2 Case Study 1 Underground Car Park Dorota Brzezińska 1, Janusz Paliszek 2, Piotr Smardz 2, Renata Ollesz 1, Karol Kaczor 2 1 Lodz University of Technology, GRID - Lodz, 2 INBEPO Wroclaw, Poland

3 Building Description A two storey enclosed underground car park sqm of net area Height 2.9 m from the floor to the ceiling The ceiling structure is of a flat smooth surface Car stackers only at level -2 (magenta hatch)

4 Polish Requirements for Enclosed CP Maximum travel distance up to 40 m (regardless if single or alternative), extended to 60 and/or 80 m if smoke control / sprinkler protection provided and counted for MoE At least two exits required if car park area exceeds sqm No special requirements for MoE for disabled occupants Maximum allowed compartment size up to sqm (doubled if fire suppression provided) Fire resistance of structural elements typically R 120, REI 120 floors, compartment walls REI 120 (EI 60 doors) The minimum clear height to the underside of structural elements 2.2 m Smoke control system required if car park area exceeds sqm Large car parks also require automatic FDAS, fire hose reels and emergency escape lighting Any deviations from the National Regulations require special exemption approval by the Ministry of Infrastructure

5 Requirements for Smoke Ventilation in Car Parks Maintain tenable conditions for occupants for required safety escape time (i.e. REST) Acceptance criteria (adopted typical values - not directly indicated in the regulations): temperature not exceeding 60 o C, minimum visibility of light-reflecting signs not less than 10 m (both measured at 1.8 m above FFL) Should have a reliable inlet of fresh replacement air The main smoke extract fans should be temperature class F if the predicted smoke temperature is less than 400 o C, otherwise F Lower temperature ratings allowed if safe conditions for fire brigade operations can be demonstrated however, these are not defined in the Polish regulations Both traditional (ducted) and jet-fan systems allowed, with the later currently more often used

6 Examples of Designs Complying with Polish National Requirements Unsprinklered car park Maximum travel distance up to 40 m or 60 m if the smoke control system allows for extended TD by 50% Sprinkler protected car park Maximum travel distance up to 40 m or 80 m if the smoke control system and use of the fire suppression system allow for extended TD by sum of two 50% allowances Maximum fire compartment size up to sqm (approximately four fire compartments at each level) Higher main extract fans capacities and temperature rating predicted Maximum fire compartment size up to sqm (approximately two fire compartments at each level) Lower main extract fans capacities and temperature rating predicted

7 Main Design Assumptions for Analysis Designs not fully complying with National Requirements (i.e. fire compartmentetion) Both levels considered as separate fire compartments Unsprinklered and sprinklered design solutions considered, two different proposals are provided for each Similar solutions and FS measures provided for both scenarios Design study based on level -2 as more demanding (stackers) A ductless jet fan ventilation system is proposed Simple solutions prefered rather than more complex More flexible approach for sprinkler protected cases

8 Optional Solutions Considered in the Case Study Four different solutions were considered for the case study purpose: CASE 1A. Unsprinklered. Each storey not divided into fire zones. CASE 2A. Unsprinklered. Each storey additionally divided into fire zones. CASE 1B. CASE 2B. Sprinklered. Each storey not divided into fire zones. Sprinklered. Each storey additionally divided into smoke compartments.

9 Fire Safety Measures and Design Approach Fire safety measures and systems Unsprinklered car park Sprinklered car park Sprinkler system No Fast response system to meet life safety requirements RTI < 80 T= 68 o C OH2 design group (minimum) Passive fire protection measures (i.e. fire/smoke compartmentation subdivision) No (1A) / Yes (2A) No (1B) / Yes (2B) Passive or active smoke barriers smoke curtains, walls separating car park stacker platforms are provided (every three spaces) Provided (no compartmentation subdivision) - walls separating car park stacker platforms are provided (every three spaces) Voice alarm system Yes Yes (option) Two stage automatic fire and smoke detection Yes Yes system Way finding and active evacuation signage (for subdivision) Yes Yes (option) Smoke control system for evacuation purpose (for Yes Yes subdivision) Fire management level of a higher standard of a higher standard Fire compartmentation between floor levels between floor levels Fire brigade access point at the ground floor entrance hall at the ground floor entrance hall

10 Detailed Design Analysis Short Summary Means of Escape Location Basement Car park Area (m 2 ) Usage Storage Occupant Load Factor (m 2 /Person) 30 Estimated Peak Occupant Level (Persons) 440 Number of final storey exits in accordance to case study project 6 Calculated minimum single exit width (m) 0.73 Proposed minimum single exit size (m) 0.9 Type Recommended Limits (m) Maximum Proposed (m) Dead End Alternative Dead End Alternative Basic Extended (vent. + sprinkl.) (up to 80)

11 Detailed Design Assumptions Schematic layout of the subdivision into fire/smoke ctrl. zones Typical subdivision for all options considered in this case study for comparison purpose Three fire or smoke compartmens Seven smoke control zones (2+3+2)

12 Detailed Design Analysis Design Fire Sizes and Fire Curves a) Sprinklered fire of one burning car 4MW (case 1B/2B) b) Sprinklered fire of two car stacker platform 6MW (case 1B/2B) c) Unsprinklered fire of two burning cars 8MW (case 1A/2A) d) Unsprinklered fire of three/four burning cars in stacker platform 12/15MW (case 1A/2A)

13 Detailed Design Analysis - Assumptions Clear height of the both car park storeys (from FFL to the ceiling) is 2.9 m; The smoke curtains with the bottom edge at height 2.2 m are placed below the ceiling slab; Smoke extraction is provided through mechanical ventilation inlet and exhaust points NW ( NW1, NW2, NW3, NW4, NW5, NW6, NW7 ) Air supply is provided through mechanical ventilation inlet and exhaust points NW ( NW1, NW2, NW3, NW4, NW5, NW6, NW7 ) and four natural air inlets points N of the effective area (net area) 5 m 2 each, located at the floor level of the car park on each storey; Maximum air flow rate through the ventilation points (net cross-section) was assumed at: 10 m/s for exhaust points, not more than 5 m/s for mechanical inlet points and 2.5 m/s for natural air inlet points;

14 Detailed Design Analysis - Assumptions The extract points activated immediately after the fire is detected (by two smoke detectors - two stage alarm system) in the same smoke detection zone or one smoke detector and brake glass unit; Full operation capacity achieved within not more than 140 seconds from the start of the fire (i.e. after about 60 seconds from the detection of the fire); The analyzed jet fans are: unidirectional fans with capacity at low speed 0.91 m 3 /s and full speed 1.79 m 3 /s and reversible jet fans with capacity at low speed 0.82 m 3 /s and full speed 1.6 m 3 /s Temperature rating C/2h for unsprinklered, lower for sprinklered (i.e C); in case of a jet fan located directly above the fire, it was assumed as non-operating since it may be damaged by the fire at the early stage; Height of the bottom of the jet fans from the floor is no less than 2.1 m; During operation of the system in the smoke ventilation mode the fans operate on at full speed. It was assumed that the jet fans shall be activated after 300 seconds from the start of the fire (i.e. after about 220 seconds from the detection of the fire);

15 Detailed Design Analysis CFD Software Used The simulations were performed by means of Fire Dynamics Simulator (FDS), software developed by the National Institute of Standards and Technology U.S. Department of Commerce. Three versions of the software have been used for the purpose of this analysis, including ver ; and of FDS, which required high computer power to be involved. The older versions were used mostly for preliminary design studies. For later stage of the works two versions (ver. 553 and 632) for sprinklered scenarios were used simultaneously and their results were directly compared. FDS 632 results are provided. Sprinkler heads based on the proposed sprinkler system parameters are physically modelled in both FDS 553 and 632 versions input files.

16 Detailed Design Analysis CFD Simulation Main Parameters Extract points Ambient (initial) temperature 20 o C Soot yield was / 0.1, Heat of combustion = kj/kg. The computational domain was represented by the multiple meshes build up of rectilinear cells Mesh resolution 0.30 m in all x, y, z directions. The model size was 1.9 mln cells The minimum run time is 900 s 50% car spaces filled with cars Inlet points

17 Detailed Design Analysis CFD Simulation Main Parameters Two-stage FDAS assumed as activated even before 80 s form the start of the fire (for the given fire type and object height 60 s would be resonable) 20 m Expansion range of smoke after 80 seconds from the start of the fire according to CFD detailed analysis. Smoke control system activated after 90 s from the start of fire

18 Aim of the study: Detailed Design Analysis Analysed Simulation Parameters Determine the tenability conditions during fire within the time required for safe evacuation for the proposed smoke control system. According to the literature data the threshold values of each analysed parameter are as follows: life hazard temperature 60 o C, however the boundary temperature on the evacuation routes obtained from the simulation is assumed at lower level of 52 o C), visibility range 10 m for structural elements, which is equal to 30 m visibility of illuminated signs Simplyfied check for fire-fighters access conditions (after 15 min) o C at 1,5 m above FFL within 10 m Limit the smoke spread within the car park to the smoke zone where fire occured - ideally

19 CASE 1A. Unsprinklered, without Compartmentation Each level is divided into seven smoke detection zones SZ: SZ1 SZ7 No fire compartmentation within each level Smoke barriers along the smoke control boundaries (not full height)

20 CASE 1A. Unsprinklered, without Compartmentation

21 CASE 2A. Unsprinklered, with Compartmentation Each level is divided into seven smoke detection zones SZ: SZ1 SZ7 Fire compartmentation at each level 3 fire compartments/zones Full smoke and fire separation provided between fire zones/compartments

22 CASE 2A. Unsprinklered, with compartmentation

23 CASE 1B. Sprinklered, without Compartmentation Each level is divided into seven smoke detection zones SZ: SZ1 SZ7 No fire compartmentation within each level Smoke curtains/barriers provided along smoke control zones (full height) and 2,2 m above drive ways

24 CASE 1B. Sprinklered, without Compartmentation

25 CASE 2B. Sprinklered, with Fire/Smoke Compartmentation Each level is divided into seven smoke detection zones SZ: SZ1 SZ7 Fire or smoke compartmentation at each level 3 fire/smoke compartments Active or passive smoke curtains/barriers to be used (more flexible approach)

26 CASE 2B. Sprinklered, with Compartmentation

27 Simulations Results HRR Plots Unsprinklered HRR curve Sprinklered HRR curve Example of fires (sprinklered) 4 MW Case 1A. Fire growth rate for two burning cars total HRR of 8 MW. Case 1B. Fire curve for one burning car with sprinkler protection total HRR of 4 MW. 6 MW (stacker) Case 2A. Fire growth rate for four burning cars total HRR of 12 MW. Case 2B. Fire curve for two car stacker with sprinklers protection total HRR of 6 MW.

28 Results of the Simulation A2 Fire in Smoke Detection Zone SZ2 A2

29 Results of the Simulation A2 Fire in Smoke Detection Zone SZ2 A2

30 Results of the Simulation A2 Unsprinklered - SZ2 A2

31 Results of the Simulation A2 Unsprinklered - SZ2 A2

32 Results of the Simulation A3 Fire in Smoke Detection Zone SZ3 A3

33 Results of the Simulation A3 Fire in Smoke Detection Zone SZ3 A3

34 Results of the Simulation A5 Fire in Smoke Detection Zone SZ5 A5

35 Results of the Simulation A5 Fire in Smoke Detection Zone SZ5 A5

36 Results of the Simulation-Case 1B (Sprinklered)

37 Results of the Simulation-Case 1B (Sprinklered)

38 Results of the Simulation-Case 2B (Sprinklered)

39 Results of the Simulation-Case 2B (Sprinklered)

40 Results of the Simulation-Case 2B (Sprinklered)

41 Results of the Simulation-Case 2B (Sprinklered)

42 Summarised Comparison of Considered Cases Case Sprinklers Fire / smoke compartmentation Volume flow of smoke exhaust system [m 3 /h] 1A No No B Yes No * 2A No Yes (fire) B Yes Yes (smoke) * for 1B (smoke zone SZ6) it would be advisable to increase the extract volume capacity by 15-20% to 210/ m 3 /h

43 Sprinklers in the CFD Model Sprinklers heads were modelled (1B and 2B cases). In the course of the simulations it was noted that 24 sprinklers heads were activated for stacker fire scenario (less for others). It suggests that OH2 could not be sufficient for car park fire scenarios. 18 heads active 24 heads active Both, ceiling jet and ventilation influence were observed as the majnor contributors for the sprinklers activation. No jet fans influence in large extence was observed in terms of sprinklers activation.

44 FDS Results Comparison Extract Rates Different extract volumes were checked for all smoke zones m 3 /h m 3 /h m 3 /h m 3 /h Direct comparison of m 3 /h vs m 3 /h (FDS 6).

45 FDS Comparison - Results Different versions of the software were used. Sprinklered scenario 1B, m 3 /h 810s (time) Identical input parameters Direct comparison of FDS and versions.

46 Conclusion and Summary 1 The analysis of the temperature and visibility distribution at the height of 1.8 m above FFL shown that in the analyzed fire scenarios the threshold values of temperature 60 o C (50 o C from simulation) and visibility below 10 m on evacuation routes and near the evacuation exits are not exceeded within the required time for evacuation (RSET= 300s) in large extent. For fully developed design fire in cases without sprinklers and compartmentation the smoke propagation exceeded the smoke control zone where fire occurs, so for the unsprinklered scenarios, it is advised that the car park area should be fire compartmented (internally subdivided). Conditions for fire-fighters intervention in case of temperature range below threshold of 100 o C measured at 1.5 m at 900 s simulation time in all shown sprinklered cases and the unsprinklered cases with compartmentation allow for access within 10 m to the bed of fire It is noted that the longest dead end travel distance is at the very low bottom right corner (60 m). Although it complies with the national fire requirements and regulations, it would be advised to reduce the travel distance by moving the staircase to the far end (cul de sac) or to reverse the staircase so that the travel distance is shortened or no dead end is present.

47 Conclusion and Summary 2 For sprinklered scenarios much lower smoke extract capacities are required. Also lower temperature rating for exhaust fans is possible. For the unsprinklered scenario, provision of the walls separating the stacker platforms provided good result in terms of protection against uncontrolled fire growth and high temperature range at fully developed fire. In both cases (2A unsprinklered and 2B sprinklered) best results were achieved for rather high degree of separation dividing the car park into separated zones/compartments. Also much lower extraction volumes were sufficient in those cases. However it is noted that in this case a direct visual contact of the occupants present at the car park with the fire or exits will be limited. This can result with necessity of use an active evacuation signage system so that no occupants would evacuate through the smoke/fire zone where fire occurred. Nevertheless it brings a higher degree of safety, as in both cases, smoke propagation is limited mostly to the smoke control zone where the fire occurred.

Case Study 1 Underground car park

Case Study 1 Underground car park Case Study 1 Underground car park Dorota Brzezińska 1, Janusz Paliszek 2, Piotr Smardz 2, Renata Ollesz 1, Karol Kaczor 2 1 Lodz University of Technology, GRID - Lodz, INBEPO Wroclaw, Poland 1. Introduction

More information

CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION

CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION - 165 - CHOOSING A FIRE VENTILATION STRATEGY FOR AN UNDERGROUND METRO STATION Wojciech Węgrzyński, Grzegorz Krajewski, Paweł Sulik Fire Research Department, Building Research Institute (ITB), Poland ABSTRACT

More information

Third Runway Project APM Depot Fire Engineering Design. Presented by Ir Wilson Sau-kit TSANG

Third Runway Project APM Depot Fire Engineering Design. Presented by Ir Wilson Sau-kit TSANG 1 Third Runway Project APM Depot Fire Engineering Design Presented by Ir Wilson Sau-kit TSANG 1 2 Presentation Overview 1. Project Background and Depot Overview 2. Building Information and Challenge for

More information

Case Study of Underground Car Park. Team Japan

Case Study of Underground Car Park. Team Japan 11th Conference on Performance Based Codes and Fire Safety Design Methods Case Study of Underground Car Park Team Japan We focused on the characteristics of the fire behavior of car fire. Car fire is not

More information

Case Study 2 (Production and Storage Buildings) - Spain

Case Study 2 (Production and Storage Buildings) - Spain Case Study 2 (Production and Storage Buildings) - Spain OBJECTIVE Developed by the SFPE Spanish Chapter Editor: Jimmy Jönsson, JVVA Fire & Risk The objective of this case study is to show how a project

More information

How to Use Fire Risk Assessment Tools to Evaluate Performance Based Designs

How to Use Fire Risk Assessment Tools to Evaluate Performance Based Designs How to Use Fire Risk Assessment Tools to Evaluate Performance Based Designs 1 ABSTRACT Noureddine Benichou and Ahmed H. Kashef * Institute for Research in Construction National Research Council of Canada

More information

Tunnel Fire Dynamics and Evacuation Simulations

Tunnel Fire Dynamics and Evacuation Simulations Tunnel Fire Dynamics and Evacuation Simulations James Priest, PhD & James Niehoff DGS-SEE Seminar on Fire Protection for Physics Research Facilities 7 & 8 October 2015 Introduction (Background) Presentation

More information

COSTCO, SAN FRANCISCO A PRESCRIPTIVE AND PERFORMANCE BASED ANALYSIS OF FIRE PROTECTION SYSTEMS AND DESIGN

COSTCO, SAN FRANCISCO A PRESCRIPTIVE AND PERFORMANCE BASED ANALYSIS OF FIRE PROTECTION SYSTEMS AND DESIGN COSTCO, SAN FRANCISCO A PRESCRIPTIVE AND PERFORMANCE BASED ANALYSIS OF FIRE PROTECTION SYSTEMS AND DESIGN Presented by Ian Levine June, 2016 Photo courtesy of Google Maps PRESENTATION OVERVIEW BUILDING

More information

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Mandatory Fire Safety Instruction NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Reference A: Reference B: Approved Document B

More information

Fire and smoke management in a uni-directional road tunnel for a congested traffic condition

Fire and smoke management in a uni-directional road tunnel for a congested traffic condition Fire and smoke management in a uni-directional road tunnel for a congested traffic condition Y Liu, J Munro Parsons Brinckerhoff Australia B Dandie Thiess Pty Ltd., Australia ABSTRACT Emergency smoke ventilation

More information

and Sprinkler System in Resalat Tunnel of Tehran

and Sprinkler System in Resalat Tunnel of Tehran CFD Simulation of Water Mist and Sprinkler System in Resalat Tunnel of Tehran Motivation Resalat tunnel is the first road tunnel in Tehran one of most crowded tunnels of Tehran my every day route, home

More information

incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks

incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks incorporating Contractors guide to car park ventilation A no-nonsense guide to the safe ventilation of underground and covered car parks Car park ventilation What are the regulations? Ventilation of car

More information

Case Study 2 Production and Storage. SFPE Polish Chapter Wojciech Węgrzyński, Grzegorz Krajewski Building Research Institute (ITB)

Case Study 2 Production and Storage. SFPE Polish Chapter Wojciech Węgrzyński, Grzegorz Krajewski Building Research Institute (ITB) Case Study 2 Production and Storage SFPE Polish Chapter Wojciech Węgrzyński, Grzegorz Krajewski Building Research Institute (ITB) So What Are You We Going to Show You? A lot of tables, simplified methods

More information

SMOKE MANAGEMENT AND EGRESS ANALYSIS OF A SPORTS ARENA USING THE PERFORMANCE-BASED DESIGN

SMOKE MANAGEMENT AND EGRESS ANALYSIS OF A SPORTS ARENA USING THE PERFORMANCE-BASED DESIGN , Volume 4, Number 2, p.73-83, 2003 SMOKE MANAGEMENT AND EGRESS ANALYSIS OF A SPORTS ARENA USING THE PERFORMANCE-BASED DESIGN K.H. Yang and C.S. Yang Mechanical Engineering Department, National Sun Yat-Sen

More information

Statue of Liberty: A Risk Analysis

Statue of Liberty: A Risk Analysis Statue of Liberty: A Risk Analysis Bruce Campbell, FSFPE VP DOE Services National Park Service Agenda Overview of Project Scope Evaluation Steps Task 1 Code Analysis Task 2 Fire Modeling Task 3 Egress

More information

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES 1 WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES TABLE 2.1 CONSTRUCTION OF STRUCTURAL MEMBERS AND FLOOR AND ROOF (1) ASSEMBLIES (Applies to each fire zone)

More information

Smoke Layer Height and Heat Flow through a Door

Smoke Layer Height and Heat Flow through a Door Smoke Layer Height and Heat Flow through a Door 2018 Smoke Layer Height and Heat Flow through a Door In this tutorial you will simulate a growing fire in the corner of a 5m x 5m room. The room has a 1m

More information

Experimental Study to Evaluate Smoke Stratification and Layer Height in Highly Ventilated Compartments

Experimental Study to Evaluate Smoke Stratification and Layer Height in Highly Ventilated Compartments Experimental Study to Evaluate Smoke Stratification and Layer Height in Highly Ventilated Compartments Jason Huczek a, Marc Janssens a, Kentaro Onaka b, Stephen Turner c a SwRI, 6220 Culebra Road, San

More information

Virtual Compartment: An Alternative Approach to Means of Egress Design in Airport Pedestrian Tunnel

Virtual Compartment: An Alternative Approach to Means of Egress Design in Airport Pedestrian Tunnel Virtual : An Alternative Approach to Means of Egress Design in Airport Pedestrian Tunnel Xiaolei Chen, PhD California State University, Los Angeles, United States Ning (Frank) Wang, P.E. Jensen Hughes,

More information

Design Guidelines Fire Safety in New and Refurbished Buildings

Design Guidelines Fire Safety in New and Refurbished Buildings Design Guidelines Fire Safety in New and Refurbished Buildings Introduction All major new or refurbishment projects must comply with the Technical Standards (Scotland) Regulations as a matter of course.

More information

COST-EFFECTIVE FIRE-SAFETY RETROFITS FOR CANADIAN GOVERNMENT OFFICE BUILDINGS

COST-EFFECTIVE FIRE-SAFETY RETROFITS FOR CANADIAN GOVERNMENT OFFICE BUILDINGS , Volume 1, Number 3, p.123-128, 1999 COST-EFFECTIVE FIRE-SAFETY RETROFITS FOR CANADIAN GOVERNMENT OFFICE BUILDINGS D. Yung and G.V. Hadjisophocleous Fire Risk Management Program, Institute for Research

More information

Enclosure 4- RISK ASSESSMENT

Enclosure 4- RISK ASSESSMENT Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment

More information

technical specification smoke venting systems

technical specification smoke venting systems technical specification smoke venting systems An Introduction to FDS FDS sets the standards the rest of the industry follows Providing a complete service for all of your smoke ventilation system needs.

More information

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS

NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS Mandatory Fire Safety Instruction Reference A: Reference B: NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION REQUIREMENTS Approved Document B Fire Safety

More information

CFD ASSESSMENT OF RAILWAY TUNNEL TRAIN FIRE SCENARIOS

CFD ASSESSMENT OF RAILWAY TUNNEL TRAIN FIRE SCENARIOS CFD ASSESSMENT OF RAILWAY TUNNEL TRAIN FIRE SCENARIOS Yunlong Liu*, Xijuan Liu and Bradley Paroz Fire Science and Technology Laboratory CSIRO Manufacturing and Infrastructure Technology PO Box 310 North

More information

Sprinklers Modeling for Tunnel Road Fire Fighting

Sprinklers Modeling for Tunnel Road Fire Fighting Sprinklers Modeling for Tunnel Road Fire Fighting P. Ciambelli, M.G. Meo, P. Russo, S. Vaccaro Department of Chemical and Food Engineering, University of Salerno - ITALY 1. INTRODUCTION Loss of lives and

More information

Impact of quick incident detection on safety in terms of ventilation response

Impact of quick incident detection on safety in terms of ventilation response Impact of quick incident detection on safety in terms of ventilation response P. J. Sturm 1) ; C. Forster 2) ; B. Kohl 2) ; M. Bacher 1) 1) Institute for Internal Combustion Engines and Thermodynamics

More information

ctbuh.org/papers Fire Engineering the Tallest Building in the Historic City of Manchester, UK Title:

ctbuh.org/papers Fire Engineering the Tallest Building in the Historic City of Manchester, UK Title: ctbuh.org/papers Title: Authors: Subjects: Keywords: Fire Engineering the Tallest Building in the Historic City of Manchester, UK Dean McGrail, Associate Director, WSP Group Simon Lay, Technical Director,

More information

Emergency Ventilation System Design - Preliminary Report Shishir Gupta

Emergency Ventilation System Design - Preliminary Report Shishir Gupta Emergency Ventilation System Design - Preliminary Report Shishir Gupta (shishir@mechartes.com), Abstract The existing stations and tunnels of Metro Railway, Kolkata are not equipped with effective emergency

More information

COMPARISON OF CFD MODELLING WITH FIRE TESTS Comparison of CFD Modelling with Results of Full Scale Compartment Fire Tests in a Residential Unit

COMPARISON OF CFD MODELLING WITH FIRE TESTS Comparison of CFD Modelling with Results of Full Scale Compartment Fire Tests in a Residential Unit Application of Structural Fire Engineering, 19-20 April 2013, Prague, Czech Republic COMPARISON OF CFD MODELLING WITH FIRE TESTS Comparison of CFD Modelling with Results of Full Scale Compartment Fire

More information

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)

Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS) Fire Protection Leaflet Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS) 0 General Regulations and recommendations missing from this leaflet do not entitle

More information

Applying the New Zealand Performance Based Design Fire Framework to Buildings Designed in Accordance with NFPA5000

Applying the New Zealand Performance Based Design Fire Framework to Buildings Designed in Accordance with NFPA5000 Applying the New Zealand Performance Based Design Fire Framework to Buildings Designed in Accordance with NFPA5000 Submitted by Chin Hung (Marco) Yip Supervised by Assoc. Professor Charles Fleischmann,

More information

CFD-AIDED TENABILITY ASSESSMENT OF RAILWAY TUNNEL TRAIN FIRE SCENARIOS

CFD-AIDED TENABILITY ASSESSMENT OF RAILWAY TUNNEL TRAIN FIRE SCENARIOS CFD-AIDED TENABILITY ASSESSMENT OF RAILWAY TUNNEL TRAIN FIRE SCENARIOS Yunlong Liu*, Xijuan Liu and Bradley Paroz Fire Science and Technology Laboratory CSIRO Manufacturing and Infrastructure Technology

More information

Design of Fire safety in Multi Occupancy Residential Accommodation

Design of Fire safety in Multi Occupancy Residential Accommodation Design of Fire safety in Multi Occupancy Residential Accommodation Myth vs Reality Myth. Fire is bright Reality. It isn t. Flames are bright Outside fires have bright flames because of the availability

More information

FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS

FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS - 203 - FINDINGS FROM FIRE TESTS IN TUNNEL CONSTRUCTIONS WITH VENTILATION SYSTEMS AND FIXED FIRE SUPPRESSION SYSTEMS Hofer R., IBS Institute for Technical Fire Protection and Safety Research, Linz / Austria

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 75 Fox Street Building OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report:

More information

ANALYSIS OF SMOKE MOVEMENT IN A BUILDING VIA ELEVATOR SHAFTS

ANALYSIS OF SMOKE MOVEMENT IN A BUILDING VIA ELEVATOR SHAFTS ANALYSIS OF SMOKE MOVEMENT IN A BUILDING VIA ELEVATOR SHAFTS Prepared for Smoke Safety Council 6775 SW 111 th Avenue, Suite 10 Beaverton, OR 97008 Prepared by Jesse J. Beitel Alison J. Wakelin Craig L.

More information

ECONOMIC JUSTIFICATION FOR SPRINKLER SYSTEMS

ECONOMIC JUSTIFICATION FOR SPRINKLER SYSTEMS ECONOMIC JUSTIFICATION FOR SPRINKLER SYSTEMS 08.03.2016 Vladimir Mozer University of Zilina INTRODUCTION The usual question: Why would I consider sprinkler protection when it is not required by codes?

More information

Provisions for the Means of Escape and Means of Access by Using Lifts and Escalators in the MTRC Main (U/G) Station

Provisions for the Means of Escape and Means of Access by Using Lifts and Escalators in the MTRC Main (U/G) Station Provisions for the Means of Escape and Means of Access by Using Lifts and Escalators in the MTRC Main (U/G) Station Content 1. Means of Escape in the Guidelines on New Railway Infrastructure 2. Means of

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 69 PRESIDENT SEPTEMBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: 69

More information

Prescriptive Requirement for Smoke Control

Prescriptive Requirement for Smoke Control HKIE CPD Training Course (II) 7July 2009 Organization by The Hong Kong Institution of Engineers Fire Division Co-organized by the Association of Registered Fire Services Installation contractors of Hong

More information

NUMERICAL STUDIES ON BARE CABIN FIRES WITH OPERATION OF SMOKE EXTRACTION SYSTEM

NUMERICAL STUDIES ON BARE CABIN FIRES WITH OPERATION OF SMOKE EXTRACTION SYSTEM , Volume 11, Number 2, p.43-48, 2012 NUMERICAL STUDIES ON BARE CABIN FIRES WITH OPERATION OF SMOKE EXTRACTION SYSTEM Q. Kui Institute of Building Fire Research, China Academy of Building Research, Beijing,

More information

Recent BRANZFIRE enhancements and validation

Recent BRANZFIRE enhancements and validation Recent BRANZFIRE enhancements and validation Michael Spearpoint University of Canterbury Summary BRANZFIRE is a multi-compartment fire zone model that has been under development since 1996 predominately

More information

Chapter 17, Initiating Devices

Chapter 17, Initiating Devices Chapter 17, Initiating Devices Summary. Chapter 17 was Chapter 5 in NFPA 72-2007. The term authority having jurisdiction is replaced in some sections by the term other governing laws, codes, or standards.

More information

Technical Information

Technical Information How to design easily a smoke management system? Mechanical smoke extraction for enclosed car park Car park: specificity of the smoke extraction system Car parks are nowadays integrated directly inside

More information

incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications

incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications Smoke shafts - an overview Scope of this guide Smoke shaft is the common term for

More information

Fire safety engineering applied to high-rise building facades

Fire safety engineering applied to high-rise building facades MATEC Web of Conferences 46, 04002 (2016) DOI: 10.1051/matecconf/20164604002 C Owned by the authors, published by EDP Sciences, 2016 Fire safety engineering applied to high-rise building facades Samuele

More information

WORKSHEET 3-1 THE MANITOBA OFFICE OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

WORKSHEET 3-1 THE MANITOBA OFFICE OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES 1 WORKSHEET 3-1 THE MANITOBA OFFICE OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES TABLE 3.1 CONSTRUCTION OF STRUCTURAL MEMBERS AND FLOOR AND ROOF (1) ASSEMBLIES (Applies each fire zone) Building

More information

Fire Investigation in Italian Waste Treatment Plant: lessons learned and future development

Fire Investigation in Italian Waste Treatment Plant: lessons learned and future development Fire and Evacuation Modeling Technical Conference (FEMTC) 2018 Gaithersburg, Maryland, October 1-3, 2018 Fire Investigation in Italian Waste Treatment Plant: lessons learned and future development Ing.

More information

A comparison between emergency ventilation systems semi-transvers ventilation and natural ventilation in Road Tunnel A

A comparison between emergency ventilation systems semi-transvers ventilation and natural ventilation in Road Tunnel A A comparison between emergency ventilation systems semi-transvers ventilation and natural ventilation in Road Tunnel A Ludwig Jerräng Carlstedt Fire Protection Engineer, bachelor's level 2017 Luleå University

More information

Construction Warehouse. FPE 596 Culminating Experience In Fire Protection Engineering Final Project (Spring 2014) By Ben Johnson

Construction Warehouse. FPE 596 Culminating Experience In Fire Protection Engineering Final Project (Spring 2014) By Ben Johnson Construction Warehouse FPE 596 Culminating Experience In Fire Protection Engineering Final Project (Spring 2014) By Ben Johnson 1 Statement of Disclaimer This project report is a result of a class assignment;

More information

Human Factors - Egress Analysis for High Hazard Occupancies. Presented by: Michael J. Klemenz, PE, SFPE

Human Factors - Egress Analysis for High Hazard Occupancies. Presented by: Michael J. Klemenz, PE, SFPE Human Factors - Egress Analysis for High Hazard Occupancies Presented by: Michael J. Klemenz, PE, SFPE Group H Other SFPE presenters today discussed issues relevant to Group H This presentation addresses

More information

General Principles of Smoke Control

General Principles of Smoke Control AMCA International General Principles of Smoke Control Patrick Janssens, Sales Manager Colt International www.coltinco.co.uk or www.coltinfo.be Air System Engineering & Technology (ASET) Conference Europe

More information

Fire and Smoke Management in a Uni-Directional Road Tunnel for a Congested Traffic Condition

Fire and Smoke Management in a Uni-Directional Road Tunnel for a Congested Traffic Condition International Journal of Ventilation ISSN 1473-3315 Volume 8 No 4 Fire and Smoke Management in a Uni-Directional Road Tunnel for a Congested Traffic Condition Y. Liu 1, J. Munro 1 and B. Dandie 2 1 Parsons

More information

Case Study by Team Japan. Underground Car Park

Case Study by Team Japan. Underground Car Park 11th Conference on Performance Based Codes and Fire Safety Design Methods Case Study by Team Japan Underground Car Park Ai Sekizawa,Tokyo University of Science Ayako Tanno, Akeno Facility Resilience Inc.

More information

Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011

Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011 Technical Seminar on the Code of Practice for Fire Safety in Buildings 2011 The Code of Practice for Fire Safety in Buildings 2011 The FS Code comprises 7 parts and 1 annex: Part A Introduction Part B

More information

Objective based approach

Objective based approach Objective based approach Failure probabilities Introduction: fire safety objectives Example 1: personal safety Example 2: fire compartment 15-11-2017 1 Introduction RUUD VAN HERPEN Eindhoven University

More information

Culminating Project. Fire Protection and Life Safety Engineering Analysis. Cal Poly. Center for Science and Mathematics. Fire Protection Engineering

Culminating Project. Fire Protection and Life Safety Engineering Analysis. Cal Poly. Center for Science and Mathematics. Fire Protection Engineering Culminating Project Fire Protection and Life Safety Engineering Analysis Fire Protection Engineering California Polytechnic State University Center for Science and Mathematics Cal Poly San Luis Obispo,

More information

Considerations in the Design of Smoke Management Systems for Atriums

Considerations in the Design of Smoke Management Systems for Atriums Construction Technology Update No. 48 Considerations in the Design of Smoke Management Systems for Atriums by G.D. Lougheed This Update discusses the use of an engineered approach to the design of smoke

More information

Crossrail Fire Safety Designs

Crossrail Fire Safety Designs 6 th International Conference TUNNEL SAFETY AND VENTILATION Graz, Austria 23 rd 25 th April 2012 Crossrail Fire Safety Designs Author: Dr Yew Ting, PhD PGDip(BA) BEng(Hons) DipEng CEng MIMechE Co-authors:

More information

Using FDS Modelling to Establish Performance Criteria for Water Mist Systems on Very Large Fires in Tunnels

Using FDS Modelling to Establish Performance Criteria for Water Mist Systems on Very Large Fires in Tunnels Using FDS Modelling to Establish Performance Criteria for Water Mist Systems on Very Large Fires in Tunnels Jack R. Mawhinney, P. Eng., FSFPE Javier J. Trelles, Ph.D. Authors & acknowledgement J. R. Mawhinney

More information

The Swedish National Board of Housing, Building and Planning s general recommendations on the analytical design of a building s fire protection, BBRAD

The Swedish National Board of Housing, Building and Planning s general recommendations on the analytical design of a building s fire protection, BBRAD The Swedish National Board of Housing, Building and Planning s general recommendations on the analytical design of a building s fire protection, BBRAD BFS 2011:27 with amendments up to BFS 2013:12 The

More information

Practicalities and Limitations of Coupling FDS with Evacuation Software

Practicalities and Limitations of Coupling FDS with Evacuation Software ABSTRACT Practicalities and Limitations of Coupling FDS with Evacuation Software Daniel Rådemar, WSP, Sweden Daniel Blixt, WSP, Sweden Brecht Debrouwere, WSP, Sweden Björn Grybäck Melin, WSP, Sweden Andrew

More information

REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS

REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS Nikola TANASIĆ, Tomislav SIMONOVIĆ, Miloš IVOŠEVIĆ, Branislav

More information

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE FIRE RISK ASSESSMENT SPORTS CENTRE BUILDING SUMMARY The building is used as a Sports Centre and contains a large sports hall with changing rooms, an office for staff and a fitness area. 1. Identification

More information

Test One: The Uncontrolled Compartment Fire

Test One: The Uncontrolled Compartment Fire The University of Edinburgh BRE Centre for Fire Safety Engineering One Day Symposium on The Dalmarnock Fire Tests: Experiments & Modelling Test One: The Uncontrolled Compartment Fire Cecilia Abecassis

More information

WORKSHEET 4-1 THE MANITOBA FIRE RISK INDEX FOR THE RESIDENTIAL OCCUPANCY OF HERITAGE BUILDINGS FIRE SAFETY PARAMETERS

WORKSHEET 4-1 THE MANITOBA FIRE RISK INDEX FOR THE RESIDENTIAL OCCUPANCY OF HERITAGE BUILDINGS FIRE SAFETY PARAMETERS 1 WORKSHEET 4-1 THE MANITOBA FIRE RISK INDEX FOR THE RESIDENTIAL OCCUPANCY OF HERITAGE BUILDINGS FIRE SAFETY PARAMETERS TABLE 4.1 CONSTRUCTION OF STRUCTURAL MEMBERS AND FLOOR AND ROOF ASSEMBLIES Construction

More information

Numerical investigation on the effect of channelled and unchannelled screens on smoke contamination in atriums upper balconies with open upstand

Numerical investigation on the effect of channelled and unchannelled screens on smoke contamination in atriums upper balconies with open upstand Numerical investigation on the effect of channelled and unchannelled screens on smoke contamination in atriums upper balconies with open upstand Mohammed Mutafi 1, Mohammad Nasif 1*, William Pao 1 and

More information

Practical problems of applying performance-based structural fire engineering in building design

Practical problems of applying performance-based structural fire engineering in building design Practical problems of applying performance-based structural fire engineering in building design Piotr Smardz INBEPO Sp. z o.o. ul. Domeyki 9a, 53-209 Wrocław, Poland INTRODUCTION The introduction of structural

More information

ICC CODE CORNER 2012 IFC Code & Commentary

ICC CODE CORNER 2012 IFC Code & Commentary SECTION 910 SMOKE AND HEAT VENTS 910.1 General. Where required by this code or otherwise installed, smoke and heat vents or mechanical smoke exhaust systems and draft curtains shall conform to the requirements

More information

An experimental study of the impact of tunnel suppression on tunnel ventilation

An experimental study of the impact of tunnel suppression on tunnel ventilation An experimental study of the impact of tunnel suppression on tunnel ventilation Yoon J. Ko and George Hadjisophocleous Civil and Environmental Engineering, Carleton University 1125 Colonel By Drive, Ottawa,

More information

Date: Place: Technical University of Denmark. Knowledge FOr Resilient society

Date: Place: Technical University of Denmark. Knowledge FOr Resilient society Date: 27-06-2017 Place: Technical University of Denmark Knowledge FOr Resilient society 11B25 Smoke and temperature ACTION 11B04 11B12 fire development 11B01 Evacuation human behaviour building response

More information

ISO/TR TECHNICAL REPORT. Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people

ISO/TR TECHNICAL REPORT. Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people TECHNICAL REPORT ISO/TR 16738 First edition 2009-08-01 Fire-safety engineering Technical information on methods for evaluating behaviour and movement of people Ingénierie de la sécurité incendie Informations

More information

A New Zealand Case Study Building Design 11 th International Conference on Performance

A New Zealand Case Study Building Design 11 th International Conference on Performance A New Zealand Case Study Building Design 11 th International Conference on Performance Prof Charles Fleischmann University of Canterbury Dept. Civil and Nat Res Eng. Christchurch, New Zealand Carol Caldwell

More information

Loss Prevention Standards

Loss Prevention Standards Introduction Fire compartmentation is an essential part of an effective fire safety design of a building. The primary objective of fire compartmentation or passive fire protection is to prevent a building

More information

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES

UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Mandatory Fire Safety Instruction UCL PRINCIPAL CONTRACTOR SITE FIRE SAFETY RISK REVIEW & MITIGATION MEASURES Principal Contractor fire safety considerations in shared occupancy project or refurbishments

More information

How to know if a residential or domestic water mist system is performance compliant to BS 8458:2015?

How to know if a residential or domestic water mist system is performance compliant to BS 8458:2015? Plumis White Paper April 2017 How to know if a residential or domestic water mist system is performance compliant to BS 8458:2015? As with the introduction of every new formal product category through

More information

Fire Safety Audit: Part B - Questionnaire (Questionnaire Devised By Mr.R.R.Nair) Yes No x

Fire Safety Audit: Part B - Questionnaire (Questionnaire Devised By Mr.R.R.Nair) Yes No x Fire Safety Audit: Part B - Questionnaire (Questionnaire Devised By Mr.R.R.Nair) Yes No x Name & Address of the Society IDENTIFY PEOPLE AT RISK 01 Have you identified who is at risk? 02 Have you identified

More information

Natural Ventilation A Green Smoke Control Approach

Natural Ventilation A Green Smoke Control Approach Natural Ventilation A Green Smoke Control Approach Presented By: William Koffel, P.E., FSFPE Adam Graybeal, P.E. Authored by: Erik Anderson, P.E Koffel Associates Background New Engineering, Aviation,

More information

Recent Advances in Fire Suppression Modeling Issues & Perspectives of Fire Safety Engineering Applications

Recent Advances in Fire Suppression Modeling Issues & Perspectives of Fire Safety Engineering Applications Recent Advances in Fire Suppression Modeling Issues & Perspectives of Fire Safety Engineering Applications Pianet Grégoire Studies and modelling section manager Fire and Environmental Department, CNPP

More information

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD

Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD DESIGNER S GUIDE Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD Introduction When to use Scope Use this chapter to provide a consistent Fire and Emergency New Zealand position

More information

OPTIMIZATION OF VENTILATION MODE OF SMOKE CONTROL SYSTEM IN HIGH-RISE BUILDING FIRE

OPTIMIZATION OF VENTILATION MODE OF SMOKE CONTROL SYSTEM IN HIGH-RISE BUILDING FIRE OPTIMIZATION OF VENTILATION MODE OF SMOKE CONTROL SYSTEM IN HIGH-RISE BUILDING FIRE 1 RU ZHOU, 2 WEI ZHANG 1 School of Urban Construction and Safety Engineering, Nanjing University of Technology, Nanjing

More information

INTRODUCTION. JAU /JCC/JVC Series Jet Fans - for car park ventilation

INTRODUCTION. JAU /JCC/JVC Series Jet Fans - for car park ventilation JAU /JCC/JVC Series Jet Fans - for car park ventilation INTRODUCTION Pacific HVAC Engineering is able to offer a complete solution in car park ventilation at a competitive price with in house developed

More information

Smoke Layer Height and Heat Flow through a Door

Smoke Layer Height and Heat Flow through a Door Smoke Layer Height and Heat Flow through a Door 2017 Smoke Layer Height and Heat Flow through a Door In this tutorial you will simulate a growing fire in the corner of a 5m x 5m room. The room has a 1m

More information

Building Description Applicable Codes & Standards Prescriptive Requirements. Performance Based Design

Building Description Applicable Codes & Standards Prescriptive Requirements. Performance Based Design June 15, 2017 Building Description Applicable Codes & Standards Prescriptive Requirements Structural Fire Protection Fire Sprinkler Fire Alarm Means of Egress Performance Based Design 2 3 Semiconductor

More information

Investigating the Effects of Sprinkler Sprays on Fire-Induced Doorway Flows: A Two-Part Study. Jeremiah Crocker and Dr. Bin Xiao New Technology Team

Investigating the Effects of Sprinkler Sprays on Fire-Induced Doorway Flows: A Two-Part Study. Jeremiah Crocker and Dr. Bin Xiao New Technology Team Jeremiah Crocker and Dr. Bin Xiao New Technology Team Copyright 2010 Tyco Fire Suppression & Building Products. All rights reserved. The products and specifications published herein are for general evaluation

More information

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally

More information

PERFORMANCE COMPLIANCE METHODS

PERFORMANCE COMPLIANCE METHODS CHAPTER 13 PERFORMANCE COMPLIANCE METHODS SECTION 1301 GENERAL 1301.1 Scope. The provisions of this chapter shall apply to the alteration, repair, addition and change of occupancy of existing structures,

More information

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY) FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY) BUILDING SUMMARY The building was constructed in Victorian times and is constructed of brick with knapped flint in fill on some outer walls. The building

More information

Interfacing Fire Alarm, Sprinkler and Elevator Systems

Interfacing Fire Alarm, Sprinkler and Elevator Systems 1 Interfacing Fire Alarm, Sprinkler and Elevator Systems Rodger Reiswig, SET Director, Industry Relations SimplexGrinnell November 17, 2010 Interfacing to Elevators 2 ASME A17.1 Safety Code for Elevators

More information

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS

THE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS FIRE RISK ASSESSMENT NEW BUILDINGS BUILDING SUMMARY The building is utilised for classroom teaching for Modern Languages. 1. Identification of the hazards 1.1 Identification of sources of fuel. Timber

More information

Following are the systems proposed as per NBC & Local Fire Authority:

Following are the systems proposed as per NBC & Local Fire Authority: 1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building

More information

2015 SFPE Europe Conference on Fire Safety Engineering

2015 SFPE Europe Conference on Fire Safety Engineering 2015 SFPE Europe Conference on Fire Safety Engineering THE FSE APPROACH FOR A HISTORICAL BUILDING IN LIGHT OF THE ITALIAN STANDARDS. Simonetto Sacco Luciano Nigro HUGHES ASSOCIATES EUROPE, srl FIRE SCIENCE

More information

FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY ABSTRACT

FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY ABSTRACT FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY Ali Pezeshk, Joseph Chang, Dwight Hunt, and Peter Jahn Parsons Infrastructure & Technology Group, Inc.

More information

CFD Analysis of Fire Characteristics on Subway Junction Station

CFD Analysis of Fire Characteristics on Subway Junction Station ISGSR27 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 27 Shanghai Tongji University, China CFD Analysis of Fire Characteristics on Subway Junction Station G. H. Wu, X. Han, Q.Q.

More information

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex:

The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: The Code of Practice for Fire Safety in Buildings 2011 It comprises 7 parts and 1 annex: Mr. Junkers Lam Senior Building Surveyor of Buildings Department (9 Sept 2013) Part A Introduction Part B Means

More information

5B-3 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea

5B-3 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea 5B-3 6th Asia-Oceania Symposium on Fire Science and Technology 17-20, March, 2004, Daegu, Korea PRACTICAL APPLICATIONS OF FIRE MODELING IN INDUSTRIAL APPLICATIONS By James M. Dewey, Advisor Risk Management

More information

Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany

Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany Making rail systems more efficient by using on-board Fire Protection Systems Jonathan Redding Area Sales Manager FOGTEC Fire Protection Cologne, Germany Key Presentation Take-Aways Holistic approach to

More information

Comparative Evaluation Method for Fire Safety Design of Large Storage Spaces

Comparative Evaluation Method for Fire Safety Design of Large Storage Spaces Comparative Evaluation Method for Fire Safety Design of Large Storage Spaces ZHENKUN WU 1,2, HAIHANG LI 1, YAPING HE 3, DECHUANG ZHOU 1, JIAN WANG 1 1 State Key Laboratory of Fire Science, University of

More information

Fire Hazard Analysis of Technical Area 53 Building 1

Fire Hazard Analysis of Technical Area 53 Building 1 Fire Hazard Analysis of Technical Area 53 Building 1 June 11, 2015 LA-UR-15-23589 Slide 1 Introduction Brett Noakes Los Alamos National Laboratory Los Alamos, New Mexico Slide 2 Outline Background of the