1 SECTION TABLE OF CONTENTS SECTION PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW DESIGN CRITERIA CODE ISSUES EQUIPMENT SYSTEM DESCRIPTIONS AND OPTIONS i
2 SECTION PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS 1.00 FILED SUB BID A. Bidding procedures shall be in accordance with latest edition of Massachusetts General Laws, Chapter 149, Section 44, including provisions for pre-qualification; and Chapter 30, Section 39M. Time and place for submission of sub-bids is given in Advertisement for Bids. Sub-bids for work under this Section shall be for complete work of this Section and shall be filed in a sealed envelope with Awarding Authority, at time and place specified in Advertisement for Bids. The following shall appear on the face of the envelope: NEW DOUGLAS ELEMENTARY SCHOOL [NAME OF BIDDER] SUB-BID FOR SECTION , HEATING, VENTILATING AND AIR CONDITIONING B. Every sub-bid submitted for work under this Section shall be on forms furnished by awarding authority, as required by Section 44 of Mass. General Laws, and specified in Advertisement for Bids. C. Sub-bids filed with the Awarding Authority shall be as accompanied by bid deposits in form of a bid bond, or cash, or a certified check on, or a treasurer's or cashier's check issued by, a responsible bank or trust company, payable to in compliance with Chapter 149, Section 44 B. Amount of bid deposit shall be 5 percent of value of bid. D. Additional Requirements: 1. Sub-bidder's attention is directed to Massachusetts G.L. Chapter H, as amended, which provides in part as follows:
3 a. Each sub-bidder shall list in Paragraph E of the "Form for Sub-bids" the name and bid price of each person, firm or corporation performing each class of work or part thereof for which the Section of the Specifications for that sub trade requires such listing, provided that, in the absence of a contrary provision in the Specifications, any sub-bidder may, without listing any bid price, list his own name or part thereof and perform that work with persons on his own payroll, if such sub-bidders, after sub-bid openings, shows to the satisfaction of the Awarding Authority that he does customarily perform such class of work with persons on his own payroll and is qualified to do so. This Section of the Specifications requires that the following classes of work shall be listed in Paragraph E under the conditions indicated herein. Classes of Work Reference Specification Paragraphs (1) Water Treatment (2) Insulation (3) Sheet Metal Work (4) Automatic Temperature Controls (5) Balancing (independent company) PROJECT OVERVIEW A. This project includes the construction of a 90,000 square foot new elementary school located in Douglas, Massachusetts. B. The building will consist of a new central boiler and chiller plant (option). This plant will serve optional induction units or variable air volume terminal units, energy recovery ventilation units and roof top air handling units. C. The work under this Section shall include the furnishings of all materials, labor, equipment and supplies and the performance of all operations to provide complete working systems, in general, to include the following items: 1. Piping and Fittings (all systems and types) 2. Pipe Hangers and Supports 3. Identification 4. Sleeves, Firestopping 5. Pipe Expansion Joints, Guides and Anchors 6. Valves and Accessories (all types)
4 7. Expansion Tanks 8. Air Separators 9. Freeze Protection 10. Pressure Gauges, Thermometers, Strainers, Accessories 11. Electric Motors and Starters 12. Pumps (Water systems) 13. Convectors 14. Fin-Tube Radiation 15. Oil Fired Boiler/Burner Units 16. Oil Storage Tank 17. Chemical Treatment Systems 18. Air Cooled Chiller 19. Air Cooled Condenser and Condensing Section 20. Factory Tests 21. Vibration Isolation 22. Ductwork 23. Sound Attenuation Equipment 24. Diffusers, Registers and Grilles 25. Fans 26. Coils 27. Air Filters 28. Air Handling Units 29. Induction Units (TBD) 30. Variable Air Volume Boxes (TBD) 31. Unit Heaters (all types) 32. Cabinet Unit Heaters (all types) 33. Electric Baseboard Heaters 34. Energy Recovery Units 35. Insulation
5 36. Chimneys, Stacks, and Flues 37. Roof Curbs 38. Operating and maintenance instructions and manuals 39. Coordination drawings 40. Shop drawings 1.02 DESIGN CRITERIA 41. Cleaning, Testing, Adjusting & Balancing of All Ducted and Piped Systems and Equipment 42. Record (as-built) Drawings 43. Control Systems 44. Seismic Restraints 45. Training of Ownerʼs Personnel on Equipment, Systems, and Controls A. Outdoor Design Conditions 1. For load calculations (ASHRAE 1% - Table 1A): Summer: 87 0 F dry bulb; 71 0 F wet bulb Winter: 4 0 F 2. For condensing units/air cooled chillers and freeze protection: Summer: 95 0 F dry bulb; F wet bulb (ASHRAE 0.4% worst month Table 4A) Winter: 0 0 F (ASHRAE Annual Min. Extreme Table 1A) B. Indoor Design Conditions 1. Offices and occupied areas: Occupied cooling: 75 0 F (maximum 60% relative humidity) Unoccupied cooling: no unoccupied cooling Occupied heating: 70 0 F (no humidification) Unoccupied heating: 55 0 F (no humidification) 2. Mechanical/Electrical rooms: F maximum (no humidity control) 60 0 F minimum (no humidity control)
6 3. Elevator machine rooms: 90 0 F maximum (no humidity control) (or shafts for MRL* elevators) 60 0 F minimum (no humidity control) * MRL = Machine-Room-Less C. Occupancy and Outdoor Air 1. Offices: 7 people/1000 sf at 20 cfm/person 2. Corridors: 0.1 cfm/sf 3. Conference rooms: 50 people/1000 sf at 20 cfm/person 4. Cafeteria: 70 people/1000 sf at 15 cfm/person 5. Auditoriums: 150 people/1000 sf at 15 cfm/person 6. Classrooms: 50 people/1000 sf at 15 cfm/person D. Electrical Load Density 1.03 CODE ISSUES 1. Lighting: 1.3 watts/sf maximum 2. Power: 2 watts/sf A. A fail open (normally closed) smoke damper will be provided for the elevator shaft vents. This damper will open on loss of power, rise in temperature to 90 o F, or a signal from the fire alarm system. B. The 100% outdoor air units will require energy recovery, as it will be larger than 5,000 cfm EQUIPMENT A. Boilers shall be oil fired cast iron sectional type (up to 88% efficient) as manufactured by Buderus or equal. Oil for heating system to be stored in a 10,000 gallon capacity double wall fiberglass tank below grade and shall include tank leak detection monitoring. B. Hot water shall be base mounted with variable frequency drives. All pumps shall be similar in construction to Bell & Gossett. C. Cooling Option 1 (VAV) Variable air volume packaged units for all areas of the school. Units include direct expansion (DX) cooling. Classrooms, offices and other spaces which are cooled shall have variable air volume boxes serving the spaces
7 D. Cooling Option 2 (Induction) The air cooled chiller shall be roof or grade mounted. The chiller will be provided with an integral variable frequency drive. It shall be similar in construction to Trane, York or McQuay. Induction units shall be 4 pipe ceiling mounted units and shall be linear Chilled beam arrangement. The induction units shall be as manufactured by Trox or equal. Energy recovery units shall be roof mounted. Each will contain hot water heating and DX cooling coils, enthalpy wheel, supply and exhaust fans, and filters. It shall be similar in construction to Greenheck 1.05 SYSTEM DESCRIPTIONS AND OPTIONS A. Central Plant Options: 1. Boiler Plant Option a. Provide complete hot water heating system including, but not limited to: boilers, combustion air, flue system, fuel piping, pumps, DDC controls, air separator, expansion tank, valving, piping, insulation, fittings, expansion provisions, drains vents, chemical treatment and make-up water. All motors shall be premium efficiency. b. The central hot water plant will be located in the ground floor boiler room. c. Provide two (2) 1800 MBH output boilers set to supply F hot water with F return water temperature. Provide for temperature reset down to F supply, based on outdoor air temperature. d. Provide two (2) hot water pumps. Provide spring isolated hangers for pumps. A maximum of one pump will be running at any one time, and one pump as a standby, to provide redundancy in the event of a pump failure. Provide a variable frequency drive (with harmonic filters) for each pump motor with remote differential pressure speed control. Provide bypass for minimum pump flow. e. Hot water pipe distribution will be provided by 4 hot water mains. Total hot water flow will be approximately 250 gpm. 2. Chiller Plant (Option 2) a. Provide complete chilled water cooling system including, but not limited to: an air cooled chiller, pumps, DDC controls, air separator, expansion tank, valving, piping, insulation, fittings, drains vents, expansion provisions, chemical treatment and makeup water. All motors shall be premium efficiency
8 b. The chiller with integral VFD (with harmonic filters) shall be set to supply 57 0 F chilled water (30% glycol) with a 7 0 F temperature rise to the induction units. Provide one 80-ton chiller which is roof or grade mounted. c. Provide two (2) chilled water pumps each sized for the flow of the chiller. The pumps shall be located in the ground floor boiler room. A maximum of one pump will be running at any one time, and one pump as a standby, to provide redundancy in the event of a pump failure. Provide a variable frequency drive (with harmonic filters) for each pump motor with remote differential pressure speed control. Provide flow sensor for the chiller with bypass for minimum chiller flow. d. Chilled water pipe distribution will be provided by 4 chilled water mains. Total chilled water flow rate will be approximately 200 gpm. e. Provide water treatment system, with blow down valve, conductivity sensor, make-up water flow meter, and coupon rack. Provide a make up water connection from the city water supply with back flow preventer. B. Building Systems 1. Option 1 The system for the classrooms shall consist of a variable air volume air conditioning system. The classrooms shall receive cooling air from roof mounted packaged air conditioning units. Variable Air Volume terminal units shall control the amount of cool air to each classroom. The VAV terminals shall also include hot water heating coils. The perimeter of the classrooms shall include fin tube radiation. Each room shall have individual temperature controls. 2. Option 2 - The systems serving the Classroom areas of the building will be four pipe induction units. The hot water and chilled water will be supplied by the central plants. Ventilation for these spaces will be supplied by roof mounted Energy Recovery Units. The Classrooms will each have two ceiling mounted induction units. Each classroom shall have individual temperature controls. 3. The Gymnasium will be served by a rooftop air handling unit. This unit shall provide heating and Ventilation only. Gymnasium ventilation will be controlled with CO2 controls. No cooling for the Gymnasium. 4. The school administration area shall be heated, cooled and ventilated by packaged variable air volume roof top mounted unit with DX cooling. 5. The cafeteria will be heated cooled and ventilated by one roof top air handling unit. The kitchen shall be served by a make up air unit. Ventilation will be controlled with CO2 controls
9 6. The Library will be heated, cooled and ventilated by a roof mounted air handling units. 7. Toilet exhaust will be provided by 2 pressure class galvanized duct sealed to leakage class 12 ductwork from each toilet room and janitorʼs closets. 8. Provide separate roof mounted exhaust fans to serve the kitchen exhaust hood and the dishwasher exhaust. The grease hood shall have minimum 16 gauge welded grease black steel ductwork (stainless steel where exposed). The duct shall be covered with 2-layers of fire rated insulation between the kitchen and the fan. The dishwasher shall have welded 16 gauge stainless steel ductwork. The fans shall operate via local switches with interlocks to the make-up air terminal units. C. Miscellaneous Exhaust Systems 1. Provide exhaust systems for the following systems: a. Trash and Recycle b. Mechanical Room Ventilation c. Electric Room Ventilation D. Automatic Temperature Controls 1. Provide a complete DDC controls system for the building complex. System will include a complete operating station, web-server, programming and graphics. 2. Provide all DDC field panels and interlocking wiring to integrate all system components. All panels will be stand-alone and fully programmable. 3. Provide adjustable high / low alarms for all sensors
Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015
Martha a s Vineyard Regional High School Vineyard Haven, MA 2 2015 HVAC Syste ems Evaluation Prepared For: Martha s Vineyard Regional School District Box 1385 Oaks Bluff, MA 02557 Prepared By: BLW Engineers,
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#56566/Page 1/May 23, 2017 HVAC Heating Plant The original Town Hall building and Addition building are primarily heated by a gas fired hot water plant that is located in the basement. The boiler plant
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57295/Page 1/July 21, 2017 HVAC SYSTEMS NARRATIVE REPORT The following is the HVAC system narrative, which defines the scope of work and capacities of the HVAC system as well as the Basis of Design.
More information4. OVERVIEW OF MECHANICAL SYSTEM
4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION
SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationBOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationMID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN
MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN September 30, 2015 PBA Project No. 2015.0140.00 PETER BASSO ASSOCIATES INC. CONSULTING ENGINEERS 5145 LIVERNOIS ROAD,
More informationBOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationDIVISION 15 MECHANICAL
DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with
More informationTechnical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer
Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section
More informationSECTION AIR COILS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationA. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.
SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate
More informationCOHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.
23 00 00 HEATING, VENTILATING & AIR-CONDITIONING The following is the HVAC outline specifications, which defines the scope of work of the HVAC system. PART 1 GENERAL 1.1 CODES A. All work installed under
More informationASHRAE Illinois Chapter 2015 Excellence in Engineering Awards
ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards PROJECT Chicago Vocational Career Academy Chicago, Illinois OWNER Chicago Public Schools PREPARED FOR American Society of Heating Refrigerating
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationDOCUMENT TABLE OF CONTENTS
DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026
More informationTHIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL
SECTION 15100 PART 1 GENERAL THIS IS A DESIGN GUIDE NOT A SPECIFICATION Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL HVAC SYSTEMS APPLICATIONS 1.1 SCOPE: The intent of this
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationCONTENTS. B. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationAIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems
233100 AIR DISTRIBUTION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 230700 HVAC Insulation B. Section 237300 Air Handling C. Section 230900 Building Automation and Control System Guidelines D. Section
More information2 Existing Mechanical System
2 Existing Mechanical System 2.1 Design Objectives and Requirements The Gossett Field House project consists of a 25,000 sqft addition and a 40,000 sqft renovation of the existing facility for the University
More information2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC
2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter
More informationExisting Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1
L21366/101 090 00.00/Page 1 HVAC EXECUTIVE SUMMARY The North Middlesex Regional High School has received average maintenance of the HVAC systems over its occupied years. Even with adequate maintenance,
More informationEnergy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE
This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission
More informationSECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS
SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the
More informationTHE ULTIMATE ROOFTOP SOLUTION
Configured Packaged Rooftop Solutions Specializing in Dedicated Outdoor Air Systems (DOAS) Capacities from 6 to 90 Tons Available in 208, 230, 460 and 575 Volts THE ULTIMATE ROOFTOP SOLUTION Service Friendly
More informationMECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY
MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION CONDITIONS FACILITIES MASTER PLAN MAY 2018 57 MECHANICAL ASSESSMENT MECHANICAL ASSESSMENT This report section includes an overview of the existing
More informationSECTION ROTARY SCREW WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower
SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B.
More informationState College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationFlorida Department of Transportation
Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,
More informationAHRI Certification Program Scopes - COOLING
Air-to-Air Energy Recovery Ventilators (AHRI Std. 1060) Automatic Commercial Ice-Cube Machines and Ice Storage Bins (AHRI Stds. 810 & 820) Central Station Air-Handling Units (AHRI Std. 430) Commercial
More informationBrown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS
SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett
More informationHAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001
This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.
More informationSECTION AIR COOLED WATER CHILLERS
PART 1 GENERAL 1.1 SECTION INCLUDES A. Chiller package B. Charge of refrigerant and oil C. Controls and control connections D. Chilled water connections E. Starters F. Electrical power connections 1.2
More informationMT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS
CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.
More informationNC State University Design and Construction Guidelines Division 23 Basic Mechanical Requirements
1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents for mechanical and plumbing systems. 2.0 General Requirements A. Warranty and Guarantee 1. Specifications
More information1 - This title will copy onto other forms Date
2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015
More informationBUILDING DESIGN STANDARDS. AIR CONDITIONING DIVISION 23 Heating, Ventilation and Air Conditioning
Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating
More informationA. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.
15684 ROTARY SCREW WATER CHILLERS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 236423 An optional
More informationJob Name Control Systems Description Date
Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In
More informationCleveland Clinic Design Standards MECHANICAL SYSTEMS DESIGN GUIDELINES HVAC AIR DISTRIBUTION PART I - GENERAL 1.1 SUMMARY
PART I - GENERAL 1.1 SUMMARY A. This section addresses the general requirements for air handling distribution systems, including air handlers, ductwork, ductwork accessories, terminal units, air devices,
More informationEXHAUST FAN SCHEDULE
DUCTWORK SCHEDULE CONCEALED SUPPLY AIR RECTANGULAR, RTU CONCEALED SUPPLY AIR RECTANGULAR, ERV CONCEALED SUPPLY AIR ROUND, RTU CONCEALED SUPPLY AIR ROUND, ERV EXPOSED SUPPLY AIR ROUND RUNOUTS RETURN AIR
More informationTECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare Center Northfield, Ohio
Technical Report 3 Northfield Mental Healthcare Center Dr. Stephen Treado Ji Won Park Mechanical Option Fall 2012 TECHNICAL REPORT 3 Mechanical Systems and Existing Conditions Northfield Mental Healthcare
More informationFEATURES AND BENEFITS
FEATURES AND BENEFITS Product Features and Benefits Full Product Line Offering Feature All models are 80% thermally efficient Blower performance up to 3.0 W.C. DX or chilled water section with factory
More informationRichard Henry Lee Elementary School
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationModular Heating & Ventilating Unit Model IGX-HV
Modular Heating & Ventilating Unit Model IGX-HV Indirect Gas-Fired Heating Evaporative Chilled Water DX Cooling October 2008 Product Features Model IGX-HV Indirect Gas-Fired Heating and Ventilating Unit
More informationSECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS
1.0 GENERAL SECTION 15740 SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.01 DESCRIPTION Item A. Scope This section specifies four sizes of fan coil units designed for hydronic heating and air conditioning.
More informationIAQ Building Education and Assessment Model (I-BEAM)
Heating, Ventilation, and Airconditioning (HVAC) Text Modules IBEAM IAQ in L... http://www.epa.gov/iaq/largebldgs/ibeam/text/hvac.html Page 1 of 6 10/21/08 IAQ in Large Buildings http://www.epa.gov/iaq/largebldgs/ibeam/text/hvac.html
More informationDirect Fired Heater Model AD Specification
Direct Fired Heater Model AD Specification Description A Direct-fired gas heating and ventilating unit(s), as indicated on the drawings shall be furnished. Unit(s) shall be tested in accordance with ANSI
More informationGil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee
Gil Rossmiller In the construction industry for over 30 years ICC IRC Plumbing & Mechanical Code Development Committee ICC- IECC Commercial Energy Code Development Committee Building Official Parker, Colorado
More informationEdward Jenner Elementary Academy of the Arts
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationDENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION BASIC MECHANICAL REQUIREMENTS
PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. Assume that buildings will be enlarged and modified in the future. 1. Make provisions for future interconnections, upgrading, and expansion of
More informationTighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance
Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December
More informationINTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings
INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,
More informationSequence of Operations (excerpt)
Sequence of Operations (excerpt) Chilled Water System Consists of one (1) 600 cooling ton Trane CVHE 3 stage centrifugal chiller, with associated chilled water pumps, condenser water pumps and one (1)
More informationA. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.
SECTION 15622 DIRECT GAS-FIRED BURNER & MANIFOLD SYSTEM PART 1: GENERAL 1.1 Section includes: A. Direct gas-fired heater modules B. Controls C. Equipment schedule 1.2 Related Sections A. Section 01655:
More informationDehumidifying with Dedicated Outdoor Air
Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,
More informationSummary Comparison of Simulation Program Features
Summary Comparison of Simulation Program Features FEATURE DOE2.2 equest TRACE 700 HAP Public/Proprietary Public Domain Proprietary Proprietary Proprietary Simulation Method 8760 hours 8760 hours 8760 hours
More informationTechnical Report #3 Mechanical Systems Existing Conditions Evaluation
Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents
More informationUpdate In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL
Section 23 20 00 FLUID SYSTEMS EQUIPMENT PART 1 GENERAL 1. CHILLERS Page 23 20 00-1 A. Provide chiller packages with centrifugal compressors, or screw compressors, and water cooled condensers. B. Design
More informationHVAC 101. The Basics of Heating, Ventilation and Air Conditioning
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort
More informationCOMcheck Software Version Mechanical Compliance Certificate
COMcheck Software Version 3.8.2 Mechanical Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: New Construction Project Title : Rudy's Star Motors Construction Site:
More informationSECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower
SECTION 15682 CENTRIFUGAL WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC) 3. 15711 - Induced Draft Cooling Tower B. Removal
More informationGuide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:
Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT
More information7. MECHANICAL SYSTEM DESIGN
7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved
More informationPACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS. RQ Series.
RN/RQ Series PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS RQ Series Features: Air-cooled or water-cooled condenser, with unit capacities
More informationA. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.
Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More information********************************************************************************************************** SYSTEMS REQUIREMENTS HVAC TEMPLATE 02/18
6. ENGINEERING SYSTEMS REQUIREMENTS D30 HVAC SYSTEMS REQUIREMENTS HVAC TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements. This template
More informationFAARM-Underground Facility. Conceptual Design Review. Mechanical Systems. Dunham Associates, Inc.
FAARM-Underground Facility Conceptual Design Review Mechanical Systems Prepared by: Dunham Associates, Inc. April 17, 2012 Dunham Project Number: 0412145-000-00 Dunham Associates Inc. Page 1 of 8 Mechanical
More informationUNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
More informationAgustin Lara Elementary Academy
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationCOMcheck Software Version Review Mechanical Compliance Certificate
COMcheck Software Version 4.0.7.2 Review Mechanical Compliance Certificate Section 1: Project Information Energy Code: 2014 Oregon Energy Efficiency Specialty Code Project Title: Benton County Health Project
More informationSECTION AIR HANDLING UNIT
SECTION 15800 - AIR HANDLING UNIT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR
More informationSECTION ROTARY SCREW WATER CHILLERS. B. Removal of Existing Refrigerant in Existing Chiller:
SECTION 15684 ROTARY SCREW WATER CHILLERS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15240 - Vibration Isolation. 2. 15540 - Pumping Equipment (HVAC). 3. 15711 - Induced Draft Cooling Tower. B.
More informationLARGE CAPACITY HEATERS
250 1,000 Capacities 7.5-12,850 150,000 CFM 200 MBH 250-7,500 MBH - - Tons APPLICATIONS Heating/Cooling/Makeup Air WAREHOUSES / FACTORIES SCHOOLS / UNIVERSITIES COMMERCIAL / RETAIL INDUSTRIAL GYMNASIUMS
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More information1.1 This section applies to air handling units for HVAC Systems.
AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling
More informationATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL
LINE ITEM # ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL LINE ITEM DETAIL Labor Material FURNACE COMPONENTS 1 Furnish & Install Sight-Impaired Thermostat For Heating and Cooling
More informationADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM
ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationHVAC PROPOSED SYSTEMS SOUTHBOROUGH PUBLIC SAFTEY BUILDING. September 12, 2017
HVAC PROPOSED SYSTEMS for SOUTHBOROUGH PUBLIC SAFTEY BUILDING September 12, 2017 PREPARED BY: GARCIA GALUSKA DESOUSA CONSULTING ENGINEERS INC 370 FAUNCE CORNER ROAD, DARTMOUTH, MA 02747 TEL 508-998-5700
More informationBasic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives
Design Considerations for Commercial Kitchen Ventilation By John A. Clark, P.E., Member ASHRAE Commercial kitchen ventilation (CKV) design must consider everything needed to be coordinated to form a system
More informationDescription of All Alternatives Considered-
Description of All Alternatives Considered- Energy efficiency is an area where the Tubman design can be improved. The design heating load is 1807.8 MBH and the design cooling load is 1702.2 MBH or 142
More informationModular Supply Make-Up Air Unit
Modular Supply Make-Up Air Unit Model MSX Flexible Design Factory Assembled Heating Options Hot Water Steam Electric Cooling Options Evaporative Direct Expansion Chilled Water November 2009 Product Features
More informationState College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT
State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the
More informationMechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013
Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...
More informationMechanical System Description
1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure
More informationSeries PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS. Features:
RZ PACKAGED ROOFTOP UNITS, HEAT PUMPS AND OUTDOOR AIR HANDLING UNITS Features: Air-cooled condenser, water-cooled condenser, or evaporative-cooled condenser packaged rooftop units from 55-240 tons Water-source
More informationMadeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)
Madeira City Schools Madeira, Ohio HVAC Assessment December 2011 (Revised February 2012) Prepared by: CMTA Engineering Consultants, Inc. 10411 Meeting Street Prospect, KY 40059 www.cmtaegrs.com (502) 326-3085
More informationA. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.
15855 AIR HANDLING UNITS SPECIFIER: CSI MasterFormat 2004 number: 237313 PART 1 GENERAL 1.1 SUMMARY A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution
More informationDirect Gas-Fired Make-Up Air
Direct Gas-Fired Make-Up Air Model TSU Heavy Duty, High Airflow Applications Manufacturing and Industrial Facilities Up to 64,000 cfm August 2012 Products Model TSU Direct Gas-Fired Make-Up Air Unit The
More informationCalmeca Academy of Fine Arts and Dual Language
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual