1 DATE: April 30, 2014 TO: FROM: Technical Committee on Heliports (HHH-AAA) M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Heliports (HHH- AAA) Barry Chase, NFPA Staff Liaison Office: (617) BChase@nfpa.org SUBJECT: AGENDA NFPA 418 First Draft Meeting (Fall 2015) May 14, 2014, Newark, NJ 1. Call to Order May 14, 2014, 8:00am ET 2. Introductions and Attendance 3. Chair s Comments 4. Review Agenda 5. NFPA Staff Liaison Presentation and Review of Key Dates in Current Cycle 6. Approval of Previous Meeting Minutes (418 ROC Meeting Teleconference May 20, 2010) 7. NFPA 418 First Draft Report a. Address Public Input and Generate First Revisions b. Issues Related to Protection Systems and Helipad Surfaces/Surface Coatings (R. Alexander, HeliExperts) 8. Other Business 9. Next Meeting Please submit requests for additional agenda items to the chair at least seven days prior to the meeting, and notify the chair and staff liaison as soon as possible if you plan to introduce any committee comments at the meeting. All NFPA Technical Committee meetings are open to the public. Please contact me for information on attending a meeting as a guest. Read NFPA's Regulations Governing the Development of NFPA Standards (Section ) for further information. Additional Meeting Information: See the meeting notice on the Document Information Page ( for meeting location details. If you have any questions, please feel free to contact Elena Carroll, Project Administrator at or by ecarroll@nfpa.org. C. Standards Administration Page 1 of 1

2 CHAIRS COMMENTS

3 NFPA-418 Heliport Standard Proposed talking points for Committee Comments from Rex Alexander on potential committee discussion items ITEMS: 1. Increasing the time duration as listed in NFPA-418 for rooftop foam systems from 5 minutes to 10 minutes. NFPA-16 calls out for a10 minute duration while NFPA-418 specifics a 5 minute duration. Provided the time span from the point an accident occurs to first responders being on the scene of a rooftop heliport accident is more than 5 minutes, the extra time will provide a critical level of added safety. The additional cost to increase the from 5-10 minutes on most foam systems would require adding additional concentrate with the potential of incorporating a larger foam tank. One of the original reasons for the 5 minute duration was in cases where the location utilized a self-contained water supply for which the amount of water required would be onerous. This, in those cases where it still exists, can be an exception if approved by the AHJ when a self-contained water supply is incorporated with the foam system. The vast majority of rooftop foam systems located at commercial buildings such as hospitals are supplied with water from fire pumps that are interconnected with municipal or private large reservoir systems. Once the foam concentrate provided runs out, the discharge then becomes water only. This in turn flushes the protective foam blanket away during the most critical phase. While this can be somewhat addressed in training, the procedure for shutting off many systems can be very difficult and time consuming. 2. Installation of a foam shut-off or Interrupt Switch at the location of an activation device. A foam shut-off or interrupt switch affords first responders and trained staff the ability to quickly shut off the foam system in the case(s) of or after: An inadvertent, mechanical malfunction (short-circuit) or vandalistic activation. Besides potentially taking the heliport out of service for an extended period of time; foam concentrate is also fairly expensive and messy as well as corrosive to a helicopter s aluminum alloy structure. Incidents have occurred where all of the foam concentrate has been used before anyone could locate the manual shut off valve and turn off the system. One notable case in point the security cameras captured the foam discharge caused by a short circuit as soon as the fire alarm went off. It then took some minutes to get someone up to the heliport to shut of the system. In this case an interrupt switch located at that security station may have helped. In the case of a small and quickly contained fire an interrupt switch would allow for the knocking down of a pad fire and then conserve the remaining foam for future flare ups. The interrupting or ceasing of the foam flow for first responders can provide a safer more conducive environment for rescue operations, inventorying aircraft wreckage for remaining flammables as well as the removal of Oxygen or other Hazardous Materials.

4 Shutting off the system when the foam is running out to prevent the plain water from washing off the protective foam blanket. Applying preventative foam in the event of a major crash without a fire as suggested by some fire professionals (best accomplished after crew/passengers/patients have off loaded and are clear of the pad). An electric Interrupt Switch is a much better way of controlling foam flow after the system has been initiated vs. a manual valve which may need to be reset to provide for reactivation of the system. This design concept has been accepted at all HeliExperts rooftop heliport clients for the past 5 years to include the U.S. Army, U.S. Air Force and Army Corp of Engineers, which includes a large number of broad and diversified AHJ s. This is a very minimal cost item as the newer deluge valves from companies such as Viking and Tyco are indeed designed to work in this fashion. Many rooftop heliport foam systems are a one-shot system, which also require maintenance to reset. During our audits we have found that in several cases the manual shutoff valves are physically located far from the primary foam activation site. Combined with the fact that the heliport security person on duty was not versed on where these valves were located or how the system worked created a high risk situation. Simple well-labeled controls like those in the enclosed photo from the Brooke Army Medical Center in San Antonio, Texas have been found to work very well. This type of state of the art system can be activated and paused or aborted leaving many options for containing a pad fire WITHOUT the need for the attendant to leave the heliport lobby or other defined safety area to hunt for the manual shutoff valve. UL guidelines for water powered foam systems prohibit abort switches which are designed to abort a self-activation function on a foam system and address an entirely different issue. Such self-activation or automatic systems are not acceptable on rooftop heliports. Using the terminology foam Shut-Off or Interrupt Switch describes its purpose and increases rather than decrease safety. 3. Define the color of the foam activation devices. NFPA?? defines the color of fire alarm and foam activation devices/pull stations. NFPA 418 should echo and reference this information. 4. Define the need for a separate fire alarm and foam activation device. Some installers are incorporating a standard red fire alarm pull to perform both fire alarm and foam activation functions simultaneously. Under certain circumstances the activation of the foam system can negatively hinder rescue efforts and potentially contaminate injured parties. 5. Increase flow rate from.10 GPM s.f. to.12 GPM s.f. for rooftop heliport foam systems. HEI s experience with fixed nozzle rooftop heliport systems has shown that due to the normal wind conditions found at rooftop heliport locations much of the foam is blown off the heliport. It has been demonstrated that it is very difficult to achieve the 95% coverage defined in NFPA utilizing a fixed nozzle system due to winds. An increased flow assist in this instance would help compensate for this.

5 6. Qualify the testing method and mechanism used for establishing the standards which define the terms Noncombustible and Non-porous for heliport surfaces as found in NFPA that deals with rooftop heliport surfaces. Numerous heliports are now incorporating pad coatings that are listed as Fire-retardant and Fire-resistant. Unlike painted or stained surfaces some of these coating have been found to be fairly thick and could be a factor in a helicopter fire on a heliport. There are several manufacturers that are promoting these coatings for both initial and resurfacing of heliports. In a very recent case the Fire Marshal having jurisdiction over a heliport rejected these materials as it did not meet the non-combustive definition as spelled out by the NFPA, IBC or IFC. While normal heliport paint or stain markings may also fall into this category their thickness and quantity after cured as defined in the IBC is generally considered acceptable. While NFPA-418 does not contain the definition for the term Noncombustible (material) NFPA 99 calls out that it is a A material that, in the form in which it is used and under the conditions anticipated, will not ignite, burn, support combustion, or release flammable vapors, when subject to fire or heat. Materials that are reported as passing ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C, shall be considered noncombustible materials. (NFPA ) This same definition of Noncombustible found in NFPA code is also the same one that is used by the ICC in their International Building Code and International Fire Code. ASTM Testing Criteria: AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM E136 Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C. Purpose. The results of the ASTM E test method may be used to characterize those materials which do not support combustion under the specified test conditions (750 C). Materials passing the test are permitted limited flaming, glowing and mass loss. Procedure. Specimens are generally conditioned at 60 ± 3 C for twenty-four hours, and then stored in a desiccator for at least one hour. The furnace temperature is stabilized at 750 ± 5.5 C (1382 ± 10 F). Each specimen should be inserted into the furnace chamber and kept there until failure or until all temperature rise had ceased. Test Criteria. The specimen fails if the surface and interior temperatures rise more than 30 C above the furnace temperature or if the specimen flames after the first 30 seconds. If the specimen weight loss exceeds 50 %, the specimen cannot have any flaming during the test and the surface and interior temperatures cannot rise above the starting furnace temperature at any time during the test.

6

7 PREVIOUS MEETING MINUTES

8 1. Call to Order ROC MEETING MINUTES NFPA 418 Technical Committee on Helicopter Facilities May 20, 2010 Windows Live Meeting The meeting of the Technical Committee on Helicopter Facilities via Windows Live was called to order by Chairman Ray Syms at 8:00 AM. 2. Introduction of Committee Members and Guests Self introductions of members and guests were completed. Those present are indicated below: TECHNICAL COMMITTEE MEMBERS & GUESTS NAME Syms, Raymond - Chair Aaron, Michael - Principal Alexander, Rex - Principal Behnke, Joseph - Principal Dryden, Steve - Principal Rosenberger, Mark - Principal Slater, Donald - Principal Levin, Jonathan - Interim Staff Liaison REPRESENTING Raymond A. Syms & Associates The RJA Group Omniflight Helicopters Inc. Tyco Fire Suppression and Building Products Poole Fire Protection, Inc. Los Alamos National Security, LLC FM Global NFPA 3. Announcements NFPA Staff briefly reviewed NFPA s meeting procedures. Jonathan Levin was introduced as the interim Staff Liaison for the committee. Before beginning, it was noted that seven voting members were present. The key dates for the revision sysle of NFPA 418 were published in the meeting agenda package as follows: Final Date for ROC Meeting May 7, 2010* Ballots Mailed to TC before May 21, 2010* ROC Published August 27, 2010 Intent to Make a Motion Closing (NITMAM) October 22, 2010 Issuance of Consent Document (No NITMAMs) December 14, 2010 NFPA Annual Meeting Boston, MA June 2011 Issuance of Document with NITMAM August 11, 2011 * Dates have been extended as approved by the Standards Council Secretary. Page 1 of 2

9 4. Approval of Minutes The minutes of the July 7-8, 2009 ROP meeting held in San Francisco, CA were approved. 5. Action on Comments The committee acted on one public comment and generated three committee comments. 6. Task Group work assignments Safety Net Task Group: A task group consisting of Rex Alexander, Mark Rosenberger and Donald Slater was formed to review issues related to safety nets. 7. Old Business There was no old business. 8. New Business There was no new business. 9. Adjournment The meeting was adjourned at 12:00 p.m. on May 20, Minutes Prepared by: Jonathan Levin, Interim Staff Liaison Page 2 of 2

10 NFPA 418 PUBLIC INPUT

11 Public Input No. 1-NFPA [ Section No ] The Whenever feasible, the design of the heliport, including all the aeronautical components, shall be in accordance with FAA AC 150/5390-2B, Heliport Design Advisory Circular. The FAA AC referenced in this section has recently been revised to include new provisions that fail to account for existing hospital facilities where it is not feasible, and in some cases would be impossible, to comply with all of the provisions of the AC. Many of those facilities were in compliance with previous versions of the AC, but will become non-compliant with the most recent change to the Heliport design AC. Other hospital heliport facilities may not have been in compliance with the previous edition of the AC, but note that compliance with the AC is only recommended, and not required, for private hospital heliports. The verbiage in NFPA 418 will take an FAA publication that is only advisory in nature and make it mandatory for facilities that cannot, and do not otherwise need to comply with it. In many cases, and depending on how strictly the enforcement of Section will be interpreted, many current hospital heliports may have to be closed at hospitals where full compliance with the AC is not feasible or is impossible and where there is no alternate helicopter landing area available. This would result in the loss of air medical transport services to those hospitals, which could result in more severe medical outcomes, including death, for the critically ill or injured patients who require air medical transport services to those facilities. By amending Section as I am suggesting the NFPA and the operator of the affected hospital heliport can jointly examine the feasibility of compliance with any provision of the FAA AC on heliport design and determine whether the existing helipad facility can continue to be utilized without undue risk of harm to any persons or damage to property. An additional weakness with many of the new changes to the FAA AC in question is that there does not appear to be any evidence-based criteria for many of the changes. That is, no data is presented that documents that any significant number of incidents or accidents have occurred that are related to the changes in question. These facts are sufficiently problematic when the AC is considered in its intended status as an advisory document for private heliports. But it becomes a critical issue if the AC is to be seen as a mandatory requirement, as Section of NFPA 418 would render it. Submitter Full Name: William Winn Organization: Intermountain Life Flight Affilliation: National EMS Pilots Association Submittal Date: Tue Jun 25 17:12:07 EDT 2013 of 12 4/30/2014 7:57 AM

12 of 12 4/30/2014 7:57 AM Public Input No. 9-NFPA [ Section No ] Fueling equipment shall be located at least 25 ft (7.6 m) from hangars and fixed fire protection equipment. The requirement is intended to specify a minimum distance. Equipment located distances greater than 25 feet from hangars and fixed fire protection equipment should also be considered as meeting the requirement. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:51:26 EST 2013

13 of 12 4/30/2014 7:57 AM Public Input No. 10-NFPA [ Section No. 5.3 [Excluding any Sub-Sections] ] The rooftop landing pad shall be pitched to provide drainage at a slope of of at least 1 / inch in 1 foot to 16 a maximum of ¼ inch in 1-foot ( 0.5 percent to 2 percent). Slope is more conventionally expressed in the number of inches of rise (or drop) per foot of run. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:52:28 EST 2013

14 of 12 4/30/2014 7:57 AM Public Input No. 8-NFPA [ Section No ] The contiguous building roof covering within 50 ft (15.2 m) of the landing pad edge shall have a Class A fire resistance rating for exterior fire exposure, and shall be tested according to FM 4470, Approval for Class 1 Roof Covers ; ANSI/UL 790, Standard Test Methods for Fire Tests of Roof Covering ; or ASTM E 108, Standard Test Methods for Fire Tests of Roof Coverings.. Section contains a requirement that is vague and not specific, the proposed wording comes from NFPA Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:50:12 EST 2013

15 of 12 4/30/2014 7:57 AM Public Input No. 11-NFPA [ Section No ] At facilities where there is more than one rooftop landing pad, the supply of foam available shall be sufficient to cover an incident on at least one of the pads on the one pad that requires the largest foam supply. The requirement does not intend to permit a supply of foam to be less than needed just because there are more than rooftop landing pad. As written, the supply of foam available only need to be sufficient to cover an incident on the smallest pad. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:53:46 EST 2013

16 of 12 4/30/2014 7:57 AM Public Input No. 12-NFPA [ Section No ] The pitch of the rooftop hangar floor shall be a minimum of 1 2 of of 1 percent ). 1 / 16 inch in 1 foot (0.5 Slope is more conventionally expressed in the number of inches of rise (or drop) per foot of run. 1/2 was changed to 0.5 to be consistent within the document. Submitter Full Name: John Chartier Organization: Northeastern Regional Fire Cod Submittal Date: Fri Nov 08 07:55:02 EST 2013

17 Public Input No. 2-NFPA [ Sections 6.7.1, ] Sections 6.7.1, Portable fire extinguishers for rooftop hangars shall be provided in accordance with NFPA 10, Standard for Portable Fire Extinguishers In helicopter or storage and service areas, the distribution of fire extinguishers shall be provided in accordance with the extra hazard azard classification of NFPA 10, Standard for Portable Fire Extinguishers. Combine paragraph and and clearly define that extinguishers are to be provided in accordance with extra hazard classification of NFPA 10. Submitter Full Name: Fred Goodnight Organization: Amerex Corporation Submittal Date: Wed Aug 21 12:16:48 EDT 2013 of 12 4/30/2014 7:57 AM

18 of 12 4/30/2014 7:57 AM Public Input No. 4-NFPA [ Section No. 9.2 ] 9.2 Minimum Requirement. At least one portable fire extinguisher Portable fire extinguishers as specified in Table 9.2 shall be provided for each takeoff and landing area, parking area, and fuel storage area. Foam extinguisher options shall be used only where freezing temperatures are not a factor or where extinguishers are protected from freezing temperatures. Revise Table 9.2 as shown in the uploaded file. Table 9.2 Minimum Ratings of Portable Fire Extinguishers for Heliport Categories Heliport Category Helicopter Overall Length* Minimum Rating H-1 Less than 50 ft (15.2 m) 4-A:80-B H-2 50 ft (15.2 m) up to but not including 80 ft (24.4 m) 10-A:120-B H-3 80 ft (24.4 m) up to but not including 120 ft (36.6 m) 30-A:240-B *Helicopter length, including the tail boom and the rotors. Additional Proposed Changes File Name Description Approved 418_PI4_Table9.2.pdf Table 9.2 Existing Table 9.2 provides fire extinguisher ratings that correspond to 17, 50 and 150 lb. halon 1211 extinguishers. These extinguishers are "clean agent type" only and currently have limtied availability. Also, UL has announced they will discontinue listing of these type extinguishers int he near future (as early as October 2014?) The revised table provides clean agent extinguisher options using EPA SNAP approved alternate agents as well as dry chemical extinguishers and foam extinguisher options. The clean agent ratings have been revised to correspond to currently available UL listed wheeled clean agent extinguishers with ratings available from at least two different manufacturers. In some cases multiple clean agent extinguishers are needed to provide a fire-fighting capability close to that that has previously been required by halon 1211 extinguishers. Submitter Full Name: Fred Goodnight Organization: Amerex Corporation Submittal Date: Wed Aug 21 12:24:50 EDT 2013

19 Page2 Table 9.2 Minimum Ratings of Portable Fire Extinguishers for Heliport Catagories Heliport Helicopter Overall Clean Agent Dry Chemical Foam Category Length Type Type Ty_pe H1 Less than 50ft 4-A: A:160 8 {15.2M) H2 50ft (15.2) up to but 10-A: A:160 8 not including 80ft (24.4M) H3 80ft (24.4M) up to 10-A: A:160 8 but not including (Qty. 2) 120ft (36.6J Helicopter length, including the tail boom and the rotors

20 Public Input No. 3-NFPA [ Section No. 9.3 ] 9.3 Extinguishers Subject to Damage, Theft, or Tampering. Where the portable extinguisher cannot be maintained and safeguarded against damage, theft, or tampering, the portable fire extinguisher shall be omitted with the approval of the AHJ Multipurpose dry chemical (ammonium phosphate) shall not be used. A.9.3 Multi-purpose dry chemical (ammonium phosphate) fire extinguishing agent is known to cause corrosion to aluminum aircraft components. Although the agent is capable of extinguishing fires on or near aircraft, it is likely that the agent will spread to other, uninvolved aircraft, causing damage from corrosion. (from NFPA 407, A ). Carbon dioxide extinguishers should not be selected due to their limited range and effectiveness in windy conditions. Extinguishers should not be removed simply because they may be subject to damage, theft or tampering. Suitable solutions are available for solving these types of problems. The new wording added is a prohibition of using ABC multi-purpose dry chemical to comply with the ratings shown in Table 9.2. It is widely recognized that ABC dry chemical should not be used around airplanes/helicopters due to corrosion and the difficulty of cleaning airframes and crevices so that corrosion does not occur. Submitter Full Name: Fred Goodnight Organization: Amerex Corporation Submittal Date: Wed Aug 21 12:18:59 EDT 2013 of 12 4/30/2014 7:57 AM

21 0 of 12 4/30/2014 7:57 AM Public Input No. 5-NFPA [ Section No. 9.3 ] 9.3 Extinguishers Subject to Damage, Theft, or Tampering. Where the portable extinguisher cannot be maintained and safeguarded against damage, theft, or tampering, the portable fire extinguisher shall be omitted with the approval of the AHJ. No fire protection equipment including fire extinguishers, fire sprinkler connections, fire alarm pull stations where required, etc., should be allowed to be omitted due to possible theft or tampering. Other approved methods of protecting the extinguisher or other fire protection equipment should be utilized. Theft and tampering of fire department connections and extinguishers has been a growing problem in some areas but should not relieve the property owner from protecting them or the AHJ from requiring them. All areas of a heliport including fueling systems, signage, fencing, etc., could be subject to damage, theft or tampering and cannot be omitted but must be protected in an approved manner. Submitter Full Name: Bill Galloway Organization: Southern Regional Fire Code De Submittal Date: Tue Oct 29 15:18:36 EDT 2013

22 1 of 12 4/30/2014 7:57 AM Public Input No. 6-NFPA [ Section No. 9.3 ] 9.3 Extinguishers Subject to Damage, Theft, or Tampering. Where the portable extinguisher cannot be maintained and safeguarded against damage, theft, or tampering, the portable fire extinguisher shall be omitted be protected by additional locking or securing methods with the approval of the AHJ. In circumstances where portable fire extinguishers are required but are subject to an extreme or unusual possibility of damage, theft, or tampering, they should be allowed to have extra unusual protections provided, including extra locking or storage arrangements, but only with the approval of the AHJ. The problem of the possibility of damage, theft, or tampering of a required fire protection feature, in this case a portable extinguisher, should not relieve the property owner of the requirement to provide it but should allow them to provide unusual extra storage or security methods approved by the AHJ. Submitter Full Name: Bill Galloway Organization: Southern Regional Fire Code De Submittal Date: Tue Oct 29 15:19:34 EDT 2013

23 2 of 12 4/30/2014 7:57 AM Public Input No. 7-NFPA [ Section No ] 10.1 Emergency Response Plan. An approved emergency response plan shall be developed for each heliport. The emergency response plan for a heliport should be reviewed and approved by the AHJ. Submitter Full Name: Bill Galloway Organization: Southern Regional Fire Code De Submittal Date: Tue Oct 29 15:21:26 EDT 2013

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

NFPA 418. Standard for. Heliports Edition. Copyright 2006, National Fire Protection Association, All Rights Reserved

NFPA 418. Standard for. Heliports Edition. Copyright 2006, National Fire Protection Association, All Rights Reserved NFPA 418 Standard for Heliports 2006 Edition Copyright 2006, National Fire Protection Association, All Rights Reserved This edition of NFPA 418, Standard for Heliports, was prepared by the Technical Committee

More information

Page 1 of 9 First Revision No. 2-NFPA 99B-2012 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 10, Standard for Portable

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

How it may affect the future of your school. Michael France Director, Regulatory Affairs National Air Transportation Association

How it may affect the future of your school. Michael France Director, Regulatory Affairs National Air Transportation Association How it may affect the future of your school Michael France Director, Regulatory Affairs National Air Transportation Association NATA Activities NFPA 409 Overview History of NATA s involvement with NFPA

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda*

NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda* NFPA Technical Meeting (Tech Session) June 24-25, 2015 Agenda* NFPA Standards presented for Action Wednesday, June 24, 2015 starting @ 2:00pm: NFPA 33, Standard for Spray Application Using Flammable or

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX 1. Call to Order. The meeting of the Technical Committee on Fire Tests

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

Page 1 of 12 Input No. 62-NFPA 409-2013 [ Section No. 3.3.9 ] 3.3.9 Hangar Building Cluster. A group of buildings with more than one area for the storage and servicing of aircraft and all attached or contiguous

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: May 14, 2014 TO: FROM: Principal and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus,

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

Public Comment No. 3-NFPA [ Chapter 7 ]

Public Comment No. 3-NFPA [ Chapter 7 ] Page 1 of 8 Public Comment No. 3-NFPA 405-2013 [ Chapter 7 ] Chapter 7 ARFF Personnel Safety and Safety Management 7.1 Scope. This chapter identifies the knowledge and skills necessary to ensure ARFF personnel

More information

Committee on NFPA 85

Committee on NFPA 85 Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Single Burner Boilers Patti Mucci, Technical Assistant II DATE: August 5, 2009 SUBJECT: NFPA ROP Letter Ballot The ROP letter

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

Fire Prevention Plan

Fire Prevention Plan Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........

More information

NFPA s Standards Development Process

NFPA s Standards Development Process NFPA s Standards Development Process Revision Cycle 104 weeks or 141 weeks Guiding Principles Due process Openness Lack of dominance Seek society s balance between: Acceptable risk Commitment of resources

More information

Public Input No. 79-NFPA [ Section No. 1.1 ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 79-NFPA [ Section No. 1.1 ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 79-NFPA 409-2013 [ Section No. 1.1 ] 1.1 Scope. 1.1.1 This standard contains the minimum requirements for the proper construction of aircraft hangars and protection of aircraft hangars

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Portable Fire Extinguishers

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

Public Comment No. 7-NFPA 30A-2013 [ Section No ]

Public Comment No. 7-NFPA 30A-2013 [ Section No ] Page 1 of 13 Public Comment No. 7-NFPA 30A-2013 [ Section No. 6.4.2 ] 6.4.2 Additional Proposed Changes Each pump shall have installed on the discharge side a listed leak detection device that will provide

More information

"Spray area" is the term that is used throughout the document. This change is for consistency.

Spray area is the term that is used throughout the document. This change is for consistency. of 78 5/30/2014 2:08 PM Public Comment No. 39-NFPA 33-2013 [ Global Input ] For Chapter 18, replace "spray paint area" with "spray area". "Spray area" is the term that is used throughout the document.

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment of 25 5/14/2015 2:32 PM Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ] A.1.4 A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

Page 1 of 46 Public Input No. 17-NFPA 13E-2013 [ New Section after 3.2.4 ] New 3.2.5 Pressure-Reducing Valve. A valve designed for the purpose of reducing the downstream water pressure under both flowing

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

Fire Prevention Plan

Fire Prevention Plan Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

Public Comment No. 1-NFPA [ Section No ]

Public Comment No. 1-NFPA [ Section No ] Page 1 of 7 Public Comment No. 1-NFPA 556-2014 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA, 19428-2959. ASTM D2859, Standard

More information

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER 5.2 RESPONSE 5.2.1 Responding to Incidents Daytime Evaluation Sheets: 5.2.1; 5.3.6 Skill Sheet: A Birth STANDARD: 5.2.1 and 5.3.6 TASK: Respond to a daytime incident or accident on and adjacent to the

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Second Revision No. 2-NFPA [ Section No ]

Second Revision No. 2-NFPA [ Section No ] Page 1 of 8 Second Revision No. 2-NFPA 410-2014 [ Section No. 10.2 ] 10.2* Fire Extinguishers. In addition to extinguishers required by NFPA 409, extinguishers shall be provided for aircraft maintenance

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ] 8 of 93 11/6/2015 7:41 AM Public Input No. 52-NFPA 30-2015 [ Section No. 21.2 [Excluding any Sub-Sections] ] For the purpose of this chapter, the term in this section shall have the definitions given.

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

FIRE PLAN. In order to assure the safety of patients, visitors and staff, a standard response to fire or the potential of fire is required.

FIRE PLAN. In order to assure the safety of patients, visitors and staff, a standard response to fire or the potential of fire is required. FIRE PLAN PURPOSE In order to assure the safety of patients, visitors and staff, a standard response to fire or the potential of fire is required. This fire plan sets out the standard response for all

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094

MEMORANDUM. Subject: NFPA 1124 Proposed Tentative Interim Amendment (TIA) No. 1094 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Pyrotechnics Elena Carroll,

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000- Log #12 BLD-BSF Final Action: (55.2 (New) ) NOTE: This proposal appeared as Comment 5000-168 (Log #86) which was held from the A11 ROC on Proposal 5000-239. Submitter: Technical Correlating Committee

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 2-NFPA 259-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D 5865, Standard Test Method

More information

Technical Committee on Portable Fire Extinguishers

Technical Committee on Portable Fire Extinguishers Technical Committee on Portable Fire Extinguishers DATE: February 29, 2016 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Portable Fire Extinguishers Barry

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM of 66 5/18/2015 1:01 PM Second Revision No. 36-NFPA 32-2015 [ Detail ] 6.5 Solvents (See Annex C for additional information on solvents) Submittal Date: Tue Mar 17 17:20:03 EDT 2015 Committee Statement:

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS 901.6 Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective.

More information

UFGS (June 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (June 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-10 44 16 (May 2009) ------------------------- Preparing Activity: NASA Superseding UFGS-10 44 16 (June 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in

More information

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Alabama Fire College Airport Firefighter Instructional JPR Verification Sheet Full Name: Fire Department: This Instructional

More information

Changes for the New Edition. Senior Engineer, NFPA NFPA

Changes for the New Edition. Senior Engineer, NFPA NFPA Changes for the New Edition Denise Beach Senior Engineer, NFPA NFPA Overview NFPA 58-2014 Substantive Changes TIAs 2017 Edition NFPA 58-2014 Substantive Changes Bulk and Industrial Plants 3.3.10 Bulk Plant.

More information

home smoke candles alarms electrical burns smoking medical oxygen cooking FIREFIGHTING MATCHES & LIGHTERS SPRINKLERS

home smoke candles alarms electrical burns smoking medical oxygen cooking FIREFIGHTING MATCHES & LIGHTERS SPRINKLERS FIREFIGHTING home smoke alarms REGULATIONS GOVERNING THE NFPA EDUCATIONAL MESSAGES DESK REFERENCE FOR THE FIRE SERVICE AND FIRE AND LIFE SAFETY EDUCATORS MATCHES & LIGHTERS medical oxygen cooking FIRE

More information

Committee on NFPA 51A

Committee on NFPA 51A Committee on M E M O R A N D U M TO: FROM: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant DATE: May 6, 2010 SUBJECT: ROC Letter Ballot The ROC letter ballot

More information

STORED PRESSURE YES TEST STANDARDS: CAN/ULC S504 & ANSI/UL 229 CAN/ULC S508 & ANSI/UL 711. Available Options: Stationary Design Tow Loop

STORED PRESSURE YES TEST STANDARDS: CAN/ULC S504 & ANSI/UL 229 CAN/ULC S508 & ANSI/UL 711. Available Options: Stationary Design Tow Loop STORED PRESSURE 50, 125/150 lb. Stored Pressure These commercial stored pressure extinguishers are available in a choice of two sizes and three chemical options. The carriage design on both sizes provides

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

NFPA 101 Life Safety Code Culture change 2012

NFPA 101 Life Safety Code Culture change 2012 NFPA 101 Life Safety Code Culture change 2012 Produced by Kansas Fire Marshal April, 2012 On March 9, 2012 Centers for Medicare & Medicaid Services implements a policy where they have formally adopted

More information

I. Welcome and call to order by Chairman Kann. Review and accept minutes from the October 2012 meeting. V. Task Group report on NFPA 1003 work

I. Welcome and call to order by Chairman Kann. Review and accept minutes from the October 2012 meeting. V. Task Group report on NFPA 1003 work Meeting Agenda First Draft Meeting NFPA 405, NFPA 408, and NFPA 422 Technical Committee on Aircraft Rescue and Fire Fighting May 8 th and May 9 th, 2013 Miami, Fl. I. Welcome and call to order by Chairman

More information

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT

ROP MEETING MINUTES. 2. Introduction of Attendees. The following committee members and guests were in attendance. TECHNICAL COMMITTEE MEMBERS PRESENT BLD/SAF-FIR 24-25 September 2009 ROP Meeting Minutes ROP MEETING MINUTES Building Code Life Safety Technical Committee on Fire Protection Features Thursday-Friday, September 24-25, 2009 Meeting Embassy

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M National Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Industrial and Medical Gases Joanne

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

Special Occupancy Requirements

Special Occupancy Requirements Special Occupancy Requirements CHAPTER 2 0 AVIATION FACILITIES CHAPTER 2 1 DRY CLEANING CHAPTER 2 2 COMBUSTIBLE DUST-PRODUCING OPERATIONS Special Occupancies The objective of this module is to make the

More information

Model Carbon Monoxide (CO) Alarm Response Policy

Model Carbon Monoxide (CO) Alarm Response Policy Published on MTAS (http://www.mtas.tennessee.edu) January 26, 2019 Model Carbon Monoxide (CO) Alarm Response Policy Summary: This model policy was created to provide procedures for personnel to follow

More information

Second Revision No. 11-NFPA [ Section No. 2.4 ] Submitter Information Verification. Committee Statement

Second Revision No. 11-NFPA [ Section No. 2.4 ] Submitter Information Verification. Committee Statement Second Revision No. 11-NFPA 16-2014 [ Section No. 2.4 ] 2.4 References for Extracts in Mandatory Sections. NFPA 11, Standard for Low-, Medium-, and High-Expansion Foam, 2010 2015 edition. NFPA 13, Standard

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

Summary. firefighter training in Since that time the firefighter had attended semi-annual

Summary. firefighter training in Since that time the firefighter had attended semi-annual Summary On August 25, 2005 a live fire training exercise was conducted at a North Carolina County airport. Personnel involved in the training evolution were three employees of the airport who were employed

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 44 16 (May 2015) ------------------------ Preparing Activity: NASA Superseding UFGS-10 44 16 (May 2012) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement

More information

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Mr. Merton Bunker, Committee Chair, called the meeting to order at 8:05 on Wednesday September

More information

June 20, 2011 PARTIES INTERESTED IN FIXED CONDENSED AEROSOL FIRE-EXTINGUISHING SYSTEMS

June 20, 2011 PARTIES INTERESTED IN FIXED CONDENSED AEROSOL FIRE-EXTINGUISHING SYSTEMS June 20, 2011 TO: PARTIES INTERESTED IN FIXED CONDENSED AEROSOL FIRE-EXTINGUISHING SYSTEMS SUBJECT: New Acceptance Criteria for Fixed Condensed Aerosol Fireextinguishing Systems, Subject AC432-0611-R1

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

NFPA Technical Committee on Fire Tests

NFPA Technical Committee on Fire Tests National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Tracy

More information

Center for Life Safety Education

Center for Life Safety Education Center for Life Safety Education Fire Sprinklers 101 Introduction, Building Codes, and Water Supplies Reprinted with permission from NFPA 13, Installation of Sprinkler Systems, Copyright 2007, National

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

Portable Fire Extinguishers

Portable Fire Extinguishers Portable Fire Extinguishers Workbook Activities The following activities have been designed to help you. Your instructor may require you to complete some or all of these activities as a regular part of

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases

Committee on 51A M E M O R A N D U M. NFPA Technical Committee on Industrial and Medical Gases Committee on 51A M E M O R A N D U M To: From: NFPA Technical Committee on Industrial and Medical Gases Patti Mucci, Administrative Assistant Date: June 14, 2010 Subject: NFPA 51A ROC Letter Ballot Circulation

More information

Fluid Collections at the Smithsonian. Michael Kilby, P.E. Joshua Stewart, P.E. Office of Safety, Health & Environmental Management (OSHEM)

Fluid Collections at the Smithsonian. Michael Kilby, P.E. Joshua Stewart, P.E. Office of Safety, Health & Environmental Management (OSHEM) Fluid Collections at the Smithsonian Michael Kilby, P.E. Joshua Stewart, P.E. Office of Safety, Health & Environmental Management (OSHEM) Who We Are OSHEM Authority Having Jurisdiction for Smithsonian

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101 Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101 For the Florida Building Commission And the Fire Code Advisory Council Introduction The scope

More information

EC 5.10 FIRE PREVENTION MANAGEMENT

EC 5.10 FIRE PREVENTION MANAGEMENT EC 5.10 FIRE PREVENTION MANAGEMENT The organization manages fire safety risks. 1 The organization develops and maintains a written management plan describing the processes it implements to effectively

More information