INSTALLATION, OPERATION AND MAINTENANCE. BeQuem 50. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

Size: px
Start display at page:

Download "INSTALLATION, OPERATION AND MAINTENANCE. BeQuem 50. ARITERM SWEDEN AB Installation, Operation & Maintenance /20"

Transcription

1 INSTALLATION, OPERATION AND MAINTENANCE BeQuem 50 ARITERM SWEDEN AB Installation, Operation & Maintenance /20

2 CONTENTS IMPORTANT INFORMATION Important Information...2 Technical Data...3 Burner Components...3 Operating Princible...4 Safety and Alarms...4 Installation...5 Wiring Diagram...6 Burner Installation...7 Start-up in Off mode...8 Start-up in Operating mode...8 Settings...9 Control Panel...9 Display Messages Actions Chart...12 Troubleshooting Maintenance Advice about Fuel Pellets...17 Guarantee and Disposal...17 Declaration of Conformity...18 Notes...18 Installation Protokol...19 GENERAL INFORMATION BeQuem 50 is a reliable and easy-to-use pellet burner. Its sturdy heat-resistant cast iron components ensure a long service life and minimise maintenance costs. Detailed technical data are presented on page 3. To make use of all features of the burner, it is important to observe these instructions. IMPORTANT Keep this manual in a safe place for future reference. Read this manual carefully before starting to use your BeQuem 50 pellet burner. The output of the pellet burner depends on how much pellets can be fed into and burned in the combustion head during one hour. (This means burning of pellets of the usual kind, which approximately comply with the fuel specifications described in this manual). NOTE! The protective hood on top of the burner must not be removed, unless the device has been disconnected from electricity supply. Follow the recommendations for the use and maintenance of the burner contained in this manual. SHIPMENT, STORAGE AND UNPACKING Delivery The manufacturer has insured the burner in case of damages during transport from the factory to the first interim storage location. Upon delivery it is important to check the condition of the burner before the burner is taken into use. If any damage is found, the seller shall be notified thereof without delay for possible claims. Storage The burner can be stored outdoors protected from rain for a short period of time. However, it is advisable to store the burner indoors. Disposal of the package The transport cardboard box can be recycled. FUNCTIONAL DESCRIPTION Heating with the BeQuem 50 pellet burner resembles in many ways oil heating. The greatest difference is that when heated with solid fuel a certain amount of ash is produced, which must be removed periodically. Otherwise, the efficiency of the burner will be reduced. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

3 TECHNICAL DATA Performance TECHNICAL DATA Output using pellets Combustion efficiency Power of ignition resistor Normal power consumption kw 95 % 450 W 90 W Dimensions Length outside the boiler Width outside the boiler Length inside the boiler Weight approx. Smallest insertion opening width height Required combustion space above the combustion head 370 mm 350 mm 420 mm 40 kg 230 mm 225 mm 350 mm 1 Electrical data Power supply Supply cable Fuse size Power in operation Power connection 240 V 50 Hz 3x1,5s 1x10 A 90 W W Burner components 1. Burn pot 2. Primary air tube 3. Optical monitor tube 4. Level monitor, receiver 5. Top coupling 6. Level monitor, transmitter 7. Fan 1 and 2 8. Auger tube 9. Burn pot skrews 10. Control panel 11. Auger motor 12. Operation panel 13. On/Off switch 14. Supply (230 V) 15. To screw feeder 16. To control sensor 17. Chain ARITERM SWEDEN AB Installation, Operation & Maintenance /20

4 OPERATING PRINCIPLE SAFETY AND ALARMS The BeQuem pellet burner is provided with automatic ignition, but it can be ignited manually, when necessary. The electric ignition system of the burner will only be activated in case the temperature of the boiler has dropped at least 8 C below the target temperature. During heating, the necessary ignition cycles take place by means of embers in the combustion head, saving electric energy. The burner and the incorporated feeding system operate automatically. The operation of the burner is controlled by a temperature sensor installed in the burner. The combustion head of the burner contains an accurately defined mixture of fuel and air, which ensures perfect combustion cost-effectively and environmentally friendly. The burner auger is over-pressurized during operation. The purpose of this is to reduce the risk of damage to the burner, e.g. if the draft through the burner is weak. Wooden pellets with a diameter of 8 millimetres are the recommended fuel for the burner. COMPATIBILITY OF THE BURNER AND THE BOILER The pellet burner can be installed in boilers, which meet certain requirements as regards the size of furnace, sufficient under-pressure and ash space. Required furnace size: Depth at least 430 mm measured form the insertion opening. Free height above the combustion head at least 350 mm to guarantee a sufficiently large combustion space for the flame. The boiler must have a sufficiently large ash space under the combustion head so that the ash removal interval is sufficiently long from the maintenance point of view and to ensure good operational reliability of the burner. Ash removal should be performed through a separate hatch to avoid the need to remove the burner for this task. For safety reasons the pellet heating centre and the fuel storage must be placed apart from each other to prevent possible accidents: any operation disturbances and damages caused by incorrect handling of the device will then be limited to the burner. The fuel storage must be built as a separate, fire-classified, confined space. Problems caused by faulty stopping of the system are indicated by a red light on the control panel. In addition, a text message appears on the display indicating what has caused the alarm. During every operating cycle, a small amount of pellets (approx. 150 g) is fed from the pellet storage via the external feeding system to the upper connection of the burner. To make it possible to dose an accurate and same amount of pellets during every cycle, the dosing is carried out by means of a separate dosing auger via the blocking feeder and burner auger to the combustion head. Because the burner auger feeds pellets forward three times faster compared with the speed at which pellets arrive at the auger, a safety zone is formed between the combustion head and the upper connection containing only single pellets. Even if a mains outage would occur in the system, the equipment had not been maintained correctly, or some of the parts of the equipment would have broken down, this safety zone will remain intact. Supply control auger Top feed connection Air lock Primary air tube Ingnitor tube In the furnace there must be a sufficient under-pressure, ( natural draft ), which allows burning of the pellets efficiently. As a guide value approx. 30 Pascal is suitable. Burner auger Fan ARITERM SWEDEN AB Installation, Operation & Maintenance /20

5 INSTALLATION Good planning saves time. Ensure immediately upon delivery from Ariterm that everything is included and undamaged. If possible plan in advance for on-site assembly. Any required adaptation of the complete docking plate is easier to do on site (home) than in a workshop. The boiler must use natural ventilation and have ample space above the combustion chamber or at least 300 mm. Exeption is possible in a number of boilers, but often in combination with a marginal reduction in efficiency. Always contact us for advice when unable to achieve the recommended measurements. The door opening must be at least 230 mm high and 225mm wide. The chimney must always be inspected at installation for airtightness, draught and risk of condensation. Draught regulators and insert tubes may need to be instaled. The recommended draught is 30 Pa. Boilers should always be installed so that variations in draught conditions do not affect boiler performance. This can be accomplished with devices such as installing a draught regulator. Space needed for installation: The open space in front of the boiler (including burner) must be at least 1,0 m, in order to facilitate usage and burner servicing. Any condensation should be checked by visual inspection of the chimney s upper reach during various weather conditions. In the event condensation runs through the flue, a condensation vessel should be installed in the lower part of the chimney in order to tap off the condensation water. Do not cover the combustion air intake. ELECTRICAL INSTALLATION The supply cable delivered with burner is connected to the burner. In addition, an over-temperature protection thermostat must be installed in the boiler (this must acquired separately). The connection is made in accordance with the wiring diagram annexed to this manual. Also the use of a safety switch (burner switch) is recommended. The other connection cable delivered with the burner is for boiler temperature and flue gas sensors. Work on the burner may only be carried out by a qualified serviceman. Make sure to cut the power supply to the burner before servicing. COMMISSIONING Before starting up the boiler, check the following: The heating pipework and the boiler are filled with water and the pressure is at least 0.5 bar. The possible flue gas damper has been opened The recirculation damper in the convection part of the boiler is in place The circulation pump is running The valves in the heating pipework have been opened The combustion air opening has been opened The safety valve is connected without obstructions to the boiler and is in good operational condition. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

6 WIRING DIAGRAM ARITERM SWEDEN AB Installation, Operation & Maintenance /20

7 MOUNTING OF DOCKNING PLATE AND SERVICE RAIL Mounting plate Quick-release hand hold Packing Service rail Secondary air tube 4 The service rail should be loosely installed on the mounting plate and secured only after the burner is in place. The fully assembled mounting plate and service rail. 1 Mount the secondary air tube, service rail and quick-release hand hold as shown in the photograph. 2 Electric cables should be installed such that they must be disconnected before the burne can be withdrawn from the boiler. Use the door frame as a template for drilling the four holes for the boiler s stud bolts in the docking plate. In some cases, the docking plate s outer dimension must be adapted to fit the boiler. It is easiest to use a circular saw. Mount the plate against the boiler frame with heat-resistence glass fibre reinforced sealing strip or furnace cement, which can easily be applied afterwards through the mounting plate opening. Tighten while making sure the plate is not deformed. Final tightening of the service rail is to be done only once the burner has been attached and secured to the mounting plate. The service rail is to be pressed up against the boilers guide pins and outer clamping bolts are to be securely tightened. Check that the burner is centred on the mounting plate s guide pins when it is pulled out and pushed in. It is a good idea to lubricate the guide arms. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

8 START-UP IN OFF MODE START-UP IN OPERATING MODE Cold start of the burner (with electric ignition) Cold start of the burner takes place after the burner has been switched off at the control panel, a fault has occurred in the operation of the burner, or the mains voltage returns after a mains outage. The temperature of the boiler must be at least 8 C below the set value. Otherwise, the automatic control unit supposes that the burner is in the hot start mode and does not use the ignition resistor at all. If the external feeding system is empty of pellets, it must be refilled before switching on the burner. Switch on the control unit of the burner at the main switch so that the red light turns on. Press the arrow button to the right. The operation display of the burner must be OFF. Browse menu 1 by means of the arrow button forward, until the message AUGER EXTERNAL MANUAL OFF is displayed. Switch on the external auger by pressing the Plus button. When the auger is rotating, the remaining running time is indicated on the display. The external auger can be stopped before the set time elapses by pressing the Minus button before the drop tube begins to be filled with pellets. To switch on the burner, go forward to menu 1 by means of the arrow button, until OFF (+ON) appears on the display. Select ON by means of the Plus button. Then the burner motors starts, the burner gets fuel to be fed to the combustion head via the feed auger, and after 3 minutes also the fan and ignition resistor will be switched on. The optical sensor of the burner detects the moment when fuel has been ignited and switches off the ignition resistor. At the same time, the operation light turns green and the speed of the fan decreases. Feeding of fuel stops completely within three minutes in order to give time for the fuel to ignite in the combustion head. After this pellets are fed at low power for further five minutes. After a full stop lasting ten minutes (7 starts), the operation program switches on and controls the burner functions. Only until at this point the burner switches to the normal heating mode. In case the ignition fails, the red light will come on again and an alarm message appears on the display. Hot start and switching off A green light indicates that the burner is in operating mode. During operation, the temperature sensor of the boiler controls the start and stop functions of the burner. When the temperature of the boiler has dropped 5 C below the selected set value, the burner switches to medium power. If the temperature drops by further two degrees, the burner starts to operate at maximum power. The burner operates at maximum power, until the temperature has dropped four degrees below the set value, after which the burner starts to operate at medium power again. The red light indicates that the device has been switched off. (see Troubleshooting ). Switching off To switch off the burner, select the menu ON (OFF). Select OFF by means of the Minus button. When the burner is in OFF mode, a red light is illuminated on the control panel indicating that the power has been switched on. The maximum amount of cold start cycles is seven. The proceeding of these cycles can be followed on the display by selecting the menu option Operating mode. Don t make any adjustments on the burner or similar measures during the ignition cycle. Note! When the burner is switched on at the first time or, for some reason, it does not contain any pellets, a restart is sometimes required approx. after a 3 minutes running time. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

9 SETTINGS CONTROL PANEL Adjusting combustion The boiler is delivered with factory settings, which in most cases are sufficient for proper, efficient combustion. The boiler s factory settings can be applied if negative pressure is 30 Pascal (Pa) in the flue. If combustion is poor anyway and the flue gases from the chimney are black or the ash is grainy, combustion can be adjusted to attain the desired end results. Adjustment is made with a flue gas analyser and should be carried out by a service technician authorised by Ariterm. Flue gas analysis shall be shown for carbon monoxide (CO) values under 200 ppm and excess air (O 2 ) 6-8%. The fan s air quantity and the feed percentage for the burner screw is adjusted in the following manner. The amount of pellets in the burner cup is set in the output menu by changing the percent figure for POWER HIGH AUGER and POWER LOW AUGER. The amount of air is set in the output menu by changing the percent figure for PO- WER HIGH FAN 1 and 2 and POWER LOW FAN 1 and 2. POWER MENU BURNER TYPE 50kW POWER HIGH AUGER 56% POWER HIGH FAN 1 46% POWER LOW AUGER 56% POWER LOW FAN 1 46% Basic settings The factory settings can be used in most cases. In general, only the target temperature of the boiler must be set. Service levels The control panel is provided with different menu levels for adjusting the control system. The control panel menus are described on page Display for set values 2. Display of operation and active alarms with indi cation light Green: Burner in operation Red: Alarm (burner not in operation) Flashing: Warning light (does not switch off the burner) Browsing forward in the menu Browsing backward in the menu Increases the set values Decreases the set values The menu level Service can be selected as follows: Press simultaneously both arrow buttons for approx. 5 seconds. The text Service appears on the display. The control unit is now in the service menu. Go forward in the service menu by pressing the arrow button to the right. If the control buttons are not pressed within 8 minutes, the control unit returns automatically to the basic display TEMPERATURE BOILER. POWER MIN AUGER 0% POWER MIN FAN 1 0% POWER HIGH FAN 2 64% POWER LOW FAN 2 64% POWER MIN FAN 2 0% ARITERM SWEDEN AB Installation, Operation & Maintenance /20

10 DISPLAY MESSAGES AND POSSIBLE ADJUSTMENTS The following tables give an overview of the messages, which may appear on the display of the control unit. They also indicate which parameters the user is allowed to change, and which parameters are allowed to be changed only in case that the user has been given instructions from an authorised installer. Note that a part of the menu options are displayed only when they are activated. Description of level 1 menu -> Text on the display Description Setting possibilities Temperature boiler xx (80) C ON (OFF) Operation mode, pellet (The menu is displayed only when the electric resistors are activated) Operation mode Boiler temperature, set value in brackets. Shows the actual temperature of the boiler, the set value shows the desired temperature. Operating mode. In ON mode the burner switches on when needed. In OFF mode the next menu displays Auger external manual. Options: pellet electric (the function electric resistors is enabled only in Biomatic+ models). OFF, start, stop, temperature hold, max, medium, min, electric. This menu also displays the different starting stages. Adjustable between 20 and 95 C by means of the Plus and Minus buttons. Selectable by means of the Plus and Minus buttons. Selectable by means of the Plus and Minus buttons. For information only. Temperature flue gas Flue gas temperature For information only. Operating time press plus key Operating time total Operating time high Operating time low Press the Plus button and then the arrow button forward to the next screen, if you want to view the operating time data. Total operating time of the burner. Operating time at high power. Operating time at medium power. The operating time is reset by pressing the Plus and Minus buttons simultaneously for 3 seconds. Text on the display Description Setting possibilities Pellets store Feeding factor Consumption average Displays the amount of pellets in the store, a new figure can be entered in connection with reloading the pellets store. Displays the feeding power of the external auger Displays the average consumption during the last 8 days. For information and can be changed. Adjustable between 0 and 76.7 kg, see Determination of the feeding factor. For information only. Consumption total Displays the total consumption of pellets. For information only. Auger external total Alarm pellets min Service press plus key Alarm ash removal Flue gas max C Displays the total operating time of the external auger in hours Sounds an alarm for calculated set minimum amount of pellets in the store. Press the Plus button and then the arrow button right to the next screen, if you want to view the service menu. Sounds an alarm for emptying the ash box upon reaching a set value. Audible alarm for cleaning of the convection parts upon reaching a set value For information only. Adjustable between 0 and 3.0 tons. Adjustable between 0 and 250 h, according to the operating time of the external auger. Adjustable for alarm max value between 120 and 280 C Operating time min Minimum power level during operating time (only displayed when the min operating level is activated) Operating time electric el1 Operating time of the resistor 1 The number of electric resistors vary between models. (Biomatic+ function) Operating time electric el2 Operating time of the resistor 2 (Biomatic+ function) Pellets store press plus key Estimated time left Press the Plus button and then the arrow button forward to the next screen, if you want to view the pellets store data. Displays the number of operating days at the average consumption level in question. For information only. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

11 DISPLAY MESSAGES AND POSSIBLE ADJUSTMENTS Description of menu 2 Service Service: To select this menu press both arrow buttons simultaneously for. approx. 5 seconds, then press the arrow button forward to the next screen. El Step Text on the display Start backup heat 15 C Level monitor Optical monitor level Testing press plus key Auger external Description Displays in brackets the activation of one of the electric resistors (enabled only in Biomatic+ models). Displays temperature difference from the target temperature, at which the electric resistor is switched on (enabled only in Biomatic+ models). Measured light intensity in percentage. The set limit value for the light in brackets in percentage. Measured light intensity in percentage. The set limit value for the light in brackets in percentage. Press the Plus button and then the arrow button to the right, if you want to view the test values. 0/1 manual test. Setting possibilities To activate one of the electric resistors enter number (3) here by means of the Plus button. Adjustable between 10 and 40 C. Adjustable between 10 and 90%. Adjustable between 1 and 98%. Enabled by pressing the Plus button, disabled by pressing the Minus button. Fan 0 to 100% Enabled by pressing the Plus button. Auger burner 0/1 manual test. Enabled by pressing the Plus button. Ignition 0/1 manual test. Enabled by pressing the Plus button. Note: the test is performed only when the fan is running. Alarm 0/1 manual test of the alarm diode. Enabled by pressing the Plus button. El Step 0/1 manual test (enabled only in Biomatic+ models). Enabled by pressing the Plus button. Power regulation 0 See the next menu. English Selection of the display language. Address 0 Not used. Default set vxxxx Displays the version number of the processor and enables resetting the factory settings. On (Off) Service Finnish, Swedish, English, German or Italian can be selected by pressing the Plus/Minus buttons. The factory settings can reset by pressing the Plus button. Description of menu 3 Power Power: In order to activate this menu, select number 5 in the Service - Power menu by pressing the Plus button. Wait, until the number stops flashing and continue by pressing the arrow button to the right. Text on the display Power 0 Burner type Description 50 kw Note: Don t change the factory setting, button -> resets the original settings. Power high auger Setting of fuel feed to high power (%). Power high fan Setting of speed of the fan to high power (%). Setting possibilities The menu is activated by entering code 5. Wait, until the number stops flashing and continue by pressing the arrow button to the right. 50 kw Power low auger Setting of fuel feed to medium power (%). 1 to 100%, Power low fan Setting of speed of the fan to medium power (%). 1 to 100%, adjusted by means of the Plus/Minus buttons. 1 to 100%, adjusted by means of the Plus/Minus buttons. 1 to 100%, adjusted by means of the Plus/Minus buttons Power min auger Setting of fuel feed to low power (%). 1 to 100%, not in use at level 0. Power min fan Setting of speed of the fan to low power (%). 1 to 100%, adjusted by means of the Plus/Minus buttons. Power high fan 2 Setting of speed of the fan to low power (%). Power low fan 2 Setting of speed of the fan to low power (%). Power min fan 2 Setting of speed of the fan to low power (%). Cleaning fan Frequency of cleaning blows 0 to 4 blows/h. Holding time Time between maintenance periods for the glow of embers Auger external time Setting of operating time for the external auger. 1 to 250 seconds. Auger external manual Hot starts Cold starts Setting of operating time for the external auger in manual operation, see page 13. Displays the number of hot starts. Displays the number of cold starts. 1 to 100%, adjusted by means of the Plus/Minus buttons. 1 to 100%, adjusted by means of the Plus/Minus buttons. 1 to 100%, adjusted by means of the Plus/Minus buttons. 20 to 120 minutes, in increments of five minutes, adjusted by means of the Plus/Minus buttons. 3 to 60 minutes, adjusted by means of the Plus / Minus buttons. Is reset by pressing the Plus/Minus buttons simultaneously for 3 seconds. Is reset by pressing the Plus/Minus buttons simultaneously for 3 seconds. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

12 ACTIONS CHART ACTIONS CHART Biomatic+ 50 / BeQuem 50 version 0906 OPERATING TIME TOTAL OPERATING TIME MAX OPERATING TIME MIN OPERATING TIME EL 1 OPERATING TIME EL 2 ESTIMATED TIME LEFT X d PELLETS STORE 0,0 t FEEDING FAKTOR 0,0 kg/h CONSUMPTION AVERAGE 0,0 kg/d CONSUMPTION TOTAL 0,0 t AUGER EXTERNAL TOTAL XX h ALARM PELLETS MIN 0,0 t FUEL EL FUEL PELLETS + EL Electric heating is available when nr 3 is selected in EL STEP menu. Only Biomatic+ function ALARM ASH REMOVE X ( x) ALARM CLEANING 0( Xh) FLUE GAS XXX C MAX 240 C MAIN MENU TEMPERATURE BOILER 55(80) C ON (-OFF) AUGER EXTERNAL MANUAL OFF FUEL PELLETS OPERATINGMODE MAX TEMPERATURE FLUE GAS xx C OPERATING TIME press plus key PELLETS STORE press plus key SERVICE press plus key Menu is only seen when OFF-set chosen.. Fun must be in operation before function of the ignition element can be found. AUGER EXTERNAL 0 FAN 0 FAN 2 0 AUGER BURNER 0 IGNITION 0 ALARM 0 EL STEP 0 SERVICE MENU SERVICE EL STEP 0 (0) LEVELMONITOR XX (50%) OPTICAL MONITOR XX ( 50%) TEST OUTPUTS Press plus key POWER 0 ENGLISH ADDRESS DEFAULT SEITINGS v0906 DIFF TANK NEJ Change nr. 0 to nr. 3 when El STEP using. Power menu is available when nr. 0 is changed to nr. 5. Service meny shows when pushing same time buttoms < and > for 5 sec. Move forward when nr. on display stops winking. POWER MENU BURNER TYPE 50kW POWER HIGH AUGER 56% POWER HIGH FAN 1 46% POWER LOW AUGER 56% POWER LOW FAN 1 46% POWER MIN AUGER 0% POWER MIN FAN 1 0% POWER HIGH FAN 2 64% POWER LOW FAN 2 64% POWER MIN FAN 2 0% CLEANING FAN 2/h HOLDING TIME 60min AUGER EXTERNAL TIME 30s AUGER EXTERNAL TIME MAN. 15min HOT STARTS BURNER X COLD STARTS BURNER X SEQUENCE Press right arrow to leave menu. Not used! ARITERM SWEDEN AB Installation, Operation & Maintenance /20

13 TROUBLESHOOTING In case an alarm becomes active, this is indicated on the display of the control panel with a red light and a text message. This facilitates troubleshooting, because the user can see the cause of the problem. The alarm is acknowledged by selecting OFF on the control unit. The cause of the alarm must always be determined and the problem removed before the device is switched on again. The following checks and remedies are described in such an order that the most probable cause of the problem is given first. Problem Check Remedy All display segments are out. The red operation indication is on. The display reads: ALARM PELLETS NO. The burner is requesting fuel, but has not received it. that the fuses of the control unit of the burner are intact and the main switch has been turned ON. has the over-temperature protection tripped? that there are pellets in the fuel storage. Replace the defective fuse in the control unit or turn ON the power by means of the main switch. Note! Disconnect the device from electricity supply before replacing the fuse. The size of fuses F1 and F2 is 4A/230 V. If the cause of over-heating cannot be determined with certainty, contact an authorised technician. If the over-temperature protection of the boiler has tripped, put it back into operation by pressing the RESET button. Also check that the 3-phase current is correctly connected. Add pellets. Problem Check Remedy The red operation indication is on and the display reads: CONTROL EL. IGNITION or CONTROL OPTICAL MONITOR The cause of the problem is that the optical flame monitoring of the burner has not detected flame during a certain period of time. No fuel has entered into the combustion head. that the motor shaft rotates the auger and the motor of the external auger operates. (In most cases the default setting of the operating time of the external auger (30 seconds) is not long enough to bring sufficient amount of pellets to the burner. If the problem cannot be removed by means of the above checks and remedies, the operating time of the external auger may be too short. In such cases increase the operating time (see page 15, menu 3 -> Auger external time ). However, the operating time must not be so long that pellets accumulate into the drop tube.) that the flame guard and/or the combustion head is not full of ash and the flame guard has not over-heated or sooty. If the motor does not rotate, disconnect the power cable from the boiler and connect it directly to a mains socket by means of the additional cable provided. If the motor has been over-heated due to a blockage or for some other reason, the over-temperature protection of the motor may have been tripped. The motor will not start until it has been cooled down. Also check that there are no blockages in the auger. If there are problems with the motor, contact an authorised technician. Remove ash, clean the combustion head from loose ash and wipe the flame guard clean. If the flame guard becomes easily sooty, the cause may be incorrect settings or too low underpressure in the furnace. In such cases call a technician. that the inclination of the drop pipe is not too gentle. that the inclination of the external auger is not too steep (max 45 ) or feeding of fuel has not stopped, because pellets have been stuck in the silo. Shake the drop tube and change the inclination so that pellets will not get stuck. Adjust the auger into a more gentle angle and turn it back and forth a few times so that the pellets come loose. The feed opening of fuel must be located in the middle of the fuel store (applies to small week stores). ARITERM SWEDEN AB Installation, Operation & Maintenance /20

14 TROUBLESHOOTING Problem Check Remedy Problem Check Remedy The device has been stopped during a hot start. The device has been stopped during a cold start. Check that the pellets fed into the combustion head are whole. The fuel consists of pieces, the burner cannot keep up the embers. The reason for recurring stops may also be an excessive play in the blocking feeder, which makes it difficult to keep up the embers. Check the function of the ignition resistor, unless ignition does not succeed after two start attempts. If the cause of the operation cannot be determined with certainty or the ignition resistor must be replaced, contact an authorised technician. that the feed auger, blocking feeder and burner auger rotate and are not blocked, e.g. because of a foreign object. A possible foreign object in the pellet fuel must be removed, if it gets stuck in the blocking feeder or in one of the feed augers. Remove the upper connection and take out the possible foreign object from the feed auger or blocking feeder. In connection with the inspection of the burner auger remove the four augers located between the inner and middle part and pull out the burner auger from the tube. Be sure to disconnect all cable connections. The red operation indication is on and the display reads: ALARM LEVEL MONITOR, or ALARM BLOCKAGE The cause of the problem is that the optical flame monitor of the burner has not detected light during a certain period of time. No fuel has entered into the combustion head. is there fuel in the upper connection? If there is no fuel in the upper connection of the burner, check the cable connections of the level switches. If this does not help, wipe the level switches clean. If the external feed of the burner does not start in spite of this or the level switches must be cleaned continuously, they may be defective and, when necessary, should be replaced by an authorised technician. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

15 MAINTENANCE Burner Carry out the necessary inspection and maintenance measures described below in connection with cleaning of the boiler: Switch off the burner one hour before commencing maintenance of the boiler. The combustion head does not normally require any specific maintenance, but in connection with ash removal it must inspected and any accumulation of ash removed, as necessary. When installing the burner back in place, inspect the hatch seals for possible damage. Every 1 to 2 years Clean the primary air ring and the primary air tube inside from dust and lumps. Check the condition and tension of the chain. Adjust and replace all defective parts, as necessary. Lubricate the chain with low-viscosity oil. In connection with a new fuel delivery, the combustion head must be inspected in order to detect sintering (ash as well as stone- and gravel-like particles stuck together in the combustion head) in good time. Such particles must absolutely be removed from the combustion head at short intervals to prevent over-heating of and thus damage to the primary air ring. Sintering is often caused by impurities in the fuel and the fuel supplier shall be notified immediately of such problems. See also paragraph Advice about fuel pellets. Note! Handle ash always carefully, because it may still be glowing. Ash must be kept in a fire-resistant container. The use of any kind of solid fuel requires usually a little more care than in the case of oil heating, even if the burning would be automatically controlled, such as in BeQuem pellet burners. The need of maintenance may vary considerably. It is therefore advisable to inspect and clean the burner, boiler and its convection parts already after one week s operation. In this way the user gains experience to schedule the maintenance at correct intervals. These maintenance measures should be carried out at frequent intervals. Close the inlet of combustion air into the boiler room. Put out the fire using a fire extinguisher. Make a fire alarm, as necessary. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

16 MAINTENANCE, CARE, SWEEPING Cleaning of Flame Control The burner cup and the screws within the cup must be carefully cleaned to ensure flawless operation. Pull the flame control sensor gently out of the pipe. Clean the flame control sensor. Check the condition of the chain and wheels regularly. Change worn out parts when necessary. Clean the flame controller metal pipe so that the ash in the pipe will not hinder the operation of the flame control sensor. The condition of the burner head wheels must be checked during maintenance. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

17 ADVICE ABOUT FUEL PELLETS GUARANTEE / DISPOSAL Wooden pellets are renewable bio-energy fuel in a compact and uniform form, which is easy to handle. Moisture content is less than 10 %, which means that the pellets do not freeze or become mouldy. No chemical substances are used in the manufacturing process, but rather the binding agent is the tree s own lignin. Diameter of the pellet is 6 to 12 mm and length 10 to 30 mm. Due to the small size the pellets move freely in the feed augers. Most of the disturbances, which occur as a result of bad fuel quality, are caused by incorrect handling and interim storage before the product is delivered to the customer. Large contents of fine materials in the pellets may be caused by insufficient sifting. Sintering of ash is often caused by silicate impurities (sand). These things cannot be detected before burning. Note! If ash is sintered, sintered material must be continuously removed form the combustion head. Fuel storage The feeding system enables building the pellet storage for so-called bulk deliveries. The storage can be located either indoors or in a separate building outside the house. The shorter the transport distance from the storage to the burner is, the better the feeding operates. In designing the boiler room and the storage, the fire regulations must be taken into consideration. Actions in emergency situations Fire If the heating equipment catches fire, switch off the burner at a separate safety switch. Guarantee This burner manufactured by Ariterm AB is guaranteed to be free of defects in workmanship and materials for a period of 24 months (2 years) from the date of installation. The manufacturer shall not be held liable for faults caused by incorrect installation, incorrect use, freezing, over-temperature or over-pressure. Any attempts made to repair the product without the manufacturer s permission or if the guarantee card has not been returned to the manufacturer, will invalidate the guarantee. The manufacturer shall not be held liable for any possible indirect damage and/or financial loss caused by the burner. Ariterm AB reserves the right to decide the method how a possible guarantee repair is carried out. Ariterm AB is not liable for damages occurred after the expiration of the guarantee period, but compensation for such incidents may be agreed upon separately case by case. Disposal The metal parts of the burner can be scrapped, the plastic parts shall be disposed of in accordance with the regulations in force. FUEL RECOMMENDATION Raw material Chemically untreated barkless wood Diameter 8 mm Length 15 to 32 mm Volume weight over 600 kg/m 3 Moisture content less than 10 % Ash content less than 0.7 weight % Fine material content max 4 weight % Melting temperature of ash > 1100 C Energy content >4,75 kwh/kg ARITERM SWEDEN AB Installation, Operation & Maintenance /20

18 DECLARATION OF CONFORMITY NOTES ARITERM SWEDEN AB Installation, Operation & Maintenance /20

19 INSTALLATION PROTOCOL After installation the burner has to be adjusted. To test every power range, press plus key for 8 seconds in On/Off menu, then can high, low and min modes be tested manually. Returning to normal position: Press minus key once. ATTENTION! In this function, the burner won t stop when the boiler water reaches desired temperature: boiling risk! Flue gas temp. High CO O 2 CO 2 Air-fuel ratio Efficiency Draught i mm Fan Effect % Flue gas temp. Low CO O 2 CO 2 Air-fuel ratio Efficiency Draught i mm Fan Effect % Flue gas temp. Min CO O 2 CO 2 Air-fuel ratio Efficiency Draught i mm Fan Effect % Retailer / Installer Installed by Inst. date If these instructions are not followed during installation, operation and maintenance, the obligations of Ariterm AB under the warranty regulations are no longer binding. Ariterm reserves the right to alter any details and specifications without prior notice. ARITERM SWEDEN AB Installation, Operation & Maintenance /20

20 Ariterm Sweden AB Flottilvägen Kalmar Sweden ARITERM SWEDEN AB Installation, Operation & Maintenance /20

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28

INSTALLATION, OPERATION AND MAINTENANCE. ARITERM SWEDEN AB Installation, Operation & Maintenance /28 INSTALLATION, OPERATION AND MAINTENANCE ARITERM SWEDEN AB Installation, Operation & Maintenance - 2009.02.18-1/28 CONTENTS IMPORTANT INFORMATION 4 4 5 Notification to building authority Inspection Sweeping

More information

Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger

Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger Operating Instructions Manual Janfire NH/Integral Pellets Burner with External Auger 11899008 R1 EN Janfire 2008 Due to constant development, Janfire AB reserves the right to change part or parts of this

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Hybrid 20 INSTALLATION, OPERATION AND MAINTENANCE Ariterm Hybrid 20 TABLE OF CONTENTS General...3 Installation... 4-5 Dimensions - with flue gas exhauster...6 Dimensions - without flue gas exhauster...7 Pipe installations...8

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm 60+ INSTALLATION AND OPERATING INSTRUCTIONS Ariterm 60+ CONTENTS General.... 2 Installation.... 4-5 Installation of temperature limit valve... 6 Measurements and connections... 7 Technical specifications and

More information

ARITERM OY. Arimatic 500. User manual

ARITERM OY. Arimatic 500. User manual ARITERM OY Arimatic 500 User manual Table of contents 1. General information... 3 2. Transport, storage and package opening... 3 3. Warranty... 3 4. Installation and commissioning... 4 5. System description...

More information

ARITERM-VTT-S INSTALLATION AND OPERATING INSTRUCTIONS

ARITERM-VTT-S INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS Ariterm Biomatic+ 40 Light Ariterm Biomatic+ 40 Ultra Light TABLE OF CONTENTS GENERAL INFORMATION General information... 2 Transport, storage and unpacking... 2

More information

ARITERM-VTT-S INSTALLATION AND OPERATING INSTRUCTIONS

ARITERM-VTT-S INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS Ariterm Biomatic+ 20 TABLE OF CONTENTS GENERAL INFORMATION General information... 2 Transport, storage and unpacking... 2 Technical data... 3 Functional description...

More information

PELLET BURNER PV 350

PELLET BURNER PV 350 PELLET BURNER PV 350 INSTRUCTION MANUAL v1.1 1 PRODUCT DESCRIPTION...3 2 SAFETY RULES...3 3 WARNINGS...4 4 INSTALLATION INSTRUCTIONS...5 4.1 BOILER REQUIREMENTS...5 4.2 PELLET CONTAINER...6 4.3 INSTALLATION

More information

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm Biomatic+ 20

INSTALLATION AND OPERATING INSTRUCTIONS. Ariterm Biomatic+ 20 INSTALLATION AND OPERATING INSTRUCTIONS Ariterm Biomatic+ 20 TABLE OF CONTENTS GENERAL INFORMATION General information... 2 Transport, storage and package opening... 2 Technical data... 3 Functional description...

More information

SWEBO Bioenergy Manual pellet burner PB20 Rev no. Date Page PBM1: (36) Installation and maintenance instructions

SWEBO Bioenergy Manual pellet burner PB20 Rev no. Date Page PBM1: (36) Installation and maintenance instructions PBM1:12 2018-01-22 1 (36) Installation and maintenance instructions PBM1:12 2018-01-22 2 (36) TABLE OF CONTENTS 1 GENERAL INFORMATION... 5 1.1 PELLET STORAGE... 5 1.2 CONSTRUCTION AND FUNCTION... 6 1.2.1

More information

SWEBO Bioenergy Manual pellet burner PB50 Rev no. Date Page PBM1: (37) Installation and maintenance instructions

SWEBO Bioenergy Manual pellet burner PB50 Rev no. Date Page PBM1: (37) Installation and maintenance instructions PBM1:12 2008-10-16 1 (37) Installation and maintenance instructions PBM1:12 2008-10-16 2 (37) TABLE OF CONTENTS 1 GENERAL INFORMATION... 5 1.1 PELLET STORAGE... 6 1.2 CONSTRUCTION AND FUNCTION... 7 1.2.1

More information

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE

TECHNICAL INSTRUCTIONS USE AND MAINTENANCE TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set For boilers CentroPlus 25/35 and CentroPlus-B 25/35 (solid fuel and wood pellets fuel firing) TUPSCP-K-11-2016-ENG CONTENTS 1.Introduction 2. Status

More information

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19

OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER. Version DC19 OPERATION MANUAL RK-2006LPP AUGER FITTED SOLID FUEL BOILER TEMPERATURE CONTROLLER Version DC19 1. Application. Controller RK-2006LPP is designed for temperature control of solid fuel fired water boilers

More information

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS

USE AND MAINTENANCE. Cm Pelet-set (60-90 kw) TECHNICAL INSTRUCTIONS CENTROMETAL d.o.o. Glavna 12 40306 Macinec Croatia tel: +385 40 372 600; fax : +385 40 372 611 TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (60-90 kw) For boilers: EKO-CK P 70-110 TUPS-90K-09-2015-E-N-eng

More information

USER MANUAL 9kW LILLY PELLET STOVE

USER MANUAL 9kW LILLY PELLET STOVE USER MANUAL 9kW LILLY PELLET STOVE Table of Contents.Overview of Stove Parts... 2.Technical Characteristics... 3 3.Important Information... 4 4.Pellet Specification...5 5.Technology... 6 6.Installation...

More information

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40)

USE AND MAINTENANCE. Cm Pelet-set TECHNICAL INSTRUCTIONS. (14-35 kw) For boilers: EKO-CK P (EKO-CK 20-40) EKO-CKB P (EKO-CKB 20-40) TECHNICAL INSTRUCTIONS USE AND MAINTENANCE Cm Pelet-set (14-35 kw) For boilers: EKO-CK P 20-40 (EKO-CK 20-40) EKO-CKB P 20-40 (EKO-CKB 20-40) TUPS-K-02-2011-E-N-ENG CONTENTS 1. Introduction....... 2. Status

More information

Operating Instructions Janfire Pellet boiler Integral Typ 25

Operating Instructions Janfire Pellet boiler Integral Typ 25 32580002_ EN_ver4 Janfire 2014 1(45) Due to the continuous development in methods, design and manufacture, the contents of this document may change at any time and without prior notice. Janfire do not

More information

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens

Main components. Buying all components from same manufacturer or reseller it guarantees better compatible and service if something happens Main components The bigger the need of heat output is. the bigger the components (storage. boiler. chimney etc.) In private houses the output need of the boiler is about 25 40 kw and in farms from 60 kw-

More information

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not

More information

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo

INSTALLATION, OPERATION AND MAINTENANCE. Ariterm Vedo INSTALLATION, OPERATION AND MAINTENANCE Ariterm Vedo CONTENTS General...3 Installation...4-5 Laddomat 21 Connection diagram...6 Temperature control valve...7 About burning wood...8 Operation...9-11 Service

More information

Pellet burner PV 180a. User manual

Pellet burner PV 180a. User manual Pellet burner User manual Table of content Table of content...2 Description...5 Fuel...7 Installation...7 Boiler requirements...8 Pellet container...11 Burner...12 External auger...20 Electrical connections...21

More information

Operation and maintenance A4 Pellet burner

Operation and maintenance A4 Pellet burner Operation and maintenance A4 Pellet burner 1-14-3009E 2005-03 MANUAL FOR A4 MODEL WITH 1 MAX. OUTPUT 20 kw Store this manual somewhere easily accessiblefor future use. Please read through the manual carefully

More information

VETO CLEANER 500 FLUE GAS CLEANER

VETO CLEANER 500 FLUE GAS CLEANER As of serial number 3100 0001 VETO CLEANER 500 FLUE GAS CLEANER USER MANUAL SPARE PARTS LIST Manufacturer: ALA TALKKARI Veljekset Ala-Talkkari Oy FI-62130 HELLANMAA TEL. +358 6 433 6333 FAX +358 6 437

More information

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14

TermEfekt USER S MANUAL AIR HEATER. Model PGA 14 Przedsiębiorstwo Produkcyjno-Wdrożeniowe ARAJ sp. z o.o. 55-080 Kąty Wrocławskie, ul. Mireckiego 30 POLAND USER S MANUAL AIR HEATER TermEfekt Model PGA 14 Kąty Wrocławskie, 2004 Product identification

More information

Model No: Little Devil II (inc ss)

Model No: Little Devil II (inc ss) GAS HEATER Model No: Little Devil II (inc ss) PART NO: 6926020, 6926025 (SS) OPERATION & MAINTENANCE INSTRUCTIONS LS1213 INTRODUCTION Thank you for purchasing this CLARKE Gas Heater. Before attempting

More information

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. 1 MHG Heating Ltd ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual. Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR Telephone 08456 448802 Fax 08456 448803

More information

Installation, operation and care Firewood boiler Vedolux 40 UB

Installation, operation and care Firewood boiler Vedolux 40 UB Installation, operation and care Firewood boiler Vedolux 40 UB 2008-09-23 Ver 2 Replaces: 05-11 VEDOLUX 40 UB Notes 0809 To be completed when the Vedolux 40 UB is installed Serial number:... Installation

More information

eurofire BIG 100, 200, 300 kw

eurofire BIG 100, 200, 300 kw Datum 080603, rev 0 eurofire BIG 100, 200, 300 kw The Pellet Burner of the 21 st Century Ekosystem AB Björkevägen 84, S-805 97 GÄVLE, Sweden Table of Contents General Information 3 Read these instructions

More information

Forced draught gas burner

Forced draught gas burner Installation, use and maintenance instructions Forced draught gas burner Code Model Type 3751982 GAS 3 519T80 291 (3) - 02/2010 DECLARATION Declaration of conformity in accordance with ISO / IEC 17050-1

More information

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use GB122 Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C For trade use Please read thoroughly before attemting to diagnose fault 7217 4900 (03/2010) GB/IE List of contents

More information

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use GB122 7210 1300-12/2002 GB(EN) For trade use Servicing manual Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C Please read thoroughly before attempting to diagnose fault List of contents

More information

SAFIRE 1600D, 1800D and 2100D Diesel / fuel oil heaters USAGE, INSTALLATION AND MAINTENANCE

SAFIRE 1600D, 1800D and 2100D Diesel / fuel oil heaters USAGE, INSTALLATION AND MAINTENANCE SAFIRE 1600D, 1800D and 2100D Diesel / fuel oil heaters 1 Heater kit contains : Heater, mounting bracket Fuel hose (3 meters), pump, a fuel tank connection to standard tanks (15, 22, 30 litres) Power supply

More information

WHE 2.24 / WHE 2.24 FF

WHE 2.24 / WHE 2.24 FF EN Wall-hung gas boilers WHE 2.24 WHE 2.24 FF User Guide 300011777-001-C . Contents 1 Introduction.............................................................................3 1.1 Symbols used...........................................................................................3

More information

Installation, operation and care. Pellmax UB. Burner not included Replaces:

Installation, operation and care. Pellmax UB. Burner not included Replaces: Installation, operation and care Burner not included 2011-11-11 ver: Replaces: Contents 11.11 otes...3 General...4 Function...4 Technical data...5 System principle Pellmax with radiator and tank-in-tank

More information

Electronic Pellet Burner Controller NPBC-V3M

Electronic Pellet Burner Controller NPBC-V3M Electronic Pellet Burner Controller NPBC-V3M SOFTWARE VERSION 3.3a/3.2 page of 27 CHANGES IN THE USER MANUAL OR IN THE CONTROLLER'S SOFTWARE Version of the user manual Changes Page 2.2. The software version

More information

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL Heating, Air Conditioning, Ventilation Отопление-Кондиционеры-Вентиляция MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL 1. Usage MTM 8-30 universal oil heater is designed for heating commercial rooms

More information

Product waste disposal - Protection of the environment:

Product waste disposal - Protection of the environment: Product waste disposal - Protection of the environment: In accordance with the provisions of the Waste Electrical and Electronic Equipment (WEEE - 2002/ 96/ EC) Directive, used electric and electronic

More information

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40 USER GUIDE VOGUE COMBI GEN2 C26 C32 C40 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not

More information

i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book UIN A05 October 2017

i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book UIN A05 October 2017 24 1 2 23 3 4 5 20 6 I 19 7 18 8 9 15 14 11 13 12 i 24, i 30, i 35 combination boilers USER GUIDE For Installation Guide see reverse of book i 24 OFF MAX E STATUS BURNER RESET MIN PRE MIN MAX HEAT PREHEAT

More information

100 step modulated Wood Pellet Boiler

100 step modulated Wood Pellet Boiler 100 step modulated Wood Pellet Boiler EN 303-5 approved by DTI (Danish Technological Institute) Approved for pressure expansion Energy class AA Approved www.kedco.ie Kedco Boiler Manual Version 1.3 Page

More information

USER GUIDE VOGUE MAX SYSTEM

USER GUIDE VOGUE MAX SYSTEM USER GUIDE VOGUE MAX SYSTEM 15 18 26 32 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not

More information

SAFIRE 2000A FUEL OIL HEATER INSTALLATION, OPERATION AND MAINTENANCE

SAFIRE 2000A FUEL OIL HEATER INSTALLATION, OPERATION AND MAINTENANCE SAFIRE 2000A FUEL OIL HEATER INSTALLATION, OPERATION AND MAINTENANCE You have selected the new generation SAFIRE oil heater as your heating solution. Although our goal is to take into account all problems

More information

INSTALLATION, OPERATION AND MAINTENANCE. Bio burners kw

INSTALLATION, OPERATION AND MAINTENANCE. Bio burners kw INSTALLATION, OPERATION AND MAINTENANCE Bio burners 60-1500 kw TABLE OF CONTENTS For the new owner...3 Burner data...4 General...5 Shipping, handling and storage... 6-7 Contents of the BioJet burner delivery...8

More information

Corn Flame Energy Corn Stove Model 3000

Corn Flame Energy Corn Stove Model 3000 Corn Flame Energy Corn Stove Model 3000 Installation and Operation Guide Read thoroughly before starting installation Save this manual for future reference SAFETY NOTICE If this stove is not properly installed,

More information

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095 Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095 Before commencing with the installation it is important that these instructions are read and fully understood. The DOVRE 700CBW is

More information

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400

INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400 INSTRUCTION MANUAL & SERVICE MANUAL ORLIGNO 400 Content 1. Delivery......................................................................... 3 2. Installation and assembly.........................................................

More information

Installation & Maintenance Manual

Installation & Maintenance Manual Installation & Maintenance Manual MOL 200 S1L (B30A) Oil Burner 11/12 Tel: +44 (0) 1905 794331 Fax: +44 (0) 1905 794017 Email: info@nu-way.co.uk Web: www.nu-way.co.uk DESCRIPTION COMPONENTS 1. Shrouded

More information

TECHNICAL AND OPERATIONAL DOCUMENTATION

TECHNICAL AND OPERATIONAL DOCUMENTATION METAL AND BOILER FACTORY 28-100 Busko-Zdrój, Owczary, ul Przemysłowa 3 Tel No +4841 378 46 19, fax +4841 370 83 10 TECHNICAL AND OPERATIONAL DOCUMENTATION SAS MULTI FLAME BURNER ADAPTED FOR BURNING OF

More information

Biomass. Biomass solid fuel boiler range

Biomass. Biomass solid fuel boiler range Biomass Biomass solid fuel boiler range Biomass Fuelling positive change For more than150 years, Baxi has been at the forefront of heating technology Baxi leads the way with new and pioneering heating

More information

Pellet heating. Boilers & Burners.

Pellet heating. Boilers & Burners. Pellet heating Boilers & Burners www.varmebaronen.org Pellets Fuel pellets are a biofuel that is often made from sawdust or wood shavings. When wood pellets are burned, the substances emitted into the

More information

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove

CentroPelet ZV14 TECHNICAL INSTRUCTIONS HEATING TECHNIQUE. for regulation, use and maintenance of pellet stove HEATING TECHNIQUE Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611 TECHNICAL INSTRUCTIONS for regulation, use and maintenance of pellet stove CentroPelet

More information

EBC20. Instructions for fitting, installation and operation. Read and save these instructions!

EBC20. Instructions for fitting, installation and operation. Read and save these instructions! EBC20 UK Instructions for fitting, installation and operation Read and save these instructions! 2 3002878 EBC20 UK 290415 1. Product information............................................... 4 1.1 Delivery.............................................................

More information

Computer Controller. The Bio-Burner has user regulated settings as well as built-in safety features to protect you and your burner.

Computer Controller. The Bio-Burner has user regulated settings as well as built-in safety features to protect you and your burner. BB-100 Features 3 6 1 2 5 (1) - Computer Controller (2) - Combustion Chamber (3) - Flue Pipe (4) - Front Maintenance Covers (5) - Igniter Service Door (6) - Heat Exchanger Service Panel 4 7 10 9 12 11

More information

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200 with resevoir. Issue 01

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200 with resevoir. Issue 01 CHESNEY S Bio-Ethanol Installation & User Manual model: EFB1200 with resevoir Issue 01 1 2 Thank you for choosing this Chesney s Bio-Ethanol fire. Please read this information guide carefully in order

More information

MODEL SF-10 CONTROL OPERATION AND INSTRUCTION MANUAL

MODEL SF-10 CONTROL OPERATION AND INSTRUCTION MANUAL MODEL SF-10 CONTROL OPERATION AND INSTRUCTION MANUAL The SF-10 Temperature Control () is an efficient boiler operator with a digital LCD display with backlight, a boiler pump output, and an alarm. The

More information

Operating Instructions

Operating Instructions Operating Instructions P4 Pellet 8-60 Read and follow the operating instructions and safety information. Subject to technical change. July 2009 Fröling Heizkessel- und Behälterbau Ges.m.b.H, Industriestrasse

More information

Silencer Preheater unit Electric post-heating unit Water circulated post-heating unit CO 2 sensor %RH sensor Pressure difference switch LON converter

Silencer Preheater unit Electric post-heating unit Water circulated post-heating unit CO 2 sensor %RH sensor Pressure difference switch LON converter VALLOX Product Code: 3158400 L 3158410 R SILENCER (OPTIONAL) INSTRUCTIONS FOR USE AND MAINTENANCE WATER CIRCULATED POST-HEATING UNIT (OPTIONAL) ELECTRIC POST-HEATING UNIT (OPTIONAL)) PREHEATER (OPTIONAL)

More information

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200. Issue 01

CHESNEY S. Bio-Ethanol Installation & User Manual. model: EFB1200. Issue 01 CHESNEY S Bio-Ethanol Installation & User Manual model: EFB1200 Issue 01 1 2 Thank you for choosing this Chesney s Bio-Ethanol fire. Please read this information guide carefully in order to safely install,

More information

BIX B-One 100 kw INSTALLATION GUIDE

BIX B-One 100 kw INSTALLATION GUIDE BIX B-One 100 kw INSTALLATION GUIDE Dear Customer, We thank you for choosing our product. The Bix B-One 100 Kw is a burner of advanced concept and technology, with a high reliability and construction quality.

More information

INSTALLATION AND OPERATING INSTRUCTIONS

INSTALLATION AND OPERATING INSTRUCTIONS INSTALLATION AND OPERATING INSTRUCTIONS CONTENTS 2 6 7 8 9 10-12 16 17 18 18 19 2 GENERAL TRANSPORTATION, STORAGE AND OPENING THE PACKAGE Receiving the goods - Storage Opening the package 3 INSTALLATION

More information

INSTRUCTION MANUAL FOR OIL BURNER MODELS

INSTRUCTION MANUAL FOR OIL BURNER MODELS INSTRUCTION MANUAL FOR OIL BURNER MODELS X500 Bio B10 E90-803-001-001-00 Rev 7-1 - Contents Technical specifications Technical data... 3 Working field... 3 Dimensions... 4 Head and electrode settings...

More information

INSTRUCTION MANUAL FOR OIL BURNER MODELS

INSTRUCTION MANUAL FOR OIL BURNER MODELS INSTRUCTION MANUAL FOR OIL BURNER MODELS X400 Bio B10 E90-803-001-001-03 Rev 13-1 - Contents Technical specifications Technical data... 3 Working field... 3 Dimensions... 4 Head and electrode settings...

More information

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL

INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL INLINE СENTRIFUGAL FAN BOX BOX-R OPERATION MANUAL CONTENT 3 Introduction 3 General 3 Safety rules 3 Storage and transportation rules 3 Manufacturer s warranty 4 Fan design 4 Delivery set 5 Technical data

More information

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND

Aqua Balance. AquaBalance TM CONTROL MODULE QUICK START GUIDE LEGEND Aqua Balance AquaBalance TM CONTROL MODULE QUICK START GUIDE 10 1 Domestic Hot Water temperature setpoint decreasing button 2 Domestic Hot Water temperature setpoint increasing button 3 Central Heating

More information

Installation Manual PellX 20 & 35 kw Pellet Burner with External Auger

Installation Manual PellX 20 & 35 kw Pellet Burner with External Auger Installation Manual PellX 20 & 35 kw Pellet Burner with External Auger SAVE THESE INSTRUCTIONS This manual is for the Installer. Important operating and maintenance instructions are included. Read, understand,

More information

INSTALLATION, OPERATION AND MAINTENANCE. Multijet hydraulic

INSTALLATION, OPERATION AND MAINTENANCE. Multijet hydraulic INSTALLATION, OPERATION AND MAINTENANCE Multijet 500-1500 hydraulic TABLE OF CONTENTS: FOR THE NEW OWNER 3 INFORMATION ABOUT THE BURNER 4 GENERAL 5 TRANSPORT, HANDLING AND STORAGE 6 MECHANICAL INSTALLATION

More information

USERS GUIDE. Esprit eco 24, 30. For installation guide see reverse of book

USERS GUIDE. Esprit eco 24, 30. For installation guide see reverse of book USERS GUIDE Esprit eco 24, 30 For installation guide see reverse of book When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification

More information

Boiler Technical Specifications (2013)

Boiler Technical Specifications (2013) ACT Bioenergy Boiler Dimensions 0.5-0.85 Million Btu/h (150-250kW) Model CP500 CP600 CP750 CP850 Heat Output in MBtu/h (kw) 510 (150) 610 (180) 750 (220) 850 (250) Height ft (mm) 6 1 (1855) 6 1 (1855)

More information

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600 I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d Model code: BORA600 Contact Caple on 0844 8003830 or for spare parts www.4caple.co.uk 1 Y O U R A P P L I A N C E Thank you for buying your

More information

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM

INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM INSTALLATION AND OPERATING INSTRUCTIONS BIOCLASS HM Thank you for choosing a DOMUSA TEKNIK heating boiler. Within the product range offered by DOMUSA TEKNIK you have chosen BioClass HM model. With a suitable

More information

USER GUIDE LOGIC HEAT H

USER GUIDE LOGIC HEAT H USER GUIDE LOGIC HEAT H 12 15 18 24 30 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not

More information

OPERATING INSTRUCTIONS with safety features

OPERATING INSTRUCTIONS with safety features Solid fuel boiler TKK3 with wood pellet burner TERMEC 70-90 KW OPERATING INSTRUCTIONS with safety features Prhova ka bb 22310 imanovci, Srbija Tel/Fax. +381 22 480404 +381 63 259422 oce@termomont.rs www.termomont.rs

More information

Interrupted Ignition Series Oil Primary Control

Interrupted Ignition Series Oil Primary Control Interrupted Ignition Series Oil Primary Control Application Guide & Installation Instruction for ICM1511*, ICM1512*, ICM151*, ICM1514* For more information on our complete range of American-made products

More information

Electronic Pellet Burner Controller NPBC-V3-1

Electronic Pellet Burner Controller NPBC-V3-1 Electronic Pellet Burner Controller NPBC-V3- SOFTWARE VERSION 3.2/3. page of 3 CHANGES IN THE TECHNICAL AND USER GUIDE OR IN THE SOFTWARE VERSION Technical and User Guide's version Changes Page 2.8. The

More information

5P01781-A 5P01781-B INSTALLATION AND OPERATING INSTRUCTIONS

5P01781-A 5P01781-B INSTALLATION AND OPERATING INSTRUCTIONS 5P01781-A 5P01781-B INSTALLATION AND OPERATING INSTRUCTIONS Ariterm Biomatic+ 20i/40i Ariterm Biomatic+ 20i/40i Light Ariterm Biomatic+ 20i/40i Ultra-Light Version 2.0 18.10.2017 TABLE OF CONTENTS GENERAL

More information

Operating Instructions Manual PellX 20 & 35 kw Pellet Burner with External Auger

Operating Instructions Manual PellX 20 & 35 kw Pellet Burner with External Auger Operating Instructions Manual PellX 20 & 35 kw Pellet Burner with External Auger SAVE THESE INSTRUCTIONS This manual is for the Home Owner. Important operating and maintenance instructions are included.

More information

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO .Technical specifications Boiler power DESCRIPTION Water content in a boiler Required draft Supply

More information

AXIAL HEATER TROUBLE SHOOTING GUIDE. Models: AX24 N/PV, AX24 N/PV LT, AX24 LP AX26 N/PV, AX26 N/PV LT, AX26 LP AX28 N/PV, AX28 N/PV NT, AX28 LP

AXIAL HEATER TROUBLE SHOOTING GUIDE. Models: AX24 N/PV, AX24 N/PV LT, AX24 LP AX26 N/PV, AX26 N/PV LT, AX26 LP AX28 N/PV, AX28 N/PV NT, AX28 LP AXIAL HEATER TROUBLE SHOOTING GUIDE Page 1 July 2009 Table of Contents Frequently Asked Questions... 3 Axial Heater CONTROL (Siemens LME69) Troubleshooting Chart... 4 Axial Heater BURNER Troubleshooting

More information

OPERATING INSTRUCTIONS. Drying cabinet DC 7774 DC Read the instructions before using the machine.

OPERATING INSTRUCTIONS. Drying cabinet DC 7774 DC Read the instructions before using the machine. OPERATING INSTRUCTIONS Drying cabinet DC 7774 DC 7784 Read the instructions before using the machine. Dear ASKO customer, Congratulations on making an excellent choice, and welcome to the ASKO family,

More information

DIESEL/PARAFFIN HEATERS

DIESEL/PARAFFIN HEATERS DIESEL/PARAFFIN HEATERS MODEL NO: XR80, XR110, XR160, XR210 PART NO: 6931004, 6931006, 6931008, 6931012 OPERATION & MAINTENANCE INSTRUCTIONS LS0814 INTRODUCTION Thank you for purchasing this CLARKE product.

More information

Operating instructions

Operating instructions The energy you need Operating instructions Betacom 3 24c -A (H-GB) 30c -A (H-GB) GB, IE Contents Contents 1 Safety... 3 1.1 Action-related warnings... 3 1.2 Intended use... 3 1.3 General safety information...

More information

PV1000agri pellet burner

PV1000agri pellet burner PV1000agri pellet burner User manual POOLELI - DRAFT PV1000agri pellet burner p 1/ 50 Description Main components 1 Contents 2 Description... 4 2.1 Main components... 5 2.2 Specifications... 7 3 Installation...

More information

RWC Issue: F. Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX. Model may vary slightly from images pictured. All measurements are in mm.

RWC Issue: F. Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX. Model may vary slightly from images pictured. All measurements are in mm. RWC Issue: F Description: ARISTON WALL CANOPY Model Numbers: ARCH90BIX Model may vary slightly from images pictured. All measurements are in mm. 1 Overview Pre-installation Thank you for purchasing a quality

More information

Installation and maintenance Viking Bio 35 - pellet burner

Installation and maintenance Viking Bio 35 - pellet burner 130603 THL no.: 01 rev0 Installation and maintenance Viking Bio 35 - pellet burner Contents Notes...3 Safety and handling...4 Operation - Technical data...5 Installation...6 Boiler Supply air to boiler

More information

Importance of a Draught Regulator

Importance of a Draught Regulator Importance of a Draught Regulator The purpose of a chimney (stack) is to generate a draught (draft) that will transport smoke and fumes away from the point of combustion. The chimney design and arrangement

More information

Forced draught gas burner

Forced draught gas burner Installation, use and maintenance instructions GB Forced draught gas burner One stage operation CODE MODEL TYPE 3751782 GAS 5 517T80 291 (4) - 07/2015 Declaration of conformity in accordance with ISO /

More information

Operating manual. Pellet boiler. Orlan Pellet ISO 9001

Operating manual. Pellet boiler. Orlan Pellet ISO 9001 Operating manual Pellet boiler Orlan Pellet ISO 9001 Contens 1. Boiler s use...................................................................... 3 2. Boiler s way of working...........................................................

More information

TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40

TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40 TECHNICAL MANUAL BIOTEC 25 AND BIOTEC 40 2 INDEX INDEX Safety information.......4 Technical data...5 Boiler features...6 Technical information........7 Fuel...... 8 Construction and function...... 9 Hydraulic

More information

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas

Varde Shape. Smoke Control Kit. Additional Installation and User Instructions for use in Smoke Control Areas Varde Shape Smoke Control Kit Additional Installation and User Instructions for use in Smoke Control Areas These instructions for fitting and operating the Smoke Control kit must be read in conjunction

More information

Page 1. Cube Ref:

Page 1. Cube Ref: Page 1 Cube Ref: 388117 Linedrawing: Technical characteristics: Unit dimensions (cm) Fire box dimensions (cm) Flue Diameter Flue outlet Recommended fuel Log size loading from the front: Panoramic glass

More information

INSTALLATION AND MAINTENANCE OF. Ulma ECO 2 Premium 30 kw

INSTALLATION AND MAINTENANCE OF. Ulma ECO 2 Premium 30 kw INSTALLATION AND MAINTENANCE OF Ulma ECO 2 Premium 30 kw 1 Chapter Table of content Page 1. Information 3 2. Description 3 3. Installation 4 4. Electrical installation 8 5. Start-up & Settings (menus)

More information

Kitchen Appliance Lift INSTRUCTION MANUAL

Kitchen Appliance Lift INSTRUCTION MANUAL Kitchen Appliance Lift INSTRUCTION MANUAL Contents Section: Headline: Page: 1. Introduction...4 2. Declaration of Conformity...4 3. Intended use - Technical data...4 Installation instructions: 4.1 Mechanical

More information

Operation Manual. An investment of a small amount of time to review this manual will ensure proper performance of your Coal-Trol Digital system.

Operation Manual. An investment of a small amount of time to review this manual will ensure proper performance of your Coal-Trol Digital system. Page 1 Welcome To a new era in solid fuel heating. You have chosen to improve your household comfort and increase the efficiency of your heating dollars. The Coal-trol Digital system has been specifically

More information

Cookshack, Inc. Model FEC100 Fast Eddy Oven. Version /1/10

Cookshack, Inc. Model FEC100 Fast Eddy Oven. Version /1/10 Cookshack, Inc. Model FEC100 Fast Eddy Oven Operator s Manual Please read this entire manual installation and use of this pellet fired smoker oven. Failure to follow these instructions could result in

More information

MODEL TECHNICAL SPECIFICATIONS POSITION KITCHEN HOODS (BUILT-IN DECORATIVE) USER MANUAL MODEL RECALL VALUES VOLTAGE(V) 220/240 AC.

MODEL TECHNICAL SPECIFICATIONS POSITION KITCHEN HOODS (BUILT-IN DECORATIVE) USER MANUAL MODEL RECALL VALUES VOLTAGE(V) 220/240 AC. TECHNICAL SPECIFICATIONS RECALL VALUES POSITION MODEL DEKORATIVE CHIMNEY HOOD KITCHEN HOODS (BUILT-IN DECORATIVE) USER MANUAL M O T O R VOLTAGE(V) FREQUENCY(Hz) CURRENT (A) POWER (W) LAMP 2 3 2 3 220/240

More information

Operating Manual PELLEMATIC PES CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH. PE 1491 EN_TO 1.0 Europe s specialist in pellet heating

Operating Manual PELLEMATIC PES CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH. PE 1491 EN_TO 1.0 Europe s specialist in pellet heating Operating Manual PELLEMATIC PES 12 56 CMP06 TO_VA6.39 Pelletronic TOUCH ENGLISH PE 1491 EN_TO 1.0 Europe s specialist in pellet heating Title: Operating manual PES 12-56 Article number: PE 1491 EN_TO 1.0

More information

INSTALLATION AND MANINTENANCE INSTRUCTIONS

INSTALLATION AND MANINTENANCE INSTRUCTIONS INSTALLATION AND MANINTENANCE INSTRUCTIONS Appr. Nr. A 9503 T - 0085 AQ 0765 PEGASUS F2 T HIGH EFFICIENCY GAS-FIRED CAST-IRON BOILERS Models 51-68 - 85-102 2 Contents 1. General technical data 2. Dimensional

More information

ENGLISH USER S MANUAL PRE SOAKER 3600

ENGLISH USER S MANUAL PRE SOAKER 3600 ENGLISH http://www.rangeservant.com USER S MANUAL PRE SOAKER 3600 CONTENTS 1 General 4 1.1 Preface 4 1.2 EC Declaration of Conformity 5 1.3 Description 6 1.3.1 Pre Soaker 6 1.3.2 Ball Management System

More information

Logic+ Combi

Logic+ Combi USER GUIDE Logic+ Combi 24 30 35 When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use

More information

Eco Angus Wood Pellet Boilers

Eco Angus Wood Pellet Boilers Eco Angus Wood Pellet Boilers ISO 9001 ISO 14001 1 Contents 3 Our product philosophy 3 Our approach 3 Manufacturing credentials 4 Orligno 400 4 Boiler construction 5 Boiler description 5 Burner 6 Technical

More information