PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Size: px
Start display at page:

Download "PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM"

Transcription

1 PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Problem: Stormwater collected from the neighborhood upstream is released at 9 Muirfield Lane and flows west toward Bellerive Country Club. The stormwater exits the outfall and has no defined flow path, creating yard erosion. In order to slow down the erosion, the residents have placed soil, brick, and rocks, but the improvements often get washed out by the high flows. The backyards of 6, 7, 2, 2, and 22 Muirfield Lane have soggy conditions and ditches carved out by erosion. Near 22 Muirfield Lane, the landscape changes from mowed lawns to a small rock swale. The rock has eroded away. Next is a wooded riparian area, which is hidden and likely not often accessed by the nearby residents. The entire reach is in very poor health. The stream is downcutting and widening. Portions of the stream have been lined with large riprap. There is little ground vegetation because the canopy of primarily honeysuckle shades and inhibits the growth of the understory. There is debris in the channel, including a lawnmower, fallen trees and branches, and a mess of live cables. The stagnant water in the stream is blue-green, cloudy, and smells of sewage. At the Bellerive Country Club, the flow is piped. Water is collected and is piped to the west. Proposed Solution: Install bioswales upstream of the project area to reduce flow coming through backyards. At the outlet of the pipe from Muirfield Ln, install a vegetated reinforced earthen swale until approximately the midpoint of the lot for. Construct grade controls at the outfall and again around the midpoint of the new swale. At the downstream end of the swale, install a level spreader to encourage the flow to spread out (much like it does in this location already). Farther downstream near the property line between 6 and 22 Muirfield Ln, remove the existing rock channel and install bank protection with a rock toe. End improvements where the channel moves into the wooded area, with a grade control to lock in the elevation. Required Easements: 5 Muirfield Lane (Temporary Construction Easement) 6 Muirfield Lane (Temporary Construction Easement) 9 Muirfield Lane (Temporary Construction Easement) 2 Muirfield Lane (Temporary Construction Easement) 22 Muirfield Lane (Temporary Construction Easement) Commentary: At the lower end of the reach, average reach slope is approximately 3.5% (typical stable slope is.5 to.7%). Scour line in this area is approximately 3-feet above channel bed, and the bed width is approximately 6-feet wide. Due to the odors in the area, it is recommended that MSD be contacted to investigate their sanitary sewer system. PROJECT SCOPE OF WORK

2 PROJECT INFORMATION SUMMARY CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 Number of Properties Impacted: Number of Easements Required: Number of Properties Benefited: Opinion of Probable Construction Cost (OPC): (LBI) Project Points: 5 $94, Project Source: x Citizen Complaint Municipality Government Agency Category of Problem: Description Cost to Benefit Ratio: 24,93 Coordination Required: x MSD x Corps of Engineers x MO DNR MODOT County Highways City s City Parks County Parks x Municipality: City of Town & Country Railroad: x : Local Utility Service Providers Attached Supplemental Information: x Project Scope of Work x Conceptual Plan Drawing x Itemized Opinion of Probable Construction Cost (OPC) x (LBI) Forms x Existing Condition Photos A: Frequent structural flooding from creeks or rivers (floodplain) B: Frequent structural flooding from overland flow (non-floodplain) C: Frequent roadway flooding D: Infrequent structural flooding from creeks or rivers (floodplain) E: Infrequent structural flooding from overland flow (non-floodplain) F: Infrequent roadway flooding G: High risk structural erosion H: High risk roadway erosion x I: Yard erosion J: Moderate risk structural erosion K: Moderate risk roadway erosion L: or flooding of common ground or unmaintained area M: Yard flooding N: from inadequate sinkhole O: from inadequate roadway drainage P: of stormwater system facilities Q: Notes: MSD/MO American Water Base Map Number(s): FEMA FIR Map Number(s): 7P4 2989C88K PROJECT INFORMATION SUMMARY

3 OPINION OF PROBABLE CONSTRUCTION COST CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 25-5 ITEM ESTIMATED UNIT EXTENDED NUMBER PAY ITEM DESCRIPTION QUANTITY UNIT PRICE PRICE Mobilization Lump Sum $2,6.35 $2, Bank Protection - Biostabilization 8 Square Yards $6. $,8. 3 Bioswale 76 Square Yards $77. $3, Clearing Square Yards $,. $,. 5 Excavation Class "B" 26 Cubic Yards $55. $, Excavation Class "C" 238 Cubic Yards $28. $6, Grade Control 27 Cubic Yards $5. $4,5. 8 Level Spreader Each $,. $,. 9 Rock Toe Protection 42 Square Yards $5. $4,83. Seeding & Live Staking 8 Square Yards $45. $8,. Sodding - Fescue 4 Square Yards $.5 $4,6. 2 Vegetated Reinforced Earthen Swale 295 Square Yards $5. $3, Protection and Restoration of Site Lump Sum $,3.53 $,3.53 SUB-TOTAL - CONSTRUCTION: $, Estimated Engineering Fee: $2,. Estimated Geotechnical Engineering Fee: $6,. Estimated Property Survey/Strip Map Preparation Fee: $4,85. Estimated Property Title/Easement Search Report Fee: $2,. Estimated Topographic Survey Fee: $6,8. Estimated Property Rights Acquisition Document Preparation Fee: $2,25. Estimated Cost of Easements: $5,. Estimated Construction Survey Fee: $583. SUB-TOTAL: $49, % Contingency: $44,825. TOTAL: $94,24.69 OPINION OF PROBABLE CONSTRUCTION COST

4 Project Id Number: Ladue Rd (Golf Course) Total Calculated :.4 ROW Yard Subtotal Yard 2 Swale / Berm 3 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

5 Project Id Number: Muirfield Ln Total Calculated :.4 ROW Yard Subtotal 2 Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

6 Project Id Number: Muirfield Ln Total Calculated :.9 ROW 9 Yard 3 Subtotal 2 Yard 6 Swale / Berm 6 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

7 Project Id Number: Muirfield Ln Total Calculated :.4 ROW Yard Subtotal Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

8 Project Id Number: Muirfield Ln Total Calculated :.4 ROW Yard Subtotal Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

9 Project Id Number: Muirfield Ln Total Calculated :.5 ROW 3 Yard 3 Subtotal 6 Yard 6 Swale / Berm 7 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

10 Project Id Number: 25-5 Total Calculated :.9 ROW 3 Yard 3 Subtotal 6 Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

11 Project Id Number: Muirfield Ln Total Calculated :.4 ROW Yard Subtotal Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

12 Project Id Number: Muirfield Ln Total Calculated :. ROW 3 Yard Subtotal 4 Yard 6 Swale / Berm 6 Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

13 Project Id Number: Muirfield Ln Total Calculated :.4 ROW Yard Subtotal 2 Yard Swale / Berm Yard > / year Life / Limb / year / 5 years Property Value. / years Multiplier Multiplier.

14 25-5 (25) (28) Outlet structure at 9 Muirfield Lane. Looking west from near 2 Muirfield Lane, just downstream of outlet pipe. (25) near 9 Muirfield Ln. (28)

15 25-5 (25) (28) Looking east from near 2 Muirfield Lane. Conditions appear to be slightly worse on site. Looking southwest. After eroded channels, topography flattens out and less erosion is observed. Runoff enters a rock channel near trees seen straight ahead in picture. (28) Rock swale near 6 & 22 Muirfield Ln. Downstream portion is washed out due to inadequate rock size. (28)

16 25-5 Looking upstream at 5 Muirfield Lane; no low vegetation is established, erosion occurring. (25) Cloudy blue-green water in stream, smells of sewage; possible location of sanitary break. (25) Typical stream reach at 5 Muirfield Lane. (25) Damaged utilities just north of stream near 23 Muirfield Lane. (25) Downstream point of stream reach at 2925 Ladue Road (Bellerive Country Club). (25) 2-inch pipe outfall at 22 Muirfield Lane.

17 P-3D V U P4-5S Proposed Improvements Strip Map Limits Topo Limits FEMA Flood Hazard Zone P4-4D 7P4-2S Regulatory Floodway.% Annual Chance Flood Hazard.2% Annual Chance Flood Hazard P4-38D 5'' 2'' 7P4-S Easements Required Properties Impacted Properties Benefited Project Conceptual Cost Cost to Benefit Ratio 36 7P4-34D Yard erosion and ponding is occurring in the backyards of several properties. Proposed Solution Description P4-26D 2'' 53 2'' '' 7P4-27D 64 Feet inch = feet Warning: If this bar does not measure " then drawing is not to scale 3 2 City of Town & Country Stormwater Program P4-27S Create a defined, reinforced swale at the outfall of the pipe. Remove and replace existing rock swale to the west. 7P4-28S 7P4-26S P4-36D '' $94,242 24,93 Problem Description 7P4-4S 7P4-37D Stormwater Gravity Main Proposed 7P4-7S 7P4-5S Stormwater Intake/Outfall Parcels 7P4-6S 22 Stormwater Manhole Pavement 35 7P4-4D Stormwater Inlet Impervious MUIRFIELD LN 2 '' '' " ) Sanitary Gravity Main Stormwater Channel Sanitary Manhole # * 7P4-39D 5 V U, %, % 2'' 7P-8S Existing -ft Contours 525 U V 7P-59S Project Location 25-5

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard

More information

Problem Understanding

Problem Understanding Introduction...2-1 Previous Data and Mapping...2-2 Known Problem Areas...2-3 Resident Survey.2-3 Introduction The Village of Downers Grove stormwater system includes storm sewers, streams, wetlands, roadway

More information

City of Waco Stormwater Management Regulations

City of Waco Stormwater Management Regulations 1.0 Applicability: City of Waco Stormwater Management Regulations These regulations apply to all development within the limits of the City of Waco as well as to any subdivisions within the extra territorial

More information

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST St. Mary s Soil Conservation District 26737 Radio Station Way, Suite B Leonardtown, MD 20650 Phone: 301-475-8402 ext. 3 Fax: 301-475-8391 www.stmarysscd.com St. Mary s County Government Department of Public

More information

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations & Considerations Morse Study Area Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division Stormwater Regulations Development Considerations Floodplain

More information

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number: Applicant: Contact Name: Phone Number: Email: Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Concept Plan Requirements: I. General Project Information 1. Address or parcel number

More information

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010 City of Elmhurst City of Elmhurst Storm Sewer System Workshop November 22, 2010 1 City of Elmhurst Watershed divide (green dashed line) through Elmhurst Area east of divide drains to Addison Creek Area

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PLEASE REFER TO THE CLEARING & GRADING PERMIT CHECKLIST BELOW FOR SUBMITTAL REQUIREMENTS. SECTION 1 CLEARING /GRADING PERMIT APPLICATION: PROJECT ADDRESS (Street, Suite #): Parcel(s) #: Total Site Area

More information

SITE PLAN REVIEW APPLICATION AND CHECKLIST

SITE PLAN REVIEW APPLICATION AND CHECKLIST SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

Northern Branch Corridor DEIS December 2011

Northern Branch Corridor DEIS December 2011 16 Floodplains 161 Chapter Overview 1611 Introduction The flowing chapter identifies floodplains found within the Northern Branch Corridor in accordance with Executive Order 11988, Floodplain Management

More information

Kickapoo Woods Restoration Plan

Kickapoo Woods Restoration Plan Report Prepared for Friends of the Chicago River Kickapoo Woods Restoration Plan Gully Recommendations 6/30/2014 INTRODUCTION WRD Environmental (WRD) was retained by Friends of the Chicago River to help

More information

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST City of Seminole 9199 113 th Street N. Seminole, FL 33772 Ph: (727) 392-1966 Fx: (727) 319-6583 SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST Note: This checklist is designed to aid designers in the review

More information

Leduc Industrial Outline Plan SE W4

Leduc Industrial Outline Plan SE W4 Leduc Industrial Outline Plan SE 1-50-25-W4 Within the North Leduc Industrial ASP Prepared for: Leduc Energy Park Ltd. Prepared by: Stantec Consulting Ltd. File No. 1161 104655 V5 Table of Contents 1.0

More information

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report Page 1 of 18 ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville Environmental Screening Report July 2011 Page 2 of 18 Table of Contents 1.0 INTRODUCTION

More information

Just The Basics: Illicit Discharge. What does it mean to me?

Just The Basics: Illicit Discharge. What does it mean to me? Just The Basics: Illicit Discharge What does it mean to me? What is an Illicit Discharge? An illicit discharge is the discharge of pollutants or non-storm water materials to storm water drainage systems

More information

Old Mill Community Association Bioretention Facility

Old Mill Community Association Bioretention Facility Project Overview This project will install a bioretention facility in a community recreation area owned by the Old Mill Community Association, Inc. Drainage from the area is currently unmanaged and has

More information

CRESCENT RESOURCES INC.

CRESCENT RESOURCES INC. CRESCENT RESOURCES INC. Due Diligence Checklist Project Name: Client: Project No. Date: 1 Survey Review survey for compliance with Crescent Resources, Inc. s Instructions to Surveyors (see below): All

More information

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION

URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION URBANIZED STREAM CORRIDOR: COMMUNITY APPROACH TO ADDRESS EROSION Stephen Crawford, P.E., CFM Romin Khavari, P.E., CFM NCTCOG Public Works Roundup MAY 23, 2018 Today s Agenda Urbanized Stream Erosion Solving

More information

CHECKLIST FOR PHASE II DRAINAGE REPORT

CHECKLIST FOR PHASE II DRAINAGE REPORT I. COVER SHEET CHECKLIST FOR PHASE II DRAINAGE REPORT A. Name of Project B. Address C. Owner D. Developer E. Engineer F. Submittal date and revision dates as applicable II. GENERAL LOCATION AND DESCRIPTION

More information

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS 5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS Low Impact Development (LID) requires a shift in stormwater management away from conveying runoff to a small number of downstream points through hydraulically

More information

Pollutant Removal Benefits

Pollutant Removal Benefits Bioswales Bioswales Similar to biocells, but have a slight, but positive grade toward an outlet Designed to convey the WQv event at very low velocities Promote filtration through native vegetation, infiltration

More information

Village of Forest Park. July 27, Sewer Separation Evaluation

Village of Forest Park. July 27, Sewer Separation Evaluation Village of Forest Park July 27, 2015 Sewer Separation Evaluation Presentation Overview Study Background Historic Nature of Forest Park Drainage Scale of Flooding Problem Forest Park Sewer System Background

More information

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working Photo to go here Table of Contents Getting to know your Stormwater Facilities..3 Fences and

More information

Severn River Sub-Watershed: BMP 09-Retrofit

Severn River Sub-Watershed: BMP 09-Retrofit Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1

More information

When planning stormwater management facilities, the following principles shall be applied where possible.

When planning stormwater management facilities, the following principles shall be applied where possible. 2.0 Principles When planning stormwater management facilities, the following principles shall be applied where possible. 2.0.1 Drainage is a regional phenomenon that does not respect the boundaries between

More information

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015 Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning

More information

Draft Rhode Island Stormwater Design and Installation Standards Manual

Draft Rhode Island Stormwater Design and Installation Standards Manual Draft Rhode Island Stormwater Design and Installation Standards Manual Summary The May 2009 Public Review Draft version of the RI Stormwater Design and Installation Standards Manual consists of approximately

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

TENTATIVE MAP CHECKLIST

TENTATIVE MAP CHECKLIST Business License 707.648.4357 www.cityofvallejo.net Central Permit Center 555 Santa Clara Street Vallejo CA 94590 Building 707.648.4374 Planning 707.648.4326 TENTATIVE MAP CHECKLIST Public Works/Engineering

More information

Chapter 3 Site Planning and Low Impact Development

Chapter 3 Site Planning and Low Impact Development CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre),

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

Washington County, Maryland Division of Public Works Policy Manual

Washington County, Maryland Division of Public Works Policy Manual Washington County, Maryland Division of Public Works Policy Manual Subject: Downstream Drainage Easement Category: Land Development Engineering Number: 7-4.1 Date: June 1, 2009 (effective) PURPOSE: The

More information

City of O Fallon, Missouri Stormwater Management Policy

City of O Fallon, Missouri Stormwater Management Policy 100 N. Main St, O Fallon MO 63366 City of O Fallon, Missouri Stormwater Management Policy Adopted: June, 2011 2011 Revised: City of O Fallon, Missouri Stormwater Management Policy Table of Contents PURPOSE

More information

POLE BRIDGE ROAD NEAR FIVE LOT FARM

POLE BRIDGE ROAD NEAR FIVE LOT FARM Drainage Improvements Village of Avon Pole Bridge Road near Five Lot Farm December 2014 POLE BRIDGE ROAD NEAR FIVE LOT FARM Pole Bridge Road is the eastern border of the Village south of NYS route 5 &

More information

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1 The ABC s of BMP s Aux Sable Watershed Plan St. Charles, IL Why are BMP s Important Best Management Practices (BMPs) developed as a set of practices which help to achieve goals of the Clean Water Act and

More information

2018 Annual Landfill Inspection Report

2018 Annual Landfill Inspection Report 2018 Annual Landfill Inspection Report Landfill H.W. Pirkey Plant Southwestern Electric Power Company Hallsville, Texas December 17, 2018 Prepared for: Southwestern Electric Power Company H.W. Pirkey Plant

More information

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment November 26, 2014 Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment Study Area & Drainage System Legend Coronation Project Park

More information

APPLICATION FOR MINOR SITE PLAN REVIEW

APPLICATION FOR MINOR SITE PLAN REVIEW www.appleton.org APPLICATION FOR MINOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY

More information

2016 WORKSHOP LVR Field Trip

2016 WORKSHOP LVR Field Trip 2016 WORKSHOP LVR Field Trip ***Note*** Many of the sites on this tour were NOT related to, or funded by, the DGLVR program. They are being shown to encourage discussion about the kinds of projects that

More information

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012 The City of Indianapolis is undergoing the completion of RebuildIndy projects. Through Mayor Ballard s RebuildIndy initiative, investments

More information

Guidelines for Streambank Protection

Guidelines for Streambank Protection PDHonline Course C187 (3 PDH) Guidelines for Streambank Protection Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School 930 Gallison Hill Rd, East Montpelier, VT Filter Berm, Sand Filter, Cistern / Rain Barrel, Gravel Wetland, Check

More information

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura Stormwater BMP and Stream Restoration in a City Park Jeff Herr P.E., D.WRE Jill Stachura 770.673.3673 JHerr@BrwnCald.com Project Location Camp Creek in Metro Atlanta 7 sq. mile drainage area at project

More information

Brigitte A. Berger, Director of Engineering

Brigitte A. Berger, Director of Engineering Brigitte A. Berger, Director of Engineering Wilmette s Sewer System Overview of Wilmette s Sewer System Green vs. Gray? Stormwater Action Plan Regulatory Compliance Why Homes Flood What can

More information

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK MAY 19, 2014 Prepared By: Timothy M. Lavocat, P.E., CFM

More information

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application General Application COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON 97051 (503) 397-1501 File No. GENERAL LAND USE PERMIT APPLICATION TYPE OF PERMIT: Zone Change Temporary

More information

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations 2 Executive Summary The City of Ramsey contracted the Anoka Conservation District to complete an inventory of riverbank condition along the entire 5.8 miles of City that border the Mississippi River. The

More information

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County ARTICLE VI. PERFORMANCE STANDARDS Section 600 Compliance All uses, activities, subdivisions and/or land developments

More information

SECTION 6. Routine Maintenance Activity Details

SECTION 6. Routine Maintenance Activity Details SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent

More information

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future. The Duck Pond Watershed is located in northern Hillsborough County in an area in which a number of land and water management issues are currently being addressed by citizen's action groups and state, regional

More information

CITY OF VALPARAISO STORMWATER MASTER PLAN

CITY OF VALPARAISO STORMWATER MASTER PLAN CITY OF VALPARAISO STORMWATER MASTER PLAN APPROVED BY THE VALPARAISO CITY UTILITIES BOARD OCTOBER, 2016 Prepared by the City of Valparaiso Engineering Department PLAN SUMMARY Major flash flooding in August

More information

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual. 4.4. Filter Strips Filter Strips are densely vegetated lands that treat sheet flow storm water from adjacent pervious and impervious areas. They function by slowing runoff, trapping sediment and pollutants,

More information

USF System Campus Master Plan Updates Goals, Objectives and Policies

USF System Campus Master Plan Updates Goals, Objectives and Policies 2015-2025 USF System Campus Master Plan Updates Goals, Objectives and Policies Tampa Goals, Objectives, and Policies Table of Contents Executive Summary 2015 2025 USF Campus Master Plan Update Introduction

More information

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014 City of Elmhurst City of Elmhurst Comprehensive Flood Plan City Council Meeting September 15, 2014 City of Elmhurst Presentation Overview Study Background Study Methodology Analysis of Three Additional

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

NOTES: 1.) THE BOGGY CREEK RD. AND SIMPSON RD. IMPROVEMENTS DEPICTED ON THIS PLAN ARE BASED ON RECORD CONSTRUCTION PLANS AND HAVE NOT BEEN SURVEYED. 2.) EXISTING RESIDENTIAL BUILDING STRUCTURES AND ANCILLARY

More information

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS DRAINAGE REPORT STATEMENT ENGINEER'S STATEMENT: The attached drainage plan and report were prepared under my direction and supervision and are correct

More information

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS In West Sadsbury Township, Chester County, Pennsylvania TABLE OF CONTENTS I. Introduction 3 II. Importance of Stormwater Management

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Town of Vershire Road Erosion Inventory Report

Town of Vershire Road Erosion Inventory Report Town of Vershire Road Erosion Inventory Report Taylor Valley Road. Photo taken by TRORC staff. Prepared by: 128 King Farm Road Woodstock, VT 05091 Inventory and report funded by the Vermont Agency of Transportation

More information

APPLICATION FOR MINOR SITE PLAN REVIEW

APPLICATION FOR MINOR SITE PLAN REVIEW www.appleton.org APPLICATION FOR MINOR SITE PLAN REVIEW Community and Economic Development Department 100 N. Appleton St. PH: 920-832-6468 Appleton, WI 54911 FAX: 920-832-5994 Stamp date received PROPERTY

More information

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC Project Location Gwinnett County, GA: Population: 825,000

More information

R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE.

R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE. R1a: REINFORCED TURF TO REPLACE GRAVEL /GRASS PARKING ADJACENT TO SOUTH PENNSYLVANIA AVENUE. Description The retrofit site is located along South Pennsylvania Avenue, between Maplewood Street and just

More information

Public Meeting for the Redevelopment of. July 17,2018 7pm to 9pm Rolling Knolls Elementary School

Public Meeting for the Redevelopment of. July 17,2018 7pm to 9pm Rolling Knolls Elementary School Public Meeting for the Redevelopment of July 17,2018 7pm to 9pm Rolling Knolls Elementary School Meeting Agenda Welcome/ Community Meeting Key Project Information History - Damian Cosby, DRP- Chief of

More information

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES 4.1 INFILTRATION BASIN AND TRENCH Figure 4.1. Infiltration basin and trench (Source: Department of Civil, Construction, and Environmental Engineering,

More information

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS May 2007 SECTION 1 Responsibility of Applicant TABLE OF CONTENTS A. Stormwater Management Plan Required Information

More information

STREAM BUFFERS

STREAM BUFFERS 88-415 STREAM BUFFERS 88-415-01 PURPOSE In the Kansas City region and throughout the nation, vegetated stream buffers have been clearly shown to protect stream stability and related infrastructure, improve

More information

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) 26.01 DESCRIPTION AND PURPOSE. Landscaping is an important element of the use, development and preservation of land, and a significant factor

More information

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield Design Considerations for Open Channel and Detention Pond Design Howard Redfearn, City of Mansfield Previous Experience/Criteria/Maintenance Issues New Criteria Discussion Overview Where is Mansfield?

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

Chapter 14. Stormwater Quality Introduction

Chapter 14. Stormwater Quality Introduction 14.0 Introduction This chapter addresses requirements and design criteria related to post-construction stormwater best management practices (requirements for construction erosion and sediment control are

More information

Flooding Hearing: Long and Short Term Strategies

Flooding Hearing: Long and Short Term Strategies Services of the San Francisco Public Utilities Commission Flooding Hearing: Long and Short Term Strategies Presentation to San Francisco Board of Supervisors Public Safety and Neighborhood Services Subcommittee

More information

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK July 2013 Jill Stachura Project Location Gwinnett County, GA: Population: 825,000 Area: 437 sq. miles 1,300 miles storm drainage system

More information

Understanding Stormwater Drainage Maintenance

Understanding Stormwater Drainage Maintenance WARREN COUNTY STORMWATER DISTRICT Understanding Stormwater Drainage Maintenance Home Owner s Association Guide Introduction Our goal is to help property owners and Home Owner s Associations (HOA) understand

More information

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32 Page 32 3.0 MAJOR DRAINAGE SYSTEMS The 1965 Master Plan Report for Storm Drainage Facilities ( 1965 Master Plan ) identified six primary subwatersheds within the Dade City study area. Each of these areas

More information

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES The following 2019 information is based on the information available to staff at the time of creation. Dates & time may change

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith Urban Stormwater Management Rebecca Leonardson Rui Teles Brooke Ray Smith Introduction Stormwater in Portugal Why urban stormwater is currently a problem What is green stormwater management? Why it is

More information

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018 Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018 Public Involvement Summary: The planning process includes opportunities

More information

Construction Site Erosion Control

Construction Site Erosion Control Construction Site Erosion Control Site: New Residence Halls for the Board of Trustees of the University of Alabama, Tuscaloosa Location North of UA Campus: North of 2nd Street (north of AIME and Bevill

More information

Alternate Green Stream Bank Stabilization Methods

Alternate Green Stream Bank Stabilization Methods U.S. Army Corps of Engineers Philadelphia/Baltimore Districts Alternate Green Stream Bank Stabilization Methods Wissahickon Creek, Tannery Run and Rose Valley Creek Bo-Rit Asbestos Site Ambler, Pennsylvania

More information

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015 RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015 IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm

More information

Standard Operating Procedure: Outfall Inspections

Standard Operating Procedure: Outfall Inspections Standard Operating Procedure: Outfall Inspections Date: 12/21/2018* Version: 3 Review Frequency: Annual Reasons for Procedure The University of Virginia (UVA) has a permit to operate a Municipal Separate

More information

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013 Lincoln 270 City of Lincoln Stormwater Management Plan April 2, 2013 # 2005.48 Prepared By: Civil Engineering Solutions, Inc. 590 E Street Lincoln, Ca 95648 (916) 645 5700 1.0 Background: The project site

More information

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA Lecture Today Urban Water management terms Examples of water management in urban areas Field

More information

C ity of Grande Prairie Development Services Department

C ity of Grande Prairie Development Services Department C ity of Grande Prairie Development Services Department FAIRWAY DEVELOPMENT OUTLINE PLAN OP 08 09 Approved April 6, 2009 Prepared by: Focus Corporation Table of Contents 1.0. Introduction 2 3 1.1. Plan

More information

Do you know there your MS4 is?

Do you know there your MS4 is? Do you know there your MS4 is? Understanding risk Beth Chesson, CPESC, CPSWQ September 14, 2015 Understand your MS4 Reduce your risk Nutrient management MS4 Flood management CIP Comprehensive Stormwater

More information

MATHEWS COUNTY RURAL DITCH ENHANCEMENT STUDY

MATHEWS COUNTY RURAL DITCH ENHANCEMENT STUDY MATHEWS COUNTY RURAL DITCH ENHANCEMENT STUDY Prepared For: Ditching Committee and Middle Peninsula Planning District Commission April 7, 2015 Prepared By: DAA Project Number: B13172B-01 Study Comments

More information

AWR Engineering, LLC

AWR Engineering, LLC AWR Engineering, LLC Alaska Water Resources Memorandum To: Kirsti Bischofberger, Watershed Manager, Municipality of Anchorage From: Janie Dusel, PE Date: February 3, 2017 Re: 2016 Low Impact Development/Green

More information

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages 4.2-d VEGETATED SLOPE STABILIZATION Alternative Names: Willow Wattles, Live Bundles, Fascines, Live Staking, Joint Planting, Branch Packing, Brush Layering, and Brush Matting DESCRIPTION Vegetated slope

More information

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK A. Authority As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.210, the Director of Planning and Development

More information

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located Outlet Retrofit Hitzel Terrace The town owned parcel along Hitzel Terrace is a natural wetland area which currently provides some level of stormwater detention and peak-flow attenuation. The proposed project

More information

POST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"

POST CONSTRUCTION STORMWATER MANAGEMENT FOR WHITE OAK SEWER INTERCEPTOR POST CONSTRUCTION STORMWATER MANAGEMENT PLAN FOR "WHITE OAK SEWER INTERCEPTOR" Located in Newberry Township, York County March 21, 2008 Prepared by: Mellott Engineering, Inc. 7500 Devonshire Heights Road

More information

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES BIO-RETENTION FACILITIES (for all basins / BMPs) Annually Prepare Operation and Maintenance Plan. Clearly outline how vegetation in the facility and its buffer area will be managed or harvested in the

More information

NAPA COUNTY PUBLIC WORKS Standards & Specifications

NAPA COUNTY PUBLIC WORKS Standards & Specifications Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6

More information

Major Subdivision Sketch Plan Checklist

Major Subdivision Sketch Plan Checklist This checklist provides specific requirements that are apart of the Sketch process. The entire process is described by the Huntersville Subdivision Review Process which details all the submittal and resubmittal

More information

4. Contractor (and subcontractors if applicable) certification statement(s)

4. Contractor (and subcontractors if applicable) certification statement(s) CHEMUNG COUNTY STORMWATER COALITION STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL CHECKLIST GENERAL INFORMATION: 1. Owner/Operator name, legal address, phone number 2. Copy of signed Notice of

More information

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY PROJECT AREA: HYDE PARK HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY 12550 http://www.hudsonvalleyregionalcouncil Insert aerial site photo with streets labeled GREEN INFRASTRUCTURE CONCEPT

More information