1 A New Approach to Museum HVAC Design PHOTO CREDIT JON MCNEAL, SNØHETTA.JPG The San Francisco Museum of Modern Art (SFMOMA) consists of a 10-story addition and a renovated existing five-story building. Pictured is the view from the Yerba Buena Gardens. BY STEVEN T. TAYLOR, P.E. FELLOW ASHRAE; DAVID HEINZERLING, P.E. MEMBER ASHRAE This article was published in ASHRAE Journal, August Copyright 2018 ASHRAE. Posted at This article may not be copied and/or distributed electronically or in paper form without permission of ASHRAE. For more information about ASHRAE Journal, visit 34 ASHRAE JOURNAL ashrae.org AUGUST 2018

2 FIRST PLACE 2018 The San Francisco Museum of Modern Art (SFMOMA) consists of a 10-story new addition to a fully renovated existing five-story museum. Program elements for the 486,000 ft 2 ( m 2 ) project include art galleries, theater, administrative offices, library, café, event space, retail shop, wood shop, art conservation studios, cafeteria, and cold and cool storage rooms. The entire project is served by an innovative HVAC system that could become a new standard for museums and similar applications. Museum Environmental Criteria Museums are traditionally large energy users because of the need to provide tight humidity control. The design team worked closely with SFMOMA conservationists to study various published environmental criteria for museums as well as those from major museums across the country. Through this roundtable process, the team concluded that a seasonally adjusted relative humidity setpoint (Figure 1) could be used while still maintaining acceptable conditions for artwork and still maintaining a Class A rating. 1 Concurrent temperature control was specified to be 72.5 F ± 2.5 F (22.5 C ± 1.4 C). This relaxation in humidity control allowed the design team to consider centralized, rather than zonal, humidification systems. Zonal humidity controls can handle wide variations in humidity loads from people and infiltration, but they cost more, have higher maintenance costs, and are less energy efficient. Centralized humidity control, on the other hand, relies on low zone humidity loads from infiltration, but the relaxed humidity setpoints Steven T. Taylor, P.E. and David Heinzerling, P.E., are principals at Taylor Engineering in Alameda, Calif. Taylor is a member of SSPC 90.1 and GPC 36. Heinzerling is a member of SSPC 55. in Figure 1, along with a tight envelope, allows it to provide acceptable control because the infiltration loads tend to vary in the same way as the humidity setpoints. The concept behind central humidification is to maintain a nearly constant supply air condition: saturated air with a dewpoint temperature just above that at the lowest acceptable space temperature and lowest acceptable relatively humidity, in our case 70 F (21.1 C) and 45% relative Building at a Glance San Francisco Museum of Modern Art (SFMOMA) Location: San Francisco Owner: San Francisco Museum of Modern Art Principal Use: Museum Includes: Art galleries, theater, administrative offices, library, café, event space, retail shop, wood shop, art conservation studios, cafeteria, and cold and cool storage rooms. Employees/Occupants: 470 staff and 1.2 million visitors in first year Gross Square Footage: 486,000 Conditioned Space Square Footage: 350,000 Substantial Completion/Occupancy: June 2016 Occupancy: 100% AUGUST 2018 ashrae.org ASHRAE JOURNAL 35

3 Relative Humidity (%) Dehumidification Setpoint (Highest Allowable RH Level) Humidification Setpoint (Lowest Allowable RH Level) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec FIGURE 1 Relative humidity seasonal setpoints. humidity, where RH is adjusted based on time of year as discussed above. For zones that are unoccupied with low cooling loads, the resulting space condition is the Unoccupied point in Figure 2. For spaces that are fully occupied, the room temperature is allowed to rise to 75 F (23.9 C) and, with the moisture added by people, the resulting condition is the Fully Occupied point. Thus, with a single supply air condition, all spaces can be maintained in the required humidity range provided humidity loads from infiltration, especially of cold, dry air, are small. Where they are not expected to be small, e.g., at entries, local humidifiers can be added to augment the centralized system. Existing System Upgrades The two air handlers serving the existing museum were single-fan/dual duct (SFDD) systems with return fans and steam humidifiers in the cold duct mains on each floor. Operational problems with the systems included: The economizer on the SFDD significantly increases heating energy use on the hot deck because the hot water coil entering air temperature is the same as the cold deck supply air temperature. The added outdoor air to the hot deck also increases the humidification load. The economizer had to be disabled even at mild outdoor air conditions, causing the chiller plant to run most of the time. The blow-through arrangement of the SFDD system results in nearly saturated cold duct supply air when mechanical cooling is active. This resulted in over-saturation and condensation on the supply air ducts leaving the cold deck discharge plenum due to the pressure drop as air accelerated into the supply air mains. This FIGURE 2 Psychrometric process of centralized humidity control. resulted in microbial growth and all cold duct acoustical lining had to be removed. Access to the coils, filters, and fans of the field-built air handlers was very poor, requiring the building engineer to climb over obstructions with ladders to reach this equipment. Replacing the 100 hp (75 kw) supply fan motors and 40 hp (30 kw) return fan motors bordered on impossible. The variable pitch vane-axial fans required annual tear-down and rebuild, made more difficult and expensive by the poor access. The humidifiers were located in ceiling plenums that were difficult to access for maintenance. They also caused condensation in ductwork due to the nearly saturated supply air when the chillers and cooling coils were active, which was most of the time. Some were relocated to the hot decks to avoid this problem. Humidity control was accordingly very poor. These two air-handling systems were gutted and replaced with dual-fan/dual-duct (DFDD) systems with relief fans and central humidification shown schematically in Figure 3. A third DFDD system was installed in the expansion building. Together the systems totaled 350,000 cooling cfm ( L/s) and 123,000 heating cfm ( L/s). The revised design resolves all the operational problems of the existing system and included additional features to further improve energy efficiency and temperature and humidity control: 36 ASHRAE JOURNAL ashrae.org AUGUST 2018

4 The use of a DFDD design instead of SFDD resolved the first two issues listed above. DFDD also has lower fan energy because with SFDD systems, duct pressure is always higher than it needs to be in one of the two supply air ducts. DFDD systems can maintain hot and cold duct pressure independently with independent pressure setpoint reset based on VAV box damper position. Centralized humidity control with direct evaporative (adiabatic) humidifiers reduces energy use, first costs, and maintenance costs (see next section for details). The use of relief fans instead of return fans allowed the layout of the mechanical rooms to be improved, resolving the maintenance access issues. Relief fans are more flexible because, unlike return fans, they need not be in series with the supply fans and can be located anywhere in the common return air path. Relief fans in this application are also more efficient than return fans in this low-pressure plenum return application. 2,3 The dual-fan/dual-duct system fully implements sequences from ASHRAE Guideline , High-Performance Sequences of Operation for HVAC Systems, including snap-acting dual-duct VAV box logic in non-humiditycontrolled zones, which eliminates simultaneous heating and cooling. Gallery zones with humidity control use a dual-duct mixing logic that minimizes simultaneous heating and cooling while allowing for some zone-level humidity control through different dew-point temperatures in the hot deck (higher) and cold deck (lower). All gallery and high occupancy zones have CO 2 sensors, and all other spaces have occupancy sensors, with demand-controlled ventilation sequences to eliminate energy associated with excessive ventilation. Minimum airflow rate setpoints are the lowest allowed to meet ventilation requirements and air is shut off entirely during unoccupied hours for non-gallery spaces. This dramatically improves efficiency compared to constant volume systems recommended by the ASHRAE Handbook, HVAC Applications. Despite low airflow rates, trend data show temperature and humidity setpoints are consistently maintained (see Figure 9, page 42). The new air handlers have multiple plenum fan arrays, a total of 84 fans, each with its own variable frequency drive and near-zero pressure drop backdraft dampers. Fan arrays have few if any disadvantages compared to the large vane-axial fans they replaced in Expansion of the new SFMOMA. Outside Air Relief Air VSD Relief Fan Economizer Cooling Fan Array Filter Bank Cooling Direct Evap VSD Humidifier Coil Filter Bank Heating Coil Steam Humidifier VSD FIGURE 3 Dual fan/dual duct air handler schematic. Return Air Plenum Cooling Supply Air Duct Heating Supply Air Duct Dual Duct VAV Box the existing building, including reduced space requirements, eliminated sound attenuators, improved redundancy, improved low load efficiency, and much easier future motor and fan replacement. Compared to smaller distributed air handing units, large air-handling units are less expensive, require less space, have lower maintenance costs, and, in this application, are more energy efficient. 4 The cooling towers are very high efficiency (>100 gpm/hp at ASHRAE/IES Standard 90.1 conditions). Heat rejected to the closed condenser water loop (which serves water-cooled kitchen and cold room R.A. PHOTO IWAN BAAN, COURTESY SFMOMA 38 ASHRAE JOURNAL ashrae.org AUGUST 2018

5 refrigeration systems, water-cooled IT air conditioners, and other process loads) is recovered as preheat for the domestic hot water system. Heating hot water is generated by three 3,000 kbh high efficiency condensing boilers with primary-only variable flow with only two-way valves and oversized heating coils, resulting in high ΔTs and thus low return water temperatures ensuring condensing and high boiler efficiency. The chilled water system is primary-only, variable speed serving two existing 365 ton (1284 kw) variable speed centrifugal chillers a new 100 ton (352 kw) scroll chiller. Centralized Humidity Control with Direct Evaporative Humidifiers The primary design innovation for this project is the humidification design. The direct-evaporative humidifiers (DEHs) on the cold deck humidify outdoor air during cool and cold weather and provide evaporative cooling during warm dry weather. The electric steam humidifiers on the hot deck provide the additional humidification required due to infiltration of outdoor air at museum entries. The energy savings of the DEH in cold weather at high airflow * can be seen in Figure 4, which shows the psychrometric process superimposed on San Francisco weather data. The conventional system (Figure 4a) has the economizer shut off to reduce humidification loads, so both chiller and humidification energy (typically electricity) are required. But the DEH system (Figure 4b) uses warm return air to evaporate the humidification moisture needed and uses no chiller or humidifier energy. Figure 5 shows the performance in warm, dry weather. The conventional system (Figure 5a) uses both chiller and humidification energy while the DEH system (Figure 5b) becomes a direct evaporative cooler to reduce chiller energy and eliminate humidification energy. The annual performance of the DEH versus a conventional system is shown in Figure 6; it lowers or eliminates energy costs when the outdoor air dew-point temperature is less than desired supply air dew-point temperature (about 50 F [10 C]) and has the same costs at higher dew-point temperatures. Alexander Calder s Untitled (1963) on view in the Evelyn and Walter Haas, Jr. Atrium at the new SFMOMA. Energy Usage The project is LEED 3.0 Gold certified, with 43% annual site energy savings compared to the Standard baseline (Figure 7) and 33% energy cost savings. The first operational year of the completed project used 34% less electricity/ft 2 and 44% less gas/ft 2 than the original museum did in its last year of operation ( ) as shown in Figure 8. The overall EUI of the building is 70.9 kbtu/ft 2 yr. (224 kwh/m 2 ) compared with kbtu/ft 2 yr. (355 kwh/m 2 ) for the original museum, a 37% reduction. Despite having a more energy intense program than the original museum, with new large cold storage rooms and on-site art-restoration laboratories, the new museum uses significantly less energy/ft 2 than the original museum, due in large part to the energyefficient HVAC system design. PHOTO IWAN BAAN, COURTESY SFMOMA * Museums are very internally load dominated due to high lighting and people loads and small or zero envelope loads since most galleries are internal spaces without windows. Hence it is not uncommon to have high airflow requirements in cold weather. 40 ASHRAE JOURNAL ashrae.org AUGUST 2018

6 FIRST PLACE 2018 A. A. B. B. FIGURE 4 Cold weather, high airflow. A. Conventional system (top). B. Evaporative humidifier (bottom). FIGURE 5 Warm dry weather. A. Conventional system (top). B. Evaporative humidifier (bottom). Indoor Air Quality and Thermal Comfort The air-handlers have design minimum outdoor airflow setpoints 30% higher than ASHRAE Standard ; however, given the mild climate of San Francisco, for the vast majority of the year higher ventilation rates are provided due to the use of the airside economizer. Air quality was improved by eliminating lined ductwork, a potential source of microbial growth given the continuously saturated supply air, made possible, in part, through the use of quiet and efficient custom fan-array air handlers. The risk of microbial growth on the direct-evaporative humidifiers was mitigated by UV radiation and conductivity control of the water circuit, along with a control sequence where each section of the evaporative media is allowed to fully dry out sequentially once per day. Given the responsibility of the museum to keep the art within these agreed upon environmental conditions at all times, the temperature and humidity of FIGURE 6 Performance summary of direct evaporative humidifier. each zone is tracked closely and trend reports are regularly generated to show consistent compliant conditions, and consequently high thermal comfort. AUGUST 2018 ashrae.org ASHRAE JOURNAL 41

7 Energy Consumption (Million Btu) 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 Baseline Design FIGURE 7 Energy modeling results (courtesy of Atelier 10) (green zone is the allowable range, minimum RH for July is 44% and maximum is 56% per Figure 1, temperature is always 70 F to 75 F [21.1 C to 23.9 C]). Similar charts have been made for all zones in all seasons, showing compliance. Cost Effectiveness Compared to a traditional VAVreheat system, dual-duct has more ductwork, but no zone hot water piping and less expensive VAV zones, resulting in first-cost savings, improved efficiency, and, most importantly to the museum, elimination of risk of damage to art due to a piping leak. The central humidification also reduces first costs compared to zonal humidifiers, and also eliminates leak issues and maintenance issues due to poor access to humidifiers located above high ceilings. Zone Relative Humidity (%) Zone Temperature ( F) Special attention was paid to reusing as much existing equipment as possible, reducing first costs. The two existing 365 ton (1284 kw) variable speed centrifugal chillers were retained and only a new 100 ton (352 kw) 43% Proposed Building Space Cool Space Heat Heat Rejection Ventilation Fans Pumps & Auxilliary Hot Water Miscellaneous Equipment Ext. Usage Decorative + Art Lighting Area Lights Annual Site Energy Intensity (kbtu/ft 2 yr) Figure 9 shows aggregated five-minute temperature and relative humidity data for every gallery zone served by AH-1, showing conditions within design parameters Electricity Power Density (kwh/ft 2 ) Gas Gas Density (MBtu/ft 2 ) Old SFMOMA 34% Total Savings New SFMOMA Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2012/ / % Total Savings Old SFMOMA New SFMOMA Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2012/ /2017 FIGURE 8 Electricity (top) and gas usage density (bottom) FIGURE 9 Humidity and temperature trend data for all gallery zones on AH-1. Maximum 90 th Percentile 10 th Percentile Minimum scroll chiller was added to the central plant. The fact that 10 stories were added to the existing museum, more than doubling the overall square footage, and only an additional 100 ton (352 kw) chiller was added to supplement the existing 730 tons (2567 kw) is testament to 42 ASHRAE JOURNAL ashrae.org AUGUST 2018

8 engineering right-sizing resulting in significant first-cost savings. Reusing existing pumps upgraded with variable frequency drives also helped reduce first costs for the project. Conclusions The new SFMOMA building is a beautiful space, housing a worldclass art collection, kept comfortable for both the visitors and the artwork using a very energy-efficient HVAC system that is also cost-effective and easily operated and maintained. Key elements of the innovative design include dual fan/dual duct variable air volume distribution systems with air economizers and centralized humidity control using direct evaporative humidifiers. The system is much more energy efficient and less expensive than traditional constant volume systems with zonal humidity control, yet it provides the same tight humidity and temperature control required in museums. Because of the combination of low cost and high efficiency, the design should be considered for all museums and other applications requiring tight humidity control. Acknowledgments The authors would like to thank Jeff Phairas, SFMOMA s Chief Engineer, for providing the energy data for this article, and for his salient feedback and insights throughout the project. References ASHRAE Handbook HVAC Applications, Chapt Taylor, S Comparing economizer relief systems. ASHRAE Journal, 42(9). 3. Kettler, J Return fans or relief fans. ASHRAE Journal, 46(4). 4. Taylor, S Designing mega AHUs. ASHRAE Journal, 60(4). AUGUST 2018 ashrae.org ASHRAE JOURNAL 43

4-Pipe VAV vs. Active Chilled Beams for Labs

4-Pipe VAV vs. Active Chilled Beams for Labs Steven T. Taylor 4-Pipe VAV vs. Active Chilled Beams for Labs BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE Variable air volume (VAV) laboratory HVAC systems, including VAV fume hoods, are now standard practice

More information

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING

HONORABLE MENTION: COMMERCIAL BUILDINGS, EXISTING ASHRAE s BEST This article was published in ASHRAE Journal, November 2010. Copyright 2010 American Society of Heating, Refrigerating and -Conditioning Engineers, Inc. Reprinted here by permission from

More information

Designing Mega-AHUs BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE

Designing Mega-AHUs BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE his article was published in ASHRAE Journal, April 2018. Copyright 2018 ASHRAE. Posted at www.ashrae.org. his article may not be copied and/or distributed electronically or in paper form without permission

More information

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems Volume 6, Issue 1 CARRIER edesign SUITE NEWS Modeling 100% OA Constant Volume Air Systems This article provides an overview of how to model a stand-alone constant air volume (CAV) 100% OA system in HAP.

More information

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria Mechanical System Redesign Dedicated Outdoor Air System Design Criteria The outdoor air conditions used were for Philadelphia, Pennsylvania IAP at a 0.4% occurrence. The supply air conditions were developed

More information

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Continuous Commissioning: A Valuable Partner to Retrofit Projects Continuous Commissioning: A Valuable Partner to Retrofit Projects Yeqiao Zhu Aamer Athar Kenneth Banks Ph.D. PE, CEM PE, CEM Energy Systems Laboratory Sempra Energy Solutions Sempra Energy Solutions Charles

More information

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report East Liberty Presbyterian Church 14 009 For: By: East Liberty Presbyterian Church Jeffery Ison, James Construction Date: October

More information

The Ed Roberts Campus Berkeley, CA

The Ed Roberts Campus Berkeley, CA The Ed Roberts Campus Berkeley, CA Anderson Clemenceau Mechanical Option Penn State A.E. Senior Thesis April 14, 2015 Leddy Maytum Stacy Architects, Photo by Tim Griffith ASHRAE Climate Zone 3C 99.6% Heating

More information

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE This article was published in ASHRAE Journal, March 20145 Copyright 2015 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Dehumidifying with Dedicated Outdoor Air

Dehumidifying with Dedicated Outdoor Air Dehumidifying with Dedicated Outdoor Air System Configurations Figure 71. Configurations for dedicated outdoor-air systems A dedicated outdoor-air handler separately filters, cools, dehumidifies, heats,

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS AND APPLICATIONS Abdullah Nuhait Ph D. King Saud University AIR-CONDITIONING SYSTEMS Earliest air conditioning system used only for heating (winter) Provided heated air for comfort

More information

FORM EG2 (502) FlexSys Configured Packaged Rooftop Air Conditioning Units

FORM EG2 (502) FlexSys Configured Packaged Rooftop Air Conditioning Units FORM 100.50-EG2 (502) TM FlexSys Configured Packaged Rooftop Air Conditioning Units TABLE OF CONTENTS PAGE TOTAL INTEGRATED HVAC SYSTEM... 3 AN INTEGRATED SOLUTION... 4 INTRODUCTION... 6 System Description...

More information

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings INTRODUCTION TO: ASHRAE STANDARD 90.1, 2013 HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings Rocky Mountain ASHRAE Technical Conference, April 29, 2016 SEAN BEILMAN, P.E.,

More information

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC 2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC Mechanical Systems Agenda Changes in NREC Chapter 11 Changes in NREC Chapter

More information

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE

Design Considerations For Dedicated OA Systems BY HUGH CROWTHER, P.ENG, MEMBER ASHRAE; YI TENG MA, ASSOCIATE MEMBER ASHRAE ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For more information about ASHRAE,

More information

Dehumidification: Energy Efficiency Comparisons

Dehumidification: Energy Efficiency Comparisons Fourth Annual Energy Management Workshop Cocoa, Florida February 10-11, 2003 Dehumidification: Energy Efficiency Comparisons Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting,

More information

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units

COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units COMMERCIAL HVAC EQUIPMENT Indoor Self-Contained Units Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection

More information

4. OVERVIEW OF MECHANICAL SYSTEM

4. OVERVIEW OF MECHANICAL SYSTEM 4. OVERVIEW OF MECHANICAL SYSTEM The 87,000 SF SLCC is served by six (6) Trane M-Series Climate Changer Air Handing Units (AHUs). Each unit serves a distinct zone within the facility that is unique in

More information

By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE

By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE By Thomas H. Durkin, P.E., Member ASHRAE, and James B. (Burt) Rishel, P.E., Fellow/Life Member ASHRAE T he advent of the small scroll or screw chiller, capable of producing condenser water as high as 140

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

ASHRAE WILL GIVE YOU THE WORLD. This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee ASHRAE WILL GIVE YOU THE WORLD This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee Complete the Distinguished Lecturer Event Summary Critique CTTC

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

Auburn University Basketball Arena:

Auburn University Basketball Arena: Auburn University Basketball Arena: How Building Data Analytics Achieved Energy and O&M Savings While Improving Comfort and Sustainability Eric Moore, PE, CEM, Auburn University Hadas Webb, CEM, Cimetrics

More information

2014 ASHRAE TECHNOLOGY AWARD CASE STUDIES

2014 ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, April 2014. Copyright 2014 ASHRAE. Posted at www. ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

HVAC Mandatory Provisions Part II, Page 1

HVAC Mandatory Provisions Part II, Page 1 HVAC Mandatory Provisions Part II, Page 1 Mandatory Equipment Efficiency Worksheet (6.4.1.1) System Equipment Type Size Category (Tables 6.8.1A through K) Sub-Category or Rating Condition Units of Efficiency

More information

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503 Inspection Phase Three Mechanical, Electrical & Plumbing Section 503 COMCheck Mechanical Field Inspection Checklist Mechanical Mechanical, Electrical & Plumbing Equipment Efficiencies But a lot ore too

More information

Temperature. In the HVAC area, we talk about two kinds of temperatures.

Temperature. In the HVAC area, we talk about two kinds of temperatures. HEATING and COOLING HEATING and COOLING PSYCHROMETRIC CHART Temperature In the HVAC area, we talk about two kinds of temperatures. One is called dry bulb (DB) temperature, a fancy name for the reading

More information

HVAC 101. H V A C S y s t e m s

HVAC 101. H V A C S y s t e m s H V A C 1 0 1 S y s t e m s Introduction & Overview Should you care? Mechanical System Types Components & operation Popular Application Key Issues and Design Considerations System Comparisons First Cost

More information

High-Performance VAV Systems

High-Performance VAV Systems This article was published in ASHRAE Journal, October 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

Best Practices for Condensing Boilers

Best Practices for Condensing Boilers ASHRAE www.ashrae.org. Used with permission from ASHRAE Journal at www.cleaverbrooks.com. This article may not be copied nor distributed in either paper or digital form without ASHRAE s permission. For

More information

1 - This title will copy onto other forms Date

1 - This title will copy onto other forms Date 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM Project Title: 1 - This title will copy onto other forms Date 1/1/2015

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection. Volume 5, Issue 1 CARRIER edesign SUITE NEWS Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC Equipment Selection A design challenge sometimes occurs when computing design loads using

More information

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT Taylor Engineering 1080 Marina Village Parkway, Suite 501 Alameda, CA 94501-1142 (510) 749-9135 Fax (510) 749-9136 LLC HVAC DESIGN INTENT PART 1 - GENERAL 1.1 Overview A. The project consists of a 3-story

More information

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

EADQUARTERS. Technical Report One. Stephanie Kunkel   Mechanical Option EADQUARTERS 707 N. Calvert St. Technical Report One ASHRAE Standard 62.1 Ventilation ASHRAE Standard 90.1 Energy Design Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

Don t Turn Active Beams Into Expensive Diffusers

Don t Turn Active Beams Into Expensive Diffusers This article was published in ASHRAE Journal, April 2012. Copyright 2012 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be

More information

Making UFAD Systems Work BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE

Making UFAD Systems Work BY STEVEN T. TAYLOR, P.E., FELLOW ASHRAE his article was published in ASHRAE Journal, March 2016. Copyright 2016 ASHRAE. Posted at www.ashrae.org. his article may not be copied and/or distributed electronically or in paper form without permission

More information

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline

Topic 2. ME 414/514 HVAC Systems Overview Topic 2. Equipment. Outline ME 414/514 HVAC Systems Overview Equipment Outline 2-1 The Complete System 2-2 The Air-Conditioning and Distribution System 2-3 Mechanical Equipment Air-handling Equipment Heating Equipment Boilers Furnaces

More information

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN

Introduction to HVAC. American Standard Inc Air Conditioning Clinic TRG-TRC018-EN Introduction to HVAC Agenda Psychrometrics Human Comfort Heat Transfer Refrigeration Cycle HVAC Terminology HVAC Systems Introduction to HVAC Psychrometrics 2000 TRG-TRC002-EN Properties of Air Dry-bulb

More information

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-05 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University at Galveston (TAMU-G) Galveston, Texas Submitted to Texas A&M University

More information

ASHRAE/IESNA Standard

ASHRAE/IESNA Standard ASHRAE/IESNA Standard 90.1-1999 An inside look at the requirements of Standard 90.1-1999 Energy Standard for Building Except Low-Rise Residential Building Mick Schwedler, PE Sr. Principal Applications

More information

Technical Report Three

Technical Report Three Technical Report Three Existing Conditions for Mechanical Systems Contents Executive Summary...2 Building Overview...2 Mechanical Systems Overview...2 Mechanical System...3 Outdoor & Indoor Design Conditions...3

More information

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign

VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS. Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign VARIABLE HEAT RECOVERY IN DOUBLE BUNDLE ELECTRIC CHILLERS Richard J Liesen 1, Rahul J Chillar 2 1 University of Illinois at Urbana Champaign Dept of Mechanical & Industrial Engineering 1206 WGreen St Urbana,

More information

Climate-Adapted Design

Climate-Adapted Design This article was published in ASHRAE Journal, May 2014. Copyright 2014 ASHRAE. Posted at www. ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

Appendix 13. Categories of Cooling and Heating systems

Appendix 13. Categories of Cooling and Heating systems EcoShopping - Energy efficient & Cost competitive retrofitting solutions for Shopping buildings Co-funded by the European Commission within the 7 th Framework Programme. Grant Agreement no: 609180. 2013-09-01

More information

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Mingsheng Liu, Ph.D., P.E. Energy Systems Laboratory Texas A&M University College Station, Texas

More information

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001 This HAP e-help provides a high-level overview of induction beams, how they work and how to model them in HAP 4.8 (and later versions). The first half of the article explains how induction beams work.

More information

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS

MT. AIRY MIDDLE SCHOOL CARROLL COUNTY PUBLIC SCHOOLS CARROLL COUNTY PUBLIC SCHOOLS LIFE CYCLE COST ANALYSIS SUMMARY DGS PROCEDURES FOR THE IMPLEMENTATION OF LIFE CYCLE COST ANALYSIS AND ENERGY CONSERVATION OCTOBER, 2010 G.A.I.#09090 GIPE ASSOCIATES, INC.

More information

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC VOLUME ONE NUMBER THREE SYNOPSIS A N H V A C N E W S L E T T E R F O R B U I L D I N G O W N E R S A N D M A N A G E R S In this issue... Part-Load Strategies Why they re important.......... 1 What Things

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

2009 IECC Commercial Mechanical Requirements

2009 IECC Commercial Mechanical Requirements BUILDING ENERGY CODES UNIVERSITY 2009 IECC Commercial Mechanical Requirements Ken Baker PNNL-SA-66171 Learning(Objec-ves(( ( 1. Find(minimum(equipment(efficiency(requirements( and(recite(at(least(3(common(terms(for(measuring(

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION

PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM ENERGY EFFICIENT DEHUMIDIFICATION ENERGY EFFICIENT DEHUMIDIFICATION PINNACLE SERIES DEDICATED OUTDOOR AIR SYSTEM Provides a very high degree of latent cooling using only a minimal amount of conventional cooling input Substantial energy

More information

Chilled Beams in Labs Eliminating Reheat & Saving Energy on a Budget

Chilled Beams in Labs Eliminating Reheat & Saving Energy on a Budget VanceFox.com 2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Journal Vol. 49, Jan. 2006. For personal use only. Additional reproduction,

More information

EarthWise System Seminar

EarthWise System Seminar EarthWise System Seminar Tim Gasper, P.E. Solutions Engineer Brady-Trane Services, Inc. EarthWise Systems? Energy Efficiency Emissions Buildings use 39% of the Primary Energy Consumed in the United States

More information

General HVAC Recommendations

General HVAC Recommendations General HVAC Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT HVAC SYSTEMS Thank you for your interest in energy efficiency! Energy efficient heating, ventilation, and air conditioning (HVAC) equipment

More information

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates Prescriptions for Critical Healthcare Cx John D. Villani, P.E. Associate Grumman/Butkus Associates AIA Quality Assurance Learning Objectives 1. Medical Industry Changes and how they impact Design, Construction,

More information

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1

Senior Thesis Centre Community Hospital East Wing Addition - Proposal Keith Beidel Mechanical Option 12/05/02 1 Table of Contents Page Number(s) Executive Summary 2 Project Background 3 Proposed Depth Alternatives 4 Proposed Depth Redesign 5-7 Justification of Proposed Depth Redesign 8 Proposed Breath Redesign 9

More information

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc.

Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. M&V Real Results of High Performance Design Matt Cooper, PE, BEMP, HBDP, Group 14 Engineering Ken Urbanek, PE, HBDP MKK Consulting Engineers, Inc. Overview Measurement & Verification (M&V) Plan for New

More information

CHAPTER 4. HVAC DELIVERY SYSTEMS

CHAPTER 4. HVAC DELIVERY SYSTEMS CHAPTER 4. HVAC DELIVERY SYSTEMS 4.1 Introduction 4.2 Centralized System versus Individual System 4.3 Heat Transfer Fluids 4.4 CAV versus VAV Systems 4.5 Common Systems for Heating and Cooling 4.6 Economizer

More information

Free cooling on RTAF Chiller. Integrated option

Free cooling on RTAF Chiller. Integrated option Free cooling on RTAF Chiller Integrated option Water based free cooling principle. Use full aluminum (car radiator based) flat channel dry cooler exchangers. Modulate 3 way to reach required free cooling

More information

Agenda and Objectives

Agenda and Objectives Agenda and Objectives Trane Engineers Newsletter Live Series Variable-Speed Drives (VSDs) and Their Effect On HVAC System Components Variable-speed drives (VSDs) can save energy, but the savings may not

More information

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering

ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery. Steven T. Taylor, PE Principal Taylor Engineering ASHRAE Region VI CRC Track III: Session 3 Ventilation Energy Recovery Steven T. Taylor, PE Principal Taylor Engineering This program is registered with the AIA/CES for continuing professional education.

More information

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS 1 AIR HANDLING UNIT TRENDS 2 1. The trending charts provided on the following pages prepared as part of a retro-commissioning investigation. The

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Optimizing Electric Humidifier Operation with an Air Side Economizer

Optimizing Electric Humidifier Operation with an Air Side Economizer Optimizing Electric Humidifier Operation with an Air Side Economizer Usama F. Shami, P.E. Senior Project Engineer Savage Engineering, Inc. Foster City, CA Abstract Air side economizer cycle is a control

More information

Displacement Ventilation in Classrooms

Displacement Ventilation in Classrooms TWO DIFFUSERS, THE WHITE COLUMNS ON EACH SIDE OF THE WHITEBOARD, PROVIDE COOL SUPPLY AIR TO THE DEMONSTRATION DV CLASSROOM. THE DV CLASSROOM DEMONSTRATION FEATURED A CUSTOMIZED ROOFTOP HVAC UNIT. Displacement

More information

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer Technical Development Program PRESENTED BY: COMMERCIAL HVAC SYSTEMS Water Source Heat Pump Systems Ray Chow Sales Engineer TDP Updates Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

ENGINEERING. Edition No. 13 October 2002

ENGINEERING. Edition No. 13 October 2002 Edition No. 13 October 2002 ENGINEERING S Y S T E M S O L U T I O N S W e at McQuay are very proud of our tradition of producing industry leading water source heat pumps. Our heritage stretches back more

More information

ASHRAE JOURNAL ON REHEAT

ASHRAE JOURNAL ON REHEAT Page: 1 of 7 ASHRAE JOURNAL ON REHEAT Dan Int-Hout Chief Engineer Page: 2 of 7 Overhead Heating: A lost art. March 2007 ASHRAE Journal Article Dan Int-Hout Chief Engineer, Krueger VAV terminals provide

More information

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Technical Development Program COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Introduction System

More information

MSP WRAP-AROUND MULTIPLE SMALL PLATE DEHUMIDIFICATION TECHNOLOGY VS. CONVENTIONAL DEHUMIDIFICATION IN DEDICATED OUTDOOR AIR SYSTEMS (DOAS)

MSP WRAP-AROUND MULTIPLE SMALL PLATE DEHUMIDIFICATION TECHNOLOGY VS. CONVENTIONAL DEHUMIDIFICATION IN DEDICATED OUTDOOR AIR SYSTEMS (DOAS) MSP WRAP-ARUND MULTIPLE SMALL PLATE DEHUMIDIFICATIN TECHNLGY VS. CNVENTINAL DEHUMIDIFICATIN IN DEDICATED UTDR AIR SYSTEMS (DAS) ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013 Mechanical Redesign, Proposal Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Mechanical Redesign, Proposal... 0 Executive Summary...

More information

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning HVAC 101 The Basics of Heating, Ventilation and Air Conditioning HVAC Heating, Ventilation and Air Conditioning Provides comfort for people Allows humans to exist under adverse conditions. Comfort Comfort

More information

7. MECHANICAL SYSTEM DESIGN

7. MECHANICAL SYSTEM DESIGN 7. MECHANICAL SYSTEM DESIGN The second primary topic of this thesis is to investigate the application of a dedicated outdoor air system (DOAS) to the SLCC. The stated goals for this thesis of improved

More information

terminal units only provide sensible cooling, a separate dehumidification system is usually needed.

terminal units only provide sensible cooling, a separate dehumidification system is usually needed. providing insights for today s hvac system designer Engineers Newsletter volume 44 3 Dual-Temperature Chiller Plants This Engineers Newsletter describes several dual-temperature configurations that can

More information

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO 2012 1 Learning Objectives for this Session Get acquainted with typical systems used in the

More information

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XRT INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1: 4510 Helgesen Drive, Madison, WI, 53718 608.221.4499, 800.627.4499, Fax: 608.221.2824 support@renewaire.com www.renewaire.com RD2XIN INSTALLATION AND OPERATION MANUAL BOOK 1 OVERVIEW ABOUT BOOK 1: This

More information

Chilled Water system

Chilled Water system Chilled Water system Introduction For large installations the Condenser, Evaporator, Compressor and Expansion device can be purchased as a package unit, known as a Chiller. The usual package consists of

More information

100% Outdoor Air Dehumidification Methods

100% Outdoor Air Dehumidification Methods Technical Bulletin 16 100% Outdoor Air ehumidification Methods I NTROUCTION As consulting engineers and end users implement the ASHRAE 6 ventilation code, they are faced with selecting an appropriate method

More information

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.com Gary Klein, 2012 Efficiency

More information

Cold Weather Operation Of Cooling Towers

Cold Weather Operation Of Cooling Towers This article was published in ASHRAE Journal, March 2014. Copyright 2014 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

The Temperature and Relative Humidity Control in Cushing Library

The Temperature and Relative Humidity Control in Cushing Library The Temperature and Relative Humidity Control in Cushing Library Chenggang Liu Research Associate Song Deng Assistant Director Homer L. Bruner, Jr., CEM Mechanical Systems Specialist Utilities Office of

More information

ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes

ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes ASHRAE Standard 90.1 Energy Requirements Wrap-Around Heat Pipes In Humid Climates BY DAVID A. JOHN, P.E., MEMBER ASHRAE; DREW ELSBERRY, MEMBER ASHRAE Designing g a building s HVAC system requires designers

More information

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory

ENGINEERING BULLETIN. Overview of Chilled Beam Technology. Purpose. Summary. Theory Overview of Chilled Beam Technology Purpose Chilled beam technology is new to the United States but has been used in Europe since the 1950 s. Chilled beams can reduce energy costs, improve indoor air quality,

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency Digital Precise Air Control System D-PAC Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency AAON 24 South Yukon Avenue Tulsa, Oklahoma 747 (918) 583-2266 Fax (918)

More information

Understanding Ventilation in Hot Humid Climates by Joseph Lstiburek

Understanding Ventilation in Hot Humid Climates by Joseph Lstiburek building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Building Science Digest 107 Understanding Ventilation in Hot Humid Climates 2006-10-26 by Joseph Lstiburek

More information

1. Packaged Variable Air Volume (VAV) Rooftop Units (RTU) with Hot Water Reheat. 2. Geothermal Heat Pump VAV Rooftop Units with Hot Water Reheat

1. Packaged Variable Air Volume (VAV) Rooftop Units (RTU) with Hot Water Reheat. 2. Geothermal Heat Pump VAV Rooftop Units with Hot Water Reheat July 6, 2017 City of Countryside Attn: Mayor Sean McDermott City Hall 5550 East Avenue Countryside, IL 60525 RE: New City Hall & Police Building HVAC Options Dear Mayor McDermott, Per your request at our

More information

Capt. Tim s s Duct Design Mythbusters. The bitterness of poor quality is remembered long after the sweetness of low price is forgotten!

Capt. Tim s s Duct Design Mythbusters. The bitterness of poor quality is remembered long after the sweetness of low price is forgotten! Capt. Tim s s Duct Design Mythbusters The bitterness of poor quality is remembered long after the sweetness of low price is forgotten! WHY CARE ABOUT THE DUCTS? Human Comfort Zone (After All, it s s only

More information

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Urbana Free Library HVAC Analysis Prepared for the Urbana Free Library Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T. Report Dated August 8, 2016 1. Introduction The Urbana Free Library is

More information

Heat Pumps and Public Swimming Pools, a Perfect Match

Heat Pumps and Public Swimming Pools, a Perfect Match TOPICAL ARTICLE Heat Pumps and Public Swimming Pools, a Perfect Match M. Zuliani, P. Pattijn - Belgium Public swimming pools have a very high energy consumption, due to high demands of heating and climatisation

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

Adding More Fan Power Can Be a Good Thing

Adding More Fan Power Can Be a Good Thing This article was published in ASHE Journal, May 14. Copyright 14 ASHE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission of

More information

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS

SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS SECTION I: EXISITNG SYSTEM AND PROPOSED SYSTEMS Original Design: Traditional Central Heating and Cooling Heating and Cooling System Schematic Original Design Ventilation Schematic: Existing system summary:

More information