2 1. General: Technical write-up on Fire safety services Nitesh Santa Clara, proposed development is a residential apartment with multiple blocks. Document briefs on fire safety systems envisaged for the facility such as water storage capacity, fire protection, detection & public address system with talk back facility. 2. Codes & standards referred: National Building Code (NBC 2005) - Part 4 Karnataka State Fire & Emergency Services (KSFS) IS for portable fire extinguishers IS for sprinkler system IS 2189 for fire alarm & detection system 3. Fire fighting system: Fire protection systems are proposed to meet requirements of local fire authority having jurisdiction & will be designed as per NBC 2005 part IV. Facility is categorised as "Residential Building group-a, sub division A4 (apartment houses)". 4. Sumps, OHT's & Pumps: As per local fire authority requirement, dedicated over head storage tank of capacity 10 CUM is proposed for block connected to the wet riser/down comer system. Underground sump of capacity 50CUM is proposed in the basement catering external yard hydrants & sprinkler system (proposed in basement). One set of pump is proposed to cater yard hydrants around the periphery of building, wet risers & sprinklers in basement. End suction top discharge pumps of suitable head will be proposed to cater vertical zones. Maximum pressure at any hydrant point shall be limited to 7 bar. Sl. No Description Residential Tower 1 Fire reserve - UG Sump 50 m³. 2 Fire reserve - OHT 10 m³ per riser 3 Motor driven end suction top discharge jockey pump 01 Number - 180LPM 4 Motor driven end suction top discharge main pump 01 Number LPM head 5 Diesel engine driven end suction top discharge stand-by pump 01 Number LPM 5. Hydrant system: Page 1
3 Main hydrant system consists of G.I C class pipes, isolation valves, hoses, hydrants, nozzles, hose cabinets located as per NBC requirements at every floor near stair cases as per local fire authority recommendation. Every floor is provided with wet riser/down comer along with single headed internal hydrant valves for every 1000sq.m of floor area near fire fighting stairs/lobbies as required. Each wet riser will be connected to terrace tank of capacity highlighted above. Landing hydrants are provided in basements for every 1000sq.m floor area. Location of these hydrants shall be such that, they are easy to access in case of emergency. Yard hydrants are proposed around the periphery of the building at an interval of 60mts along with hose cabinet capable to house branch pipe & hose pipe. 6. First aid portable fire extinguishers: Hand held extinguishers of suitable capacity will be proposed as per IS: ABC type extinguishers are shall be located inside staircase landing at each level, car parking area in basement, pump house, transformer, electrical panel, etc. as per statutory requirements. Mechanical foam extinguishers shall be used near pump house, transformer yard. All the fire extinguishers shall be free from halon & other gases which have ozone depletion potential. Each flat kitchen will be provided with ABC type extinguisher of capacity 2Kgs. Fire buckets are an interval of one set for every 8 car parks in the basements. 7. Automatic Sprinkler system: System proposed consists of providing sprinkler protection at ceiling of basement floor level with specified spacing as per statutory requirement. Water for sprinkler system is tapped from wet riser with Installation control valve. G.I C class pipe with fittings, sprinklers, flow switches, drain valves located at strategic points as per statutory requirement. Pendent sprinklers are proposed in basements, lift lobbies & side wall sprinklers in basement ramp areas. Flow switches will be envisaged to detect activation of sprinklers. Same will be integrated with fire alarm system. Following sprinklers are proposed for different areas in the building. Colour of the Sl. No Sprinkler Type K - factor Size of the bulb bulb 01 Std. response Pendent sprinkler 5.6 (80.6) 5mm Red 02 Std. response Sidewall sprinkler 5.6 (80.6) 5mm Red 8. Fire brigade connection: One 4-way fire brigade inlet will be proposed for connection with hydrant system & to fill the fire sump. This shall comprise of 4 instantaneous male inlet couplings, plugs & chains and. Page 2
4 9. Talk back PA System: Main objective of PA system is to convey clear & audible instructions (as per NBC) to all people on all floors / buildings in case of fire / other emergency to reach a place of safety outside the buildings. Proposed system scheme consists of Talk back speakers near staircase all levels Amplifiers sized to suit to number of speakers. Talk back console with goose neck, zone selection & other features. Switching unit. Speaker monitoring system Wall mounted talk back speakers proposed are of 6W. Each tower will have one console, switching unit & amplifiers connected to tower level speakers. 10. Manual/Conventional fire alarm system: Residential tower is proposed with manual fire alarm system. A control panel will be provided in apartment lobby/reception at ground floor. Each floor will be considered as one single zone. Hooters linked to specifc zone will be triggerd once the manual pull stations are operated. Clubhouse will be proposed with smoke/heat detectors as applicable & will be connected to the respective control panel. System operation: MCP, hooter & talk back speakers will be installed at all exits for convenient & quick way of raising an alarm. Manual call points help the occupants to inform other occupants & security personnel about fire break out while they evacuate themselves from the floor. 11. Fire Lift: To enable fire service personnel to reach upper floors with minimum delay, fire lifts are proposed & shall be available for exclusive use of firemen in an emergency. Lifts shall have a floor area of not less than 1.4m². It shall have loading capacity of not less than 545kg. (8 persons lift) with automatic closing doors of minimum 0.8m width. At least one lift in each block will be considered as a fire lift. Page 3
5
6
7 Site Location
8
9
Following are the systems proposed as per NBC & Local Fire Authority:
1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building
More informationPROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES
PROJECT: NITESH PALO ALTO @ Bangalore FIRE SAFETY MEASURES System Description 1 Firewater pumping system 2 Wet riser system and hose reel system. 3 Automatic sprinkler system 4 Yard hydrant system 5 Pressurization
More informationEnclosure 4- RISK ASSESSMENT
Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment
More informationDISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL
DISASTER MANAGEMENT PLAN 1.0 DISASTER (EMERGENCY) A disaster or an emergency, occurring in a project is one, as a result of a malfunctioning of the normal operating procedures or an intervention of an
More informationRISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally
More informationCHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes:
More informationDEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.
DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH. CHECK LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION FORM FOR ISSUANCE OF RENEWAL OF FIRE NO OBJECTION CERTIFICATE FOR INDUSTRIAL / HIGH RISE / COMMERICIAL
More informationNITOL INSURANCE COMPANY LIMITED
NITOL INSURANCE COMPANY LIMITED 1. Name and Address of the Insured : PROPOSAL FORM 2. Nature of Risk : 3. Location : 4. Period of Insurance : From: To: 5. Sum Insured : (Section-wise) (a) Section-I (Property
More informationDelhi Metro System. Emergency and Fire Safety Measures in. - by Sanjeev Kumar & Kailash Chandra Joshi. Fire Protection & Safety
Emergency and Fire Safety Measures in Delhi Metro System - by Sanjeev Kumar & Kailash Chandra Joshi 40 MARCH-APRIL 2017 FSAI Journal Delhi Metro An Introduction Delhi Metro has been incorporated in 1995
More informationGovt. of West Bengal Online Clearance for Fire Safety Certificate and Renewal (Application for Fire Safety Recommendations)
Govt. of West Bengal Online Clearance for Fire Safety Certificate and Renewal (Application for Fire Safety Recommendations) Application ID IND/WB/FES/20172018/8381 1. Details of Owner/Occupier/Proprietor/Director.
More informationProposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)
SAFETY AND DISASTER MANAGEMENT PLAN India has been traditionally vulnerable to natural disasters on account of its unique geo climatic conditions. Floods, droughts, cyclones, earthquakes and landslides
More information+91-8048078054 Laxmi Fabricators http://www.laxmifire.net/ We are considered in the market to be one of the leading manufacturers, distributors and suppliers of this impeccable range of Fire s and Safety
More information+91-8048763768 Cease Fire & Electrical Services http://www.ceasefireengineers.com/ We are the supplier, trader and service provider of fire alarm equipment, fire suppression system, fire detection system,
More informationSCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY
SCHEDULE Essential s taken from Schedule 9 of the Building Regulations 2006 43 PART 1 BUILDING FIRE INTEGRITY 1 Building elements required to satisfy prescribed fire-resistance levels 2 Materials and assemblies
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 69 PRESIDENT SEPTEMBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: 69
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST FIRE AND LIFE SAFETY SYSTEMS FOR STRUCTURES FIVE OR MORE STORIES IN HEIGHT AND LESS THAN 75 FEET IN HEIGHT FROM THE POINT
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 75 Fox Street Building OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report:
More information1.1.1 HAZARD IDENTIFICATION
1.1 RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment is determination of qualitative
More information7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM
CLERNCE FOR EXPNSION OF GROUP HOUSING PROJECT "ECO VILLGE - III" T PLOT NO GH-06, SECTOR - 16 B, GRETER NOID, U.P. 7. RISK SSESSMENT & DMP 7.1 INTRODUCTION The construction project involves lot of activities
More informationFIRE SAFETY and COMPLIANCE
PRESENTATION TO FIRE SAFETY and COMPLIANCE 3 RD NOVEMBER, 2018 1 Fire Preparedness at Mantri Tranquil Total Apartments : 1131 Total Area : 19 Acres # Residents : 3000 2 What insures you against fire Fire
More informationTHE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act
Government Notice 134 of 2018 THE MAURITIUS FIRE AND RESCUE SERVICE ACT Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act 1. These regulations may
More informationRULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS
rr. 1-3 163 UNDERGROUND COAL MINES FIRE PRECAUTIONS [Published Gazette 14 October 1978, pp. 499-504; and as amended by Rules published Gazette 26 January 1980, pp. 199-200; 30 May 1981, p. 1077; 3 December
More informationDEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.
DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH. CHECK LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION FORM FOR ISSUANCE OF FINAL NO OBJECTION CERTIFICATE FOR INDUSTRIAL / HIGH RISE / COMMERICIAL / HOTEL
More informationEE/ / To, Dear Sir,
EE/2016-17/ 03.04.2017 To, Dear Sir, Wax sealed/tamper proof quotations are invited on percentage rate basis from specialised contractors for the following work on behalf of Director, NITIE, Mumbai 87.
More informationHIGH PRESSURE WATER MIST SYSTEM Application: High Rise Building Bindreiter Michael London,
HIGH PRESSURE WATER MIST SYSTEM Application: High Rise Building Bindreiter Michael London, 2018-09-19 1 Application High Rise Building Hotel & Apartment Office & Walkways Shopping mall & Lobbies Parking
More informationFirefighting operations on multi-tiered vehicle stacking buildings F5-13 GD
DESIGNER S GUIDE Firefighting operations on multi-tiered vehicle stacking buildings F5-13 GD Introduction When to use Scope Use this chapter to provide a consistent Fire and Emergency New Zealand position
More informationAPPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY
Mauritius Fire and Rescue Service 14, Deschartres Street, Port Louis. Tel No: 2113580; Fax: 2113258 Email: mfrs_headoffice@govmu.org FSD Form 1 File No. Date received: Received by: Signature: APPLICATION
More informationWinnipeg Fire Department Fire Prevention Branch
Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of
More informationBOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E
A 1 2 4 PUMP HOUSE: BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E Supply, erection,testing & commissioning of Single stage, end suction / back pull-out type motor driven Jockey Pump of capacity 10.8
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT SPORTS CENTRE
FIRE RISK ASSESSMENT SPORTS CENTRE BUILDING SUMMARY The building is used as a Sports Centre and contains a large sports hall with changing rooms, an office for staff and a fitness area. 1. Identification
More informationFUNDAMENTALS OF FIRE SAFETY
FUNDAMENTALS OF FIRE SAFETY BEHAVIOURAL ASPECTS AND CONTROL MITIGATIO MEASURES IN HIGH RISE BUILDINGS V RAVINDRANATH T I O N A L F I R E P R O T E C T I O N A S S O C I AT I O N, U S A, C E R T I F I E
More informationHOW COMMERCIAL FIRE PROTECTION SPRINKLER SYSTEMS REALLY OPERATE
A Guide for Fire Sprinkler Maintenance and Operation Commercial fire protection sprinkler systems have been saving lives and reducing property damage for more than a century. New England s textile mills
More informationFIRE EMERGENCY ACTION PLAN (EAP)
FIRE EMERGENCY ACTION PLAN (EAP) Gorseinon Institute December 2012 1 TABLE OF CONTENTS SECTION 1 Workplace Details Page 3 SECTION 6 Means of Escape Page 9 SECTION 2 Organisation and Responsibility 4 SECTION
More informationBALAJI FIRE PROTECTION SYSTEMS:
BALAJI FIRE PROTECTION SYSTEMS: Automatic Water Sprinkler System: One of the oldest & traditional ways of fire protection, which is water based protection system, is in the form of automatic sprinklers.
More informationREGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT
OVERALL COLOUR ACTION CODE RISK AMBER STATUTORY INSTRUMENT 2005:1541 REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT Address of Premises: Thuurock CCG, Civic Offices New Road Grays Responsible
More informationFIRE PROTECTION SYSTEMS IN BURJ KHALIFA. By NAFFCO Fire Protection
FIRE PROTECTION SYSTEMS IN BURJ KHALIFA By NAFFCO Fire Protection 8 September 2015 Company Introduction NAFFCO ( National Fire Fighting Manufacturing FZCO ) an ISO 9001:2008 certified company with its
More informationProperty Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes)
Property Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes) Insured Name: Risk Address: New Business Construction: Walls Renewal Policy Number: Building
More informationBlack Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment
Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment February 2017 Alberta Fire Code safety equipment maintenance requirements: The Black Diamond Fire Department has
More informationInternational Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures
International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures Please note this is not an all-inclusive list. The type and complexity of your project
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT HORSEFAIR HOUSE
FIRE RISK ASSESSMENT HORSEFAIR HOUSE BUILDING SUMMARY The building is utilised for the teaching of Science and contains Laboratories and Chemical storage. 1. Identification of the hazards 1.1 Identification
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR LIBRARY HOTEL OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: Library
More informationModule 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements
Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why
More informationAPPLICATION FOR GRANT OF FINAL NO OBJECTION CERTIFICATE OF THE FACTORY/HOTEL/RESIDENTIAL CUM COMMERCIAL/HIGH RISE BUILDING AND OTHER OCCUPANCIES.
APPLICATION FOR GRANT OF FINAL NO OBJECTION CERTIFICATE OF THE FACTORY/HOTEL/RESIDENTIAL CUM COMMERCIAL/HIGH RISE BUILDING AND OTHER OCCUPANCIES. 01. Name and Address of the Premises/Building. 02. Name
More informationFire Protection Coffee Break Training May 2016
Fire Protection Coffee Break Training May 2016 Introduction High-Rise Requirements Questions and Answers Agenda Overview Site Fire Access Aerial Access Power/Back-up Power Elevators and Access Sprinklers
More informationPRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM
ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NEW BUILDINGS
FIRE RISK ASSESSMENT NEW BUILDINGS BUILDING SUMMARY The building is utilised for classroom teaching for Modern Languages. 1. Identification of the hazards 1.1 Identification of sources of fuel. Timber
More informationFire Protection District Business Pre-Plan Form
DATE OF INSPECTION Fire Protection District Business Pre-Plan Form OCCUPANT INFORMATION BUSINESS NAME: BUSINESS ADDRESS: CITY: STATE: ZIP: MAIN CONTACT PERSON: BUSINESS PHONE: BUSINESS FAX: EMAIL ADDRESS:
More informationRisk assessment is a term used to describe the overall process or method where you:
RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. However, Hazard is a situation that poses a level of threat to life health
More informationPREMISES FIRE SAFETY HANDBOOK
UCL ESTATES Fire Safety UNIVERSITY COLLEGE LONDON PREMISES FIRE SAFETY HANDBOOK Regulatory Reform (Fire Safety) Order 2005 188 TOTTENHAM COURT ROAD University College London 188 TOTTENHAM COURT ROAD, LONDON,
More informationFire protection on chemical manufacturing sites
CFPA-E No 18:2008 Fire protection on chemical manufacturing sites FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation
More informationSlight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk
Fire Risk Assessment: ABC Sample House Sample Road SA1 3M2 C J Sparks Ltd 13 Alexandra Gardens Carshalton SM5 4LJ T: 02077577457 W: www.cjsparks.com E: sales@cjsparks.com Ref: 3077 Action Plan Number Action
More information5123: information. The graphic plan shall include, but may not be limited to: (a) A primary and secondary means of exit from each floor;
ACTION: Original DATE: 09/30/2005 1:17 PM 5123:2-3-11 Fire safety and emergency response plans. (A) Purpose The purpose of this rule is to ensure the safety of individuals residing in residential facilities
More informationHIGH-RISE RETROFIT ORDINANCES - NO and NO
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 91.8604 Effective: 9-06-90 DOCUMENT NO. P/BC 2002-054 Revised: 4-15-03 Previously Issued As: MGD 88 HIGH-RISE RETROFIT ORDINANCES - NO.
More informationTECHNICAL SPECIFICATIONS 167 CASTLEREAGH STREET
TECHNICAL SPECIFICATIONS 67 CASTLEREAGH STREET GENERAL Development Name Address Location Liberty Place 67 Castlereagh Street 67 Castlereagh Street Sydney s Mid Core of CBD Total Net Lettable Area (Office)
More informationChapter 5. Energy Conservation & Fire Safety
Chapter 5 Energy Conservation & Fire Safety For internal circulation of BSNL only Page 1 Introduction: ENERGY CONSERVATION The ever-increasing cost of energy (i.e. Electrical power & diesel) has contributed
More informationTHE REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY)
FIRE RISK ASSESSMENT NO 68 (ENGLISH AND PHILOSOPHY) BUILDING SUMMARY The building was constructed in Victorian times and is constructed of brick with knapped flint in fill on some outer walls. The building
More informationRevision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.
SECTION 211300 FIRE SUPPRESSION SYSTEMS 1.0 All new and renovated buildings shall be provided with automatic sprinklers throughout and fire standpipe systems. The design and installation of these systems
More informationFire Safety Concept Hotel Jumeirah
Fire Safety Concept Hotel Jumeirah Dr.-Ing. Christoph Klinzmann hhpberlin Ingenieure für Brandschutz Department performance-based methods Office Hamburg Part 1 Fire safety concept Palais Quartier and Jumeirah
More informationUnit 5: Fire Safety Installations
Unit 5: Fire Safety Installations 5.1 Basic Fire Science Definition of Fire: A process of combustion accompanied by a rapid release of heat and light in varying quantities. i By products of fire: Gas and
More information- CONSTRUCTION FIRE SAFETY STANDARDS
SGG15 - CONSTRUCTION FIRE SAFETY STANDARDS 1) Construction Planning All construction sites shall plan and sequence their construction activities to ensure the early installation and operation of permanent
More informationSAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.
SAFETY GENERAL Buildings must be designed according to building and fire safety codes and other regulatory standards at the time of construction. However, such codes and standards are continuously changing.
More informationAPPLICATION FOR GRANT OF PROVISIONAL CONSTRUCTION PERMISSION/FINAL NO OBJECTION CERTIFICATE OF FIRE & EMERGENCY SERVICES.
APPLICATION FOR GRANT OF PROVISIONAL CONSTRUCTION PERMISSION/FINAL NO OBJECTION CERTIFICATE OF FIRE & EMERGENCY SERVICES. 01. Name and Address of the Premises/Building. 02. Name of the Premises/ Firm/Company
More information(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;
(1979) (Rev.1 1990) (Rev.2 1996) (Rev.3 Jan 2012) Safety features.1 Fire protection and extinction.1.1 General Fire protection arrangements and fire extinguishing systems are to be in accordance with the
More information2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.
2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is
More informationNFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,
NFPA CODE TESTING & INSPECTION Requirements & Recommendations for Licensed Florida Hospitals, Ambulatory Surgery Centers, ICF/IID Healthcare, & In-patient Hospice Facilities per NFPA Life Safety Code 101
More informationBP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6
BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6 1. Purpose This policy sets forth requirements for preventing and detecting fires, sounding an alarm, and suppressing fires. Fire protection
More informationFIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.
15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.
More informationActive & Passive Fire Protection System. Page 1 Kalidasan S BT IN SSP-OP
Active & Passive Fire Protection System Page 1 Kalidasan S BT IN SSP-OP Fire Protection - Introduction Introduction: The definition of fire protection of a building refers to the building ability to detect,
More informationOwner/Operator Guide for Successful Sprinkler and Fire Pump Systems
Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Adam Olomon, P.E. Associate Consultant Fire & Life Safety and Fire Protection Introduction Adam Olomon Licensed Professional Engineer
More informationFire Protection System and Life Safety Evaluation of Building X. Anthony W. Sublett
Fire Protection System and Life Safety Evaluation of Building X Presented by Anthony W. Sublett Culminating Project Master of Science in Fire Protection Engineering California Polytechnic State University
More informationGENERAL AREAS OF INSPECTION
This information is intended to assist you in preparation for the annual high-rise inspection. This is not a complete list and the Inspector may identify other conditions or issues in the building that
More informationFire Sprinkler Plan Submittal Form
Contents Fire Sprinkler Plan Submittal Form... 2 Standpipe Plan Review Submittals... 4 Fire Pump Plan Submittal Requirements... 6 Fire Alarm Plan Submittal Form... 8 Kitchen Hood Wet Chemical Submittal...10
More informationFire Risk Assessment
Fire Risk Assessment Premises Description Address Area Post Code Tel no. Num of Employees Normal Occupancy Max Allowed Use of Premises Building Length Building Breadth Area 0.00 M² Floors Storeys Below
More informationRE: BASIC FIRE SAFETY PROCEDURES AND OPERATION OF FIRE EQUIPMENT
March 15, 2016 Security Staff Training Memo RE: BASIC FIRE SAFETY PROCEDURES AND OPERATION OF FIRE EQUIPMENT Dear Staff Officers: As part of your daily rounds, security officers must look out for any unsafe
More informationTechnical Information
How to design easily a smoke management system? Mechanical smoke extraction for enclosed car park Car park: specificity of the smoke extraction system Car parks are nowadays integrated directly inside
More informationRAMBLER PARK FIRE SAFETY INFORMATION
RAMBLER PARK FIRE SAFETY INFORMATION Parmenter Realty Partners 7557 Rambler Rd. Dallas, Texas 75231 214-373-9561 214-373-9620 (fax) RAMBLER PARK RAMBLER PARK FIRE SAFETY INFORMATION II. Objective To provide
More informationProject: Location: Date Prepared: Last Reviewed:
Project: Location: Date Prepared: Last Reviewed: Contents Premises Essential Information 4 Definitions & Acronyms 5 Introduction 5 Building Description and Safety Systems 7 General Strategy, Responsibilities
More informationDIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION
DIVISION 21 FIRE SUPPRESSION 21 00 00 FIRE SUPRESSION 21 01 00 Operation and Maintenance of Fire Suppression 21 01 10 Operation and Maintenance of Water Based Fire Suppression Systems 21 01 20 Operation
More informationFire. IMO fire control signs - according to IMO Resolution A.654 (16) (mm) 150x x200
IMO fire control signs - according to IMO Resolution A.654 (16) Safety and operating instructions for trained personnel (SIS) - As per ISO 24409, SIS signs are safety-related signs that replicate the symbols
More informationCertification Assessment Instrument and Guidelines
Certification Instrument Full compliance with BCA 96 will ensure passing 19 for Section 1 Do not need 100 to pass 1 SECTION 1 SAFETY (25 POINTS) Residential Fire Sprinkler System Not required to pass Section
More informationFIRE DEPARTMENT - RULES FOR FIRE PROTECTION IN AUSTRIA
93 FIRE DEPARTMENT - RULES FOR FIRE PROTECTION IN AUSTRIA INTRODUCTION 94 Legal requirements for the protection of firefighters Requirements of Building Act Fire Prevention Act Technical Guidelines OIB
More informationHCD DSA OSHPD 1 2 1/AC AC SS SS/CC
CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 30 ELEVATORS AND CONVEYING SYSTEMS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency
More informationModule 9: Ontario Building Code Fire Fighting Provisions
Ontario Building Code (OBC) 1. Sprinklers 2. Standpipes 3. Fire Alarms 4. Entrances Ontario Building Code (OBC) 1. Sprinklers 2. Standpipes 3. Fire Alarms 4. Entrances 1. Sprinklers i) Sprinkler Systems
More informationGuidelines for Fire Safety Plans at Construction or Demolition Sites
Guidelines for Fire Safety Plans at Construction or Demolition Sites Sun Peaks Fire Rescue P.O. Box 1000, Sun Peaks, V0E 5N0 Phone 250-578-8985 Fax 250-578-8905 Guidelines for Fire Safety Plans at Construction
More informationSafety Manual: Emergency Response
Safety Manual: Emergency Response January, 2017 6.0 Emergency Preparedness Introduction This Chapter provides guidelines for dealing with Emergencies. Fires, no matter how small, must be reported to management
More informationDCN: ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS
DCN: 4.05.01 ENGINE COMPANY OPERATIONS CHAPTER 4 March 15, 1997 FIRE SCENE OPERATIONS 4. FIRE SCENE OPERATIONS 4.1 FIREFIGHTING OBJECTIVES 4.1.1 The objectives of firefighting are to protect life and property
More informationFire Prevention Plan
Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........
More informationENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) PRICED BILL OF QUANTITIES
NAME OF PROJECT : CONSTRUCTION OF SUPER SPECIALITY HOSPITAL FOR GOVT. RAJAJI MEDICAL COLLEGE, MADURAI, TAMIL NADU - FIRE PROTECTION & FIRE ALARM SYSTEM. NIT NO. SRO/MKT/TH/290 dated 03.07.2014 Item no.
More information4 August Islington Fire Protection Transpower NZ Limited
4 August 2011 Islington Fire Protection Contents 1. Introduction...1 General Approach...2 2. General Notes...3 3. Description of Building Areas...4 Use, Layout, Fire Load, Criticality and Division...4
More informationService Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT
58 Fire protection equipment requires care and maintenance at scheduled intervals to assure it will operate properly and safely when needed. Only personnel who are trained and qualified to maintain the
More informationAFEC FIRE ENGINEERING TEMPLATE FOR CLIENTS INTERNALLY COMPLETED RISK ASSESMENT
AFEC FIRE & RISK ENGINEERING SPECIALISTS would like to share an in house Risk Assessment Template we have developed for in house use to assist Facilities Managers and Environmental Health and Safety Staff
More informationMAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS
FIRE CODE BULLETIN December 2004 97 FCB 018 (R1) Page 1 of 5 BACKGROUND: MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS Fire protection service companies are
More informationCHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS
CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS 61G15-32.001 61G15-32.002 61G15-32.003 61G15-32.004 61G15-32.005 61G15-32.006 61G15-32.007
More informationRISK ASSESSMENT AND HAZARD MANAGEMENT
Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that may exist in the plant. On the other hand, risk analysis deals with the identification and
More informationNYU RESIDENTIAL FIRE SAFETY PLAN PART I - BUILDING INFORMATION SECTION
BUILDING ADDRESS: BUILDING OWNER: Name: Address: Telephone : NYU RESIDENTIAL FIRE SAFETY PLAN PART I - BUILDING INFORMATION SECTION Greenberg Hall 545 First Avenue, NY, NY, 10016 New York University 70
More informationAgency for Health Care Administration
Page 1 of 100 FED - K0000 - INITIAL COMMENTS Title INITIAL COMMENTS CFR Type Memo Tag FED - K9999 - FINAL OBSERVATIONS Title FINAL OBSERVATIONS CFR Type Memo Tag FED - KA100 - General Requirements - Other
More information1. A fire certificate is issued under Section 76 of the Occupational, Safety and Health ActNo. 28 of 2005.
Guidelines for the issue of a Fire Certificate 1. A fire certificate is issued under Section 76 of the Occupational, Safety and Health ActNo. 28 of 2005. Extract from Occupational Safety and Health Act
More informationFire Safety Management Plan. Qube 90, Whitfield Street, W1T 4EZ. Fire Safety Management Plan & Evacuation Procedures
Fire Safety Management Plan & Evacuation Procedures Contents 1.0 Introduction 2.0 Means of Escape in Case of Fire 3.0 Means for Giving Warning in Case of Fire 4.0 Means for Fighting Fire 5. 0 Discovering
More informationUniversity of London
University of London Senate House and Stewart House Fire safety arrangements Contents 1. Introduction p.2 2. Fire Risk Assessment documentation p.2 3. Action to be taken by a person discovering a fire
More informationWhat you need to know about. Maintaining essential safety measures in your building
What you need to know about Maintaining essential safety measures in your building When the construction of a building is complete, the building owner is responsible for its upkeep and maintenance, particularly
More information