1 Case Study: Furman University Charles H. Townes Center for Science Michael K. Mantai, PE, CCP President System WorCx
2 AIA Quality Assurance Learning Objectives 1. Case study example of Chilled Beam technology in laboratory. 2. Issues with phased construction projects. 3. Issues with implementing innovative technologies. 4. Lessons learned in commissioning approach.
3 Charles H. Townes Center for Science Departments of Biology, Chemistry, EES, Physics 85,000 GSF New; 120,000 GSF Renovation Phase 1: New + Renovation (35%); Phase 2: Renovation (65%) Project Cost: $ 62.3M; Construction Cost: $37.8M (GMP)
4 Charles H. Townes Center for Science
5 Charles H. Townes Center for Science New Existing New
6 Basis of Design Campus chilled water system for cooling Separate loops for chilled beams and AHUs Gas and Electric boilers for heating All pumps on VFDs VAV terminal units with reheat for ventilation to spaces Phoenix laboratory air valves Perimeter ceiling-mounted radiant heaters Radiant floor heating/cooling in Commons and Reading Room
7 Basis of Design Low-flow fume hoods (50 fpm face velocityconstant volume) 6 Air Changes per Hour occupied 4 ACH unoccupied via occupancy sensors Lighting load 1.2 W/sf Equipment load 6.4 W/sf Ventilation, chilled water, hot water on emergency power (partial capacity)
8 ENERGY ENERGY WHEEL WHEEL Basis of Design All exhaust (including fume hoods) through energy recovery wheels
9 Basis of Design Chilled Beams (Active) AIR SUPPLY LOW PROFILE
10 Basis of Design Condensation Sensors
11 Basis of Design Radiant Floor Heating/Cooling
12 Basis of Design Radiant Floor Heating/Cooling
13 Basis of Design
14 Design Phase Commissioning Design Reviews Design Development 50% CD 100% CD Team Meetings Integrated Design Team Controls Review Meeting
15 Contractual Arrangements Design Team A/E in same firm contracted to the University Commissioning Provider Direct contract to the University Construction Manager Selected on qualifications; GMP contract Subcontractors Local; experienced with projects at the University Test and Balance Direct contract to the University
16 Phasing Phase I Phase II
17 Phasing Issues Commissioning Plan Test all Systems as if complete Contractor Plan Temporary use; completeness and functionality not a priority Central Equipment New boilers and pumps in Phase II portion of building
18 Phase I Results Issues Basic coordination not happening Emergency Power system inoperable No heating (outside temperature 95 F, inside temperature 65 F) contaminated new equipment (air handling units, pumps, boilers) Warranties started before performance demonstrated
19 Coordination?
20 Emergency Power
21 Emergency Power
22 Boiler and Pump Room
23 Phase II Commissioning Results Issues Exhaust fan capacity Chilled beam condensate sensors Excessive reheat Incomplete items/general responsiveness Controls issues
24 Exhaust Fan Capacity (typical) Design 16, SP 1824 RPM Future capacity Variable Speed Actual 14, SP Max fan RPM Run at 100%
25 Exhaust Fan Capacity (typical)
26 Exhaust Fan Capacity (typical) Design X X Actual
27 Exhaust Fan Capacity (typical) Corrective Actions Static pressure profile of entire duct runs Replace high loss fittings Remove dampers/filters (temporarily) Correct faulty occupancy sensor relays to allow setback of room exhaust
28 Chilled Beam Condensate Sensors -Approx. 30% of sensors in alarm -Some sensors painted
29 Chilled Beam Condensate Sensors Corrective Actions:
30 Excessive Reheat Ventilation Air 55 F supply air (dehumidification) 6 ACH (minimum) Chilled Beams 60 F chilled water Handle sensible loads
31 Excessive Reheat Findings Most chilled beam control valves closed Ventilation air terminal units in reheat Ventilation air overcooling rooms Equipment loads significantly less than BOD Corrective actions AHU Supply Air Temperature Reset control Reduce minimum supply air to some rooms
32 Radiant Floor Heating/Cooling Tested OK Has not operated in heating season Owner has chosen not to operate in cooling season
33 Summary of Findings >400 issues Many controls issues (sensors, programming, incomplete items) Many items corrected by Owner Most issues outstanding
34 Lessons Learned/Room for Improvement Fan configuration considerations Load estimations Condensate sensors not needed Energy recovery reheat Hourly contract arrangement reduces time on site? Issues resolution
35 AIA Quality Assurance Portland Energy Conservation, Inc is a registered provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
36 Michael K. Mantai, PE, LEED AP, CEM, CCP ,
Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates
Prescriptions for Critical Healthcare Cx John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. Medical Industry Changes and how they impact Design, Construction,
More informationSelected Laboratory Energy Efficiency Measures
Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper
More informationASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering
ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.
More information7. MECHANICAL SYSTEM DESIGN
7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved
More informationHumidity Control Design Tips. R. Mark Nunnelly, PE, CxA, LEED AP President
Humidity Control Design Tips R. Mark Nunnelly, PE, CxA, LEED AP President AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects
More informationSEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT
SEQUENCE OF OPERATION GUIDELINE AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT Document: VAV-HTG rev1 Revision: 1.0 Rev. Date: July 22, 2011 NOTES: 1. THIS SEQUENCE
More informationCivil Engineering Building
Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationFAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney
FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1
More informationTechnical Assignment 3
0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Technical Assignment 3 Mechanical Systems and Existing Conditions Report David H. Koch Institute for Integrative
More informationHVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,
More informationBuilding Analytics and Compliance: How analytics can be used to aid in performancebased certifications. Bryant M. Kirkland Jr, PE, CCP, LEED AP
Building Analytics and Compliance: How analytics can be used to aid in performancebased certifications Bryant M. Kirkland Jr, PE, CCP, LEED AP AIA Quality Assurance The Building Commissioning Association
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.
More informationOpen to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP
Open to Below: A Discussion of Allowed Floor Openings Kevin S. Hastings, P.E., LEED AP Jay A. Ierardi, Ph.D., P.E., LEED AP R.W. Sullivan Engineering (617) 523-8227, Fax (617) 523-8016 http://www.rwsullivan.com
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationTHIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL
SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this
More informationWelsh Commissioning Group, Inc.
Ongoing Commissioning with Building Automation System and Data Loggers Bryan W. Welsh, P.E. President Welsh Commissioning Group, Inc. AIA Quality Assurance Learning Objectives 1. General understanding
More informationMechanical System Redesign. Dedicated Outdoor Air System. Design Criteria
Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed
More informationState of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney
Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled
More informationNational Institutes of Health Building 37 Modernization Bethesda, Maryland MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM
MECHANICAL DEPTH EXISTING MECHANICAL SYSTEM The need to maintain occupancy during the renovation and the strict NIH Design Guidelines were the main driving forces behind the design. The mechanical engineering
More informationHVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in
More informationSubmitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas
More informationSECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL
SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationUNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS
PART 1 - GENERAL 1.01 General: A. Laboratory ventilation system will ensure the health and safety of laboratory occupants. B. Room pressurization control will utilize airflow tracking to vary the volume
More informationHAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001
This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.
More information2 Existing Mechanical System
2 Existing Mechanical System 2.1 Design Objectives and Requirements The Gossett Field House project consists of a 25,000 sqft addition and a 40,000 sqft renovation of the existing facility for the University
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationb.) Technical Information:
Section VI- Strategies a.) Summary: It is important for new construction designers to consider the heating, ventilation, and air conditioning needs within a building. There are many different systems,
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationHigh Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO
High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the
More information1. Packaged Variable Air Volume (VAV) Rooftop Units (RTU) with Hot Water Reheat. 2. Geothermal Heat Pump VAV Rooftop Units with Hot Water Reheat
July 6, 2017 City of Countryside Attn: Mayor Sean McDermott City Hall 5550 East Avenue Countryside, IL 60525 RE: New City Hall & Police Building HVAC Options Dear Mayor McDermott, Per your request at our
More informationBenefits Offered by Passive Dehumidification Wheel Speed Control
Benefits Offered by Passive Dehumidification Wheel Speed Control White paper By John Fischer Benefits Offered by Passive Dehumidification Wheel Speed Control The most significant advantage of the Pinnacle
More informationBOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationChristopher Kelly Technical Report Three
Christopher Kelly Technical Report Three Mechanical Systems and Existing Conditions Evaluation SALK HALL ADDITION The University of Pittsburgh, Pittsburgh Christopher Kelly, Mechanical Option Professor
More informationPaul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA
Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 4.0.6.2 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2007) Standard HALCYON Bldg. 400 Alpharetta, Georgia 3a
More informationHVAC Mandatory Provisions Part II, Page 1
HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency
More informationMECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE
MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE 18422 Bear Valley Road Victorville, CA 92395 Date 25 September 2012 dha Job No. 12155 TABLE OF CONTENTS I. Purpose.... Page 1 II. Existing
More informationDADANCO Technical Paper
DADANCO Technical Paper 260 North Elm Street Westfield, MA 01085 Phone: (413) 564-5657 Fax: (413) 568-2969 March 2013 CLASSROOM SOLUTION USING ACTIVE CHILLED BEAMS (Note: This technical paper assumes the
More informationBOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationChilled Beam and Radiant Cooling Basics. Salt Lake City, UT ASHRAE Chapter December 2013 Nick Searle
Chilled Beam and Radiant Cooling Basics Salt Lake City, UT ASHRAE Chapter December 2013 Nick Searle nsearle@dadanco.com Contents Radiant Ceilings & Chilled Beam Basics Energy & Space Savings First and
More informationChallenges and Methods of Estimating a Conceptual HVAC Design
Challenges and Methods of Estimating a Conceptual HVAC Design ABSTRACT In any conceptual HVAC design, estimators are faced with the challenge of trying to capture all of the pieces that complete a system.
More informationENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory
Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,
More informationThe M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO
The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting
More informationINTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings
INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationBuilding Automation System (BAS) Design Criteria
25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate
More informationPassive House Northwest AIA CEU Provider. Aubrey Gewehr March 27, 2015
Passive House Northwest AIA CEU Provider Multifamily Ventilation Strategies Workshop AIA Course # phnw082 Aubrey Gewehr March 27, 2015 Credit(s) earned on completion of this course will be reported to
More informationGeneral Notes. See V sheets for scope of work details on thermostats, terminal units, air handling units and exhaust fans. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor.
More informationIAQ: Re-tuning Commercial Buildings
IAQ: Re-tuning Commercial Buildings A low-cost path to improved air quality and energy efficiency. B y S c o t t G o r d o n, C M All images courtesy of Johnson Controls Service. 10 RSES Journal FEBRUARY
More informationTrane Engineers Newsletter Live
Trane Engineers Newsletter Live Presenters: John Murphy, Eric Sturm and Jeanne Harshaw (host) Trane program number: APP-CMC061-EN Agenda Trane Engineers Newsletter Live Series Abstract A large number of
More informationHigh Efficiency Dehumidification System (HEDS)
Advanced HVAC Technologies High Efficiency Dehumidification System (HEDS) Scot Duncan, P.E., Jim Meacham, P.E. Conservant Systems, Inc. August 16, 2017 Tampa Convention Center Tampa, Florida Why Was HEDS
More informationSP07: Coordinating New Door Assembly Installation with Access Control Systems
SP07: Coordinating New Door Assembly Installation with Access Control Systems Keith E. Pardoe, DAHC, CDC, CDT Door and Hardware Institute (DHI) Thursday, April 11, 2013 Provider #: K054 Learning Objectives
More informationMadeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)
Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085
More informationNEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80
NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page
More informationEnergy Savings Potential of Passive Chilled Beam System as a Retrofit Option for Commercial Buildings in Different Climates
Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 2014 Energy Savings Potential of Passive Chilled Beam System as a Retrofit Option for
More informationExisting Mechanical System Operation
majority of the air handlers. There are louvers along the north side of the building that allow for outdoor air to come in and feed the air handlers. On levels 4-8 the research laboratories are variable
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationRetrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
More information4-Pipe VAV vs. Active Chilled Beams for Labs
Steven T. Taylor 4-Pipe VAV vs. Active Chilled Beams for Labs BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE Variable air volume (VAV) laboratory HVAC systems, including VAV fume hoods, are now standard practice
More informationVentilation and Humidity Control in Army Barracks Using DOAS for Better Indoor Air Quality and Energy Conservation
Ventilation and Humidity Control in Army Barracks Using DOAS for Better Indoor Air Quality and Energy Conservation Author:John Vavrin, PE Presenter: Dale Herron US Army Corps of Engineers Engineer Research
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationFan Power in 90.1 & IECC
AMCA International Fan Power in 90.1 & IECC Jeff Boldt, Principal IMEG Corp Jeff.G.Boldt@IMEGcorp.com Air System Engineering & Technology (ASET) Conference US San Antonio, TX Hyatt Regency San Antonio
More informationA. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.
SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate
More information4.0 Mechanical Redesign
4.0 Mechanical Redesign As my depth area of research, I have performed a detailed analysis of the existing air handling units and the existing conditions of the FIT Science Lab. After one semester of breaking
More informationModular Active. Chilled. Beams
Modular Active Chilled Beams How Twa MAC Beams Work Primary air (100% outside air) is dehumidified to between 50-57 F dew point and is used to: control the latent requirements of the space, provide fresh
More informationTerminal Commissioning Case Study- Terminal A Logan International Airport
Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Brad Jones, PE, AP Sebesta Blomberg Sam Sleiman, PE, CCM
More informationYour Home. Jacco & Assoc.
Your Home Fan on with call for heating or cooling Heating on with call from space thermostat Stage as required to maintain The 75F Basics adj. - First stage of heating shall be heat pump Cooling on with
More informationCleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY
PART I - GENERAL 1.1 SUMMARY A. This section addresses the general requirements for air handling distribution systems, including air handlers, ductwork, ductwork accessories, terminal units, air devices,
More informationHVAC OUTDOOR AIR VENTILATION STANDARD. ASHRAE Standard ASHRAE Standard
ASHRAE Standard 62.1-2013 BuildingsOne February 4, 2016 Landlord s HVAC system design capacity shall equal or exceed outdoor air ventilation requirements specified in ASHRAE Standard 62.1-2013 (prospect
More informationSECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...
SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...
More informationREPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop
Energy-Savings Strategies for Rooftop VAV Systems Occupied set-point temperature Unoccupied set-point temperature Rooftop variable-air-volume (VAV) s are used to provide comfort in a wide range of building
More informationHVAC DISTRIBUTION and DELIVERY SYSTEMS
HVAC DISTRIBUTION and DELIVERY SYSTEMS (Part 1) Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 REMINDER HVAC = Heating, Ventilating, Air-Conditioning The AC part of HVAC implies a system that
More informationMID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN
MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,
More informationImpact of Minimum Fan Efficiency Grade. Dr. John Cermak Executive Vice President ACME Engineering and Manufacturing Corp.
Impact of Minimum Fan Efficiency Grade Dr. John Cermak Executive Vice President ACME Engineering and Manufacturing Corp. Learning Objec-ves 1. Describe Fan Efficiency Grade (FEG) 2. Describe the use and
More informationF.W. Olin Physical Science Laboratory
Mechanical Systems Existing Conditions Evaluation Presented on Page 1 of 16 Table of Contents Executive Summary Depth p.3 Executive Summary Breadth p.4 Introduction & Background p.5 Alternatives p.7 Breadth
More information1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.
2018 NC Energy Conservation Code Commercial Mechanical Module 7 CHAPTER 5 [CE] WORKSHEET 1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the
More informationEarthWise System Seminar
EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States
More informationRE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana
ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum
More informationRichard B. Alpert, P.E. Senior FPE, Clark Nexsen
Richard B. Alpert, P.E. Senior FPE, Clark Nexsen Clark Nexsen is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Buda, Texas 2a New Construction Construction
More informationMechanical Compliance Certificate
COMcheck Software Version 4.0.7.0 Mechanical Compliance Certificate Project Information Energy Code: Location: Climate Zone: Project Type: 90.1 (2013) Standard Austin, Texas 2a (weather data: TBD) New
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationGreen Maintenance Needed to Keep HVAC Systems Green
Green Maintenance Needed to Keep HVAC Systems Green Robert G. (Bob) Baker BBJ Consulting Service 235 Apollo Beach Blvd. #157 Apollo Beach, Florida bbaker@bbjconsultingservice.com ASHRAE is a Registered
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More informationImproving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks
Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while
More informationVerasys System Operation Overview Technical Bulletin
Contents subject to change. Verasys System Operation Overview Technical Bulletin Code No. LIT-12012370 Issued January 2016 Refer to the QuickLIT Web site for the most up-to-date version of this document.
More informationDesigning Energy Efficient Outdoor Air Systems
Designing Energy Efficient Outdoor Air Systems Joseph Thorndal Applied Products Sales Manager Greenheck, Schofield, Wisconsin 1 Joseph Thorndal BS Industrial Engineering North Dakota State University Work
More informationContinuous Commissioning: A Valuable Partner to Retrofit Projects
Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles
More informationASHRAE JOURNAL ON REHEAT
Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationCARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems
Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.
More informationEfficiency Vermont The American Institute of Architects Continuing Education Systems (AIA/CES) AIA/CES AIA/CES
Efficiency Vermont is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES
More informationHot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT
Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.com Gary Klein, 2012 Efficiency
More informationCOMcheck Software Version Review Mechanical Compliance Certificate
COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project
More informationSingle Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return
Single Zone System One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return Multi Zone System Used in small to medium sized buildings
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationImpacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation
Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Mingsheng Liu, Ph.D., P.E. Energy Systems Laboratory Texas A&M University College Station, Texas
More informationCARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.
Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using
More informationTrane Engineers Newsletter Live
Trane Engineers Newsletter Live Presenters: John Murphy, Dustin Meredith and Jeanne Harshaw (host) Trane program number: APP-CMC059-EN Agenda Trane Engineers Newsletter Live Series Abstract The Air Movement
More information