Roof: sound attenuation Category B. 4.0 DOORS

Size: px
Start display at page:

Download "Roof: sound attenuation Category B. 4.0 DOORS"

Transcription

1 APPENDIX I DEFINITION OF LANDLORD BASE BUILD 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S 1.0 WALLS 1.1 Internal skin of external wall. Fairfaced block work with rubbed joints. 1.2 To service corridors. Fairfaced block work with rubbed joints. 1.3 As dividing wall between Leased Areas. Decorate as necessary. Sound attenuation Category B. Decorate as necessary. Sound attenuation Category B. Jumbo stud plasterboard partition. Decorate as necessary. Sound attenuation Category B. 2.0 FLOORS Dense screed finish by float. Final floor finish and matwells. Allowance for Tenant finish 35mm. Sound attenuation Category C. 3.0 CEILINGS Structural soffit untreated. Suspended ceiling as necessary. Nominal ceiling height 3300mm above finish floor level. (North Building 3100mm). Roof: sound attenuation Category B. 4.0 DOORS 4.1 From Service Corridor. 1 hour fire rated plywood faced, NIL Sound attenuation Category B. painted doors complete with mortise lock, hinge, bolts and lever handle override (flush bolts for double doors). 4.2 To refuse rooms. NIL NIL Not applicable to retail Leased Areas.

2 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S 4.3 To loading bay. Steel faced painted security door complete with mortise lock, hinge, bolts and lever handle override (flush bolts for double doors). NIL Sound attenuation Category B. 5.0 WINDOWS/GLAZING (where applicable) Aluminium powder coated frames with double glazing. NIL Sound attenuation Category B. 6.0 SHOP FRONT Timber Shop Front with single laminated glazing complete with ironmongery, fascias and external store riser and hanging sign. 7.0 INTERNAL STAIRS (where applicable) 8.0 MECHANICAL INSTALLATIONS Galvanised (steel framed with steel treads and risers, treads with screed in fill to pan. Tubular galvanised steel balustrading. 8.1 Drainage 1 No. 100mm stack with 54mm branch plugged. Internal bulkheads and store risers Lighting and signage. Decorate and apply finishes as necessary. Connect to 54mm branch and complete installation as required. 8.2 Water Supply Supply with meter. Connect to supply and complete installation as required. Refer to Tenant Handbook for Shop Front and signage requirements. Sound attenuation Category B. System cannot have a toilet connected. Refer to Appendix F for certificates to be provided to GWQ Tenant Delivery Team to allow Tenant Service installation to be connected to the Provided, metered and charged by the Landlord. Provide domestic hot water services (to be heated electrically). Refer to Appendix F for certificates to be provided to GWQ Tenant

3 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S Delivery Team to allow Tenant Service installation to be connected to the 8.3 Gas main NIL NIL Not applicable for retail Leased Areas. 8.4 Heating Heating circuit water flow and return connections, with Landlord s metering. Connect to supply and complete installation as required. Provided, metered and charged by the Landlord. Refer to Appendix F for certificates to be provided to GWQ Tenant Delivery Team to allow Tenant Service installation to be connected to the 8.5 Cooling Chilled water circuit flow and return connectors with Landlord metering. Connect to supply and complete installation as required. Provided, metered and charged by the Landlord. 8.6 Ventilation Shop front supply and extract louver. See Appendix K. Complete installation as required. To include ventilation installation, duct termination, blacking out, security bars, balancing plates and insulation and fire dampers. Refer to Appendix F for certificates to be provided to GWQ Tenant Delivery Team to allow Tenant Service installation to be connected to the

4 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S Fire Suppression Fire Suppression cont Valved sprinkler connection for a rating of ordinary Hazard Group III complete with flow switch and test valve. Connect to supply and complete installation including: Install test and drain valve located at the end of the line. Test system at 15 bar for one hour on completion. Tenant to install Quick Response Sprinklers, life safety. Allowance of max 200 sprinkler heads per Leased Area. Tenant to design the system to a max pressure loss of 300 mb between any tenant design point and the Landlord/Tenant control zone valve. Tenant s system must be left charged prior to opening of the Landlord s valve. Tenant s installation shall be by certified installer. Refer to Appendix F for certificates to be provided to GWQ Tenant Delivery Team to allow Tenant Service installation to be connected to the 8.8 Smoke Ventilation NIL Units over 1000 m² to provide their own smoke ventilation. Final connection will be by direct order from the Tenant with Grinnell Firekill.

5 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S 9.0 ELECTRICAL INSTALLATION 9.1 Mains Supply Service provider cable located at the rear of the Leased Area. Order direct with service provider to obtain the supply. 9.2 Small Power NIL Installation as required. The service provider will install the electricity meter for the Tenant on receipt of the order. 9.3 Lighting NIL Installation as required. Tenant s installation to include emergency lighting system. 9.4 Fire Alarm Addressable FA interface unit The design and installation of automatic fire alarm system to BS5839:2002 Category L1. Voice message sounders and cabling to Landlord Interface unit. See sections 6.14 Final connections into the F.A interface panel will be by ADT by direct order from the Tenant Refer to Appendix F for certificates to be provided to GWQ Tenant Delivery Team to allow Tenant Service installation to be connected to the 9.5 Security Panic button at rear of Leased Area. Installation as required. 9.6 Telephone Cable Management System Order direct with service provider. 9.7 Restricted Dial Telephone. Handset in Service Yard to allow abbreviated dialling to Tenant s external Telephone number. 9.8 Data System NIL Installation as required. 9.9 Aerials and Satellite NIL NIL None permitted. NIL

6 1.1 PARTICULAR LANDLORD/TENANT WORKS - RETAIL LEASED AREAS S dishes 10.0 FITTINGS NIL Installation as required 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS 1.0 WALLS 1.1 Internal skin of external Fairfaced block work with rubbed Apply surface finish and decorate as wall joints. necessary 1.2 To service corridors Fairfaced block work with rubbed Apply surface finish and decorate as joints necessary Sound attenuation Category B. Sound attenuation Category B. 1.3 As dividing wall between Leased Areas Plasterboard stud partition. Apply surface finish and decorate as necessary. Tenant to construct walls to refuse area. Sound attenuation Category C. 2.0 FLOORS Dense screed finish by float Final floor finish and matwells Allowance for Tenant s finish 35mm. Sound attenuation Category C. 3.0 CEILINGS Structural soffit untreated Suspended ceiling required. Nominal ceiling height GF 3300mm FF 3200mm Above finish floor level. Roof: sound attenuation Category B. 4.0 DOORS 4.1 From Service Corridor 1 hr fire rated plywood faced, painted doors complete with mortise lock, hinge, bolts and lever handle override (flush bolts for double doors) NIL Sound attenuation Category B

7 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS 4.2 To refuse rooms 2 hour fire rated double leaf steel door, NIL complete with mortise lock, kick plates, signage and louvers. Tenant to provide refuse store area within the Tenanted space for 1100 Euro bins. Suited locks for use by the Landlord. 4.3 To loading bay Steel faced painted security door complete with mortise lock, hinge, bolts and lever handle override (flush bolts for double doors) 5.0 WINDOWS/GLAZING (where applicable) Aluminium powder coated frames with double glazing Sound attenuation Category B. NIL Not applicable to Restaurants NIL Sound attenuation Category B. 6.0 SHOP FRONT NIL Timber Shop Front with single laminated glazing complete with fascias and external store riser. Internal bulkheads and store risers Signage installation and lighting. 7.0 INTERNAL STAIRS (where applicable) Galvanised (steel framed with steel treads and risers, treads with screed in fill to pan Tubular galvanised steel balustrading 8.0 MECHANICAL INSTALLATIONS 8.1 Drainage 2 Nr, 100mm stack with 100mm branch plugged. Floor gully in area for refuse room. Decorate and apply finishes as necessary. Connect to 100mm branch and complete installation required Provide and install plant to intercept and safely dispose of grease and oil Refer to Tenant Handbook for Shop Front and signage for Landlord requirements. Sound attenuation Category B. The method of grease oil interception will be Big Dipper with automatic grease collection. Refer to Appendix F for certificates to

8 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS used in the preparation and cooking of meals. 8.2 Water Supply Supply with meter Connect to supply and complete installation as required. Provided, metered and charged by the Landlord. 8.3 Gas service pipe with valve. Gas Service Pipe with stop valve and meter. Provide domestic hot water services (to be heated electrically). Install tanked water storage facilities. Complete installation. Refer to Appendix F for certificates to Provided, metered and charged by the Landlord. 8.4 Heating Heating circuit water flow and return connections with Landlord metering. Connect to supply and complete installation as required. Refer to Appendix F for certificates to Provided, metered and charged by the Landlord. Only to be used for space heating. Refer to Appendix F for certificates to 8.5 Cooling Chilled water circuit flow and return Connect to supply and complete Provided, metered and charged by

9 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS connectors with Landlord metering. installation as required. the Landlord. Only to be used for space cooling. 8.5 Cooling cont 8.6 Ventilation Shop front supply and extract louver. Inlet and outlet apertures are applicable to ground floor units only Kitchen Extract Fire resistant extract duct to roof termination. Connect to grilles and complete installation as required to supply ventilation to kitchen, toilet and restaurant areas. Tenant system includes fan, air temperature and filtration, interconnecting duct work grilles + controls, duct termination blacking out, security bars, balancing plates, and insulation. Install extract system including fan hoods, grease filtration, odour filtration and all other associated fittings and controls. Connection by the Tenant to Landlord extract duct termination Refer to Appendix F for certificates to Assumed: 40% of the total restaurant area will be evacuated by the kitchen. Air changes rate 10 ac/hr Assumed: Air change rate 40 ac/hr Kitchen extract velocity 8 pa/m. Ultra Violet and ESP systems are mandatory as part of the tenant fit out at their cost. See section 6.18 in the main fit out guide which states the requirements out clearly. Kitchens shall have as a minimum a 3 stage filtration unit for odours and stainless steel

10 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS Kitchen Extract cont Toilet Extract Extract ventilation duct work to roof termination Refuse Extract Extract ventilation duct work to roof termination 8.7 Fire Suppression Valved sprinkler connection for a rating of ordinary Hazard Group III complete with flow switch and test valve. Toilet extract system including fan, interconnecting duct work and grilles, and other associated fittings and controls. Connection by the Tenant to Landlord s extract air duct termination Refuse extract fan and associated fittings and controls. Connection by Tenant to Landlord ductwork. Connect to supply and complete installation including: Install test and drain valve located at the end of the line. Test system at 15 bar for one hour on completion. grease baffles. A fire damper is not required. An Ansul or Hydramist type of system is also mandatory as part of the suppressant system installed within the kitchen hood. Assumed: air change rate 15 ac/hr Fire damper installed by Landlord. Assumed: air change rate 15 ac/hr Fire damper installed by Landlord. Tenant to install Quick Response Sprinklers. Allowance of max 200 sprinkler heads per Leased Area. Tenant to design the system to a max pressure loss of 300 mb between any tenant design point and the Landlord/Tenant control zone valve. Tenant s system must be left charged prior to opening of the Landlord s valve.

11 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS 8.7 Fire Suppression cont 8.8 Smoke Ventilation Nil Units over 1000 m² to provide their own smoke ventilation. 9.0 ELECTRICAL INSTALLATION 9.1 Mains Supply Service provider cable located at the rear of the Leased Area. Order direct with service provider to obtain the supply. Tenant s installation shall be by certified installer. Refer to Appendix F for certificates to The service provider will install the electricity meter for the Tenant on receipt of the order. 9.2 Small Power NIL Installation as required. 9.3 Lighting NIL Installation as required Tenant s installation to include emergency lighting system. 9.4 Fire Alarm Addressable FA interface unit. The design and installation of automatic fire alarm system to BS5839:2002 Category L1. Voice message sounders and cabling to Landlord Interface unit. See sections 6.14 Final connections into the F.A interface panel will be by ADT by direct order from the Tenant. Refer to Appendix F for certificates to

12 1.2 PARTICULAR LANDLORD/TENANT WORKS - RESTAURANT LEASED AREAS 9.5 Security Panic button at rear of Leased Area. Installation as required. 9.6 Telephone Cable Management System Order direct with service provider 9.7 Restricted Dial Telephone Handset in Service yard to allow NIL abbreviated dialling to Tenant s external telephone numbers. 9.8 Data System NIL Installation as required. 9.9 Aerials and Satellite NIL NIL None permitted. dishes 10.0 FITTINGS NIL Installation as required

13 1.3 PARTICULAR LANDLORD/TENANT WORKS - OFFICE LEASED AREAS 1.0 WALLS 1.1 Internal skin of external Plaster on blockwork or plasterboard Decorate as required Sound attenuation Category B. wall walls, painted in white emulsion 1.2 To service corridors Plasterboard dry lining on block work and painted in white emulsion Decorate as required Sound attenuation Category B. 1.3 Dividing wall between Leased Areas Plasterboard, painted in white emulsion. Decorate as required Tenant will construct partitions for kitchen area. Sound attenuation Category B. NIL Sound attenuation Category C. 2.0 FLOORS Raised floor 500mm cavity with anti static carpet tiles. 3.0 CEILINGS Suspended ceiling NIL Roof: sound attenuation Category B. 4.0 DOORS 4.1 From Service Corridor 1 hour fire rated plywood faced, NIL Sound attenuation Category B. painted doors complete with mortise lock, hinge, bolts and lever handle override (flush bolts for double doors). 4.2 To refuse rooms NIL NIL Not applicable to office Leased Areas. 4.3 To loading bay NIL NIL Not applicable to office Leased Areas 5.0 WINDOWS/GLAZING Aluminium powder coated frames Fit blinds as required with double glazing. Windows openable for ventilation 6.0 SHOP FRONT N/A N/A Not Applicable to office Leased Areas 7.0 INTERNAL STAIRS N/A N/A 8.0 MECHANICAL INSTALLATIONS 8.1 Drainage 1 No. 100mm stub terminating in floor void at perimeter of unit. Connect to 100mm stub and complete installation as required. System cannot have a toilet connected.

14 1.3 PARTICULAR LANDLORD/TENANT WORKS - OFFICE LEASED AREAS 8.1 Drainage cont Refer to Appendix F for certificates to 8.2 Water Supply Supply with meter, terminated above the floor void at perimeter of unit. Connect to supply and complete installation as required. Provided, metered and charged by the Landlord. Provide domestic hot water services (to be heated electrically). Refer to Appendix F for certificates to 8.3 Gas main NIL NIL Not applicable for office Leased Areas. 8.4 Heating Natural Convector radiators to unit and perimeter. Under floor heating to windows. NIL Provided, metered and charged by the Landlord. Individual control to each unit. 8.5 Cooling NIL System installation if required. Refer to Appendix F for certificates to 8.6 Ventilation Passive ventilation. Restrictions on penetrations through the roof and glazing. 8.7 Fire Suppression Valved sprinkler system pipework installed above ceiling of ordinary Hazard Group III complete with flow switch and test valve. Pipework installed above ceiling. NIL unless area is sub-divided then Tenant must provide design and installation for GMQL approval Allowance of max 200 sprinkler heads per Leased Area. Tenant to design the system to a max pressure loss of 300 mb, between any tenant design point and the

15 1.3 PARTICULAR LANDLORD/TENANT WORKS - OFFICE LEASED AREAS 8.7 Fire Suppression cont Landlord/Tenant control zone valve. 8.8 Smoke Ventilation Nil Units over 1000 m² to provide their own smoke ventilation. 9.0 ELECTRICAL INSTALLATION 9.1 Mains Supply Power distribution board (30 amp 3 phase) adjacent to unit entrance door 9.2 Small Power Minimal installation. Busbar & cabled basket + 6 floor boxes (each floor box, 2 double electrical boxes + 2 single boxes for Telecom/IT) 9.3 Lighting CAT 2 lighting including emergency lighting. 9.4 Fire Alarm Addressable FA interface unit and fire alarm system. Extend installation as required Extend installation as required Nil unless area is sub-divided or refitted, then Tenant must provide design and installation for GQML approval. The design and installation of automatic fire alarm system to BS5839:2002 Category L1. Tenant s installation shall be by certified installer. Refer to Appendix F for certificates to Provided metered and charged up by the Landlord Voice message sounders and cabling to Landlord Interface unit.

16 1.3 PARTICULAR LANDLORD/TENANT WORKS - OFFICE LEASED AREAS 9.5 Security Swipe card access to Ground floor Own installation as required. doors. 9.6 Telephone Distribution point in floor void at Order direct with service provider perimeter of unit. Cable basket in floor void. 9.7 Restricted Dial Telephone Handset in Service Yard dialled NIL through an external telephone system. 9.8 Data System NIL Installation as required. 9.9 Aerials and Satellite dishes NIL NIL None permitted FITTINGS NIL Kitchen/tea area and other installations as required.

SPACE TYPE: JUDICIAL CHAMBER

SPACE TYPE: JUDICIAL CHAMBER SPACE TYPE: JUDICIAL CHAMBER Construction Criteria The unit costs for Judicial Chamber space types are based on the construction quality and design features in the following table. This information has

More information

Library stacks and records storage 150 LB/SF live load

Library stacks and records storage 150 LB/SF live load SPACE TYPE: LIBRARY Construction Criteria The unit costs for Library space types are based on the construction quality and design features in the following table. This information has been generally organized

More information

CENTRAL HOUSING GROUP LTD. General Property Standards Guide

CENTRAL HOUSING GROUP LTD. General Property Standards Guide CENTRAL HOUSING GROUP LTD General Property Standards Guide THE FOLLOWING BASIC STANDARDS ARE REQUIRED TO ALLOW THE MANAGEMENT OF YOUR PROPERTY TO BE UNDERTAKEN BUT THIS LIST IS NOT COMPREHENSIVE. ALL OF

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

thehydebuilding Executive Own Door Office Suites

thehydebuilding Executive Own Door Office Suites thehydebuilding Executive Own Door Office Suites the hyde building The Park Carrickmines Masterplan M50 Proposed LUAS Stop Future Commercial Retail 2 16 Storey Landmark Tower M50 Exit 15 Retail 1 the hyde

More information

2. Location of Executive Tower Creek side located between Sheikh Zayed Road and Al Khail Road, between interchange 1 and 2.

2. Location of Executive Tower Creek side located between Sheikh Zayed Road and Al Khail Road, between interchange 1 and 2. General Information PROJECT FACT SHEET 1. Name of the Tower/ Project/ etc. The Executive Towers 2. Location of Executive Tower Creek side located between Sheikh Zayed Road and Al Khail Road, between interchange

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK ISO/IEC 17065:2012 to provide product conformity 20 Park Street Princes Risborough Buckinghamshire HP27 9AH Contact: Ian Woodhouse Tel: +44

More information

DOCUMENT TABLE OF CONTENTS

DOCUMENT TABLE OF CONTENTS DOCUMENT 00003 June 16, 2005 TABLE OF CONTENTS DOCUMENT NO. INTRODUCTORY INFORMATION DOCUMENT 00003 TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS SECTION 01011 SECTION 01025 SSP21.1-1 SECTION 01026

More information

Information for all Residents. Rechargeable Repairs Policy

Information for all Residents. Rechargeable Repairs Policy Information for all Residents Rechargeable Repairs Policy 1st June 2018 Castles & Coasts Housing Association () aims to provide an excellent repairs service to our s in compliance with our legal obligations

More information

SCHEDULE OF FINISHES AND OUTLINE SPECIFICATIONS

SCHEDULE OF FINISHES AND OUTLINE SPECIFICATIONS SCHEDULE OF FINISHES AND OUTLINE SPECIFICATIONS LIVING, DINING & CONSERVATORIES 1200 X 200 TIMBER LOOK TILE. 3 COATS OF PAINT ON PLASTER BOARD. PLASTERED TO A HIGH STANDARD WITH 3 COATS OF PAINT USING

More information

Vanilla Box Design Criteria

Vanilla Box Design Criteria Description: 1. Floor: 2. Walls: 3. Ceiling: A. Finished and sealed 4 thick concrete slab on 10 mil poly vapor barrier on 4 of crushed stone throughout, including toilets. A. Interior gypsum board walls

More information

How to report a repair

How to report a repair How to report a repair We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities, we will: Keep the exterior (e.g. roof, walls, doors, windows, paths) and

More information

Schedule of works required for Fire Protection in a 2 Storey semi-detached/terraced house

Schedule of works required for Fire Protection in a 2 Storey semi-detached/terraced house Schedule of works required for Fire Protection in a 2 Storey semi-detached/terraced house THIS DOES NOT COVER 3 STOREY PROPERTIES you must consult with the Private Sector Housing Team on any 3 storey property.

More information

1.4 Provide and fix the following ironmongery.

1.4 Provide and fix the following ironmongery. Schedule of works required for Fire Protection in a first & second floor purpose built masionette above shops where the exit door is at first floor level. THIS DOES NOT COVER NORMAL 3 STOREY PROPERTIES

More information

Stronger communities, Better homes, Smarter business Repair Responsibilities

Stronger communities, Better homes, Smarter business Repair Responsibilities Stronger communities, Better homes, Smarter business Repair Responsibilities 2 If your property needs a repair you need to let us know so we can fix it. If you live in a block of flats or sheltered accommodation,

More information

Design Guidelines Fire Safety in New and Refurbished Buildings

Design Guidelines Fire Safety in New and Refurbished Buildings Design Guidelines Fire Safety in New and Refurbished Buildings Introduction All major new or refurbishment projects must comply with the Technical Standards (Scotland) Regulations as a matter of course.

More information

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS Mandatory Fire Safety Instruction Reference A: Reference B: NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS Approved Document B Fire Safety

More information

FUME EXTRACT STRATEGY STATEMENT

FUME EXTRACT STRATEGY STATEMENT FUME EXTRACT STRATEGY STATEMENT : New Islington Free School No: 7/4781 The site is located in central Manchester on an area of disused land adjacent to the Rochdale canal. The site forms a roughly rectangular

More information

Brunswick Grove Vale. The Three Bedroom The Floor Plans & Specification

Brunswick Grove Vale. The Three Bedroom The Floor Plans & Specification 1822 / Brunswick Brunswick House The Three Bedroom The Floor Plans & Specification www.regencyhouse.info Balcony THE THIRD FLOOR home office Balcony 20 unit 20 3 bedroom GIA = 88.17 m² NIA = 85.76 m² terrace

More information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp. Volume 1 Bidding Requirements, Contract Forms, Conditions of the Contract, Division 1, Architectural and Site Specifications 000107 Certification Page 000110 Table of Contents DIV00 PROCUREMENT AND CONTRACTING

More information

Swan/Axis Repairs Standards

Swan/Axis Repairs Standards Bathroom Kitchen Electrics or renew bath or renew electric over bath shower or renew shower tray or renew shower screen or door or renew shower curtain and/or rail or renew flexible shower hoses and head

More information

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

TENANT AND LANDLORD REPAIR RESPONSIBILITIES TENANT AND LANDLORD REPAIR RESPONSIBILITIES REPAIR LANDLORD TENANT Notifying Repairs Any alteration or improvement you have carried out to the property Permission required Water damage cause by push-on

More information

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION)

GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) GUIDELINES FOR HIGHRISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL VENTILATION) February, 2017 Contents Clauses Page 1. Basic Concepts 1 2. Design Considerations 1 3. Car Parks Ventilation 2 4. Kitchen

More information

- CONSTRUCTION FIRE SAFETY STANDARDS

- CONSTRUCTION FIRE SAFETY STANDARDS SGG15 - CONSTRUCTION FIRE SAFETY STANDARDS 1) Construction Planning All construction sites shall plan and sequence their construction activities to ensure the early installation and operation of permanent

More information

HCJ/LJ/B100841/JR Issue M July Fit Out Guide

HCJ/LJ/B100841/JR Issue M July Fit Out Guide Fit Out Guide CONTENTS 1.0 INTRODUCTION... 2 2.0 PROJECT DIRECTORY... 3 3.0 LANDLORD APRPOVAL PROCESS... 6 STEP 1 RETAILER BRIEFING... 7 STEP 2(A) CONCEPT DESIGN REVIEW... 8 STEP 2(B) DETAILED DESIGN REVIEW...

More information

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN 04.13.2017 1 MONTICELLO INTERIOR FINISHES PAINT MOULDING WALLS ACCENT DOORS DOOR TRIM/STAIRS

More information

Document Information Cover Sheet

Document Information Cover Sheet Document Information Cover Sheet Asite/Document Reference Number: LOR-CO-SW-RP-0015 Document Title: Equipment Interface Document Revision: F02 Publisher: Laing O Rourke Published: 23/04/2013 Outline Description/Comments

More information

1.0 CONDITIONS FOR CHILLED WATER SUPPLY (PRIMARY SIDE BY DHCS SUPPLIER)

1.0 CONDITIONS FOR CHILLED WATER SUPPLY (PRIMARY SIDE BY DHCS SUPPLIER) GENERAL This document contains the basic technical information for Architectural, Civil & Structural and M&E Building Services as required by supplier to achieve optimum operation. The time frame required

More information

Areas of the building to which access was not available. Details of any onsite management (if known)

Areas of the building to which access was not available. Details of any onsite management (if known) SECTION ONE UPRN Address 1 (block name and/or street number) Address 2 (flat numbers) Address 3 (street) Address 4 (area) Postcode Date of inspection Suggested review date Fire Risk Assessor Property Designation

More information

Specified Systems List

Specified Systems List Specified Systems List Index: SS 1 Automatic systems for fire suppression SS 2 Automatic or manual emergency warning systems for fire or other dangers SS 3 Electromagnetic or automatic doors or windows

More information

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS The York County Department of Fire Safety reviews all commercial building plan submittals for compliance with the 2015 International

More information

SPACE TYPE: CHILD CARE

SPACE TYPE: CHILD CARE SPACE TYPE: CHILD CARE Construction Criteria The unit costs for Child Care Center space types are based on the construction quality and design features in the following table. This information has been

More information

INSTALLATION OF ACCESS FLOOR SYSTEMS IN GENERAL OFFICE AREA AND COMPUTER ROOM

INSTALLATION OF ACCESS FLOOR SYSTEMS IN GENERAL OFFICE AREA AND COMPUTER ROOM INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: Mech Code 601 Effective: 2-07-79 DOCUMENT NO. P/BC 2002-018 Revised: 9-25-03 Previously Issued As: RGA 2-79, MGD101 INSTALLATION OF ACCESS FLOOR

More information

Common Fire Code Violation Checklist. Listed are some of the most commonly found fire code violations and should not be considered as all inclusive.

Common Fire Code Violation Checklist. Listed are some of the most commonly found fire code violations and should not be considered as all inclusive. Common Fire Code Violation Checklist Listed are some of the most commonly found fire code violations and should not be considered as all inclusive. Exterior Features All fire access roads signed per TFD

More information

Swan/Axis Repairs Standards

Swan/Axis Repairs Standards Swan/Axis s s or renew bath or renew electric over bath shower or renew shower tray or renew tap to basin or bath Rewasher tap to bath or basin Renew mastic sealant to basin, bath or shower or renew toilet

More information

Check Out Report. Residence: Flat 7 Elm House The White Road. Highgate London N20 6LK. John Doe. An Inventory Clerk Company.

Check Out Report. Residence: Flat 7 Elm House The White Road. Highgate London N20 6LK. John Doe. An Inventory Clerk Company. Check Out Report Residence: Flat 7 Elm House The White Road Highgate London N20 6LK Produced By: Clerk: Company: John Doe An Inventory Clerk Company Telephone: 0845 869 3032 On Behalf Of: Contact: Company:

More information

RENTED DWELLING REGULATIONS

RENTED DWELLING REGULATIONS Louth Local Authorities RENTED DWELLING REGULATIONS INSPECTION FORM NEW TENANCY LEASES COMMENCING ON OR AFTER 1st OF FEBRUARY 2009 1 These Regulations do NOT apply to: (a) House let for use as a holiday

More information

Construction standards and qualities

Construction standards and qualities Structure The structure of the building is made of reinforced concrete with lattice slabs. An independent technical control body guarantees the perfect execution of the structure, which is also covered

More information

Telephone: for you - for your community - not for profit.

Telephone: for you - for your community - not for profit. What to expect in your new home Telephone: 0800 316 0897 www.tworivershousing.org.uk for you - for your community - not for profit www.tworivershousing.org.uk We are fully committed to delivering high

More information

Commercial Kitchen Ventilation Services. Ventilation Systems. Canopies. Ductwork. Gas Interlock Systems

Commercial Kitchen Ventilation Services. Ventilation Systems. Canopies. Ductwork. Gas Interlock Systems Commercial Kitchen Ventilation Services ACK offers a full range of commercial kitchen ventilation services including design and planning, manufacture, installation, maintenance and servicing as well as

More information

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Mandatory Fire Safety Instruction NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Reference A: Reference B: Approved Document B

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Exova (UK) Limited trading as Warrington Certification Issue No: 033 Issue date: 06 November 2017 to provide product conformity Holmesfield

More information

ACTIVE VENTILATION SYSTEMS

ACTIVE VENTILATION SYSTEMS ...................................... CI/SfB (57) Uniclass L75 June 2013 Contents Passivent Active Ventilation 3 The need for ventilation 4 What is Active Ventilation? 5 Active Transfer - Atrium System

More information

1. What s so good about loft conversions? 2. What s new? - Legislation. 3. Key design options. 4. What Type of Roof? 5. Complying with Fire

1. What s so good about loft conversions? 2. What s new? - Legislation. 3. Key design options. 4. What Type of Roof? 5. Complying with Fire 1. What s so good about loft conversions? 2. What s new? - Legislation 3. Key design options 4. What Type of Roof? 5. Complying with Fire 6. Loft stairs 7. Designing the new structure 8. Loft windows 9.

More information

www.abpconsultants.com.au Site & Connections M Class Concrete slab 300mm of fall over the building platform Connections within allotment Gas, Water, Electrical and Telephone included in contract price.

More information

TABLE OF CONTENTS 1.0 INTRODUCTION TO AHA TENANT S HANDBOOK 1.1 HOUSING ASSOCIATION CONTACT DETAILS 1.2 EMERGENCY CALL OUTS 2.0 DEFECTS & REPAIRS

TABLE OF CONTENTS 1.0 INTRODUCTION TO AHA TENANT S HANDBOOK 1.1 HOUSING ASSOCIATION CONTACT DETAILS 1.2 EMERGENCY CALL OUTS 2.0 DEFECTS & REPAIRS TABLE OF CONTENTS 1.0 INTRODUCTION TO AHA TENANT S HANDBOOK 1.1 HOUSING ASSOCIATION CONTACT DETAILS 1.2 EMERGENCY CALL OUTS 2.0 DEFECTS & REPAIRS 3.0 MOVING IN 3.1 CARPETS AND FLOOR COVERINGS 3.2 FIXINGS

More information

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan ADDENDUM NO. 2 RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan TO: All Bidders Gentlemen: You are hereby directed to make the following changes in the Project Manual and/or

More information

Design criteria for public cyclone shelters

Design criteria for public cyclone shelters Design criteria for public cyclone shelters Dr Peter Mullins Mullins Consulting Brisbane TC Yasi 2nd Feb 2011 Evacuation Storm tide inundation Harvey Bay Storm Tide Model Vulnerable houses Tully TC Yasi

More information

Passive Fire Protection Guidance for the Fire Risk Assessor. Niall Rowan Technical Officer Association for Specialist Fire Protection

Passive Fire Protection Guidance for the Fire Risk Assessor. Niall Rowan Technical Officer Association for Specialist Fire Protection Passive Fire Protection Guidance for the Fire Risk Assessor Niall Rowan Technical Officer Association for Specialist Fire Protection ASFP has just completed a guide on what to look for when undertaking

More information

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option.

If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally ventilated solution is a viable option. Air handling units Aesthetic Not to add significantly to the existing ambient noise levels. Functional requirements If a peak space temperature to about 28ºC is acceptable to the occupants then a naturally

More information

REQUIREMENTS FOR HOOD PLANS

REQUIREMENTS FOR HOOD PLANS DEPARTMENT OF PUBLIC HEALTH Division of Environmental Health REQUIREMENTS FOR HOOD PLANS Submit one (1) set of plans drawn to scale of at least ¼-inch per foot. Plans shall conform to applicable California

More information

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Fire Alarm Systems Plan Review Checklist Date: Permit Number: Business Name: Address: Fire Alarm System Submittal

More information

Ceiling diffusers. Type DLQL

Ceiling diffusers. Type DLQL X X testregistrierung Type Horizontal one-way air discharge Horizontal two-way air discharge Horizontal four-way air discharge Horizontal duct connection For horizontal one-way to four-way air discharge,

More information

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex:

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: Mr. Junkers Lam Senior Building Surveyor of Buildings Department (9 Sept 2013) Part A Introduction Part B Means

More information

Perimeos. Ceiling Recess. decor. systems

Perimeos. Ceiling Recess. decor. systems Ceiling Recess decor systems Ceiling Recess Perimeos is a revolutionary ceiling perimeter solution, for concealing blinds and curtain tracks. A key feature is the SpeedClip mounting channel. This allows

More information

Venture Series Inclusions.

Venture Series Inclusions. Venture Series Inclusions. Kitchen 1. Fully laminated Kitchen cabinets with laminated bench tops 2. Set of 4 drawers to Kitchen cabinets 3. Laminex handles on kitchen cabinets 4. Base double bowl stainless

More information

COOKER HOOD USER HANDBOOK FOR INSTALLATION AND OPERATION MODELS CRC95

COOKER HOOD USER HANDBOOK FOR INSTALLATION AND OPERATION MODELS CRC95 COOKER HOOD USER HANDBOOK FOR INSTALLATION AND OPERATION MODELS CRC95 Your new Cooker Hood Using your new Cooker Hood is very simple. Nevertheless, to get the best results it is important that you read

More information

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue I April 16. Appendix C

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue I April 16. Appendix C APPENDIX C APPROVAL PROCESS SUBMISSION FORMS STEP 2A CONCEPT DESIGN SUBMISSION To: Edward Utteridge From: Jonathan Everitt jeveritt@oriumdesign.co.uk Terry Lailey t.lailey@oriumdesign.co.uk Checklist (tick

More information

PART II: New Construction Inspections and Acceptance Testing Procedures

PART II: New Construction Inspections and Acceptance Testing Procedures Stafford County Fire Marshal s Office Handbook for Building/Fire Code Policies and Guidelines PART II: New Construction Inspections and Acceptance Testing Procedures Phone: 540-658-8648 Fax: 540-658-9128

More information

Installation and Maintenance

Installation and Maintenance 1.0 Introduction MRXBOX-ECO2 (Standard Unit) MRXBOX-ECO2-OH (Opposite hand Unit) MRXBOXAB-ECO2 (Standard Unit) MRXBOXAB-ECO2-OH (Opposite hand Unit) Mechanical Ventilation Units with Heat Recovery for

More information

Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer

Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer INSTALLATION INSTRUCTIONS UNDER CABINET HOOD Read All Instructions Thoroughly Before Beginning Installation WARNING

More information

TECHNICAL CRITERIA THE PLACE TO SHOP SCOTTSDALE FASHION SQUARE

TECHNICAL CRITERIA THE PLACE TO SHOP SCOTTSDALE FASHION SQUARE TECHNICAL CRITERIA THE PLACE TO SHOP ADDENDUM LOG May, 2008 Entire Criteria Manual February, 2009 Full Layout/Content Revision May, 2009 Revision of full update June, 2009 Revision to current Technical

More information

4 August Islington Fire Protection Transpower NZ Limited

4 August Islington Fire Protection Transpower NZ Limited 4 August 2011 Islington Fire Protection Contents 1. Introduction...1 General Approach...2 2. General Notes...3 3. Description of Building Areas...4 Use, Layout, Fire Load, Criticality and Division...4

More information

Baggaley Drive, Horncastle, LN9 5GE 120,000 Call us today on

Baggaley Drive, Horncastle, LN9 5GE 120,000 Call us today on Baggaley Drive, Horncastle, LN9 5GE 120,000 Call us today on 01507 524 910 THINKING OF SELLING? If you are thinking of selling your home or just curious to discover the value of your property, Hunters

More information

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY) FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY) BUILDING SUMMARY The building was constructed in Victorian times and is constructed of brick with knapped flint in fill on some outer walls. The building

More information

TENANT FIT OUT GUIDE

TENANT FIT OUT GUIDE TRINITY LEEDS TENANT FIT OUT GUIDE September 2016 CONTENTS 1.0 INTRODUCTION... 1 2.0 PROJECT DIRECTORY... 3 3.0 LANDLORD APPROVAL PROCESS... 6 Step 1 Tenant Briefing... 7 Step 2(a) Concept Design Review...

More information

FIRE RISK ASSESSMENT NOT KNOWN 15/10/ SOMERTON COURT BROADMOSS DRIVE SIMON ROFFEY

FIRE RISK ASSESSMENT NOT KNOWN 15/10/ SOMERTON COURT BROADMOSS DRIVE SIMON ROFFEY UPRN Date of inspection Address 1 (flat numbers) Address 2 (street) Address 3 (area) Fire Risk Assessor Checked by Approved by Postcode Does the building have common areas? Was access available to the

More information

Application and Installation Guide (excluding Solar Air Collectors)

Application and Installation Guide (excluding Solar Air Collectors) Application and Installation Guide (excluding Solar Air Collectors) Manual Number 671276 September 2011 The EMC Directive 89/336/EEC With modification 92/31/EEC The Low Voltage directive 2006/95/EEC Application

More information

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35 installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35 built on innovation acb 30 & 35 Active Chilled Beam Models ACB30 & ACB35 are designed for installation in the ceiling

More information

Passive Fire Protection Guidance. Niall Rowan Technical Officer Association for Specialist Fire Protection

Passive Fire Protection Guidance. Niall Rowan Technical Officer Association for Specialist Fire Protection Passive Fire Protection Guidance for the Fire Risk Assessor Niall Rowan Technical Officer Association for Specialist Fire Protection ASFP has just completed a guide on what to look for when undertaking

More information

BUILDING SERVICES INFORMATION VENTILATION

BUILDING SERVICES INFORMATION VENTILATION BUILDING SERVICES INFORMATION VENTILATION 1. Laboratories and Ancillary Areas. The lab side of the Building is mechanically ventilated due to the requirement for control of air changes therefore windows

More information

fire risk assessment For use by landlords of small premises Premises Address

fire risk assessment For use by landlords of small premises Premises Address fire risk assessment For use by landlords of small premises Premises Address FIRE RISK ASSESSMENT for use by landlords of small premises Person having control of the premises: Name of landlord (if different):

More information

VOID Property Inspection Form

VOID Property Inspection Form VOID Property Inspection Form Order Number. Address Prop Type: Void Category (1 / 2 /6 weeks) Keys collected on: Keysafe Fitted on: Communal Entrance? Please ensure 3 communal doors are returned on completion

More information

IS-ORANGE Envirograf. Orange Book. Ventilation. T +44 (0) F +44 (0)

IS-ORANGE Envirograf. Orange Book. Ventilation. T +44 (0) F +44 (0) IS-ORANGE-01-15 Orange Book Ventilation Envirograf Innovators - Developers - Manufacturers Passive Fire Prevention Products T +44 (0) 1304 842 555 F +44 (0) 1304 842 666 sales@envirograf.com www.envirograf.com

More information

Prescriptive Requirement for Smoke Control

Prescriptive Requirement for Smoke Control HKIE CPD Training Course (II) 7July 2009 Organization by The Hong Kong Institution of Engineers Fire Division Co-organized by the Association of Registered Fire Services Installation contractors of Hong

More information

AUTOMATIC FIRE CURTAIN FIRE CURTAIN FM 1

AUTOMATIC FIRE CURTAIN FIRE CURTAIN FM 1 PRODUCT DATA SHEET AUTOMATIC FIRE CURTAIN FM 1 AUTOMATIC FIRE CURTAIN FIRE CURTAIN FM 1 FM-1 fire curtains are used where, if there is a fire, it is necessary to create a temporary barrier within an opening

More information

HOUSING (STANDARDS FOR RENTED HOUSES) REGULATIONS 2017

HOUSING (STANDARDS FOR RENTED HOUSES) REGULATIONS 2017 COMMENCE 1 ST JULY 2017 REVOKE 2008 & 2009 LEGISLATION APPLY TO ALL RENTED HOUSES INCLUDING LA HOUSES INTERPRETATION HABITABLE ROOM MEANS A ROOM USED FOR LIVING OR SLEEPING PURPOSES BUT DOES NOT INCLUDE

More information

Units for suspended ceilings

Units for suspended ceilings X X testregistrierung Units for suspended ceilings Type, hinged induced air grille, water connections Active chilled beam with two-way air discharge and horizontal heat exchanger, suitable for grid ceilings

More information

Agency details Owner details Tenant(s) details. Mr & Mrs Smith C/O High Street Brierley Hill DY5 3AW

Agency details Owner details Tenant(s) details. Mr & Mrs Smith C/O High Street Brierley Hill DY5 3AW Agency details Owner details Tenant(s) details Taylors Estate Agents 84-88 High Street Brierley Hill DY5 3AW Mr & Mrs Smith C/O 84-88 High Street Brierley Hill DY5 3AW Mr Robert Dewick Miss Catherine Fear

More information

Notable Changes in the Mechanical Codes

Notable Changes in the Mechanical Codes Notable Changes in the Mechanical Codes July 2004 The following are some of the changes between the 1997 Uniform Mechanical Code and the 2003 International Mechanical Code(M) and the 2003 International

More information

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Facility Condition Assessment Summary Report British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building Submitted by: VFA Canada Corp. Burnaby Centre 4211 Kingsway Burnaby, BC V5H 1Z6

More information

For the Florida Building Commission And the Fire Code Advisory Council

For the Florida Building Commission And the Fire Code Advisory Council Life-Safety Modifications Mechanical and Existing Building Compared to the 2012 Changes of the International Building Code and National Fire Protection Association- 101 For the Florida Building Commission

More information

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev BID INFORMATION LIST Crossroads East 18511 N. Scottsdale Road, #105 Scottsdale, AZ 85255 Rev.1 12-20-17 SITE CONTACTS: LANDLORD CONSTRUCTION CONTACT Diversified Partners Kevin Gantner Office - (480) 947-8800

More information

900 N. Via Piemonte Ontario, CA

900 N. Via Piemonte Ontario, CA 2 3 L 8 5'-0" 6'-1" 5'-0" 4'-0" 2'-0" D.5 6" 9'-9" K 2 1 2 " 5'-0" 2'-0" 1'-2" 8" 4 4.3 7'-0" C.6 1'-8 1 2 " 7'-0" 8" 10'-6" 5'-0" 8" 6" 6'-6" 6'-3" PLUMBING SCOPE OF WORK - DRAINS 7'-3" 6'-8" KEC TO PROVIDE:

More information

Swan/Axis Repairs Standards

Swan/Axis Repairs Standards Swan/Axis s Bathroom or renew bath Routine 20 21 electric over bath shower Routine 20 21 shower tray Urgent 5 5 or replace shower screen or door Routine 20 21 Renew shower curtain and/or rail Urgent Renew

More information

Osceola County Department of Fire Rescue and Emergency Medical Services

Osceola County Department of Fire Rescue and Emergency Medical Services St. Number Dir Street Name Street Type Inspected Time of Day to be Re-inspected Zip Code Occupancy Type Emergency Contact Phone (Inc. Area Code) Building Owner Building Owner Mailing Address Bldg. Owner

More information

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect 1 Site Summary Address 7200 Bluff Springs Road Austin, TX 78744 Number of Permanent Campus Facilities 2 Original Year of Construction 2014 Total Campus Building Area (combined) 25,314 SF Introduction The

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Alarm System Plan Review 2009 International Fire Code and 2010 NFPA 72 Date of Review // BLD201 - Project Address: Project Name: _ Professional

More information

Domestic & Commercial Fans

Domestic & Commercial Fans Max. airflow l/s Axial Fan Centrifugal Fan Speed Controllable Reversible Airflow Page Number BF IF CF CBF BF 64 * 16 IF 64 * 16 EAF LV 23 * 169 ECF LV 31 * 169 CF 25 * 170 CBF 31 * 170 RVF 0 * * 171 BRAVO

More information

Fire Risk Assessment. Index. Part 1 Introduction Part 2 The Fire Risk Assessment Part 3 The Management Action Plan

Fire Risk Assessment. Index. Part 1 Introduction Part 2 The Fire Risk Assessment Part 3 The Management Action Plan Fire Risk Assessment Worksafe Solutions Consultancy Ltd 67 Flitwick Road Maulden Bedfordshire, MK45 2BJ Tel: 01525 406787 email enquiries@worksafesoultions.co.uk Index Part 1 Introduction Part 2 The Fire

More information

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome! Building & Fire Code Academy Building Better With Our Greatest Resource Education Welcome! Understanding the Sprinkler System Design Alternatives in the 2015 International Why inspect, test and maintain?

More information

Erf 3254, Ingleside Road, Camps Bay. Marketing Pack v0.1 November 2009

Erf 3254, Ingleside Road, Camps Bay. Marketing Pack v0.1 November 2009 Erf 3254, Ingleside Road, Camps Bay Marketing Pack v0.1 November 2009 Site Location 4B Ingleside Road, Camps Bay Kitchen opening out onto the terrace Master Bedroom en suite with views of the Atlantic

More information

INVENTORY AND HOME CONDITION REPORT. Keys

INVENTORY AND HOME CONDITION REPORT. Keys Landlord / Agent Details INVENTORY AND HOME CONDITION REPORT Tenant Details * Please ensure you take a clipboard with you * Name Mr. B. Simpson Address 742 Evergreen Terrace, Springfield Contact details

More information

34 Delhi Street Belfast BT7 3AJ

34 Delhi Street Belfast BT7 3AJ Inventory 34 Delhi Street Belfast BT7 3AJ Inspected by: JMH Inventories Date of Inspection: Prepared By: Michael Harshaw MAPIP M0193573 Prepared for: Paul McCusker Date Published: Inventory Inventory Table

More information

Detached House - Fountain Street, Ferndale 73,500

Detached House - Fountain Street, Ferndale 73,500 propertyplus for sale Detached House - Fountain Street, Ferndale This is a beautifully presented two bedroom, mid terraced cottage with bay frontage which has been renovated and modernised. Situated in

More information

AN INTRODUCTION TO BUILDING SERVICES

AN INTRODUCTION TO BUILDING SERVICES AN INTRODUCTION TO BUILDING SERVICES AN INTRODUCTION TO BUILDING SERVICES Christopher A. Howard MPhil, DipQS, FRICS M MACMILLAN EDUCATION Christopher Anthony Howard 1988 All rights reserved. No reproduction,

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST TENANT IMPROVEMENTS Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;

More information

Belling Cooker Hood User Manual

Belling Cooker Hood User Manual Belling Cooker Hood User Manual 1 Contents Introduction................................................ 3 Using the Hood.............................................. 4 Care and Maintenance.........................................

More information

SUNNY LANE TERRACE HOMES

SUNNY LANE TERRACE HOMES SUNNY LANE TERRACE HOMES Well Located Park or Lakefront homes Relaxed Lifestyle Backdrop for living Well Designed In your element Well Balanced Naturally inspired Well Styled Matters of taste Inclusions

More information

About This Model. Series: Rockbridge Modular Homes Model: RJ501A Grand Rockwell. Style: Ranch / Bedrooms: 4 / Bathrooms: 2 / Square Feet: 2280.

About This Model. Series: Rockbridge Modular Homes Model: RJ501A Grand Rockwell. Style: Ranch / Bedrooms: 4 / Bathrooms: 2 / Square Feet: 2280. About This Model Style: Ranch / Bedrooms: 4 / Bathrooms: 2 / Square Feet: 2280 Floorplan Standards & Features INTERIOR Primed Smooth Drywall Throughout Flat Ceiling Throughout Stipple Ceiling 8'0" Ceiling

More information