WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area
|
|
- Marybeth Washington
- 6 years ago
- Views:
Transcription
1 City/CCSD 28E Agreement February 14, 2017 Page 1 28E Agreement Between the City of Cedar Rapids, Iowa (City) and College Community School District (CCSD) Regarding the construction of a roundabout at the intersection of Kirkwood Boulevard SW and College Community School District South Access Drive WHEREAS increased traffic at the intersection of Kirkwood Boulevard SW and the south school access drive warrants improvements to the intersection for safe and efficient flow of traffic, and WHEREAS, the City will be constructing a roundabout at the intersection of Kirkwood Boulevard SW and the south CCSD school access drive to provide safe and efficient traffic flow, and WHEREAS, the construction of the roundabout will include addition of sidewalk, pedestrian curb ramps, and a trail to improve the accessibility and safety for pedestrians, and a bioretention area to treat stormwater runoff from CCSD property before being discharged to Hoosier Creek, and WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area NOW THEREFORE, the City and CCSD agree as follows: Intent 1. By this agreement, the parties hereto intend to plan and implement a construction project to reconstruct the intersection of Kirkwood Boulevard SW and the south CCSD school access drive, as shown on the attached Project Concept Drawing, Exhibit A. a. Scope: The project would include removing the existing intersection pavement, constructing a new roundabout intersection, storm sewer, culvert, sidewalk, trail, landscaping, and lighting. b. Schedule: Construction is anticipated to occur during the 2017 construction season, with road closures to occur on weekends prior to summer when CCSD is in hiatus, and full closure during summer 2017 CCSD hiatus. Roadway is anticipated to be open to traffic for Fall 2017 school semester, with final completion continuing until the end of the 2017 construction season and possibly into the 2017 spring seeding and planting season.
2 City/CCSD 28E Agreement February 14, 2017 Page 2 Project Development 1. Project Design: The City will be responsible for providing the project plans and specifications to meet City criteria for a roundabout intersection and a graded urban section, side street connections, pedestrian sidewalk and trail facilities as shown in the attached Exhibit A. CCSD will review the plans and specifications, and will not unreasonably withhold concurrence prior to the project being put out for bids. Reimbursement for design work shall be per the benefit share as determined through the City assessment process. 2. Project Administration: After CCSD concurrence of the design plans and specifications, the City shall order bids to be received, and enter into a contract for the construction of the project. City shall administer and inspect the construction of the project. The City shall receive acceptance of the construction along the CCSD campus property prior to the City accepting the work. Such approval shall not be unreasonably withheld. 3. City will maintain all items within the Kirkwood Boulevard Right of way and center islands of the side streets, with the exception of mowing the turf grass within the right of way which will be done by CCSD. Financing 1. The parties agree that the opinion of probable cost for this project is $1,951,070 as shown on attached Exhibit B. CCSD s estimated cost share for the sidewalk, trail, and bioretention improvements is estimated to be $78,560 as shown on the attached Exhibit B which is ultimately 100% responsibility of CCSD. Although the indication is this is an assessment project, the City and CCSD agree that CCSD, in lieu of being specially assessed, will pay its share of the project within 30 days of City accepting the project. 2. Any underage of the opinion of probable cost for the total project, based upon actual costs upon completion, shall be credited to CCSD in the form of a reduced amount below the preliminary estimate. Any final costs, based upon actual expenditures, which exceed the preliminary estimate amount, shall be reimbursed by CCSD to the City. 3. The City shall make all payments to the contractor for work completed. At final project acceptance, the City shall prepare final assessments, per Iowa Code Section 384 for billing within the assessment district and reimbursement by CCSD per Financing items 1 and 2 above. 4. This agreement constitutes an assessment petition by CCSD per Iowa Code Section CCSD waives notice of the assessment to property owner by publication and mailing and also waives objection to the assessment. 5. CCSD agrees to provide temporary grading easements and permanent roadway right of way for this project at no cost to the project.
3 City/CCSD 28E Agreement February 14, 2017 Page 3 Recitals 1. City and CCSD agree to hold each other harmless from actions arising from this agreement unless such actions are the result of negligence or intentional acts resulting in damages. 2. This document represents the entire agreement between the City and CCSD regarding this project. Any subsequent changes or modifications to the terms of this agreement will be in the form of a duly executed amendment to this document. 3. If any section, provision, or part of this agreement shall be found to be invalid or unconstitutional, such a finding shall not affect the validity of the agreement as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the agreement cannot be fulfilled. 4. This agreement may be executed in two counterparts, each of which so executed will be deemed to be an original City of Cedar Rapids, Iowa Jeffrey A. Pomeranz City Manager Amy Stevenson City Clerk Date Date College Community School District Randy Bauer Board President James Rotter Board Secretary Date Date
4 I= /SPLIT I= I= R= D /TRI SPLIT I= /TRI SPLIT I= I= /SPLIT I= I= HY SDW1 /DROP P P WAT /SVC EAST FN B /4 CHAINLINK R= D I= BM /VERT /NGS186 CN L186 E R= D I= R= DS KIRKWOOD BLVD I= I= R= CNT /CUT X CNE E N2006 KIRKWOOD BLVD R= DS R= R= DS T /VE /VE VE R= DS VE T R= DS P P E /VE E G R= S R= E R= S E L CNE PT CLS MHL /SEE PHOTO CNT /GROMET TIFT STA R= R= R= LS B /EDGING ROCK HY HY R= S BOX CULVERT REPLACEMENT R= GAS R= S SIDEWALK TRAIL TEMPORARY STORMWATER BMP AREA EASEMENT PROPOSED ROW SCHOOL SERVICE ROAD PROPOSED ROW TEMPORARY EASEMENT TRAIL DEMOLISH AND RECONSTRUCT CULVERT SIDEWALK TEMPORARY EASEMENT $USERNAME$ $PLTDRVS$ $PENTBLS$ $DATE$ $TIME$ $FILEL$ O FEET TEMPORARY EASEMENT SIDEWALK 100 EXHIBIT A KIRKWOOD ROUNDABOUT R TRAIL LEGEND PROPOSED ROW TEMPORARY EASEMENT SIDEWALK AND TRAIL STORMWATER BMP AREA
5 EXHIBIT B CITY OF CEDAR RAPIDS, IOWA MOBILIZATION LS $150, $75, $75, $0.00 $150, $150, CONSTRUCTION SURVEYS LS $11, $9, $1, $0.00 $11, $11, TRENCH COMPACTION TESTING LS 1 1 $2, $2, $0.00 $0.00 $2, $2, SUBGRADE AND SUBBASE COMPACTION TESTING LS 1 1 $1, $1, $0.00 $0.00 $1, $1, CONCRETE MATURITY TESTING FOR PCC PAVEMENT LS 1 1 $1, $1, $0.00 $0.00 $1, $1, TRAFFIC CONTROL LS 1 1 $10, $10, $0.00 $0.00 $10, $10, EROSION AND SEDIMENT CONTROL TEMPORARY EROSION AND SEDIMENT CONTROLS, ROADWAY AND PAVING TEMPORARY EROSION AND SEDIMENT CONTROLS, CULVERT LS 1 1 $2, $2, $0.00 $0.00 $2, $2, LS 1 1 $2, $2, $0.00 $0.00 $2, $2, SILT FENCE LF 3,400 3,400 $4.50 $15, $0.00 $0.00 $15, $15, FILTER SOCKS LF 1,700 1,700 $1.88 $3, $0.00 $0.00 $3, $3, FILTER SOCKS AT STORM SEWER STRUCTURES EA $62.67 $1, $0.00 $0.00 $1, $1, CLEARING AND GRUBIING LS 1 1 $3, $3, $0.00 $0.00 $3, $3, REMOVALS REMOVAL OF EXISTING PAVEMENTS, DRIVEWAYS, CURB, AND GUTTER SY 5,187 5,187 $17.43 $90, $0.00 $0.00 $90, % 5446 $94, REMOVAL OF EXISTING SIDEWALKS SY $11.25 $4, $0.00 $0.00 $4, % 392 $4, MILLING OF HMA PAVEMENT, 3IN SY $5.17 $1, $0.00 $0.00 $1, % 399 $2, SAWCUTTING OF PAVEMENT (FULL-DEPTH) LF $2.00 $ $0.00 $0.00 $ $ REMOVAL OF STORM SEWER STRUCTURES EA 3 3 $ $1, $0.00 $0.00 $1, $1,749.00
6 CITY OF CEDAR RAPIDS, IOWA REMOVAL OF STORM SEWER AND CULVERT PIPE LF $36.63 $26, $0.00 $0.00 $26, $26, REMOVAL OF EXISTING BOX CULVERT, 12'x8' R W/ WINGWALLS AND APRON LS 1 1 $8, $0.00 $8, $0.00 $8, $8, RELOCATION OF EXISTING BOULDER ON SITE LS 1 1 $ $0.00 $0.00 $ $ $ EXCAVATION UNCLASSIFIED EXCAVATION AND EMBANKMENT (WHICH SHALL INCLUDE BOULDERS UP TO 1/2 CUBIC YARDS) CY 2,666 2,666 $12.00 $31, $0.00 $0.00 $31, $31, STRIP AND RESPREAD TOPSOIL CY 1,923 1,923 $15.00 $28, $0.00 $0.00 $28, $28, BORROW, OFF SITE, CONTRACTOR FURNISHED CY 4,578 4,578 $25.00 $114, $0.00 $0.00 $114, $114, SUBGRADE PREPARATION SY 7,189 7,189 $3.00 $21, $0.00 $0.00 $21, % 7548 $22, GRANULAR SUBBASE CY 1,052 1,052 $15.53 $16, $0.00 $0.00 $16, % 1105 $17, SPECIAL BACKFILL CY 3,167 3,167 $16.00 $0.00 $50, $0.00 $50, $50, TRENCH STABILIZATION TON $18.00 $ $0.00 $0.00 $ $ RAIN GARDEN BEDDING STONE AND FILTER AGGREGATE CY $25.00 $0.00 $0.00 $1, $1, % 42 $1, GRANULAR BACKFILL CY $15.53 $5, $0.00 $0.00 $5, % 368 $5, STORM SEWER STORM SEWER MAIN, TRENCHED, R CL III, 15IN LF $ $43, $0.00 $0.00 $43, $43, STORM SEWER MAIN, TRENCHED, R CL III, 24IN LF $ $41, $0.00 $0.00 $41, $41, STORM SEWER MAIN, TRENCHED, R CL III, 30IN LF $ $40, $0.00 $0.00 $40, $40, STORM SEWER MAIN, TRENCHED, R CL III, 36IN LF $ $21, $0.00 $0.00 $21, $21, STORM SEWER MAIN, TRENCHED, R CL III, 42IN LF $ $37, $0.00 $0.00 $37, $37,740.00
7 CITY OF CEDAR RAPIDS, IOWA SUBDRAIN, 6IN LF $24.00 $2, $0.00 $0.00 $2, % 105 $2, SUBDRAIN, RAIN GARDEN, 6IN HDPE LF $24.00 $0.00 $0.00 $1, $1, % 58 $1, CULVERT, PRECAST REINFORCED CONCRETE ARCH WITH INTEGRAL BOTTOM, 24FT SPAN x 9FT RISE LS 1 1 $299, $0.00 $299, $0.00 $299, $299, FLARED END SECTION, DR-201, 24IN EA 2 2 $ $ $0.00 $0.00 $ $ FLARED END SECTION, DR-201, 42IN EA 1 1 $ $ $0.00 $0.00 $ $ STORM SEWER MANHOLE, SW-401, 48" DIA. EA 1 1 $4, $4, $0.00 $0.00 $4, $4, STORM SEWER MANHOLE, SW-402, 5FTx5FT. EA 1 1 $4, $4, $0.00 $0.00 $4, $4, STORM SEWER MANHOLE, SW-402, 6FTx6FT EA 1 1 $4, $4, $0.00 $0.00 $4, $4, STORM SEWER MANHOLE, SW-404, 6FTx6FT EA 1 1 $4, $4, $0.00 $0.00 $4, $4, STROM SEWER INTAKE, SW-507 EA 5 5 $4, $22, $0.00 $0.00 $22, $22, STROM SEWER INTAKES, SW-508 EA 3 3 $5, $15, $0.00 $0.00 $15, $15, STROM SEWER INTAKES, SW-509 EA 2 2 $6, $12, $0.00 $0.00 $12, $12, STROM SEWER INTAKES, SW-510 EA 7 7 $6, $44, $0.00 $0.00 $44, $44, STROM SEWER INTAKES, SW-541S EXT EA 1 1 $5, $5, $0.00 $0.00 $5, $5, STROM SEWER INTAKES, RAIN GARDEN OUTLET STRUCTURE, NYLOPLAST DRAIN BASIN, 12IN DIA. EA $ $0.00 $0.00 $ $ $ REVETMENT TON $45.00 $0.00 $14, $0.00 $14, % 361 $16, TEMPORARY STREAM CROSSING LS 1 1 $3, $0.00 $3, $0.00 $3, % 1 $3, ROADWAY AND PAVING PORTLAND CEMENT CONCRETE PAVEMENT, JOINT- REINFORCED,C-3, 8IN SY 6,011 6,011 $47.67 $286, $0.00 $0.00 $286, % 6312 $300,871.59
8 CITY OF CEDAR RAPIDS, IOWA PORTLAND CEMENT CONCRETE SIDEWALK, 5IN SY $35.00 $0.00 $0.00 $26, $26, % 793 $27, PORTLAND CEMENT CONCRETE TRAIL, 6IN SY $37.00 $0.00 $0.00 $27, $27, % 783 $28, PORTLAND CEMENT CONCRETE SIDEWALK RAMP SF $45.00 $0.00 $0.00 $4, $4, % 98 $4, HOT MIX ASPHALT CONCRETE OVERLAY, PG 70-28, 1/2" AGG., 3IN TON $81.00 $0.00 $0.00 $7, $7, % 103 $8, PAVEMENT MARKINGS, PAINTED STA $85.00 $6, $0.00 $0.00 $6, % 75 $6, SITE WORK AND LANDSCAPING IMPORTED TOPSOIL (CONTINGENCY) CY $45.00 $27, $0.00 $0.00 $27, $27, IMPORTED SOIL, RAIN GARDEN ENGINEERED SOIL CY $50.00 $0.00 $0.00 $2, $2, $2, SEEDING, FERTILIZING AND MULCHING, TYPE 6, RURAL ACRE 1 1 $1, $1, $0.00 $0.00 $1, $1, SODDING SY 3,950 3,950 $10.42 $41, $0.00 $0.00 $41, $41, PLANTINGS, FURNISHING AND INSTALLATION, OVERSTORY TREES PLANTINGS, FURNISHING AND INSTALLATION, ORNAMENTAL TREES PLANTINGS, FURNISHING AND INSTALLATION, SHRUBS, 5 GAL PLANTINGS, FURNISHING AND INSTALLATION, RAIN GARDEN SHRUBS, 5 GAL PLANTINGS, FURNISHING AND INSTALLATION, PERENNIAL GRASSES, 1 GAL PLANTINGS, FURNISHING AND INSTALLATION, RAIN GARDEN PERENNIAL AND GRASSES, 1 GAL EA $ $20, $0.00 $0.00 $20, $20, EA $ $16, $0.00 $0.00 $16, $16, EA $50.00 $2, $0.00 $0.00 $2, $2, EA $50.00 $0.00 $0.00 $ $ $ EA $20.00 $19, $0.00 $0.00 $19, $19, EA $20.00 $0.00 $0.00 $5, $5, $5, STONE RETAINING WALL TON $45.00 $ $0.00 $0.00 $ $ HANDRAIL, SS PIPE LF $80.00 $0.00 $6, $0.00 $6, $6, ROADWAY LIGHTING AND SIGNS
9 CITY OF CEDAR RAPIDS, IOWA SERVICE CABINET EA 1 1 $11, $11, $0.00 $0.00 $11, $11, SERVICE CABINET FOOTING EA 1 1 $1, $1, $0.00 $0.00 $1, $1, LIGHTING UNIT EA $4, $57, $0.00 $0.00 $57, $57, LIGHTING UNIT FOOTING EA $ $12, $0.00 $0.00 $12, $12, HANDHOLE, NOT TRAFFIC RATED EA 2 2 $ $1, $0.00 $0.00 $1, $1, WIRE - 1C #12 LF 5,304 5,304 $10.00 $53, $0.00 $0.00 $53, $53, WIRE - 1C #6 INSULATED GROUND LF 1,693 1,693 $14.00 $23, $0.00 $0.00 $23, $23, CONDUIT - 2" PVC SCHEDULE 80 LF 1,166 1,166 $15.00 $17, $0.00 $0.00 $17, $17, CONDUIT - 3" PVC SCHEDULE 80 LF $20.00 $5, $0.00 $0.00 $5, $5, PERMANENT TRAFFIC SIGNS, WITH POSTS, PER PLANS EA $ $2, $0.00 $0.00 $2, $2, SUBTOTAL: $1,386,492 $458,932 $78,560 $1,923,984 TOTAL: $1,951,070 Roadway Culvert Rain Garden
GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts
Sectional View of Concepts PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS
More informationJOB CREATION PROJECTS
SPRINGDALE INFRASTRUCTURE DEVELOPMENT PLAN JOB CREATION PROJECTS The following pages provide a narrative description, preliminary street alignment and a preliminary construction cost estimate for each
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM
BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: September 2, 2015 # 9 SUBJECT: ELECTION DISTRICT: Identification of Funds for the Traffic Signal at the Intersection of Northstar Boulevard
More informationCity of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*
12/6/2017 3012115-03 Northwood Dr NE, Glass to s/o Brookland $980,000.00 J. 4/16/2018 12/13/2017 3012121-02 O Ave NW, 16th to Ellis $4,065,000.00 Tippe; Lee J. 3/19/2018 Collins Rd NE from E of Northland
More informationAmes City Hall Campus: Stormwater Improvements
Ames City Hall Campus: Stormwater Improvements Tracy Warner, Municipal Engineer for the City of Ames, IA Jake Moore, Stormwater Specialist for the City of Ames, IA Ryan Benjegerdes, Water Resources Engineer
More informationSTANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS
STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS July 23, 2018 Page 1 of 7 STANDARD LEGEND SYMBOLS (September, 1973)... AS-101A STANDARD LEGEND SYMBOLS (September, 1973)... AS-101B
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES
01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2
More informationUniversity Park Subdivision Street Assessment Report
University Park Subdivision Street Assessment Report Prepared for: University Park Subdivision TABLE OF CONTENTS Introduction... 3 Existing Conditions Analysis... 4 Street Improvements... 5 Existing:...
More informationConcluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).
Pelican Bay Community Improvement Plan Traffic,JI Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates). D1 -A: Provide consistent signing, marking
More informationSTANDARD DETAILS QUICK REFERENCE
STANDARD DETAILS QUICK REFERENCE Note: DWGs need to be saved locally before opening file. Requires AutoCad, DWG TrueView, or Autodesk Design Review (the later two are available for free from http://usa.autodesk.com/)
More informationUrban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT
NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.
More informationSITE PLAN REVIEW APPLICATION AND CHECKLIST
SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description
More informationDESIGN SCENE SUBJECT INDEX
DESIGN SCENE SUBJECT INDEX CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY BRIDGE & APPROACH PLANS CONSTRUCTION PLAN FOR EXCEPTIONS EXCEPTION CLARIFICATION GOVERNING SPECIFICATIONS
More informationMetropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax
Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities and Towns in the Metropolitan Boston Region MEMORANDUM
More informationGYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado Schematic Design January 2015 1 2 3 4 5 6 7 8 9 DESIGN WORKSHOP Landscape Architecture Land Planning Urban Design Tourism Planning Asheville Aspen Austin
More information900 Roadside Improvement
900 Roadside Improvement Plate 901 TEMPORARY EROSION AND POLLUTION CONTROL Temporary Berm 901-1 Temporary Slope Drain 901-1 Temporary Slope Barrier (Set Price) 901-1 Temporary Ditch Check 901-1 Temporary
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 362 Featherstone Dr Project ID Number: 27-3 Problem: Anecdotal evidence suggests a natural spring exists in the backyard
More informationOld Mill Community Association Bioretention Facility
Project Overview This project will install a bioretention facility in a community recreation area owned by the Old Mill Community Association, Inc. Drainage from the area is currently unmanaged and has
More informationCITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL
CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL The following is a list of conditions requiring completion to the City s Satisfaction prior to Site Plan Approval being granted
More informationSection 9 Landscaping and Street Trees
Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3
More informationPlease make the following changes in your copy of the bid proposal for the captioned project:
Charles A. Kilpatrick, P.E. Commissioner September 8, 2014 DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 Order No.: F50 Route: 0501 Project: (NFO) 0501-005-640,C501,B648
More informationWELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A
WELCOME! 168 TH STREET IMPROVEMENTS 6:30 Open House 7 8 Presentation & Q&A 8 8:30 Open House WELCOME Todd Pfitzer City of Omaha Engineer Bob Stubbe City of Omaha Public Works Director Jon Meyer Project
More informationAPPENDIX G: TOWN ORDINANCE REVIEW
APPENDIX G: TOWN ORDINANCE REVIEW TYLin (225740) Woodard & Curran SWMP January 2013 Stormwater LID strategies, ranked for Zoning Bylaw and Site Plan Review Standards Dimensional Requirements Permit the
More informationFall 2017 Construction Update
Fall 2017 Construction Update Ward 4 Southeast Engineering Department Riverwalk Red Multi-Use Trail Bridge Rehabilitation The Riverwalk Red Multi Use Trail Bridge was awarded to Cramer and Associates,
More informationMonica Smith, PE President Robinson Engineering Company
Monica Smith, PE President Robinson Engineering Company Owner Robinson Engineering Masters Degree in Water Resource Management for Colorado State University The Dry Run Creek project got me interested
More information2-B-18-UR. Revised: 3/27/2018
Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard
More informationDEPARTMENT OF PUBLIC WORKS & UTILITIES
CITY OF PORT ANGELES DEPARTMENT OF PUBLIC WORKS & UTILITIES URBAN SERVICES STANDARDS AND GUIDELINES January 2017 Craig Fulton, P.E., Director TABLE OF CONTENTS "URBAN SERVICES STANDARDS AND GUIDELINES"
More informationMEADOWVIEW HOMEOWNERS ASSOCIATION
MEADOWVIEW HOMEOWNERS ASSOCIATION November 2, 2016 Mr. Justin V. Yaich, Township Manager West Bradford Township 1385 Campus Drive Downingtown, PA 19335 RE: Meadowview Development Home Owner s Association
More informationKittson Parkway / Watershed Park Parking Lot
Kittson Parkway / Watershed Park Parking Lot Date Constructed: Summer 2005 Site Location / Description: Kittson Parkway, North Delta, British Columbia. Permeable parking lot adjacent to Watershed Park;
More information5-Year Street Reconstruction Plan ( )
5-Year Street Reconstruction Plan (2006-2010) City of Delano Wenck File #0564-37 Prepared for: CITY OF DELANO 234 2 nd Street West Delano, MN 55328 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek
More informationSevern River Sub-Watershed: BMP 09-Retrofit
Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1
More informationReview Zone Application for D&R Canal Commission Decision
Review Zone Application for D&R Canal Commission Decision MEETING DATE: July 20, 2016 DRCC #: 16-4803 Latest Submission Received: June 13, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road, 2
More informationSOIL EROSION AND SEDIMENT CONTROL
SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86
More informationGuidance on Preparation of Construction and Maintenance Costs
INVER GROVE HEIGHTS Northwest Area Appendix F Guidance on Preparation of Construction and Maintenance Costs Northwest Area (NWA) Inver Grove Heights Stormwater Manual Guidance on Preparation of Construction
More informationUNIVERSITY OF NORTHERN IOWA
UNIVERSITY OF NORTHERN IOWA Municipal Separate Storm Sewer System September 2008 Report Permit Number 07-09-0-04 August 2008 Prepared by: University of Northern Iowa Environmental Health and Safety Office
More informationDESIGN CRITERIA PACKAGE
RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
More informationUse of Best Management Practices
Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions
More informationVALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION
MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION Adopted November 28, 2005 TABLE OF CONTENTS DEFINITION OF TERMS...II I. DESIGN CRITERIA... 1 A. GENERAL DESIGN CRITERIA... 1 B. ROADWAY CLASSIFICATION...
More informationCity of Richmond. Engineering Design Specifications
City of Richmond Design Specifications June 2008 CITY OF RICHMOND ENGINEERING DESIGN SPECIFICATIONS JUNE 2008 THIS DOCUMENT DETAILS THE MINIMUM STANDARDS TO BE USED FOR THE DESIGN OF ENGINEERING PROJECTS
More informationThe Engineer/Developer s Perspective on Storm Water Management
The Engineer/Developer s Perspective on Storm Water Management CASE STUDY: An Innovative Approach to Storm Water Management for Small Parcel Site Development Presented by: James B. Leedom, P.E. The Sigma
More informationMUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT
MUNICIPAL SEPARATE STORM SEWER SYSTEM 2009 ANNUAL REPORT Permit Number 85 03 0 04 March 2010 Prepared by: Iowa State University Department of Environmental Health and Safety 2809 Daley Drive Ames, Iowa
More informationCARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015
CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY Adopted by the Carver County Board of Commissioners March 3, 2015 Policy Statement Goals It is the goal of Carver County Public Works to provide
More informationThe Town Board of the Town of Vienna, County of Dane, State of Wisconsin, does ordain and adopt as follows.
ORDINANCE DRIVEWAYS AND CULVERTS NO. 6-5-06 ORDINANCE CONCERNING DRIVEWAY AND CULVERT REQUIREMENTS 1-1-1 Driveway Permits; Culvert Requirements 1-1-2 Driveway and Culvert Location, Design and Construction
More informationALLEGAN COUNTY ROAD COMMISSION 108TH AVENUE RECONSTRUCTION PROJECT 5,000' EAST OF 15TH STREET TO 6,750' EAST OF 15TH STREET
TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH ST. 8TH ST. TH ST. TH ST. ND ST. 0TH
More informationFinal Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information
Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix C. LID Parking Lot Design and Teaching Tool
More informationAppendix D - Technical Design Criteria for BMPs
Appendix D - Technical Design Criteria for BMPs City of Wayzata Page 3 On-site infiltration features Definitions and Scope: Infiltration facilities are constructed basins or depressions located in permeable
More informationMEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item
MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item TO: THRU: FROM: RE: Mayor Leon Skip Beeler and Members of the City Commission Chuck Billias, City Manager Anthony
More informationCITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS
CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS 2010 EDITION CITY OF OZARK, MISSOURI REVISIONS TO THE 2009 EDITION The following revisions have been made to the 2009 edition of the city
More informationCoffee Creek Park Development Low Impact Development (LID)
Coffee Creek Park Development Low Impact Development (LID) City of Duluth, St. Louis County, MN Presented By: Christopher J. Rousseau, P.E. February 27, 2008 Developer / Owner Information Trinity Development
More informationHomeowners Guide to Stormwater BMP Maintenance
Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management
More information5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion
Topics Erosion, TESC and Construction sequencing Procedures and timing Remedies for failing sites Curtis Hinman WSU Extension and Bio Systems Eng. Faculty Low Impact Development Specialist chinman@wsu.edu
More informationCONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE
CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE CITY STREETS AS PART OF STATE HIGHWAYS GUIDELINES REACHED BY THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
More informationFederal Project No.: OC-095-1(365), OC-095-1(367)
Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-964-415, C501 Federal Project : OC-095-1(365), OC-095-1(367) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING CONSTRUCTION
More informationSUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)
1) Application form and filing fee. Application Form.pdf Development Review Guide STEP 6 of 8 SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP) 2) Transportation Development Review
More informationLetter of Credit Itemized Cost Estimate For: 100% Site Development Costs
Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for
More informationCHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)
CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08) 26.01 DESCRIPTION AND PURPOSE. Landscaping is an important element of the use, development and preservation of land, and a significant factor
More information12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1
The ABC s of BMP s Aux Sable Watershed Plan St. Charles, IL Why are BMP s Important Best Management Practices (BMPs) developed as a set of practices which help to achieve goals of the Clean Water Act and
More informationSmall Town Sustainable Stormwater Solutions
Small Town Sustainable Stormwater Solutions Kathryn Hamilton, RLA, ASLA Westmoreland Conservation District PA/DE ASLA Annual Meeting April 8-9, 8 2011 Urban, Industrial, Residential, Agricultural Flooding,
More informationGloucester County PLAN SUBMITTER'S CHECKLIST
Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,
More informationErosion & Sediment Control Plan Application Form & Checklist
Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:
More informationPRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016
PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016 The following items are required for the preliminary plat. Numbers correspond with those on the example preliminary plat. RENO COUNTY SUBDIVISION REQUIREMENTS
More informationGeneral Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration
Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General
More informationTown of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE
Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE 1.01 PURPOSE The purpose of this ordinance is to regulate the establishment, construction, improvement, modification or reworking of a driveway
More informationDATE: June 17, 2013 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ x ]
PUBLIC WORKS COMMISSION DATE: June 17, 2013 REPORT NO. PW2013-044 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General Manager, Public Works Commission
More informationAPPENDIX F: DETAIL DRAWINGS
APPENDIX F: DETAIL DRAWINGS DRAWING DIVISION 100 GENERAL NOTES 200 ROAD WAYS 300 TRAFFIC CONTROL 400 FENCES 500 SEDIMENT CONTROL 600 SANITARY AND STORM SEWERS 700 WATERMAIN 800 PARKS AND LANDSCAPING 900
More informationCITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details
CITY OF LATHROP Department of Public Works DESIGN & CONSTRUCTION Standard Details January 2014 General G-1A Signature Blocks G-1B Signature Blocks G-2 Drafting Standards G-3 Drafting Standards G-4 Drafting
More informationPLAN SUBMITTER'S CHECKLIST
Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write
More informationBelow the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.
The existing railroad trestle, when refitted as a pedestrian walkway, could be an important, eye-catching, scenic component to the Cobbossee Stream Trail. South end of the trestle, at the proposed trailhead
More informationStorm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.
September 15, 2016 Brett Eidem Cost Share Grant Administrator Minnehaha Creek Watershed District 15320 Minnetonka Boulevard Minnetonka, MN 55345 RE: Storm Water Quality and Shoreline Restoration Improvements
More informationSpring 2018 Construction Update
Spring 2018 Construction Update Ward 3 Southwest Engineering Department Locust Street Bridge over the Des Moines River The Locust Street Bridge over the Des Moines River project is being let through the
More informationGREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M
GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M MANAGE STORMWATER RUNOFF 4 x8 : 96 specially designed pavers will reduce or eliminate storm water run-off and
More informationAppendix G. Detailed Design
Appendix G Detailed Design G1: Construction details Construction detail drawings usually include important details and specifications for required project design elements. This section provides information
More informationWhite Street Area Sewer Separation, Project ID Date Issued: June 8, 2015
White Street Area Sewer Separation, Project ID 11240090 Date Issued: June 8, 2015 ADDENDUM NO. 3 This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website
More informationAppendix E Preliminary Design
Appendix E Preliminary Design 1 1 0+080 0+100 0+200 0+240 LEGEND PROPOSED POOL PROPOSED RIFFLE PROPOSED COIR CLOTH BANK TREATMENT PROPOSED VEGETATED STONE BANK TREATMENT PROPOSED VEGETATED BLOCK BANK TREATMENT
More informationleel NG CITY COUNCIL AGENDA REPORT Honorable Mayor and City Council Members
oe", City of RE leel NG CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: Honorable Mayor and City Council Members From: Ron Rosenthal, Engineering Director Agenda Item: 8J 2016 Street
More informationGovernor Stone Parkway Shared Use Path Planning Study
Governor Stone Parkway Shared Use Path Planning Study Concept Design Alternatives Report Anne Arundel County, Maryland Project No. H545906 Prepared for: Anne Arundel County Department of Public Works Bureau
More informationAppendix N. Preliminary Design
Appendix N Preliminary Design Belfountain Dam and Headpond Class EA Preferred Alternative D4H5: Lower the spillway & backfill headpond & construct channel Preliminary Cost Estimate ITEM ITEM UNIT EST.
More informationSTORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE
STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE Codes analyses for each subcommittee were completed to assist participants of the Richland County Site Planning Roundtable.
More informationSite Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.
SURFACE SAND FILTER COST ESTIMATE WORKSHEET 2005 Prices Project Title Owner Location Project Number Date Description Units Quantity Unit Cost Total Estimated Price Site Preparation Tree removal - up to
More informationStormwater Control Plan: Small (Tier 1) Land Development Project
Stormwater Control Plan: Small (Tier 1) Land Development Project Project ID for Tracking (for City Staff only): The California Regional Water Quality Control Board for the Central Coast Region (Water Board)
More informationBUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.
ARTICLE 20 BUFFERS, TREE PROTECTION AND LANDSCAPING Sec. 20.1. Purpose and Intent. Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for desirable wildlife,
More informationTHE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.
THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP
More informationINDEX EXECUTIVE SUMMARY...1 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS EXISTING UTILITIES
INDEX EXECUTIVE SUMMARY...1 INTRODUCTION...2 BASIC INFORMATION AND PROCEDURES...3 EXISTING CONDITIONS... 4-5 EXISTING UTILITIES... 6-7 MEDIAN BREAKS AND TURN LANE STORAGE REQUIREMENTS...8 PRELIMINARY DESIGN
More information23 EA , , , , , , , LF , , ,596.
Mast Arm Traffic Signals at Central Ave. 5th, 6th, 8th & 31st St. Engineering & Capital Improvements Department, City of St. Petersburg, FL Project No.: 11027-112 Bid date: January 10, 2012 Item Description
More informationLesson 2: Stormwater Best Management Practices (BMPs)
Lesson 2: Stormwater Best Management Practices (BMPs) Environmental Stewards Class Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources 732-932-9800 ext. 6209 obropta@envsci.rutgers.edu
More informationAGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:
AGENDA ITEM: CITY OF WAUKEE, IOWA CITY COUNCIL MEETING COMMUNICATION MEETING DATE: March 7, 2016 AGENDA ITEM: Consideration of approval of a resolution approving Engineering Services Amendment No. 1 with
More informationGRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.
GRAND ARBOR RESERVE BIRCHWOOD POINT, LOT-1 10203 MINERAL POINT ROAD MADISON, WISCONSIN GRAND ARBOR RESERVE, LLC 6417 ODANA RD MADISON, WISCONSIN 53719 CONTACT: DAN SCHMIDT PHONE: 608-285-8680 FAX: 608-255-3387
More informationTown of Essex Small Site Erosion Control Guide
Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams
More informationFinal Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information
Bridgewater State University Virtual Commons - Bridgewater State University Phase II Final Report Taunton River Watershed Project 2011 Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing
More informationSpreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev
Spreadsheet Report Page 1 Phase I Wickenburg, AZ SD Estimate Rev 0 9-29-11 Project name Estimator Labor rate table Equipment rate table Job size Duration Wickenburg AZ Hal White Denver Denver 121 ac 9
More informationPOST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"
POST CONSTRUCTION STORMWATER MANAGEMENT PLAN FOR "WHITE OAK SEWER INTERCEPTOR" Located in Newberry Township, York County March 21, 2008 Prepared by: Mellott Engineering, Inc. 7500 Devonshire Heights Road
More informationCounty of El Dorado Standard Plans
County of El Dorado Standard Plans Table of Contents Section 1 General Standards GS-01 General Legend and Abbreviations Section 2 Roads and Streets RS-01 RS-02 RS-03 RS-04 RS-05 RS-06 RS-07 RS-08 RS-20
More informationBioretention cell schematic key
Bioretention Cells Bioretention cell schematic key 1 3 Hardwood mulch 2 Curb cut 3 18-30 Modified soil 4 Stone aggregate choker layer 5 Stone aggregate base layer 6 Subdrain 7 Undisturbed soil 8 Overflow/Cleanout
More informationROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID
ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK 13440 DELTA PROJECT NO. 2017.226.001 SEPTEMBER 2017 ISSUED FOR BID INDEX OF DRAWINGS GENERAL CIVIL ARCHITECT/ENGINEER PROJECT
More information4. CONCEPT PLAN DEVELOPMENT
4. CONCEPT PLAN DEVELOPMENT Concept Plan Step 1: Identify Site Constraints and Opportunities Review the existing site to identify constraints and opportunities for GI Practices to meet the RRv. Constraints
More informationSoil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District
Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District The following is a list of the minimum requirements required on Soil Erosion and Sediment Control
More informationProject Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM
Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM I. PROJECT DATA Project Name Bay Meadows Development Phase II Project Address 2600
More informationASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON
ASPEN GROVE D-1 DETAIL STANDARD NOTES ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF WAY OR ON PUBLIC LANDS
More informationMetropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax
Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts 02111 617-451-2770 fax 614-482-7185 www.mapc.org Serving the 101 Cities Towns in the Metropolitan Boston Region MEMORANDUM TO:
More information