1 Exhibit II - Expanded Scope of Work Xeriscaping / Rain Water Harvesting Sustainability Program National Guard Armory, Located at 308 North Fiske Boulevard Cocoa, FL PART 1 GENERAL 1.01 BACKGROUND & SUMMARY OF WORK A. Background: The Florida Department of Military Affairs (DMA), as an agent of the National Guard Bureau (NGB), is currently responsible for the storm water management and erosion control of the National Guard Armory, located at 308 North Fiske Blvd. Cocoa, FL In order to reduce the impact of storm water runoff from the parking areas and facility roofs, the DMA Sustainability office has determined to Xeriscape approximately.25 acres of the property, and install a storm water collection system connected to the downspouts of the Armory and the adjacent storage building for irrigation. This project will allow for storm water to be reused and returned to the aquifer. This project also reduces the heat island effect, creates a habitat for native species to thrive, and stabilizes the soil. See attached documents, and aerial map at the end of the SOW for more detailed information. B. Description of work: The work consists of designing and installing a Florida Native and/or Florida Friendly drought tolerant Xeriscaping, and a storm water collection system for the Cocoa Readiness Center. The awarded contractor will furnish all labor, machinery, tools, apparatus, means of transportation, supplies, equipment, materials, services and incidentals necessary to construct and complete the work as indicated on the approved and accepted design plans, and in the planting plan specifications. C. The work shall include, but not be limited to: Furnishing material, delivery, storage, layout, protection to the public, the installation of tree protection devices and fences of existing and newly installed plant material as specified in the approved/accepted drawings, maintenance of traffic if applicable, inspections, excavation, installation, transplanting, installation of soil, top soil and soil amendments, grading and fine grading, backfilling, xeriscaping, mulching, rolling, sanding, sprigging in areas indicated on drawings, staking and guying, watering, root and canopy pruning, cleanup, Initial Planting Maintenance Period, warranty, and, any specified work in the plans. D. The work includes installing a re-use irrigation system. Included in the design will be an above ground irrigation system connected to a catchment system that collects rainwater from the downspouts and allows the plants to be watered when and where needed in order to ensure plant survival. Other Plants/Trees not in the reach of the catchment system will be watered independently to ensure survival. E. Quantities and Locations: The Project Manager reserves the right to adjust the number and locations of the designated types, species and materials to be used at any of the locations shown, in order to provide for any modifications which might become necessary. Readiness Center Xeriscaping/Storm Water Catchment Page 1
2 F. Investigation of Subsurface Conditions: The Contractor shall be responsible for making site subsurface investigations and examinations as he or she chooses in order to become familiar with the character of the existing material and the construction conditions under which he or she will be working. These subsurface investigations, examinations, all necessary remedial work necessary to complete the approved/accepted proposal shall be included in the bid price. The Contractor will not receive separate, additional compensation for such investigations. G. Kick of Meeting: The Contractor will be required to attend a kick-off meeting either by telephone, or in person with the Construction & Facility Management Office (CFMO)-Environmental Office in St. Augustine. The meeting will be scheduled within ten days of the Contractor receipt of the contract/purchase order award. At this meeting, the DMA project managers and the Contractor will agree on expectations, deliverable formats, and project deadlines. This meeting will serve as an opportunity for the Contractor to obtain DMA specific information necessary to the project. Following the kick off meeting, the Contractor will submit a definitive schedule/timeline of the tasks to be performed within the project. H. Performance: The DMA anticipates that completion of this Scope of Work will require no longer than 60 days from issuance of contract/purchase order for completion of this project. This includes required project preparation and mobilization/demobilization of heavy equipment onsite. This time frame may be reduced or extended as necessary in the event of unavoidable delays such as, hurricanes and/or abnormal weather conditions that would prevent on-site activities. Project must be completed on or before September 30, SUBMITTALS A. In general, the following shall be submitted by the Contractor to the Project Manager prior to execution: 1. List of sub-contractors to be used on the job; 2. Xeriscape/Catchment design drawing submittals; 3. Plant and Material Certifications Submittal; 4. Planting Schedule Submittal; 5. Comprehensive Landscape Maintenance Schedule and Completed Work Log Submittals; 6. Extension of Landscape Maintenance Schedule and Completed Work Log Submittals; B. Submittal of request for substitution of plant material designations, sizes, etc.: Written requests for approval, to substitute a material's plant designation, type, grade, quality, size, quantity, etc., due to the non-availability of the material specified, shall be submitted within ten (10) work days after the kick-off meeting. C. Submittal of request for approval of an equal material: Any request for the approval of an equal material shall be in writing. Requests shall be submitted within ten (10) work days after the kick-off meeting. Approval shall be given by the Project Manager before the material authorized for use PRODUCT DELIVERY, STORAGE AND HANDLING A. Movement of nursery stock will comply with all Federal, State, and local laws, regulations, ordinances and codes, etc. in force at the time of construction. Readiness Center Xeriscaping/Storm Water Catchment Page 2
3 B. The Contractor will exercise care in handling, loading, unloading, storing, and, transporting all material and allied material to prevent damage. The Contractor will assume full responsibility for protection and safekeeping of stored materials. The Contractor will be responsible for the protection of all plant materials and non-plant materials during the preparation, delivery, storage and execution of the project. C. The Contractor shall provide freshly dug trees, palms, shrubs, and, any other plant material. Trees shall be protected during shipping by tying in the branches and covering all exposed branches as necessary. Branches shall be tied with rope or twine only. Trees or shrubs shall not be bent or bind-tied in such manner as to damage the tree barks, break branches or destroy natural shape. All plant material shall have protective covering during delivery. Balled and burlap covered stock shall not be dropped during delivery. D. During transportation of plant material, the Contractor will exercise care to prevent injury and drying out of plant material. Should the roots be dried out, large branches broken, balls of earth broken or loosened, or areas of bark torn, the Project Manager may reject the injured or damaged plant material and request their replacement at no additional cost. E. All plants shall be handled so that roots are adequately protected at all times from drying out and from other injury. The root systems of containerized plants that cannot be planted immediately upon delivery shall be kept in a moist condition until planted. F. The Contractor will protect plants at all times from sun or drying winds. The plant material that cannot be installed immediately on delivery shall be kept in the shade, well protected with soil, wet mulch, or other acceptable material, and kept well watered. Plants shall not remain unplanted any longer than three days after delivery. Plants shall not be bound with wire or rope at any time so as to damage the bark or break branches. Plants shall be lifted and handled with suitable support of the soil ball to avoid damaging it. G. Replacements: In the event of damage or rejection, the Contractor will immediately make repairs and replacements necessary to the acceptance of Project Manager at no additional cost. H. The Contractor is responsible for all plants installed on job until final acceptance PERMITS AND CODES A. The Contractor will procure all necessary permits to accomplish all of the work, at no additional cost to the Owner. B. The Contractor is responsible for performing all work in accordance with all applicable statutes, laws, regulations, ordinances and code requirements from the appropriate city, county, state and/or federal jurisdiction the project is located in. PART 2 PRODUCTS 2.01 PLANT MATERIAL TREES, PALMS, SHRUBS, GROUNDCOVER A. Quality: Plant material, not otherwise specified as being Florida Native, Florida Friendly, Florida Fancy or "Specimen", shall be Florida No. 1 or better quality, graded in accordance with Grades and Standards Readiness Center Xeriscaping/Storm Water Catchment Page 3
4 for Nursery Plants, published by the State of Florida, Department of Agriculture (1998 or most recent edition). Plants judged to be not in accordance with said standards will be rejected.. B. Varietal Characteristics: All plant materials shall be the genus, species and variety specified in the documents, typical of the varietal characteristics. The growth habit, leaf arrangement, texture and plant structure shall be obviously characteristic of plants known to be of a specific species. If there is any question as to the certainty, it will be the responsibility of the Project Manager to verify species and his/her decision shall be final. All costs incurred due to the verification of species shall be the responsibility of the Contractor. Where applicable, plants shall be selected from stock having the most desirable varietal characteristics. C. Substitutions: Substitutions in plant species or sizes shall be made only after written authorization by the Project Manager. D. Plant material condition: Plants shall be freshly dug, balled and bur lapped nursery grown stock or container grown nursery stock. All plants shall be free of broken, damaged root balls or root bound conditions. In addition, plant material shall be sound, healthy, vigorous, free from plant diseases, insect pests, or their eggs and shall have healthy normal root systems. E. Chlorosis: The allowable level of Chlorosis in foliage shall be set forth in the latest edition of the Florida Department of Agriculture's "Grades and Standards for Nursery Plants. F. Ground Cover: Plants shall be established and well rooted in removable containers or integral peat pots and with not less than minimum number and length of runners required by ANSI Z60.1 for the pot size shown or listed WATER A. The Contractor is responsible to ascertain the location and accessibility of a potable water source. The Contractor is responsible for distribution of water to the areas of planting. If there is no source of potable water available at the job site approved for use, then the Contractor will be responsible for bringing in water with water trucks or tanks for hand watering, at no additional cost to DMA ROCK, STONE, GRAVEL A. Cap rock shall be as dimensioned on the plans, solid and with a generally smooth, rounded surface. B. Rock material shall be as is typically available in this locality. C. TO THE MAXIMUM EXTENT POSSIBLE INTEGRATE THE EXISTING ROCK/GRAVEL ON-SITE INTO THE XERISCAPE DESIGN MULCH A. Natural color organic mulch, pine straw, or shredded eucalyptus bark free of weeds, as specified in landscape drawings. 1. All mulch shall comply with all applicable Florida and local regulations. Readiness Center Xeriscaping/Storm Water Catchment Page 4
5 2. Mulch shall consist of bark, straw, and wood only. PART 3 EXECUTION 3.01 PROTECTION A. Protect landscape work and materials from damage due to landscape operations, operations by other contractors and trades, and trespassers. Maintain protection during landscape installation and landscape maintenance periods. Treat, repair, or replace damaged landscape work as directed. B. Responsibility for Protection and Restoration of Property: The Contractor will be responsible for all damage or injury to person or property. C. Protection against Mechanical Damage: The Contractor s responsibility for protection against mechanical damage shall include providing protection from vehicles and providing warning signs and barricades as might be necessary. The Contractor shall repair, restore to its original condition and replace all property which becomes damaged as a result of any actions by the Contractor and his/her subcontractor, or their employees in the execution of the work PREPARATION GENERAL A. Preparation for Planting: Layout individual tree and shrub locations and areas for multiple plantings. Stake the proposed location of trees to be planted. The Project Manager reserves the right to adjust the location of plant material. B. Excavate planting pits and beds, prepare sub-grade. C. Excavation for Planting: Sides of pits and trenches shall be vertical. The soil in the bottom of the pits shall be loosened to a minimum of six (6) inches. All debris and deleterious materials encountered in the excavation shall be removed from the planting area. ` D. When hardpan or muck is encountered, break through to clean sand and backfill with prepared backfill as directed. The width of plant pit in areas with hardpan should be a minimum of two times the width shown on the detail. Loosen compacted soil at sides and bottoms by scarifying or other approved method. E. Provide plants, planting soil, fertilizer, and, incidental materials as specified in accepted proposal. F. Place plants, backfill and guy or brace plants as required. G. Fine grade lawn areas and complete incidental work as specified in accepted proposal. H. Maintain and protect planting, including incidental materials. I. Bracing of trees and palms shall remain in place and its removal shall be the responsibility of the Contractor and his/her sub-contractor as directed by the Project Manager. Readiness Center Xeriscaping/Storm Water Catchment Page 5
6 3.03 FINE GRADING A. Rough and Finish Grades: Grading for drainage, swales, etc. shall be provided by the Contractor. 1. Final Grades: It shall be the responsibility of the Contractor to provide the final grading so the final level for planting areas reduces the amount of storm-water runoff, and prevent erosion. 2. Planting Areas Next to Pavement: All planting areas next to pavement areas, such as, but not limited to, curbs, roads, drives, walks, terraces, decks and slabs shall be set to reduce erosion and storm water runoff PLANTING GROUNDCOVERS A. Maximize drought tolerant ground cover as specified on plant list plan or details ADJUSTMENT AND CLEANING A. Cleaning Up the Site: Upon completion of any landscape installation, the Contractor will thoroughly clean up the project site. In addition to removing all equipment, unused materials, deleterious material and surplus excavated material, the Contractor will fine grade all disturbed areas and the areas adjacent to the new plantings to provide a neat and uniform site. B. Protection and Repair: During landscape work and cleanup, protect materials from damage due to landscape operations, operations by other Contractor's and trades and trespassers. Maintain protection during installation and maintenance periods. Treat, repair or replace damaged landscape work as directed by the Project Manager. All damaged or altered existing structures as a result of the landscape work shall be corrected at no additional cost to DMA. C. Disposal of Waste: All waste and other objectionable material created through the execution of the work shall be removed completely, on a daily basis, from the job site or as directed by DMA. Any paved areas, including curbs and sidewalks, which contain soil, fertilizer or other waste, shall be thoroughly swept and cleaned as necessary. DMA is not required to supply areas or facilities for storage or removal of waste on-site. D. Excess Fill: All excess fill, which is produced during the landscape installation shall remain the property of DMA and remain on the project at the option of DMA. All excess fill, which DMA chooses not to keep, shall be removed and disposed of, at no additional cost to DMA. No excess fill shall be removed or disposed of from the site until approved by DMA in writing COMPLETION AND FINAL ACCEPTANCE A. Final acceptance will be provided by the Project Manager upon examination of the site ensuring that all deliverables have been provided, site has been cleaned, protection and repairs if necessary have been completed, proper disposal of wastes has been accomplished, any excess fill not required by DMA has been removed. B. Final acceptance shall not be official until acknowledged in writing by the Project Manager. Readiness Center Xeriscaping/Storm Water Catchment Page 6
7 C. The 365-Day Warranty for trees, palms, shrubs, and, groundcover shall begin the date provided in the letter of final acceptance by the Project Manager. Readiness Center Xeriscaping/Storm Water Catchment Page 7
8 Readiness Center Xeriscaping/Storm Water Catchment Page 8
DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING
DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of
More informationA. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.
SECTION 02910 TREE RELOCATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. B. Related Section: 1. 02900 - Landscaping.
More informationNC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation
1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not
More information7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.
SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.
More informationEXTERIOR PLANTS
c. Fertilize immediately prior to sodding or immediately after the sodding operation at a rate of.5 pounds of nitrogen per 1000 square feet. d. Work is to be done at typically accepted sodding times in
More informationSECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.
SECTION 32 9300 PLANTS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. B. Related Sections: 1. Section 32 9001:
More informationSECTION LANDSCAPE
1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation
More informationSECTION 605 PLANTING
SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall
More informationSECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply
More informationSECTION TREE TRANSPLANTING
SECTION 329643 TREE TRANSPLANTING PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for transplanting trees. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Qualifications:
More informationSECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS
SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.
More informationSECTION TREES, PLANTS AND GROUND COVERS
SECTION 02950 TREES, PLANTS AND GROUND COVERS PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Trees. 2. Plants and shrubs. 3. Ground covers. 4. Non-plant materials required to complete installation
More informationDIVISION II PLANTING SECTION 02950
Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section
More informationB. Finish Grade: Elevation of finished surface of planting soil.
SECTION 02930 - PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A.
More information2-B-18-UR. Revised: 3/27/2018
Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard
More informationSECTION TREES, SHRUBS AND GROUNDCOVERS
SECTION 02950 TREES, SHRUBS AND GROUNDCOVERS PART 1 GENERAL 1.01 REFER TO SECTION 01000 FOR GENERAL REQUIREMENTS 1.02 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification
More informationC. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.
SECTION 329300 - PLANTS 1.1 QUALITY ASSURANCE A. Installer's Personnel Certifications: Certified Landscape Technician, CLT-Exterior. Provide at least 1 person who shall be present at all times during execution
More informationConstruction Specification for Planting
Engineering and Construction Services Division Standard Specifications for Road Works TS 5.30 April 2014 for Planting Table of Contents TS 5.30.01 SCOPE... 3 TS 5.30.02 REFERENCES... 3 TS 5.30.03 DEFINITIONS
More informationLANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE
LANDSCAPE STANDARDS COMMUNITY DEVELOPMENT DEPARTMENT / PLANNING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: 619.667-1177 Fax: 619.667-1380 PURPOSE AND INTENT OF LANDSCAPE ORDINANCE The regulations
More informationEntegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique
Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique ONE STORY RESIDENCES IN THE AREA 6610 S.W. 62 ND Court 6620 S.W. 62 ND Court (Subject Property) 6630 S.W. 62 ND Court 6700 S.W. 62 ND
More informationLAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS
SECTION 32 93 00 PART 1 GENERAL 1.1 SUMMARY A. The Project requires particular attention to the aesthetic and landscape architectural design elements that are incorporated into the project site plan. The
More informationANEW LANDSCAPE really
Installing Woody Landscape Plants, Groundcovers, Perennials, and Annuals ANEW LANDSCAPE really approaches a finished project once plant materials have been installed. Since plants are the most admired
More informationSECTION SODDING
SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -
More informationPlanting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes
Planting Trees & Shrubs Handouts: Planting and Maintaining Trees and Shrubs Study Guide Choosing Trees and Shrubs Tip: Walk around the neighborhood, see what grows in your area and bring a sample to the
More informationDARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES
PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02951 PLANTING DETAILS A. This section consists of AutoCad drawings depicting typical landscape details governing the installation of plant materials on the
More informationHIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Corporate Boulevard, Orlando, FL 32817
HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT 12051 Corporate Boulevard, Orlando, FL 32817 REQUEST FOR PROPOSALS TO BE RETURNED BY: FRIDAY, JAN. 29 th VIA EMAIL TO JANEG@FISHKIND.COM LANDSCAPING, COMMON AREAS,
More informationSpecimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.
Authorised by : Parks & Gardens Manager Section 5 Page 1 of 6 SECTION 5: STREET TREE PLANTING 1.0 GENERAL This section describes the work to be carried out to prepare planting sites and complete planting
More informationUBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6
Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00
More informationPlanting Trees & Shrubs. and Shrubs Study Guide
Planting Trees & Shrubs Handouts: Planting and Maintaining Trees Handouts: Planting and Maintaining Trees and Shrubs Study Guide Choosing Trees and Shrubs Tip: Walk around the neighborhood, see what grows
More informationSection 815. LANDSCAPING
815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may
More informationVan Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS
Van Buren Bridge Project IFB #0721-17-VBB GENERAL TREE & LANDSCAPE PROVISIONS CONSTRUCTION SPECIFICATIONS PROJECTS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS DEPARTMENT OF PUBLIC
More informationSECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:
SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring
More informationA. Surface parking areas shall be constructed of bituminous paving.
September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.
More informationDIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING
32 90 00 PART 1 - GENERAL 1.01 SCOPE: A. This document provides guidelines that shall be used for all WSU facilities that require Landscape Architectural (LA) design and construction services. B. References:
More information1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.
SECTION 329300 - LANDSCAPE PLANTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationGuelph Humane Society Section PLANTING Page 1
Page 1 Part 1 General 1.1 DESCRIPTION.1 This section describes the requirements for the supply and installation for plant material of different stock sizes and types, accessories, planting, mulching, maintenance,
More informationSIUE LANDSCAPE UPGRADE
SIUE LANDSCAPE UPGRADE Project Introduction The Southern Illinois University Edwardsville campus was established and built in the mid-1960's, based on a landscape master plan by HOK. The landscape plan
More informationCity of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS
1.0 GENERAL 1.1 Related Work 1.1.1 Section 02210 - Site Grading Rough 1.1.2 Section 02212 - Planting Soil and Finish Grading 1.1.3 Section 02990 - Landscape Maintenance 1.2 Source Quality Control 1.2.1
More informationTown of Fuquay-Varina
170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape
More informationCITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX
CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP
More informationSECTION LANDSCAPING
SECTION 02900 LANDSCAPING PART 1 - GENERAL 1.01 WORK INCLUDED A. Clearing and grubbing. B. Site grading to subgrade for topsoil. C. Leaching of subgrade soils. D. Placing topsoil and prepared soil backfill.
More informationSECTION AMENDED TOPSOIL
SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration
More informationSECTION TREES, SHRUBS, AND GROUNDCOVER
SECTION 329313 TREES, SHRUBS, AND GROUNDCOVER PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Trees. 2. Shrubs. 3. Ground cover. 1.2 REFERENCES A. "Grades and Standards", latest edition, Texas Association
More informationThe planning and zoning board considered amending the zoning code to address plantings and alteration of the swale.
MIAMI SHORES DEPARTMENT OF PLANNING & ZONING 10050 NE 2 nd Avenue Miami Shores FL 33037-2304 www.miamishoresvillage.com David A. Dacquisto AICP, Director Main Number: 305-795-2207 Fax Number: 305-756-8972
More informationACTIVITY: Trees, Shrubs and Vines ES 10
Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &
More informationRAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION
ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed
More informationOVERALL LANDSCAPE PLAN
OVERALL LANDSCAPE PLAN : LIC. NO: SM RECORD COPY BY: L.0 OVERALL LANDSCAPE PLAN Scale: " = 40'-0" 0 40' 80' Scale: " = 40' L.0 L2.0 TREE PLANTING PLAN Scale: " = 40'-0" 0 Scale: " = 40' 40' wsbeng.com
More informationImprove the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;
Bedford Township, MI (Monroe Co.) 2012 http://library.municode.com/index.aspx?clientid=02123 400.1907 - Landscaping and screening. Se 1907. 1. Intent. Landscaping, greenbelts, and screening are necessary
More informationSELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!
SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! Craig R. Miller Parks & Open Space Manager www.cpnmd.org Environmental Factors to Consider: Minimum temperature the
More informationThe following general requirements will be met for all planter box installations:
Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended
More informationSection 9 Landscaping and Street Trees
Section 9 Landscaping and Street Trees GENERAL REQUIREMENTS...9-1 I. MATERIALS...9-1 9.1 GRASS...9-1 9.2 STREET TREES...9-1 A. General...9-1 B. Species...9-2 C. Design Standards...9-2 9.3 LANDSCAPING...9-3
More informationPLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.
PART 1 - GENERAL PLANT MATERIAL AND PLANTING 1.01 SECTION INCLUDES A. Plant Material and Planting B. Tree Drainage Wells C. Warranty for Plant Material 1.02 DESCRIPTION OF WORK A. Furnishing and installing
More informationThe planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.
MIAMI SHORES DEPARTMENT OF PLANNING & ZONING 10050 NE 2 nd Avenue Miami Shores FL 33037-2304 www.miamishoresvillage.com David A. Dacquisto AICP, Director Main Number: 305-795-2207 Fax Number: 305-756-8972
More informationa. Section Irrigation b. Section Operation and Maintenance of Planting c. Section xx xx xx Trees
SECTION 32 90 00 PLANTING PART 1 - GENERAL 1.1 SUMMARY A. Description 1. Work included: Provide all labor, materials and installation necessary to complete the fine grading, incidental grading, planting
More informationDIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES
PART 1 - GENERAL 1.01 SCOPE A. Work covered by this section includes all of the planning, compliance, design, installation, and warranty elements for new landscaping using trees. Contractor shall furnish
More informationLandscape Design. earth-wise guide to. earth-wise guide to
earth-wise guide to earth-wise guide to Landscape Design The purpose of this fact sheet is to provide background information on creating a green garden for either the do-it-yourselfer of for those working
More informationSECTION 910 LANDSCAPING
SECTION 910 911.0 DESCRIPTION This section covers the furnishing of all labor, material, equipment, and performance of all work and services necessary or incidental to plant removal and installation as
More informationSECTION LANDSCAPE PLANTING
SECTION 32 93 23 LANDSCAPE PLANTING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Placing topsoil or site soil; soil preparation and fine grading; furnishing and installing trees, shrubs and groundcovers;
More informationSECTION FINE GRADING AND SOIL PREPARATION
SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.
More informationExtension of Naugatuck Street Hartford, Connecticut
Extension of Naugatuck Street Hartford, Connecticut DEVELOPMENT TEAM LIST OF DRAWINGS Property Owner - Right of Way Construction Manager- Roadway Residential Developer Civil Engineer Landscape Architect
More informationPlanting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office
Trees and Shrubs Provide Beauty Wind protection Shade Wildlife habitat Visual Screening Topics of the Day Buying Trees Digging Holes Planting Trees Planting Landscape Trees Larry A. Sagers Extension Horticulture
More informationTREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service
TREE PLANTING AND ESTABLISHMENT Keith Wood Colorado State Forest Service Select the Right Tree for the Right Place Match the Tree to the Site: Growth Habit, Water Needs, Durability (Hardiness) Insect and
More information1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.
Issued 2006/08/01 Section 02906 Planting of Trees, Shrubs and Ground Covers Page 1 of 9 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 02311 Site Grading..3 Section
More informationHALIFAX REGIONAL MUNICIPALITY
[PROJECT NAME] PLANTING OF TREES, SHRUBS PART 1 - GENERAL 1.1 Work Included 1.2 Related Sections 1.3 Reference Standards 1.4 Quality Control 1.5 Delivery, Storage and Protection 1.6 Samples 1.7 Warranty
More informationSelecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)
Selecting Quality Trees from the Nursery Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida) Poor vs. good quality Advantages to selecting quality trees Higher survival
More informationThe planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.
MIAMI SHORES DEPARTMENT OF PLANNING & ZONING 10050 NE 2 nd Avenue Miami Shores FL 33037-2304 www.miamishoresvillage.com David A. Dacquisto AICP, Director Main Number: 305-795-2207 Fax Number: 305-756-8972
More informationSPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT
8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE
More informationSECTION TREE AND PLANT PROTECTION
SECTION 01 56 39 TREE AND PLANT PROTECTION PART 1 GENERAL 1.1 SUMMARY A. As a condition of project approval, all trees within the project limit including lay down or staging areas shall be inventoried
More informationSECTION LANDSCAPING
PART 1 -GENERAL 1.01 DESCRIPTION SECTION 32 9200 A. Furnish all labor, materials, and equipment required to complete all landscaping work indicated on the drawings and specified herein. This includes seeding,
More informationREQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA
REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA The Town of Haymarket, Virginia is requesting bids (RFBs) from professional landscaping companies which wish to be considered for providing landscaping
More informationSuccess with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties
Success with Trees in Your Yard Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties P s for Success with Trees Planning Proper selection Proper planting planting
More informationPart 3: Interior Landscape Installation and Maintenance
Part 3: Interior Landscape Installation and Maintenance Contents 1.0. General Conditions...1 1.1. Scope and Coordination... 1 1.2. Foliage Plant Standards... 1 1.3. Guarantee and Maintenance Period...
More informationHome Depot Page 1 of Humacao, Puerto Rico 03/19/10
PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide trees, shrubs, vines and groundcover in accordance with the contract documents. 1.02 REFERENCES A. "American Standard for Nursery Stock", 1990 Edition,
More informationOVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.
L1 (NOT USED) L2 L3 L4 L5 L6 L7 L8 L9 (NOT USED) (NOT USED) L210 L211 L212 L213 L214 (NOT USED) (NOT USED) (NOT USED) L215 L215a (NOT USED) L2 (NOT USED) L217 (NOT USED) L2 (NOT USED) L218 L2 L221 L222
More informationSITE TOPSOIL & FINISH GRADING
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,
More informationStormwater and Your Rain Garden
Stormwater and Your Rain Garden When rain falls on natural areas, such as a forest or meadow, it is slowed down, filtered by soil and plants, and allowed to soak back into the ground. When rain falls on
More information5.0 Storm Water Landscape Guidance Introduction
5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can
More informationCreate your own. Rain Garden
Create your own Rain Garden July 2013 Sacramento County Rain Garden Guidelines What s so cool about rain gardens? Rain gardens are shallow, landscaped depressions that capture rain water that runs off
More informationSECTION LANDSCAPE PLANTING
SECTION 32 90 00 LANDSCAPE PLANTING PART 1 - GENERAL 1.01 DESCRIPTION A. Work Included: Furnish all labor, materials, equipment, rentals, facilities, transportation, excavations, and services for installation
More informationC7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.
C7.1 www.resourceinternational.com 6350 PRESIDENTIAL GATEWAY COLUMBUS, OHIO 43231 PHONE: (614) 823-4949 FAX: (614) 823-4990 RESOURCE INTERNATIONAL INC. OUTLOT "A" OUTLOT "B" WINCHESTER PIKE WATER LINE
More informationSECTION SOIL PREPARATION
SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting
More informationREQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for
APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes
More informationSECTION TURF AND GRASSES
SECTION 32 92 00 TURF AND GRASSES PART 1: GENERAL 1.01 DESCRIPTION Restore all disturbed grass and landscaped areas to conditions equal to or better than before the work began and to the satisfaction of
More informationThis section covers the planting of seed, sod, trees and vegetation.
Tender 1, 2017 Page 1 of 5 1. INTENT This section covers the planting of seed, sod, trees and vegetation. 1.1 REFERENCES Agriculture and Agri-Food Canada; The Canadian System of Soil Classification, Third
More informationHomeowners Guide to Stormwater BMP Maintenance
Homeowners Guide to Stormwater BMP Maintenance What You Need to Know to Take Care of Your Property Rain Barrel Dry Well Rain Garden Pervious Asphalt Porous Pavers City of El Monte Stormwater BMP Management
More informationESPLANADE LANDSCAPE MAINTENANCE STANDARDS
ESPLANADE LANDSCAPE MAINTENANCE STANDARDS At Esplanade, landscaping is an essential element of design with the landscape theme being a natural, less formal design focusing on the use of native plant materials.
More informationMaster Gardener Recommended Horticulture Best Management Practices
Master Gardener Recommended Horticulture Best Management Practices Practices that should always be recommended: Group plants with similar needs (water, fertilizer, sun ) for easier maintenance Fertilize
More informationGuidelines for planting within the 100 Ft. Buffer
CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service
More informationExhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service
Exhibit A Section 1: Commerce City Right Of Way Landscape Maintenance Scope of Service A. Scope: (i) Services: At the City s direction, the Contractor shall provide programmatic and nonprogrammatic Right
More informationSITE PREPARATION GRADING
17 SITE PREPARATION GRADING Objectives 1. Be able to describe and explain why grading is done in the landscape. 2. Be able to define and summarize how cutting and filling affect plant growth. 3. Be able
More informationWMU Tree Care Plan and Policies
WMU Tree Care Plan and Policies PURPOSE The purpose of the Western Michigan University Tree Care Plan and Policies is to define protocols and give guidance and direction as to the best practices for any
More informationCHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES
CHAPTER 4: GENERAL LANDSCAPING STANDARDS This chapter describes plant material minimum standards that apply to landscaping both on private property (on-site) and within the public right-of-way (off-site).
More informationWhat is Xeriscape? Why Xeriscape?
What is Xeriscape? Communities have been faced with increased demands on existing water supplies. Consequently, there is a greater focus on water conservation, not just in times of drought, but in anticipation
More informationWatering Guide. 1. Trees, Shrubs, Perennials, Annuals Sod Seed Pruning Plants Fertilizing Plants...
Watering Guide The following instructions provide general guidelines for maintaining and improving plant and lawn health, longevity and appearance. Properly watering all new plant material and transplanted
More informationPROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION
PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION NO CONSTRUCTION OR EXCAVATION IS TO OCCUR ON LOTS THAT REQUIRE TREE PRESERVATION UNTIL PROPER APPROVALS HAVE BEEN GIVEN BY A CITY ARBORIST 1. When trees
More informationA. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationX X W W W W W W W W W W W W UG UG OHE OHE OHE OHE OHE OHE OHE FO UGE FO FO UGE UGE FO FO FO FO FO FO FO UGE UGE UGE UGE UGE UGE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE EXISTING
More informationMilpitas College Extension Milpitas Dry Landscape
SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document
More informationA. Contractor shall provide product data for each type of product indicated.
31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution
More informationExhibit A. Scope of Work
Exhibit A Scope of Work TURF / LAWNS Mowing Lawns shall be mowed weekly during growing season and as required during winter months. The height of mowing shall be maintained consistently to prevent scalping
More information