1 An HVAC Audit of the Canberra Institute of Technology 30 th November 2016 Amnon Holland
2 Agenda Overview CIT and various other sites The sites Type of Buildings HVAC Audit typical scope Examples of Common Technical issues and opportunities (Controls, Operations & State of commissioning) Note: Behavioural/ Management is important but not covered. E.g. Set points, proactively changing time schedule to suit space use. BMS Diagnostics
3 HVAC Audit Typical Scope 1. Use metering data or other means to establish energy use breakdown 2. Walk through site inspection by Engineer, taking measurements (air/waterflow, temperature, pressure, power, etc) as necessary. 3. Review of most recent Air, Water and System commissioning results 4. Review of BMS trend data to understand controls opportunities
4 HVAC Audit kwh Load reduction (E.g. OA and infiltration reduction, Capacity control Airflows/Waterflows State of tuning Time Schedules OSS Zoning Afterhours
5 BMS Start/Stop Public holidays are often not programmed 10 days/p.a. = 3%/p.a. Energy Time schedules are often advanced by a few hours for warmup (especially in Canberra), due to occupant complaints. This indicates malfunctioning OSS or other issues. (Which need investigation!) The OSS software does not have a runout limit and a 3am start may occur. Teaching spaces All areas often left conditioned 24/7 despite only < 20% occupancy due to resource constraints (i.e. FM doesn t have time) Integration of room booking systems with BMS?
6 Airside Fans and Motors Fan pressure setpoints are excessive, not having been based on commissioning data. Also no dynamic pressure reset for VAV systems Fans are often running at low speed on the end of their turndown(10hz) and require a pulley change. (Since they have been oversized) Fans are throttled by poor balancing or by decommissioned inlet guide vanes.
7 Airside Fans and Motors All too common scenario Electrician installs VFD, everyone expects savings will result Reality VFD was left at 50Hz Inlet guide vanes not opened Fan used more energy than before due to lack of commissioning Throttling, Speed control
8 Airside - VAVs Electric reheats operating during warmup Dampers and airflow sensor mechanical issues (Easily picked with diagnostics) Not sequenced to use gas heating(ahu HW coils) before electric reheat (or lack the smarts to do so) Reduce reliance on series fan assisted boxes (Often not required if system is rebalanced) Poor control zone definition such as high select Minimum airflow setpoints and Ventilation rates = Opportunities for significant energy savings (from fan energy, chiller and boiler) Minimum outdoor air strategies Often unreliable Excess OA rates
9 Waterside Installation of VFDs without recommissioning Hydraulic issues including poor connection locations: Parallel boilers/chillers not receiving common return water temp and unable to load equally Flow circulation through non operating equipment causing casing losses. Constant Flow loops ->VF opportunities? Hardware probably already there, just recommission
10 Plant and Equipment Tenant CDW Loop is served by a base building pump and tower Common issues: Pumps running 24/7 or cycling to maintain low leaving conditions at low load Loops not balanced, resulting in much higher pumping power When equipment is added or subtracted the loop must be balanced. Has your tenant CDW loop been balanced?
11 Plant and Equipment Tenant CDW Oversized pumps (sized based on all tenants needing sup cooling) Possible solution - Since most are duty standby, replace one with smaller pump for better turndown
12 Plant and Equipment - Boilers Condensing boilers inefficient operation with return temp above 55 C 10% difference in gas consumption by dropping water temps <55 C Full load conditions vs actual. What about a 70/50 C design condition?? A BMS controlled boiler flow temp reset is necessary to gain the 10% efficiency over the year.
13 Standby Power Chillers - ~0.5-1kW continuous per compressor. Multiple chiller installations can switch off chillers and sump heaters. Generators Block heater loads can be substantial for medium to large generators Consult with manufacturer about lower temp thermostats. UV Sterilisation lamps Be mindful how long lamps are run for. Can lamps be inadvertently left on? Cooling tower dosing pumps These can usually be interlocked with Dosing controller for a signal to run rather than 24/7.
14 DHW Water Consumption Gas Consumption Circulation losses can be higher than use annually. The circulator ran 24/7 Sequencing issues with solar preheat/ connections in wrong location
15 Hours BMS Diagnostics BMS prerequisites (Talk to your BMS provider to setup): 1. Trends setup on all control or points of intervals 2. Ability to download time aligned data (12 months) into excel 3. Start trending data so it is available for review Targeted KPIs to overall system performance. Target specific zones out of hundreds of VAVs. Some examples AHU 3 Number EDH operation hours before 8am EDHs Shouldn t operating during optimum start 0 G4 G5 G VAV
16 More Hours BMS Diagnostics AHU 5 Duct Pressure 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 AHU-1 Annual Heating Setpoint Deviation Identify Problem zones with basic excel diagnostics
17 BMS Diagnostics Same problem zone as before AHU- 1 % time at minimum airflow setpoint AHU-1 % time at maximum airflow 80% 30% 70% 60% 50% 25% 20% 40% 15% 30% 20% 10% 10% 5% 0% % Cooling Heating Heating Cooling VAV operating as a constant volume system due to conservative designers
18 Thank you me for simplified checklist
Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
More informationState of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney
Frenger Radiant chilled beam performance at 3D Model Creation Daylight Analysis Comparison of the performance of various HVAC systems at 1 Shelly St, Sydney VAV fancoil Active chilled beam Passive chilled
More informationHVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in
More informationImproving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks
Improving Performance with a Building Tune-Up Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks How much is too much? Most buildings can cut total energy use by 5-30% while
More informationIndoor Swimming Pools:
Indoor Swimming Pools: The Technologies 20 th November 2017 Amnon Holland BE Eng, M.AIRAH www.esbsconsult.com.au 1 Agenda The driver Code Compliance of Ventilation The Technologies - Heat exchange and
More informationHVAC Controls Upgrades: Requirement Details ( )
REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,
More informationContinuous Commissioning: A Valuable Partner to Retrofit Projects
Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles
More informationFAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney
FAST AND ROBUST BUILDING SIMULATION SOFTWARE Chilled Beam Performance: 1 Shelly Street, Sydney 3D Model Creation 1 Shelley Street, Sydney 3D Model Creation 1 Shelley Street, Sydney Daylight Analysis 1
More information10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.
10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager 2019 WHEA Webinar Johnson Controls Institute Overview Operation & Maintenance (O&M)
More informationDigital Precise Air Control - DPAC
Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section
More informationDIGI-VAV APPLICATIONS
DIGI-VAV DIGI-VAV APPLICATIONS Digi-VAV: An optimization kit for Variable Air Volume Air Handling Units (VAV AHU) that ensures individual zone indoor air quality (IAQ), and minimizes system energy consumption.
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and
More informationSECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section
More informationAIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS
AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The
More informationFeature Summary. I. System
I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in
More informationFUNCTIONAL DESIGN SPECIFICATION
Issue Date: Issued To: Revision: FUNCTIONAL DESIGN SPECIFICATION Specification Number: SP-XXXX Company Name Signature Date Issued By: Manutec Ltd. Approved By: Approved By: Approved By: Approved By: Authorised
More information1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT
Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story
More informationVapor-Compression Refrigeration
Vapor-Compression Refrigeration condenser D C expansion device compressor A B evaporator Types of Heat Pumps water-source heat pumps water-to-water heat pump air-source heat pumps Cooling Heating
More informationA. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.
SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate
More informationMatt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.
M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New
More informationHVAC Mandatory Provisions Part II, Page 1
HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency
More informationINTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings
INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,
More informationAndrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3
Existing System Evaluation Executive Summary The MBNA Career Services Center is a 44,000 square foot, 4-story office type building at Penn State University, University Park Campus. The building is located
More informationBAS Point Trend Data Guidance
BAS Point Trend Data Guidance Rev. 3, January 2018 Introduction The Building Automation System (BAS also, referred to as a DDC system, or a Direct Digital Control system) at your building has been set-up
More informationHVAC 101. The Basics of Heating, Ventilation and Air Conditioning
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort
More informationJob Name Control Systems Description Date
Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In
More informationSECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL
SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationSubmitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas
More informationBES-TECH TECHNOLOGY & SYSTEM INTEGRATION
BES-TECH TECHNOLOGY & SYSTEM INTEGRATION BES-TECH TECHNOLOGY & SYSTEM INTEGRATION DIGI-ACC Digi-ACC is a control kit for air cooled chiller systems, optimizing both chiller and pumps thereby reducing consumption
More informationThe M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO
The M & V Guided Recommissioning Process MOO Energy & Water Conservation Program September 2015 EWC Agenda MOO EWC Overview Our approach Progress Fault Detection Zone & customer feedback Variance reporting
More informationRE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana
ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum
More informationSECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of
More informationHAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001
This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.
More informationYork 25-Ton VAV Rooftop Unit
HVAC PRO for Windows User s Manual 637.5 OEM Section Technical Bulletin Issue Date 0996 York 25-Ton VAV Rooftop Unit Introduction Page 3 Overview *3 Configuration 5 Sequence of Operation 7 Modes of Operation
More informationINTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012
HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
More informationVerasys System Operation Overview Technical Bulletin
Contents subject to change. Verasys System Operation Overview Technical Bulletin Code No. LIT-12012370 Issued January 2016 Refer to the QuickLIT Web site for the most up-to-date version of this document.
More information9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A
Nicholas Thornton, CEM 1 Overview Today s Goals Introductions HVAC Electrical Technology Q&A 2 1 Today s Goals An overview, a crash course Maybe a few tangents (ASK QUESTIONS!) Show typical arrangements
More informationApplication of Direct Digital Temperature Control Systems for Maximum System Efficiency on VAV Systems
Application of Direct Digital Temperature Control Systems for Maximum System Efficiency on VAV Systems Frank W. Mayhew, EC/TC Consulting The acceptance of direct digital temperature control technology
More informationAmerican University Design Standards
25 95 00 CONTROL SEQUENCES FOR HVAC PART 1. GENERAL 1.01 SECTION INCLUDES A. Description of Work B. Control Sequences General Requirements C. System Specific Control Sequences 1.02 RELATED DOCUMENTS A.
More informationEnergy-Efficiency Measures List
Guidelines for Public Agencies Energy-Efficiency Measures List 1.0 Envelope 1.1 Reduce Heat Losses-Ceiling/roof 1.11 Additional Ceiling/Roof Insulation 1.12 Exhaust Attics 1.13 Use Light-Colored Roof Surfaces
More informationSeptember 19, 20, 2009 Fort Lee, VA
International Energy Agency Energy Conservation in Buildings and Community Systems (ECBCS) Programme Annex 46, U.S. Army Installations Management Command (IMCOM), US Department of Energy, Ft. Lee and The
More informationSubmitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge
ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University
More informationTerminal. Las Vegas, NV. Technical
McCarran International port Terminal 3 Technical Assignment 3 Mechanical System Existing Conditions Evaluation December 3, 2007 Prepared By: Faculty Advisor: Dr. William Bahnfleth, Ph.D., P..E. Table of
More informationFLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK
FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK ENERGY CONSERVATION MEASURE 1 Partial Steam System Decentralization SIEMENS will Furnish and Install condensing hot water boilers with associated
More informationPaul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA
Continuous Commissioning of a LEED-EB Gold Certified Office Building Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA KEYWORDS Continuous Commissioning, Retro-Commissioning,
More informationSEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT
SEQUENCE OF OPERATION GUIDELINE AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT Document: VAV-HTG rev1 Revision: 1.0 Rev. Date: July 22, 2011 NOTES: 1. THIS SEQUENCE
More informationApplications and Piping Strategies for Condensing Boilers - Introduction
Applications and Piping Strategies for Condensing Boilers - Introduction Foil 2, 10/2015 Viessmann Manufacturing Applications and Piping Strategies for Condensing Boilers Webinar Objectives: 1. Control
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationNovember 11, City of Sparks 215 S. 21 st St. Sparks, NV
November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of
More informationOSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon
OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113 Introduction: Glumac was engaged by
More informationTAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products
Document 475595 Microprocessor Controller for Tempered Air Products Reference Guide for the Microprocessor Controller Please read and save these instructions. Read carefully before attempting to operate
More informationAppendix 13. Categories of Cooling and Heating systems
EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01
More informationDesigning Energy Efficient Outdoor Air Systems
Designing Energy Efficient Outdoor Air Systems Joseph Thorndal Applied Products Sales Manager Greenheck, Schofield, Wisconsin 1 Joseph Thorndal BS Industrial Engineering North Dakota State University Work
More informationFacility information. Building Envelope
ENERGY AUDIT CHECKLIST A school building or community center is more than just a set of rooms and offices; it is a living structure. Energy flows through the building just like any living thing. Buildings
More informationAgenda and Objectives
Agenda and Objectives Trane Engineers Newsletter Live Series Variable-Speed Drives (VSDs) and Their Effect On HVAC System Components Variable-speed drives (VSDs) can save energy, but the savings may not
More informationSubmitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner
ESL-TR-99/12-09 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Commerce (TAMU-Commerce) Commerce, Texas Submitted to Texas
More informationSingle zone RTU, controlled by a programmable thermostat. Single zone RTU, generic description, with power exhauster
Rooftop Units CV Reheat RTU Reheat Reheat system RTU, serving electric reheat coils, w/dehumidification cycle & RA CO2 override of OAD CV Single Zone RTU SZ (from PC) RTU SZ Generic RTU SZ Multiple Units
More informationIntegrated VarIable refrigerant flow ahu/pau (r410a)
Integrated Variable Refrigerant Flow AHU/PAU (R410A) CONTENTS Features of VRF AHU/PAU 2 WELAIRE i-gt Concept 9 VRF Outdoor Unit Performance Data 10 Drawings & Performance Data 12 Dimensions 13 Notes 14
More informationSYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC
VOLUME ONE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Part-Load Strategies Why they re important.......... 1 What Things
More informationStrategies for Building Energy Efficiency
Strategies for Building Energy Efficiency Ben Sliwinski Technical Director SEDAC University of Illinois at Urbana-Champaign How Buildings Use Energy Building Envelope (Walls, Roof, Windows, Floors) Lighting
More information2009 IECC Commercial Mechanical Requirements
BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(
More informationGETTING THE MOST OUT OF HYDRONIC HEATING SYSTEMS
GETTING THE MOST OUT OF HYDRONIC HEATING SYSTEMS Copyright 2011. R. Trethewey, All rights reserved. No part of this document or file may be used without permission of the author. All diagrams are conceptual
More informationAIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University
AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort
More informationSelected Laboratory Energy Efficiency Measures
Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper
More informationASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee
ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC
More informationHVAC 101. H V A C S y s t e m s
H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost
More informationZoning Solutions. Thermostats & Wiring Centers Designed to Maximize Indoor Comfort. A Watts Water Technologies Company
Zoning Solutions Thermostats & Wiring Centers Designed to Maximize Indoor Comfort HVAC Systems Multi-Staging Alternative Energy Zoning Snow Melting Setpoint A Watts Water Technologies Company Zoning in
More informationDX-9100 Applications from Engineering Services
System 9100 Technical Manual 636.4 Application Examples Section Technical Bulletin Issue Date 0896 DX-9100 Applications from Engineering Services Introduction Page 3 Overview 3 Air Handling Unit Applications
More informationHigh Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO
High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the
More informationIntroduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN
Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb
More informationCHAPTER 4. HVAC DELIVERY SYSTEMS
CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer
More informationASHRAE Guideline 36 Advanced HVAC Control Sequences
ASHRAE Guideline 36 Advanced HVAC Control Sequences Rick Stehmeyer - Senior Engineer Matt Napolitan, P.E., CCP, CPMP, LEED AP BD+C - Principal Image Source: http://worldatdistance.com/2013/10/07/the-complete-noobs-guide-to-making-a-website//
More informationBOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:
4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This
More informationTechnical Report Three
Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3
More informationTechnical Assignment 3 11/15/04. Executive Summary
Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria
More informationMethod to test HVAC equipment at part load conditions
IPLV Method to test HVAC equipment at part load conditions For water cooled chillers: 100% load ( % hrs) + 75% ( Hrs ) + 50% ( Hrs ) + 25% ( Hrs ) = IPLV value Manufacturer can favor this number by tweaking
More informationTechnical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer
Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section
More informationReference Guide for Microprocessor Controller
Document 483232 Microprocessor Controller for Energy Recovery Reference Guide for Microprocessor Controller Please read and save these instructions for future reference. Read carefully before attempting
More informationHigh-Performance VAV Systems
This article was published in ASHRAE Journal, October 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not
More informationEnergy Management and Controls
As with the Chapter Review Tests and the Final Exam, the tests your understanding of the materials underlying the learning objectives. After you ve reviewed your answers to the Chapter Review Tests, try
More informationComputing Services Center
Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationHVAC Myths and Realities Trane Engineers Newsletter Live Series
HVAC Myths and Realities Trane Engineers Newsletter Live Series AGENDA Low delta T is unavoidable 55 F supply air temperature is adequate for today s loads ASHRAE Standard 15 has to be updated before new
More informationDaikin Blueprint: Delivering Hot Water with a Chiller
Daikin Blueprint: Delivering Hot Water with a Chiller Analyzing the design of heat recovery on air-cooled chillers and the effect it has on building energy consumption By Paul Crisman Daikin Chiller Applications
More informationterminal units only provide sensible cooling, a separate dehumidification system is usually needed.
providing insights for today s hvac system designer Engineers Newsletter volume 44 3 Dual-Temperature Chiller Plants This Engineers Newsletter describes several dual-temperature configurations that can
More informationImproved Thermal Comfort & Energy Efficiency with low-pressure VAV diffusion design
Improved Thermal Comfort & Energy Efficiency with low-pressure VAV diffusion design Technical Paper A guide to the design of an effective low pressure VAV air distribution system By Noel de Villiers Pr.
More informationRCE # April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES
RCE #12-4181 April 30, 2013 Centennial School District William Tennent HS, Region 3 ES, Region 1 ES, Region 2 ES Commissioning Progress Report The Commissioning Technician returned to visit R2ES and R1ES
More informationSmall Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment.
Small Commercial Business Energy Audits Recognizing and addressing the special requirements of the small business market segment. Class 7 Class 7: Refrigeration Fundamentals The Vapor-compression cycle
More informationZoned Rooftop Systems. Light commercial packaged rooftop systems from Trane
Zoned Rooftop Systems Light commercial packaged rooftop systems from Trane Trane Zoned Rooftop Systems Components of Trane Zoned Rooftop Systems p. 3 Zoned Rooftop System Configurations p. 4 Systems comparison
More informationHello, my name is Sarah Hilden and I am a Marketing Engineer in the C.D.S. group at Trane.
Slide 1 TRACE 700 Waterside Economizers Hello, my name is Sarah Hilden and I am a Marketing Engineer in the C.D.S. group at Trane. Today, we will be going over how to model waterside economizers in TRACE
More informationVirginia Tech Standards for Building Automation System
March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia
More informationParameter guide 95M-200 GAS-FIRED DIRECT VENT MODULATING HOT WATER BOILER WARNING WARNING
95M-200 GAS-FIRED DIRECT VENT MODULATING HOT WATER BOILER! WARNING Revise boiler control parameters only if you fully understand the purpose and result of the changes and on the advice of ECR Technical
More informationNEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80
NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80 Carrier Software Systems Carrier Corporation Syracuse, New York rev October 10, 2013 Copyright 2013 Carrier Corporation, All Rights Reserved Page
More informationManual Supplement. Product/System Title: Static Pressure Controller. Contents of this manual supplement include:
Model Number: Product/System Title: 8635-ST Static Pressure Controller Contents of this manual supplement include: 1) Sequence of operation 2) Description of new software items 3) Deleted software menu
More informationContinuous Commissioning of Commercial Kitchen and Dining Facilities Case Study
The 7 th International onference for Enhanced Building Operations (IEBO 2007) ontinuous ommissioning of ommercial Kitchen and Dining Facilities ase Study Hui Li, hen Xu, Qiang hen and Song Deng Energy
More informationAnalyzing Air Handling Unit Efficiency. Michael Rosenberg, PE, CEM
Analyzing Air Handling Unit Efficiency Michael Rosenberg, PE, CEM Analyzing Air Handling Unit Efficiency Introduction...1 Air Handlers and Energy...2 Air Handler Case Study...7 Optimizing Economization
More informationASHRAE JOURNAL ON REHEAT
Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide
More informationSingle Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return
Single Zone System One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return Multi Zone System Used in small to medium sized buildings
More informationTerminal Commissioning Case Study- Terminal A Logan International Airport
Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Brad Jones, PE, AP Sebesta Blomberg Sam Sleiman, PE, CCM
More informationPhysical Plant Complex
Continuous Commissioning Report For the Physical Plant Complex Building #1156 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More information