1 SECTION AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for Installation of Sprinkler Systems in Low-Rise Residential Occupancies 2013) 4. NFPA #13 (Standard for Installation of Sprinkler Systems 2013) 5. NFPA #14 (Standard for Installation of Standpipes & hose Systems 2013) 6. NFPA #24 (Standard for the installation of Private Fire Services Mains & Their Appurtenances 2013) 7. NFPA #25 (Standard for Inspection, Testing, & Maintenance of Water Based Fire Protection Systems 2014) 8. Authority Having Jurisdiction B. Contractor Installation Program: 1.2 SUBMITTALS 1. Provide journeyman sprinkler fitter(s) for installation and supervision. 2. Contractor shall be licensed in the State of Florida for installation of fire protection systems. A. Materials: 1. Pipe, Fittings 2. Valves 3. Tamper Switches 4. Flow Switches 5. Sprinkler Heads 6. Sprinkler Head Cabinet 7. Hanger Assemblies 8. Pressure Gauges 9. Fire Department Connection (FDC) 10. Detector Check Valve 11. Fire Department Valves (FDV) 12. Hydraulic Calculations 13. Drawings B. At completion of acceptance tests: 1. Send copy of Contractor's Material and Test Certificates and fire pump test results to: a) General Contractor b) Authority Having Jurisdiction AUTOMATIC FIRE SPRINKLER SYSTEM

2 PART 2 PRODUCTS 2.1 MATERIALS 2.2 PIPE 2. Provide Owner with following: a) Manufacturer's literature and instructions describing operation and maintenance of equipment and devices installed. b) Fire Protection Sprinkler System Zone Map c) Current copy of NFPA 25, Standard for the Inspection, Testing and Maintenance of Water- Based Fire Protection Systems. A. Materials and Equipment: 1. Materials and equipment in system shall be new and current products of manufacturer regularly engaged in production of such materials and equipment. B. Approval Guides: 1. Unless otherwise shown, products shall be UL Listed in the latest publication of the UL Fire Protection Equipment Directory. A. Above Ground 2.3 VALVES 1. Carbon Steel, 2 and smaller: a. Pipe: Black Carbon steel pipe, Schedule 40, ASTM A795, ASTM A53, or A135 b. Fittings: 1) Malleable iron, threaded, 300 psi CWP pressure rating 2) Cast iron, threaded, 300 psi CWP pressure rating 3) Ductile iron, threaded, 300 psi CWP pressure rating 4) Cast iron, flanged, 300 psi CWP pressure rating 5) Grooved mechanical coupling, 300 psi CWP pressure rating 2. Black Carbon Steel, 2½ and larger: a. Pipe: Black Carbon steel pipe, Schedule 10, ASTM A795, ASTM A53, or A135 b. Fittings: Grooved mechanical coupling, 300 psi CWP pressure rating, flanged 300 psi CWP pressure rating. Victaulic or equal. 3. CVPC (listed for Fire Protection) a. Spears or equal. A. Gate Valve: 1. Acceptable manufacturers: Kennedy or equal 2. Outside screw and yoke (OS&Y), gate valve, bronze body and trim or cast iron body bronze mounted and rated for 300 psi, non-shock cold water working pressure. AUTOMATIC FIRE SPRINKLER SYSTEM

3 3. Provide high pressure valves when pressures exceed 175 psi water working pressure. B. Check Valve: 1. Acceptable manufacturers: Victaulic or equal 2. Iron body, bronze seat, stainless steel clapper with a replaceable rubber seal. 3. Provide high pressure valves and fittings when pressures exceed 175 psi water working pressure. C. Ball Valve: 1. Acceptable manufacturers: Argco, Victaulic, or equal 2. Provide high pressure valves and fittings when pressures exceed 175 psi water working pressure. D. Butterfly Valve: 1. Acceptable manufacturers: Victaulic or equal 2. Provide high pressure valves and fittings when pressures exceed 175 psi water working pressure. E. Detector Check Valve: 1. Acceptable manufacturers: Ames, or equal 2. Provide high pressure detector check and fittings when pressures exceed 175 psi. F. Test and Drain Valves: 1. Acceptable manufacturers: Victaulic, or equal 2. Provide high pressure valves and fittings where pressures exceed 175 psi water working pressure. G. Drain Valves: 1. Acceptable manufacturers: Argco, or equal 2. Globe, angle or ball valve type 3. Provide high pressure valves and fittings when pressures exceed 175 psi cold water working pressure. H. Fire Department Valve (FDV): 1. Acceptable manufacturers: Croker, or equal 2. Fire Department valve shall be 2-1/2 angle valve, able to regulate inlet pressure, cast brass body with brass and stainless steel internal parts, indicating scale, nonrising stem, red hand wheel. Finish shall be rough brass. Valve cap for 2-1/2 valve shall be 2-1/2 cap with chain. Cap and chain shall match finish of valve body. Threads shall match Fire Department Standards. I. Provide identification sign (enamel on metal) for valves per NFPA requirements. AUTOMATIC FIRE SPRINKLER SYSTEM

4 2.4 TAMPER SWITCH A. Acceptable manufacturers: Potter, System Sensor, or equal. B. Outside screw and yoke (OS&Y) supervisory switch, provided with 2 sets of contacts. C. Grooved Victaulic butterfly valve with internal factory installed tamper switch with 2 sets of contacts. D. Unit shall be compatible with Fire Alarm System. 2.5 FLOW SWITCH A. Acceptable manufacturers: Potter, System Sensor, or equal B. Vane type water-flow switch for use in wet sprinkler systems, minimum 300 psi service pressure rating, 10 gpm minimal flow rate to activate alarm, and 2 sets of contacts.. C. Unit shall be compatible with Fire Alarm System. 2.6 SPRINKLER HEAD A. Manufacturers: 1. Shall be manufactured by Reliable, Tyco Fire Products, Viking, or equal. B. Provide the following type of sprinkler head: 1. Unfinished areas such as mechanical spaces: 1. Standard coverage, brass upright or pendent, 300 psi CWP pressure rating 2. In areas with finished or suspended ceilings: 2. Standard coverage, Concealed or Recessed Pendent or Side Wall, 1/2" orifice, 175 or 300 psi CWP pressure rating, with white cover plate. C. Extended coverage sprinkler heads can be used on the project. D. Temperature ratings of sprinkler heads shall vary if installed close to heat sources, under skylights or in special hazard areas. Refer to NFPA 13 for requirements. E. Provide high pressure sprinklers where pressures exceed 175 psi working water pressure. F. Sprinkler Cabinets: 1. Shall be complete with required number of spare sprinkler heads of each type and temperature rating per NFPA Shall be provided with at least one sprinkler wrench for each type of sprinkler installed. 3. Provide multiple cabinets to meet this requirement. 4. Coordinate cabinet locations with Owner's representative. AUTOMATIC FIRE SPRINKLER SYSTEM

5 2.7 FIRE DEPARTMENT CONNECTION (FDC) A. Manufacturers: 1. Acceptable Manufacturers: Badger-Powhatan, Croker Corp., Elkhart Brass, Potter-Roemer, Tyco Fire Products, or equal. B. Fire Department Connection: 2.8 BALL DRIP 1. Provide flush type, cast brass body with drop clappers, faceplate shall be polished chrome finish, with lettering reading AUTOSPKR STANDPIPE. Unit shall include 2-1/2" snoots with rigid end threading to match local fire department standards by pin-lug hose thread swivels, pin- lug plugs and chains. Finish of snoots shall match faceplate finish. A. Acceptable manufacturer: Potter-Roemer, Reliable, Tyco Fire Products, or equal. B. Provide bronze ball drip for fire department connection (FDC) inside of building. 2.9 HANGERS A. Acceptable manufacturers: Caddy, Anvil, B-Line, Tolco, or equal B. Concrete expansion hangers, when provided, are to be Hilti, Phillips, Powers, or equal. C. Hanger rods shall comply with Manufacturer Standardization Society (MSS) standards and manufacturer's published load rating. D. Provide hanger rod, hanger rod attachments, bolts, nuts, studs and washers with electroplated zinc coating. E. Riser clamps shall be electroplated zinc coated, black steel or hot-dipped galvanized finish and shall not protrude more than 2 beyond edge of hole PRESSURE GAUGES A. Acceptable manufacturers: Ashcroft, Argco, Viking, or equal B. Pressure gauges shall be 3-1/2", corrosion resistant moving parts, polycarbonate window, and provided with connection not smaller than 1/4 NPT, 600 psi rating. C. Include bronze 3-way angle valve with provisions for draining on each pressure gauge. PART 3 EXECUTION 3.1 DESIGN CRITERIA A. Flow Test Sprinkler contractor shall obtain an existing flow test from the local utility authority. Flow test shall include: AUTOMATIC FIRE SPRINKLER SYSTEM

6 1. Static Pressure 2. Residual Pressure 3. Test Location 4. Test Date 5. Test conducted by or information supplied by: (provider source) B. The elevation of the gauge hydrant relative to the building floor slab shall be included. C. Send current hydrant flow test data to General Contractor. D. Hydraulically calculated system shall be designed to a minimum of 5 psi below available water flow curve. E. Basis of Design: 1. Wet Sprinkler Systems: Provide a separate wet sprinkler system with supervised shutoff valve, water flow alarm switch, and test and drain provisions for each floor level. Each floor level of the building shall be a separate sprinkler system zone. 2. Office areas and general building spaces shall be hydraulically designed to provide minimum density of.10 gpm per sq ft over hydraulically remote area, per NFPA 13. Maximum spacing shall not exceed 225 sq ft per head. Residential Occupancies shall be designed in Accordance with NFPA 13R (.05 gpm per the most demanding 4 adjacent sprinklers- Minimum Flow & Pressure requirements per manufacturer) & or per NFPA #13 (.10 gpm per the most demanding 4 adjacent sprinklers- Note: Base line flows and pressures must meet or exceed those determined by the manufacturer) 3. Mechanical, electrical, generator room and storage areas shall be hydraulically designed to provide minimum density of.20 gpm per sq ft over hydraulically remote area, per NFPA 13. Maximum spacing shall not exceed 130 sq ft per head. F. Hose Streams: 1. Add 100 gpm hose stream to sprinkler zone hydraulic calculations for light hazard occupancies. 2. Add 250 gpm hose stream to sprinkler zone hydraulic calculations for ordinary hazard occupancies. G. Wet Standpipe: 1. Provide a Class I manual wet (for buildings not classified as High-Rise Building and an automatic wet standpipe system (Classified as a High-Rise Building) in each egress stair. Provide 2½ pressure reducing hose valves at each stairway floor or intermediate landing, and at each horizontal exit. Provide a supervised butterfly valve at the base of each wet standpipe. Wet standpipe system is to be provided in accordance with NFPA Standard Drain Riser: Provide a drain riser in stairwells to allow for testing of water flow alarm and pressure reducing hose valves where PRV s are applicable. H. Fire Protection System Layout and Installation Drawings: AUTOMATIC FIRE SPRINKLER SYSTEM

7 3.2 INSPECTION 1. Contractor shall review Design Drawings and shall provide installation drawings, calculations, and product data sheets. 2. Conceal sprinkler piping above ceilings where possible. 3. Submit shop drawings, calculations and product data sheets for coordination review to: General Contractor, and permitting authority. 4. Contractor shall coordinate routing of piping with other trades. 5. Contractor shall participate in coordination process and shall not install piping prior to coordination with other trades. A. Investigate site conditions; Forward discrepancies to General Contractor before proceeding with construction. 3.3 INSTALLATION A. Install hydraulically designed sprinkler system and associated accessories according to requirements of NFPA 13R & #13 and as shown on drawings. B. Install hydraulically designed standpipe system and associated accessories according to requirements of NFPA 14 and as shown on drawings. C. Install pipe and fittings according to requirements of pipe manufacturer. D. Keep materials within listed temperature range to assure jointing in accordance with manufacturer's requirements. E. Pipe and fittings shall be of corresponding materials when assembled. F. Provide test connection for each flow switch. G. Discharge test connections inside building to receptacles provided as part of plumbing system. H. Drain line detailed adjacent to standpipe/sprinkler risers shall be considered as part of Sprinkler System from combination test/auxiliary drain valve for each zone or sub-zone shown on plans to plumbing receptacle. I. Provide auxiliary drains at low points of systems per requirements of NFPA 13. J. Sprinklers are not required to be installed in the center of ceiling tiles. K. Provide minimum 1 outlets for sprinklers located in shelled spaces. L. Install tamper switch on each shutoff valve. M. Install chain and lock with each shutoff valve to prevent inadvertent closing of valve. N. Install sprinkler heads as recommended by manufacturer. Sprinklers shall be set level and at locations to avoid interference with spray pattern of sprinkler. When ducts and lights are obstructions to sprinkler distribution, provide additional heads beneath obstruction. AUTOMATIC FIRE SPRINKLER SYSTEM

8 O. Make joints of threaded pipe by cutting pipe square and reaming inside. P. Install joints for mechanical coupled pipe according to manufacturer's recommendations. Q. Pipe grooving shall be per coupling manufacturer's instructions. R. Install flexible fitting at building's expansion joints per manufacturer's instructions. S. Install pressure gauges as required in manufacturer's installation instructions and as required per NFPA standards. 3.4 CLEANING A. Ensure underground feed pipe has been flushed by the underground piping installing contractor, to clear out construction debris, prior to connecting aboveground fire protection system to it. Underground feed pipe installing contractor shall provide Test Certificates indicating piping has been flushed and tested in accordance with NFPA TESTING A. Perform all NFPA required acceptance tests. B. Perform all NFPA required acceptance tests. C. Test sprinkler system as entire system or partial system. System shall be hydrostatically tested at not less than 200 psi or 50 psi above static pressure in excess of 150 psi for 2 h. No leakage allowed. D. Hydrostatically test piping between the exterior fire department connection (FDC) and the check valve in the fire department inlet pipe in the same manner as the balance of the system. E. Pipe shall not be concealed until satisfactorily pressure tested. F. Conduct drain test. Record static pressure and residual pressure per NFPA 13. G. Owner's representative or engineer may witness tests. Contractor shall notify General contractor a minimum of 3 days in advance to allow for participation. The Authority Having Jurisdiction shall witness all required testing. Log of tests shall be kept at job site and shall identify: 1. Who performed test 2. Time of test 3. Date of test 4. Section of system tested 5. Results of test 6. Completed Contractor's Material and Test Certification forms from NFPA 13 and NFPA 14 H. Operate flow switches to test that signals are transmitted to Fire Alarm Control Panel. Include test for tamper switches. AUTOMATIC FIRE SPRINKLER SYSTEM

9 END OF SECTION AUTOMATIC FIRE SPRINKLER SYSTEM

Gas Station & C Store SECTION CWM Job No

Gas Station & C Store SECTION CWM Job No SECTION 21 1300 - PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in Contract

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

B. Related Sections: The following Sections contain requirements that relate to this Section.

B. Related Sections: The following Sections contain requirements that relate to this Section. SECTION 211313- FIRE-SUPPRESSION PIPING PART1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide

More information

Environmental Health & Safety

Environmental Health & Safety Environmental Health & Safety Oklahoma State University FIRE SPRINKLER SYSTEM STANDARD Environmental Health and Safety University Health Services Suite 002 Stillwater, OK 74078 (405) 744-7241 www.ehs.okstate.edu

More information

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8 City of Ottawa Project No. CR006230 Page 1 of 8 PART 1 - GENERAL 1.1 Reference Standards.1 Conform to the following:.1 Provincial and municipal building and fire regulations as approved by Provincial Fire

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

WET-PIPE SPRINKLER SYSTEMS

WET-PIPE SPRINKLER SYSTEMS SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

FIRE SUPPRESSION SPRINKLER SYSTEM

FIRE SUPPRESSION SPRINKLER SYSTEM PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the plumbing work specified in this Division. B. The requirements of this

More information

North Hanover Township School District North Hanover Township, New Jersey

North Hanover Township School District North Hanover Township, New Jersey SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPRINKLERS TABLE OF CONTENTS

SPRINKLERS TABLE OF CONTENTS SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 1314D - AUTOMATIC SPRINKLER SYSTEMS (DRY-PIPE) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL SECTION 21 13 16 DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure. SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

ADDENDUM NO. 3 March 19, 2018

ADDENDUM NO. 3 March 19, 2018 ADDENDUM NO. 3 March 19, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be

More information

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED

More information

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM SECTION 213100 WET PIPE FIRE PROTECTION SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The requirements of the General Conditions and Supplementary Conditions apply to all work herein.

More information

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES DIVISION 21 FIRE SUPPRESSION PART 1 GENERAL 1.01 DESCRIPTION A. Provide UL listed, FM approved listed fire protection specialties or accessories as required by either the equipment manufacturer or the

More information

2. Welding Materials and Procedures shall conform to the ASME Code.

2. Welding Materials and Procedures shall conform to the ASME Code. PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 1314W - AUTOMATIC SPRINKLER SYSTEMS (WET PIPE SYSTEMS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5 DOC Cremer Heating and Hot Water Plant Project Number: M 1411-04 TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION 21 30 00- WATER BASED FIRE PROTECTION SYSTEMS... 5 SECTION 22 40 00 -PLUMBING

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION FIRE-SUPPRESSION STANDPIPES

SECTION FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified

More information

A. Section includes wet-pipe sprinkler system, system design, installation, and certification.

A. Section includes wet-pipe sprinkler system, system design, installation, and certification. SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes wet-pipe sprinkler system, system design, installation, and certification. 1.2 REFERENCES A. General: Comply

More information

SECTION FIRE PROTECTION

SECTION FIRE PROTECTION SECTION 15300 - FIRE PROTECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, and Section 15030, ELECTRICAL REQUIREMENTS FOR

More information

SECTION WET FIRE SPRINKLER SYSTEMS

SECTION WET FIRE SPRINKLER SYSTEMS SUNY GENESEO 211310-1 PART 1 - GENERAL 1.1 WORK INCLUDED A. Provide labor, materials, equipment and services to perform operations required for the complete installation and related Work as required in

More information

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES SECTION 15300 FIRE PROTECTION PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. Dartmouth College is currently insured by Factory Mutual. References to the owner s insurance company in this specification

More information

B. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum.

B. Standard-Pressure Standpipe Piping: Fire-suppression standpipe piping designed to operate at working pressure 175 psig (1200 kpa) maximum. Page 211200-1 SECTION 211200 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13.

A. All Fire Suppression System design and installation shall comply with the most current and adopted version of NFPA 13. 21 10 00 PART 1 - GENERAL 1.01 SCOPE A. The following standards and procedures apply to the design and installation of all wet pipe and dry pipe sprinkler systems. The design of fire suppression systems

More information

SECTION SPRINKLER SYSTEMS

SECTION SPRINKLER SYSTEMS SECTION 13900 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following: SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION PART I - GENERAL 1.1 SUMMARY A. Inclusion of sprinkler and standpipe systems shall be as determined by NFPA National Fire Code pamphlet 101 and program statement.

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

CITY OF PASADENA FIRE DEPARTMENT

CITY OF PASADENA FIRE DEPARTMENT Page 1 of 8 CITY OF PASADENA FIRE DEPARTMENT INSTALLATION OF COMMERCIAL SPRINKLERS (Revised 12/10/2014) SCOPE: This standard applies to the design and installation of automatic fire sprinkler systems in

More information

Port of St Helens SIA Aircraft Hanger Scappoose, OR

Port of St Helens SIA Aircraft Hanger Scappoose, OR Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance

More information

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE

More information

SECTION AUTOMATIC SPRINKLER PIPING

SECTION AUTOMATIC SPRINKLER PIPING SECTION 15330 AUTOMATIC SPRINKLER PIPING ****** ***** **** *** ** * ** *** **** ***** ****** NOTE TO SPECIFIER: This section contains several types of automatic sprinkler piping. Some piping is allowed

More information

A. This Section includes the following fire-suppression piping inside the building:

A. This Section includes the following fire-suppression piping inside the building: SECTION 211000 - WATER-BASED FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following fire-suppression piping inside the building: 1. Automatic wet-type, standpipe systems.

More information

DIVISION 21: FIRE SUPPRESSION WATER BASED FIRE SUPRESSION SYSTEMS

DIVISION 21: FIRE SUPPRESSION WATER BASED FIRE SUPRESSION SYSTEMS DIVISION 21: FIRE SUPPRESSION 21 1000 WATER BASED FIRE SUPRESSION SYSTEMS 21 1200 FIRE-SUPPRESSION DRY STANDPIPES 21 1313 WET PIPE SPRINKLER PROTECTION SYSTEM 21 1314 WET-PIPE AUTOMATIC SPRINKLER SYSTEM

More information

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION SECTION 211200 - FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Hose connections. 4. Fire-department connections.

More information

SECTION FIRE-SUPPRESSION PIPING

SECTION FIRE-SUPPRESSION PIPING SECTION 211313 FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department

More information

Addendum No. 2 to the Contract Documents

Addendum No. 2 to the Contract Documents Addendum No. 2 to the Contract Documents Lewis County Jefferson Community College Education Center Project CONTRACT 2A: GENERAL CONSTRUCTION CONTRACT 2B: ELECTRICAL CONSTRUCTION CONTRACT 2C: MECHANICAL

More information

SECTION PREACTION SPRINKLER SYSTEMS

SECTION PREACTION SPRINKLER SYSTEMS PART 1 GENERAL SECTION 211316 - PREACTION SPRINKLER SYSTEMS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION SPRINKLER SYSTEMS

SECTION SPRINKLER SYSTEMS SECTION 15325 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Wet-pipe sprinkler systems. B. Preaction sprinkler systems. C. System design, installation, and certification. D. Fire department

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements. SECTION 21 13 13 FIRE PROTECTION SPRINKLER SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes labor and materials for the installation of a hydraulically calculated automatic, wet-pipe sprinkler

More information

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with

More information

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS SECTION 13930 WET-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete wet-pipe fire sprinkler system in new addition only as specified

More information

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE SECTION 21 1316 DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE PART 1 GENERAL 1.01 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department

More information

A. This section includes design and performance information for fire protection and suppression systems.

A. This section includes design and performance information for fire protection and suppression systems. SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials

More information

DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION

DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION Table of Contents TOC Page 1 DIVISION 21 FIRE PROTECTION ISSUE DATE REVISION 210517 SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING 08/15/18 0 210523 GENERAL-DUTY VALVES FOR FIRE PROTECTION PIPING

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 210523 - GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

B. Section Identification for Fire Suppression Piping and Equipment.

B. Section Identification for Fire Suppression Piping and Equipment. SECTION 211300 - FIRE SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.2 RELATED

More information

SECTION FIRE-SUPPRESSION SYSTEMS

SECTION FIRE-SUPPRESSION SYSTEMS SECTION 13900 FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Automatic wet-type, Class I, fire-suppression standpipes and branches for sprinklers. 2. Wet-pipe, fire-suppression

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

PHYSICAL FACILITIES. 1 General. 2 Related Requirements. 5 Quality Assurance. 3 Wiring. 4 Submittals

PHYSICAL FACILITIES. 1 General. 2 Related Requirements. 5 Quality Assurance. 3 Wiring. 4 Submittals 1 General 1.1 Provide all material, labor, engineering and operations for the installation of complete and operable fire suppression systems as shown in the job scope and as specified herein. 1.2 Provide

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 21 FIRE SUPPRESSION SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

SECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM

SECTION ADDENDUM NO. 1 FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.01 GENERAL DESCRIPTION A. Furnish all materials and labor for the detailed design and installation for new fire sprinkler wet pipe systems for Buildings A through R hereafter referred

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

SECTION FIRE SUPPRESSION SYSTEMS

SECTION FIRE SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS

2016 CDM Smith All Rights Reserved July 2016 SECTION FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 21 13 13 FIRE PROTECTION - SPRINKLER AND STANDPIPE SYSTEMS A. Furnish all labor, materials, equipment services and incidentals required to design and install properly

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 211313 WET-PIPE SPRINKLER SYSTEMS PRT 1 GENERL 1.01 RELTED DOCUMENTS. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015 SECTION 211000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Related Documents: Drawings, Notice to Bidders, General Conditions, Project Coordination, RFP Format, Requested RFP Alternatives, Cutting and

More information

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 - FIRE SUPPRESSION DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,

More information

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 - FIRE SUPPRESSION DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,

More information

SECTION FIRE SUPRESSION

SECTION FIRE SUPRESSION PART 1 GENERAL 1.1 SCOPE SECTION 21 00 00 FIRE SUPRESSION A. The work under this section of the specifications consists of furnishing all materials, equipment, labor, testing, appurtenances, engineering

More information

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 20 00 05 Mechanical - General Requirements.2 Section 22 05 00 Plumbing - General Requirements.3 UBC Standard Fire Hydrant Drawings.4 Section

More information

Facility Fire-Suppression Water-Service Piping

Facility Fire-Suppression Water-Service Piping University of New Hampshire University of New Hampshire Scholars' Repository Division 21 Fire Supression Chapter 5 Technical Construction and Renovation Standards 4-23-2015 211100 - Facility Fire-Suppression

More information

SECTION DRY-PIPE FIRE-SUPPRESSION SPRINKLERS

SECTION DRY-PIPE FIRE-SUPPRESSION SPRINKLERS SECTION 13935 DRY-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete fire sprinkler system as specified in Contract Documents. B.

More information

WET AUTOMATIC FIRE SPRINKLER SYSTEMS

WET AUTOMATIC FIRE SPRINKLER SYSTEMS SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,

More information

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805) Oxnard Fire Department 360 W. Second Street Oxnard, CA 93030 (805) 385-7722 Fax (805) 385-8009 FIVE YEAR CERTIFICATION REPORT Service and maintenance report for automatic fire extinguishing systems, including

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for the design and construction of standpipe systems to include combination standpipe

More information

SECTION SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING

SECTION SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING SECTION 210517- SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION

Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION Bluffs Tower Apartments Section TOC Council Bluffs, Iowa Division TOC 1 TABLE OF CONTENTS DIVISION 21 FIRE SUPPRESSION 211000 WATER-BASED FIRE-SUPPRESSION SYSTEMS 213113 ELECTRIC-DRIVE, CENTRIFUGAL FIRE

More information

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University-San Marcos for automatic fire sprinkler and standpipe systems.

More information

New Construction Fire Inspection Process

New Construction Fire Inspection Process New Construction Fire Inspection Process This document is intended to provide the Owner, Designer, and/or Contractor of new construction with an outline of required fire inspections and with the specific

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

TECHNICAL SPECIFICATIONS SECTION DRY PIPE SPRINKLER SYSTEM PLAISTOW PUBLIC LIBRARY 85 MAIN STREET PLAISTOW, NEW HAMPSHIRE 100%CD.

TECHNICAL SPECIFICATIONS SECTION DRY PIPE SPRINKLER SYSTEM PLAISTOW PUBLIC LIBRARY 85 MAIN STREET PLAISTOW, NEW HAMPSHIRE 100%CD. TECHNICAL SPECIFICATIONS SECTION 211316 DRY PIPE SPRINKLER SYSTEM PLAISTOW PUBLIC LIBRARY 85 MAIN STREET PLAISTOW, NEW HAMPSHIRE 100%CD Prepared for: Mr. Cab Vinton Director Plaistow Public Library 85

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following: PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of Sam Houston State University for the design and construction of standpipe systems to include combination standpipe

More information

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS DIVISION 21 - FIRE SUPPRESSION Includes the following sections: None DESIGN REQUIREMENTS It is the policy of City of Santa Cruz to install fire sprinkler systems in all new construction/facilities. If

More information

Design and Construction Standards SECTION FIRE SUPPRESSION

Design and Construction Standards SECTION FIRE SUPPRESSION SECTION 13900 FIRE SUPPRESSION PART 1 GENERAL 1.1 SCOPE A. The work under this section of the specifications consists of furnishing all materials, equipment, labor, testing, appurtenances, engineering

More information

SECTION WET-PIPE FIRE SUPPRESSION SPRINKLERS

SECTION WET-PIPE FIRE SUPPRESSION SPRINKLERS SECTION 15932 WET-PIPE FIRE SUPPRESSION SPRINKLERS PART 1 - GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred

More information

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12 12 24 SOUTH TEJON ST., SUITE 00 COLORADO SPRINGS, CO. 00 TELE.: FAX: WALL ESCUTCHEON PACK ANNULAR SPACE WITH MINERAL WOOL GENERAL NOTES. THIS PROJECT INCLUDES THE DESIGN AND PROVISION OF A NEW WET SPRINKLER

More information

University of Missouri St. Louis September 9, 2013 Recreation and Wellness Center #S

University of Missouri St. Louis September 9, 2013 Recreation and Wellness Center #S SECTION 210548 - VIBRATION AND SEISMIC CONTROLS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Isolation pads. 2. Isolation mounts. 3.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-21 13 17.00 10 (May 2009) Change 1-02/13 ------------------------------ Preparing Activity: USACE Superseding UFGS-21 13 17.00 10 (November 2008) UNIFIED FACILITIES GUIDE

More information

PART 1 - GENERAL SECTION FIRE PROTECTION BASIC MATERIALS AND METHODS

PART 1 - GENERAL SECTION FIRE PROTECTION BASIC MATERIALS AND METHODS FIRE PROTECTION BA SECTION 13910 - FIRE PROTECTION BASIC MATERIALS AND METHODS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe, fittings, valves, and connections for sprinkler, standpipe and fire hose,

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The design and installation of a hydraulically

More information

FIRE SPRINKLER SYSTEMS POLICY

FIRE SPRINKLER SYSTEMS POLICY FIRE SPRINKLER SYSTEMS POLICY Revised 1/1/17 DESIGN AND SUBMITTAL REQUIREMENTS All new and existing fire sprinkler systems within the jurisdiction of the City Fire Department shall meet all of the applicable

More information

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION (13900) - FIRE SUPPRESSION SYSTEMS PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety