Work to be performed Subcontractor Name, City, State. Mechanical Contractor: Electrical Contractor: Temperature Controls Contractor:

Size: px
Start display at page:

Download "Work to be performed Subcontractor Name, City, State. Mechanical Contractor: Electrical Contractor: Temperature Controls Contractor:"

Transcription

1

2 Work to be performed Subcontractor Name, City, State echanical Contractor: Electrical Contractor: emperature Controls Contractor:. BID FOR LUP SU CONRAC: a. Revise paragraph -a SUPPLIER DIVERSIY PARICIPAION GOALS to read: he Contractor shall have as a goal subcontracting with inority Business Enterprise (BE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and Veteran Owned Business of en Percent (0%) of the awarded contract price for work to be performed for all four combined, and a goal subcontracting with Service Disabled Veteran Owned Business of hree Percent (%) of awarded contract price for work to be performed. Specifications:. 8 Humidifiers: a. odify. to read as follows: A. Steam Header / Separator: AS A, ype 0 stainless steel, with integral heat exchanger which shall provide atmospheric condensate vaporizing and pressurized condensate return.. All dispersion tube-generated condensate that falls to the heat exchanger in the header shall be vaporized into humidification steam.. As condensate is vaporized in the header, pressurized condensate created in the heat exchanger shall return to main without need for additional pumps, valves, or controls. NOE: Contractor s Option to provide a humidifier which complies with this specification except for the above described condensate management. In this case, Contractor shall consult humidifier manufacturer regarding required vented condensate reservoir, and provide submittal information for the condensate reservoir for Engineer s review. B. Humidifier Steam Control Valve: Comply with ANSI B. Class 0; equal percentage flow characteristics; brass or bronze body globe valve with stainless steel seat, stem and plug; sized to meet humidification requirements.. Actuator: Electric modulating with spring return; normally closed.. Actuator: As specified in Division Section Control Systems. C. Heat Exchanger Control Valve: wo-position, normally closed, solenoid operated, on-off steam valve. Valve shall respond to a signal from a humidistat via VAC signal. PAGE CP79/ EDICAL SCIENCE BUILDING REPLACE AHU- Addendum #

3 b. Remove. A Vapor Hose Kit in its entirety. c. Add. A. to read: Humidifier panel assembly shall be contained within a ype 0 stainless steel metal casing to allow convenient mounting in air handler casings. d. odify. A. to read: Steam shall discharged in diametrically opposite directions, perpendicular to airflow, and shall be absorbed into the airstream such that no moisture accumulates on interior air handling unit surfaces more than inches beyond the centerline of the steam dispersion grid at 00 fpm face velocity. he dispersion tube quantity and spacing, and vapor outlet ports quantity and spacing, shall be factoryengineered to meet this absorption requirement. e. odify. Accessory Hardware to read: A. Steam rap: Humidifier shall be provided with one float/thermostatic type trap complying with Division Section Steam and Condensate Piping. B. Inlet Strainer: Humidifier shall be provided with one inlet strainer complying with Division Section Steam and Condensate Piping. f. Add. A to read: Humidifier shall be factory installed within air handling unit by air handling unit manufacturer. Drawings:. X-: a. ODIFY Enlarged Site Plan: Revise Contractor parking area.. 000: a. ADD Floor Protection Notes.. 00: a. ODIFY General Note. b. ODIFY Keyed Notes,, 7, and 8. c. ADD Keyed Notes 9, 0,, and. d. ODIFY Fifth Floor emporary Cooling and Construction Phasing Plan: Revise construction phase boundaries.. D0: a. ODIFY First Floor Demolition Plan: Revise construction phase boundary. b. ODIFY Keyed Note 8.. D0: a. ODIFY Fifth Floor Ductwork Demolition Plan i. Remove ductwork demolition from fume hood ductwork in Labs 0 and 8. ii. Revise ductwork demolition work in Research Office. iii. Remove keyed note and renumber keyed notes accordingly.. D0: a. ODIFY General Note. 7. 0: a. ODIFY First Floor Piping New Work Plan: Revise construction phase boundaries. b. ODIFY Keyed Note 0. c. ODIFY Partial Fourth Floor Piping New Work Plan: Revise hot water supply and return riser size. PAGE CP79/ EDICAL SCIENCE BUILDING REPLACE AHU- Addendum #

4 8. 0: a. ODIFY Fifth Floor Ductwork New Work Plan: i. Remove manual volume dampers from fume hood ductwork in Labs 0 and 8. ii. Revise supply and exhaust layout in Labs 9 and. b. ADD Keyed Note. c. ODIFY note on Detail Exhaust Duct Fitting Detail. 9. 0: a. ODIFY Enlarged Fifth Floor Ductwork New Work Plan: i. Clarify shoe tap fitting on cold supply air duct serving north wing. ii. Revise supply air and exhaust air ductwork to maintain access to existing electrical bus duct in echanical Room. b. ODIFY Enlarged Fifth Floor Piping New Work Plan: i. Revise hot water supply and return layout and valve requirements in echanical Room. c. ADD Keyed Notes and. 0. 0: a. ODIFY Section D: Revise exhaust riser to provide required access to existing electrical bus duct in echanical Room. b. ADD Keyed Note.. 0: a. ODIFY Chilled Water Flow Diagram. b. ODIFY Heating Hot Water Flow Diagram.. 0: a. ODIFY Detail AHU Humidifier Detail. b. ODIFY AHU- Air Handling Unit Components List: Remove reference to unit-mounted outside air damper from component.. 0: a. ODIFY otorized Damper Schedule. Omit cold deck damper. b. ODIFY Humidifier Schedule: Revise note.. 70: a. ODIFY AHU- Control Diagram: i. Revise to show new single duct terminal units for north wing. ii. Revise location of cooling coil temperature sensor. iii. Revise humidifier sequence of operation.. 70: a. ODIFY Box with Reheat Control Diagram: i. Add occupancy sensor. ii. Add Keyed Note 0. Attachments:. X- SAGING PLAN. 000 ECHANICAL SYBOLS, ABBREVIAIONS, AND GENERAL AND CONSRUCION PHASING NOES. 00 FIFH FLOOR EPORARY COOLING AND CONSRUCION PHASING PLAN. D0 FIRS FLOOR DEOLIION PLAN. D0 FIFH FLOOR DEOLIION PLAN. D0 ENLARGED DEOLIION PLANS 7. 0 PIPING NEW WORK PLANS 8. 0 FIFH FLOOR DUCWORK NEW WORK PLAN PAGE CP79/ EDICAL SCIENCE BUILDING REPLACE AHU- Addendum #

5 9. 0 ENLARGED NEW WORK PLANS 0. 0 SECIONS. 0 HYDRONIC FLOW DIAGRAS. 0 DEAILS. 0 SCHEDULES. 70 CONROLS. 70 CONROLS END OF ADDENDU PAGE CP79/ EDICAL SCIENCE BUILDING REPLACE AHU- Addendum #

6 Issued on 0/0/07 with Addendum SECION.A BID FOR LUP SU CONRAC Date: BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of, a partnership* consisting of, an individual* trading as, a joint venture* consisting of. *Insert Corporation(s), partnership or individual, as applicable. O: Curators of the University of issouri c/o Assistant Vice Chancellor Facilities Room L00 General Services Building University of issouri Columbia Columbia, issouri. Bidder, in compliance with invitation for bids for construction work in accordance with Drawings and Specifications prepared by Ross & Baruzzini, Inc., entitled "EDICAL SCIENCE BUILDING REPLACE AHU-", project number CP79, dated January, 07 having examined Contract Documents and site of proposed work, and being familiar with all conditions pertaining to construction of proposed project, including availability of materials and labor, hereby proposes to furnish all labor, materials and supplies to construct project in accordance with Contract Documents, within time set forth herein at prices stated below. Prices shall cover all expenses, including taxes not covered by the University of issouri s tax exemption status, incurred in performing work required under Contract documents, of which this Bid is a part. Bidder acknowledges receipt of following addenda: Addendum No. Addendum No. Addendum No. Addendum No. Dated Dated Dated Dated. In following Bid(s), amount(s) shall be written in both words and figures. In case of discrepancy between words and figures, words shall govern.. BID PRICING a. Base Bid: he Bidder agrees to furnish all labor, materials, tools, and equipment required to remove an existing air handling unit and associated ductwork, piping, conduits, controls, and auxiliary electrical equipment and install a new air handling unit and associated ductwork, piping, conduits, controls, and auxiliary electrical equipment, including the installation of new chilled water and heating hot water piping and conversion of the th floor north wing from constant volume dual duct to variable volume with hot water reheat; all as indicated on the Drawings and described in these Specifications for sum of: DOLLARS ($ )..A -

7 Issued on 0/0/07 with Addendum b. Additive Alternate Bids: NO APPLICABLE c. Unit Prices: NO APPLICABLE. PROJEC COPLEION a. Contract Period - Contract period begins on the day the Contractor receives unsigned Contract, Performance Bond, Payment Bond, and "Instructions for Execution of Contract, Bonds, and Insurance Certificates." Bidder agrees to complete project within one hundred and fifty (0) calendar days from receipt of aforementioned documents. Fifteen () calendar days have been allocated in construction schedule for receiving aforementioned documents from Bidder. b. Commencement - Contractor agrees to commence work on this project after the "Notice to Proceed" is issued by the Owner. "Notice to Proceed" will be issued within seven (7) calendar days after Owner receives properly prepared and executed Contract documents listed in paragraph.a. above. c. Special scheduling requirements:.) Work associated with demolition of existing piping and installation of new piping on first floor shall be scheduled to occur between arch, 07 and arch, 07. Scheduled outage of heating hot water and chilled water systems shall occur during this time period. See drawings D0 and 0 for affected areas..) All equipment shutdowns and scheduling of work within occupied spaces shall be scheduled with the Owner s Representative a minimum of weeks in advance of the outage..) Saw-cutting, core-drilling, use of hammer drills, and installation of powder-actuated fasteners shall occur only during the following time periods to minimize disruption of adjacent work and clinical study areas: :00 a.m. to 8:00 a.m., or :00 p.m. to 0:00 p.m..) Prior to demolition, Contractor shall provide mobile cooling units to temporary cool select spaces. Units shall remain in place for entire AHU- shutdown duration. See drawing 00 for affected areas..) Prior to demolition, Contractor shall coordinate with Owner s Representative to obtain Owner-furnished window AC units salvaged from the Lathrop and Laws Demolition project to temporarily cool spaces with operable windows. Units shall remain in place for entire AHU- shutdown duration. See drawing 00 for affected areas..) Construction schedule shall allow a minimum of two () weeks for system testing and balancing. 7.) Construction schedule shall allow a minimum of two () weeks for the Ownerprovided programming and startup of Johnson Controls etasys temperature controls system.. SUBCONRACOR LIS: Bidder hereby certifies that the following subcontractors will be used in performance of Work: NOE: Failure to list subcontractors for each category of work identified on this form or listing more than one subcontractor for any category of work without designating the portion of work performed by each shall be grounds for rejection of bid. List name, city, and state of designated subcontractor, for each category of work listed in Bid For Lump Sum Contract. If work within a category will be performed by more than one subcontractor, Bidder shall provide name, city, and state of each subcontractor and specify exact portion of work to be performed by each. If acceptance/nonacceptance of Alternates will affect designation of a subcontractor, Bidder shall provide information, for each affected category, with this bid form. If Bidder intends to perform any designated subcontract.a -

8 Issued on 0/0/07 with Addendum work by using Bidder's own employees, then Bidder shall list their own name, city, and state. he bidder may petition the Owner to change a listed subcontractor only within 8 hours of the bid opening. See Information For Bidders Section List of Subcontractors for requirements. Work to be performed Subcontractor Name, City, State echanical Contractor: _ Electrical Contractor: _ emperature Controls Contractor:. SUPPLIER DIVERSIY PARICIPAION GOALS a. he Contractor shall have as a goal subcontracting with inority Business Enterprise (BE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and Veteran Owned Business of en Percent (0%) of the awarded contract price for work to be performed for all four combined, and a goal subcontracting with Service Disabled Veteran Owned Business of hree Percent (%) of awarded contract price for work to be performed. b. Requests for waiver of this goal shall be submitted on the attached Application For Waiver form. A determination by the Director of Facilities Planning & Development, U, that a good faith effort has not been made by Contractor to achieve above stated goal may result in rejection of bid. c. he Undersigned proposes to perform work with following Supplier Diversity participation level: BE PERCENAGE PARICIPAION: percent ( %) SDVE PERCENAGE PARICIPAION: percent ( %) WBE, DBE, and/or VEERAN PERCENAGE PARICIPAION: percent ( %) d. A Supplier Diversity Compliance Evaluation form shall be submitted with this bid for each diverse subcontractor to be used on this project. 7. BIDDER'S ACKNOWLEDGENS a. Bidder declares that he has had an opportunity to examine the site of the work and he has examined Contract Documents therefore; that he has carefully prepared his bid upon the basis thereof; that he has carefully examined and checked bid, materials, equipment and labor required thereunder, cost thereof, and his figures therefore. Bidder hereby states that amount, or amounts, set forth in bid is, or are, correct and that no mistake or error has occurred in bid or in Bidder's computations upon which this bid is based. Bidder agrees that he will make no claim for reformation, modifications, revisions or correction of bid after scheduled closing time for receipt of bids. b. Bidder agrees that bid shall not be withdrawn for a period of sixty (0) days after scheduled closing time for receipt of bids..a -

9 Issued on 0/0/07 with Addendum c. Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities in bidding. d. Accompanying the bid is a bid bond, or a certified check, or an irrevocable letter of credit, or a cashier's check payable without condition to "he Curators of the University of issouri" which is an amount at least equal to five percent (%) of amount of largest possible total bid herein submitted, including consideration of Alternates. e. Accompanying the bid is a Bidder's Statement of Qualifications. Failure of Bidder to submit the Bidder's Statement of Qualifications with the bid may cause the bid to be rejected. Owner does not maintain Bidder's Statements of Qualifications on file. f. It is understood and agreed that bid security of two () lowest and responsive Bidders will be retained until Contract has been executed and an acceptable Performance Bond and Payment Bond has been furnished. It is understood and agreed that if the bid is accepted and the undersigned fails to execute the Contract and furnish acceptable Performance/Payment Bond as required by Contract Documents, accompanying bid security will be realized upon or retained by Owner. Otherwise, the bid security will be returned to the undersigned. 8. BIDDER'S CERIFICAE Bidder hereby certifies: a. His bid is genuine and is not made in interest of or on behalf of any undisclosed person, firm or corporation, and is not submitted in conformity with any agreement or rules of any group, association or corporation. b. He has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. c. He has not solicited or induced any person, firm or corporation to refrain from bidding. d. He has not sought by collusion or otherwise to obtain for himself any advantage over any other Bidder or over Owner. e. He will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin in connection with performance of work. f. By virtue of policy of the Board of Curators, and by virtue of statutory authority, a preference will be given to materials, products, supplies, provisions and all other articles produced, manufactured, mined or grown within the State of issouri. By virtue of policy of the Board of Curators, preference will also be given to all issouri firms, corporations, or individuals, all as more fully set forth in "Information For Bidders.".A -

10 Issued on 0/0/07 with Addendum 9. BIDDER'S SIGNAURE Note: All signatures shall be original; not copies, photocopies, stamped, etc. Authorized Signature Printed Name Date itle Company Name ailing Address City, State, Zip Phone No. Fax No. Federal Employer ID No. E-ail Address Circle one: Individual Partnership Corporation Joint Venture If a corporation, incorporated under the laws of the State of Licensed to do business in the State of issouri? yes no (Each Bidder shall complete bid form by manually signing on the proper signature line above and supplying required information called for in connection with the signature. Information is necessary for proper preparation of the Contract, Performance Bond and Payment Bond. Each Bidder shall supply information called for in accompanying "Bidder's Statement of Qualifications.") END OF SECION.A -

11 edical Science Building Replace AHU- Date: January 0, 07 University of issouri Addendum U Project No. CP 79 SECION 8 - HUIDIFIERS PAR - GENERAL. RELAED DOCUENS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification Sections, apply to this Section. B. 000 Basic echanical Requirements, and Section 000 Basic echanical aterials and ethods all apply to the work of this Section as if fully repeated herein.. SUARY A. his Section includes the following types of humidifiers:. Direct steam injection. B. Related Sections: he following Sections contain requirements that relate to this Section:. Division Section odular Air-Handling Units for air handlers which will house humidifier steam dispersion grids.. Division Section Steam and Condensate Piping for steam and condensate lines, steam traps, strainers, and other specialties associated with the humidifiers.. Division Section Control Systems for humidistats and humidification controls.. SUBIALS A. Product data including rated capacities of selected models, weights (shipping, installed, and operating), supports, weight on each support, required clearances, furnished specialties, and accessories. B. Shop Drawings: Detail fabrication and installation of humidifiers. Include piping details, plans, elevations, sections, details of components, manifolds, injection and dispersion elements, and attachments to other work. Show support locations, type of support, weight on each support, required clearances, and other details. C. Field quality-control test reports. D. Operation and aintenance Data: For humidifiers to include in operation and maintenance manuals specified in Division 0. Include detailed manufacturer s instructions on startup, shutdown, troubleshooting, preventive maintenance, and servicing. Include parts list and list of accessories. HUIDIFIERS 8 -

12 edical Science Building Replace AHU- Date: January 0, 07 University of issouri Addendum U Project No. CP 79. QUALIY ASSURANCE A. Comply with AHRI 0 Commercial and Industrial Humidifiers.. COORDINAION A. Coordinate physical size of humidifier steam dispersion manifold with interior dimensions of the air handling unit for uniform steam distribution. At contractor s discretion, ship steam dispersion grids with complete written mounting instructions to air handling unit manufacturer s facility for incorporation into air handling units.. DELIVERY, SORAGE, AND HANDLING A. Deliver, store, and handle humidifiers according to manufacturer s recommendations. B. Store humidifiers on elevated platforms in a dry location..7 WARRANY A. General Warranty: Extended warranty specified in this Article shall not deprive Owner of other rights Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by Contractor under requirements of the Contract Documents. B. anufacturer s Extended Warranty: Submit written warranty, signed by manufacturer, agreeing to repair or replace any component up to and including the entire unit, due to defects in materials or workmanship. Warranty must include parts, labor, shipping and handling charges, and applicable taxes; for no out-of-pocket cost to the Owner. Extended warranty period shall be manufacturer s standard, but not less than two years () after date of Substantial Completion. PAR - PRODUCS. HUIDIFIERS, GENERAL A. anufacturers: Subject to compliance with requirements, provide humidifiers and humidifier accessory products by one of the following manufacturers:. Dri-Steem Humidifier Company.. Armstrong International, Inc.. Herrmidifier Co., Inc.. Nortec Industries Inc.. Pure Humidifier Company. HUIDIFIERS 8 -

13 edical Science Building Replace AHU- Date: January 0, 07 University of issouri Addendum U Project No. CP 79. DIREC SEA-INJECION HUIDIFIERS A. Steam Header / Separator: AS A, ype 0 stainless steel, with integral heat exchanger which shall provide atmospheric condensate vaporizing and pressurized condensate return.. All dispersion tube-generated condensate that falls to the heat exchanger in the header shall be vaporized into humidification steam.. As condensate is vaporized in the header, pressurized condensate created in the heat exchanger shall return to main without need for additional pumps, valves, or controls. NOE: Contractor s Option to provide a humidifier which complies with this specification except for the above described condensate management. In this case, Contractor shall consult humidifier manufacturer regarding required vented condensate reservoir, and provide submittal information for the condensate reservoir for Engineer s review. B. Humidifier Steam Control Valve: Comply with ANSI B. Class 0; equal percentage flow characteristics; brass or bronze body globe valve with stainless steel seat, stem and plug; sized to meet humidification requirements.. Actuator: Electric modulating with spring return; normally closed.. Actuator: As specified in Division Section Control Systems. C. Heat Exchanger Control Valve: wo-position, normally closed, solenoid operated, on-off steam valve. Valve shall respond to a signal from a humidistat via VAC signal.. SEA-INJECION DISPERSION ANIFOLD A. Steam Dispersion Grid: ube bank consisting of a header and required quantity of multiple dispersion tubes, factory assembled in a rack sized to fit across entire cross-section of duct or plenum and equipped with mounting hardware.. Humidifier panel assembly shall be contained within a ype 0 stainless steel metal casing to allow convenient mounting in air handler casings.. Header shall be constructed of AS A, ype 0 or stainless steel and shall be fitted with -inch, ½-inch or -inch tee outlets for dispersion tube connections. he header shall be baffled or otherwise internally balanced to ensure uniform steam flow to each dispersion tube.. he dispersion tubes shall be constructed of AS A, ype 0 or stainless steel and shall be engineered to limit airstream sensible heat gain to a maximum of ºF when no humidification is required.. Vapor emission ports shall be sized and located along the dispersion tube for uniform steam distribution across the grid. Dispersion tubes shall either be fully jacketed with punched emission ports, or unjacketed with emission port sleeves extending to the center of the dispersion tube; to minimize condensate carryover.. Steam shall discharged in diametrically opposite directions, perpendicular to airflow, and shall be absorbed into the airstream such that no moisture accumulates on interior air handling unit surfaces more than inches beyond the centerline of the steam dispersion grid at 00 fpm face velocity. he dispersion tube quantity and spacing, and vapor outlet ports quantity and spacing, shall be factory-engineered to meet this absorption requirement. HUIDIFIERS 8 -

14 edical Science Building Replace AHU- Date: January 0, 07 University of issouri Addendum U Project No. CP 79. Provide /8-inch thick, PVDF insulation on thermal dispersion tubes and humidifier grid header. Insulation shall have a maximum rating under UL 7 (AS E8) flame spread/smoke developed of /0; high temperature rated for 00ºF continuous operation; closed-cell construction that will not absorb moisture and therefore not support microbial growth; zero particle erosion per AS C07, and resistant to UV light.. ACCESSORY HARDWARE A. Steam rap: Humidifier shall be provided with one float/thermostatic type trap complying with Division Section Steam and Condensate Piping. B. Inlet Strainer: Humidifier shall be provided with one inlet strainer complying with Division Section Steam and Condensate Piping.. FIELD PIPING A. As specified in Division Section Steam and Condensate Piping. PAR - EXECUION. EXAINAION A. Examine air-handling units for compliance with requirements for installation tolerances and other conditions affecting performance. B. Examine roughing-in for piping systems to verify actual locations of piping connections before humidifier installation. C. Proceed with installation only after unsatisfactory conditions have been corrected.. INSALLAION A. Humidifier shall be factory installed within air handling unit by air handling unit manufacturer. B. Install humidifiers as indicated, in accordance with manufacturer s written instructions and AHRI 0. C. Install humidifiers with required clearance for service and maintenance. D. Seal humidifier manifold duct or plenum penetrations with flange. E. Install manifold supply piping pitched to drain condensate back to humidifier. HUIDIFIERS 8 -

15 edical Science Building Replace AHU- Date: January 0, 07 University of issouri Addendum U Project No. CP 79. CONNECIONS A. Piping installation requirements are specified in other Division Sections. Drawings indicate general arrangement of piping, fittings, and specialties.. Install piping adjacent to humidifiers to allow service and maintenance.. FIELD QUALIY CONROL A. Perform tests and inspections and prepare test reports. B. ests and Inspections:. Leak est: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.. Operational est: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.. est and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. C. Remove and replace malfunctioning units and retest as specified above.. DEONSRAION A. Engage a factory-authorized service representative to train Owner s maintenance personnel to adjust, operate, and maintain humidifiers.. rain Owner s maintenance personnel on procedures and schedules for starting and stopping, troubleshooting, servicing, and maintaining equipment and schedules.. Review data in maintenance manuals. Refer to Division 0.. Schedule training with Owner, through Architect, with at least seven days advance notice. END OF SECION 8 HUIDIFIERS 8 -

16 SOUH OLD ORCHARD S. LOUIS, O F CONRACOR PARKING. WO () SPACES WILL BE ADE AVAILE. COORDINAE WIH OWNER'S REPRESENAIVE. GRAVEL SAGING AREA AVAILE FOR ENIRE DURAION OF CONSRUCION. CONRACOR SHALL INSALL EPORARY PROECIVE FENCING AROUND ENIRE SAGING AREA. FENCING SHALL BE LEF IN PLACE HROUGHOU DURAION OF CONSRUCION. CONRACOR SHALL AKE CARE O NO DAAGE OR DISRUP EXISING ELECRICAL EQUIPEN WIHIN HIS AREA. ROSS & BARUZZINI ISSOURI SAE CERIFICAE OF AUHORIY #0008 DEAN'S DRIVE DOUBLE DOOR ON HIS END OF HE FACILIY SHALL BE HE PRIARY EANS OF BRINGING EQUIPEN AND AERIALS INO EDICAL SCIENCE BUILDING. HIS DOOR ENERS INO HE HALLWAY ADJACEN O HE FREIGH ELEVAOR. SERVICE DRIVE SERVICE DRIVE SHALL REAIN ACCESSIBLE HROUGH ENIRE DURAION OF CONSRUCION UNIVERSIY OF ISSOURI SANKOWSKI HAWHORN GALENA ARYLA ND AVEN UE FIELD LOES CROWDER NURSING LIBRARY EDICAL SCIENCE BUILDING REPLACE AHU- U PROJEC NUBER CP79 COLUBIA, O ACCESS DRIVE SHALL REAIN ACCESSIBLE HROUGH ENIRE DURAION OF CONSRUCION DOGWOOD ED SCIENCE ADDIION COOLING OWER EDICAL SCIENCE BIO-WASE CLINICAL SUPPOR ROSS & BARUZZINI, INC 07 DEANS DRIVE CRIICAL CENER PSYCHIARIC HOSPIAL & CLINICS HOSPIAL CONCOURSE CHANEY HALL INSIUE ARYLAND AVENUE GARAGE ASON EYE DIABEES CARE ISSOURI ARYLAND AVENUE & EDUCAION BLDG JEFFREY R. CRAWFORD O LICENSE NO. E-707 he Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. he Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization. WHEN HIS DRA IS REPRODUCED A ORIGINAL SCALE HIS BAR = INCH INCH REVISIONS: DAE DESCRIPION 0/0/7 ADDENDU HOSPIAL DRIVE SAGING PLAN NO SCALE DESIGNED BY: JCS CHECKED BY: DPP U PROJ. NO.: CP R&B PROJ. NO.: ISSUE DAE: 0//07 /0/07 :: P DRA ILE: SAGING PLAN DRA NO.: X-

17 GENERAL SYBOLS x S- 00 AHU FSD x DUC SIZE DUC SIZE x ø x 0ø AP # 0 R 0 SI EPERAURE SENSOR YPE OF SERVICE: S = SUPPLY R = REURN SCHEDULED E = EXHAUS DEVICE NO = RANSFER AIR QUANIY IN CF KEYED NOE INERFACE, EXISING O NEW PLAN NUBER SHEE WHERE LOCAED SECION NUBER SHEE WHERE LOCAED EQUIPEN DESIGNAION UNI NUBER DAPER YPE DESIGNAION UNI NUBER DUC SYSE SYBOLS NEW WORK EXISING O REAIN DUC SIZE, FIRS FIGURE IS SIDE SHOWN (CLEAR INSIDE, ADJUS FOR LINER) ROUND DUC SIZE, (ACUAL SIZE INDICAED) SPIRAL FLA-OVAL DUC SIZE, FIRS FIGURE IS SIDE SHOWN (ACUAL SIZE INDICAED) ACCESS PANEL, OP OR SIDE FLEXIBLE DUC CONNECION CHANGE OF ELEVAION - RISE (R) OR DROP (D) URNING VANES DEO O BE REOVED OORIZED DAPER ANUAL VOLUE DAPER FIRE DAPER SOKE DAPER FIRE/SOKE DAPER FLEXIBLE DUC SUPPLY AND OUSIDE AIR SECION UP SUPPLY AND OUSIDE AIR SECION DOWN REURN AIR SECION UP REURN AIR SECION DOWN EXHAUS AIR SECION UP EXHAUS AIR SECION DOWN FLOW ARROW DOWNSREA OF FAN FLOW ARROW UPSREA OF FAN SUPPLY DIFFUSER AS SCHEDULED ARROWS INDICAE DIRECION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWN ON PLAN, DEFAUL IS A -WAY HROW. REURN GRILLE OR REGISER AS SCHEDULED EXHAUS GRILLE OR REGISER AS SCHEDULED PIPE LINE SYBOLS EDIU DEAIL FINE DEAIL SHU OFF VALVE (SEE SPECIFICAION FOR YPE) BALL VALVE BUERFLY VALVE CHECK VALVE CALIBRAED - ORIFACE BALANCING VALVE IN-LINE PUP Y - PAERN SRAINER UNION AIR VEN ( - ANUAL, A - AUOAIC) RELIEF VALVE PRESSURE AND EPERAURE ES POR WO-WAY CONROL VALVE OORIZED BUERFLY VALVE ELBOW DOWN ELBOW UP EE DOWN EE UP CAP CONCENRIC REDUCER/INCREASER ECCENRIC REDUCER/INCREASER FLANGE DEO O BE REOVED PIPE SYSE ABBREVIAIONS CWR CHILLED WAER REURN CWS CHILLED WAER SUPPLY D DRAIN HWR HWS HEAING WAER REURN HEAING WAER SUPPLY LPR LOW PRESSURE CONDENSAE REURN LPS LOW PRESSURE SEA SUPPLY PC PUPED CONDENSAE EQUIPEN DESIGNAION ACU AIR CONDIIONING UNI AF AIR FILER AHU AIR HANDLING UNI BCU BLOWER COIL UNI CAV CONSAN AIR VOLUE CC COOLING COIL CU CONDENSING UNI EAV EXHAUS AIR VALVE EF EXHAUS FAN F FAN FAV FUE AIR VALVE FCU FAN COIL UNI FD FIRE DAPER FSD COBINAION FIRE/SOKE DAPER H HUIDIFIER HC HEAING COIL HEV HOOD EXHAUS VALVE HPU HEA PUP UNI HWP HEAING WAER PUP L LOUVER D OORIZED DAPER P PUP PICV PRESSURE INDEPENDEN CONROL VALVE RHC ERINAL REHEA COIL RU ROOFOP UNI SAV SUPPLY AIR VALVE SD SOKE DAPER SF SUPPLY FAN S SEA RAP UH UNI HEAER VARIABLE AIR VOLUE BOX GENERAL ABBREVIAIONS A AIR OR AP (PER CONEX) ACC ACCESSORIES AD ACCESS DOOR AFF ABOVE FINISHED FLOOR AFS AIR FLOW SWICH AI ANALOG SIGNAL INPU AB ABIEN AO ANALOG SIGNAL OUPU AP ACCESS PANEL APD AIR PRESSURE DROP APPROX APPROXIAE ARCH ARCHIECURE/ARCHIEC AUX AUXILIARY AV AUOAIC VEN AVG AVERAGE BDD BACK DRAF DAPER BFC BELOW FINISHED CEILING BFP BACKFLOW PREVENER BHP BRAKE HORSEPOWER BI BINARY SIGNAL INPU BS BUILDING ANAGEEN SYSE BO BINARY SIGNAL OUPU BOB BOO OF BEA BOD BOO OF DUC BOP BOO OF PIPE BS BEA SPACE BU BRIISH HERAL UNI BUH BRIISH HERAL UNIS PER HOUR CAP CAPACIY CAV CONSAN AIR VOLUE CFH CUBIC FEE PER HOUR CF CUBIC FEE PER INUE CI CAS IRON CLG COOLING DUC (COLD DUC) CO CLEAN OU CONC CONCREE COND CONDENSAE CONN CONNECION CORR CORRIDOR CV CONROL VALVE D DEPH DB DRY BULB DBA A-WEIGHED DECIBELS DEFL DEFLECION DEG DEGREES DEG F DEGREES FAHRENHEI DES DESIGN DIA DIAEER DI DIENSION DISCH DISCHARGE DIV DIVISION DN DOWN DP DIFFERENIAL PRESSURE SENSOR DPS DIFFERENIAL PRESSURE SWICH DP DIFFERENIAL PRESSURE RANSIER DL DEAIL DWG(S) DRA(S) EA EXHAUS AIR OR EACH (PER CONEX) EA ENERING AIR EPERAURE EFF EFFICIENCY ELEC ELECRIC ELEV ELEVAION EQ EQUAL ESP EXERNAL SAIC PRESSURE EWB ENERING AIR WE BULB EPERAURE EW ENERING WAER EPERAURE EXH EXHAUS EXIS, EX EXISING EX EXERNAL F FAHRENHEI FC FLEXIBLE CONNECION FD FLOOR DRAIN FIN FINISHED FLR FLOOR FPF FINS PER FOO FP FEE PER INUE F FEE F-HD HEAD IN FEE GA GAUGE GAL GALLONS GALV GALVANIZED GC GENERAL CONRACOR GP GALLONS PER INUE H HEIGH HD HEAD HEV HOSE END VALVE HORIZ HORIZONAL HP HORSEPOWER HR HOUR HG HEAING DUC (HO DECK) HVAC HEAING, VENILAING & AIR CONDIIONING HW HO WAER HZ HERZ IN INCH/INCHES INDIC INDICAOR ISP INERNAL SAIC PRESSURE JS JOIS SPACE KW KILOWAS L LENGH LA LEAVING AIR EPERAURE LB(S) POUNDS LF LINEAR FEE LVL LEVEL LW LEAVING WAER EPERAURE AN ANUAL GENERAL ABBREVIAIONS, CONINUED ANU ANUFACURER AX AXIU BH HOUSAND BRIISH HERAL UNIS PER HOUR CC OOR CONROL CENER ECH ECHANICAL ERV INIU EFFICIENCY REPORING VALUE (ASHRAE.) FR ANUFACURER IN INIU OR INUE (PER CONEX) D OUNED L EAL V ANUAL VEN NC NORALLY CLOSED OR NOISE CRIERIA (PER CONEX) NIC NO IN CONRAC NO NORALLY OPEN OR NUBER (PER CONEX) NO NOINAL NPLV NON-SANDARD PAR LOAD VALUE NPSH NE POSIIVE SUCION HEAD NS NO O SCALE OA OUSIDE AIR OBD OPPOSED BLADE DAPER OC ON CENER OD OUSIDE DIAEER O OIL RAP PA PIPE ANCHOR PBD PARALLEL BLADE DAPER PD PRESSURE DROP PEN PENHOUSE PH PHASE PHC PREHEA COIL PLBG PLUBING PNEU PNEUAIC PPH POUNDS PER HOUR PRESS PRESSURE PRV PRESSURE REGULAING VALVE PSI POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH ABSOLUE PSIG POUNDS PER SQUARE INCH GAUGE QY QUANIY RA REURN AIR REFR REFRIGERAN REQ REQUIRED RH RELAIVE HUIDIY R RP REVOLUIONS PER INUE SA SUPPLY AIR SAN SANIARY SEC'N SECION SEER SEASONAL ENERGY EFFICIENCY RAIO SENS SENSIBLE SF SQUARE FOO SH SENSIBLE HEA SH SHEE SND SOUND SOL SOLENOID SP SAIC PRESSURE SPD SAIC PRESSURE DIFFERENIAL SP SAIC PRESSURE RANSIER SQ SQUARE SS SAINLESS SEEL SL SEEL S SEA &P EPERAURE AND PRESSURE C EPERAURE CONROL D HERODYNAIC OR EPERAURE DIFFERENIAL (PER CONEX) DH OAL DYNAIC HEAD EP EPERAURE O OAL SP OAL SAIC PRESSURE YP YPICAL UC UNDERCU DOOR UNO UNLESS NOED OHERWISE V VOLS VAC VACUU VD VOLUE DAPER (ANUAL) VEL VELOCIY VER VERICAL VFD VARIABLE FREQUENCY DRIVE VOL VOLUE VR VEN HRU ROOF W WA OR WIDH (PER CONEX) W/ WIH W/O WIHOU WB WE BULB WC WAER COLUN WG WAER GAUGE WPD WAER PRESSURE DIFFERENIAL W WEIGH CONSRUCION PHASING NOES: HE FIRS FLOOR INSRUCIONAL AREA OF HE EDICAL SCIENCES BUILDING WILL BE UNOCCUPIED BEWEEN ARCH, 07 AND ARCH, 07. SCHEDULED OUAGE OF HEAING HO WAER AND CHILLED WAER SYSES SHALL OCCUR DURING HIS IE PERIOD. CONRACOR SHALL DEOLISH ALL EXISING FIRS FLOOR PIPING SHOWN O BE REOVED, INSALL ALL NEW FIRS FLOOR HEAING HO WAER PIPING, AND PROVIDE VALVED AND CAPPED CONNECIONS FOR NEW VERICAL HEAING HO WAER AND CHILLED WAER RISERS. VERICAL RISERS AY BE INSALLED A A LAER DAE. HEAING HO WAER AND CHILLED WAER SYSES SHALL BE FILLED, ESED, AND ADE OPERAIONAL AGAIN BY HE FOLLO ONDAY ORNING (ARCH H) O RESORE OPERAION OF HE VARIOUS HVAC SYSES WIHIN HE FACILIY AND ALLOW FOR COPLEE AND NORAL BUSINESS ACIVIIES O RESUE BY :00 A ON HA SAE ONDAY ORNING (ARCH H). ALL EQUIPEN SHUDOWNS AND SCHEDULING OF WORK WIHIN OCCUPIED SPACES SHALL BE COORDINAED WIH HE OWNER'S REPRESENAIVE WIH A INIU WEEKS ADVANCE NOICE. SAW-CUING, CORE-DRILLING OF SS AND WALLS, USE OF HAER DRILLS, AND INSALLAION OF POWDER-ACUAED FASENERS SHALL OCCUR ONLY DURING HE FOLLO IE PERIODS O INIIZE DISRUPION OF ADJACEN WORK AND CLINICAL SUDY AREAS: :00 A O 8:00 A, OR :00 P O 0:00 P. PRIOR O SHUING DOWN AHU-, CONRACOR SHALL INSALL EPORARY COOLING SYSES FOR H FLOOR S AND SUPPOR AREAS AS SHOWN ON SHEE 00. CONRACOR SHALL COORDINAE WIH OWNER'S REPRESENAIVE O OBAIN OWNER-FURNISHED WINDOW UNIS. CONRACOR SHALL PROVIDE AND INSALL EPORARY ROLL-IN SPO COOLERS, WHERE REQUIRED. SEE CONSRUCION PHASING PLAN ON 00 FOR SPECIFIC SCHEDULING CONSRAINS ASSOCIAED WIH WORK ON HE FIFH FLOOR. ELEVAOR PROECION NOES: HE INEGRIY OF EXISING FREIGH ELEVAOR US BE AINAINED DURING CONRACOR'S ACIVIIES. HE FOLLO ELEVAOR PROECION NOES SHALL APPLY: CONRACOR SHALL FULLY PROEC HE INERIOR OF HE ELEVAOR, INCLUDING BU NO LIIED O HE FLOOR, WALLS, CEILINGS, AND ELEVAOR CONROLS. ELEVAOR PROECION SHALL BE INSALLED PRIOR O HE SAR OF CONSRUCION AND SHALL REAIN HROUGHOU HE ENIRE DURAION OF CONSRUCION ACIVIIES REQUIRING ELEVAOR USE. FLOOR PROECION NOES: HE INEGRIY OF EXISING FLOORING SURFACES HROUGHOU HE FACILIY US BE AINAINED DURING CONRACOR'S ACIVIIES. HE FOLLO FLOORING PROECION NOES SHALL APPLY: OVEEN OF AERIAL AND EQUIPEN INO AND FRO HE FACILIY REQUIRES PROECION OF ALL FLOORING SURFACES HROUGHOU RAVEL PAH. CONRACOR SHALL UILIZE PLASIC PROECION SHEES UNDER PLYWOOD OR ASONIE SHEES OVER HE ENIRE FLOOR SURFACE O PROEC EXISING ILE OR CARPEED FLOOR SURFACES FRO DAAGE. ANY EXISING FLOORING SURFACES DAAGED AS A RESUL OF HIS CONSRUCION WORK SHALL BE REPAIRED BY CONRACOR O HE SAISFACION FO HE OWNER'S REPRESENAIVE. SOUH OLD ORCHARD S. LOUIS, O F ROSS & BARUZZINI ISSOURI SAE CERIFICAE OF AUHORIY #0008 UNIVERSIY OF ISSOURI EDICAL SCIENCE BUILDING REPLACE AHU- U PROJEC NUBER CP79 COLUBIA, O ROSS & BARUZZINI, INC 07 JEFFREY R. CRAWFORD O LICENSE NO. E-707 /0/07 :: P SIDEWALL DIFFUSER AS SCHEDULED SIDEWALL REURN OR EXHAUS AS SCHEDULED GENERAL NOES: HESE PLANS ARE DIAGRAAIC IN NAURE. HE CONRACOR SHALL BE PREPARED O AKE SOE ALERAIONS O HE EXAC LOCAION OF DUCWORK, PIPING AND EQUIPEN FRO HE LOCAION INDICAED ON HESE DRAS O FI ACUAL JOB CONDIIONS. ALL ELBOWS, FIINGS, EC., IN PIPING AND DUCWORK REQUIRED O CLEAR ALL JOB OBSRUCIONS ARE NO NECESSARILY INDICAED. ALL NECESSARY RANSIIONS, FIINGS AND OFFSES ARE REQUIRED WHEHER SHOWN OR NO. BECAUSE OF HE LIIED SPACE AVAILE O INSALL ALL OF HE ECHANICAL WORK, COORDINAION BEWEEN HE VARIOUS RADES IS OF HE UOS IPORANCE. HE CONRACOR SHALL COORDINAE SAGING AND SCHEDULING WIH HE OWNER'S REPRESENAIVE. EXISING CONDIIONS ARE BASED ON INFORAION OBAINED FRO PREVIOUS CONSRUCION DOCUENS AND INFORAL FIELD OBSERVAION AND SHALL NO BE CONSIUED AS "AS BUIL." HE CONRACOR SHALL FIELD-VERIFY EXISING CONDIIONS BEFORE HE ONSE OF CONSRUCION. DEOLISH ALL PIPING, DUCWORK EQUIPEN, EC., SHOWN O BE REOVED, IN IS ENIREY,INCLUDING ALL HANGERS AND SUPPORS. WHERE CONRACOR IS REQUIRED O CONCEAL NEW WORK, REOVE OR ODIFY EXISING CONSRUCION OR EQUIPEN, OR AACH O EXISING CONSRUCION, HE CONRACOR SHALL REPAIR OR REPLACE EXISING CONSRUCION AND AERIALS O ACH CONDIIONS A HE ONSE OF CONSRUCION. I IS HE CONRACOR'S RESPONSIBILIY O REOVE AND REPLACE EXISING CEILINGS AND WALLS REQUIRED FOR INSALLAION OF ECHANICAL SYSES. HE OWNER SHALL AINAIN ALL SALVAGE RIGHS OF EQUIPEN AND AERIALS REOVED. ALL EQUIPEN AND AERIALS NO CLAIED BY HE OWNER SHALL BE REOVED FRO HE PREISES BY HIS CONRACOR. ALL EXISING DDC CONROLS LOCAED IN HE H FLOOR ECHANICAL SHALL BE REOVED BY ONLY HE OWNER. ALL WORK SHALL BE INSALLED PER HE REFERENCE DEAILS, REGARDLESS OF WHEHER OR NO HE DEAILS ARE CALLED OU ON HE PLANS. SEE 00 SERIES SHEE(S) PROVIDE VENS A ALL HYDRONIC PIPING HIGH POINS, AND DRAINS A ALL PIPING LOW POINS, REGARDLESS OF WHEHER SHOWN OR NO. DUE O EXENSIVE OCCURRENCE OF HAZARDOUS AERIALS USED IN HE ORIGINAL CONSRUCION OF HE BUILDING (I.E. LEAD-BASED PAIN, ASBESOS INSULAION, AND RANSIE EXHAUS DUCWORK), HE CONRACOR SHALL COORDINAE ALL DEOLIION WIH HE ABAEEN CONRACOR. EFFORS HAVE BEEN ADE O SHOW HE AJORIY OF HIS DEOLIION ON HE PLANS, BU CLEARLY, HE EXAC LOCAION AND EXEN OF HIS DEOLIION US BE FULLY COORDINAED. NOE: FOR ALL INSANCES WHERE EXISING HAZARDOUS AERIALS WERE REOVED FRO EXISING PIPING SYSES WHICH WILL REAIN IN PLACE FOLLO HIS PROJEC, CONRACOR SHALL INSALL NEW INSULAION ON EXISING EXPOSED PIPING EEING INSULAION SPECIFICAIONS. DO NO LEAVE ANY EXISING PIPING UNINSULAED. ALL DUCWORK SHALL COPLY WIH "HVAC DUC CONSRUCION SANDARDS - EAL AND FLEXIBLE," SACNA LAES EDIION, EXCEP WHERE ORE RESRICIVE REQUIREENS ARE SPECIFIED. ANY PLAN REFERENCES O "SACNA FIGURE ---" REFERS O HIS SANDARD. SEE SPECIFICAIONS FOR SCHEDULE OF DUC PRESSURE CLASS AND SEAL CLASS. I IS HE INEN OF HESE DRAS HA A ANUAL BALANCING DAPER BE PROVIDED A EVERY INDIVIDUAL DUCED CONNECION O AN AIR DEVICE. NOE, UNLESS A BALANCING DAPER IS SCHEDULED O BE FURNISHED WIH AIR DEVICE. PROVIDE A ANUAL BALANCING DAPER IN EACH INDIVIDUAL BRANCH DUC SERVING AN AIR DEVICE BEWEEN HE CONNECION O HE DUC SERVING ULIPLE DEVICES AND HE AIR DEVICE WHEN HARD DUCED AND A EACH POIN OF CONNECION OF FLEX DUC RUNOU O BRANCH DUC (A HE SPIN-IN FIING) WHERE FLEX DUC IS USED. BOXES WIH SINGLE DIFFUSERS ARE NO REQUIRED O HAVE A BALANCING DAPER. COORDINAE WIH OWNER'S REPRESENAIVE O VERIFY ALL EXISING OWNER SALVAGED AND OWNER REOVED CONROLS WORK IS COPLEE. ALL EXISING EPERAURE CONROLS HA ARE BEING DEOLISHED OR DISABLED AS WORK OF HIS CONRAC SHALL BE COPLEELY REOVED FRO HIS PROJEC WORK AREA. REOVE ALL EXISING CONROL WIRING, PNEUAIC UBING AND RELAED CONROLS AND ALL ACCESSORIES ADE OBSOLEE BY HE WORK OF HIS PROJEC. PROVIDE A BRASS COPRESSION CAP YPE FIING A ALL UNUSED ERINAIONS. DO NO PINCH-OFF UBING. HE CONRACOR SHALL CONNEC HE NEW HVAC CONROL SYSE O HE OWNER'S EXISING BUILDING CONROL SYSE. REFER O HE SPECIFICAIONS FOR ADDIIONAL REQUIREENS HE WORK OF SECION 0900 SHALL INCLUDE HE FOLLO ELECRICAL WORK, COPLYING WIH REQUIREENS OF DIVISION SECIONS: A. CONROL WIRING BEWEEN FIELD-INSALLED CONROLS, INDICAING DEVICES, AND UNI CONROL PANELS. B. INERLOCK WIRING BEWEEN ELECRONICALLY OPERAED EQUIPEN UNIS AND BEWEEN EQUIPEN AND FIELD INSALLED CONROL DEVICES. C. POWER SUPPLY WIRING FRO POWER SOURCES O POWER CONNECION ON CONROLS AND/OR UNI CONROL PANELS, INCLUDING, BU NO LIIED O, AIR ERINAL UNI CONROLLERS, DDC PANELS, DAPER ACUAORS, AND VALVE ACUAORS. I SHOULD BE NOED HA EXHAUS SYSES AY BE REQUIRED O BE BALANCED ORE HAN ONCE O ASSURE DESIGN AIRFLOWS ARE PROVIDED. HE SCOPE OF WORK FOR HIS PROJEC IS LOCAED ON FLOORS HROUGH OF HE EDICAL SCIENCE BUILDING. I IS SRONGLY ENCOURAGED HA HE CONRACOR VISIS HE SIE PRIOR O SUBIING HIS OR HER BIDS. CONRACOR SHALL INCLUDE IN HIS OR HER BID ALL COSS O DISASSEBLE AND REASSEBLE NEW EQUIPEN IN ORDER O OVE I INO PLACE. COSS SHALL INCLUDE ANUFACURER SUPERVISION HA IS REQUIRED O AINAIN EQUIPEN WARRANIES IN FULL. EQUIPEN IS NO ALLOWED O BE CU O BE BROUGH INO PLACE. CONRACOR SHALL PROEC SAIR AND SERVICE ELEVAOR O NO DAAGE DURING CONSRUCION. ALL DAAGE SHALL BE A HE COS OF HE CONRACOR O REPAIR O ACH EXISING CONDIIONS. ACCESS O HE JOB SIE IS HROUGH HE EXISING BUILDING (EXISING SAIRS AND SERVICE ELEVAOR). ALL EQUIPEN AND AERIALS SHALL BE BROUGH O HE WORK AREA HROUGH HESE EANS ONLY. CONRACOR SHALL FIELD VERIFY SERVICE ACCESS. HE EXISING SERVICE ELEVAOR HAS LIIED ACCESS OF 8 INCHES ALL BY 8 INCHES DEEP BY INCHES WIDE. CONRACOR SHALL PROEC INEGRIY OF ELEVAOR PER ELEVAOR PROECION NOES ON HIS SHEE. COORDINAE DRAINING AND FILLING OF CHILLED WAER SYSE WIH OWNER'S REPRESENAIVE. I IS HE CONRACOR'S RESPONSIBILIY O VEN AIR FRO ALL COILS AFFECED BY WORK OF HIS PROJEC. REFER O 0 FOR ORE INFORAION AND CONSUL OWNER'S REPRESENAIVE O HELP ENSURE COILS ARE NO ISSED. he Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. he Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization. WHEN HIS DRA IS REPRODUCED A ORIGINAL SCALE HIS BAR = INCH DESIGNED BY: CHECKED BY: R&B PROJ. NO.: ISSUE DAE: DRA ILE: DRA NO.: INCH REVISIONS: DAE DESCRIPION 0/0/7 ADDENDU U PROJ. NO.: JCS DPP CP //07 ECHANICAL SYBOLS, ABBREVIAIONS, AND GENERAL AND CONSRUCION PHASING NOES 000

18 GENERAL NOES: CONRACOR SHALL REFER O CONSRUCION PHASING NOES ON SHEE 000 FOR INFORAION REGARDING REQUIREENS AND RESRICIONS ON ANY CONSRUCION ACIVIIES IPACING BUILDING OPERAIONS AND SYSES. SOUH OLD ORCHARD S. LOUIS, O F ROOF CONRACOR SHALL INSALL EPORARY FRAED PLASIC CONSRUCION BARRIER(S) O CONAIN DUS AND DEBRIS ASSOCIAED WIH CONSRUCION ACIVIIES. BARRIER(S) SHALL BE DESIGNED O AINAIN ACCESS O REGULARLY OCCUPIED SPACES. BARRIER(S) SHALL BE CONSRUCED PRIOR O DEOLIION AND SHALL REAIN IN PLACE UNIL CONSRUCION IS COPLEE. INSALL SICKY AS PADS IN FRON OF ALL EPORARY DOORS ASSOCIAED WIH CONSRUCION BARRIER(S). REFER O DIVISON SPECIAL CONDIIONS FOR ORE INFORAION. ROSS & BARUZZINI ISSOURI SAE CERIFICAE OF AUHORIY # SC FOR ALL WORK IN OCCUPIED AND SPACES, CONRACOR SHALL COPLEELY COVER ALL BENCHOPS, SHELVING, CABINES, FURNIURE, AND EQUIPEN WIH PROECIVE PLASIC SHEEING O PREVEN DAAGE. EPORARY PROECIVE COVERING SHALL REAIN IN PLACE PRIOR O DEOLIION HROUGH COPLEION OF WORK WIHIN HE SPACE. UPON COPLEION OF WORK, CONRACOR SHALL WIPE DOWN COUNERS, ABLES, AND FURNIURE, AND VACUU AS NECESSARY O REURN SPACE O ORIGINAL CONDIION PRIOR O CONSRUCION. # KEYED NOES: A 0 7 SC CORRIDOR 7 0 EN'S RES. SERV 08 0 WOEN'S RES. 09 COOLER 9 SC ECHANICAL SC A SC SCHOOL OF NURSING ISSUE CULURE 0 CELL CULURE 9A 0 F E 9 D SERVICE ICROSCOPE 8C C 8 ICROSCOPE 8B A B ICROSCOPE 8A 7C CONRACOR SHALL PROVIDE EPORARY SPO COOLER O SERVE SPACE. CONRACOR O EPORARILY ROUE PUPED CONDENSAE LINE O NEARBY SINK OR FLOOR DRAIN. DRAIN LINE SHALL BE ROUED IN A ANNER O AVOID CREAING A RIP HAZARD FOR BUILDING OCCUPANS. ROUE SPO COOLER HO VEN HOSE O NEARES RA DUC. PACH RA DUC AIRIGH ONCE SPO COOLER IS REOVED FRO SERVICE. OWNER-FURNISHED WINDOW AC UNI. CONRACOR SHALL COORDINAE WIH OWNER'S REPRESENAIVE O OBAIN WINDOW UNIS SALVAGED FRO HE LAHROP AND LAWS DEOLIION PROJEC O PROVIDE EPORARY COOLING FOR SPACES SERVED BY AHU-. CONRACOR SHALL PROVIDE AND INSALL PLYWOOD PANELS O SUPPOR WINDOW UNI AND BLANK-OFF REAINING WINDOW OPENING FOLLO UNI INSALLAION. WINDOW UNIS SHALL REAIN IN SERVICE UNIL NEW AHU- IS ADE OPERAION. WINDOW UNIS SHALL BE REURNED O OWNER'S REPRESENAIVE IN GOOD WORKING ORDER. FOLLO REOVAL OF WINDOW UNI, CONRACOR SHALL PACH / PAIN WINDOW FRAING AND SURROUNDING SURFACES O REPAIR ANY DAAGE CAUSED BY INSALLAION OF UNI AND SURROUNDING PLYWOOD SUPPOR. CONRACOR SHALL INSALL A EPORARY WALL-OUNED PROPELLER EXHAUS FAN ON EXISING LOUVER O EXHAUS AND NEGAIVELY PRESSURIZE HE CONSRUCION AREA. CONRACOR SHALL CONSRUC EPORARY CONSRUCION ZONE PARIIONS O PREVEN IIGAION OF DUS O HE ADJACEN OCCUPIED SPACES. EXHAUS FAN SHALL EXHAUS INIU 00 CF. FAN SHALL REAIN OPERAIONAL UNIL AHU- IS ADE OPERAIONAL. EXISING OPENING IN CU WALL BEWEEN ECHANICAL AND CORRIDOR PU IN PLACE AS WORK OF A PRIOR PROJEC. INSALLAION OF DOOR IS PENDING. A HE DISCREION OF HE CONRACOR, HE EXISING CU WALL AY BE REOVED AS NECESSARY O FACILIAE HE WORK. WALL US BE REPLACED O ACH EXISING IF REOVED. ALL WORK WIHIN HIS HACHED REGION CONSISING OF NORH HALF OF CORRIDOR,, AND 8 SHALL BE COPLEED IN A WEEK WINDOW, SAR O FINISH. ALL WORK WIHIN HIS HACHED REGION CONSISING OF 9 AND 0 SHALL BE COPLEED IN A WEEK WINDOW, SAR O FINISH. SOUH HALF OF SHALL REAIN OPERAIONAL HROUGHOU ENIRE DURAION OF WORK IN HIS AREA. 7 ALL WORK WIHIN HIS HACHED REGION CONSISING OF AND SHALL BE COPLEED IN A WEEK WINDOW, SAR O FINISH. NORH HALF OF SHALL REAIN OPERAIONAL HROUGHOU ENIRE DURAION OF WORK IN HIS AREA. 8 A FULL HEIGH DUS PARIION SHALL BE INSALLED HERE O SEPARAE HIS INO WO SEPARAE ZONES O ALLOW FOR PHASED CONSRUCION. 9 A FULL HEIGH DUS PARIION WIH ACCESS DOOR SHALL BE INSALLED HERE O SEPARAE HE CORRIDOR INO WO SEPARAE ZONES O ALLOW FOR PHASED CONSRUCION. 0 ALL WORK WIHIN SHALL BE COPLEED IN A WEEK WINDOW, SAR O FINISH. ALL WORK WIHIN HIS HACHED REGION CONSISING OF SOUH HALF OF CORRIDOR SHALL BE COPLEED IN A WEEK WINDOW, AFER COPLEION OF CONSRUCION IN NORH HALF OF CORRIDOR. AFER COPLEION OF WORK IN SOUH CORRIDOR, CONRACOR SHALL PROVIDE A EPORARY FULL HEIGH DUS PARIION (SIZED APPROXIAELY AS SHOWN BY HACHED REGION) WIH ACCESS DOOR O PROEC OCCUPIED SPACES FRO CONSRUCION DUS AND DEBRIS WHILE SILL ALLO OCCUPANS O ENER AND. UNIVERSIY OF ISSOURI EDICAL SCIENCE BUILDING REPLACE AHU- U PROJEC NUBER CP79 COLUBIA, O ROSS & BARUZZINI, INC 07 JEFFREY R. CRAWFORD O LICENSE NO. E-707 NORH FIFH FLOOR EPORARY COOLING AND CONSRUCION PHASING PLAN /8" = '-0" he Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the embossed or wet seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. he Professional Engineer will not be responsible for subsequent changes to this document, unless the changes are made by the Engineer or with the Engineer's written authorization. EPORARY SPO COOLER SCHEDULE WHEN HIS DRA IS REPRODUCED A ORIGINAL SCALE HIS BAR = INCH INCH NOES:. CONRACOR SHALL PROVIDE SCHEDULED AKE/ODEL OR APPROVED EQUAL. PROVIDE SPO COOLER WIH FACORY HOSES AND CONDENSAE PUP. SPO COOLER SHALL BE COPAIBLE WIH SANDARD NEA - PLUG.. SPO COOLER SHALL REAIN IN SERVICE UNIL NEW AHU- IS AHE OPERAIONAL. REVISIONS: DAE DESCRIPION 0/0/7 ADDENDU ELECRICAL DAA PLAN ARK FR. ODEL SERVICE LOCAION AIRFLOW (CF) OAL COOLING CAPACIY (BH) V/PH/HZ NOES SC SPO COOLER PRO / /0,, SC SC SC SC SPO COOLER SPO COOLER SPO COOLER SPO COOLER PRO PRO PRO PRO / /0 0 / /0 0 / /0 0 / /0,,,,,,,, NORHWES WES NORHEAS SCOPE AREA EAS DESIGNED BY: CHECKED BY: U PROJ. NO.: JCS DPP CP79 R&B PROJ. NO.: 0-0 LOCAION OF SERVICE ELEVAOR SOUH ISSUE DAE: DRA ILE: 0//07 /0/07 :: P KEY PLAN FIFH FLOOR EPORARY COOLING AND CONSRUCION PHASING PLAN DRA NO.: 00

MECHANICAL LINETYPE LEGEND MINIMUM MISC MISCELLANEOUS MEDIUM PRESSURE STEAM RETURN MEDIUM PRESSURE STEAM SUPPLY NOT TO SCALE OUTSIDE AIR

MECHANICAL LINETYPE LEGEND MINIMUM MISC MISCELLANEOUS MEDIUM PRESSURE STEAM RETURN MEDIUM PRESSURE STEAM SUPPLY NOT TO SCALE OUTSIDE AIR XX XX H C S F/S NOES: SYMBOL LEGEND 1. ALL SYMBOLS MAY NO APPLY. CODED PLAN NOE EQUIPMEN AION POIN OF CONNECION HUMIDISA CO2 SENSOR RECANGULAR SPLY DUC RISER RECANGULAR REURN DUC RISER RECANGULAR EXHAUS

More information

RONALD G. BILLY JR. THIS ADDENDUM CONSISTS OF THREE (3) PAGES AND ATTACHMENTS:

RONALD G. BILLY JR. THIS ADDENDUM CONSISTS OF THREE (3) PAGES AND ATTACHMENTS: Lincolnshire Place Memory Care Facility - Muncie 00 000 7-60 ADDENDUM # ADDENDUM #0 O: ALL BIDDERS RE: CHANGES O PROJEC MANUAL AND DRAWINGS DAED /8/8 DAE: MARCH 9, 08 SUBJEC: LINCOLNSHIRE PLACE MEMORY

More information

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - "Systems and Equipment.

1. Product Data for Prerequisite EQ 1: Documentation indicating that units comply with ASHRAE 62.1, Section 5 - Systems and Equipment. Page 238239-1 SECTION 238239 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

City of Duluth Festival Center 04/25

City of Duluth Festival Center 04/25 SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services Page 238216-1 Copyright 2003 and 2005 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified by MSU Physical

More information

Florida Department of Transportation

Florida Department of Transportation Page 1 of 7 RICK SCOTT GOVERNOR Florida Department of Transportation 1109 S. Marion Avenue Lake City, Florida 32025 ANANTH PRASAD SECRETARY September 27, 2011 To: Proposal Holders Addendum No: 1, E2Q23,

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. Page 238219-1 SECTION 238219 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

BID PROPOSAL-REVISED

BID PROPOSAL-REVISED BID PROPOSAL-REVISED PROJECT: B17-13, Bldg 1300 HVAC ( the Work ) CABRILLO COMMUNITY COLLEGE DISTRICT Bidder Name Bidder Representative(s) Bidder Representative(s) Contact Information Bidder Mailing Address

More information

Wireless keypad RKB1. Data sheet. Device identification number:

Wireless keypad RKB1. Data sheet. Device identification number: Wireless keypad RKB1 Daa shee Device idenificaion number: 2 1. General Informaion The RKB1 wireless keypad wih LED indicaion (hereinafer referred o as he keypad) is designed for conrolling Rim radio channel

More information

Automatic Burner Controls IFS 110 IM

Automatic Burner Controls IFS 110 IM Auomaic Burner Conrols IFS 110 IM T 12..1.1. ediion 5.05 Block diagram for inerruped sysen Auomaic Burner Conrols IFS 110 IM Flame conrol by means of flame rod or UV-deecor Flame simulaion check before

More information

SECTION FAN COIL UNITS

SECTION FAN COIL UNITS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER

More information

SECTION AIR COILS

SECTION AIR COILS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

1.3 REFERENCES A. ANSI/NFPA 70 - National Electrical Code. B. ARI Commercial and Industrial Humidifiers.

1.3 REFERENCES A. ANSI/NFPA 70 - National Electrical Code. B. ARI Commercial and Industrial Humidifiers. PART 1 GENERAL 1.1 Section Includes Low Pressure Nozzle and Evaporative Media Humidifier/Cooler 1.2 RELATED SECTIONS A. Section 08310 - Access Doors and Panels. B. Section 15052 - Common Work Results for

More information

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.0 GENERAL SECTION 15740 SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS 1.01 DESCRIPTION Item A. Scope This section specifies four sizes of fan coil units designed for hydronic heating and air conditioning.

More information

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components. Page 238126-1 SECTION 238126 - This Section includes requirements for the LEED Rating System. However, equipment specified in this Section may not qualify for LEED Rating System prerequisites and credits.

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS Annex Laundry and Shower Alterations ADDENDUM #1 March 7, 2019 ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS A. Invitation to Bid - Call for Bids has been modified as follows: 1. Notice

More information

DIVISION FINNED WATER-TUBE WATER HEATERS

DIVISION FINNED WATER-TUBE WATER HEATERS HI DELTA, TYPE WH - MODELS 992C-2342C SUGGESTED SPECIFICATIONS Catalog No.: 3500.932A Effective: 04-01-17 Replaces: 10-31-16 DIVISION 23 52 33.13 FINNED WATER-TUBE WATER HEATERS - GENERAL 1.1 SUMMARY A.

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Balancing Air Systems: a. Constant-volume air systems. b. Variable-air-volume systems. 2.

More information

DIVISION FINNED WATER-TUBE WATER HEATERS

DIVISION FINNED WATER-TUBE WATER HEATERS DELTA LIMITED, TYPE WH - MODELS 399B-899B SUGGESTED SPECIFICATIONS Catalog No.: 3500.97B Effective: 04-01-17 Replaces: 11-15-08 DIVISION 23 52 33.13 FINNED WATER-TUBE WATER HEATERS - GENERAL 1.1 SUMMARY

More information

Construction Standards Page

Construction Standards Page Construction Standards Page 236313-1 SECTION 236313 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

FINNED WATER-TUBE POOL HEATERS

FINNED WATER-TUBE POOL HEATERS HI DELTA, TYPE P - MODELS 992C-2342C SUGGESTED SPECIFICATIONS Catalog No.: 6000.611 Effective: 10-31-16 Replaces: NEW FINNED WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes gas-fired,

More information

PROJ. NO SECTION REFRIGERANT PIPING

PROJ. NO SECTION REFRIGERANT PIPING SECTION 23 23 00 REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SOLAR FEATURES TANK FEATURES

SOLAR FEATURES TANK FEATURES SOLAR GAS BACKUP INEGRAED SOLAR & HIGH EFFICIENCY GAS BACKUP WAER HEAERS he Solar Gas Backup blends all of the features of the Ultra Force high efficiency gas water heater with a storage tank optimized

More information

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION STEAM HUMIDIFIERS

SPECIFICATION DIVISION 23 SECTION DESCRIPTION DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION STEAM HUMIDIFIERS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

FIREYE EPD260, EPD261, EPD270 PROGRAMMER MODULES

FIREYE EPD260, EPD261, EPD270 PROGRAMMER MODULES EPD-201 AUGUS, 200 FIREYE EPD20, EPD21, EPD20 PROGRAER ODULES AN ALERNAIVE PROGRAER FOR USE WIH HE FLAE-ONIOR SYSE DESCRIPION he Fireye EPD20, EPD21, and EPD20 Programmer odules are used with the FLAE-ON-

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

TESTING, ADJUSTING AND BALANCING

TESTING, ADJUSTING AND BALANCING PART 1 GENERAL 1.01 DESCRIPTION A. Work Included: After completion of the work of installation, owner is responsible for procuring an air balancing and testing agency to test and regulate all components

More information

DACC Health Sciences Building Air Handler Assessment/Study

DACC Health Sciences Building Air Handler Assessment/Study DACC Health Sciences Building Air Handler Assessment/Study NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 June 14, 2016 Final Submittal 1065 S. Main St., Bldg. D, Ste.

More information

FINNED WATER-TUBE POOL HEATERS

FINNED WATER-TUBE POOL HEATERS HI DELTA, TYPE P - MODELS 502C-902C SUGGESTED SPECIFICATIONS Catalog No.: 6000.601A Effective: 07-12-18 Replaces: 10-31-16 FINNED WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes gas-fired,

More information

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS SECTION 237413 - PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, outdoor, central-station air-handling units (rooftop units) with the

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work. Buchtel/Perkins Community Learning Center GPD -2007271.15 OSFC Project # 55-7110-9029425 Phase 3 CLC Package Bidding Documents July 1, 2010 SECTION 15513 CONDENSING BOILERS PART I- GENERAL 1.1 RELATED

More information

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015. SECTION 000050 - INVITATION AND NOTICE TO BIDDERS PROJECT: OWNER: 3003 Cisco Road Sidney, Ohio 45365 Ohio Presbyterian Retirement Services 1001 Kingsmill Parkway Columbus, Ohio 43229 ARCHITECT: 4685 Larwell

More information

SECTION (15530) - REFRIGERANT PIPING

SECTION (15530) - REFRIGERANT PIPING SECTION 23 23 00 (15530) - REFRIGERANT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Tubes. 2. Fittings. 3. Joining Materials. 4. Specialties. B. Related Sections: 1. Section 07 92 00 (07920)

More information

SECTION DUCTWORK

SECTION DUCTWORK PART 1 GENERAL 1.1 REFERENCES SECTION 23 31 00 DUCTWORK A. ASHRAE - Handbook, Duct Design B. ASHRAE - Handbook, Duct Construction C. ASTM A90/A90M - Standard Test Method for Weight (Mass) of Coating on

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0593 TESTING, ADJUSTING, AND A. Testing, adjustment, and balancing of air systems. B. Testing, adjustment, and balancing of hydronic, steam, and refrigerating

More information

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING SECTION 15990 PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING PROJECT NO. ####### PART I - GENERAL 1.01 WORK INCLUDED A. Final test and balance of air distribution systems. B. Final test and balance

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for: Date: 05/21/2001 Time: 02:57:44 PM Job Name: EarthWise VAV Terminal Units Full Spec Location: AnyTown, Earth Prepared by: Phone Number: Prepared for: Guide Spec Summary Option List SINGLE & DUAL DUCT UNIT

More information

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW... SECTION 230001 TABLE OF CONTENTS SECTION 230001 PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS... 1 1.00 FILED SUB BID... 1 1.01 PROJECT OVERVIEW... 2 1.02 DESIGN CRITERIA... 4 1.03 CODE ISSUES...

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that sealed bids will be received by the City Council of the City of Reedley for furnishing all labor, materials, services, and equipment and performing all

More information

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING. SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING Table of Contents Section Title Page 1 Introduction 2 2 Proposed Schedule 2 3 Instructions

More information

15900 HVAC INSTRUMENTATION AND CONTROLS

15900 HVAC INSTRUMENTATION AND CONTROLS 15900 HVAC INSTRUMENTATION AND CONTROLS PART 1 GENERAL - Andover Controls BAS system is the standard for the University, and may be specified as a proprietary item. 1.0 RELATED DOCUMENTS A. Drawings and

More information

WATER-TUBE POOL HEATERS

WATER-TUBE POOL HEATERS XTHERM, TYPE P - MODELS 1005A-2005A SUGGESTED SPECIFICATIONS Catalog No.: 6000.63B Effective: 3-01-15 Replaces: 9-01-09 WATER-TUBE POOL HEATERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes condensing,

More information

Q7300L Series 2000 Commercial Thermostat Subbases

Q7300L Series 2000 Commercial Thermostat Subbases Q700L Series 2000 Commercial hermostat Subbases INSALLAION INSRUCIONS APPLICAION he Q700L hermostat Subbase is used with the 700D,F hermostat to provide electronic control of commercial 24 Vac single zone

More information

WATER-TUBE POOL HEATERS

WATER-TUBE POOL HEATERS XTHERM, TYPE P - MODELS 2505-4005 SUGGESTED SPECIFICATIONS Catalog No.: 6000.70 Effective: 09-15-16 Replaces: NEW WATER-TUBE POOL HEATERS - GENERAL 1.1 SUMMARY A. Section includes condensing, gas-fired

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 504A-2004A SUGGESTED SPECIFICATIONS Catalog No.: 2000.933C Effective: 06-25-15 Replaces: 12-21-09 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS SECTION 23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes split-system air-conditioning units consisting of separate evaporator-fan and compressor-condenser components.

More information

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1. SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers

More information

Exercises in causal loop diagrams (CLD s)

Exercises in causal loop diagrams (CLD s) Exercises in causal loop diagrams (CLD s) 1 Room hea A room is heaed by an elecrical heaer. Explain how he in he room is changed by he elecrical heaer using a causal loop diagram. Reference mode: Draw

More information

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC PART 1 GENERAL 1.01 RELATED REQUIREMENTS SECTION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC A. Section 26 2717 - Equipment Wiring: Electrical characteristics and wiring connections. 1.02 ADMINISTRATIVE

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for fire-extinguishing systems other than water-based fire suppression systems.

More information

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

SECTION SPLIT-SYSTEM AIR-CONDITIONERS SECTION 238126 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CHIMNEY CENTRIFUGAL FAN KAMIN OPERATION MANUAL

CHIMNEY CENTRIFUGAL FAN KAMIN OPERATION MANUAL CHIMNEY CENTRIFUGAL FAN KAMIN OPERATION MANUAL CONTENT Inroducion 3 General 3 Safey rules 3 Sorage and ransporaion rules 3 Manufacurer's warrany 3 Fan design 4 Delivery se 4 Modificaions and opions 4 Technical

More information

DOCUMENT ADVERTISEMENT FOR BIDS

DOCUMENT ADVERTISEMENT FOR BIDS IFB 15-014 - 2015 Fire Alarm Upgrades for 4-15078 DOCUMENT 00 11 13 ADVERTISEMENT FOR BIDS 1.1 PROJECT INFORMATION A. Notice to Bidders: Qualified bidders may submit bids for project as described in this

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 503A-2003A SUGGESTED SPECIFICATIONS Catalog No.: 2000.932C Effective: 04-01-14 Replaces: 07-15-13 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

Technical Assignment 3 11/15/04. Executive Summary

Technical Assignment 3 11/15/04. Executive Summary Executive Summary This report is an analysis of the existing systems within the Outreach Innovation Building in University Park, PA. One significant design criteria was a lower than average noise criteria

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM. City of Raleigh, Fire Station No. 11 Renovation September 28, 2018 274-CM2018-15A Page 1 HUFFMAN ARCHITECTS, PA 632 PERSHING ROAD RALEIGH, NORTH CAROLINA 27608 PHONE (919) 740-5669 TO: ALL PRIME BIDDERS

More information

Product Specifications. Vertical Floor Consoles By First Co.

Product Specifications. Vertical Floor Consoles By First Co. NOW WITH 18 GAUGE CABINET AND FACTORY INSTALLED SERVICE SWITCH Product Specifications VFB Series VSB Series VCB Series Vertical Console Fan Coils 300-00 CFM Vertical Floor Consoles By First Co. VFB Series

More information

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 12/4/2017 Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1 This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. Tenant

More information

BULLETIN. Temperature Controls (VAV) (3/11/2010)

BULLETIN. Temperature Controls (VAV) (3/11/2010) BULLETIN Temperature Controls (VAV) (3/11/2010) This bulletin is to advise you of the fees and responsibilities associated with Tenant s temperature controls. Tenant Responsibility: 1. Unit power is by

More information

BULLETIN. Temperature Controls (10/2013)

BULLETIN. Temperature Controls (10/2013) BULLETIN Temperature Controls (10/2013) This bulletin is to advise you of the fees and responsibilities associated with the tenant s temperature controls. This applies to Phase I & II only. Tenant Responsibility:

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 233423 - HVAC POWER VENTILATORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Operating

More information

Chilled Water DOAS Fan Powered Terminal Units

Chilled Water DOAS Fan Powered Terminal Units Chilled Water DOAS Fan Powered Terminal Units CHILLED WATER DOAS FAN POWERED TERMINAL UNITS DOAS TERMINAL UNITS FEATURES AND BENEFITS MINIMUM VENTILATION CONTROL The DOAS unit provides the Designer, Owner

More information

D. Reference Standards (Utilize latest editions available):

D. Reference Standards (Utilize latest editions available): 1.01 Scope of Standard A. This standard provides general requirements of The Sam Houston State University for fireextinguishing systems other than water-based fire suppression systems. This document is

More information

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC SECTION 23 05 93 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

REQUEST FOR QUOTES (RFQ) # Issue Date: September 21, 2017

REQUEST FOR QUOTES (RFQ) # Issue Date: September 21, 2017 Procurement Division Public Services Building 2051 Kaen Road Oregon City, OR 97045 (503) 742-5444 (Office) REQUEST FOR QUOTES (RFQ) #2017-66 Issue Date: September 21, 2017 Project Name: Quote Due Date/Time:

More information

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS XTHERM, TYPE WH - MODELS 1005A- 2005A Catalog No.: 3500.801 Effective: 11-15-14 Replaces: NEW PART 1 - GENERAL 1.1 SUMMARY DIVISION 23 34 36.29 COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

More information

Linear Floor Heaters

Linear Floor Heaters Linear Floor Heaters The Price Linear Floor Heater family provides ultimate flexibility in terms of style, performance, and ease of installation. Using room-side heat virtually eliminates the requirement

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

DIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS

DIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS XPAK FT TYPE H - MODELS 088AR-398A SUGGESTED SPECIFICATIONS Catalog No.: 2100.91 Effective: 05/01/15 Replaces: new DIVISION 23 52 33.13 WALL-HUNG STAINLESS STEEL HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS SECTION 23 70 00 AIR HANDLING UNITS PART 1. GENERAL 1.1 Section includes air-handling units to 15,000 cfm and accessories. 1.2 Related Sections 1 : A. Division 01 - Brown University Standard for Narragansett

More information

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories. SECTION 238113 - PACKAGED TERMINAL AIR CONDITIONERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS SECTION 26 92 50 PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS MVB, TYPE WH - MODELS 503A-2003A SUGGESTED SPECIFICATIONS Catalog No.: 3500.952C Effective: 06-25-15 Replaces: 12-22-09 DIVISION 23 34 36.29 COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

More information

GENERAL DEMOLITION NOTES: 1.

GENERAL DEMOLITION NOTES: 1. ECHANICAL LEGEND LI OF ABBREVIAION AND CONROL AFF ABOVE FINIHED FLOOR.O.D. OP OF DUC C/W COPLEE WIH.O.P. OP OF PIPE RWL RAIN WAER LEADER U.O.D. UNDERIDE OF DUC F/A, /A FRO ABOVE, O ABOVE U.O.P. UNDERIDE

More information

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup. SECTION 23 70 00- CENTRAL HVAC EQUIPMENT PART 1: GENERAL 1.1 PURPOSE: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

DIVISION FINNED WATER-TUBE BOILERS

DIVISION FINNED WATER-TUBE BOILERS MVB, TYPE H - MODELS 2503-4003 SUGGESTED SPECIFICATIONS Catalog No.: 2000.934A Effective: 04-01-14 Replaces: 06-01-13 DIVISION 23 52 33.13 FINNED WATER-TUBE BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

DIVISION 15 MECHANICAL

DIVISION 15 MECHANICAL DIVISION 15 MECHANICAL A. GENERAL DESIGN CONDITIONS 1. Design occupied spaces to maintain 72 F and a space dew point temperature not to exceed 55 F. 2. Design classroom and office space buildings with

More information

Q7300H Series 2000 Commercial Thermostat Subbases

Q7300H Series 2000 Commercial Thermostat Subbases Q700H Series 000 Commercial hermostat Subbases INSALLAION INSRUCIONS APPLICAION he Q700H hermostat Subbases are used with 700F hermostats to provide electronic control of commercial Vac single or multistage

More information

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS

SMALL WORKS PROJECT REQUEST FOR SEALED BIDS SMALL WORKS PROJECT REQUEST FOR SEALED BIDS PIERCE COUNTY FIRE PROTECTION DISTRICT #22 18421 OLD BUCKLEY HIGHWAY BONNEY LAKE, WA 98391 (253) 863-1800 (253) 863-1848 (FAX) Date Bid Requested: 5/24/2012

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum. ADDENDUM NO. 2 TO THE BIDDING DOCUMENTS Solicitation Number 2016-13 Fire Alarm, Sprinkler & BFP Inspections and Repairs Saint Clair County MidAmerica Saint Louis Airport DATE: November 30, 2016 BIDS CLOSE:

More information

HMWH Education Lab. Houston Methodist West Hospital S. Sam Houston Parkway W. Suite 200 Houston, Texas (832)

HMWH Education Lab. Houston Methodist West Hospital S. Sam Houston Parkway W. Suite 200 Houston, Texas (832) Lab 0/8/9 Issued for Construction Lab EP Engineer 0 W Sam Houston Pkwy. S., Houston, 7 (7)-9-86 PWP. ELISSAJAESEWARS REGISEREARCHIEC 8" min clear EQ EQ ' - 0" to highest operable part Countertop 8" ' -

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 21 30 00 FIRE PUMPS GENERAL This standard provides general requirements of The University of South Alabama in Mobile Alabama for fire pumps. This document is not intended to serve as a guide specification.

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in

More information