1 Public Input No. 4-NFPA [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the extent and method of fire protection required for induced-draft and natural-draft watercooling towers: (1) Importance to continuity of operation (2) * Size and construction of tower (3) Type of tower (4) Location of tower (5) Water supply (6) Value of tower (7) Climate (8) * Water delivery time (9) Environment (10) Rooftop towers (11) Limited access (12) Materials of construction (see Section 4.1 ) (1) The language within 4.2* describes methods used to determine the extent and method of fire protection features, therefore should be moved out of Chapter 4 which covers the Location of Water-Cooling towers to Chapter 5, Fire Protection. A PI has been submitted to add to Submittal Date: Thu Sep 26 09:08:17 EDT 2013 Resolution: The committee agrees that this requirement does not belong under the chapter "Location of Water- Cooling Towers". Please see FR-15 changing the title of Chapter 4 to "General Requirements" making the document more consistent with typical NFPA format.

2 Public Input No. 6-NFPA [ Section No. 4.4 ] 4.4 Combustible Surfaces with Fixed Protection. Towers with combustible exterior surfaces that are provided with fixed exposure protection in accordance with shall be permitted to be located closer than 100 ft (30.5 m) from but no closer than 75 ft (22.8 m) from the hazards listed in Section as written does not define a minimum distance. The 75 ft minimum now allows for a defensible space for both buildings as well as an area that could be used for additional exposure protection by firefighters. The type of occupancies defined in section 4.3 (new 4.2) has extreme fire risks and should be respected as such. If located too close, the occupancies as defined in 4.3 (1) may cause accidental activation of the exposure protection system, not to mention that the fixed exposure protection system on a tower located next to an occupancy listed in 4.3 (2) would be useless if that building should go. Submittal Date: Thu Sep 26 09:14:42 EDT 2013 Resolution: The committee finds no technical basis for the 75-foot requirement. The committee also noted that distance is a criteria in the fire risk analysis in Section 4.2.

3 Public Input No. 13-NFPA [ Section No ] * Types of Suppression Systems. If the fire risk analysis results in Section 4.2, or the conditions of Section 4.7 exist, requiring a fire protection system, one of the following general types of systems shall be used: (1) Open-head deluge system (2) Closed-head dry-pipe system (3) Wet-pipe automatic sprinkler system (4) (5) Closed-head preaction system Without open heads, it s not a deluge type system. Without Closed head, it can t be a dry system or a preaction system. Recommendation uses conventional wording. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:46:10 EST 2013 Resolution: FR-2-NFPA Statement: The committee agrees in principle. For simplicity, it is cleaner to reference the requirements contained in Section rather than restating the types of sprinkler systems. The title of the section is also being changed to be consistent with the rest of the document.

4 Public Input No. 14-NFPA [ Section No [Excluding any Sub-Sections] ] A complete plan showing piping arrangement, location of sprinklers, fixed detectors, and operating equipment such as valves and deluge valves, together with hydraulic calculations, water requirements, and water supply information, shall be submitted to approved by the authority having jurisdiction for approval before jurisdiction before installation. Merely submitting plans is not the requirement that needs to be achieved. The goal is to obtain approval of the plans prior to the installation. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:48:10 EST 2013 Resolution: The current wording is consistent with NFPA 13 Section

5 Public Input No. 5-NFPA [ New Section after ] 5.1.3* Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the extent and method of fire protection required for induced-draft and natural-draft water-cooling towers. (1) Importance to continuity of operation (2) *Size, materials and construction of tower (3) Type of tower (4) Location of tower (5) Water Supply (6) Value of tower (7) Climate (8) *Water delivery time (9) Environment (10) Rooftop towers (11) Limited access (12) Materials of construction The language within 4.2* describes methods used to determine the extent and method of fire protection features, therefore should be moved out of Chapter 4 which covers the Location of Water-Cooling towers to Chapter 5, Fire Protection. This text text was moved and modified from 4.2. Related Public Inputs for This Document Related Input Public Input No. 4-NFPA [Section No. 4.2] Relationship Submittal Date: Thu Sep 26 09:10:35 EDT 2013 Resolution: The committee has decided to leave the text in Section 4.2 and change the title of Chapter 4, and believes that changing the text doesn't provide additional clarification of the section.

6 Public Input No. 8-NFPA [ New Section after 5.4 ] Hose house. Where required by the AHJ, a Hose house and standard Hose house equipment in accordance with NFPA 24 shall be provided at each hydrant required by section 5.4. A.5.4 is referenced when seeking clarification on hydrants. It is within A.5.4 that Hose houses are mentioned and has enough specifics that warrants it be addressed separately. Submittal Date: Thu Sep 26 09:20:26 EDT 2013 Resolution: Hose houses are covered in other standards. A.5.4 refers users to NFPA 24 for more information.

7 Public Input No. 7-NFPA [ Section No. 5.4 ] 5.4 * Hydrant Protection. Hydrant protection capable of providing the minimum fire flow as specified in is required. Such Hydrants shall not be located less than 40 ft (12.2 m) from towers towers and not greater than 200 ft (60. 9 m) of all parts of towers having combustible construction. 1) The content of A.5.4 has more than just explanatory material and should be included within the body of the standard. 2) The item of Hose houses has specifics and should have its own section. 3) The current standard states that hydrants shall be no closer than 40 ft (12.2 m) to buildings while the annex allows it to be on top of it. Submittal Date: Thu Sep 26 09:18:29 EDT 2013 Resolution: Hydrant protection is covered in other standards. A.5.4 refers users to NFPA 24 for more information.

8 Public Input No. 9-NFPA [ Section No. 5.5 [Excluding any Sub-Sections] ] Towers with any combustible construction located on a building 50 ft (15.3 m) or more in height shall be provided with Class III standpipe protection with hose connections within 200 within 100 ft(61 m) of 30.5m) of all parts of the tower. 1) NFPA 14, allows for a maximum of 100 ft (30.5 m) of 1-1/2 inch hose for Class III standpipes. 2) If allowed to be kept at 200 ft (60.9 m), firefighters will need to add/ extend hose lines while working on buildings. And if doing so on buildings greater than 50 ft (15.2 m), they would more than likely be working within confined areas such as stairways and catwalks. Submittal Date: Thu Sep 26 09:21:51 EDT 2013 Resolution: This section is not intended to address hose requirements.

9 Public Input No. 10-NFPA [ Section No ] Access to the tops of water-cooling towers for fire fighting and maintenance shall be provided by an approved stairway or ladder. The existing firefighting access language in is not applicable in section 8, Maintenance. Access for firefighting is not a maintenance issue and therefore should stand alone. A new Chapter 9 is being proposed to address that. Submittal Date: Thu Sep 26 09:23:17 EDT 2013 Resolution: The committee resolved this issue by changing the title of Chapter 8 to "Operating Features, Maintenance, and Access" (See FR-16)

10 0 Public Input No. 11-NFPA [ New Section after 8.10 ] Chapter 9 Fire Fighter Access 9.1 Firefighter access to the tops of water-cooling towers shall be provided by an approved stairway or ladder. 9.2 Towers in excess of 120 ft (36.6 m) in any dimension shall be provided with not less than two approved means of firefighter access remote from each other. 9.3 Access can also be used for maintenance purposes. Firefighter access language was not applicable in Section 8, Maintenance. The content was extracted from section and moved out of the maintenance section to here. Also, added the word approved. Related Public Inputs for This Document Related Input Public Input No. 10-NFPA [Section No ] Relationship Submittal Date: Thu Sep 26 09:24:41 EDT 2013 Resolution: The committee resolved this issue by changing the title of Chapter 8 to "Operating Features, Maintenance, and Access".

11 1 Public Input No. 12-NFPA [ Section No. A.5.4 ] A.5.4 Hydrant protection should be provided within 200 ft (61 m) of all parts of towers having combustible construction and located on the ground or on buildings less than 50 ft (15.3 m) in height. A hose house and standard hose house equipment should be provided at each hydrant. (See NFPA 24 for further details.) The content within A.5.4 would now be within the body of the standard. Related Public Inputs for This Document Related Input Public Input No. 6-NFPA [Section No. 4.4] Public Input No. 8-NFPA [New Section after 5.4] Relationship Submittal Date: Thu Sep 26 09:26:40 EDT 2013 Resolution: The committee believes this material should remain in the Annex.

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

Page 1 of 46 Public Input No. 17-NFPA 13E-2013 [ New Section after 3.2.4 ] New 3.2.5 Pressure-Reducing Valve. A valve designed for the purpose of reducing the downstream water pressure under both flowing

More information

Public Input No. 11-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 11-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 159 6/10/2014 8:52 AM Public Input No. 11-NFPA 14-2013 [ Global Input ] Include the provision of new design proposal in the code for Fire water system. Additional Proposed Changes File Name NFPA_Public_Input_Form.pdf

More information

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment of 25 5/14/2015 2:32 PM Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ] A.1.4 A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

Public Comment No. 3-NFPA [ Chapter 7 ]

Public Comment No. 3-NFPA [ Chapter 7 ] Page 1 of 8 Public Comment No. 3-NFPA 405-2013 [ Chapter 7 ] Chapter 7 ARFF Personnel Safety and Safety Management 7.1 Scope. This chapter identifies the knowledge and skills necessary to ensure ARFF personnel

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

Page 1 of 12 Input No. 62-NFPA 409-2013 [ Section No. 3.3.9 ] 3.3.9 Hangar Building Cluster. A group of buildings with more than one area for the storage and servicing of aircraft and all attached or contiguous

More information

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification

Page 1 of 5 1/29/2016 4:08 PM. First Correlating Revision No. 3-NFPA [ Section No ] Submitter Information Verification First Correlating Revision No. 3-NFPA 101-2016 [ Section No. 6.1.8.1.1 ] 6.1.8.1.1* Definition One- and Two-Family Dwelling Unit. A building that contains not more than two dwelling units, with independent

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ]

NFPA 30 FLC-SWC First Revisions Page 1 of 10 11/6/2015 9:21 AM. First Revision No. 208-NFPA [ Section No ] of 46 11/6/2015 9:21 AM First Revision No. 208-NFPA 30-2015 [ Section No. 9.3.3.1 ] 9.3.3.1 Storage of liquids shall not physically obstruct a means of egress. Submittal Date: Wed Sep 09 18:24:20 EDT 2015

More information

Page 1 of 19 Committee Input No. 14-NFPA 33-2013 [ Global Input ] Type your content here... Supplemental Information File Name IndoorDraftforCI.docx Description This committee input would be added to new

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

The distances in shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking garages.

The distances in shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking garages. of 123 6/10/2014 9:07 AM First Revision No. 117-NFPA 14-2014 [ Global Input ] 7.3.2.7.5 The distances in 7.3.2.2 shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour.

4/13/2015. Everything a firefighter wants to tell a design professional or building code official, in one hour. Everything a firefighter wants to tell a design professional or building code official, in one hour. 1 2 3 1 4 The job of the fire department is to put the wet stuff on the red stuff. 5 Job #1. of the

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No. 158-NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 326 11/21/2013 1:03 PM First Revision No. 158-NFPA 72-2013 [ Global Input ] Revise 2.3.1 to update UL 864 to "2003, revised 2012" and upate ANSI/ASME A17 to 2013. Submittal Date: Wed Sep 11 11:08:52

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Public Comment No. 7-NFPA [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 7-NFPA [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification 1 of 6 2/2/2017 1:09 PM Public Comment No. 7-NFPA 1026-2016 [ Section No. 2.3 ] 2.3 Other Publications. Homeland Security Presidential Directive-5 (HSPD-5), National Incident Management System, United

More information

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT LOCAL AMENDMENTS INTERNATIONAL FIRE CODE 2009 December 5, 2012 1 Chapter 1 Administration Chapter 5 Fire Service Features Chapter 9 Fire Protection Systems Chapter

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 221 Revision Cycle: A2014 Meeting Date: 5/20/2013

More information

Center for Life Safety Education

Center for Life Safety Education Center for Life Safety Education Fire Sprinklers 101 Introduction, Building Codes, and Water Supplies Reprinted with permission from NFPA 13, Installation of Sprinkler Systems, Copyright 2007, National

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 3-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 3-NFPA 1408-2013 [ Global Input ] Type your content here... NFPA 1408, Standard for Training Fire Service Personnel in the Operation, Care, Use and Maintenance of Thermal Imagers Revise

More information

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET 1 SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

Western Michigan University Facilities Management Engineering Division

Western Michigan University Facilities Management Engineering Division Western Michigan University Facilities Management Engineering Division Design Guidelines for Facilities Construction: DESIGN GUIDELINE DG21-1 Fire Suppression Systems & Equipment I. GENERAL... 1 A. General

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

Page 1 of 10 Second Revision No. 8-NFPA 600-2014 [ Section No. 3.3.17 ] 3.3.17* Incident Management System (IMS). A system that defines the roles and responsibilities to be assumed by responders and the

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM 2 of 326 11/21/2013 1:03 PM First Revision No. 82-NFPA 72-2013 [ Section No. 2.3.4 ] 2.3.4 ISO Publications. International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56, CH-1211

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Understanding, Applying and Enforcing NFPA 25. James D. Lake NFSA Director of Training

Understanding, Applying and Enforcing NFPA 25. James D. Lake NFSA Director of Training Understanding, Applying and Enforcing NFPA 25 James D. Lake NFSA Director of Training When Sprinklers Are Ineffective Water did not reach fire 8% 7% 7% 5% 44% Not enough water released Damaged Component

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement Second Revision No. 5501-NFPA 5000-2016 [ New Section after 29.2.1.2 ] 29.2.1.3 Bathtubs, bathtub-shower combinations, and nonemergency showers shall be provided with grab bars in accordance with the provisions

More information

"Spray area" is the term that is used throughout the document. This change is for consistency.

Spray area is the term that is used throughout the document. This change is for consistency. of 78 5/30/2014 2:08 PM Public Comment No. 39-NFPA 33-2013 [ Global Input ] For Chapter 18, replace "spray paint area" with "spray area". "Spray area" is the term that is used throughout the document.

More information

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5 UNIT PRICING IS A "NOT TO EXCEED" PRICE EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5 Unit Pricing to perform all required Test

More information

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures Please note this is not an all-inclusive list. The type and complexity of your project

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory 214 Baiozid Bostami Road Nasirabad Industrial Area Chittagong 04 Sep 2016 The Alliance for Bangladesh Worker Safety Page 1/11 Factory 04 Sep 2016 Introduction to

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

Public Input No. 79-NFPA [ Section No. 1.1 ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 79-NFPA [ Section No. 1.1 ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 79-NFPA 409-2013 [ Section No. 1.1 ] 1.1 Scope. 1.1.1 This standard contains the minimum requirements for the proper construction of aircraft hangars and protection of aircraft hangars

More information

Committee Input No. 28-NFPA 13R-2013 [ Global Input ]

Committee Input No. 28-NFPA 13R-2013 [ Global Input ] Page 1 of 6 Committee Input No. 28-NFPA 13R-2013 [ Global Input ] 6.2.2 Outside Dwelling Units. 6.2.2.1 All sprinklers used outside of the dwelling units shall be in accordance with 6.2.2 7.2 and 7.3.

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c Table 1015.1 EXIT ACCESS TRAVEL DISTANCE a WITHOUT SPRINKLER WITH SPRINKLER OCCUPANCY SYSTEM SYSTEM A, E, F-1, I-1, M, 200 250 b,d R, S-1 B 200 300 c F-2, S-2, U 300 400 c No Change to Other Entries in

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

PLAN REVIEW CHECKLIST

PLAN REVIEW CHECKLIST PLAN REVIEW CHECKLIST Date Documents Submitted: Log No.: File No.: Property Information Building Name: Building Address: Owner s Name: Owner s Address: Owner s Phone: Fax: E-mail: System Designer/Contractor

More information

DIVISION 21 FIRE SUPPRESSION

DIVISION 21 FIRE SUPPRESSION Table of Contents 21 00 00 FIRE SUPPRESSION...2 A. REFERENCE ABBREVIATIONS... 2 B. GENERAL... 2 C. DESIGN REQUIREMENTS... 2 D. DOCUMENTATION... 2 21 08 00 FIRE SUPPRESSION COMMISSIONING...2 A. PIPE CLEANING...

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

NFPA 101 SAF-RES PUBLIC COMMENTS

NFPA 101 SAF-RES PUBLIC COMMENTS Page 134 of 195 Public Comment No. 3-NFPA 101-2013 [ Section No. 28.7.6.1 ] 28.7.6.1 New draperies, curtains, and other similar loosely hanging furnishings and decorations shall be flame resistant as demonstrated

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

Changes in NFPA

Changes in NFPA Changes in NFPA 72-2002 2002 Oregon Fire Code Committee November 25, 2003 Michael B. Baker, SET Automatic Fire Alarm Association MikeBaker@afaa.org 2003 Michael B. Baker 1 Table of Contents 1. Administration

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Module 9: Ontario Building Code Fire Fighting Provisions

Module 9: Ontario Building Code Fire Fighting Provisions Ontario Building Code (OBC) 1. Sprinklers 2. Standpipes 3. Fire Alarms 4. Entrances Ontario Building Code (OBC) 1. Sprinklers 2. Standpipes 3. Fire Alarms 4. Entrances 1. Sprinklers i) Sprinkler Systems

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Brighton Area Fire Authority

Brighton Area Fire Authority 615 W. Grand River Ave. Brighton, MI 48116 o: 810-229-6640 f: 810-229-1619 January 14, 2019 Fire Alarm Contractors RE: Fire Alarm Credential & Submittal Requirements To Whom It May Concern: The following

More information

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing

M E M O R A N D U M. NFPA Technical Committee on Wood and Cellulosic Materials Processing National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

Essentials of Fire Fighting, Fourth Edition Transition Guide. Chapter 1: The History of the Fire Service (Essentials, Chapter 1)

Essentials of Fire Fighting, Fourth Edition Transition Guide. Chapter 1: The History of the Fire Service (Essentials, Chapter 1) Essentials of Fire Fighting, Fourth Edition Transition Guide Chapter 1: The History of the Fire Service (Essentials, Chapter 1) This chapter covers the history of the fire service, the organization of

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD STANDPIPE SYSTEMS PURPOSE This standard outlines the general requirements for the installation of standpipe systems. CODE REFERENCES

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

Public Input No. 122-NFPA [ Global Input ]

Public Input No. 122-NFPA [ Global Input ] 1 of 122 4/18/2016 2:12 PM Public Input No. 122-NFPA 1001-2016 [ Global Input ] Submitted as a new section following 5.5.2 X.X.X Smart firefighting JPR for Fire Fighter Identify and describe basic cyber-physical

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

Public Comment No. 16-NFPA 13D-2014 [ Section No ]

Public Comment No. 16-NFPA 13D-2014 [ Section No ] of 52 9/22/2014 9:20 AM Public Comment No. 16-NFPA 13D-2014 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Plot # 33-36 Sector # 07, Chittagong Chittagong Chittagong 08 Jun 2014 The Alliance for Worker Safety Page 1/18 08 Jun 2014 Introduction to the Report

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Our Statement is not a problem - we are encouraging continuation of the standard as it is written without substantive changes.

Our Statement is not a problem - we are encouraging continuation of the standard as it is written without substantive changes. of 69 10/3/2016 2:09 PM Public Input No. 25-NFPA 652-2016 [ Global Input ] This standard was approved on September 7, 2015, less than one year ago. We believe this standard as written generally provides

More information

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids. SECTION 211300 FIRE SUPPRESSION SYSTEMS 1.0 All new and renovated buildings shall be provided with automatic sprinklers throughout and fire standpipe systems. The design and installation of these systems

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19 PART 3 Building and Equipment Design Features Chapters 5 through 19 Chapter 5 Fire Service Features No changes addressed Chapter 6 Building Services and Systems Chapter 7 Fire-Resistance-Rated Construction

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

First Revision No NFPA [ Section No ]

First Revision No NFPA [ Section No ] 1 of 58 10/28/2015 10:15 AM First Revision No. 5015-NFPA 5000-2015 [ Section No. 3.3.628.11 ] 3.3.633.11* Parking Structure. A building, structure, or portion thereof used for the parking, storage, or

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR7040 SAF-MER (36.1.1.4) 36.1.1.4 The provisions of this chapter shall apply to life safety requirements for all new mercantile buildings. Specific requirements shall apply to suboccupancy groups,

More information

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE Developed by the Midwestern Regional Work Group CONTENTS Item 15 Limited area sprinkler systems Item 20 Scope of IFC Ch 7 Item 21 Fire-resistance-rated

More information

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions. 11/16/12 TerraView First Revision No. 15-NFPA 720-2012 [ Global Input ] Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

More information

Florida Building Code 2010

Florida Building Code 2010 Introduction Florida Building Code 2010 Chapter 9 Fire Protection Systems This course will cover specific sections of Chapter 9 that relate to fire alarm systems. While many contractors are familiar with

More information

Requirements for ships carrying hydrogen and compressed natural gas vehicles

Requirements for ships carrying hydrogen and compressed natural gas vehicles Lloyd's Register briefing IMO FP 55 Summary report for clients Overview The 55 th session of the IMO Fire Protection Sub Committee (FP) was held from 25 th to 29 th July 2011, at the IMO headquarters in

More information

INITIAL FIRE SAFETY ASSESSMENT

INITIAL FIRE SAFETY ASSESSMENT INITIAL FIRE SAFETY ASSESSMENT Factory Mouza Chandra, Shafipur, Kaliakoir, Gazipur Gazipur Dhaka 24 Mar 2014 The Alliance for Worker Safety Page 1/12 24 Mar 2014 Introduction to the Report The following

More information

ICC CODE CORNER 2015 International Fire Code

ICC CODE CORNER 2015 International Fire Code SECTION 504 ACCESS TO BUILDING OPENINGS AND ROOFS 504.1 Required access. Exterior doors and openings required by this code or the International Building Code shall be maintained readily accessible for

More information

NFPA 37 Public Comment Responses Page 1 of 32

NFPA 37 Public Comment Responses Page 1 of 32 of 30 11/4/2016 3:05 PM Public Comment No. 6-NFPA 37-2016 [ New Section after 1.6 ] TITLE OF NEW CONTENT Type your content here... 1.7 Pressure Measurement. All pressures expressed in this document are