1

2 GENERAL NOTES: SYMBOL LEGEND 1. All work shall comply with the constriction specifications, drawings, project-specific quality assurance plan and other contract requirements. 2. All notes on the drawings and information in specifications are directed to the Contractor, unless stated otherwise. 3. Contact the Owner or NRCS representative for any conflicts or discrepancies among the drawings, details, and specifications PROFILE STATIONING (100 FT.) DIVERSION STRUCTURE 4. Verify site conditions at the work site before mobilization. 5. Accomplish in-stream work during low flow conditions. 6. Finish grade to slopes as specified on the drawings. Blend grades to match existing grades. Work includes minor grading, and sloping flat areas to at least 2% to provide positive drainage. TEMPORARY BENCHMARK STAKE STAGING AREA 7. Provide erosion control measures and best management practices to prevent runoff from disturbed areas and exposed soils from entering surface waters or wetland areas. Muddy runoff or discharges from disturbed areas shall be filtered to prevent an increase in turbidity of surface water (seeps, springs, streams, rivers, lakes, and wetlands). APPROXIMATE PROPERTY LINE WORK DONE BY OTHERS, NOT IN CONTRACT 8. Take precautions to avoid spilling fuel or oil. If a fuel or oil spill occurs, properly clean the affected area and dispose of any contaminated soils to prevent surface or ground water contamination. A spill response kit is required while equipment is operating. See specifications for more details. CONSTRUCTION LIMITS BIOENGINEERING 9. Remove, store, and replace topsoil to restore disturbed areas that do not have other specified surfacing. Seed and mulch all disturbed soil surfaces with native grass seed according to the specifications. EXISTING ALIGNMENT CHANNEL, FLOODPLAIN GRADING (Sheet 4) 10. Restore access and staging areas used during construction to pre-existing conditions or better. Plan the movement of equipment and materials to minimize disturbance, and to limit the number of trips to and from each work site. 11. All excavation work is unclassified (See Construction Specification 822 for the definition of unclassified excavation ). All earthwork required by and shown on the drawings is included in the work. PROPOSED ALIGNMENT DORMANT STOCK PLANTING 12. Stake bankfull elevations at the work site before installing structures or other work. NRCS will provide bankfull elevations by station, or will help identify bankfull in the field. CROSS-SECTION LOCATION EARTHFILL (Sheet 4) 13. Provide all structures according to typical details and proposed cross-sections, unless noted otherwise. 14. NRCS representative will stake the approximate locations of major work items and structures. EXISTING FLOWLINE EROSION CONTROL FABRIC DEFINITIONS Definitions are in the general requirements in the construction specifications. EDGE OF WATER ESTABLISH FLOODPLAIN & SHAPE STREAMBANK EROSION & SEDIMENT CONTROL NOTES: TOP OF BANK ROCK RIPRAP 1. Provide erosion and sediment (E&S) control measures to minimize sediment runoff and soil loss from project site. 2. Use the following additional E&S control measures as required: limit area of disturbance; preserve existing vegetation where removal is not required by work; surface roughening; surface water control; biodegradable erosion control matting; seeding and mulching; diversion of runoff around disturbed areas. See the specifications for additional information. 3. Provide E&S control measures before disturbing the site. Provide erosion control wattles or silt fence where necessary to prevent muddy surface runoff from entering the stream. BANK EROSION RIFFLE SEDIMENT/DEBRIS REMOVAL (Sheet 4) SEEDING AND MULCHING 4. After final site stabilization (re-vegetation), remove temporary E&S control measures. Immediately stabilize areas disturbed during removal of temporary measures. THALWEG SHAPING J-HOOK VANE 5. Construction access and work limits are restricted to locations shown on the drawing or as approved by the Owner. 6. Keep stockpile heights below 35 feet with slopes of 2H:1V or flatter. For stockpiles left for 5 or more days, place silt fence or wattles around the low side of the stockpile to filter the runoff. Seed and mulch stockpiles that will remain for 21 days or longer. ROCK TOE PROTECTION J-HOOK COMBO VANE (LOG VANE, ROCK HOOK) 7. Seed and mulch finish graded areas within 5 days. 8. Maintain all erosion control devices throughout construction and until the site is stabilized. Inspect erosion control measures weekly and after each rainfall or snowmelt. Accomplish all remedial maintenance work immediately, including clean out, repair, replacement, re-grading, re-seeding, re-mulching, etc. 9. When pumps are used for dewatering operations, filter the discharge through a properly sized stilling basin. 10. To help prevent the introduction of invasive, non-native plants to work areas, clean all equipment brought to the work site from outside of the project location watershed. Anytime equipment is moved to a stream in a different watershed, it should be cleaned to remove soil, seeds, sticks, and other potential contaminants. WOOD TOE PROTECTION CULVERT EXISTING POOL NEW OR ENHANCED POOL EXISTING BOULDER LARGE WOODY DEBRIS WITH LIMBS LARGE WOODY DEBRIS WITHOUT LIMBS SINGLE WING DEFLECTOR REMOVE RUBISH ROCK CROSS VANE NEW BOULDERS OR ROCK TOE ROOT WAD DEPOSITION OR POINT BAR TOE WOOD

3

4 ³ ³

5

6 ROOSEVEL

7

8

9 EROSION CONTROL FABRIC DORMANT STOCK PLANTING SEEDING AND MULCHING

10 DIAMETER RANGE = INCHES LENGTH RANGE = FEET* DENSITY = 3.0 FEET X 2.0 FEET TRIANGULAR SPACING * LENGTHS SHORTER THAN 3 FT REQUIRE PRIOR APPROVAL OF NRCS TECH. REPRESENTATIVE. IN SOME CASES A 2 FT LONG STAKE IS ADEQUATE. UPSTREAM FABRIC OVERLAPS DOWNSTREAM FABRIC BY 12 INCHES (SEE OVERLAP DETAIL) TOP EDGE 12" USE KEY TRENCH ON TOP EDGE (SEE DETAIL) UPSTREAM FABRIC OVERLAPS DOWNSTREAM FABRIC BY 12 INCHES (SEE NOTE 8) 12" BANKFULL ELEVATION SEE MID-SLOPE OVERLAP DETAIL OVERLAP SECTION A NORMAL WATER LEVEL PROVIDE LIVE STAKES ACCORDING TO NOTES, AND SPECIFICATIONS BOTTOM EDGE PLAN VIEW SPACE WOOD STAKES EVERY INCHES IN A DIAMOND SHAPED PATTERN THIS EXAMPLE SHOWS ROCK TOE OPTION SEE NOTE 3 REGARDING ALTERNATE FASTENING DEVICES OVERLAP SECTION A POINT BUDS UPWARD FINISHED GRADE UNROLL PARALLEL TO FLOW MINIMUM ROLL WIDTH = 10 FT LIVE STAKE NOTES: NOTES: 1. KEY UPSTREAM AND DOWNSTREAM ENDS INTO STABLE BANKS AND THICKEN THE ROCK RIPRAP AS SHOWN IN RIPRAP END KEY DETAIL. SECTION VIEW (IN MIDDLE PORTION) ROCK RIPRAP MID-SLOPE OVERLAP DETAIL ISOMETRIC VIEW MID-SLOPE OVERLAP 1. SPECIES SELECTION MAY VARY DUE TO AVAILABILITY. IF AVAILABLE, USE NATIVE SPECIES. 2. DO NOT ALLOW STAKES TO DRY OUT. 3. SOAK STAKES BEFORE PLANTING. 4. DRIVE A PILOT HOLE IN FIRM SOIL AT RIGHT ANGLES WITH BUDS ORIENTED UP. 5. BURY 70% OF STAKE LENGTH AS SHOWN IN CLOSE-UP DETAIL. 6. PLANT STAKES RANDOMLY OR ON TRIANGULAR SPACING. 7. CUT THE BASAL OR BUTT ENDS AT AN ANGLE FOR EASY INSERTION INTO THE SOIL. CUT THE TOP SQUARE OR BLUNT. 8. LIVE STAKES MAY EXTEND DOWN TO NORMAL WATER LEVEL AND MAY EXTEND BEYOND TOP OF BANK. USE WATER TOLERANT SPECIES BELOW BANKFULL. 9. RECOMMENDED SPECIES FOR THIS SITE ARE SHOWN IN TABLE 1. CUT AT ANGLE LIVE STAKE CLOSE-UP 2. PROVIDE ROCK RIPRAP MEETING THE SPECIFICATIONS FROM A CDOT APPROVED QUARRY OR FROM ENGINEER APPROVED SOURCE. 3. IF LARGE BOULDERS ARE USED AND ONLY ONE ROCK IS REQUIRED TO MEET THICKNESS REQUIREMENTS, BOULDERS MUST FIT TIGHTLY TOGETHER. 4. EXCAVATED STREAMBED MATERIALS MAY BE USED TO FILL BETWEEN. ROCK TOE AND EXISTING STREAMBANK DISPOSE OF EXCESS ROCKY EXCAVATION AND OTHER UNSUITABLE MATERIALS AT A LOCATION ACCEPTABLE TO OWNER. IF NO ON-SITE DISPOSAL AREAS ARE AVAILABLE, THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL. 5. SCHEDULE IN-STREAM WORK DURING LOW FLOW CONDITIONS. GEOTEXTILE EXTEND THE KEYS FROM THE TOE TO THE TOP OF THE ROCK RIPRAP. RIPRAP END KEYS (PLAN VIEW) KEY TRENCH SECTION VIEW FILL AND COMPACT WITH TOPSOIL 2 1 EROSION CONTROL FABRIC STAKES MAY BE MADE BY SAWING A 2 x 4 DIAGONALLY TO PRODUCE 2 DEAD STOUT STAKES. WOOD STAKE DO NOT EXTEND FABRIC BELOW NORMAL FLOW ELEVATION DIAMETER RANGE = INCHES LENGTH RANGE = FEET* PLANTING DENSITY, 3.0 FT. X 2.0 FT. ON TRIANGULAR SPACING * LENGTHS SHORTER THAN 3 FT REQUIRE PRIOR APPROVAL OF NRCS TECH. REPRESENTATIVE. IN SOME CASES A 2 FT LONG STAKE MAY BE ADEQUATE. TYPICAL USES: CRITICAL AREA PLANTING FOR STREAMBANK PROTECTION. TYPICALLY USED WITH OTHER CONSERVATION PRACTICES, SUCH AS STREAMBANK PROTECTION AND RIPARIAN BUFFERS. ASSOCIATED DETAILS: - Erosion Control Fabric - Rock Toe (If Specified) - Streambank Shaping NOTES: 1. USE EROSION CONTROL FABRIC DESCRIBED IN THE SPECIFICATIONS. BOTTOM EDGE TRENCH 2. PREPARE SOIL SURFACE AND INSTALL ACCORDING TO THIS DETAIL, THE PLAN VIEW DRAWINGS, AND THE SPECIFICATIONS. SEED AND MULCH THE GROUND SURFACE BEFORE INSTALLING FABRIC. 3. ALTERNATE FASTENING DEVICES REQUIRE ENGINEER'S APPROVAL BEFORE USE. SUBMIT TECHNICAL DATA AND SPECIFICATIONS TO THE ENGINEER. WOOD STAKE EVERY 24-INCHES

STREAM ALTERATION PRACTICES

STREAM ALTERATION PRACTICES STREAM ALTERATION PRACTICES Stream Diversion Channel SDC DEFINITION A temporary channel constructed to convey stream flow around in-stream construction. PURPOSE Stream diversion channels are used to allow

More information

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE Please complete this narrative form and submit with your SWPPP drawings. Refer to Kitsap County Stormwater Design Manual Vol.

More information

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015 Guiding Landowners in Stream Restoration The Science, Practice & Art of Restoring Native Ecosystems 2015 January 24, 2015 Guiding Landowners in Stream Restoration January 24, 2015 Agenda 1Watershed Planning

More information

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION AREA SITE LOCATION & DRAINAGE AREA SITE LOCATION Drainage Area = 1.14 sq. miles STREAM BANK STABILIZATION THORPS CREEK @ MORTIMER RECREATION

More information

SECTION 6. Routine Maintenance Activity Details

SECTION 6. Routine Maintenance Activity Details SECTION 6 Routine Maintenance Activity Details 80. DEBRIS REMOVAL When Deadfall, and other objects, such as shopping carts, tires, appliances, and mattresses have accumulated in the drain. Why To prevent

More information

Bio-Engineering Techniques to Revegetate Streambanks

Bio-Engineering Techniques to Revegetate Streambanks Bio-Engineering Techniques to Revegetate Streambanks DORMANT CUTTINGS Dormant cuttings are harvested from living woody plants. The cuttings are prepared from branches of woody plants when the plant is

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL Surface Water Protection During Well Site Construction Kelly Kees, PE WVDEP, Office of Oil and Gas SEDIMENT & EROSION CONTROL PLANS Per West Virginia State Code 22-6-6(d) 22-6A-7(c),

More information

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE Stream Restoration: Working with Nature? Greg Jennings, PhD, PE jenningsenv@gmail.com Ecosystem Restoration activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability

More information

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages 4.2-d VEGETATED SLOPE STABILIZATION Alternative Names: Willow Wattles, Live Bundles, Fascines, Live Staking, Joint Planting, Branch Packing, Brush Layering, and Brush Matting DESCRIPTION Vegetated slope

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 (360) 754-4126 (FAX) Email: cdd@ci.tumwater.wa.us APPENDIX II-C SHORT FORM CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

More information

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN 2.1 Requirements The City of Shelbyville, KY will require an Erosion Prevention and Sediment Control (EPSC) Plan for most types of development construction.

More information

Biotechnical streambank stabilization

Biotechnical streambank stabilization Traditional streambank stabilization Biotechnical streambank stabilization Channelization alters: shape pattern slope bed morphology cover Ecological effects: loss of riparian habitat loss of fish habitat

More information

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT NOT WELL 800 - Urban Stormwater Wetlands A constructed system of shallow pools that create growing conditions for wetland plants to lessen the impacts of stormwater quality and quantity in urban areas.

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity. City of Charlottesville, Virginia Erosion and Sediment Control Plan Review Checklist 610 East Market Street, Charlottesville, VA 22902 Telephone 434-970-3182; Fax 434-970-3359 Project: Developer/Designer:

More information

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures MARBLE RIVER WIND POWER PROJECT Siting Considerations 1. Locate access roads and, to the extent allowed by local laws, wetlands and topography, individual wind turbines and other structures along field

More information

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING. ATTACH FABRIC TO POSTS WITH MINIMUM 3 ZIP TIES (50 LB. TENSILE) PER POST IN TOP 8" OF FABRIC. MONOFILAMENT GEOTEXTILE FABRIC PER MNDOT TABLE

More information

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA REFERENCE DRAWINGS FOR REET ROCK HILL, SOUTH CAROLINA COVER SHEET 1 OF 6 GENERAL NOTES 2 OF 6 REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION.

More information

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank. Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank. By Greg Northcutt When White Creek Mitigation, LLC,

More information

HOW TO CONTROL STREAMBANK EROSION

HOW TO CONTROL STREAMBANK EROSION 6 HOW TO CONTROL STREAMBANK EROSION Prepared by the Iowa Department of Natural Resources In cooperation with the Natural Resources Conservation Service, U.S. DEPARTMENT OF AGRICULTURE 2006 The 1984 printing

More information

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration Model Construction SWPPP Planning & Development Services 1800 Continental Place Mount Vernon WA 98273 voice 360-416-1320 inspections 360-416-1330 www.skagitcounty.net/stormwaterpermitting Permit #: General

More information

PLAN SUBMITTER'S CHECKLIST

PLAN SUBMITTER'S CHECKLIST Page 1 of 8 PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and reference the plan sheets/pages where the information may be found, where appropriate, or write

More information

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) 4.5-s EROSION CONTROL BLANKET SYSTEM Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP) DESCRIPTION Erosion control blanket systems are woven or

More information

Town of Essex Small Site Erosion Control Guide

Town of Essex Small Site Erosion Control Guide Town of Essex Small Site Erosion Control Guide Why do we need to protect against erosion? Water Quality: Erosion and the transport of sediment and pollutants impacts the water quality of nearby streams

More information

The Toe Wood Structure

The Toe Wood Structure The Toe Wood Structure by Dave Rosgen Objectives: Enhance fish habitat/food chains Stabilize streambanks Maintain a low width/depth ratio Provide a more natural appearance & improve visual values Be compatible

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education Wisconsin Contractors Institute Continuing Education Erosion & Sediment Control Course # 12775 2 hours Wisconsin Contractors Institute N27 W23953 Paul Road, Suite 203 Pewaukee, WI 53072 Website: www.wicontractorsinstitute.com

More information

Guidelines for Streambank Protection

Guidelines for Streambank Protection PDHonline Course C187 (3 PDH) Guidelines for Streambank Protection Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS SECTION 01570 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements, procedures, and methods related to responsibilities for providing

More information

Illinois Urban Manual

Illinois Urban Manual Illinois Urban Manual Jim Nelson: Association of Illinois Soil and Water Conservation Districts (AISWCD) Funding for this project provided, in part, by the Grand Victoria Foundation of Elgin IL, the Governor

More information

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION ILLINOIS URBAN MANUAL PRACTICE STANDARD RAIN GARDEN (feet) CODE 897 Source: Kendall County Soil and Water Conservation District DEFINITION Rain gardens are small, shallow, flat bottomed depressions constructed

More information

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary

Feet. Overland. Drainage Area Boundary. To Swale. Swale. To Catch Basin. Culvert Pipe. To Drain Outfall. NRCS Soil Area Boundary 0 25 50 00 Feet Parcel Boundary, Approximate 202 LIDAR 2 FT CONTOURS, VCGI BING AERIAL NRCS SOIL MAPPING MMI FIELD DATA Culvert Pipe Swale 0 Scale: "=40' SOURCE(S): NRCS Soil Area Boundary Overland st

More information

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Part IV(a): BMPs for Erosion, Sediment, Velocity Control Part IV(a): BMPs for Erosion, Sediment, Velocity Control Find Design Standards and Specifications for Iowa Erosion and Sediment Control Practices at: www.iowasudas.org Erosion Control Keeping the soil

More information

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION

SECTION SOIL BIOENGINEERING OR SHORELINE STABILIZATION SECTION 32 93 43 SOIL BIOENGINEERING OR SHORELINE STABILIZATION PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish all labor, materials, supplies, equipment, tools and transportation; perform

More information

DITCH BANK STABILIZATION TECHNIQUES

DITCH BANK STABILIZATION TECHNIQUES onstructed Ditch Drainage anagement Guide - No. 0 in series Order No. 5.0- December 00 DITH BANK STABILIZATION TEHNIQUES It is important to maintain ditches using practices that ensure ditch banks remain

More information

Erosion & Sediment Control Plan Application Form & Checklist

Erosion & Sediment Control Plan Application Form & Checklist Erosion & Sediment Control Plan Application Form & Checklist GENERAL INFORMATION Application Date: Project Address: Tax Map / Parcel Number(s): PROPERTY OWNER / DEVELOPER Firm Name: Contact Person: Title:

More information

SECTION 10.0 BEST MANAGEMENT PRACTICES

SECTION 10.0 BEST MANAGEMENT PRACTICES SECTION 10.0 BEST MANAGEMENT PRACTICES INDEX: 10.1 Asphalt Berm 10.2 Brush Layering 10.3 Brush Packing 10.4 Clean Water Bypass 10.5 Cofferdam 10.6 Coir Fabric/Netting 10.7 Concrete Washout 10.8 Containment

More information

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Grass Linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] May be used on short, steep

More information

Construction Progress Report

Construction Progress Report Report Date: 4/8/2017 Subject: Construction Week 2 70% Complete Project: Sunset Pond EWP Stream Reclamation, Fourmile Creek, Boulder County, CO Report By: TJ Burr, Civil Engineer/Stream Restoration Specialist,

More information

The Low Risk Site Handbook

The Low Risk Site Handbook The Low Risk Site Handbook for Erosion Prevention and Sediment Control The content of this Handbook is adapted from the New York State Standards and Specifications for Erosion and Sediment Control-August

More information

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 Using the Updated RI Soil Erosion and Sediment Control Handbook The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015 URI Cooperative Extension NEMO URI Cooperative Extension NEMO White Oak,

More information

3" TO 4" OF TOPSOIL 2:1 MIRAFI HP 565 GEO FABRIC OR EQUIVALENT 9' SPILLWAY EL=7147 2:1 SPILLWAY SECTION N.T.S. TOP OF POND EL=7149' RIP-RAP D 50 8" WRAPPED IN FILTER FABRIC 45 MIL HDPE POND LINER OR EQUIVALENT

More information

Information for File # JTF

Information for File # JTF Information for File # 2013-04665-JTF Applicant Corps Contact Enbridge Energy, Limited Partnership Josh Fitzpatrick Address 1554 Highway 2, Suite 2, Two Harbors, MN 55616 E-Mail joshua.t.fitzpatrick@usace.army.mil

More information

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness. Buffer Zone (BZ) Figure BZ-1 Buffer Zone in Agricultural Area Practice Description A buffer zone is a strip of plants adjacent to land-disturbing sites or bordering streams, lakes, and wetlands that provides

More information

East Coast Erosion Blankets

East Coast Erosion Blankets Protect Your Landscapes with East Coast Erosion Blankets Soil erosion can be a serious problem, resulting in catastrophic damage to water sources, landscaping, and wildlife. Repairing damage caused by

More information

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

Gloucester County PLAN SUBMITTER'S CHECKLIST

Gloucester County PLAN SUBMITTER'S CHECKLIST Page 1 of 9 Gloucester County PLAN SUBMITTER'S CHECKLIST FOR EROSION AND SEDIMENT CONTROL PLANS Please fill in all blanks and please reference the plan sheets/pages where the information may be found,

More information

ACTIVITY: Geotextiles ES 12

ACTIVITY: Geotextiles ES 12 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

Plan Review Checklist

Plan Review Checklist Plan Review Checklist FOR EROSION AND SEDIMENT CONTROL PLANS _ Minimum Standards - All applicable Minimum Standards must be addressed. All minimum Standards must be adhered to during the entire project

More information

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist Vegetating Disturbed Road & Stream Banks By Mike Fournier NRCS Resource Conservationist Clearly Identify The Problem Project Objectives Clearly Define Objectives Before Work Starts Determine Whether Project

More information

EROSION & SEDIMENT CONTROL

EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL 1 EROSION & SEDIMENT CONTROL Effective Soil & Water Protection Whether you want to prevent soil erosion caused by rain, water and wind, or protect waterways from inevitable build

More information

Soil Reclamation and Site Reinstatement

Soil Reclamation and Site Reinstatement APPENDIX 6 Soil Reclamation and Site Reinstatement Purpose To undertake soil reclamation, erosion protection, Site restoration and reinstatement, taking into account natural processes, operational requirements

More information

POST-FIRE RESTORATION Dos and Don ts

POST-FIRE RESTORATION Dos and Don ts POST-FIRE RESTORATION Dos and Don ts USDA Natural Resources Conservation Service The NRCS/RCD office is located at: 744 LA GUARDIA ST BLDG A SALINAS, CA 93905-3354 (831) 424-1036 (NRCS) (831) 424-1036

More information

Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs)

Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs) June 2008 Nevada Contractors Field Guide for Construction Site Best Management Practices (BMPs) Funding for the development and production of the Nevada BMP Field Guide was provided by the Nevada Division

More information

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements COMPLETE APPLICATION CHECKLIST Jan 2016 STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS The following checklist has been compiled to assist the applicant in preparing their application for approval

More information

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11 Overview of Sedimentation and Erosion Control Practices Practice no. 6.11 PERMANENT SEEDING Permanent vegetation controls erosion by physically protecting a bare soil surface from raindrop impact, flowing

More information

Section Specification for Geotextile Used in Permanent Erosion Control Application

Section Specification for Geotextile Used in Permanent Erosion Control Application Project Name: Project Number: 1 GENERAL Section 02370 Specification for Geotextile Used in Permanent Erosion Control Application 1.1 SECTION INCLUDES A. Geotextile to prevent soil loss resulting in excessive

More information

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration Rocky Powell Clear Creeks Consulting, LLC Keith D. Tate, P.E. BayLand Consultants & Designers, Inc.

More information

Analyzing the Bioretention Construction Sequence

Analyzing the Bioretention Construction Sequence Analyzing the Bioretention Construction Sequence Avoiding future problems through careful installation procedures, construction inspection and first year maintenance 20 Steps to Better Bioretention Step

More information

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures 4.0 EROSION & SEDIMENT CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell

More information

Soil Erosion and Sediment Control

Soil Erosion and Sediment Control PDHonline Course C188 (3 PDH) Soil Erosion and Sediment Control Instructor: John Poullain, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

Vegetation Management

Vegetation Management Vegetation Management GENERAL CONSTRUCTION PRACTICE Best practice vegetation management involves giving appropriate consideration to the following issues. Not all the issues will be relevant on every site.

More information

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine Final Report June 30, 2006 Page 1 of 16 I. Project Title Restoration of Riparian Buffer at the Former Smelt Hill Dam Site,

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 - EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Grading and Excavation B. Trenching C. Bedding D. Backfill and Compaction (New and Native) E. Aggregate Material F. Geotextile Fabric PART

More information

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS Prepared by TenCate Geosynthetics North America 365 South Holland Drive Pendergrass, GA 30567 Tel: (706) 693-2226 Fax:

More information

Milpitas College Extension Milpitas Dry Landscape

Milpitas College Extension Milpitas Dry Landscape SAN JOSÉ / EVERGREEN COMMUNITY COLLEGE DISTRICT Milpitas College Extension Milpitas Dry Landscape PROJECT MANUAL VOLUME II TABLE OF CONTENTS DIVISION 02 through 30 Not Used DIVISION 31 - EARTHWORK Document

More information

Soil bioengineering and ecological

Soil bioengineering and ecological Soil bioengineering and ecological systems Techniques Click to proceed... Copyright 2001 Maccaferri Inc. All rights reserved. All reproduction, including photocopy, film and microfilm, is forbidden. Release

More information

Case Study Bioretention Installation and Maintenance

Case Study Bioretention Installation and Maintenance Case Study Bioretention Installation and Maintenance Bioretention Crime Scene Investigation A reality TV series where you get to watch disturbing bioretention crimes and use advanced forensics to solve

More information

Erosion Control for Home Builders in the. City of Jacksonville

Erosion Control for Home Builders in the. City of Jacksonville Erosion Control for Home Builders in the City of Jacksonville Eroding construction sites are a leading cause of water quality problems in Jacksonville. For every acre under construction, about a dump truck

More information

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers Stormwater Standards Clackamas County Service District No. 1 APPENDIX B Planting Guide for Buffers Table of Contents Appendix B - Planting Guide for Buffers... Page B.1 General... 1 B.1.1 Introduction...

More information

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES 4.1 INFILTRATION BASIN AND TRENCH Figure 4.1. Infiltration basin and trench (Source: Department of Civil, Construction, and Environmental Engineering,

More information

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer Protect Stormwater Quality Project and Site Management Training for General Contractors Presenter Becky Pearson Professional Civil Engineer Part II Best Management Practices (BMPs) What is a Best Management

More information

Use of Best Management Practices

Use of Best Management Practices Use of Best Management Practices Presented at the ANJEC Flood Hazard Workshop Bordentown, NJ March 13, 2008 Stormwater BMPs "a technique, measure or structural control that is used for a given set of conditions

More information

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Key Topics Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence Bioretention Crime Scenes Investigation A 9 part reality TV series where you get to watch disturbing

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

CHAPTER 5. Soil Bioengineering Techniques

CHAPTER 5. Soil Bioengineering Techniques CHAPTER 5 Soil Bioengineering Techniques Soil bioengineering is an applied science that combines the use of engineering design principles with biological and ecological concepts to construct and assure

More information

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 and Water Quality Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT M-231 Facts: 7-Miles long 2-Lane Limited Access Highway Connects I-96 and M-45 M-231 Facts: Includes Michigan

More information

NATURAL LAKE & STREAMBANK PROTECTION & NATURAL BUFFERS. By Sam Martin, Water Management Specialist, Pine SWCD

NATURAL LAKE & STREAMBANK PROTECTION & NATURAL BUFFERS. By Sam Martin, Water Management Specialist, Pine SWCD NATURAL LAKE & STREAMBANK PROTECTION & NATURAL BUFFERS By Sam Martin, Water Management Specialist, Pine SWCD Natural Lake & Streambank Protection & Natural Buffers Lakeshore & Streambank Erosion Projects

More information

PROPOSED DRAINAGE PATTERNS

PROPOSED DRAINAGE PATTERNS 1121 1118.50 Basin Floor 1120 1119 0 N 100 200 PROPOSED DRAINAGE PATTERNS Deroiser Drive Riverwood Drive County 260 0 100 200 Project Name: Riverwood Drive LITTLE FALLS TOWNHOMES Project Location: LITTLE

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

Tips for Maintaining and Enhancing Stormwater Management Areas

Tips for Maintaining and Enhancing Stormwater Management Areas 4 4 N. Second Street, Denton, Md. 21629 (410) 479-3625 (410) 479-3534 fax www.dentonmaryland.com Tips for Maintaining and Enhancing Stormwater Management Areas Information provided by the Town of Denton

More information

Preventing Storm Water Pollution: What We Can Do

Preventing Storm Water Pollution: What We Can Do Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL PROTECTION

More information

Vegetated Filter Strips and Buffers

Vegetated Filter Strips and Buffers 3.15 Sediment Control Description: Buffer strips (existing vegetation) and filter strips (planted vegetation) are sections of vegetated land adjacent to disturbed areas. They are designed with low slopes

More information

5.0 Storm Water Landscape Guidance Introduction

5.0 Storm Water Landscape Guidance Introduction 5.0 Storm Water Landscape Guidance Introduction Landscaping is a critical element to improve both the function and appearance of storm water management practices. Integrated storm water landscapes can

More information

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

City of Stoughton Erosion Control Permit Application (effective 2/6/2018) City of Stoughton Erosion Control Permit Application (effective 2/6/2018) Incomplete applications will not be accepted Project Name: Address of subject property: Landowner Name(s): Applicant Name: Landowner

More information

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Standard Operating Procedures Central Massachusetts Regional Stormwater Coalition SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation from land-disturbing

More information

ENVIRONMENTAL BEST PRACTICES EROSION AND SEDIMENT CONTROL

ENVIRONMENTAL BEST PRACTICES EROSION AND SEDIMENT CONTROL ENVIRONMENTAL BEST PRACTICES EROSION AND SEDIMENT CONTROL JUNE 2003 UPDATED FEBRUARY 2012 PREFACE The purpose of this document is to provide guidance to field personnel (construction contractors, maintenance

More information

Appendix E Preliminary Design

Appendix E Preliminary Design Appendix E Preliminary Design 1 1 0+080 0+100 0+200 0+240 LEGEND PROPOSED POOL PROPOSED RIFFLE PROPOSED COIR CLOTH BANK TREATMENT PROPOSED VEGETATED STONE BANK TREATMENT PROPOSED VEGETATED BLOCK BANK TREATMENT

More information

Appendix N. Preliminary Design

Appendix N. Preliminary Design Appendix N Preliminary Design Belfountain Dam and Headpond Class EA Preferred Alternative D4H5: Lower the spillway & backfill headpond & construct channel Preliminary Cost Estimate ITEM ITEM UNIT EST.

More information

Florence County Small Commercial Land Disturbance Permit Application

Florence County Small Commercial Land Disturbance Permit Application Florence County Small Commercial Land Disturbance Permit Application Florence County Engineering Division 518 South Irby Street Florence, S.C. 29501 Phone (843) 676-8600 Fax (843) 676-8667 Tax Map Number:

More information

6.9 Check Dams Description/Purpose Catchment Area Construction

6.9 Check Dams Description/Purpose Catchment Area Construction 6.9 Check Dams 6.9.1 Description/Purpose Check Dam Check dams are barriers placed across channels primarily to reduce runoff velocity. They can also retain sediment but this is not their primary function.

More information

Rule D Wetland and Creek Buffers

Rule D Wetland and Creek Buffers Rule D Wetland and Creek Buffers 1 Policy It is the policy of the Board of Managers to ensure the preservation of the natural resources, recreational, habitat, water treatment and water storage functions

More information

SOIL EROSION AND SEDIMENT CONTROL

SOIL EROSION AND SEDIMENT CONTROL SOIL EROSION AND SEDIMENT CONTROL SECTION 1: AUTHORITY, TITLE AND PURPOSE 11. STATUTORY AUTHORIZATION This ordinance is adopted pursuant to the provisions of the Federal Water Pollution Control Act 86

More information

MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5

MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5 MPDP VEGETATION ADVISORY WORKGROUP WORKSHOP #5 DATE: TO: LOCATION: April 21, 215 MPDP Vegetation Advisory Workgroup SWA Group Office, 1245 West 18 th Street Meeting Purpose: Review Workgroup Activities

More information

4.6. Low Impact and Retentive Grading

4.6. Low Impact and Retentive Grading 4.6. Low Impact and Retentive Grading Low Impact Grading techniques focus on utilizing existing topography during Site layout to minimize cost. Proposing structures, roads, and other impervious surfaces

More information

Coir Fibers Help Strengthen Environmentally-Friendly Golf Course Stream Restoration Project

Coir Fibers Help Strengthen Environmentally-Friendly Golf Course Stream Restoration Project Coir Fibers Help Strengthen Environmentally-Friendly Golf Course Stream Restoration Project RoLanka International, Inc. 2004 Stabilizing nearly two miles of streambanks and slopes wasn t the only challenge

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains Chapter 10: Stormwater Management A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter describes existing and proposed stormwater management on the Site. Potential impacts to stormwater infrastructure

More information

Section 3: Erosion and Sediment Control Best Management Practices

Section 3: Erosion and Sediment Control Best Management Practices Section 3: Erosion and Sediment Control Best Management Practices 3.1 Introduction 19 3.2 Permanent Erosion Control 19 3.2.1 Vegetation 20 3.2.2 Native and Adapted Vegetation Species 20 3.2.3 Soils and

More information

Vermont Better Backroads Pocket Guide

Vermont Better Backroads Pocket Guide Vermont Better Backroads Pocket Guide Clean Water You Can Afford Northern Vermont Resource Conservation & Development (RC&D) Council 617 Comstock Road, Suite 2 Berlin, VT 05602 (802) 828-4595 June 1997