1 must be carried out and any necessary action taken Water Circulation Systems Open or sealed type central heating systems should be in accordance with the relevant recommendations given in BS 5376 : 2. BS 5449 : 1 (for smallbore or microbore systems) and the British Gas publication entitled (( Material and installation Specifications for Domestic Central Heating and Hot Water 1). Hot water systems should be in accordance with the relevant recommendations given in CP 342 : 1 and the above mentioned British Gas publication and BS Electrical Supply The CORVEC 28 boiler has no electrical connections, but all wiring external to the boiler must be in accordance with the I.E.E. Regulations. For external wiring instructions, see 4.6. Electrical Connections. 4) INSTALLATION OF BOILER 4.1. General A vertical flat area is required for the boiler as follows. Balanced Flue Version mm wide x 803 mm high (12.6 ins x 31.6 ins). Open Flue Version mm wide x 802 mm high (16.6 ins x 31.6 ins). Above dimensions include the necessary clearances around the boilers for case removal and for air movement Fheing 4.2-l. Balanced Flue Version The standard flue set supplied with the boiler is suitable for walls having a thickness of 75 mm to 355 mm (3 ins 14 ins). (Flue sets for walls of thickness up to 610 mm (24 in) are available to special order). Using the boiler as a template determine the position for the flue duct. The following procedure should now be followed. (a) Prepare the Wall Cut a hole in the wall which measures 20 mm high x 240 mm wide (4 l/2 x 9 l/2 in). If the hole is cut accurately, there is no need to line the hole, since the wall liner make a satisfactory seal. (b) Prepare the Parts Cut the wall liner to the same length as the wall thickness. Cut the flue duct to the same length, plus 80 mm (3.25 ins). (cl Fit the wall Liner (fig. 1) (see page 6). Position the wall liner in place. Ensure that the liner is square and horizontal with the seam uppermost and that the flange is flush with the inside face of the wall. With the liner fixed in place, make good the external and internal wall surfaces around the liner with cement. 5

6 installation Open Flue Version The CORVEC 28 open flue version has a draught diverter outlet suitable for a nominal 100 mm (4 in flue pipe). The flue should be installed in accordance with the requirements of BS 5440 : FITTING THE BOILER Blanced Flue Version Pull off the gas control knob. remove the screw below the gas control knob and the two screws top and bottom. Remove the front cover by pulling forwards. Remove the Flue Bend from the top of the heat exchanger (two screws). Fix the top bracket to the rear boiler case using the screws provided (fig. 2). Using the boiler as a template, mark all three fixing holes (A. fig. 3). Drill and plug the wall. For walls in excess of 6 in. terminal may now be fitted from within the building, if required, by passing it through the wall liner before fitting the boiler to the wall. TAKE CARE NOT TO ALLOW THE TERMINAL TO FALL. Attach the chains onto the hooks inside the walls liner (fig. 4). Attach the self adhesive foam gasket to the flat surface of the boiler around the air inlet spigot on the back of the boiler. Pull off the protective paper whilst sticking down the gasket. Lift the boiler into position with the air inlet spigot locating in the wall liner. Secure the boiler to the wall using the screws and washers provided. If not previously fitted, fit the terminal from the outside. For walls between 3 in and 6 in thickness the chains may be located in the slots provited in the brackets on which the flue hood is fitted (b. Fig. 3). Slide the flue duct through the wail liner and engage it in the terminal by at least 25 mm (1 in) and fully onto the flue bend. The duct may have to be cut to length and fitted with seam uppermost. Replace the flue bend and secure with the two screws. Ensure that the seal between the heat exchanger and the flue bend is made evenly and securely Open Flue Version The boiler is attached to.the wall by a bracket at the top the boiler and by two screws at the bottom. Using the dimensions detailed in 2. TECHNICAL DATA, mark the position of the fixing holes for wall mounting plate ensuring adequete space for connection to the flue pipe. Remove the boiler cover by pulling off the gas control knob and removing the screw below it. pull the bottom of the cover forwards then lift off. Hang the boiler on the wall bracket and mark the positions of the two bottom fixing holes. Drill and plug the wall. Rehang the boiler and screw in position. Connect the flue to the draught diverter outlet making a good seal between the spigot and flue pipe Gas Connections The gas service tap must be fitted as in fig. 5 together with the filter/washer. The gas supply pipe size should be sufficient to ensure that there is 8 in.w.g. gas pressure at the service tap when working Water Connections The water flow pipe is on the left hand side of the boiler and the water return pipe on the right as indicated in 2. TECHNICAL DATA. The balanced flue version has a built-in facility for top connection; To avoid damage to the internal pipework it is recommended that the unions are held whilst screwing fittings on to the flow and return connections. Where the top connection is used remove the plugs from the two top connections. Remove unions from the bottom connections, re-fit the unions in the top connections and transfer the plugs to the bottom connections. Where bottom outlet connections are used, the blanked off top outlet connections can be used as air vents when commissioning. The open flue version has no purpose made facility for top connections, but recesses are provided on both sides of the boiler frame to allow pipes to rise within the boiler dimension as shown in 2. TECHNICAL DATA. I

7 installation 4.6. Electrical Connections The CORVEC 28 has no electrical connections and all external electrical controls should be wired to control the circulating pump. Most normal pumped primary control schimes can be used, including non-electrical heating and hot water controls. The following diagrams show typical control schemes using electrical controls only. fig 6 Hot Water only Pump, Time Clock and Cylinder Thermostat TIME CLOCK CYLINDER PIMP THERMCSTAT fig 7 Heating only Pump, Time Clock and Room Thermostat TIME CLOCK Row TMERYOSTAT PlM? ROON THERMOSTAT fig 8 Hot Water and Heating Pump Programmer, Room/Cylinder Thermostat and Flow Share Valve fig 9 Hot Water and Heating Pump, Programmer, Room/Cylinder thermostats and two Motorized Valves. The following diagrams show typical control schemes using electrical/non-electrical controls. fig 10 Hot Water and Heating Pump, Time CIock and Non-Electrical Hot Water and Heating Controls TIME CLOCK PlMP fig 11 Hot Water and Heating Pump, Time Clock, Non-Electrical Hot Water Control and Electrical Heating Control MOTOEIZED C/H VALVE ROOM THERMOSTAT < fig 12 Hot Water and Heating Pump, Time Clock, Non-Electrical Heating Control and Electrical Hot Water Control TIME CLOCK PWP CYLINDER I7lERMOSTA.T It is not normally possible to use full programming ficilities when using a mixture of electrical an.d non-electrical controis, but some non-electrical hot water controls are -now available with an external micro-switch which would allow the scheme as in fig. 11 to be fully programmed.

8 installation 5) WATER CIRCULATING SYSTEM 5.1. General The CORVEC 28 is a low water content boiler designed only for use with fully pumped systems. It may be used with open or sealed systems, all safety controls excluding the pressure relief valve being incorporated in the boiler. The thermostat is set to give a nominal 82 C (180 F) flow temperature and is not adjustable. Thermostatic control must be fitted to the cylinder and heating circuits. Where it is impossible to fit the pump in the return. It may be fitted in the flow as shown in fig 14, providing that there is a minimum of 2 metres (6.5 ft) static head between the water level in the feed and expansion tank and the top of the boiler casing System By-Pass A valved system by-pass as shown in figs 13 and 14 may be required to ensure adequate water flow through the boiler. The by-pass should be a 15 mm (l/2 in) pipe with a suitable balancing valve Control Schemes The boiler does not incorporate electrical controls or connections, the primary control being provided by the pump, the operation of which will light the boiler, providing that there is a minimum flow of 450 l/h (1.65 gpm). Most normal pumped primary control schemes can be used including thermostatic radiator and cylinder valves. When using motorized valves, the systems control should.be designed to switch off the pump when all circuits are satisfied. For details of wiring and of control schemes, see 4.6. Chaffoteaux Limited should be consulted where technical assistance is required Isolating Valves Two isoiating valves should be fitted adjacent to the boiler to allow full servicing facilities. Where the circulating pump is adjacent to the boiler and is provided with isolating valves, it is only necessary to fit one isolating valve in the boiler flow. Fig. 13 shows a typical pipework arrangement Circulating Pump The circulating pump should be fitted in the return as shown in fig. 13. and should be sized to overcome the hydraulic iesistance of the boiler and system. The boiler requires a minimum flou r;ltc of.380 I h (I.39 gpm) its correct operation and at this flow has a resistance of 3.1 metres ( 10.5 ti.) See graph utoma:ir :i.ir Separators ChaffoteatiA ~iau;cti ~o.:gly recommend the inclusion of a British Gas accepted automatic air separator in the system as shown in fig I3 and 14. Where an air separator is not fitted, the open vent pipe should rise continuously from the pump inlet and the common return be introduced at right angles to this pipe. The preferred arrangement is shown in fig Open Systems Only Cylinder. The domestic hot water cylinder used with the CORVEC 28 must be of the indirect coil and high recovery type. Flow and return pipework to the cylinder should be in 22 mm pipe Feed and Expansion Tank The feed and expansion tank should be connected as shown in figs 13 or 14 and should not be mounted closer than 9 ins to a ceiling to allow access to the ball valve. The minimum static head for the CORVEC 28 should be 0.15 (6 ) for the pump on the return (fig. 13) and 2 metres (6.5 ft) for the pump on the flow (fig. 14) Sealed System Only Safety Valve A safety valve shall be fitted close to the appliance on the flow pipe by a horizontal or a vertically upward connection. Only safety valves set to operate at 3 bar shall be used; they shall be so positionned, or any discharge pipe so arranged, that discharge of water or steam from the valve cannot create a hazard to occupants of the premises or cause damage to electrical components and wiring FLOW RATE Litres/hour Pressure Gauge A pressure gauge covering at least the range O-4 bar (O-60 1 b/irp) shall be fitted to the system adjacent to, and visible from, the filling point. 8

9 installation AIR SEPARATOR 6 ins TO BOILER PUMP E E G.*.:.:...:.*.:,.....e.*.*.*.-.*. 4 -E E ua 6ins - 150% 9, Fig. 15

10 installation Expansion Vessel (i) A diaphragm type expansion vessel shall be fit- (ii) The nitrogen or air charge pressure of the ted by a connection to the inlet side of the circu- expansion vessel shall be not less than the lating pump, in a manner laid down in the vessel hydro-static head (height of the top point of the maker s instructions (see fig 16 for illustration system above the expansion vessel). of recommended system layouts). The expansion vessel shall be capable of accepting water (iii) The expansion vessel shall be sized in accorup to at least 62.5 % of its volume without dance with the following Table. damage. Air or nitrogen charge Expansion Vessel Volume (litres) pressure (bar*, gauge) Pre-pressurisation pressure (bar*, gauge) None i 3 None 1.5 System Volume Litres Gallons l 1 bar 14.5 lb.f/in2 (Approx. 1 atmosphere or 34 feet head of water). Where a vessel of the calculated size is not obtainable, the next available larger size should be used. For the purpose of the above calculation, the volume of the system shall be determined as accurately as possible using manufacturers data as appropriate. Alternatively the volumes given below may be used to give a conservative estimate of the system volume : Low water capacity boiler Small borepipework ,8 litres (0.18 gallons) 0.3 litres (0.07 gallons) per kw (1000 Btu/h) of system output. Microbore pipework _. Steel panel, radiators _ litres (1.5 gallons) 2.3 litres (0.5 gallons) per kw (1000 Btu/h) of system output. Hotwatercylinder litres (0.44 gallons). If a system if extended, an expansion of increased volume may be required unless previous provision has been made for the extension. ill

11 installation DIAGRAMSSHOWING SYSTEMLAYOUT 1 - Gcpmsion vessel 2 - Pmmm 9-e 3 - Filling point 4. - Drain code 5 - Airrdmsopoint 6-6dtyvalva 7 - Topup bottle PUMP ON THE FLOW Fig. 16 PUMP ON THE RETURN Hot Water Storage Cylinder The hot water cylinder shall be the indirect coil type which is suitable for the system pressure Make-Up System Provision shall be made for replacing water lost from the system either : (i) (ii) From a make-up vessel or tank mounted in a osition higher than the top point of the system, and connected through a non-return valve to the system on the return side of the hot water cylinder or the return side of all heat emitters, or. Where access to a make-up vessel would be difficult, by pressurisation of the system Mains Connection There shall be no connection to the mains water supply or to the water storage tank supplying domestic water, even through a non-return valve, without the approval of the local Water Authority Filling Point The system shall be fitted with a filling point at low level, which shall have a stop valve to BS 1010, a test cock, an anti-vacuum valve and a non-return valve approved by the National Water Council in this order from the system to the mains Pipework Pipework should be of copper; small bore or microbore with capillary or compression jointing to a high standard. Leak sealant shall not be used in the system Feed and Expansion System Except as provided for above, the expansion cistern and cold feed required for systems shall not be fitted to sealed systems Inhibitors Chaffoteaux Limited do not generally recommend the inclusion of an inhibitor with heating and hot water systems, utilizing the CORVEC boilers. It is, however, appreciated that the specification for a new installation may require the addition of an inhibitor and the following are the appliance manufacturers recommendations. (i) (ii) (iii) Use only a British Gas approved inhibitor. Use only the quantities specified by the inhibitor manifacturer. Add the inhibitor only when the system has all air removed. 6) COMMISSIONING AND TESTING 6.1. Electrical Installation Checks to ensure electrical safety should be carried out by a competent person Gas Installation The whole of the gas installation, including the meter, should be inspected and tested for soundness and purged in accordance with the recommendations of CP 331 : Water Circulation System Open System Only The whole of the system should be filled and thoroughly flushed out with cold water without the pump in position. Ensure that all valves are open. With the pump fitted, the system should be filled and air locks cleared. The boiler water section can be vented if necessary by unscrewing the knurled nut on the drain valve (see 6.7.) and the top outlet plugs (see 4.5.). Vent all radiators and check for water soundness. Light the boiler as detailed in 6.4. The water system should be heated maximum to working temperature and examined for water Soundness. Both gas and water should then be turned off and the water system rapidly drained while still hot. 11

12 installation The system should again be filled, cleard of air locks and examined for water soundness. Add inhibitor to the system if required in the specification (see 5.9.) Sealed System Only The whole of the system should be filled and thoroughly flushed out with cold water without the circulating pump in position. Ensure that all valves are open. (The system must be filled with water either from a sealed system filler pump with a break tank, or by any other method approved by the local Water Undertaking). With the circulating pump fitted, the system should be filled and air locks cleared until the pressure gauge registers 1.5 bar (21.5 lbf/in ). (The boiler water section can be vented if necessary by unscrewing the knurled nut on the drain valve, see 6.7). Vent all radiators and check for water soundness. Manually raise the water pressure to ensure that the safety valve lifts. This should occur within f 0.3 bar (+ 4.3 lbf/inz) of the preset lift pressure, i.e 3 bar (43.5 lbf/ir?). Release water from the system until the initial system design pressure is attained, taking into account any difference in height between the pressure gauge and the point at which the pressure vessel in connected. Light the boiler as detailed in 6.4. The water system should be heated to maximum working temperature and examined for water soundness. Both gas and water should then be turned off and the water system rapidly drained whilst still hot. The system should again be filled, cleared of air locks and adjusted to the initial system design pressure. Any set pointer on the pressure gauge should be set to coincide with the indicating pointer. Examine for water soundness. Add inhibitor to the system if required in the specification (see 5.9.) Lighting the boiler The following procedure should be followed : (a) Check that the gas service tap is open. (b) Replace the gas control knob. (c) Turn the gas control knob in an anticlockwise direction which will automatically light the pilot N.B. (d) (e) (f) (g) it may necessary to wait a few moments for gas to reach the pilot. Wait 15 seconds, then turn the gas control knob slowly, fully, in an anticlockwise direction. If pilot is extinguished for any reason, wait 3 minutes before lighting. The boiler is now ready to operate and will light when water is pumped through. Test for gas soundness. Check and, if necessary, adjust the gas rate as detailed in Gas rate Adjustment The boiler is not fitted with a governor. To obtain the riquired output, it may be necessary to change the restrictor situated in the burner manifold (fig. 17). To alter the heat output remove the pilot supply tube and the two screws securing the burner manifold to the burner assembly. Replace the restrictor with the required size as detailed in TECHNICAL DATA. Replace the burner manifold and pilot tube. Since the opening of the gas valve depends upon water flow rate, make the above adjustment when all the air is removed from the system and all radiator valves are fully open. Mark the data badge in the line SET TO (against output) to which the boiler has been adjusted. The data badge is situated inside the case Balancing the System By-Pass The system by-pass should be balanced as the final part of commissioning. 1. A system by-pass is not required for the safe operation of the boiler. which will automatically shut down if the flow rate drops below 450 l/h (1.65 gpm). If however the system may be required to be used with a large reduction of heat output at certain times i. e. a reduced number of radiators, then a 15 mm system by-pass should be used valve and turn off the required number of radiators to suit the customer s needs then open the by-pass until the boiler lights. 2. Check system on hot water only. Open by-pass furher if necessary to obtain correct operation Draining the Boiler Close the valves in the pipework connecting the boiler to the system (fig. 13 or 14). Drain the boiler unscrewing the knurled nut on the drain valve. F. Fig ) BOILER CASE ASSEMBLY 7.1. Balanced Flue Version Fit front cover and refit securing screws at the top and bottom and immediately under the gas control. Push on gas control knob Open Flue Version Fit case and refit securing screw immediately under the gas control. Push on gas control knob. Hand the USER S INSTRUCTIONS to the user for retention and instruct in the operation of the boiler. Advise the user of the precautions necessary to prevent damage to the system and to the building in the event of the system remaining inoperative during frost conditions. Finally advise the user that, for continued efficient and safe operation of the boiler, it is important.that adequate servicing is carried out at regular intervals recommended by the local Gas region. 12

13 servicing requirements 9) SERVICING REQUIREMENTS Remove the heating body. Clean the heating body by brushing with hot water and detergent. Do not attempt to clean the internal water- For efficient and trouble free operation it is important that the CORVEC 28 receives regular maintenance. The following schedules are recommended. Before commencing any work, turn off the gas at the gas inlet tap and isolate the boiler from the water circulating system (see 5.3.). Ensure that the electricity supply to the system is switched off. Remove the front cover as detailed in or Annual Service Clean the Burner (fig. 17). Unscrew the pilot tube clamping screw A, and remove the clamp and tube. Remove the burner manifold by unscrewing fixing screws B. Pull burner head assembly forward to remove, taking care not to trap the thermocouple or ignitor wires. Invert the burner head and clean by brushing. Replace in reverse order ensuring that the burner head is correctly located on the spigots at the rear, and that the gasket between the burner manifold and gas section is in place Clean the Heating Body Remove the flue bend on balanced flue versions as detailed in Drain the boiler as detailed in 6.7. Remove burner as detailed in 9.1.l. Remove the two wires from the fusible link overheat carrier taking care not to lose the nuts and washers. B.F. Model - Remove the screw holding the bottom of the heating body skirt to rear case. Release the union nuts joining the heating body legs to the water section. O.F. Model - Remove the screw holding the bottom of the heating body skirt and clamping plate to the rear case. Release the union nuts at each end of the pipes connecting to the heating body legs and remove. ways of the heating body without prior consultation with the manufacturer. Before replacing heating body, see Replace in reverse order, using new washers where applicable Clean the Pilot Assembly. Thermocouple and Spark Electrode. Unscrew the pilot tube clamping screw and remove the clamp and tube. Blow through the tube to remove any dust. Remove the burner as in 9.1-l. Unscrew the pilot body (C - fig 18) with a 15 mm or adjustable spanner. It may be necessary to remove the heating body (9.1.2.) if this has already been replaced. Clean the pilot body by blowing or washing. Do not clean the holes with a wire. Disconnect the thermocouple from the overheat terminal stud. With a 7 mm box spanner, unscrew the nut holding the thermocouple into the gas section (D fig. 19). Thread the thermocouple and wire up through the gas section. Clean the end of the thermocouple by brushing. Remove the spark electrode fixing screw (E - fig 19) with a cruciform head screwdriver. Pull off the electrode cable from the piezo ignitor. Lift the electrode out of the gas section. Clean the end of the.eiectrode by brushing. Blow any dust off the gas section. Replace all parts in reverse order and ensure that the slot in the electrode cable connector is vertical when pushed onto the piezo ignitor. The pilot flame is non-adjustable. When burning correctly, the flame should be 3/16 to l/4 (5-7 mm) high, reaching half way up the exposed part of the thermocouple Clean the Gas Filter Unscrew the union nut attaching the gas inlet tap to the appliance. Lower the union nut and withdraw the filter which also acts as a washer. Clean the filter by blowing or washing in water. Do not use any solvents. replace in reverse order. Fig. 17 Fig Fig. 19 :

14 clean the Thermostat Capsule and Water Filter Drain the boiler as detailed in 6.7. Using a 14 mm spanner or adjustable spanner, remove the thermostat housing cover (G fig. 20) taking care not to lose the spring. Remove the thermostat capsule and clean with soap and water. Replace in the reserve order. Remove union nut (circled figs. 20 and 2Oa) remove and clean water filter General service Clean Burner, Heriting Body, Pilot Assembly and Thermocouple. As detailed Replace the Gas Filter As detailed in Replace the Diaphragm Drain the boiler as detailed in 6.7. Unscrew the four water union nuts (A - fig. 21) on the water section and remove the high & low pressure tubes. Unscrew the 4 screws (B - fig 21) holding the water section to the gas section. Note the relative positions of the gas and water sections and the two halves of the water section. Unscrew the two screws holding the water section clamp. Remove the water section complete with the diaphragm and bearing plate. Separate the top and bottom halves of. the water section by removing the eight screws. Remove diaphragm and discard. Wash out water section. Replace with a new diaphragm fitted and the bearing plate positioned on the top of the diaphragm. Reassemble with the components in their original relative positions Clean the gas Valve Remove the burner as in 9.1-l. Disconnect the thermocouple from the overheat terminal stud and pull off the electrode cable from the piezo ignitor. servicing requirements Remove the two screws at the rear of the burner holding it to the rear case. Remove the four fixing screws fastening the top of the gas section to the base. N.B. Provided isolating valves are fitted it may be found easier if the heating body is removed. Lift the gas section top off the base. Remove the gas valve spring. Lift out the gas valve. Do not attempt to further dismantle the valve assembly. Clean the valve seating and replace the gas valve facing rubber if necessary. Replace in reverse order To replace the Thermosiectric Valve. Remove the therthiiceuple nut (H fig. 20). Unscrew cap from the side of the gas section and withdraw the thermo-electric valve. replace if necessary. Reassemble in reverse order To replace the Fusible Link. Remove the two nuts securing the thermocouple leads to terminals of the overheat assembly. Remove clamping disc. Remove fusible link. Replace the fusible link. When forming the wires to shape, avoid bending them close to their entry into the fuse. Use long nosed pliers to support the wire. Reassemble in reverse order To replace the Piezo Ignitor Cartridge Pull off the electrode lead from the cartridge. Remove the screw holding the gas control cam. Pull the cam off the spindle. Remove the two screws holding the retaining plate in position. Remove the plate and then the Piezo cartridge. Replace in reverse order, note the slot in the end of the electrode cable is vertical when pushed on to the Piezo. Fig. 20 Fig.20 a 14

15 fault finding chart FAULT POSSIBLE CAUSE REMEDY Pilot will not light Gas supply not turned on. Gas supply pipes not purged of air. Fusible Link open circuited. Fusible Link shorting to earth. Turn on. Purge. Replace. Re-position. Pilot lights with taper but not with igniter Spark electrode wrongly positioned. Spark from electrode not jumping to thermocouple. Electrode lead detached from Piezo igniter Electrode lead damaged causing local short circuit Faulty Piezo Ignitor. Re-position. Refit. Replace. Replace. Pilot goes out Pilot too small, injector blocked. Replace or wash in solvent. Thermocouple/thermo-electric valve faulty, low MV output Replace. Thermocouple loose. Terminal wrongly positioned causing Tighten. recirculation. Installer to resite boiler. Flue set wrongly fitted causing re-circulation. Fit correctly. Fusible Link fused. Replace. Securing nuts loose. Re-tighten. Insulation washers fitted incorrectly. Refit. Low meter pressure. Gas Region to adjust. Pilot flame too soft. Clean pilot tube or replace pilot injector. Main burner will not light or lights at low rate Low flow rate pump duty not sufficient. Water Filter blockad. Low flow rate system very restrictive. Low flow rate, air in system. Water section spindle bent or dry. Diaphragm split or stretched. Thermostat not seated properly. Gas supply insufficient. Heat exchanger blocked. Pump speed too slow. Flow and return pipes crossed or plaster, cement in pipes. Rectify. Installer to check pump data. Clean. Open system by-pass. Purge thoroughly, fit air separator if persistent or wher convectors are used a head emitters. Replace or grease. Replace. Inspect clean. Check working pressure 8 in. w.g. at service tap. Descale or replace. Adjust. Main burner lifts Re-circulation of flue products. Remove flue set and fit correctly. Terminal badly sited and flue set wrongly assembled Reflit. Terminal not fitted in wall liner. Fit correctly. Over-gassed. Adjust set to correct gas rate. Check sealing of blue. Re-seal fit correctly. 15

16 Imp. Chaffoteaux et Maury FM l

chaffoteaux ltd. CORVECELT TS CONFORMS WITH EUROPEAN (BS5386Ptl) EN26 installation servicing requirements

chaffoteaux ltd. CORVECELT TS CONFORMS WITH EUROPEAN (BS5386Ptl) EN26 installation servicing requirements chaffoteaux ltd. CORVECELT TS CONFORMS WITH EUROPEAN (BS5386Ptl) STANDARD EN26 installation servicing requirements contents Page 3 : TECHNICAL DATA Pages 4 and 5 : INSTALLATION Pages 6 and 7 : SERVICING

More information

==sv u. installation. servicing requirements CORVEC BRITONY I I.T. chaffoteaux ltd.

==sv u. installation. servicing requirements CORVEC BRITONY I I.T. chaffoteaux ltd. ==sv u chaffoteaux ltd. CORVEC BRITONY I I.T CONFORMS WITH BRITISH STANDARD BS 5386 PART I AND EUROPEAN STANDARD EN.26 installation servicing requirements contents Page 3 : TECHNICAL DATA Pages 4,5 and

More information

chaffoteaux ltd. chaffoteau et lmaury M CORWC 45 BF 45 OF BF GC No OF GC No installation servicing requirements

chaffoteaux ltd. chaffoteau et lmaury M CORWC 45 BF 45 OF BF GC No OF GC No installation servicing requirements chaffoteaux ltd. chaffoteau et lmaury M C@RVEC 45 OF CORWC 45 BF OF GC No 41 980.30 BF GC No 41 980.29 installation servicing requirements contents Page 3 : TECHNICAL DATA Pages4.5.6. 7,8, 9, 10, 11 and

More information

JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No

JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No 53 416 06 Publication No. ZZ 180/17 May 2000 These appliances are tested and certified by B G Technology for

More information

MULTIPOINT BF Gas Fired Balanced Flue Water Heater

MULTIPOINT BF Gas Fired Balanced Flue Water Heater Please leave these instructions with the user MULTIPOINT BF Gas Fired Balanced Flue Water Heater User Operating, Installation and Servicing Instructions 6 720 607 090 (03.12) JS Natural Gas Main Multipoint

More information

BAXI BOSTON ALL MODELS FLOOR STANDING OPEN FLUE (OF) CENTRAL HEATING BOILERS INSTALLATION AND SERVICING INSTRUCTIONS. GAS TYPE G20 (Natural Gas)

BAXI BOSTON ALL MODELS FLOOR STANDING OPEN FLUE (OF) CENTRAL HEATING BOILERS INSTALLATION AND SERVICING INSTRUCTIONS. GAS TYPE G20 (Natural Gas) BAXI BOSTON ALL MODELS FLOOR STANDING OPEN FLUE (OF) CENTRAL HEATING BOILERS INSTALLATION AND SERVICING INSTRUCTIONS GAS TYPE G20 (Natural Gas) BAXI BOSTON 80 OF G.C. No 41 077 65 BAXI BOSTON 70 OF G.C.

More information

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL STREBEL GENEVA CE ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL INDEX TABLE 1 TECHNICAL DATA SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 SECTION 7 SECTION 8 SECTION

More information

KEY TO COMPONENTS. 1. Heat exchanger 2. Pilot gas pipe 3. Gas injector nozzle 4. Measuring point

KEY TO COMPONENTS. 1. Heat exchanger 2. Pilot gas pipe 3. Gas injector nozzle 4. Measuring point Bosch Thermotechnik WR 325 BF Gas Fired Multipoint Water Heater INSTALLATION AND SERVICING INSTRUCTIONS GC NUMBER 52 311 01 For your safety if you smell gas: 3. Do not operate any electrical switches 1.

More information

30e, 40e, 50e, 60e, & 80e, fanned balanced flue gas fired boilers

30e, 40e, 50e, 60e, & 80e, fanned balanced flue gas fired boilers 30e, 40e, 50e, 60e, & 80e, fanned balanced flue gas fired boilers THIS APPLIANCE IS FOR USE WITH NATURAL GAS (G20) ONLY Installation and Servicing Instructions LEAVE THESE INSTRUCTIONS ADJACENT TO THE

More information

Installation & Servicing Manual. for the Ultra range of wall mounted fan assisted balanced flue gas boilers

Installation & Servicing Manual. for the Ultra range of wall mounted fan assisted balanced flue gas boilers 405/0302-03 Installation & Servicing Manual for the Ultra range of wall mounted fan assisted balanced flue gas boilers G.C. Appliance No's. Ultra 30 41 494 78 Ultra 40 41 494 79 Ultra 50 41 494 80 Ultra

More information

Installation and Servicing Instructions. Alpha 240/280. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers

Installation and Servicing Instructions. Alpha 240/280. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers Installation and Servicing Instructions Alpha 240/280 Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boilers For Technical help or for Service call... ALPHA HELPLINE Tel: (0322)

More information

kw Btu/h Metres Feet l/min. Gal/min C C

kw Btu/h Metres Feet l/min. Gal/min C C 80ic RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS 6 720 605 553 PT 2000 11 Cat: II 2H3+ GC NUMBER NG: 47 311 43 LPG:

More information

INSTALLATION AND SERVICE INSTRUCTIONS. Medway Super. Gas Fired Water Heater THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS 1984.

INSTALLATION AND SERVICE INSTRUCTIONS. Medway Super. Gas Fired Water Heater THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS 1984. INSTALLATION AND SERVICE INSTRUCTIONS Medway Super Gas Fired Water Heater G.C. NO. 52 476 39 G.C. NO. 52 476 41 (When Fitted with Low Pressure Throttle Kit) NON SPOUTED MULTIPOINT MODEL FOR USE WITH NATURAL

More information

Installation & Servicing Instructions

Installation & Servicing Instructions Installation & Servicing Instructions Baxi System 35/80 IE & 60/100 IE Gas Fired Wall Mounted System Boiler Please keep these instructions safe. Should you move house, please hand them over to the next

More information

Performa System 12e, 18e, 24e & 28e

Performa System 12e, 18e, 24e & 28e Performa System 12e, 18e, 24e & 28e Gas Fired Wall Mounted System Boilers Installation and Servicing Instructions Please leave these instructions with the user Natural Gas Potterton Performa System 12e

More information

Installation and Servicing Instructions. Alpha CB50

Installation and Servicing Instructions. Alpha CB50 Installation and Servicing Instructions Alpha CB50 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired Combination Boiler with Unvented Hot Water Storage For Technical help or for Service call... ALPHA

More information

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water Bosch Group 15SBi / 24SBi WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water INSTALLATION AND SERVICING INSTRUCTIONS 24SBi This appliance is for use with Natural Gas or

More information

Installation & Service Instructions

Installation & Service Instructions Part No. 966/9350/1 02 Potterton Housewarmer Illusion ASD - G.C. NO. 37 590 16 966 Inset DGF with ILLUSION FACIA Potterton Housewarmer Stratton ASD - G.C. NO. 37 590 17 966 Inset DGF with STRATTON FACIA

More information

Highflow 400 ELECTRONIC BF FLOOR STANDING COMBINATION APPLIANCE FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER

Highflow 400 ELECTRONIC BF FLOOR STANDING COMBINATION APPLIANCE FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER Highflow 400 ELECTRONIC BF FLOOR STANDING COMBINATION APPLIANCE FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS GC NUMBER NATURAL GAS 47 311 62 BOILER OUTPUT

More information

Installation & Service Instructions. Suprima 30-80

Installation & Service Instructions. Suprima 30-80 See inside cover for models covered by these instructions Installation & Service Instructions Suprima 30-80 Wall Mounted Fan Assisted Balanced Flue Gas Boilers THE GAS SAFETY (INSTALLATION AND USE) REGULATIONS

More information

Installation & Servicing Instructions

Installation & Servicing Instructions 220683B.11.96 Installation & Servicing Instructions To be left with the user 70FF 80FF GC 41 319 86 GC 41 319 60 Fanned Flue Boiler 4098 This is a Cat I 2H Appliance BS 6332 BS 5258 Reference in these

More information

Osprey 2 CFL

Osprey 2 CFL Osprey 2 CFL 125-150 - 180-220 Gas Fired Floor Standing Boiler Installation and Servicing Instructions Please leave these instructions with the user Natural Gas Potterton Osprey 2 CFL 125 G.C.N o 41 590

More information

Suprima 30L - 100L. Installation & Service Instructions. About the Boiler

Suprima 30L - 100L. Installation & Service Instructions. About the Boiler Installation & Service Instructions Suprima 30L - 100L About the Boiler See inside cover for models covered by these instructions. This is a Wall Mounted Fan Assisted Balanced Flue Gas Boiler. This boiler

More information

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150 Wall Mounted Fan Flue System boiler Appr. nr. B 94.04 A - CE 0063 AQ 2150 Phone numbers: Installer Service Engineer Serial N Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS Please read

More information

LPG 50e, 60e, 80e & 100e fanned balanced flue gas fired boilers

LPG 50e, 60e, 80e & 100e fanned balanced flue gas fired boilers LPG 50e, 60e, 80e & 100e fanned balanced flue gas fired boilers THIS APPLIANCE IS FOR USE WITH PROPANE GAS ONLY Installation and Servicing Instructions LEAVE THESE INSTRUCTIONS ADJACENT TO THE APPLIANCE

More information

30C, 40C, 50C & 60C open flue gas fired boiler

30C, 40C, 50C & 60C open flue gas fired boiler 30C, 40C, 50C & 60C open flue gas fired boiler FOR USE WITH NATURAL GAS (G20) ONLY Read these instructions thoroughly before working on the boiler. Leave the instructions adjacent to the gas meter. GENERAL

More information

MODEL 466 Radiant / Convector Gas Fire Black Beauty

MODEL 466 Radiant / Convector Gas Fire Black Beauty I N S T A L L E R G U I D E MODEL 466 Radiant / Convector Gas Fire Black Beauty Please keep in a safe place for future reference 600A734/02 Please leave this Installer Guide with the user This appliance

More information

Profile 40eL - 80eL. Installation & Service Instructions. About the Boiler

Profile 40eL - 80eL. Installation & Service Instructions. About the Boiler Installation & Service Instructions Profile 40eL - 80eL About the Boiler See inside cover for models covered by these instructions. This is a Wall Mounted Fan Assisted Balanced Flue Gas Boiler. This boiler

More information

Bosch Group. 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Bosch Group. 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS Bosch Group 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS GC NUMBER 47 311 32 (N.G) GC NUMBER 47 311 33 (L.P.G.)

More information

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water Bosch Group SBi / SBi WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water INSTALLATION AND SERVICING INSTRUCTIONS SBi This appliance is for use with Natural Gas or LPG (Cat

More information

MULTIPOINT FF Room Sealed Fan-Assisted Water Heater

MULTIPOINT FF Room Sealed Fan-Assisted Water Heater Please leave these instructions with the user MULTIPOINT FF Room Sealed Fan-Assisted Water Heater User Operating, Installation and Servicing Instructions 6 720 607 160 (04.02) JS Natural Gas Main Multipoint

More information

looe, fanned balanced flue gas fired boiler

looe, fanned balanced flue gas fired boiler looe, fanned balanced flue gas fired boiler THIS APPLIANCE IS FOR USE WITH NATURAL GAS (G20) ONLY Installation and Servicing Instructions LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER GAD (90/396/EEC)

More information

These Appliances must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

These Appliances must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations. G350/11 and 12 FREESTANDING FRYERS INSTALLATION and SERVICING INSTRUCTIONS These Appliances must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

More information

Celt Star. installation and servicing instructions (leave these instructions with the User)

Celt Star. installation and servicing instructions (leave these instructions with the User) Celt Star Celt Star F HP Model F HP GC N 5.980.29 F LP GC. N 5.980.30 2 F HP GC. N 5.980.3 2 F LP GC. N 5.980.32 installation and servicing instructions (leave these instructions with the User) The model

More information

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc Mikrofill Ethos Condensing combination boiler Maintenance Instructions 24cc IMPORTANT Benchmark Installation, Commissioning and Service Record Log Book is enclosed in your customer information pack. This

More information

Installation and Servicing Instructions

Installation and Servicing Instructions Installation and Servicing Instructions Alpha HE CB25/33 and HE SY25 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Boiler Range For Technical help or for Service call...

More information

Superior Mk.II. Installation, Servicing & User Instructions

Superior Mk.II. Installation, Servicing & User Instructions Superior Mk.II Installation, Servicing & User Instructions CONTENTS 1 TECHNICAL FEATURES AND DIMENSIONS...................................................... 1 2 GENERAL REQUIREMENTS FOR INSTALLATION..................................................

More information

Installation and Servicing Instructions. Alpha CD50

Installation and Servicing Instructions. Alpha CD50 Installation and Servicing Instructions Alpha CD50 Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency, Condensing Combination Boiler with Unvented Hot Water Storage For Technical help

More information

CELT STAR C GAS-FIRED WATER HEATER. Category: I 2E+ Installation and Use Instructions. Contents : Description:

CELT STAR C GAS-FIRED WATER HEATER. Category: I 2E+ Installation and Use Instructions. Contents : Description: GAS-FIRED WATER HEATER Category: I 2E+ Installation and Use Instructions CELT STAR C These installation and User instructions are intended for appliances installed in Great Britain. This appliance, intended

More information

Alpha CombiMax 350 and 600

Alpha CombiMax 350 and 600 Installation and Servicing Instructions Alpha CombiMax 350 and 600 Unvented Hot Water Store for use with the Alpha 240/280 Range of Gas Fired Combination Boilers For Technical help or for Service call...

More information

Alpha CD13R,18R and 24R

Alpha CD13R,18R and 24R Installation and Servicing Instructions Alpha CD3R,8R and 24R Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Regular Boiler Range For Technical help or for Service call...

More information

BOILER MODEL m³/h (31.5 ft³/h)

BOILER MODEL m³/h (31.5 ft³/h) Technical Data BOILER MODEL 30 40 Heat Input 9.6 kw (32,600 Btu/h) 12.7 kw (43,500 Btu/h) Heat Output 80-60ºC 8.1 kw (27,700 Btu/h) 11.0 kw (37,400 Btu/h) Heat Output 60-40ºC 8.8 kw (30,000 Btu/h) 11.7

More information

Bosch Group. 24CDi RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Bosch Group. 24CDi RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS Bosch Group 24CDi RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS GC NUMBER 47 311 30 (N.G) GC NUMBER 47 311 31 (L.P.G.)

More information

Bosch Group. 24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Bosch Group. 24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS Bosch Group 24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS GC NUMBERS N.G. 47 311 37 L.P.G. 47 311 38 BOILER OUTPUT

More information

EDENA CLASSIC E. Model : kw INTALLATION AND SERVICING INSTRUCTIONS. Gas Fired Floor Standing Boiler. Réf. : CH I EN 09/05

EDENA CLASSIC E. Model : kw INTALLATION AND SERVICING INSTRUCTIONS. Gas Fired Floor Standing Boiler. Réf. : CH I EN 09/05 INTALLATION AND SERVICING INSTRUCTIONS EDENA CLASSIC E Model : 35-43 - 53-64 kw Gas Fired Floor Standing Boiler N04266.DSF Réf. : CH - 1254 - I - 0 - EN 09/05 1 Réf. : CH - 1254 - I - 0 - EN Contents 1.0

More information

Super Combination Boilers

Super Combination Boilers Super Combination Boilers installation and servicing instructions CONTENTS 1 TECHNICAL FEATURES AND DIMENSIONS 1.1 INTRODUCTION.............................................................. 1 1.2 DIMENSIONAL

More information

Installation and Servicing Instructions. Alpha CD24C/32C

Installation and Servicing Instructions. Alpha CD24C/32C Installation and Servicing Instructions Alpha CD24C/32C Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers For Technical help or for Service call...

More information

Mynute. Installation & Servicing Instructions. 28e THESE INSTRUCTIONS TO BE RETAINED BY USER

Mynute. Installation & Servicing Instructions. 28e THESE INSTRUCTIONS TO BE RETAINED BY USER 28e Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Contents Design principles & operating sequence Page 1.1 Principle components 2 1.2 Mode of operation 2 1.3 Safety devices

More information

Baxi Barcelona System

Baxi Barcelona System Baxi Barcelona System Wall Mounted Powered Flue Condensing Boiler Gas Fired Central Heating Unit Comp N o 243612 - Iss 5-4/00 Please leave these Instructions with the User Installation and Servicing Instructions

More information

Kingfisher Mf RSL40-100, CFL40-100

Kingfisher Mf RSL40-100, CFL40-100 CON0005A Installation & Service Instructions Kingfisher Mf RSL40-100, CFL40-100 About the Boiler See inside cover for models covered by these instructions. This Floor Mounted Fan Assisted Gas Boiler is

More information

74800 Btu/h (22.0kW) HEATING INPUT MIN (60 80 C) 11.3 mbar Btu/h (25.5 kw) Btu/h (14.7kW) HEATING INPUT MAX (40 60 C)

74800 Btu/h (22.0kW) HEATING INPUT MIN (60 80 C) 11.3 mbar Btu/h (25.5 kw) Btu/h (14.7kW) HEATING INPUT MAX (40 60 C) Datatable Factory settings Burner Pressure INPUT OUTPUT HEATING INPUT MAX (60 80 C) 11.3 mbar 87000 Btu/h (25.5 kw) 74800 Btu/h (22.0kW) HEATING INPUT MIN (60 80 C) 5.5 mbar 61075 Btu/h (17.9 kw) 50155

More information

THELIA IN WARRANTY TECHNICAL HELPLINE THIS IS A CAT II2H3+ APPLIANCE

THELIA IN WARRANTY TECHNICAL HELPLINE THIS IS A CAT II2H3+ APPLIANCE THELIA IN WARRANTY TECHNICAL HELPLINE 01773 828400 THIS IS A CAT II2H3+ APPLIANCE 01773 828100 1 INSTALLATION AND OPERATING INSTRUCTIONS THELIA 23, THELIA 23 E, THELIA SB 23 Note! The boiler serial number

More information

Compact HE. High efficiency combi boiler. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

Compact HE. High efficiency combi boiler. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Compact HE High efficiency combi boiler Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Vokèra is a licensed member of the Benchmark scheme which aims to improve the standards

More information

Glow-worm 45/2 Back Boiler Unit

Glow-worm 45/2 Back Boiler Unit 221780A.07.00 Installation and Servicing Instructions To be left with the user Glow-worm 45/2 Back Boiler Unit GC No 44 315 39 For use with specially designed Glow-worm fire fronts only 8010 References

More information

INSTALLATION AND SERVICING INSTRUCTIONS

INSTALLATION AND SERVICING INSTRUCTIONS C1 WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS 0 I This appliance is for use with Natural Gas. GC NUMBER 47 311 53 (N.G.)

More information

Baxi Genesis Gas Fired Wall Mounted Combination Boiler Natural Gas, Propane & Butane Comp N o /96

Baxi Genesis Gas Fired Wall Mounted Combination Boiler Natural Gas, Propane & Butane Comp N o /96 Please leave these Instructions with the User Baxi Genesis Gas Fired Wall Mounted Combination Boiler Natural Gas, Propane & Butane Comp N o. 236463-10/96 Baxi Genesis 80 G.C.N o 47 077 01 Baxi Genesis

More information

Baxi Solaire Super Gas Fire Natural Gas Comp N o /95

Baxi Solaire Super Gas Fire Natural Gas Comp N o /95 Please leave these Instructions with the user. Baxi Solaire Super Gas Fire Natural Gas Comp N o 236216-10/95 Baxi Solaire Super - G.C.N o 32 077 36 Installation And Servicing Instructions Installation

More information

Utility and Utility System Floor Standing Condensing Oil Boiler Range ADDENDUM ATTENTION INSTALLERS - UPDATED INFORMATION!

Utility and Utility System Floor Standing Condensing Oil Boiler Range ADDENDUM ATTENTION INSTALLERS - UPDATED INFORMATION! Grant Vortex Eco Utility and Utility System Floor Standing Condensing Oil Boiler Range ADDENDUM ATTENTION INSTALLERS - UPDATED INFORMATION! LOW Nox yellow flame (riello rdb 2.2 bx) burner fitted The Grant

More information

Installation & Service Instructions Kingfisher Mf

Installation & Service Instructions Kingfisher Mf Installation & Service Instructions Kingfisher Mf 40 100 About the Boiler About Safety See inside cover for models covered by these instructions. This Floor Mounted Fan Assisted Gas Boiler is available

More information

Finest. HALSTEAD Finest Finest Gold INSTALLATION & SERVICING INSTRUCTIONS FOR THE

Finest. HALSTEAD Finest Finest Gold INSTALLATION & SERVICING INSTRUCTIONS FOR THE INSTALLATION & SERVICING INSTRUCTIONS Finest FOR THE HALSTEAD Finest Finest Gold FULLY AUTOMATIC FAN ASSISTED BALANCED FLUE COMBINATION BOILER FOR USE WITH NATURAL GAS OR PROPANE B R I T I S H M A D E

More information

24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS 24i RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS GC NUMBERS N.G. 47 311 37 L.P.G. 47 311 38 BOILER OUTPUT To Domestic

More information

Ace and Ace High. Installation and Servicing Instructions To be left with user adjacent to gas meter. Wall Mounted Gas Combination Boiler

Ace and Ace High. Installation and Servicing Instructions To be left with user adjacent to gas meter. Wall Mounted Gas Combination Boiler Ace and Ace High Wall Mounted Gas Combination Boiler Installation and Servicing Instructions To be left with user adjacent to gas meter G. C. APPLIANCE No. 41 333 77 Ace G. C. APPLIANCE No. 41 333 78 Ace

More information

Bosch Group. 35CDi WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS.

Bosch Group. 35CDi WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS. Bosch Group CDi WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS CDi This appliance is for use with Natural Gas or LPG (Cat II

More information

ESS. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

ESS. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER ESS Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Contents Design principles & operating sequence Page 1.1 Principle components 2 1.2 Mode of operation (at rest) 2 1.3

More information

BRITONY FF. installation servicing instructions. (leave these instructions adjacent to the gas meter)

BRITONY FF. installation servicing instructions. (leave these instructions adjacent to the gas meter) BRITONY FF installation servicing instructions (leave these instructions adjacent to the gas meter) I 1. GENERAL The BRITONY FF is a fanned draught, balanced flued instantaneous multipoint water heater.

More information

HALSTEAD Ace INSTALLATION & SERVICING INSTRUCTIONS FOR THE

HALSTEAD Ace INSTALLATION & SERVICING INSTRUCTIONS FOR THE INSTALLATION & SERVICING INSTRUCTIONS FOR THE HALSTEAD Ace FULLY AUTOMATIC FAN ASSISTED BALANCED FLUE COMBINATION BOILER FOR USE WITH NATURAL GAS B R I T I S H M A D E B O I L E R S G. C. APPLIANCE No.

More information

PARAGON GAS FRYER INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS MODEL : PDGF/PDGFP

PARAGON GAS FRYER INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS MODEL : PDGF/PDGFP Page 1 of 13 INSTALLATION INSTRUCTIONS SAFETY INSTRUCTIONS USER INSTRUCTIONS PARAGON GAS FRYER MODEL : PDGF/PDGFP Page 2 of 13 IMPORTANT PLEASE READ INSTRUCTIONS FULLY BEFORE USE MODEL PDGF FRYER & PDGFP

More information

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A cod. 6272262A GENERAL DATA Heating Data Heat Output Input (Adjustable) (Adjustable) Format 34i 11.2 34KW 45 145MJ/hr Format 34e 11.2 34KW 45 145MJ/hr General Specifications FORMAT 34i 34e Main burner injectors

More information

K. F. B 30 GC GC GC Installation and Servicing Instructions. Fanned Flue Boiler S P A C E S A V E R

K. F. B 30 GC GC GC Installation and Servicing Instructions. Fanned Flue Boiler S P A C E S A V E R 221051B.01.98 Installation and Servicing Instructions To be left with user S P A C E S A V E R K. F. B 4757 30 GC 41 319 08 40 GC 41 319 09 50 GC 41 319 10 Fanned Flue Boiler Fully Pumped system. Open

More information

BLACK KNIGHT 2 - Classic Collection

BLACK KNIGHT 2 - Classic Collection BLACK KNIGHT 2 - Classic Collection Installation & Servicing Instructions (GC No. 32 170 16) IMPORTANT - THIS FIRE DOES NOT NORMALLY REQUIRE ADDITIONAL VENTILATION INTO THE ROOM IN WHICH IT IS INSTALLED

More information

Baxi Solo 2 RS Range. Installation and Servicing Instructions. Wall Mounted Room Sealed Gas Fired Central Heating Boilers

Baxi Solo 2 RS Range. Installation and Servicing Instructions. Wall Mounted Room Sealed Gas Fired Central Heating Boilers Please leave these Instructions with the User. Baxi Solo 2 RS Range Wall Mounted Room Sealed Gas Fired Central Heating Boilers Installation and Servicing Instructions Natural Gas Baxi Solo 2 60 RS G.C.No.

More information

External Module Floor Standing Condensing Oil Boiler Range ADDENDUM ATTENTION INSTALLERS - UPDATED INFORMATION!

External Module Floor Standing Condensing Oil Boiler Range ADDENDUM ATTENTION INSTALLERS - UPDATED INFORMATION! Grant Vortex Pro External Module Floor Standing Condensing Oil Boiler Range ADDENDUM ATTENTION INSTALLERS - UPDATED INFORMATION! LOW Nox yellow flame (riello rdb 2.2 bx) burner fitted The Grant Vortex

More information

MAINTENANCE AND SERVICE GUIDE

MAINTENANCE AND SERVICE GUIDE c Dimensions MAINTENANCE AND SERVICE GUIDE System II 80 and 100 Central Heating Fanned Flue Boiler Sizes in mm Flue types: C 12 or 42: horizontal C 32 xx: vertical concentric C 32 xy: Twin flue Boiler

More information

Assessment Schedule - TS.6

Assessment Schedule - TS.6 The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall

More information

Mikrofill Ethos Condensing combination boiler

Mikrofill Ethos Condensing combination boiler Mikrofill Ethos Condensing combination boiler User Instructions 24cc CE Mark Mikrofill gas appliances comply with the requirements contained in CE Mark documents contained with European directives applicable

More information

AUS. Format 34I-34E BF

AUS. Format 34I-34E BF AUS Format 34I-34E BF Installation and servicing instructions CONTENTS 1 TECHNICAL FEATURES AND DIMENSIONS..................................................... 2 2 GENERAL REQUIREMENTS FOR INSTALLATION.................................................

More information

Instructions for Use Installation and Servicing

Instructions for Use Installation and Servicing 221808B.12.00 Instructions for Use Installation and Servicing To be left with the user Hideaway 50 G.C. No. 41 313 15 1037 Open Flue Boiler This is a Cat I 2H Appliance BS 6332 BS 5258 Reference in these

More information

Baxi Combi 80 Maxflue

Baxi Combi 80 Maxflue Please leave these instructions with the user Baxi Combi 80 Maxflue Gas Fired Wall Mounted Combination Boiler Installation and Servicing Instructions Natural Gas Baxi Combi 80 Maxflue G.C.N o 47 075 07

More information

Wall hung combination boilers. This is a CAT II2H3+ appliance USER, INSTALLATION AND SERVICING INSTRUCTIONS SUPPORTED BY

Wall hung combination boilers. This is a CAT II2H3+ appliance USER, INSTALLATION AND SERVICING INSTRUCTIONS SUPPORTED BY Wall hung combination boilers This is a CAT II2H3+ appliance SUPPORTED BY USER, INSTALLATION AND SERVICING INSTRUCTIONS Index Introduction... 3 User instructions...3 Introduction... 4 Controls and lighting...

More information

INSTALLATION AND SERVICING INSTRUCTIONS

INSTALLATION AND SERVICING INSTRUCTIONS 9/4CBi, 4/9CBi, 9/4CBi WALL MOUNTED BOILERS FOR CENTRAL HEATING AND INDIRECT SUPPLY OF DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS Worcester supports the Benchmark code of practice This

More information

Baxi Solo 2 PF. Wall Mounted Powered Flue Gas Fired Central Heating Unit Comp N o Iss 22 11/98. Installation and Servicing Instructions

Baxi Solo 2 PF. Wall Mounted Powered Flue Gas Fired Central Heating Unit Comp N o Iss 22 11/98. Installation and Servicing Instructions Baxi Solo 2 PF Please leave these instructions with the user. Wall Mounted Powered Flue Gas Fired Central Heating Unit Comp N o 230988 - Iss 22 11/98 Installation and Servicing Instructions Page 2 Natural

More information

This appliance must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

This appliance must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations. G3512 and G3532 DOMINATORPLUS Grills INSTALLATION and SERVICING INSTRUCTIONS This appliance must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

More information

Installation and Servicing Instructions. Alpha CD25C/28C/35C

Installation and Servicing Instructions. Alpha CD25C/28C/35C Installation and Servicing Instructions Alpha CD25C/28C/35C Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers For Technical help or for Service

More information

USER INSTRUCTIONS & CUSTOMER CARE GUIDE HIGHFLOW 400 ELECTRONIC SERIES

USER INSTRUCTIONS & CUSTOMER CARE GUIDE HIGHFLOW 400 ELECTRONIC SERIES HIGHFLOW 400 ELECTRONIC SERIES G.C. NUMBERS APPLIANCE NATURAL GAS L.P.G. Fanned Flue (RSF) 47 311 61 47 311 64 Balanced Flue (BF) 47 311 62 Open Flue (OF) 47 311 63 USER INSTRUCTIONS & CUSTOMER CARE GUIDE

More information

This is a Wall Mounted Powered Flue Condensing Combination Boiler Gas Fired Central Heating Unit.

This is a Wall Mounted Powered Flue Condensing Combination Boiler Gas Fired Central Heating Unit. Installation & Service Instructions Performa System HE This is a Wall Mounted Powered Flue Condensing Combination Boiler Gas Fired Central Heating Unit. The boiler meets the requirements of Statutory Instrument

More information

Compact. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

Compact. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Compact Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER Contents Design principles and operating sequence Page 1.1 Principle components 2 1.2 Central heating mode 2 1.3

More information

SECTION 1 - INSTALLATION UNLESS OTHERWISE STATED, PARTS WHICH HAVE BEEN PROTECTED BY THE MANUFACTURER ARE NOT TO BE ADJUSTED BY THE INSTALLER 1.1 MODE

SECTION 1 - INSTALLATION UNLESS OTHERWISE STATED, PARTS WHICH HAVE BEEN PROTECTED BY THE MANUFACTURER ARE NOT TO BE ADJUSTED BY THE INSTALLER 1.1 MODE G1808X, G1838X, G1848X DEEP FAT FRYERS INSTALLATION and SERVICING INSTRUCTIONS These appliances must only be installed, serviced and converted for use with other gases by a competent person as stipulated

More information

RD 628 WALL MOUNTED COMBINATION BOILERS FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

RD 628 WALL MOUNTED COMBINATION BOILERS FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS RD 68 WALL MOUNTED COMBINATION BOILERS FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS This appliance is for use with Natural Gas GC NUMBER 47 108 14 (N.G.)

More information

INSTALLATION AND MANINTENANCE INSTRUCTIONS

INSTALLATION AND MANINTENANCE INSTRUCTIONS INSTALLATION AND MANINTENANCE INSTRUCTIONS Appr. Nr. A 9503 T - 0085 AQ 0765 PEGASUS F2 T HIGH EFFICIENCY GAS-FIRED CAST-IRON BOILERS Models 51-68 - 85-102 2 Contents 1. General technical data 2. Dimensional

More information

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual POWERFLOW Series Unvented Electric Storage Water Heaters Installation & Operating Instructions Manual These Instructions must be left with the user after installation. Version 3.0 June 2009 Hyco POWERFLOW

More information

"B" SERIES OPEN FLUED WARM AIR HEATERS

B SERIES OPEN FLUED WARM AIR HEATERS INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS "B" SERIES OPEN FLUED WARM AIR HEATERS STORE NEAR HEATER Installer :... Address :... Place :... Telephone :... Date :... Distributed by: J O H N S

More information

Compact in size; designed to building modular dimensions to blend unobtrusively with other kitchen furniture.

Compact in size; designed to building modular dimensions to blend unobtrusively with other kitchen furniture. balanced flue gas fired boilers KINGFISHER 2 RS 60 KINGFISHER 2 RS 80 KINGFISHER 2 RS 100 Kingfisher 2 RS 60 G.C. No. 41 607 19 G.C. No. 41 607 46 (Sealed System) Kingfisher 2 RS 80 G.C. No. 41 607 20

More information

Installation & Servicing Instructions

Installation & Servicing Instructions 24e & 28e Installation & Servicing Instructions British Gas Service Listed G.C. No. 47 094 22 (24e) G.C. No. 47 094 23 (28e) THESE INSTRUCTIONS TO BE RETAINED BY USER SECTION 1 INTRODUCTION The Vokèra

More information

Baxi Boston 2 OF Floor Standing Open Flue Gas Fired Central Heating Boilers Natural Gas Comp N Iss 8-4/00

Baxi Boston 2 OF Floor Standing Open Flue Gas Fired Central Heating Boilers Natural Gas Comp N Iss 8-4/00 Baxi Boston 2 OF Floor Standing Open Flue Gas Fired Central Heating Boilers Natural Gas Comp N 235305 - Iss 8-4/00 Please leave these Instructions with the User. Installation and Servicing Instructions

More information

Friendly Format. Installation and servicing instructions

Friendly Format. Installation and servicing instructions GB Friendly Format Installation and servicing instructions Friendly Format 80: Gas Council number 4771907 Friendly Format 80 E: Gas Council number 4771908 Friendly Format 100 E: Gas Council number 4771909

More information

RADIANT / CONVECTOR GAS FIRE MODEL 426 (GC ) INSTALLATION & SERVICING INSTRUCTIONS INSTALLER: Please leave these instructions with the owner

RADIANT / CONVECTOR GAS FIRE MODEL 426 (GC ) INSTALLATION & SERVICING INSTRUCTIONS INSTALLER: Please leave these instructions with the owner THIS APPLIANCE IS FOR USE WITH NATURAL GAS (G20) AT A SUPPLY PRESSURE OF 20mbar (8in w.g.) THIS APPLIANCE IS FOR USE IN THE UNITED KINGDOM (GB) AND THE REPUBLIC OF IRELAND (IE) RADIANT / CONVECTOR GAS

More information

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER CARVER - CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER 1:0 SPECIFICATIONS Water capacity Water connections Water supply 9 litres (2 gallons)

More information

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler

Baxi System 100 HE Plus. User s Operating Instructions. Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler User s Operating Instructions Baxi System 100 HE Plus Wall Mounted Powered Flue Condensing Gas Fired Central Heating Boiler Please keep these instructions safe. Should you move house, please hand them

More information

Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21

Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21 Part No. DOC 38 Rev. 02 January 2007 SUPPLEMENTARY INSTALLATION and SERVICING INSTRUCTIONS Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21 For use with Kerosene only

More information

Installation & Servicing Instructions. To be left with the user MELODY BBU. Fire Front GC No

Installation & Servicing Instructions. To be left with the user MELODY BBU. Fire Front GC No 221102B.11.97 Installation & Servicing Instructions To be left with the user MELODY BBU Fire Front GC No. 37 314 09 For use with a specially designed Glow-worm Back Boiler Unit only 5098 References in

More information