MECHANICAL ADDENDUM #1

Size: px
Start display at page:

Download "MECHANICAL ADDENDUM #1"

Transcription

1 MECHANICAL ADDENDUM # DAE: March 4, 208 PROJEC NO: 7574 PROJEC: Orchard Cove Renovation DIISION 22 & 23 DRAWINGS SHEE - MG-00 Basement Level Medical Gas. Emergency oxygen supply connection was added and the associated keynote. SHEE - MP-0 Attic Mechanical Piping Plan. Keyed note #2 has been removed from this sheet. Fire-rated access doors are not required for each A box. he A boxes will be accessed/maintained through the attic access. 2. hey leaders & symbols for keyed notes 3 & 4 have been moved so they point to the correct locations near the north exterior of the building. SHEE - MP-40 Enlarged Mechanical Piping Plans. his sheet is no longer required and can be ignored. SHEE - P-0 Level Plumbing Plan. Pipe size of DHW and DCW increased to. 2. DHWR return loop added. SHEE - P-40 Enlarged Plumbing Plans. Detail - Roll-in Shower & Exam Rm Enlarged Plumbing Plan A. Keyed note #2 has been added to Exam Room 2-A, Roll-In Shower 24, & Existing Activity Space Keyed note #2 has been added to this sheet. 3. Automatic Fire Sprinklers and Piping General Notes have been added to this sheet. 4. Pipe size of DHW and DCW increased to. 5. DHWR return loop added. 6. Pressure callout was realigned. SHEE - P-50 Plumbing Details. Emergency oxygen supply connection detail added. 2. Detail title scale description adjusted.

2 Page 2 of 3 SPECIFICAIONS SECION - Specification Index. his index has been updated to include sections 2000, 23528, & It has also been updated to no longer show section SECION Water-Based Fire-Suppression Systems. his section has been added to the mechanical specifications. SECION Flexible Steel Water-ube Boilers. his section has been added to the mechanical specifications. SECION Fire-ube Boilers. his section is no longer required and has been removed from the mechanical specifications. SECION Underground Hot Water Piping System. his section has been added to the mechanical specifications. PRIOR APPROALS he following manufacturers, trade names and products are allowed to bid on a name brand only basis with the provision that they completely satisfy all and every requirement of the drawings, specifications and all addenda shall conform to the design, quality and standards specified, established and required for the complete and satisfactory installation and performance of the building and all its respective parts. Item Manufacturer Comments Boilers Pumps Domestic Heat Exchanger Access Doors Louvers Centrifugal Roof entilators Duct Silencers Split System A/C Units Air Separators Expansion anks Boiler Flue Building Automation Controls Phenolic Foam Ducts Fulton, Lochinvar Wilo, PACO, Grundfos Kelvion Nailor, Kees Nailor, American Warming, Cesco, Greenheck ACME, Greenheck Price LG, Lennox, Daikin Spirotherm Wessels, Flexcon an Packer, Industrial Chimney Company Wasatch Controls, Controls Solutions Group PALDuct Fire, Smoke, Combination Dampers Cesco High Efficiency ake-off Fittings Manual olume Dampers Control Dampers ariable Frequency Drives Clifco Air-Rite Greenheck Danfoss

3 Page 3 of 3 Underground Duct Manufactured Casings Electric Radiant Heaters Hydronic Heating & Cooling Panels Hydronic Air Coils Humidifiers Monoxivent Commercial Acoustics Indeeco Sigma emtrol Neptronic

4 GENERAL NOES # KEYED NOES. PROIDE LINK-SEAL IN ANNULAR SPACE, YPICAL. 2. PROIDE SCHEDULE 80 PC SLEEE HROUGH FOUNDAION WALL, YPICAL.. SEE SHEE MG-40 FOR CONINUAION. 2. UNDERGROUND MED GAS PIPING IS O BE ENCLOSED IN A CONINUOUS CONDUI AND RACER PIPE. 8. PROIDE 45 DEGREE FIINGS O MAKE ERICAL CHANGE IN PIPE ROUING. REMOE SUFFICIEN BUILDING FOUNDAION AND SLAB O ALLOW FOR CONDUIS AND PIPING O ENER INSIDE BUILDING. " MA UP 2" AC UP " O2 UP 3. PROIDE FERNCO RANSIION COUPLING, YPICAL. 4. PROIDE 4" ADS CONINUOUS CORRUGAED CASING, YPICAL. 5. UPON ENRY INO MECHANICAL ROOM RUN PIPING OERHEAD. 6. FLOOR SLEEE O BE PROIDED FOR NEW PIPING. 3. SAW CU EXISING ASPHAL FOR NEW PIPING. REPAIR AND REPLACE WIH ROAD BASE AND ASPHAL O MACH EXISING. YPICAL. 4. " O (OXYGEN), 2" AC (ACUUM), AND " MA (MEDICAL AIR) INSALLED IN SEPARAE 4" SLEEES. 5. PROIDE 45 DEGREE FIINGS O ALL FOR SLEEE O SLIDE OER AND PAS FIING. 6. REPLACE CONCREE CURB O MACH EXISING. REMOE CONCREE O NEARES JOIN. REPLACE WIH FULL PANELS OF CONCREE. 7. PRESERE AND PROEC EXISING CURB AND GUER. 9. CORE DRILL FOUNDAION WALL. 0. EXISING 3 ON CONDENSER UNIS AND MECH EQUIPMEN ON CONCREE PADS.. EXISING ELECRICAL O REMAIN. HIGH OLAGE ELECRICAL CONDUI ON EXERNAL FACE OF BUILDING. ERIFY EXAC UNDERGROUND LOCAIONS WIH UILIY LOCAER SERICE. 2. EXISING REE/BUSHES O BE PRESERED. 3. GUER SYSEM O BE PRESERED. 4. REFER O SHEE P-50 FOR EMERGENCY OXYGEN SUPPLY CONNECION DEAIL. ELLIO WORKGROUP ARCHIECURE LLC 44 West Ute Blvd, Suite 00 Park City, Utah or elliottworkgroup.com 5 3 N3 MA AC O2 " 2" " 2 4 N4 N MA 2 S3 S4 S5 REGISERED SAE PROFESSIONAL No JEFFREY S. WAKINS OF UAH ENGINEER SOUH DAIS COMMUNIY HOSPIAL N6 N " MA UP 2" AC UP " O2 UP DHX " MA UP 2" AC UP " O2 UP S6 Orchard Cove Renovation 485 E 500 S Bountiful, U 8400 YY No. Date Description 5/4/8 ADDENDUM # ZZ AA AA W W2 W3 W4 W5 W6 W7 W8 W9 ISSUE DAE: OWNER PROJEC NO:. CONRAC NO:. DRAWN BY: CHECKED BY: DESIGNED BY: EWG PROJEC NO: COPYRIGH: Author JSW KJM Elliott Workgroup Architecture, LLC SHEE ILE BASEMEN LEEL MEDICAL GAS PLAN SCALE: /8" = '-0" W W W. B F A. C O M 330 South 300 East AN BOERUM & FRANKASSOCIAES, INC. CONSULING ENGINEERS Salt Lake City Logan St. George empe Salt Lake City, U 84 BFA Project Number: F BASEMEN LEEL MEDICAL GAS MG-00 SHEE OF

5 # KEYED NOES. HIS HEAING HO WAER SUPPLY AND REURN PIPING IS O RUN BELOW GRADE FROM HE NEW BOILER SHED O HE MECHANICAL ROOM ON HE LOWER LEEL. SEE SHEE MP-00 FOR CONINUAION. 2. HIS KEYED NOE IS NO USED. 3. HIS HEAING HO WAER SUPPLY AND REURN PIPING IS O RUN BELOW GRADE FROM HE NEW MAIN PIPING OER O HE NEW AIR HANDLER LOCAED ON GRADE. 4. ALL EXPOSED PIPING IS O BE LINED WIH HEA RACE A 5 WAS PER LINEAR FOO. E E2 E3 E4 E5 E6 E7 E8 E9 E0 E E2 E3 ELLIO WORKGROUP ARCHIECURE LLC 44 West Ute Blvd, Suite 00 Park City, Utah or elliottworkgroup.com 4 2 /2" HWR 3 M-40 AHU H 2 /2" HWS XX AAA BBB N N2 N3 N4 N5 N6 N7 YY 4 3 /4" HWR 2/2" HWS " HWR 3/4" HWR 2/2" HWS 2/2" HWR 3/4" HWS 2 /2" HWS S S2 S3 S4 S5-8 2/2" HWS DN 2/2" HWR DN S6 /4" HWR /4" HWR /2" HWR /2" HWR 2" HWR 2/2" HWS 2" HWS 2" HWS /4" HWS 3/4" HWR " HWR 2" HWS 2" HWR 2" HWS 2" HWR 2" HWS /2" HWS REGISERED PROFESSIONAL No JEFFREY S. WAKINS SAE OF UAH ENGINEER SOUH DAIS COMMUNIY HOSPIAL Orchard Cove Renovation 485 E 500 S Bountiful, U 8400 No. Date Description 5/4/8 ADDENDUM # AIC MECHANICAL PIPING PLAN SCALE: 3/32" = '-0" ZZ AA 2 /2" HWR 3/4" HWS " HWS " HWS /4" HWS 2 /2" HWR AA W W2 W3 W4 W5 W6 W7 /4" HWS /2" HWS 2 /2" HWR 2" HWR /2" HWS 2" HWR W8 W9 W0 W W2 W3 BB AN BOERUM & FRANKASSOCIAES, INC. ISSUE DAE: OWNER PROJEC NO:. CONRAC NO:. DRAWN BY: CHECKED BY: DESIGNED BY: EWG PROJEC NO: COPYRIGH: KJM JSW KJM Elliott Workgroup Architecture, LLC SHEE ILE AIC MECHANICAL PIPING PLAN CONSULING ENGINEERS W W W. B F A. C O M Salt Lake City Logan St. George empe 330 South 300 East Salt Lake City, U 84 BFA Project Number: F MP-0 SHEE OF

6 # KEYED NOES. PLUMBING O BE IED INO EXISING LAAORY SUPPLIES ON OPPOSIE SIDE OF WALL. SEE P-40, YPICAL. 2. PIPE CHASE ABOE BASEMEN MECHANICAL ROOM WASE DROPS FROM BELOW FIRS FLOOR LEEL O BELOW BASEMEN LEEL. 4. NEW DOMESIC SUPPLY LINES O IE INO EXISING MAINS. 5. PROIDE ACCESS O ISOLAION ALES. 6. CONNEC O EXIS 2" (2 PSI) GAS SERICE DOWNSREAM OF MEER ADDED CFH. COORDINAE WIH GAS SUPPLIER FOR YARD LINE, REGULAOR AND MEER SIZE. 7. INCREASE SIZE OF MEER PAD O SUPPOR GAS MEER AND PIPING. 8. HEA RACE RO WAER PIPING FROM MECHANICAL SHED O AIR HANDLER. E E2 E3 E4 E5 E6 E7 E8 E9 E0 E E2 E3 XX AAA BBB N 3 P-40 L- PRIAE 69 OILE 68A L- 4" W(E) SEMI PRIAE 68 SEMI PRIAE 68 OILE 69A 2" (E) S LAUNDRY 65 4" 64 W(E) EXISING SUPPLY ROOM 2" (E) PRIAE PRIAE PRIAE PRIAE PRIAE PRIAE SEMI-PRIAE SEMI-PRIAE L- L- PRIAE L- L- L- L- L- L- 55 L- 2 P-40 OILE OILE OILE OILE OILE OILE 99 OILE OILE OILE OILE 200 4" W(E) " (E) OILE OILE OILE 55A 24 54A OILE 53A 3" W(E) 3/4" DHW(E) PRIAE 53 3/4" DCW(E) L- ELLIO WORKGROUP ARCHIECURE LLC 44 West Ute Blvd, Suite 00 Park City, Utah or elliottworkgroup.com MEP GAS SORAGE - HR RAED 9 MED GAS SUPPOR - HR RAED 92 4 P-40 BOILER ROOM - HR RAED /4" LPG G ROS 3/4" 3/4" AHU H N2 N3 N4 PRIAE 70 PRIAE 7 L- 3" WOILE (E) L- OILE 70A 7A OILE 205 S2 S3 2" UP(E) /2" DCW(E) 2" (E) EXISING NURSE SAION 36 /4" DHW(E) 34 /2" DHW(E) EXISING BAHING 2" DCW(E) ELEAOR 45 EXISING BEAUY / BARBER EXISING ACIIY SPACE 37 EXISING PRIAE DINING 2-B 2" (E) /4" DCW(E) 2" (E) " DCW(E) UIL " DHW(E) 3/4" DHW(E) 47 3" (E) 2" (E) EXISING NURSE SAION 46 EXISING DINING EXISING ACIIY SPACE PRIAE EXISING ACIIY SPACE " UP(E) EX OFFICE EX OFFICE Room 52 EX SOCIAL SERICES CLEAN 48 COPY 49 OILE 52A ADMINISRAION 5 L- SEMI-PRIAE 52 REGISERED PROFESSIONAL No JEFFREY S. WAKINS SAE OF UAH ENGINEER SOUH DAIS COMMUNIY HOSPIAL N5 N6 N7 YY PRIAE 72 PRIAE 73 PRIAE 74 3" W(E) L- L- L- 3 SEMI-PRIAE 75 2 OILE SOILED 72A 3 OILE CLEAN 73A 30 2" DCW(E) OILE 2" 74ADHW(E) 3/4" DHWR(E) S4 S5 S6 4 " DHW EX OILE 28 SAIRS 33 " DCW 5 EXISING MED ROOM 23 EXISING NURSE SAION 25 2" (E) 3" UP(E) /2" DCW(E) 3" (E) EXAM ROOM 2-A ROLL-IN SHOWER 24 EXISING ACIIY SPACE 20 3/4" GPM EXISING DINING 9 P-40 EXISING PHYSICAL HERAPY GYM 5 EX HEAD NURSE EXIS P WORK 03 3 WOMEN 05 EX OFFICE MEN 2 06 EXISING ACIIY SPACE 7 EXISING ADL RAINING " (E) " DCW(E) EXISING NURSE SAION /4" DHW(E) " DHW(E) 4" W(E) 3/4" DHWR(E) L- OILE 89A SOIL 09 UIL 0 3 2" (E) 89 3" UP(E) 2" (E) 4" W(E) OILE 88A SEMI-PRIAE L- SEMI-PRIAE 88 Orchard Cove Renovation 485 E 500 S Bountiful, U 8400 OILE OILE OILE OILE OILE OILE OILE OILE OILE OILE OILE OILE 75A L- 76A L- 77A 78A 79A 80A OILE L- L- L- L- L- L- L- L- L- L- 2" (E) 2" (E) 2" (E) OILE L- No. Date Description 5/4/8 ADDENDUM # PRIAE 76 PRIAE 77 PRIAE 78 PRIAE 79 PRIAE PRIAE PRIAE PRIAE PRIAE PRIAE PRIAE SEMI-PRIAE " (E) 3" W DN(E) LEEL PLUMBING PLAN SCALE: 3/32" = '-0" ZZ AA 6 GAS MEER 7 BB ISSUE DAE: OWNER PROJEC NO:. CONRAC NO:. DRAWN BY: CHECKED BY: DESIGNED BY: EWG PROJEC NO: COPYRIGH: KJM JSW KJM Elliott Workgroup Architecture, LLC SHEE ILE LEEL PLUMBING PLAN AN BOERUM & FRANKASSOCIAES, INC. CONSULING ENGINEERS W W W. B F A. C O M Salt Lake City Logan St. George empe 330 South 300 East Salt Lake City, U 84 BFA Project Number: F P-0 SHEE OF

7 # KEYED NOES N6 N LPG 3' - 4" 2" (" WC) LPG SPS -2 MP LPG FS- ENLARGED SHED PLAN SCALE: /4" = '-0" AA ' - 0" 20 " DCW UP SPS - MAC SPS 2- O2 " 3" UP " DCW DN 3/4" 2/2" 4 2/2" FS- 3/4" 7 G G 5 3/4" /2" " DCW UP 2/2" G UP B 4 4 2" PC 3/4" LPG G LPG SPS 2-2 SPS DHX LPG BASEMEN LEEL PLUMBING PLAN ENLARGED PLAN SCALE: /4" = '-0" MA 2 8 FCO DCW(E) 9 2" PC 3/4" 2" 2 G 8 PC LPG 4' - 0" 20 2" DCW UP(E) 3/4" DHWR UP(E) 2" DHW UP(E) DHW(E) RCP DHWR(E) 2" 6 0 3/4" 5 ' - 0" 2" 2" W(E) 7 PC 2" PC B 2 2 SPS 3- LPG RO ROS S 3/4" ROS 3/4" 3/4" ROS DN HWP HWP 2 L 9 B L- S4 S5 WC EX OILE SD 28 E4 SH " FD- WC- 2" SH- " EXISING MED ROOM 23 ROLL-IN SHOWER " 4" 4" L- 3 " 3/4" 4" W DN SCALE: /4" = '-0" YP. PAIEN ROOM EXAM SINK SCALE: /4" = '-0" 2" 3/4" /2" 2 3/4" AAA BBB EXAM ROOM 2-A 3 EXISING ACIIY SPACE ROLL-IN SHOWER & EXAM RM ENLARGED PLUMBING PLAN FIRE SPRINKLERS SYSEM EQUIPMEN SPRINKLERS: L 20 AUOMAIC FIRE SPRINKLERS AND PIPING GENERAL NOES 3 2 MANUFACURER SH W L- WC L-2 YCO, RELIABLE, IKING, OR ICAULIC SEMI-RECESSED, WHIE, MACH EXISING K-FACOR PIPE HANGERS UL LISED & NFPA #3, SEISMIC BRACING PER & SUPPORS NFPA 3 CHAPER 9 PIPING: SCHEDULE 40 OR HREADABLE HINWALL FIINGS: UL LISINGS & NFPA #3 MECHANICAL EE: FLEXIBLE SPRINKLER DROPS: ICAULIC SERIES 920 OR 920N ICAULIC AH2 MAY BE USED IF A HYDRAULIC CALCULAION IS PROIDED A. BUILDING HAS AN EXISING SPRINKLER SYSEM INSALLED O PROEC SHELLED SPACE AND ALL OHER SURROUNDING AREAS. SCOPE OF WORK SHALL CONSIS OF ADDING/RELOCAING SPRINKLERS FOR NEW FLOOR AND CEILING PLAN INCLUDING HEIGH ADJUSMENS. B. MAKE CONNECION O EXISING PIPING AS NEEDED USING MECHANICAL EES, PLAIN END OR HREADED FIINGS. C. AUOMAIC, WE FIRE SPRINKLER SYSEM SHALL BE DESIGNED, AND INSALLED IN ACCORDANCE WIH NFPA # 3, 203 EDIION. D. SHOP DRAWINGS, CALCULAIONS AND MAERIAL SUBMIALS SHALL BE SUBMIED O HE ENGINEER AND FIRE MARSHALL. E. ANY SPRINKLER MODIFIER OR MOED SHALL BE REPLACED WIH A NEW QUICK RESPONSE SPRINKLER. ANY COMPARMEN CONAINING A MODIFIED SPRINKLER SHALL HAE QUICK RESPONSE SPRINKLERS INSALLED HROUGHOU HE COMPARMEN. EXENDED COERAGE SPRINKLERS MAY BE USED IF HEY ARE CURRENLY INSALLED IN HE EXISING AREA. IF EXENDED COERAGE SPRINKLERS ARE USED HEY SHALL BE INSALLED PER HE MANUFACURER'S REQUIREMENS. F. SPRINKLER & PIPING SHALL BE PROIDED HROUGHOU HE BUILDING, WIH QUICK RESPONSE SPRINKLERS, SPRINKLERS SHALL ALSO BE PROIDED O PROEC COMBUSIBLE SPACES HROUGHOU HE BUILDING. G. A WARRANY, FOR PRODUC AND SYSEM OPERAIONS SHALL BE PROIDED FOR ONE YEAR, UPON SYSEM ACIAION ND ACCEPANCE. DCW DHW YP. PAIEN ROOM EXAM SINK 2 SCALE: /4" = '-0". PLUMBING FOR SINK O BE IED INO EXISING LAAORY. 2. 4" WASE LINE HROUGH FLOOR O BELOW BASEMEN LEEL. SEE SHEE P PROIDE ACCESS O ISOLAION ALES. 4. NAURAL GAS FIRED BOILERS WIH LOW PRESSURE GAS BACK UP CONNECIONS. 5. EXISING AO SMIH BH 99 WAER HEAERS. 6. EXISING WAER SOFENER SYSEM. 7. EXISING M. 8. EXISING PRESSURE REDUCING SAION. 9. EXISING ELECRICAL PANELS. 0. PROIDE SEISMIC RESRAIN SRAPS FOR WAER SOFENER AND BRINE ANK.. EXISING DOMESIC RECIRCULAION PUMP 2. IE MAKE UP WAER LINE INO EXISING MAIN DOWNSREAM OF WAER SOFENERS GALLON EASERN SORAGE PROPANE ANK. LOCAE 0' FROM CREEK FENCE AND 0' MECHANICAL SHED. 4. QUICK FILL ALE DCW MAKE UP O HYDRONIC WAER HEAING SYSEM. REFER O SHEE M INSALL BACKFLOW PREENER ON DOMESIC COLD WAER LINE SERING MECHANICAL SHED. 6. SEE SHEE P-00 FOR CONINUAION. 7. LB O 4 OZ GAS PRESSURE REGULAOR 30 CFH LB O LB GAS PRESSURE REGULAOR 2050 CFH. 9. EXEND AND CONNEC O HUMIDIFIER. 20. REFER O SRUCURAL DRAWINGS AND SECIONS FOR AREA WELL CONSRUCION. 2. HE EXISING FIRE SPRINKLERS IN HIS AREA ARE O BE MODIFIED, REPLACED, OR ADDED AS REQUIRED BY NFPA HE FIRE SPRINKLER CONRACOR SHALL FIELD ERIFY HE LOCAION OF HE EXISING FIRE SPRINKLERS. ADD/RELOCAE AS NECESSARY FOR HE REMODELED SPACE, INCLUDING NEW FLOOR PLAN, CEILING PLAN, AND CEILING HEIGH ADJUSMENS. ALL REMOED SPRINKLERS SHALL BE REPLACED WIH NEW QUICK RESPONSE SPRINKLERS. PLEASE REFER O HE AUOMAIC FIRE SPRINKLERS AND PIPING GENERAL NOES ON HIS PAGE FOR ADDIIONAL INFORMAION. W W W. B F A. C O M 330 South 300 East AN BOERUM & FRANKASSOCIAES, INC. CONSULING ENGINEERS Salt Lake City Logan St. George empe Salt Lake City, U 84 BFA Project Number: F ELLIO WORKGROUP ARCHIECURE LLC 44 West Ute Blvd, Suite 00 Park City, Utah or elliottworkgroup.com REGISERED SAE EWG PROJEC NO: COPYRIGH: PROFESSIONAL No JEFFREY S. WAKINS OF UAH Orchard Cove Renovation ENGINEER SOUH DAIS COMMUNIY HOSPIAL 485 E 500 S Bountiful, U 8400 No. Date Description 5/4/8 ADDENDUM # ISSUE DAE: OWNER PROJEC NO:. CONRAC NO:. DRAWN BY: CHECKED BY: DESIGNED BY: SHEE KJM JSW KJM Elliott Workgroup Architecture, LLC SHEE ILE ENLARGED PLUMBING PLANS P-40 OF

8 2 7/8" 5" YP. 6" 6 7/8" 2 5/8" WALL (BY OHERS) C.I. COER AND FRAME FINISHED GRADE CLEANOU PLUG 9 /4" MAIN LINE PRESSURE SWICH 8"x8"x6" HICK CONCREE PAD 4" C.I. CEMEN PACH OERALL MANIFOLD LENGH SEE CHAR BELOW MAIN LINE GAUGE CONCREE PIPE (SIZE AS SHOWN ON PLANS) 4" CONCREE PIPE CYLINDERS PER BANK OERALL LENGH 2" 2 24" PLAN IEW 3 4 MED GAS MANIFOLD 47" 5 57" 6 67" 7 77" " 97" 07" 7 27 MAIN LINE PRESSURE SWICH HIGH PRESSURE SIGNAL O MASER ALARM PANEL (BY AUOMAIC EMPERAURE CONROLS CONRACOR) LOW PRESSURE SIGNAL O MASER ALARM PANEL CLEANOU O GRADE DEAIL (COG) SCALE: 2" = '-0" RESERE IN USE SIGNAL: O MASER ALARM PANEL (BY ELECRICAL CONRACOR) POWER FEED -20 OL,. 60 Hz EMERGENCY CIRCUI (BY ELECRICAL CONRACOR) MOUNING BRACKE (YP.) HEADER EXENSION (YP.) H-YPE CYLINDERS (SUPPLIED BY OHERS) WALL MOUNED POWER SUPPLY 6" FACORY INSALLED SOURCE ALE MAIN OULE O2 FRON IEW MAIN LINE PRESSURE GAUGE /2" DIA. EN LINE RUN O OUSIDE URN DOWN AND SCREEN (SEE NOE 7) RELIEF ALE OULE PRESSURE CONROL CABINE FLEXIBLE CYLINDER CONNECIONS (YP.) 8 /4" NOES O FACILIY FIRE RAED PENERAION O MACH WALL WALL (BY OHERS) ACCESSORIES BEYOND SOURCE ALE SUPPLIED BY ENDOR AND INSALLED BY CONRACOR. ALL PIPE AND FIINGS BEYOND SOURCE ALE AND RELIEF ALE OULE SUPPLIED BY MECHANICAL. INDIIDUALLY SECURE EACH CYLINDER WIH RACKS, CHAINS, OR OHER FASENINGS O PREEN DAMAGE. NEER PERMI OIL, GREASE OR OHER COMBUSIBLE MAERIAL O COME IN CONAC WIH CYLINDERS, MANIFOLDS AND CONNECIONS. REFER O DRAWINGS FOR ACUAL CYLINDER QUANIIES. MANIFOLD DIMENSIONS ARE BASED ON H-YPE CYLINDERS. FULL CYLINDERS OF COMPRESSED GAS, OHER HA N2O AND CO2, NORMALLY CONAIN APPROX. 2,200 PSIG. N20 AND CO2 ARE LIQUEFIED IN SANDARD FULL CYLINDERS AND CYLINDER PRESSURES ARY WIH EMPERAURE. RELIEF ALE PIPING SHALL BE BRAZED WIH A SILER BRAZING FILLER MAERIAL. ALL MANIFOLDS OHER HAN 02 SHALL USE SAINLESS SEEL PIGAILS. O2 MANIFOLD SHALL BE SUPPLIED WIH PRE-FORMED RIGID COPPER PIGAILS. 2 COUNERSUNK SCREW ACCESS COER AND FRAME. OP OF COER SHALL BE FLUSH W/OP OF FLOOR. CAS IRON /8 BEND BRASS CLEANOU PLUG AND FERRULE FINISHED FLOOR BALANCE OF PIPING SAME AS CLEANOU O GRADE. WASE PIPING FLOOR CLEANOU DEAIL NO O SCALE /8 BEND IF CLEANOU OCCURS A END OF LINE ELLIO WORKGROUP ARCHIECURE LLC 44 West Ute Blvd, Suite 00 Park City, Utah or elliottworkgroup.com REGISERED SAE PROFESSIONAL No JEFFREY S. WAKINS OF UAH ENGINEER SOUH DAIS COMMUNIY HOSPIAL Orchard Cove Renovation 485 E 500 S Bountiful, U MED GAS MANIFOLD NO O SCALE 3 HEA EXCHANGER DEAIL NO O SCALE SHU-OFF ALE (YP.) CHECK ALE (YP.) LINE PRESSURE ALARM SWICH PRESSURE LINE INDICAOR No. Date Description 5/4/8 ADDENDUM # WALL MAIN LINE EXERIOR CONNECION POIN FINISHED FLOOR RELIEF ALE AND EN ISSUE DAE: OWNER PROJEC NO:. CONRAC NO:. DRAWN BY: CHECKED BY: DESIGNED BY: EWG PROJEC NO: COPYRIGH: Author JSW KJM Elliott Workgroup Architecture, LLC SHEE ILE 5 PROPANE ANK DEAIL NO O SCALE 6 EMERGENCY OXYGEN SUPPLY CONNECION NO O SCALE W W W. B F A. C O M 330 South 300 East AN BOERUM & FRANKASSOCIAES, INC. CONSULING ENGINEERS Salt Lake City Logan St. George empe Salt Lake City, U 84 BFA Project Number: F PLUMBING DEAILS P-50 SHEE OF

9 SPECIFICAION INDEX Water-Based Fire-Suppression Systems Common Work Results for Plumbing Common Motor Requirements for Plumbing Equipment Meters and Gages for Plumbing Piping General-Duty alves for Plumbing Piping Hangers and Supports for Plumbing Piping and Equipment Heat racing for Plumbing Piping ibration and Seismic Controls for Plumbing Piping and Equipment Identification for Plumbing Piping and Equipment Plumbing Piping Insulation 226 Domestic Water Piping 229 Domestic Water Piping Specialties 2223 Domestic Water Pumps 2236 Sanitary Waste and ent Piping 2239 Sanitary Waste Piping Specialties Sanitary Waste Interceptors 2243 Facility Storm Drainage Piping Storm Drainage Piping Specialties Packaged Domestic Water Steam-o-Water Heat Exchangers Plumbing Fixtures Emergency Plumbing Fixtures Pressure Water Coolers 2263 Compressed-Air Piping for Laboratory and Healthcare Facilities 2269 Compressed-Air Equipment for Laboratory and Healthcare Facilities acuum Piping for Laboratory and Healthcare Facilities acuum Equipment for Laboratory and Healthcare Facilities Gas Piping for Laboratory and Healthcare Facilities Medical Gas Alarms Deionized Pure Water System Pure Water Piping Mechanical Requirements emporary Use of Equipment and Systems Common Work Results for HAC Common Motor Requirements for HAC Equipment Expansion Fittings and Loops for HAC Piping Sleeves and Sleeve Seals for HAC Piping Escutcheons for HAC Piping Meters and Gages for HAC General-Duty alves for HAC Piping Hangers and Supports for HAC Piping and Equipment ibration and Seismic Controls for HAC Operation and Maintenance of HAC Systems Identification for HAC Piping and Equipment esting, Adjusting, and Balancing for HAC Duct Insulation HAC Equipment Insulation HAC Piping Insulation elliott workgroup architecture LLC SPECIFICAION INDEX Specification Index -

10 Instrumentation and Control for HAC 2323 Facility Natural-Gas Piping 2323 Hydronic Piping 2326 Hydronic Piping Specialties Hydronic Pumps Steam and Condensate Heating Piping Steam and Condensate Piping Specialties Refrigerant Piping Water reatment for Closed-Loop Hydronic Systems Common Duct Requirements 2333 Metal Ducts 2336 Non-Metal Ducts 2339 HAC Casings Air Duct Accessories HAC Power entilators Air erminal Units Diffusers, Registers, and Grilles Fixed Louvers Breechings, Chimneys, and Stacks Flexible Steel Water-ube Boilers Packaged, Outdoor, Rooftop Units HW Piping System Split-System Wall Air-Conditioners Balance Heating and Cooling Units Hydronic Air Coils Humidifiers Underground Hot Water piping System elliott workgroup architecture LLC SPECIFICAION INDEX Specification Index - 2

11 SECION WAER-BASED FIRE-SUPPRESSION SYSEMS.0 GENERAL. RELAED DOCUMENS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 0 Specification Sections, apply to this Section..2 SUMMARY A. his Section includes the following fire-suppression piping inside the building:. Remodel to an existing wet-pipe sprinkler system including adding/relocating fire sprinklers as necessary for the remodeled space including new floor plan, ceiling plan and ceiling height adjustments. 2. All sprinklers removed shall be replaced with new quick response sprinklers. All sprinklers throughout the remodeled compartment shall be flat plate concealed quick response. Modify sprinklers adjacent to the remodel as required by NFPA 3. B. Related Sections include the following:. Division 0 Section "Fire Extinguisher Cabinets" and "Fire Extinguishers" for cabinets and fire extinguishers. 2. Division 22 Section "Facility Water Distribution Piping" for piping outside the building. 3. Division 28 Section "Fire Detection and Alarm" for alarm devices not specified in this Section. C. All black steel sprinkler pipe shall have a wall thickness less than or equal to schedule 40 and greater than schedule 0. D. All fire protection equipment, including piping, hangers, control valves, shall be UL listed and FM approved. A copy of the manufacturer s specification sheet for each specific component installed shall be included with shop drawings. E. Summary able: Item Underground service entrance piping, Alarm device, FDC Interior pipe type Sprinkler Finish Extended Coverage Center of ile Flexible Sprinkler Drops FM Global Calculations Summary Existing to remain Mains: Schedule 40 Branch-lines: hreadable thin-wall or schedule 40 Flat Plate Concealed Match existing k-factor and flow characteristics Required, Center thirds are acceptable Not allowed in remodel No Not required, Building occupancy to remain unchanged. No more than one fire sprinkler drop to be fed from an existing outlet. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

12 .3 DEFINIIONS A. CPC: Chlorinated polyvinyl chloride plastic. B. CR: Chlorosulfonated polyethylene synthetic rubber. C. High-Pressure Piping System: Fire-suppression piping system designed to operate at working pressure higher than standard 75 psig. D. PE: Polyethylene plastic. E. Underground Service-Entrance Piping: Underground service piping below the building..4 SYSEM DESCRIPIONS A. Wet-Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water and that is connected to water supply. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts fusible link or destroys frangible device. Hose connections are included if indicated..5 PERFORMANCE REQUIREMENS A. Standard Piping System Component Working Pressure: Listed for at least 75 psig. B. Original fire sprinkler system design to remain. All remodel work shall match the existing installation for pressure and flow characteristics.. Sprinkler Occupancy Hazard Classifications: a. Building Service Areas: Ordinary Hazard, Group. b. Electrical Equipment Rooms: Ordinary Hazard, Group. c. General Storage Areas: Ordinary Hazard, Group. d. Mechanical Equipment Rooms: Ordinary Hazard, Group. e. Office and Public Areas: Light Hazard. 2. Minimum Density for Automatic-Sprinkler Piping Design: a. Light-Hazard Occupancy: 0.0 gpm over 500-sq. ft. area. b. Ordinary-Hazard, Group Occupancy: 0.5 gpm over 500-sq. ft. area. c. Ordinary-Hazard, Group 2 Occupancy: 0.20 gpm over 500-sq. ft. area. d. Special Occupancy Hazard: As determined by authorities having jurisdiction. 3. Maximum Protection Area per Sprinkler: a. Office Spaces: 225 sq. ft.. b. Storage Areas: 30 sq. ft.. c. Mechanical Equipment Rooms: 30 sq. ft.. d. Electrical Equipment Rooms: 30 sq. ft.. e. Other Areas: According to NFPA 3 recommendations, unless otherwise indicated. 4. otal Combined Hose-Stream Demand Requirement: According to NFPA 3, unless otherwise indicated: elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

13 a. Light-Hazard Occupancies: 00 gpm for 30 minutes. b. Ordinary-Hazard Occupancies: 250 gpm for 60 to 90 minutes. C. Seismic Performance: Fire-suppression piping shall be capable of withstanding the effects of earthquake motions determined according to NFPA 3..6 SUBMIALS A. Product Data: For the following:. Piping materials, including sprinkler specialty fittings. 2. Pipe hangers and supports, including seismic restraints. 3. alves, including listed fire-protection valves, unlisted general-duty valves, and specialty valves and trim. 4. Sprinklers, escutcheons, and guards. Include sprinkler flow characteristics, mounting, finish, and other pertinent data. B. Shop Drawings: Diagram power, signal, and control wiring. C. Approved Sprinkler Piping Drawings: Working plans, prepared according to NFPA 3, that have been approved by authorities having jurisdiction, including hydraulic calculations, if applicable. Drawings are to be approved by Engineer prior to submission to State Fire Marshal. D. Seismic Calculations. E. Field est Reports and Certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA 3. Include "Contractor's Material and est Certificate for Aboveground Piping" and "Contractor's Material and est Certificate for Underground Piping." F. Field quality-control test reports. G. Operation and Maintenance Data: For sprinkler specialties to include in emergency, operation, and maintenance manuals..7 QUALIY ASSURANCE A. Installer Qualifications:. An experienced installer who has designed and installed fire-suppression piping similar to that indicated for this Project and obtained design approval and inspection approval from authorities having jurisdiction. he Engineer requires evidence to support the ability of the contractor to perform work in the scope and volume as specified. A contractor, who cannot show such experience, may be found not suitable to perform the work. he following are the approved contractors for this project: a. PRE-APPROED CONRACORS LIS ) Certified Fire 2) Chaparral Fire 3) Cottle Fire 4) Delta Fire 5) FireFly Fire Protection 6) Fire Services Inc. 7) Firerol elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

14 8) Quality Fire Protection 9) Simplex-Grinnell 0) he Safety eam ) Western Automatic 2) Or prior approved equal b. A contractor not listed in the PRE-APPROED CONRACORS LIS must receive prior approval from the engineer to bid this project. B. Installer's responsibilities include designing, fabricating, and installing fire-suppression systems and providing professional engineering services needed to assume engineering responsibility. Base calculations on results of fire-hydrant flow test.. Engineering Responsibility: Preparation of working plans, calculations, and field test reports by a qualified professional engineer or NICE Level III technician. C. Welding: Qualify processes and operators according to ASME Boiler and Pressure essel Code: Section IX. D. NFPA Standards: Fire-suppression-system equipment, specialties, accessories, installation, and testing shall comply with the following:. NFPA 3-203, "Installation of Sprinkler Systems." E. International Conference of Building Code Officials codes and standards complying with the following:. IBC-205, International Building Code. 2. IFC-205, International Fire Code. 3. Utah Amendments.8 COORDINAION A. Coordinate layout and installation of sprinklers with other construction that penetrates ceilings, including light fixtures, HAC equipment, and partition assemblies..9 EXRA MAERIALS A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.. Sprinkler Cabinets: Include number of sprinklers required by NFPA 3 and sprinkler wrench. Include sprinklers and wrench for each type of sprinkler on Project. 2.0 PRODUCS 2. MANUFACURERS A. In other Part 2 articles where titles below introduce lists, the following requirements apply to product selection: elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

15 . Manufacturers: Subject to compliance with requirements, provide products by one of the manufacturers specified. 2.2 SEEL PIPE AND FIINGS A. hreaded-end, Standard-Weight Steel Pipe: ASM A 53/A 53M, ASM A 35, or ASM A 795, hot-dip galvanized where indicated and with factory- or field-formed threaded ends.. Cast-Iron hreaded Flanges: ASME B Malleable-Iron hreaded Fittings: ASME B Gray-Iron hreaded Fittings: ASME B Steel hreaded Pipe Nipples: ASM A 733, made of ASM A 53/A 53M or ASM A 06, Schedule 40, seamless steel pipe hot-dip galvanized where indicated. Include ends matching joining method. 5. Steel hreaded Couplings: ASM A 865 hot-dip galvanized-steel pipe where indicated. B. Plain-End, Standard-Weight Steel Pipe: ASM A 53/A 53M, ASM A 35, or ASM A 795 hot-dip galvanized-steel pipe where indicated.. Locking-Lug Fittings: UL 23, ductile-iron body with retainer lugs that require one-quarter turn to secure pipe in fitting not allowed. C. Plain-End, Standard-Weight Steel Pipe: ASM A 53/A 53M, ASM A 35, or ASM A 795 hot-dip galvanized-steel pipe where indicated.. Steel Welding Fittings: ASM A 234/A 234M, and ASME B6.9 or ASME B Steel Flanges and Flanged Fittings: ASME B6.5. D. Grooved-End, Standard-Weight Steel Pipe: ASM A 53/A 53M, ASM A 35, or ASM A 795, hotdip galvanized where indicated and with factory- or field-formed, roll-grooved ends.. Grooved-Joint Piping Systems: a. Manufacturers: ) Anvil International, Inc. 2) Central Sprinkler Corp. 3) ictaulic Co. of America. 4) Ward Manufacturing. b. Grooved-End Fittings: UL-listed, ASM A 536, ductile-iron casting with OD matching steelpipe OD. c. Grooved-End-Pipe Couplings: UL 23 and AWWA C606, rigid pattern, unless otherwise indicated; gasketed fitting matching steel-pipe OD. Include ductile-iron housing with keys matching steel-pipe and fitting grooves, pre-lubricated rubber gasket listed for use with housing, and steel bolts and nuts. E. hreaded-end, hreadable, hin-wall Steel Pipe: ASM A 35 or ASM A 795, with wall thickness less than Schedule 40 and greater than Schedule 0, and with factory- or field-formed threaded ends.. Cast-Iron hreaded Flanges: ASME B Malleable-Iron hreaded Fittings: ASME B Gray-Iron hreaded Fittings: ASME B6.4. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

16 4. Steel hreaded Pipe Nipples: ASM A 733, made of ASM A 53/A 53M or ASM A 06, Schedule 40, seamless steel pipe. 5. Steel hreaded Couplings: ASM A 865. F. Plain-End, hreadable, hin-wall Steel Pipe: ASM A 35 or ASM A 795, with wall thickness less than Schedule 40 and greater than Schedule 0.. Locking-Lug Fittings: UL 23, ductile-iron body with retainer lugs that require one-quarter turn to secure pipe in fitting not allowed. G. Plain-End, hreadable, hin-wall Steel Pipe: ASM A 35 or ASM A 795, with wall thickness less than Schedule 40 and greater than Schedule 0.. Steel Welding Fittings: ASM A 234/A 234M, and ASME B6.9 or ASME B Steel Flanges and Flanged Fittings: ASME B6.5. H. Grooved-End, hreadable, hin-wall Steel Pipe: ASM A 35 or ASM A 795, with wall thickness less than Schedule 40 and greater than Schedule 0, and with factory- or field-formed, roll-grooved ends.. Grooved-Joint Piping Systems: a. Manufacturers: ) Anvil International, Inc. 2) Central Sprinkler Corp. 3) ictaulic Co. of America. 4) Ward Manufacturing. b. Grooved-End Fittings: UL-listed, ASM A 536, ductile-iron casting with OD matching steelpipe OD. c. Grooved-End-Pipe Couplings: UL 23 and AWWA C606, rigid pattern, unless otherwise indicated; gasketed fitting matching steel-pipe OD. Include ductile-iron housing with keys matching steel-pipe and fitting grooves, pre-lubricated rubber gasket listed for use with housing, and steel bolts and nuts. 2.3 LISED FIRE-PROECION ALES A. alves shall be FMG approved, with 75-psig minimum pressure rating. alves shall have 250-psig minimum pressure rating if valves are components of high-pressure piping system. B. Ball alves: Comply with UL 09, except with ball instead of disc.. NPS -/2 and Smaller: Bronze body with threaded ends. 2. NPS 2 and NPS 2-/2: Bronze body with threaded ends or ductile-iron body with grooved ends. 3. NPS 3: Ductile-iron body with grooved ends. 4. Manufacturers: a. NIBCO. b. ictaulic Co. of America. C. Butterfly alves: UL 09. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

17 . NPS 2 and Smaller: Bronze body with threaded ends. a. Manufacturers: ) Global Safety Products, Inc. 2) Milwaukee alve Company. 2. NPS 2-/2 and Larger: Bronze, cast-iron, or ductile-iron body; wafer type or with flanged or grooved ends. a. Manufacturers: ) Central Sprinkler Corp. 2) McWane, Inc.; Kennedy alve Div. 3) Mueller Company. 4) NIBCO. 5) ictaulic Co. of America. D. Check alves NPS 2 and Larger: UL 32, swing type, cast-iron body with flanged or grooved ends.. Manufacturers: a. American Cast Iron Pipe Co.; Waterous Co. b. Central Sprinkler Corp. c. Clow alve Co. d. Crane Co.; Crane alve Group; Crane alves. e. Crane Co.; Crane alve Group; Jenkins alves. f. Globe Fire Sprinkler Corporation. g. Grinnell Fire Protection. h. Hammond alve. i. McWane, Inc.; Kennedy alve Div. j. Mueller Company. k. NIBCO. l. Potter-Roemer; Fire Protection Div. m. Reliable Automatic Sprinkler Co., Inc. n. Stockham. o. United Brass Works, Inc. p. ictaulic Co. of America. q. Watts Industries, Inc.; Water Products Div. 2.4 UNLISED GENERAL-DUY ALES A. Ball alves NPS 2 and Smaller: MSS SP-0, 2-piece copper-alloy body with chrome-plated brass ball, 600-psig minimum CWP rating, blowout-proof stem, and threaded ends. B. Check alves NPS 2 and Smaller: MSS SP-80, ype 4, Class 25 minimum, swing type with bronze body, nonmetallic disc, and threaded ends. C. Gate alves NPS 2 and Smaller: MSS SP-80, ype 2, Class 25 minimum, with bronze body, solid wedge, and threaded ends. D. Globe alves NPS 2 and Smaller: MSS SP-80, ype 2, Class 25 minimum, with bronze body, nonmetallic disc, and threaded ends. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

18 2.5 SPRINKLERS A. Sprinklers shall be UL listed or FMG approved, with 75-psig minimum pressure rating. Sprinklers shall have 250-psig minimum 300-psig pressure rating if sprinklers are components of high-pressure piping system. B. Manufacturers:. Reliable Automatic Sprinkler Co., Inc. 2. yco Fire Products 3. ictaulic Co. of America. 4. iking Corp. C. Automatic Sprinklers: With heat-responsive element complying with the following:. UL 99, for nonresidential applications. D. Sprinkler ypes and Categories: Nominal /2-inch orifice for "Ordinary" temperature classification rating, unless otherwise indicated or required by application. E. Sprinkler types, features, and options as follows:. Concealed ceiling sprinklers, including cover plate. 2. Pendent sprinklers. 3. Quick-response sprinklers. 4. Sidewall sprinklers. 5. Upright sprinklers. F. Sprinkler Finishes: Chrome plated, bronze, and painted. G. Special Coatings: Wax, lead, and corrosion-resistant paint. H. Sprinkler Escutcheons: Materials, types, and finishes for the following sprinkler mounting applications. Escutcheons for concealed and semi-recessed type sprinklers are specified with sprinklers.. Ceiling Mounting: Flat plate concealed, white. 2. Sidewall Mounting: Semi-recessed, white. I. Sprinkler Guards: Wire-cage type, including fastening device for attaching to sprinkler. 3.0 EXECUION 3. PREPARAION A. Contractor to field verify all existing conditions. 3.2 EXAMINAION A. Proceed with installation only after unsatisfactory conditions have been corrected. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

19 3.3 PIPING APPLICAIONS A. Shop-weld pipe joints where welded piping is indicated. B. Do not use welded joints for galvanized-steel pipe. C. Flanges, flanged fittings, unions, nipples, and transition and special fittings with finish and pressure ratings same as or higher than system's pressure rating may be used in aboveground applications, unless otherwise indicated. D. Branch line piping: Use the following:. NPS 2 and Smaller: Schedule 40 or hreadable steel pipe with threaded ends; cast- or malleable-iron threaded fittings; and threaded joints. E. Mains: Use the following:. NPS 2-/2 and larger: Schedule 40 steel pipe with grooved ends & Welded outlets. 3.4 ALE APPLICAIONS A. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply:. Fire-Protection-Service alves: UL listed for applications where required by NFPA General-Duty alves: For applications where UL-listed valves are not required by NFPA 3. a. Shutoff Duty: Use gate, ball, or butterfly valves. b. hrottling Duty: Use globe, ball, or butterfly valves. 3.5 JOIN CONSRUCION A. Refer to Division 23 Section "Common Work Result for HAC" for basic piping joint construction. B. Steel-Piping, Grooved Joints: Use Schedule 40 steel pipe with cut or roll-grooved ends and Schedule 30 or thinner steel pipe with roll-grooved ends; steel, grooved-end fittings; and steel, keyed couplings. Assemble joints with couplings, gaskets, lubricant, and bolts according to coupling manufacturer's written instructions. Use gaskets listed for dry-pipe service for dry piping. 3.6 PIPING INSALLAION A. Refer to Division 23 Section "Common Work Result for HAC" for basic piping installation. B. Locations and Arrangements: Drawing plans, schematics, and diagrams indicate general location and arrangement of piping. Install piping as indicated, as far as practical.. Deviations from approved working plans for piping require written approval from authorities having jurisdiction. File written approval with Architect before deviating from approved working plans. C. Use approved fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

20 D. Install unions adjacent to each valve in pipes NPS 2 and smaller. Unions are not required on flanged devices or in piping installations using grooved joints. E. Install flanges or flange adapters on valves, apparatus, and equipment having NPS 2-/2 and larger connections. F. Install sprinkler piping with drains for complete system drainage. G. Hangers and Supports: Comply with NFPA 3 for hanger materials. Install according to NFPA 3 for sprinkler piping.. No powder driven studs allowed. 2. Wrap-around braces are to be provided at end of branch lines. H. Earthquake Protection: Install piping according to NFPA 3 Chapter 9 requirements to protect from earthquake damage. Seismic Bracing shall be designed to withstand vertical forces and movement. I. Install piping with grooved joints according to manufacturer's written instructions. Construct rigid piping joints, unless otherwise indicated, or required by NFPA 3 for flexibility in seismic zones. 3.7 SPECIALY SPRINKLER FIING INSALLAION A. Install specialty sprinkler fittings according to manufacturer's written instructions. 3.8 ALE INSALLAION A. Refer to Division 23 Section "alves" for installing general-duty valves. Install fire-protection specialty valves, trim, fittings, controls, and specialties according to NFPA 3, manufacturer's written instructions, and authorities having jurisdiction. B. alves: Install fire-protection-service valves supervised-open, located to control sources of water supply except from fire department connections. Provide permanent identification signs indicating portion of system controlled by each valve. C. Double Check alve Assemblies: Install valves in vertical or horizontal position, per listings and for proper direction of flow. 3.9 SPRINKLER APPLICAIONS A. General: All sprinklers are to be quick response type. Sprinkler heads shall be of the latest design closed spray type for 55 F unless specified otherwise or required by code. Extended coverage heads shall not be used. Orifices larger than /2" may be used as required by density and spacing demands. Use sprinklers according to the following applications:. Rooms without Ceilings: Upright and/or pendent sprinklers. Provide mechanical guards on all heads at or below 7-0 height above the floor or where damage from room occupant use may occur. 2. Rooms with Ceilings: Flat plate concealed sprinklers. 3. Wall Mounting: Sidewall sprinklers with recessed escutcheon. 4. Spaces Subject to Freezing: Upright; pendent, dry-type; and sidewall, dry-type sprinklers. 5. Provide freeze proof type automatic sprinkler heads serving unconditioned spaces, areas subject to freezing and in other areas requiring their use. elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

21 6. Heads located within the air streams of unit heaters or other heat-emitting equipment shall be selected for proper temperature rating. 7. Sprinkler Finishes: Use sprinklers with the following finishes: a. Upright, Pendent, and Sidewall Sprinklers: Chrome in finished spaces exposed to view; rough bronze in unfinished spaces not exposed to view. b. Concealed Sprinklers: Rough brass, with White cover plate to match white ceiling tile color. Ceilings with gypsum board finish having matching color applied by the factory. Ceilings with wood finish to have brushed chrome or brushed copper finish as determined by Architect. B. Sprinklers: Use the following:. All sprinklers shall be listed, quick response type. 3.0 SPRINKLER INSALLAION A. Every effort shall be required to insure that the heads form a symmetrical pattern in the ceiling with the ceiling grid, lights, diffusers and grilles. Offsets shall be made in piping to accommodate ductwork in the ceiling. Heads should be symmetrical and all piping run parallel or perpendicular to building lines.. In no case shall sprinkler heads be installed closer than approved distances from ceiling obstructions and HAC ductwork. 2. Sprinkler heads shall not conflict with tile grids. 3. Sprinkler heads shall be located near center of corridors. B. Where layout of sprinkler heads is shown on reflected ceiling plans the locations shall be followed unless approval is obtained from the Architect or such locations shown do not meet the requirements of NFPA-3. In either case, approval of the Architect shall be obtained in writing before sprinkler head locations are changed. If the installation of additional heads is needed to conform to NFPA 3 requirements in areas where heads are shown on reflected ceiling plans, they shall be included in the contract price. C. Install sprinklers in patterns indicated. D. Do not install pendent or sidewall, wet-type sprinklers in areas subject to freezing. Use dry-type sprinklers with water supply from heated space. 3. CONNECIONS A. Connect water-supply piping and sprinklers where indicated. B. Electrical Connections: Power wiring is specified in Division 26, Alarm wiring is specified in Division 28. C. Connect alarm devices to fire alarm, Division LABELING AND IDENIFICAION A. Install labeling and pipe markers on equipment and piping according to requirements in NFPA 3 and and in Division 23 Section "Common Work Result for HAC." elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

22 3.3 FIELD QUALIY CONROL A. Flush, test, and inspect sprinkler piping according to NFPA 3, "System Acceptance" Chapter. B. Replace piping system components that do not pass test procedures and retest to demonstrate compliance. Repeat procedure until satisfactory results are obtained. C. Report test results promptly and in writing to Architect and authorities having jurisdiction. D. Whether the underground serving the sprinkler system is done by this contractor or another, this contractor will be responsible to assure and have in his possession a certificate that the underground has been flushed and tested by the contractor who installed it in accordance with NFPA-24 prior to connection of the underground piping to the overhead sprinkler system. 3.4 CLEANING A. Clean dirt and debris from sprinklers. B. Remove and replace sprinklers having paint other than factory finish. 3.5 PROECION A. Protect sprinklers from damage until Substantial Completion. 3.6 COMMISSIONING A. erify that specialty valves, trim, fittings, controls, and accessories are installed and operate correctly. B. erify that specified tests of piping are complete and that Material est Certificates are complete. C. erify that damaged sprinklers and sprinklers with paint or coating not specified are replaced with new, correct type. D. erify that sprinklers are correct types, have correct finishes and temperature ratings, and have guards as required for each application. E. erify that fire department connections have threads compatible with local fire department equipment. F. Fill wet-pipe sprinkler piping with water. G. Coordinate with fire alarm tests. Operate as required. 3.7 DEMONSRAION & ESS A. Demonstrate equipment, specialties, and accessories. Review operating and maintenance information. B. All tests will be conducted as required by the local authority having jurisdiction, and in no case less than those required by NFPA standards. As a minimum, piping in the sprinkler system shall be tested at a water pressure at 200 psi for a period of not less two hours, or at 50 psi in excess of the normal pressure when the normal pressure is above 50 psi. Bracing shall be in place, and air shall be elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

23 removed from the system through the hydrants and drain valves before the test pressure is applied. No apparent leaks will be permitted on interior or underground piping. C. he local jurisdiction having authority and the Utah State Fire Marshal's office (where required) shall be notified at least three working days in advance of all tests and flushing. his includes any flushing of underground, hydrostatic testing, or flow testing that may be required. D. his contractor shall make all the required tests to the sprinkler system as required by code. He shall be responsible to assure that the Contractor est Certificates for the overhead, backflow and underground work are completed and delivered to the owner s insurance underwriter to assure proper insurance credit. E. All tests requiring the witnessing by local authorities will be the responsibility of this contractor. If tests are not run or do not have the proper witness, then they will be run later and all damage caused by the system, or caused in uncovering the system for such test, will be borne by this contractor. F. Final acceptance of the automatic sprinkler systems by AIG Global Property Risk Engineering is contingent upon field investigation and satisfactory completion of the Contractor s Material & est Certificate. 3.8 WARRANY A. his contractor shall warranty the sprinkler system and all its components for one year from the date of acceptance by the owner. Any costs incurred to extend any warranties of materials to assure this time frame shall be borne by this contractor. B. Provide Operation and Maintenance Manuals with correct as-builts test certificates and warranties included. A minimum 6 sets to be provided in red 3-ring binders. C. Electronic copy of AutoCAD as-built drawings shall also be provided on CD, with each O&M Manual. 3.9 FIELD QUALIY CONROL A. Flush, test and inspect sprinkler piping according to NFPA 3, System Acceptance Chapter. B. Replace piping system components that do not pass test procedures and retest to demonstrate compliance. Repeat procedure until satisfactory results are obtained. C. Report test results promptly and in writing to Architect and authorities having jurisdiction. END OF SECION elliott workgroup architecture LLC WAER-BASED FIRE-SUPPRESION SYSEM

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression

More information

B. Related Sections: The following Sections contain requirements that relate to this Section.

B. Related Sections: The following Sections contain requirements that relate to this Section. SECTION 211313- FIRE-SUPPRESSION PIPING PART1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification

More information

SPRINKLERS TABLE OF CONTENTS

SPRINKLERS TABLE OF CONTENTS SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

WET-PIPE SPRINKLER SYSTEMS

WET-PIPE SPRINKLER SYSTEMS SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

A. This Section includes the following fire-suppression piping inside the building:

A. This Section includes the following fire-suppression piping inside the building: SECTION 211000 - WATER-BASED FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following fire-suppression piping inside the building: 1. Automatic wet-type, standpipe systems.

More information

SECTION FIRE-SUPPRESSION PIPING

SECTION FIRE-SUPPRESSION PIPING SECTION 211313 FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

North Hanover Township School District North Hanover Township, New Jersey

North Hanover Township School District North Hanover Township, New Jersey SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE

More information

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure. SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 211313 WET-PIPE SPRINKLER SYSTEMS PRT 1 GENERL 1.01 RELTED DOCUMENTS. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No. SECTION 22 63 13 GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 1314W - AUTOMATIC SPRINKLER SYSTEMS (WET PIPE SYSTEMS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide

More information

SECTION SPRINKLER SYSTEMS

SECTION SPRINKLER SYSTEMS SECTION 15325 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Wet-pipe sprinkler systems. B. Preaction sprinkler systems. C. System design, installation, and certification. D. Fire department

More information

SECTION SPRINKLER SYSTEMS

SECTION SPRINKLER SYSTEMS SECTION 13900 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM SECTION 213100 WET PIPE FIRE PROTECTION SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The requirements of the General Conditions and Supplementary Conditions apply to all work herein.

More information

B. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum.

B. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum. Page 211200-1 SECTION 211200 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5 DOC Cremer Heating and Hot Water Plant Project Number: M 1411-04 TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION 21 30 00- WATER BASED FIRE PROTECTION SYSTEMS... 5 SECTION 22 40 00 -PLUMBING

More information

DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION

DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION Table of Contents TOC Page 1 DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION 210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 08/15/18 0 210523 GENERAL-DUTY VALVES FOR FIRE PROTECTION PIPING

More information

SECTION FIRE-SUPPRESSION SYSTEMS

SECTION FIRE-SUPPRESSION SYSTEMS SECTION 13900 FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Automatic wet-type, Class I, fire-suppression standpipes and branches for sprinklers. 2. Wet-pipe, fire-suppression

More information

SECTION SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING

SECTION SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING SECTION 210517- SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8 City of Ottawa Project No. CR006230 Page 1 of 8 PART 1 - GENERAL 1.1 Reference Standards.1 Conform to the following:.1 Provincial and municipal building and fire regulations as approved by Provincial Fire

More information

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following: SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION PART I - GENERAL 1.1 SUMMARY A. Inclusion of sprinkler and standpipe systems shall be as determined by NFPA National Fire Code pamphlet 101 and program statement.

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION SECTION 211200 - FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Hose connections. 4. Fire-department connections.

More information

Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION

Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION Bluffs Tower Apartments Section TOC Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION 211000 WATER-BASED FIRE-SUPPRESSION SYSTEMS 213113 ELECTRIC-DRIVE, CENTRIFUGAL FIRE

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 1314D - AUTOMATIC SPRINKLER SYSTEMS (DRY-PIPE) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES SECTION 15300 FIRE PROTECTION PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. Dartmouth College is currently insured by Factory Mutual. References to the owner s insurance company in this specification

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

Port of St Helens SIA Aircraft Hanger Scappoose, OR

Port of St Helens SIA Aircraft Hanger Scappoose, OR Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance

More information

ADDENDUM NO. 3 March 19, 2018

ADDENDUM NO. 3 March 19, 2018 ADDENDUM NO. 3 March 19, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be

More information

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No SECTION 213113 - ELECTRIC-DRIVE, CENTRIFUGAL FIRE PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION PREACTION SPRINKLER SYSTEMS

SECTION PREACTION SPRINKLER SYSTEMS PART 1 GENERAL SECTION 211316 - PREACTION SPRINKLER SYSTEMS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL SECTION 21 05 00 - COMMON WORK RESULTS FOR FIRE SUPPRESSION 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21 Division 21: FIRE SUPRESSION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM Table of Contents 1 Division 21 SECTION 21 1313 WET-PIPE SPRINKLER PROTECTION SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.

More information

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements. SECTION 21 13 13 FIRE PROTECTION SPRINKLER SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes labor and materials for the installation of a hydraulically calculated automatic, wet-pipe sprinkler

More information

University of Missouri St. Louis September 9, 2013 Recreation and Wellness Center #S

University of Missouri St. Louis September 9, 2013 Recreation and Wellness Center #S SECTION 210548 - VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Isolation pads. 2. Isolation mounts. 3.

More information

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 - FIRE SUPPRESSION DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,

More information

SECTION FIRE SUPPRESSION SYSTEMS

SECTION FIRE SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2

More information

SECTION FIRE-SUPPRESSION STANDPIPES

SECTION FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified

More information

Facility Fire-Suppression Water-Service Piping

Facility Fire-Suppression Water-Service Piping University of New Hampshire University of New Hampshire Scholars' Repository Division 21 Fire Supression Chapter 5 Technical Construction and Renovation Standards 4-23-2015 211100 - Facility Fire-Suppression

More information

Addendum No. 2 to the Contract Documents

Addendum No. 2 to the Contract Documents Addendum No. 2 to the Contract Documents Lewis County Jefferson Community College Education Center Project CONTRACT 2A: GENERAL CONSTRUCTION CONTRACT 2B: ELECTRICAL CONSTRUCTION CONTRACT 2C: MECHANICAL

More information

A. Section includes wet-pipe sprinkler system, system design, installation, and certification.

A. Section includes wet-pipe sprinkler system, system design, installation, and certification. SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes wet-pipe sprinkler system, system design, installation, and certification. 1.2 REFERENCES A. General: Comply

More information

TECHNICAL SPECIFICATIONS SECTION DRY PIPE SPRINKLER SYSTEM PLAISTOW PUBLIC LIBRARY 85 MAIN STREET PLAISTOW, NEW HAMPSHIRE 100%CD.

TECHNICAL SPECIFICATIONS SECTION DRY PIPE SPRINKLER SYSTEM PLAISTOW PUBLIC LIBRARY 85 MAIN STREET PLAISTOW, NEW HAMPSHIRE 100%CD. TECHNICAL SPECIFICATIONS SECTION 211316 DRY PIPE SPRINKLER SYSTEM PLAISTOW PUBLIC LIBRARY 85 MAIN STREET PLAISTOW, NEW HAMPSHIRE 100%CD Prepared for: Mr. Cab Vinton Director Plaistow Public Library 85

More information

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 210523 - GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

END OF SECTION

END OF SECTION SECTION 210553 ~IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT PART 1 -GENERAL 1.1 SUMMARY Section Includes: I. Equipment labels. 2. Warning signs and labels. 3. Pipe labels. 1.2 ACTION SUBMITTALS

More information

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 - FIRE SUPPRESSION DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,

More information

SECTION AUTOMATIC SPRINKLER PIPING

SECTION AUTOMATIC SPRINKLER PIPING SECTION 15330 AUTOMATIC SPRINKLER PIPING ****** ***** **** *** ** * ** *** **** ***** ****** NOTE TO SPECIFIER: This section contains several types of automatic sprinkler piping. Some piping is allowed

More information

Gas Station & C Store SECTION CWM Job No

Gas Station & C Store SECTION CWM Job No SECTION 21 1300 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract

More information

2. Welding Materials and Procedures shall conform to the ASME Code.

2. Welding Materials and Procedures shall conform to the ASME Code. PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston

More information

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department

More information

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

A. This Section includes the following domestic water piping specialties:

A. This Section includes the following domestic water piping specialties: SECTION 221119 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO SECTION 210523 - GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

PROJ. NO SECTION REFRIGERANT PIPING

PROJ. NO SECTION REFRIGERANT PIPING SECTION 23 23 00 REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION FIRE PROTECTION

SECTION FIRE PROTECTION SECTION 15300 - FIRE PROTECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR

More information

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,

More information

SECTION DRY-PIPE FIRE-SUPPRESSION SPRINKLERS

SECTION DRY-PIPE FIRE-SUPPRESSION SPRINKLERS SECTION 13935 DRY-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete fire sprinkler system as specified in Contract Documents. B.

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

DIVISION 21: FIRE SUPPRESSION WATER BASED FIRE SUPRESSION SYSTEMS

DIVISION 21: FIRE SUPPRESSION WATER BASED FIRE SUPRESSION SYSTEMS DIVISION 21: FIRE SUPPRESSION 21 1000 WATER BASED FIRE SUPRESSION SYSTEMS 21 1200 FIRE-SUPPRESSION DRY STANDPIPES 21 1313 WET PIPE SPRINKLER PROTECTION SYSTEM 21 1314 WET-PIPE AUTOMATIC SPRINKLER SYSTEM

More information

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS DIVISION 21 - FIRE SUPPRESSION Includes the following sections: None DESIGN REQUIREMENTS It is the policy of City of Santa Cruz to install fire sprinkler systems in all new construction/facilities. If

More information

SECTION FIRE PROTECTION

SECTION FIRE PROTECTION SECTION 15300 PART I - GENERAL 1.01 WORK INCLUDED A. Furnish all labor, materials, tools, and equipment to complete the automatic fire sprinkler system as hereinafter described, ready for service to the

More information

A. This section includes design and performance information for fire protection and suppression systems.

A. This section includes design and performance information for fire protection and suppression systems. SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials

More information

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS SECTION 13930 WET-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete wet-pipe fire sprinkler system in new addition only as specified

More information

SECTION DOMESTIC WATER PIPING SPECIALTIES

SECTION DOMESTIC WATER PIPING SPECIALTIES SECTION 22 11 19 DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University-San Marcos for automatic fire sprinkler and standpipe systems.

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING SECTION 23 21 13 HYDRONIC PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes pipe and fitting materials, joining methods, special-duty valves, and specialties for the following: 1. Hot-water

More information

B. Section Identification for Fire Suppression Piping and Equipment.

B. Section Identification for Fire Suppression Piping and Equipment. SECTION 211300 - FIRE SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.2 RELATED

More information

Sprinkler Permit Applications

Sprinkler Permit Applications REQUIREMENTS FOR NFPA 13 SYSTEM Building Inspections Sprinkler Permit Applications A complete application for a Sprinkler Permit will comply with the requirements of Chapter 8 of NFPA 13. Hydraulic calculations

More information

SECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM

SECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL DESCRIPTION A. Furnish all materials and labor for the detailed design and installation for new fire sprinkler wet pipe systems for Buildings A through R hereafter referred

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

A. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13.

A. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13. 21 10 00 PART 1 - GENERAL 1.01 SCOPE A. The following standards and procedures apply to the design and installation of all wet pipe and dry pipe sprinkler systems. The design of fire suppression systems

More information

NATURAL GAS PIPING

NATURAL GAS PIPING SECTION 15496 - NATURAL GAS PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

B. Shop Drawings: Detail fabrication of pipe anchors, hangers, special pipe support assemblies, alignment guides, expansion joints and loops,

B. Shop Drawings: Detail fabrication of pipe anchors, hangers, special pipe support assemblies, alignment guides, expansion joints and loops, SECTION 23 21 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete wet chemical automatic fire suppression system for the exhaust hood, including necessary

More information

SECTION WET-PIPE FIRE SUPPRESSION SPRINKLERS

SECTION WET-PIPE FIRE SUPPRESSION SPRINKLERS SECTION 15932 WET-PIPE FIRE SUPPRESSION SPRINKLERS PART 1 - GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred

More information

Mercury Plastics New Building February TABLE OF CONTENTS

Mercury Plastics New Building February TABLE OF CONTENTS DIVISION 21: FIRE SUPPRESSION 210500 COMMON REQUIREMENTS FOR FIRE SUPPRESSION 210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND EQUIPMENT 211300 WET PIPE FIRE SUPPRESSION SPRINKLERS

More information

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION DIVISION 21 FIRE SUPPRESSION 21 00 00 FIRE SUPRESSION 21 01 00 Operation and Maintenance of Fire Suppression 21 01 10 Operation and Maintenance of Water Based Fire Suppression Systems 21 01 20 Operation

More information

REFRIGERANT PIPING

REFRIGERANT PIPING SECTION 232300 - REFRIGERANT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

SECTION WET FIRE SPRINKLER SYSTEMS

SECTION WET FIRE SPRINKLER SYSTEMS SUNY GENESEO 211310-1 PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in

More information