Technical Committee on Fluidized Bed Boilers

Size: px
Start display at page:

Download "Technical Committee on Fluidized Bed Boilers"

Transcription

1 Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Committee Members and Guests 3. Approval of Minutes from the April 5, 2010 Meeting via teleconference. See 4. Staff Liaison Report A. Committee membership update (For the period April 5, 2010 Feb. 5, 2013) Name Category Change Date William George U (Principal) Resign 4/6/2010 David Habenicht SE (Principal) Resign 6/8/2011 David Pickles U (Principal) Appoint 8/2/2010 (Total Voting Members 13; M=38%, SE=23%, U=23%; I=8%; IM = 8%) B. Revision Cycle Review and timeline (Attachment A) 5. Old Business A. Gasifiers. The TC discussed adding coverage for gasifiers but determined that interest is limited. The TC requested that gasifiers remain on the agenda for periodic review as the technology matures. 6. New Business A. Create First Revision of Chapter 7. The committee should review the Public Input (Attachment B) and revise chapter 7 of NFPA 85 as appropriate. B. Review BCS-FUN actions. The committee members are asked to review the actions of the Fundamentals committee (sent under separate cover) and bring forward any items warranting further dicussion. C. Industry Update. The committee should discuss current projects, new technology, and any other items related to fluidized bed boilers that may be of general interest. 7. Other Items? 8. Date/Location of Next Meeting. The Second Draft meeting must take place between Nov. 15, 2013 and January 24, The BCS-FUN meeting is tentatively scheduled for Dec 4-5, 2013 in Atlanta, GA. 9. Adjournment.

2 Attachment A: Fall 2014 Revision Cycle

3 2014 FALL REVISION CYCLE *Public Input Dates may vary according to documents and schedules for Revision Cycles may change. Please check the NFPA Website for the most up to date information on Public Input Closing Dates and schedules at # (i.e. and click on the Next Edition tab Process Stage Public Input Stage (First Draft) Process Step Dates for TC Dates for TC with CC Public Input Closing Date* 1/4/2013 1/4/2013 Final date for TC First Draft Meeting 6/14/2013 3/15/2013 Posting of First Draft and TC Ballot 8/2/2013 4/26/2013 Final date for Receipt of TC First Draft ballot 8/23/2013 5/17/2013 Final date for Receipt of TC First Draft ballot recirc 8/30/2013 5/24/2013 Posting of First Draft for CC Meeting 5/31/2013 Final date for CC First Draft Meeting 7/12/2013 Posting of First Draft and CC Ballot 8/2/2013 Final date for Receipt of CC First Draft ballot 8/23/2013 Final date for Receipt of CC First Draft ballot recirc 8/30/2013 Post Final First Draft for Public Comment 9/6/2013 9/6/2013 Public Comment closing date 11/15/ /15/2013 Final Date to Publish Notice of Consent Documents (Documents That Received No Comments) 11/22/ /22/2013 Appeal Closing Date for Consent Documents (15 Days) (Documents That Received No Comments) 12/7/ /7/2013 Final date for TC Second Draft Meeting 5/2/2014 1/24/2014 Posting of Second Draft and TC Ballot 6/13/2014 3/7/2014 Comment Stage Final date for Receipt of TC Second Draft Ballot 7/7/2014 3/28/2014 (Second Draft) Final date for receipt of TC Second Draft ballot recirc 7/14/2014 4/4/2014 Posting of Second Draft for CC Mtg 4/11/2014 Final date for CC Second Draft Meeting 5/23/2014 Posting of Second Draft for CC Ballot 6/13/2014 Final date for Receipt of CC Second Draft ballot 7/7/2014 Final date for Receipt of CC Second Draft ballot recirc 7/14/2014 Post Final Second Draft for NITMAM Review 7/18/2014 7/18/2014 Tech Session Preparation (& Issuance) Notice of Intent to Make a Motion (NITMAM) Closing Date 8/22/2014 8/22/2014 Posting of Certified Amending Motions and Consent Documents 10/17/ /17/2014 Appeal Closing Date for Consent Documents (15 Days) 11/1/ /1/2014 SC Issuance Date for Consent Documents (25 Days) 11/11/ /11/2014 Tech Session Association Meeting for Documents with CAMs 6/22 25/2015 6/22 25/2015 Appeals and Issuance Appeal Closing Date for Documents with CAMs (20 Days) 7/15/2015 7/15/2015 SC Issuance Dates for Documents with CAMs 8/27/2015 8/27/2015

4 Attachment B: Public Input

5 04 of 171 2/6/2013 3:15 PM Public Input No. 223-NFPA [ Section No. 7.2 ] 7.2 Purpose. The purpose of this chapter is to establish minimum standards for the design, installation, operation, and maintenance of atmospheric fluidized bed boilers, associated fuel-burning systems, and related systems to contribute to safe operation to the design operation and, in particular, to the prevention of furnace explosions and pressure excursions. The objective of this suggested change is to replace "safe operation" as it may not be unenforceable language. Related Public Inputs for This Document Related Input Public Input No. 222-NFPA [Section No. 5.2] Relationship Submitter Full Name: Ted Jablkowski Organization: Fives North American Combustion Submittal Date: Thu Jan 03 16:51:05 EST 2013 I, Ted Jablkowski, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Ted Jablkowski, and I agree to be legally bound by the above and the terms and

6 05 of 171 2/6/2013 3:15 PM Public Input No. 153-NFPA [ Section No ] The procedure shall include inspections by the owner/operator that start from the upper elevations of the hot cyclone(s) and other equipment and proceed to each space or chute below. As written, this paragraph is open to misinterpretation as to who should do the inspection. Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies. Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 14:04:37 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

7 06 of 171 2/6/2013 3:15 PM Public Input No. 155-NFPA [ Section No (C) ] (C) Observation ports shall be provided to allow owner/operator inspection of the duct and warm-up burners. As written, this paragraph is open to misinterpretation as to who should do the inspection. Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies. Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 14:16:37 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

8 07 of 171 2/6/2013 3:15 PM Public Input No. 156-NFPA [ Section No ] Preparation for starting shall include a thorough inspection by the owner/operator and shall verify the following: (1) The furnace and gas passages are in good repair and free of foreign material. (2) All personnel are evacuated from the unit and associated equipment, all access and inspection doors are closed, and all equipment and instrumentation are ready for operation. (3) All airflow and flue gas flow control dampers have been operated through their full range to check the operating mechanism. (4) All adjustable individual burner dampers or registers have been operated through their full range to check the operating mechanism. (5) All safety shutoff valves are operational and closed, and ignition sparks are de-energized. (6) The feeder equipment is effectively isolated to prevent the leakage of fuel or sorbent into the furnace and to prevent hot air or flue gas from the fluidized bed from leaking back into the feed system. (7) The drum water level is established in drum-type boilers, circulating flow is established in forced circulation boilers, or minimum water flow is established in once-through boilers. (8) The feeders and associated equipment are calibrated and ready for operation. (9) Energy is supplied to the control system and to the safety interlocks. (10)* The oxygen analyzer and carbon monoxide or combustibles analyzer, if provided, are operating, the carbon monoxide or combustibles indication is at zero, and oxygen indication is at maximum. (11) A complete functional check of the safety interlocks has been made, at minimum, after system maintenance. (12) A complete periodic operational test of each igniter has been made as follows: (a) (b) (c) Frequency of testing is dependent on the design and operating history of each individual unit and ignition system. As a minimum, a test shall be performed during every start-up following overhaul or other maintenance. A test shall be integrated into the starting sequence and shall follow the unit purge and precede the admission of any burner fuel. (13) Individual igniters or groups of igniters shall be permitted to be tested while the unit is in service as follows: (a) (b) Such tests shall be made with no main fuel present in the igniter's associated burner. The burner air register shall be in its start-up or light-off position as described in the established operating procedure. (14)* The furnace contains the required bed inventory as defined by the manufacturer or determined by test. As written, this paragraph is open to mininterpretation as to who should do the inspection. Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies.

9 08 of 171 2/6/2013 3:15 PM Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 14:22:09 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

10 09 of 171 2/6/2013 3:15 PM Public Input No. 158-NFPA [ Section No ] Preparation for starting shall include a thorough inspection by the owner/operator and shall verify the following: (1) All safety shutoff valves are closed, and all sparks are de-energized. (2) Oil ignition systems meet the requirements of Section 7.8. (3) Fuel system vents are open and venting to atmosphere outside the boiler room; lines are drained and cleared of condensate and other foreign material. (4) The correct drum water level is established in drum-type boilers, circulating flow is established in forced circulation boilers, or minimum water flow is established in once-through boilers as established by the boiler manufacturer. (5) Burner elements and igniters are positioned in accordance with the manufacturer's specification. (6) Energy is supplied to the control and interlock systems. (7) Meters or gauges are indicating fuel header pressure to the unit. As written, this paragraph is open to misinterpretation as to who should do the inspection. Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies. Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 14:30:59 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

11 10 of 171 2/6/2013 3:15 PM Public Input No. 159-NFPA [ Section No ] Preparation for start-up shall include a thorough inspection by the owner/operator and shall verify the following: (1) Energy is supplied to the control system and to the interlock systems. (2) All safety shutoff valves are closed; all sparks are de-energized. (3) Gas ignition systems meet the requirements of Section 7.7. (4) Circulating valves are open to provide and maintain hot oil in the burner headers. (5) The proper drum water level is established in drum-type boilers, circulating flow is established in forced circulation boilers, or minimum water flow is established in once-through boilers. (6) Burner guns have been checked to ensure that the correct burner tips and sprayer plates and gaskets are in place to ensure a safe operating condition. (7) Burner elements and igniters are positioned in accordance with the manufacturer's specifications. (8) Meters or gauges indicate fuel header pressure to the unit. As written, this paragraph is open to misinterpretation as to who should do the inspection. Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies. Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 14:35:36 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

12 50 of 171 2/6/2013 3:15 PM Public Input No. 171-NFPA [ Section No. A ] A One method by which the absence of solids can be confirmed is by soundings. Soundings are accomplished by lowering a weighted cable from the top of the cyclone to the base of the loop seal. Visual inspections inspections by the owner/operator are also feasible if light from an opening in the loop seal can be seen from the top of the cyclone. It should be noted that these methods may not indicate the presence of solids adhering to the sides of the cyclone, the loop seal, or the connecting pipe. [See L.2.2 (10).] As written, this paragraph is open to misinterpretation as to who should do the inspection. Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies. Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 15:30:34 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

13 51 of 171 2/6/2013 3:15 PM Public Input No. 11-NFPA [ New Section after A (1) ] A (6) Bed solidification can occur as a result of agglomeration. Alkali compounds can attach to bed material particles. These alkali compounds can have low melting points and can cause the bed particles to stick to each other to form agglomerates. In discussions with the BCS-FUN-TC the definition for agglomeration (3.3.2) is being deleted from the first draft. Defining agglomeration for this specific case precludes the use of the term in other cases within the code where agglomeration is a concern. This public comment offers annex materail to (6) to capture and explain how agglomeration occurs in this particular case. Submitter Full Name: Richard Gallagher Organization: Zurich Services Corporation Submittal Date: Tue May 29 09:47:30 EDT 2012 I, Richard Gallagher, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Richard Gallagher, and I agree to be legally bound by the above and the terms and

14 52 of 171 2/6/2013 3:15 PM Public Input No. 67-NFPA [ Section No. A (10) ] A (10) Analyzers could contain heated elements that exceed the autoignition temperature of some fuels. Zirconium oxide analyzers, commonly used for oxygen analysis, contain an element heated to 704 C (1300 F). This high temperature element presents a potential ignition source to unburned fuel that could be present at start-up. Some analyzers are designed to protect the sampled space from the ignition source by providing flashback protection (such as flame arresters in the sample gas path). Analyzers that have that protection or that are not heated to autoignition temperature do not present an ignition hazard It should be noted, however, that flame arrestors may only work below a certain temperature which is usually not quantified, may not quench a flame as well once it becomes corroded and may induce a speed of response delay that could be detrimental to the control or protection strategy. Consideration should be given to powering down analyzers during boiler or fuel trip situations if they can exceed the autoignition temperature of the fuel being fired. Discussions with a major supplier of zirconium oxide based oxygen analyzers revealed the stated limitations of flame arrestors and those limitations need to be understood by users of the Code. This same change is being proposed against identical annex material in A , A (2) and A (10). Submitter Full Name: Dale Evely Organization: Southern Company Services, Inc Submittal Date: Thu Nov 29 09:28:01 EST 2012 I, Dale Evely, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Input (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire no rights, including rights as a joint author, in any publication of the NFPA in which this Public Input in this or another similar or derivative form is used. I hereby warrant that I am the author of this Public Input and that I have full power and authority to enter into this copyright assignment. By checking this box I affirm that I am Dale Evely, and I agree to be legally bound by the above and the terms and

15 70 of 171 2/6/2013 3:15 PM Public Input No. 157-NFPA [ Section No. L.2.2 ] L.2.2 Recommendations. Recommendations are as follows: (1) The designers of the boiler and related plant equipment should identify the potential sources of hot solids and associated hazards and make recommendations for personnel safety. (2) The designer should give careful consideration to the selection of materials that come into direct contact with hot solids. (3) Clean-out ports, fittings that might be used as clean-out ports, and spool pieces that might be removed for rodding out blockages should be positioned so that a sudden rush of hot solids does not lead to personnel injury. Components that are removable for maintenance when the plant is out of service but that should not be removed when the plant is in service because of the risk of hot spills should be marked clearly. (4) Instrumentation and wiring needed for the safe operation of the plant should not be routed near potential sources of hot solids. If such routing is necessary, the wiring should be protected from the direct flow of the solids. (5) Fuel lines should not be located near potential sources of hot solids. The fuel lines should be protected from the direct flow of the solids. (6) Plant personnel should be trained in the potential sources of hot solids, associated hazards, and the corresponding safety procedures. (7) Procedures should be developed for cleaning obstructions that provide safety to personnel and equipment. Protective clothing and eye protection should be provided for personnel who rod out obstructions. (8) Components that might contain hot solids should be inspected frequently by the owner/operator. (9) Water-cooled screws have failed when suddenly flooded with hot bed material following the removal of an upstream blockage. The sudden transfer of large amounts of heat has resulted in overpressurizing the cooling water passages. The operators should be trained adequately and the systems designed with appropriate instrumentation, interlocks, and pressure relief devices to mitigate the risks associated with this type of event. (10) An FBC system's furnace and connected components will contain substantial quantities of hot solids for some time after a master fuel trip (MFT). Personnel should be aware of and trained to deal with the following possible results: (a) (b) (c) (d) (e) (f) Hot solids stored in a furnace-connected space may suddenly flow into another space. Care should be taken to ensure that personnel do not enter a furnace or connected space that could still contain hot solids or be connected to a space that contains hot solids. Solids stored in the cyclone or loop seal for example, due to blockage could suddenly be released and flow into another space when the blockage fails or the solids cool and their fluidization characteristics change. Operation of an FD fan, an ID fan, or other fans might not rapidly cool stored solids because the moving air could bypass the bulk of a heap of hot particles. While a surface could appear cool because of rapid heat loss due to radiation, the bulk of the heap could still be hot due to self-insulation. A large heap of solids could require many hours to cool to a safe temperature. Water might enter a body of hot solids from any of a number of sources, including a boiler tube leak. Water pouring onto the solids might not immediately wet the hot solids (much like a drop of water on a hot griddle). When the solids suddenly become wet, rapid generation of steam (steam explosion) could occur. In the event of a steam explosion, hot solids could flow upward as well as in other directions. Large hot clinkers or hot refractory could suddenly be released from the cyclone and flow into the loop seal and connected spaces with the assistance of smaller fluidizable particles. As written, paragraph (8) is open to misinterpretation as to who should do the inspection.

16 71 of 171 2/6/2013 3:15 PM Jurisdictional authorities (AHJ) have for many years been inappropriately interpreting NFPA 85 as containing in-service inspection responsibilities for the National Board Commissioned Boiler Inspectors employed by Authorized Inspection Agencies as defined by the National Board document NB-369 Qualifications and Duties for Authorized Inspection Agencies (AIAs) Performing Inservice Inspection Activities and Qualifications for Inspectors of Boilers and Pressure Vessels. This has caused significant legal issues for Authorized Inspection Agencies. The proposed change is intended to make it clear that NFPA 85 does not contain any requirements.for in-service inspections for these agencies. Related Public Inputs for This Document Related Input Public Input No. 132-NFPA [Section No ] Relationship Submitter Full Name: Brian Moore Organization: Hartford Steam Boiler Inspecti Submittal Date: Wed Jan 02 14:26:27 EST 2013 I, Brian Moore, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this By checking this box I affirm that I am Brian Moore, and I agree to be legally bound by the above and the terms and

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

Technical Committee on Multiple Burner Boilers

Technical Committee on Multiple Burner Boilers Technical Committee on Multiple Burner Boilers AGENDA Salt River Project PERA Club 1 Continential Drive Tempe, AZ January 14-15, 2014 1. Chair s welcome, call to order, and opening remarks at 8:00 a.m.

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

Technical Committee on Fundamentals of Combustion Systems Hazards

Technical Committee on Fundamentals of Combustion Systems Hazards Technical Committee on Fundamentals of Combustion Systems Hazards AGENDA Dec 4-6, 2013 Georgia Power Company Headquarters Banquet Room 241 Ralph McGill Blvd Atlanta, GA 1. Chair s welcome, call to order,

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Technical Committee on Incinerators and Waste Handling Systems

Technical Committee on Incinerators and Waste Handling Systems Technical Committee on Incinerators and Waste Handling Systems Date: April 27, 2017 To: From: Technical Committee on Incinerators and Waste Handling Systems Eric Nette, Staff Liaison/Engineer Re: Agenda

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

NFPA 101 SAF-RES PUBLIC COMMENTS

NFPA 101 SAF-RES PUBLIC COMMENTS Page 134 of 195 Public Comment No. 3-NFPA 101-2013 [ Section No. 28.7.6.1 ] 28.7.6.1 New draperies, curtains, and other similar loosely hanging furnishings and decorations shall be flame resistant as demonstrated

More information

M E M O R A N D U M. The Technical Correlating Committee on Boiler and Combustion Systems Hazards

M E M O R A N D U M. The Technical Correlating Committee on Boiler and Combustion Systems Hazards M E M O R A N D U M TO: FROM: The Technical Correlating Committee on Boiler and Combustion Systems Hazards Jeanne Moreau DATE: June 22, 2010 SUBJECT: NFPA 85 TCC Report on Comments Letter Ballot (F10)

More information

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

DIRECTIVE NO: D-B

DIRECTIVE NO: D-B DIRECTIVE NO: D-B6 100604 1 LOW PRESSURE THERMAL FLUID PLANT AUTOMATED CONTROL SYSTEMS Date of Issue: June 4, 2010 General Details This directive is being issued to owners, licensed contractors, consulting

More information

Changes for the New Edition. Senior Engineer, NFPA NFPA

Changes for the New Edition. Senior Engineer, NFPA NFPA Changes for the New Edition Denise Beach Senior Engineer, NFPA NFPA Overview NFPA 58-2014 Substantive Changes TIAs 2017 Edition NFPA 58-2014 Substantive Changes Bulk and Industrial Plants 3.3.10 Bulk Plant.

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Correlating Committee on Combustible Dusts Susan

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

NFPA 85 COMPLIANCES OF BMS: A CASE STUDY OF BOILER CONTROL AT SBM OFFSHORE MALAYSIA COMPANY 1. AHMED ABOUELRISH 2 Universiti Teknologi Petronas

NFPA 85 COMPLIANCES OF BMS: A CASE STUDY OF BOILER CONTROL AT SBM OFFSHORE MALAYSIA COMPANY 1. AHMED ABOUELRISH 2 Universiti Teknologi Petronas Journal of Contemporary Issues in Business Research ISSN 2305-8277 (Online), 2013, Vol. 2, No. 4, 109-123. Copyright of the Academic Journals JCIBR All rights reserved. NFPA 85 COMPLIANCES OF BMS: A CASE

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122

Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122 Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122 Zurich Hosted 1400 America Lane Schaumburg, Illinois May 22 23, 2013 AGENDA 1. Chair Matt Bujewski calls meeting to order

More information

Second Revision No. 3 implements the text of Committee Input No. 36 as proposed in the First Draft Report, along with the following amendments:

Second Revision No. 3 implements the text of Committee Input No. 36 as proposed in the First Draft Report, along with the following amendments: Second Revision No. 3-NFPA 31-2015 [ Section No. 10.5.1 ] 10.5.1* Oil burners, other than oil stoves with integral tanks, shall be provided with some means for manually stopping the flow of oil to the

More information

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on

Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on Report on Proposals F2007 Copyright, NFPA NFPA 499 Report of the Committee on This list represents the membership at the time the Committee was balloted on the text of this edition. Since that time, changes

More information

Page 1 of 46 Public Input No. 17-NFPA 13E-2013 [ New Section after 3.2.4 ] New 3.2.5 Pressure-Reducing Valve. A valve designed for the purpose of reducing the downstream water pressure under both flowing

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

Prevention of Fires and Explosions in Wood Pellet Facilities. Allen Wagoner, FLAMEX, Inc.

Prevention of Fires and Explosions in Wood Pellet Facilities. Allen Wagoner, FLAMEX, Inc. Prevention of Fires and Explosions in Wood Pellet Facilities Allen Wagoner, FLAMEX, Inc. Wood Dust The smaller the particles the more dangerous Particle size of 420 microns or less (NFPA Code 664)

More information

Low pressure boiler* inspection and maintenance

Low pressure boiler* inspection and maintenance 2-12.001 May 2011 Low pressure boiler* inspection and maintenance Introduction Even as our society evolves into a more technologically advanced, economically driven environment, many businesses and their

More information

NFPA 86 Commitee Inputs Page 1 of 45

NFPA 86 Commitee Inputs Page 1 of 45 of 44 1/26/2017 2:28 PM Committee Input No. 102-NFPA 86-2016 [ Global Input ] The Committee is considering language for pre-purge of the work chambers for Class A, Class B and Class C furnaces. This could

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

3. Approval of Meeting Minutes from January 21, 2014 (Attachment A). Fall 2018 revision cycle schedule. (Attachment C)

3. Approval of Meeting Minutes from January 21, 2014 (Attachment A). Fall 2018 revision cycle schedule. (Attachment C) TECHNICAL COMMITTEE ON FLUIDIZED BED BOILERS NFPA 85 First Draft Meeting Agenda February 16, 2017 9:30 AM 4:30 PM Eastern Time Web Meeting/Teleconference 1. Call to Order. James Walawender, Chair 2. Introductions.

More information

Public Comment No. 13-NFPA [ Section No ]

Public Comment No. 13-NFPA [ Section No ] Public Comment No. 13-NFPA 30-2013 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A 395/A395M, Standard

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

NFPA 79 - Second Draft Meeting July 8-10, DoubleTree Hotel, Portland, ME

NFPA 79 - Second Draft Meeting July 8-10, DoubleTree Hotel, Portland, ME National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org AGENDA NFPA TECHNICAL COMMITTEE ON ELECTRICAL EQUIPMENT OF INDUSTRIAL

More information

National Fire Protection Association

National Fire Protection Association National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M (AMENDMENT) TO: FROM: Technical Committee on Mercantile

More information

TECHNICAL COMMITTEE ON FIRE PUMPS

TECHNICAL COMMITTEE ON FIRE PUMPS TECHNICAL COMMITTEE ON FIRE PUMPS MEMORANDUM TO: FROM: Technical Committee on Fire Pumps Joanne Goyette, on behalf of C. Duffy / R. P. Benedetti DATE: May 2, 2011 SUBJECT: Letter Ballot on Proposals to

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Page 1 of 13 Public Comment No. 2-NFPA 703-2013 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, P.O. Box C700, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM D 2898, Standard

More information

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 106-NFPA [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 106-NFPA 86-2012 [ Chapter NFPA ] 7.4.10.2* The number of safety shutoff valve cycles shall be determined by one of the following ways: (1) Counting of actual safety shutoff valve open-closed

More information

MINUTES OF MEETING. Technical Committee on Fundamentals of Combustion Systems Hazards

MINUTES OF MEETING. Technical Committee on Fundamentals of Combustion Systems Hazards MINUTES OF MEETING Technical Committee on Fundamentals of Combustion Systems Hazards January 29-30, 2013 GE Corporate Headquarters Houston, TX I. Attendance: Principal Members/Staff: Dale Evely, Technical

More information

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler ClearFire Model CFH Horizontal Steam Boiler Startup Guide 750-293 www.cleaverbrooks.com Improper installation, adjustment, service, or maintenance can cause equipment damage, personal injury, or death.

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET NFPA 804, Standard for Fire Protection for Advanced Light Water Reactor Electric Generating Plants, NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fundamentals of Combustion Systems Hazards Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

Technical Committee on Fluid Heaters

Technical Committee on Fluid Heaters Technical Committee on Fluid Heaters Date: August 9, 2016 To: Technical Committee on Fluid Heaters From: Eric Nette, Staff Liaison/Engineer Re: Agenda Package NFPA 87 A2017 Second Draft Meeting October

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

The Committee updated the edition dates for the reference sources for extracted text within the standard per the NFPA Manual of Style.

The Committee updated the edition dates for the reference sources for extracted text within the standard per the NFPA Manual of Style. Second Revision No. 51-NFPA 86-2013 [ Section No. 2.4 ] 2.4 References for Extracts in Mandatory Sections. NFPA 54, National Fuel Gas Code, 2009 2015 edition. NFPA 69, Standard on Explosion Prevention

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

4.6 Advanced Propane Appliance Service and Troubleshooting Performance-Based Skills Assessment 2019

4.6 Advanced Propane Appliance Service and Troubleshooting Performance-Based Skills Assessment 2019 4.6 Advanced Propane Appliance Service and Troubleshooting Performance-Based Skills Assessment Section One Section Two Task 3 Task 4 Section Three Task 3 Section Four Section Five Task 3 Task 4 Task 5

More information

AGENDA First Draft Meeting for the 2016 Edition of NFPA 70B March 12-14, 2014 San Antonio, TX

AGENDA First Draft Meeting for the 2016 Edition of NFPA 70B March 12-14, 2014 San Antonio, TX National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org Technical Committee on Electrical Equipment Maintenance (EEM-AAA) AGENDA

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

NFPA s Standards Development Process

NFPA s Standards Development Process NFPA s Standards Development Process Revision Cycle 104 weeks or 141 weeks Guiding Principles Due process Openness Lack of dominance Seek society s balance between: Acceptable risk Commitment of resources

More information

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Mercantile and Business Occupancies. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Mercantile and Business Occupancies

More information

White Paper. Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System

White Paper. Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System White Paper Project: Integrated Safety for a Single BMS Evaluation Based on Siemens Simatic PCS7 System Version 1, Revision 2, August 4, 2016 Jim Jenkins, William Goble The document was prepared using

More information

MODEL HS115-3, HS115-4 & HS115-5 WIRING DIAGRAM ADDENDUM

MODEL HS115-3, HS115-4 & HS115-5 WIRING DIAGRAM ADDENDUM TJERNLUND PRODUCTS, INC. 1601 Ninth Street White Bear Lake, MN 55110-6794 PHONE (800) 255-4208 (651) 426-2993 FAX (651) 426-9547 Visit our web site www.tjernlund.com MODEL HS115-3, HS115-4 & HS115-5 WIRING

More information

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners 1 1. General Installation Information (to be completed by technician) Date installed: Location (city & state): Cleaner s name: National Board number (boiler): Installed by (company): Installed by (technician):

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

TECHNICAL COMMITTEE ON WASTEWATER TREATMENT PLANTS First Draft Meeting Agenda September 10-12, 2013 Hampton Inn, Columbus, Ohio

TECHNICAL COMMITTEE ON WASTEWATER TREATMENT PLANTS First Draft Meeting Agenda September 10-12, 2013 Hampton Inn, Columbus, Ohio TECHNICAL COMMITTEE ON WASTEWATER TREATMENT PLANTS First Draft Meeting Agenda September 10-12, 2013 Hampton Inn, Columbus, Ohio September 10 (12 PM-5 PM) September 11 (8 AM-5 PM) September 12 (8 AM-12

More information

SAFETY CONTROL REQUIREMENTS FOR OVENS AND FURNACES

SAFETY CONTROL REQUIREMENTS FOR OVENS AND FURNACES SAFETY CONTROL REQUIREMENTS FOR OVENS AND FURNACES SAFETY CONTROL REQUIREMENTS The NATIONAL FIRE PROTECTION ASSOCIATION is organized to promote the science and improve the methods of fire protection and

More information

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!! Sample Written Program For Your Company For BOILER SAFETY Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-781-1446 Email: info@se-safety.com Purpose Boiler Safety Program The

More information

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on

Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Report on Comments F2006 Copyright, NFPA NFPA 560 Report of the Committee on Nonvoting Industrial and Medical Gases Michael W. St. Clair, Chair Ostrander, OH [U] Rep. NFPA Industrial Fire Protection Section

More information

SECTION HEATING BOILERS

SECTION HEATING BOILERS SECTION 23 52 00 HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes boilers, controls and boiler trim, steam and condensate connections, hot water connections, fuel burning system and connections,

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: DATE: Technical Committee on Handling and Conveying

More information

Technical Committee on Gas Process Safety

Technical Committee on Gas Process Safety Technical Committee on Gas Process Safety AGENDA Web/Teleconference Dec. 13, 2013 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introductions of Members and Guests 3. Staff

More information

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12. 2/18/2016 National Fire Protection Association Report Committee Input No. 70 NFPA 54 2015 [ Section No. 12.5 ] This was a First Revision that failed ballot. 12.5 Type of Venting System to Be Used. 12.5.1

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART # INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #238-39387-00 THIS INSTRUCTION SUPPLEMENT IS ONLY INTENDED TO GIVE INSTALLATION INSTRUCTIONS AND INFORMATION RELATED TO THE INDUCED

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM of 66 5/18/2015 1:01 PM Second Revision No. 36-NFPA 32-2015 [ Detail ] 6.5 Solvents (See Annex C for additional information on solvents) Submittal Date: Tue Mar 17 17:20:03 EDT 2015 Committee Statement:

More information

Rental Boiler Specifications (Nebraska Boiler)

Rental Boiler Specifications (Nebraska Boiler) Rental Boiler Specifications (Nebraska Boiler) ESI's 72,000 pph trailer-mounted watertube steam boilers are designed and built in accordance with ASME Code. Each boiler is arranged for natural gas or #2

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Pumps Patti

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

Industrial furnaces and associated processing equipment Safety. Part 2: Combustion and fuel handling systems

Industrial furnaces and associated processing equipment Safety. Part 2: Combustion and fuel handling systems Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO 13577-2 First edition 2014-09-15 Industrial furnaces and associated processing equipment Safety Part 2: Combustion and fuel handling systems Fours

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Building Service and

More information

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS

MEMORANDUM. SUBJ: NFPA 72 Proposed TIA No FINAL CC BALLOT RESULTS National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: NFPA Correlating Committee on Signaling Systems for

More information

The element is closed at one end and open at the other, and it s bolted onto the explosion vent opening on the equipment so that its open end overlaps

The element is closed at one end and open at the other, and it s bolted onto the explosion vent opening on the equipment so that its open end overlaps Meeting explosion safety requirements with flameless venting Jef Snoeys Fike Corp. Flameless venting is a recently developed technology for protecting indoor equipment from dust explosions. This technology

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: September 16, 2010 SUBJECT:

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

Document Code: 1 (15) Issuing date: Status:

Document Code: 1 (15) Issuing date: Status: Document Code: 1 (15) Project : MULTI FUEL CFB BOILER SIMULATOR Author: Approved: Language: HSK Document title: SYSTEM DESCRIPTION BOILER WATER SYSTEM Submitted for: Customer reference: Other information:

More information

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Changes to the Florida Building Code, Fuel-Gas This Analysis of Changes for the 5 th Edition (2014) of the Florida Codes is intended

More information

Public Input No. 23-NFPA [ Section No. 1.1 [Excluding any

Public Input No. 23-NFPA [ Section No. 1.1 [Excluding any of 222 1/26/2017 2:37 PM Public Input No. 23-NFPA 86-2016 [ Section No. 1.1 [Excluding any Sub-Sections] ] This standard shall apply to Class A, Class B, Class C, and Class D ovens, dryers, and furnaces;

More information

Second Revision No. 14-NFPA [ Global Comment ] Submitter Information Verification. Committee Statement 8/25/ :39 AM

Second Revision No. 14-NFPA [ Global Comment ] Submitter Information Verification. Committee Statement 8/25/ :39 AM of 36 8/25/2015 10:39 AM Second Revision No. 14-NFPA 664-2015 [ Global Comment ] Add the following statement to the begining of Chapter 10 and Chapter 11 - The provisions of this Chapter shall be applied

More information

TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES

TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES TECHNICAL COMMITTEE ON INTERNAL COMBUSTION ENGINES MEMORANDUM TO: FROM: Technical Committee on Internal Combustion Engines R. P. Benedetti DATE: August 17, 2016 SUBJECT: Agenda for NFPA 37 Second Draft

More information

Compliance Guidance for non-technical managers

Compliance Guidance for non-technical managers 11699 Brookpark Road Cleveland, OH 44130 USA P: 888-826-3473 F: 216-398-8403 www.combustionsafety.com -WHITEPAPER- NFPA 56 (2012 Ed.) Standard for Fire and Explosion Prevention During Cleaning and Purging

More information

REFERENCE SYLLABUS. For FIRED PROCESS HEATER OPERATOR S. CERTIFICATE of COMPETENCY EXAMINATION AB-239. Edition 3, Revision 1, Issued

REFERENCE SYLLABUS. For FIRED PROCESS HEATER OPERATOR S. CERTIFICATE of COMPETENCY EXAMINATION AB-239. Edition 3, Revision 1, Issued For CERTIFICATE of COMPETENCY EXAMINATION AB-239 Edition 3, Revision 1, Issued 2018-07-13 Visit our Website at www.absa.ca GENERAL INMATION Introduction: As provided for under the Power Engineers Regulation,

More information