1 F 1-1 Proposed Brampton Fire & Emergency Services Training Campus Williams Parkway / Chrysler Drive June 10, 2015

2 F 1-2 Outline Current Situation: Statement of Need Existing Facilities Current Land Use Proposal: Proposed Brampton Fire & Emergency Services (BFES) Training Campus Proposed Timelines Capital Project Budget Estimate Financial Implications

3 F 1-3 Statement of Need Centralize non-suppression operations Consolidate training facilities on single site Design and build facilities for intended purpose Provide adequate space for administration, operations, training, and storage Meet all current and projected operational needs Cost avoidance on aging buildings and poor condition of existing facilities High state of good repair investment Over next 6 years $15.6M is needed to bring facilities to current standard Does not factor future growth needs or program enhancements

4 F 1-4 Existing Facilities Fire Headquarters 8 Rutherford Road, S. Construction Date: 1962 (converted in 1974) Facility Condition Index: 15% (Very Poor) State of Good Repairs Costs: $2.4M Operational Program Requirements Effectiveness: Facility shared with Station 201 Subject to ODA retrofit by 2025 Limited space for meeting rooms, offices, media rooms, public reception and waiting areas Energy Efficiency: Yearly avg. $32K; consumption of Electricity, Natural Gas and Water and Sewer

5 F 1-5 Existing Facilities Emergency Operations Centre (EOC) 175 Sandalwood Parkway Construction Date: N/A Facility Condition Index: N/A State of Good Repairs Costs: N/A Operational Program Requirements Effectiveness: Facility under ownership and control of Hydro One Brampton Hydro One Brampton reserves top priority during emergencies Brampton Emergency Measures Office staff currently located in leased facility at 8 Nelson Street W. Energy Efficiency: N/A

6 F 1-6 Existing Facilities Training Division Various Loc. 425 Chrysler Drive; Fire Training Building 129 Glidden Road; Administration 115 Orenda Road; Car rescue Winston Churchill Blvd, Halton Hills; Rapid Intervention Team training 8700 Huntington Road, Vaughan; Trench Rescue, High angle Crane Rescue Operational Program Requirements Effectiveness: Fragmented operations reduces time for hands-on training Facilities not designed for BFES training Insufficient Administration, Operation, Training and Storage space Transportation and logistics moving students, equipment and supplies Energy Efficiency: Yearly avg. $168K; consumption of Electricity, Natural Gas and Water and Sewer at 115 Orenda Road and 129 Glidden Road (shared costs with other operating departments).

7 F 1-7 Existing Facilities Fire Station Chrysler Drive Construction Date: 1974 Facility Condition Index: 78.48% (Critical) State of Good Repairs Costs: $3.5M Operational Program Requirements Effectiveness: Facility shared with Williams Parkway Operations Centre (WPOC) Demolition of existing building is forecast Emerging issues: current redevelopment of WPOC; inability to operate building once WPOC vacates Current station needs to remain operational during construction of training campus Energy Efficiency: Yearly avg. $200K; consumption of Electricity, Natural Gas and Water and Sewer (shared costs with other operating departments).

8 F 1-8 Existing Facilities Location Overview 7 Town of Halton Hills 2 Proposed BFES Training Campus (425 Chrysler Drive) City of Vaughn 6 Distance from BFES Training Campus (425 Chrysler Drive) 1. Fire Station 201 & HQ 7.6 KM 2. Hydro One Brampton 12.2 KM 3. EOC Admin Staff 9.1 KM 4. Training Admin 8.7KM 5. Car Rescue 8.4 KM 6. Trench Rescue 9.5 KM 7. RIT Training 35 KM

9 F 1-9 Current Land Use - Overview By-Law Office Animal Shelter Fire Station 203 Williams Pkwy Works Operation Centre (WPOC) SWM Pond Peel Recycling Centre

10 F 1-10 Current Land Use Building Delineation Brampton Fire & Emergency Services Planning & Infrastructure Services

11 F 1-11 Conceptual - BFES Training Campus 5 1 Existing Fire Station 203 & WPOC 2 New Fire Station Fire Headquarters & Emergency Operations Centre 4 Training Administration Building (3 floors) 5 Outdoor Simulation & Training Props Existing Burn Tower Fire Suppression Firefighter survival RIT Training Trench rescue High angle crane rescue Auto Extrication Hazardous Materials Response Technical rescue and driving

12 F 1-12 Concept of Street Massing

13 F 1-13 Proposed Project Schedule mos. 15 mos. 18 mos. 12 mos. LEGEND Preliminary Site Investigations Q Consultant RFP, Design and Construction Tender All Phases ( ) Construction and Contract Administration All Phases ( ) New Fire Station 203 Occupancy Q Demolish Existing Fire Station 203 & WPOC Q Fire Headquarters & Emergency Operations Centre Occupancy Q Training Administration Building Occupancy Q Outdoor Simulation & Training Props Occupancy Q mos. 7 mos.

14 F 1-14 Proposed Budget Estimate Breakdown Description Cost Site Investigations $250,000 Design & Construction Admin (ALL PHASES) $4,707,640 New Fire Station 203, Site Infrastructure and Demolition $14,994,269 Training and Administration Building $20,465,216 Fire Headquarters and Emergency Operations Centre $16,450,030 Fire Training Simulators $1,668,360 Total Proposed Budget $58,535,515 *Order of Magnitude Estimate +/- 20% (for funding purposes only); excludes escalation

15 F 1-15 Financial Implications: For the 2016 Capital Budget request, Facility Services and Brampton Fire and Emergency Services will work closely with Finance to explore all funding options, including but not limited to: Traditional Funding Sources: Development Charges Tax based funding Internal borrowing External borrowing Grant Opportunities Being Explored: New Canada Build Fund HydroOne Brampton, High Performance New Construction (HPNC)

16 F 1-16 Thank You!

FIRE DEPARTMENT FIRE CHIEF. Deputy Fire Chief Operations Section. Assistant Fire Chief Planning & Budget Section

FIRE DEPARTMENT FIRE CHIEF. Deputy Fire Chief Operations Section. Assistant Fire Chief Planning & Budget Section FIRE DEPARTMENT FIRE CHIEF Deputy Fire Chief Operations Section Battalion Chiefs A-1, A-2, B-1, B-2, C-1, C-2 Risk Management Supervisor Training Group Support Staff Supervisor Assistant Fire Chief Logistics

More information

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS Recommendation The Commissioner of Planning recommends: THAT

More information

WELCOME TO ROSEVILLE UNIVERSITY

WELCOME TO ROSEVILLE UNIVERSITY WELCOME TO ROSEVILLE UNIVERSITY FIRE OPERATIONS 101 Welcome Introduction of the Roseville Fire Department Review our Operations Tour of the Fire Department Our Mission To preserve life and property Our

More information

Local Growth Planning in North Central Green Line Communities

Local Growth Planning in North Central Green Line Communities 2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments

More information

Mayor and Council Briefing Cherry Hill Fire Department Operations. March 26, 2018

Mayor and Council Briefing Cherry Hill Fire Department Operations. March 26, 2018 Mayor and Council Briefing Cherry Hill Fire Department Operations March 26, 2018 Presentation Overview Fire and EMS Operations Accreditation Insurance Service Office Grading 2018 Budget Future Outlook

More information

Fire Department. Mission Statement

Fire Department. Mission Statement George Morris, Fire Chief Fire Department Department Summary Mission Statement The mission of the Butte County Fire Department (BCFD) is to protect the citizens of Butte County from all types of fires

More information

Downtown Brampton Capital Project

Downtown Brampton Capital Project Downtown Brampton Capital Project BIA Update November 1 st, 2017 Anthony Parente, Director, Wastewater Region of Peel Public Works 1 Agenda Why Now? Design Update Construction Sequencing Traffic Management

More information

Route 110 Alternatives Analysis

Route 110 Alternatives Analysis Route 110 Alternatives Analysis Public Meeting #1 December 15, 2014 Source: Town of Babylon Agenda Welcome/Introduction Hon. Antonio A. Martinez Deputy Supervisor, Town of Babylon Update on East Farmingdale

More information

Sydenham Pearl Brownfield Remediation Project

Sydenham Pearl Brownfield Remediation Project Sydenham Pearl Brownfield Remediation Project 2017 Conference - Brownfields: The Next Generation June. 15, 2017 Ed Taves Project Manager CH2M HILL Joshua Schram, BA Policy Planner City of Brantford Presentation

More information

2017 Annual Report. King County Fire District No. 27 Fall City, WA

2017 Annual Report. King County Fire District No. 27 Fall City, WA 2017 Annual Report King County Fire District No. 27 Fall City, WA Foreword Beginning in 2006, the District began collecting the detailed data elements necessary to develop and publish an annual report

More information

The Commissioner of Engineering and Public Works, the Director of Public Works and the Director of Development / Transportation Engineering recommend:

The Commissioner of Engineering and Public Works, the Director of Public Works and the Director of Development / Transportation Engineering recommend: COMMITTEE OF THE WHOLE JUNE 16, 2008 WATER FOUNTAINS AND AERATION DEVICES IN STORM WATER MANAGEMENT FACILITIES Recommendations The Commissioner of Engineering and Public Works, the Director of Public Works

More information

Courthouse Square Implementation Comment/Response Matrix

Courthouse Square Implementation Comment/Response Matrix Courthouse Square Implementation /Response Matrix 1 Are open space symbols binding? GLUP No, open space symbols are not binding, as the GLUP is a policy instrument illustrating the County s future vision

More information

DEPARTMENT SUMMARY. Departmental Relationship to City Council Goals: Support and Promote the Local Economy

DEPARTMENT SUMMARY. Departmental Relationship to City Council Goals: Support and Promote the Local Economy Public Works DEPARTMENT SUMMARY Public Works Mission Statement The Department of Public Works is the caretaker of the community's infrastructure and a direct provider of sewer and refuse utility services

More information

2014 Capital Improvement Budget Anchorage Fire Department

2014 Capital Improvement Budget Anchorage Fire Department Capital Improvement Budget (in thousands) Projects Bonds State Federal Other Fire Ambulance Replacement 520 - - - 520 Fire Ladder Truck Replacement 1,150 - - - 1,150 Fire Water Tender Replacement 800 -

More information

Brevard County Fire Rescue. Department Overview

Brevard County Fire Rescue. Department Overview Brevard County Fire Rescue Department Overview 1 Organizational Overview Organizational Chart 2 2 Organizational Overview Department responds from 33 Fire/EMS stations located throughout the county, which

More information

Performance Metrics for First Responder Locating/Tracking Technologies

Performance Metrics for First Responder Locating/Tracking Technologies Precision Indoor Personnel Location and Tracking for Emergency Responders Workshop Performance Metrics for First Responder Locating/Tracking Technologies Nelson Bryner and David Stroup Fire Fighting Technology

More information

Urban Design and Infrastructure An Overview

Urban Design and Infrastructure An Overview Urban Design and Infrastructure An Overview Alex Taranu, FCIP, RPP, OAA Municipal Urban Designers roundtable May27th, 2011 1 Urban Design and Infrastructure - Overview 1. Introduction Urban Design and

More information

PEMBROKE PINES FIRE DEPARTMENT ISO Class 1 Department

PEMBROKE PINES FIRE DEPARTMENT ISO Class 1 Department 2014 PEMBROKE PINES FIRE DEPARTMENT ISO Class 1 Department Rescue Fire Prevention Training Operations Logistics/Support Services 9500 Pines Boulevard Building B Pembroke Pines, FL 33024 954-435-6700 www.ppines.com

More information

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 EXHIBIT A Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1 1 As amended by Resolution No. 2008-02-001(TR1R) of the Tax Increment Reinvestment Zone No.1, and approved to

More information

February 11, Monica King, LEED AP Environmental Analyst RBF Consulting 9755 Clairemont Mesa Blvd, Suite 100 San Diego, CA 92124

February 11, Monica King, LEED AP Environmental Analyst RBF Consulting 9755 Clairemont Mesa Blvd, Suite 100 San Diego, CA 92124 Nevada County Consolidated Fire District "Excellence in Emergency Service" 11329 McCourtney Road, Grass Valley, CA 95949 (530) 273-3158 FAX (530) 271-0812 nccfire@nccfire.com www.nccfire.com February 11,

More information

Agenda Standing Policy Committee on Infrastructure Renewal and Public Works January 31, 2013 REPORTS

Agenda Standing Policy Committee on Infrastructure Renewal and Public Works January 31, 2013 REPORTS Agenda Standing Policy Committee on Infrastructure Renewal and Public Works January 31, 2013 REPORTS Item No. 1 Amendment of the Transportation Master Plan to Reflect the Recommendation of the Southwest

More information

13 Extending the Esri Enterprise Licence Agreement

13 Extending the Esri Enterprise Licence Agreement Clause 13 in Report No. 10 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 21, 2015. 13 Extending the Esri Enterprise

More information

Pier 70 Master Plan. Port of San Francisco

Pier 70 Master Plan. Port of San Francisco Project Overview Develop a Preferred Master Plan for a 65-acre Brownfield site Adaptive reuse of historic structures and new development that reconciles numerous regulatory, economic, maritime, historic

More information

Western Light Rail Transit Corridor Planning and Environmental Assessment Study. Public Open House #2 25 April 2013

Western Light Rail Transit Corridor Planning and Environmental Assessment Study. Public Open House #2 25 April 2013 Western Light Rail Transit Corridor Planning and Environmental Assessment Study Public Open House #2 25 April 2013 1 Presentation Overview 2 1. Where We Began Background and Study Area 2. Understanding

More information

Road pricing in the Netherlands. Overview

Road pricing in the Netherlands. Overview Road pricing in the Netherlands Overview 13 januari 2010 Past: 2004 Drafting a new policy document Objectives for 2020: - Acceptable and predictable travelling times - Reliable & sustainable mobility system

More information

Open House - Programing and Planning Social Sciences Facility & Classroom Auditorium. Capital Planning Process

Open House - Programing and Planning Social Sciences Facility & Classroom Auditorium. Capital Planning Process Open House - Programing and Planning Social Sciences Facility & November 3, 2011 Recreation Lounge Colleges Nine and Ten Capital Planning Process 2005 Long Range Development Plan 2010 Physical Design Framework

More information

COURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN

COURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN COURTICE MAIN STREET COMMUNITY IMPROVEMENT PLAN Public Meeting #1 April 28, 2016 Birdseye view of the study area PIC #1 AGENDA Agenda and Format 6:30 6:50 Registration 6:50 7:45 Introductions, Presentation

More information

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land. 2.0 Future Land Use Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land. Objective 1.1: Make available future building sites that

More information

12 Intergovernmental Coordination

12 Intergovernmental Coordination Intergovernmental Coordination Supporting Data The purpose of the Intergovernmental Coordination Element is to identify and resolve incompatible goals, objectives, policies and development proposed in

More information

implementation r expression in landscape

implementation r expression in landscape 6 ubc okanagan implementation campus plan r expression in landscape 68 6 implementation campus plan sections The Campus Plan supports the academic mission, values and commitments of the University by providing

More information

Logistics/Support Services

Logistics/Support Services Rescue Communications Training Operations Logistics/Support Services Prevention 9500 Pines Boulevard ~ Building B ~ Pembroke Pines, FL 33024 ~ 954-435-6700 ~ www.ppines.com Table of Contents Page Message

More information

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE MacPherson Room, 10 am 5 pm MOUNTAIN VIEW SCHOOL SITE REDEVELOPMENT 1 WELCOME TO THE OPEN HOUSE FOR THE MOUNTAIN VIEW SCHOOL SITE WHY WE ARE

More information

A nn ua l Re po r t

A nn ua l Re po r t 2 0 1 4 A nn ua l Re po r t The Village of Elm Grove has been served and protected by the Elm Grove Volunteer Fire Department since 1956. The department is comprised of a dedicated and highly-trained group

More information

Chapter 14: Community Services and Public Utilities

Chapter 14: Community Services and Public Utilities Chapter 14: Community Services and Public Utilities Goal: Cost-effective community services related to the needs of the community. Background The City of Dundas provides a variety of services to community

More information

Fire Safety Account Financial Report for Fiscal Year 2014

Fire Safety Account Financial Report for Fiscal Year 2014 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

PRINCE WILLIAM COUNTY FIRE AND RESCUE ASSOCIATION RESOLUTION LOG

PRINCE WILLIAM COUNTY FIRE AND RESCUE ASSOCIATION RESOLUTION LOG 01/21/09 Rescind Fire and Rescue Association Operations-Related Procedural Memoranda 09-02 01/21/09 ALS Curriculum Coordinator Job Description 09-03 01/21/09 Fiscal Year 2010 Proposed Budgets 09-04 01/21/09

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO. 5.a TO THE HONORABLE MAYOR AND COUNCIL: DATE: May 26, 2015 SUBJECT: ADOPT RESOLUTION NOS. 15-33, 15-34, 15-35, AND 15-36, CONFIRMING THE ASSESSMENT DIAGRAMS

More information

Welcome! Agenda. South Downtown

Welcome! Agenda. South Downtown Welcome! Agenda 4:00 Open House 5:00 Presentation Welcome Subarea Plan Overview Existing Studies Next steps: Scoping 6:00 Questions and Answers 6:30 Open House continues Project background and purpose

More information

CENTRAL YORK FIRE SERVICES 2009 Annual Report PROUDLY PROTECTING THE COMMUNITIES OF AURORA AND NEWMARKET

CENTRAL YORK FIRE SERVICES 2009 Annual Report PROUDLY PROTECTING THE COMMUNITIES OF AURORA AND NEWMARKET CENTRAL YORK FIRE SERVICES 2009 Annual Report PROUDLY PROTECTING THE COMMUNITIES OF AURORA AND NEWMARKET Report 2010-07 Established January 1, 2002 1 2010 SENIOR OFFICERS Robert Comeau Ian Laing Paul Leslie

More information

STAFF REPORT INFORMATION ONLY. Vacuum Waste Collection Systems SUMMARY. Date: March 19, Executive Committee. To: Deputy City Manager.

STAFF REPORT INFORMATION ONLY. Vacuum Waste Collection Systems SUMMARY. Date: March 19, Executive Committee. To: Deputy City Manager. Vacuum Waste Collection Systems STAFF REPORT INFORMATION ONLY Date: March 19, 2008 To: From: Wards: Reference Number: Executive Committee Deputy City Manager All Wards P:\2008\Cluster B\PLN\ec080020 SUMMARY

More information

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

Atlanta BeltLine, Inc. Pathways to Urban Sustainability Atlanta BeltLine, Inc. Pathways to Urban Sustainability September 30, 2010 WHAT IS THE ATLANTA BELTLINE? Transit 22-mile loop Parks 1300 + new acres Trails 33 miles Jobs & Economic Development 20 areas,

More information

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010

THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom Happiness No. 37/2010/ND CP Hanoi, April 07, 2010 THE GOVERNMENT SOCIALIST REPUBLIC OF VIET NAM ------- Independence - Freedom Happiness --------- No. 37/2010/ND CP Hanoi, April 07, 2010 DECREE ON THE FORMULATION, EVALUATION, APPROVAL AND MANAGEMENT OF

More information

7700 College Town Drive, Suite Ninth Street, Suite 212 Sacramento, CA Sacramento, CA 95814

7700 College Town Drive, Suite Ninth Street, Suite 212 Sacramento, CA Sacramento, CA 95814 ACKNOWLEDGEMENTS/PROJECT TEAM: Property Owners Representative: The Hodgson Company John Lambeth 7700 College Town Drive, Suite 220 1025 Ninth Street, Suite 212 Sacramento, CA 95826 Sacramento, CA 95814

More information

Stafford County Strategic Plans

Stafford County Strategic Plans Stafford County Strategic s Strategic Department Description Date Adopted Board of Supervisors Priorities Fiscal Responsibility Education Public Safety Infrastructure Economic Development Service Excellence

More information

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016 Silver Line CPAM UPDATE Transportation and Land Use Committee October 14, 2016 Purpose Recap Project History and Map Changes Provide Overview of CPAM Components Discuss Transportation Impacts Discuss Fiscal

More information

11 CONTRACT AWARD FOR SECURITY SERVICES

11 CONTRACT AWARD FOR SECURITY SERVICES 11 CONTRACT AWARD FOR SECURITY SERVICES The Finance and Administration Committee recommends the adoption of the recommendations contained in the following report dated November 3, 2011, from the Commissioner

More information

Humboldt No. 1 Fire Protection District

Humboldt No. 1 Fire Protection District Humboldt No. 1 Fire Protection District Municipal Service Review September 2008 Prepared for Development of the District Sphere of Influence Report TABLE OF CONTENTS Page Local Agency Formation Commission

More information

Frequently Asked Questions Station 302 Bolton

Frequently Asked Questions Station 302 Bolton March 2015 UPDATE: ZAS Architects Inc. are currently working on the schematic design phase of the project, developing preliminary site layouts and floor plans Direct access to Regional Road 50 has been

More information

2 USE OF KRAFT BAGS FOR COLLECTION OF YARD WASTE MUNICIPAL RESPONSES

2 USE OF KRAFT BAGS FOR COLLECTION OF YARD WASTE MUNICIPAL RESPONSES 2 USE OF KRAFT BAGS FOR COLLECTION OF YARD WASTE MUNICIPAL RESPONSES The Transportation and Works Committee recommends: 1. The communication dated October 5, 2004 from Regional Councillor Jack Heath be

More information

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT Seeking artists to design, fabricate and install art elements in the nature sanctuary

More information

Making Transit Oriented Development Work For Boonton, NJ

Making Transit Oriented Development Work For Boonton, NJ Making Transit Oriented Development Work For Boonton, NJ Bloustein School of Planning and Public Policy Studio Dan Burton Loannie Dao Webster Slater Brandon Williams Ian Watson Maria Laham Nicola Mammes

More information

Mission. Vision. To set the standard for excellence and innovation in public safety. Department Description

Mission. Vision. To set the standard for excellence and innovation in public safety. Department Description Fire FIRE Mission The mission of the Fire Department is to ensure the health, safety, and well-being of our community by providing a wide range of innovative services. Vision To set the standard for excellence

More information

Pantops Area Public Safety Station

Pantops Area Public Safety Station Pantops Area Public Safety Station General Information Services Provided - All Hazard Fire Suppression HazMat Rescue Personnel Education Advanced Life Support EMS Transport General Information Services

More information

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit.

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit. M 1/ 4 1/ 2 E IL M E IL Station Family: County: City: UNC Hospitals WHY THIS STATION? University Village Orange Chapel Hill Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and

More information

A Water Meter System Upgrade and Its Long Term Benefits - Utilization of AMR/AMI Data and Smart Metering

A Water Meter System Upgrade and Its Long Term Benefits - Utilization of AMR/AMI Data and Smart Metering A Water Meter System Upgrade and Its Long Term Benefits - Utilization of AMR/AMI Data and Smart Metering Adam Hogan, PE, Alliance Consulting Engineers, Inc. Cory Cox, PE, Gaffney Board of Public Works

More information

Places29: List of Implementation Projects

Places29: List of Implementation Projects Important Points to Keep in Mind When Using This List Places29: List of s Each of the projects in this List represents an action needed to implement the Places29 Master Plan. The projects are grouped first

More information

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan 425 Hillside Avenue Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan I. INTRODUCTION The is seeking the services of a qualified consulting firm to prepare plans

More information

City of Mississauga. Fire and Emergency Services. Business Plan Update

City of Mississauga. Fire and Emergency Services. Business Plan Update Fire and Emergency Services Business Plan City of Mississauga 2012-2014 Update Last year the City of Mississauga undertook an extensive process to create a four year, 20111 through 2014, detailed Business

More information

ECONOMIC JUSTIFICATION FOR SPRINKLER SYSTEMS

ECONOMIC JUSTIFICATION FOR SPRINKLER SYSTEMS ECONOMIC JUSTIFICATION FOR SPRINKLER SYSTEMS 08.03.2016 Vladimir Mozer University of Zilina INTRODUCTION The usual question: Why would I consider sprinkler protection when it is not required by codes?

More information

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS Caldwell County Pathways along with our co-partners City of Lenoir, Town of Gamewell,

More information

5 Year Capital Improvement Plan Update

5 Year Capital Improvement Plan Update 5 Year Capital Improvement Plan Update Board Approved May 10, 2016 Collierville Schools Board of Education Wanda Chism Wright Cox Mark Hansen, Chairman Cathy Messerly Kevin Vaughan Superintendent John

More information

A DYNAMIC CITY AND ITS ASSETS

A DYNAMIC CITY AND ITS ASSETS A DYNAMIC CITY AND ITS ASSETS Great new urban projects are being completed Significant funding for public realm upgrades in the commercial core Population growth and skills on the rise Growing internal

More information

Developer, new connection and infrastructure charges

Developer, new connection and infrastructure charges Ends of duct to be sealed Pipe clips mounted off to allow for insulation Pipe insulated in accordance with B.S. 6700 against damage from frost Drain Tap Double check valve Copper to Polyethylene fitting

More information

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN 12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions East Courtenay Fire Service Review The City of Courtenay has completed a lengthy and thorough evaluation of fire services and requirements. Two separate, independent third-party

More information

Outline. Standards of Coverage. ICS Features 2/12/2016 ICS

Outline. Standards of Coverage. ICS Features 2/12/2016 ICS Outline Fire Department Operations Standards of Coverage What does it look like in your town? Standard Assignment House Fire, Commercial Fire, Smoke in Structure Incident Command System Arrival Reports

More information

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment Authority September 17, 2015 Discussion Points Overview of

More information

Fire Safety Account Financial Report for Fiscal Year 2018

Fire Safety Account Financial Report for Fiscal Year 2018 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department

More information

South Yonge Street Corridor

South Yonge Street Corridor South Yonge Street Corridor Streetscape Master Plan Study Draft Final Executive Summary Prepared by: January 2012 In Partnership with: Introduction The Future... Yonge Street is at the forefront of York

More information

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation Police Headquarters Auditorium Mineola, NY December 9 th,

More information

Garver Feed Mill Timeline

Garver Feed Mill Timeline Garver Feed Mill Timeline 1) 1989 Garver Feed Mill is designated as a CDA Redevelopment Project 2) 1991 Olbrich Botanical Gardens opens Bolz Conservatory, Schumacher Library, and associated buildings 3)

More information

Master Project List Report

Master Project List Report Blue Hills Elementary School 01-8215 Site Utilities Replacement $52,835 01-8502 Modernization $3,135,933 01-8525 Exterior Painting $181,478 01-8552 Kindergarden Fencing $13,180 Install new backflow preventer.

More information

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1 Implementation 10 Implementation This chapter overviews how to use the comprehensive plan as a land use and programming tool for the Town of Bloomsburg and recommends annual review of the plan by the Town

More information

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014 Railyard Alternatives and I-280 Boulevard Feasibility Study MTA Board Meeting May 6, 2014 Planned Infrastructure Major pieces of new infrastructure are planned including: Downtown Rail Extension (DTX)

More information

Green Infrastructure and Adaptive Management

Green Infrastructure and Adaptive Management Green Infrastructure and Adaptive Management A New Synergy One Water August 27, 2014 Tina Wolff, PE Imagine 1 23 September the result 2014 Prepared by the Green Infrastructure Implementation Task Force

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm

LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm LINCOLN COUNTY COMMONS - REVISED MASTER PLAN Lincoln County Public Meetings June 26-27, 2018, 6pm PROJECT OVERVIEW Lincoln County is preparing a Refined Master Plan for facilities at the Lincoln County

More information

2017 First Quarter Report

2017 First Quarter Report PALM BEACH GARDENS FIRE RESCUE 2017 First Quarter Report Deputy Chiefs James Ippolito and Shon Broedell receive the accreditation plaque at the 2017 Center for Public Safety Excellence Conference in Anaheim,

More information

6 Growth Management Challenges and Opportunities

6 Growth Management Challenges and Opportunities 6 Growth Management Challenges and Opportunities The Town has established a goal of attaining a 50% participation rate with respect to employment opportunities versus residential population. The Town s

More information

EMERGENCY MANAGEMENT

EMERGENCY MANAGEMENT EMERGENCY MANAGEMENT MISSION STATEMENT: The mission of the Emergency Management Department is to prepare for, monitor and recover from natural and man-made disasters through the implementation of the City

More information

WELCOME 4201 E. ARKANSAS AVENUE PROPERTY COMMUNITY DISCUSSION

WELCOME 4201 E. ARKANSAS AVENUE PROPERTY COMMUNITY DISCUSSION WELCOME 4201 E. ARKANSAS AVENUE PROPERTY COMMUNITY DISCUSSION Salem United Church of Christ June 7, 2018 AGENDA Introduction Existing Conditions CDOT s Next Steps Proposed Zoning Overview Transportation

More information

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016 Item 5, Report No. 26, of the Committee of the Whole (Working Session), which was adopted without amendment by the Council of the City of Vaughan on June 7, 2016. 5 MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

More information

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan Scope of Services River Oaks Boulevard (SH 183) Corridor Master Plan PROJECT AREA The project area consists of the River Oaks Boulevard (SH 183) corridor bounded by SH 199 at the northern end and the Trinity

More information

Town of Whitby By-law #

Town of Whitby By-law # Town of Whitby By-law # 7263-17 Fire Department Establishing and Regulating By-law Being a By-law to Establish and Regulate the Fire Department, and to Repeal By-law # s. 4202-98, 6078-08 and 6834-14.

More information

The City of Bowie Arts Committee Bowie, Maryland ART IN PUBLIC PLACES PROGRAM Request for Proposals

The City of Bowie Arts Committee Bowie, Maryland ART IN PUBLIC PLACES PROGRAM Request for Proposals The City of Bowie Arts Committee Bowie, Maryland ART IN PUBLIC PLACES PROGRAM Request for Proposals Deadline for Submission: September 1, 2016. 5 p.m. EDT Background The City of Bowie announces a Request

More information

HOUZZ & HOME. August 2016 INTERNATIONAL COMPARISON. Overview of Home Renovation in Houzz Inc.

HOUZZ & HOME. August 2016 INTERNATIONAL COMPARISON. Overview of Home Renovation in Houzz Inc. 2016 HOUZZ & HOME INTERNATIONAL COMPARISON August 2016 Overview of Home Renovation in 2015 What We Are Doing in Our Home: 2015 Activities of Homeowners on Houzz Tables below show the frequency of home-related

More information

Alertus Emergency Notification Software

Alertus Emergency Notification Software Alertus Emergency Notification Software General Account/Department CONTRACTS - RISK MGMT Priority Based on steering committee score Created Mon 3/5/18 11:38 AM Dates/Times Resources Not Available None.

More information

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on The time is right to find funding solutions that address our aging infrastructure. We can enable

More information

Eco-Roof Incentive Program application: 77 Glen Rush Boulevard

Eco-Roof Incentive Program application: 77 Glen Rush Boulevard PG25.3 REPORT FOR ACTION Eco-Roof Incentive Program application: 77 Glen Rush Boulevard Date: December 19, 2017 To: Planning and Growth Management Committee From: Director, Environment and Energy Division

More information

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017 PORT OF VANCOUVER WATERFRONT DEVELOPMENT Concept Development Plan City Center Redevelopment Authority April 20, 2017 Port History PORT ESTABLISHED 1912 TERMINAL 1 ACQUIRED 1925 GWM SIGNS LEASE 1935 HARBOR

More information

SIOUX FALLS FIRE RESCUE STRATEGIC PLAN

SIOUX FALLS FIRE RESCUE STRATEGIC PLAN SIOUX FALLS FIRE RESCUE The mission of Sioux Falls Fire Rescue is to protect the citizens and visitors of Sioux Falls and their property from fires and other emergencies through education, prevention,

More information

Integrated Urban Structuring in Australia An Overview of Principles and Practice

Integrated Urban Structuring in Australia An Overview of Principles and Practice ACNU08 Brisbane Integrated Urban Structuring in Australia An Overview of Principles and Practice Wendy Morris Ecologically Sustainable Design Pty Ltd Melbourne, Australia esdesign@netspace.net.au Ecologically

More information

MERIDEN AND PLAINFIELD VOLUNTEER FIRE DEPARTMENTS Chief s Report 2018

MERIDEN AND PLAINFIELD VOLUNTEER FIRE DEPARTMENTS Chief s Report 2018 MERIDEN AND PLAINFIELD VOLUNTEER FIRE DEPARTMENTS Chief s Report Following an affirmative vote at the Town Meeting, the assets and liabilities of both the Meriden and Plainfield Volunteer Fire Departments

More information

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB Program Goals, Activities and Accomplishments I. Beach Front Multi-modal Transportation, Aesthetic and Parking Improvements III. Connector

More information

CITY COUNCIL MEETING Olympia, Washington November 23, 2010

CITY COUNCIL MEETING Olympia, Washington November 23, 2010 CITY COUNCIL MEETING Olympia, Washington November 23, 2010 Authorization for the Purchase and Installation of the Fire Simulation System at the Fire Training Center (Resolution Waiving Public Bidding Requirements,

More information

campus master plan VIRGINIA STATE UNIVERSITY

campus master plan VIRGINIA STATE UNIVERSITY campus master plan VIRGINIA STATE UNIVERSITY agenda 01 INTRODUCTION & GENERAL OVERVIEW 02 03 04 LAND USE CONCEPT PROGRAM ACCOMMODATION MAXIMIZE EXISTING INFRASTRUCTURE SUMMARY AND NEXT 05 STEPS agenda

More information

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway RFP 61-18 REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway Sealed Requests for Proposals, plainly marked RFP 61-18 Design Engineering Services

More information

REVIEW AND EVALUATION OF REGIONAL LAND USE

REVIEW AND EVALUATION OF REGIONAL LAND USE REVIEW AND EVALUATION OF REGIONAL LAND USE AND TRANSPORTATION SCENARIOS #220831 Environmental Justice Task Force October 7, 2014 VISION 2050 Process Development of Guiding Vision for Land Use and Transportation

More information