1 Future Fit Risk Engineering 2017 Global Risk Engineering Conference 18 th / 19 th May 2017 Gary Howe EngTech FIFireE MIFPO Senior Fire Protection Engineer Fixed Fire Protection Getting it right, Case studies and Lessons learnt Zurich Risk Engineering
2 Objectives Recap the concepts of: Is it in service? Will it work? Is it designed right? Six case studies Questions 2
3 The basics Basic approach to any fire protection or detection system: Is it designed right? Is it in service? Will it work? 3
4 Photograph copyright Zurich Risk Engineering 4
5 Case studies Indoor market Food factory 1 Hanging garment warehouse Chilled, frozen and ambient food storage warehouse Art storage facility Food factory 2 5
6 Indoor Market Before the loss Values (TIV) 25,000,000. Occupancy Historic indoor market Risk Engineering Engagement : Plan review and on site assessments Photograph copyright Zurich Risk Engineering 6
7 Indoor Market Story of loss How did it start Fire started within an electrical fridge Ignition source was the electrical motor How it spread and what was damaged Combustible insulation materials Contained to the kitchen How it stopped Single sprinkler head Public fire service Photograph copyright Local Fire and Rescue Service 7
8 Indoor Market Result of loss Estimate < 5,000 Cause Electrical fire (fridge) Contributing factors Zurich Risk Engineering engagement Photograph copyright Local Fire and Rescue Service 8
9 Food factory Northern Ireland Will it work? Before the event Values (TIV) 70,000,000 Occupancy Bread manufacturer RE engagement Desktop and on site risk assessments Photograph copyright Zurich Risk Engineering 9
10 Food factory Northern Ireland Story How did we get involved? Is it designed right? Is it in service? Will it work? Is it in designed right? Is it in service? Will it work? 10
11 Food factory Northern Ireland Risk Engineering engagement - witness and proving tests Site visit 1 - FAILURE Site visit 2 - FAILURE Zurich fire protection engineer correctly identified multiple causes of failure. Photograph copyright Zurich Risk Engineering 11
12 Food factory Northern Ireland Potential result of not undertaking proving testing of loss 70,000,000 Potential cause Ignition of combustible materials Contributing factors: Impaired fire protection system, combustible construction 12
13 Brake Bros Warehouse Is it in service? Before the loss Values (TIV) 60,000,000 Occupancy Ambient, chilled and frozen foods RE engagement On-site risk assessments Photograph copyright Zurich Risk Engineering 13
14 Chilled, frozen and ambient food storage warehouse Is it in service? Before the loss Values (TIV) - 60,000,000 Occupancy - Ambient, chilled and frozen foods Risk Engineering engagement: Plan review and on-site risk assessments Photograph copyright Zurich Risk Engineering 14
15 Chilled, frozen and ambient food storage warehouse Story of involvement How did it start QBE - stock and contents insurer Zurich property insurer QBE had accepted and signed off the sprinkler system How did we get involved? Is it designed right? Is it in service? Will it work? Is it in designed right? Is it in service? Will it work? 15
16 Chilled, frozen and ambient food storage warehouse Risk Engineering engagement - witness and proving tests 16
17 Chilled, frozen and ambient food storage warehouse Potential result of not undertaking proving testing Potential for loss 60,000, % Estimated Maximum Loss Probable causes: Forklift truck, arson, electrical Contributing factors - polystyrene composite panels and impaired fire protection system 17
18 And a genuine quote from the Risk Manager.. I am really glad our Zurich Risk Engineer asked for this testing to be carried out. I would not have wanted to wait until we had a fire to find out the system did not work 18
19 ASOS Will it work? Before the loss Occupancy - On-line clothing retailer Values (TIV) - Machinery and contents 39.4m, Stock 176.7m ( 120m worth on premises at the time of the loss) Gross Profit 529m (24 month IP) Building leased Tenants improvements 20m RE engagement - On-site risk assessments AIG lead Photograph copyright Zurich Risk Engineering 19
20 Hanging garment warehouse Will it work? Before the loss Occupancy - On-line clothing retailer Values (TIV) - Machinery and contents 39.4m, Stock 176.7m ( 120m worth on premises at the time of the loss) Gross Profit 529m (24 month IP) Risk Engineering engagement - On-site risk assessments Photograph copyright Zurich Risk Engineering 20
21 Hanging garment warehouse Story of loss 200m x 100m five storey mezzanine. Fire started on level 2 within the racking of the mezzanines at 21:49pm. Later found to have started deliberately. Photograph copyright Zurich Risk Engineering 21
22 Hanging garment warehouse How it spread and what was damaged Fire fueled by combustible contents Racking and contents damaged Extensive smoke and water damage to stock Fire spread vertically due to holes How it stopped Sprinkler system Public fire service Photograph copyright Zurich Risk Engineering 22
23 Hanging garment warehouse Result of loss Cost of loss - 20,300,000 Cause - Arson Contributing factors Holes in mezzanine floors acting like a chimney Risk Engineering - Due to these negative features the standard 5 sprinkler Probable Maximum Loss should not be used, as more heads are likely to operate than normally expected. Photograph copyright Zurich Risk Engineering 23
24 Photograph copyright Zurich Risk Engineering 24
25 Art Store Will it work? Before the event Values (TIV) 170,000,000 Occupancy High value art and artefacts RE engagement Desktop and on site risk assessments Photograph copyright Zurich Risk Engineering 25
26 Art Store Story How did it start Underwriter sent fire protection engineer commissioning documentation Signed off by contractor No need for Zurich to get involved Aberdeen City Council had approved and signed off the fire protection system How did we get involved? Is it designed right? Is it in service? Will it work? 26
27 Art Store Risk Engineering engagement - witness and proving tests across two site visits. Site visit 1 - FAILURE Site visit 2 - FAILURE Zurich fire protection engineer correctly identified multiple causes of failure. 27
28 Art Store Potential result of not undertaking proving testing of loss 170,000,000 Potential cause Ignition of combustible materials Contributing factors Impaired fire protection system 28
29 Food factory Will it work? Before the event Values (TIV) > 100,000,000 Occupancy Crisp (potato chip) manufacturer Risk Engineering engagement: Desktop, plan review and on site risk assessments Photograph copyright Zurich Risk Engineering 29
30 Food factory Story How did we get involved? Is it designed right? Is it in service? Will it work? Photograph copyright Zurich Risk Engineering 30
31 Food factory Risk Engineering engagement - witness and proving tests across three site visits. Site visit 1 - FAILURE Site visit 2 - FAILURE Zurich fire protection engineer correctly identified multiple causes of failure. 31
32 Food factory Potential result of not undertaking proving testing of loss > 100,000,000 Potential cause: Thermocouple failure leading to spontaneous Ignition of oil Contributing factors: Impaired fire protection system, combustible construction Photograph copyright Zurich Risk Engineering 32
33 Our approach to any fire protection or detection system: Is it in designed right? Is it in service? Will it work? 33
34 Thank you Gary Howe EngTech FIFireE MIFPO Senior Fire Protection Engineer Zurich Risk Engineering Tel: Mob:
35 The information contained in this document is intended as a general description of certain types of services and insurance covers available to qualified customers. Zurich Insurance Company Ltd or any of its subsidiaries and its employees do not assume any liability of any kind whatsoever, resulting from the use, or reliance upon any of the information contained herein. It does not replace or complement your individual insurance policy, which is the only source for terms and conditions of your respective insurance cover. This is intended as a general description of certain types of services and insurance covers available to qualified customers through subsidiaries within the Zurich Insurance Group Ltd. including, in the United States, Zurich American Insurance Company, 1299 Zurich Way, Schaumburg, Illinois 60196, and, in Canada, Zurich Insurance Company Ltd, 100 King Street West, Toronto ON M5X 1C9, and, outside the US and Canada, Zurich Insurance Plc, Ballsbridge Park, Dublin 4, Ireland (and its EU branches), Zurich Insurance Company Ltd, Mythenquai 2, 8002 Zurich, Zurich Australian Insurance Limited, 5 Blue St., North Sydney, NSW 2060 and further entities, as required by local jurisdiction. 35
Fixed Fire Protection Getting it right, Ensuring Performance and Value
Fixed Fire Protection Getting it right, Ensuring Performance and Value 18 th May 2017 Stuart Lloyd, EngTech TIFireE Principal Risk Engineer Practice Leader Fire Protection Engineering Zurich Risk Engineering
More informationFixed fire protection solutions
Risk Engineering Fixed fire protection solutions At a glance Fixed fire protection can reduce the severity of fire events and positively impact Risk Engineering Assessments. To provide an effective solution
More informationProperty protection principles for fire protection
Property protection principles for fire protection April 24 th 2018 Stuart Lloyd EngTech TIFireE Principal Fire Protection Engineer Gary Howe EngTech FIFireE MIFPO Senior Fire Protection Engineer Zurich
More informationManagement Practices: Fire Protection Impairments November 2015
RiskTopics Management Practices: Fire Protection Impairments November 2015 When business capital is invested in fire protection, it is difficult to explain any fire protection outage that allows a fire
More informationCold weather regions where temperatures can fall below freezing present a threat to any building housing water-filled systems.
RiskTopics Management practices Cold weather freeze-ups August 2015 Cold weather regions where temperatures can fall below freezing present a threat to any building housing water-filled systems. Introduction
More informationWater Mist v Sprinklers
Water Mist v Sprinklers 15 th November 2018 Gary Howe EngTech FIFireE MIFPO Senior Fire Protection Engineer Zurich Risk Engineering Photo source: Stuart Lloyd, Zurich Zurich Fire Protection BS8489 FIA
More informationStorage Questionnaire
SQ/2/15 Page 1 of 5 Storage Questionnaire Introduction Policyholder s name Storage location business name Policy number Storage location address Contact details of the person completing the questionnaire,
More informationPrinting works and warehouse area Press Lane, 21 Ink Street, Presstown. PR3 3SS Postcode: Assessor signature:
RECORD OF FIRE SAFETY RISK ASSESSMENT Building Name & Use: Address: Printing works and warehouse area Press Lane, 21 Ink Street, Presstown. PR3 3SS Postcode: Name of person(s) with fire safety duties:
More informationAutomatic Sprinkler Systems Care and Maintenance
0-0.0 January 2012 Country of Origin: United Kingdom Automatic Sprinkler Systems Care and Maintenance Introduction...1 Weekly Inspection and Tests...2 Monthly Inspection and Tests...3 Service and Maintenance
More informationImpairments to Fire Protection Equipment
Impairments to Fire Protection Equipment INTRODUCTION Buildings and equipment are provided with fire protection and/or detection systems to reduce property damage and interruption to business in the event
More informationCost-Effective Fire Safety Management
Slide 1 BIFM Ireland Conference, Belfast 4 November 2011 Cost-Effective Fire Safety Management Stewart Kidd MA, MSc, FIFireE, FIFSM Chartered Security Practitioner Slide 2 Of course, modern buildings don
More informationFreezing of Water-Based Fire Protection Systems
Risk Solutions Freezing of Water-Based Fire Protection Systems Freezing of water in fire protection piping can seriously compromise a property s fire protection. This report provides information on methods
More information5 Key Stages to Risk Assessment
5 Key Stages to Risk Assessment Stage 1: Identify Fire Hazards For a fire to start, three things are needed: A source of ignition Fuel Oxygen If any one of these is missing, a fire cannot start. Taking
More informationSAA HB THE DOMESTIC KITCHEN HANDBOOK
THE DOMESTIC KITCHEN HANDBOOK SAA HB111 1998 THE DOMESTIC KITCHEN HANDBOOK Compiled by Anelia Pty Ltd Foreword SAA HB111 1998 FOREWORD This handbook was prepared jointly by Anelia Pty Ltd and Standards
More informationREVERSIONARY RETAIL WAREHOUSE INVESTMENT
REVERSIONARY RETAIL WAREHOUSE INVESTMENT Hinckley lsh.co.uk Investment Summary Located in Hinckley town centre Prominent site on the corner of Leicester Road and New Buildings Detached retail warehouse
More informationEnergy Efficiency Rating
Energy Performance Certificate Northern Ireland 37, Church Street MAGHERA BT46 5EA Date of assessment: 20 July 2011 Date of certificate: 20 July 2011 Reference number: 9639-0923-6880-4640-9926 Type of
More informationFIRE IMPAIRMENT NOTICE
Notification of Fire System Isolation FIN NORA No. Complete Fire Impairment Notice (FIN) before any impairment. Note 3 business days notice is required. Submit the FIN to the BAC Airport Facilities on
More informationTable EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c
Table 1015.1 EXIT ACCESS TRAVEL DISTANCE a WITHOUT SPRINKLER WITH SPRINKLER OCCUPANCY SYSTEM SYSTEM A, E, F-1, I-1, M, 200 250 b,d R, S-1 B 200 300 c F-2, S-2, U 300 400 c No Change to Other Entries in
More informationZurich s experience case studies
Zurich s experience case studies April 24 th 2018 Stuart Lloyd EngTech TIFireE Principal Fire Protection Engineer Gary Howe EngTech FIFireE MIFPO Senior Fire Protection Engineer Zurich Risk Engineering
More informationHOW COMMERCIAL FIRE PROTECTION SPRINKLER SYSTEMS REALLY OPERATE
A Guide for Fire Sprinkler Maintenance and Operation Commercial fire protection sprinkler systems have been saving lives and reducing property damage for more than a century. New England s textile mills
More informationDan Gray, Property Director. Date: November 2017 Review Due Date: November 2020
Policy title: Scope: Policy owner & job title: Approver: Fire Safety Policy Group-wide Dan Gray, Property Director Aspire Housing Board Date: November 2017 Review Due Date: November 2020 POLICY SUMMARY
More informationBUILDING CODE INTERPRETATION
BUILDING CODE INTERPRETATION November 2017 14-BCI-009 Page 1 of 6 FIRE ALARM AND FIRE SUPPRESSION SYSTEM VERIFICATION AND TESTING CERTIFICATES PURPOSE This STANDATA has been developed to give municipalities
More informationAS AS Australian Standard. Installation of fire hose reels. This is a free 6 page sample. Access the full version online.
AS 2441 2005 AS 2441 2005 Australian Standard Installation of fire hose reels This Australian Standard was prepared by Committee FP-007, Fire Hose Reels. It was approved on behalf of the Council of Standards
More informationQualification Specification Highfield Level 1 Award in the Principles of Fire Safety Awareness (RQF)
Qualification Specification Highfield Level 1 Award in the Principles of Fire Safety Awareness (RQF) Qualification Number: 603/1564/7 Version 1.1 July 2017 Copyright 2017 HABC Ltd. All rights reserved
More informationFIRE SAFETY RISK ASSESSMENT
FIRE SAFETY RISK ASSESSMENT Princes Risborough Lawn Tennis Club New Road Princes Risborough Buckinghamshire General: The following document has been produced to record the risk assessment process and the
More informationOUTLINE FOR FIRE PREVENTION ACTIVITY
OUTLINE FOR FIRE PREVENTION ACTIVITY Background Buildings under construction present unique fire exposures that require special attention. Fires can result in major losses and long delays in the completion
More informationSandwell Valley School and Sandwell Community Care Trust Training. 150 Birmingham Road, West Bromwich, B70 6QT
Fire Risk Assessment Company ame Address of premises (premises being assessed) Sandwell Valley School and Sandwell Community Care Trust Training 150 Birmingham Road, West Bromwich, B70 6QT ame of Responsible
More informationHealth, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service
Health, Safety and Wellbeing Management Arrangements Core I Consider I Complex Fire Safety Health, Safety and Wellbeing Service 1. Success Indicators The following indicators will demonstrate success in
More informationFire Safety Management
Fire Safety Management Wednesday 20 th June 2018 Russ Timpson www.bcptesting.com 24-storey Grenfell Tower in Kensington, West London June 14, 2017 We shape our buildings, thereafter they shape us Winston
More informationFire Protection. A Health and Safety Guideline for Your Workplace. Introduction. Fire Prevention and Control. Workplace Assessment
A Health and Safety Guideline for Your Workplace Fire Protection Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will
More informationManufactured Home Community Self-Inspection Checklist
Manufactured Home Community Self-Inspection Checklist Facility Inspector Location Date The following items should be regularly inspected and maintained to help ensure safety in your mobile home community.
More informationProperty Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes)
Property Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes) Insured Name: Risk Address: New Business Construction: Walls Renewal Policy Number: Building
More informationLegal Requirements. There is no general legal requirement to install sprinklers. in places of work
01 A sprinkler system is a pipework distribution system charged with water, with a network of heatsensitive sprinkler heads supplied via a tank/reservoir or a water main. If the temperature rises above
More informationAn Overview of Extinguishing Systems for Computer Equipment
Risk Solutions An Overview of Extinguishing Systems for Computer Equipment Various types of automatic suppression systems are available for protecting computer equipment. This report discusses the uses
More informationDate of assessment: 08 February 2014 Date of certificate: 10 February 2014 Reference number:
Energy Performance Certificate Northern Ireland 385, Oldpark Road BELFAST BT14 6QS Date of assessment: 08 February 2014 Date of certificate: 10 February 2014 Reference number: 0965-2998-0821-9104-3245
More informationI. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018
Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018 Prepared by: EH&S The probability of casualties and major structural damage increases when fire
More informationLarge Family Daycare Guideline
Moreno Valley Fire Department Fire Prevention Bureau Large Family Daycare Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: April 10, 2017 Large Family Daycare Guideline Purpose
More informationFIRE RISK ASSESSMENT Self Assessment
FIRE RISK ASSESSMENT Self Assessment Important! This fire risk assessment form is to be filled in by the responsible person within a business or organisation. As this is a free download for the use of
More informationAmerican Society of Safety Engineers Professional Development Conference June 9-12, Fire Protection. Stephen J.
American Society of Safety Engineers Professional Development Conference June 9-12, 2008 Session No. 101F Fire Protection Stephen J. Musur CSP, CFPS Chubb Group of Insurance Companies June 12, 2008 1 Fundamentals
More informationFIRE-RESISTANCE TEST ON FIRE COLLARS PROTECTING A PLASTERBOARD WALL PENETRATED BY SERVICES
FIRE-RESISTANCE TEST ON FIRE COLLARS PROTECTING A PLASTERBOARD WALL PENETRATED BY SERVICES Report number FSP 1360 CSIRO job number SP3241 Date of issue 31 JULY 2009 Client SNAP FIRE SYSTEMS PTY LTD. Commercial-in-confidence
More informationLarge Airports Maintaining Fire Safety through the years
2017 NFPA Conference & Expo through the years Presented by: Panos Samaras Fire Safety Officer Athens International Airport Greece 1 Main Points Part 1 Identify Regulatory Environment Recent Fires in Airports
More informationFIRE-RESISTANCE TEST ON DOWNLIGHT COVERS INSTALLED IN PLASTERBOARD CEILINGS
FIRE-RESISTANCE TEST ON DOWNLIGHT COVERS INSTALLED IN PLASTERBOARD CEILINGS Report number FSP 1290A CSIRO job number LP46ASP3085 Date of issue 30 NOVEMBER 2007 Client EFFICIENCY MATRIX PTY LTD and YOUNGEN
More informationGUIDELINES FOR INSPECTING GROUND BASED SPARKLING DEVICE (GBSD) RETAIL SALES FACILITIES
OFFICE OF THE FIRE MARSHAL Worcester County GOVERNMENT CENTER - ONE WEST MARKET STREET - ROOM 1003 SNOW HILL, MARYLAND 21863-1194 TEL: 410-632-5666 FAX: 410-632-5664 GUIDELINES FOR INSPECTING GROUND BASED
More informationCHC's One Big Housing Conference Health and Safety Update: Gas Safety
CHC's One Big Housing Conference 2017 Health and Safety Update: Gas Safety Presented by Mark Baker CORGI Technical Services Ltd. & Association of Gas Safety Managers Legislative Documentation The Gas Safety
More informationProperty risk solutions
Property risk solutions Inside this issue Welcome to this edition of the Property risk solutions newsletter. This quarterly publication focuses on fixed fire protection and human element safety solutions
More informationCarbon Monoxide: The High Cost and Affects of Complacency
Carbon Monoxide: The High Cost and Affects of Complacency April 27, 2015 Carey M. Bilyeu NB-AB Machinery Breakdown Division Photo by Carey Bilyeu Scope Discuss some of the advantages of performing a thorough
More informationManaging Fire Safety Through Construction. Reece Walker Arup Fire Engineer
Managing Fire Safety Through Construction Reece Walker Arup Fire Engineer Contents When it goes wrong, what is at risk Legislation and Guidance Who s responsible Risk assessment process Project Case Study
More informationGCSE 4080/01 BUSINESS STUDIES
Surname Centre Number Candidate Number Other Names 0 GCSE 4080/01 BUSINESS STUDIES S16-4080-01 P.M. FRIDAY, 10 June 2016 2 hours For s use Question Maximum Mark Mark Awarded 1. 3 2. 2 4080 010001 3. 3
More informationChecklist For Building Inspection & Fire Safety
INSPECTION CHECKLIST Date of Inspection: Location/Address: Weather Condition: Inspector: AFTER COMPLETING YOUR INSPECTION, TRANSFER YOUR CONCERNS/OBSERVATIONS TO THIS AREA Facility: Name: Staff Contact:
More informationFIRE SAFETY RISK ASSESSMENT
FIRE SAFETY RISK ASSESSMENT Wyclif Independent Christian School Premises Middle School, St. Johns Hall, Machen Fire Safety Risk Assessment for Wyclif Christian School Introduction Regulatory Reform Order
More informationEC TYPE EXAMINATION (MODULE B) CERTIFICATE
EC TYPE EXAMINATION (MODULE B) CERTIFICATE This is to certify that: LLOYD'S REGISTER VERIFICATION LIMITED (LRV), specified as a notified body under the terms of The Merchant Shipping (Marine Equipment)
More informationManaging Fire Safety in Occupied Buildings FM Ireland Fire Safety Theatre
FM Ireland Fire Safety Theatre Welcome David O Reilly FIFireE Association for Specialist Fire Protection in Ireland Institution of Fire Engineers Republic of Ireland Branch President International General
More informationA down-to-earth explanation on how Automatic Fire Sprinkler Systems function, where they are used and the various types of systems in use
Sprinklers Simplified A down-to-earth explanation on how Automatic Fire Sprinkler Systems function, where they are used and the various types of systems in use Sprinklers Simplified HB 147 2000 ISBN 0
More informationFire Engineering in High Rise 15 November 2013
Fire Engineering in High Rise 15 November 2013 Neal Butterworth Arup UK www.arup.com Neal.Butterworth@arup.com Contents How do we protect against fire? How do we know this works? Why evacuate? What assumptions
More informationFire Risk Assessment
Fire Risk Assessment Premises Description Address Area Post Code Tel no. Num of Employees Normal Occupancy Max Allowed Use of Premises Building Length Building Breadth Area 0.00 M² Floors Storeys Below
More informationNew Facilities. Minimum Requirements
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Item Reference Violation General Requirements NFPA 1124-7.1.1 Retail sales of consumer fireworks in both new and existing buildings, structures, and
More informationEnergy Efficiency Rating
Energy Performance Certificate Northern Ireland 49, Donard Avenue BANGOR BT20 3QD Date of assessment: 08 December 2017 Date of certificate: 08 December 2017 Reference number: 9663-0022-7739-7078-8902 Type
More informationThe Smoke and Carbon Monoxide Alarm (England) Regulations 2015
The Smoke and Carbon Monoxide Alarm (England) Regulations 2015 Q&A Booklet for the Private Rented Sector landlords and tenants September 2015 Department for Communities and Local Government Crown copyright,
More informationFIRE EMERGENCY POLICY
University Policies and Procedures 11-01.01 FIRE EMERGENCY POLICY I. Policy Statement: This is a statement of official University policy for the reporting of fire emergencies and for the evacuation of
More informationMaking sense of risk Risk engineering. Metalworking operations
Making sense of risk Risk engineering Metalworking operations Metalworking operations Metalworking operations involve the fabrication of ferrous or nonferrous metal products, structural metal products,
More informationEnergy Performance Certificate
Energy Performance Certificate Northern Ireland 54, Tobarcooran Avenue, NEWTOWNABBEY, BT36 6EP Date of assessment: Date of certificate: Reference number: Type of assessment: Accreditation scheme: Assessor
More informationHigh-Piled Combustible Storage
High-Piled Combustible Storage Presenters: Rob Neale & Scott Adams Tuesday, September 12, 2017 1:30 PM - 4:30 PM High-piled Combustible Storage Based on the 2015 International Fire Code ICC Annual Conference
More informationFire-resistance test on fire collars protecting a plasterboard wall penetrated by services
INFRASTRUCTURE TECHNOLOGIES Fire-resistance test on fire collars protecting a plasterboard wall penetrated by services Test Report Author: Peter Gordon Report number: FSP 1960 Date: 5 February 2019 Client:
More informationFire Safety. A TUC guide for trade union activists
Fire Safety A TUC guide for trade union activists Contents Section one Introduction 3 Section two The law 4 Section three Fire risk assesment 5 Section four Policies and procedures 6 Section five Enforcement
More informationProtection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers
Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers Final Report Prepared by: UL LLC The Fire Protection Research Foundation One Batterymarch Park Quincy,
More informationFor personal use only TOUCHCORP 1H2015 RESULTS PRESENTATION DATED: THURSDAY, 27TH AUGUST 2015
TOUCHCORP 1H2015 RESULTS PRESENTATION DATED: THURSDAY, 27TH AUGUST 2015 DISCLAIMER The material in this presentation has been prepared by Touchcorp Limited ARBN 603 731 184 (Touchcorp) and is general background
More information161 Eglinton Avenue East. Corner Retail for Lease at Eglinton & Redpath
161 Eglinton Avenue East Corner Retail for Lease at Eglinton & Redpath CBRE Limited, Real Estate Brokerage 145 King Street West Suite 1100 Toronto, ON M5H 1J8 416 362 2244 www.cbre.ca 161 Eglinton Avenue
More informationPARISH SELF-INSPECTION GUIDE
PARISH SELF-INSPECTION GUIDE Gallagher Bassett Services, Inc. Risk Control Consulting Division June 2008 Gallagher Bassett Services, Inc. The information contained in this report was obtained from sources,
More informationFire Cause Determination
Fire Cause Determination Objectives (1 of 3) Describe the role and relationship of the fire fighter to criminal investigators and insurance investigators. Differentiate accidental fires from incendiary
More informationGuideline No 11:2005. European guideline. Recommended Numbers of Fire Protection Trained Staff
European guideline Recommended Numbers of Fire Protection Trained Staff EFSAC Endorsed CFPA-E -Guidelines Foreword The European fire protection associations have decided to produce common guidelines in
More informationEnergy Performance Certificate
Energy Performance Certificate Northern Ireland 167, Killowen Grange, LISBURN, BT28 3JF Date of assessment: Date of certificate: Reference number: Type of assessment: Accreditation scheme: Assessor s name:
More informationNZS 4517:2010. New Zealand Standard. Fire sprinkler systems for houses. Superseding NZS 4517:2002 NZS 4517:2010
New Zealand Standard Fire sprinkler systems for houses Superseding NZS 4517:2002 NZS 4517:2010 NZS 4517:2010 COMMITTEE REPRESENTATION This Standard was prepared under the supervision of the P 4517 Committee,
More informationBuilding Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems
Building Standards Division Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems Crown Copyright 2015 Produced by the Buildings Standards Division February 2015 Version
More informationSlight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk
Fire Risk Assessment: ABC Sample House Sample Road SA1 3M2 C J Sparks Ltd 13 Alexandra Gardens Carshalton SM5 4LJ T: 02077577457 W: www.cjsparks.com E: sales@cjsparks.com Ref: 3077 Action Plan Number Action
More informationFire Safety Risk Assessment Large Premises
Fire Safety Risk Assessment Large Premises Premises Name: Person Completing this Assessment: Date of Assessment: Date of Next Review: (Recommended Annually) Fire Safety Risk Assessment (Large Premises)
More informationPage 1 of 4 FIRE REPORT - STRUCTURE Emergency Management BC / Office of the Fire Commissioner INCIDENT NUMBER: DDE 2014 06 17 05 03. Location of Incident: 4283 ARTHUR DR DELTA BC # of Occupants (At time
More informationBeau s Emergency Response Plan
Beau s Emergency Response Plan The following protocols are intended to keep employees and visitors at Beau s All Natural Brewing Company safe in the event of an emergency, while also minimizing damage
More informationA 92 plus B C D E F 21-38
Energy Performance Certificate Northern Ireland 5 Harmin Park NEWTOWNABBEY County Antrim BT36 7UR Date of assessment: 12 August 2010 Date of certificate: 17 August 2010 Reference number: 9929-1003-0238-6360-5964
More informationFire resistance test on fire collars protecting a concrete slab penetrated by services
INFRASTRUCTURE TECHNOLOGIES Fire resistance test on fire collars protecting a concrete slab penetrated by services Test Report Author: Mario Lara Report number: FSP 1601a Date: 11 April 2014 (This report
More informationBuilders Risk - Fire Prevention Inspection Checklist
Builders Risk - Fire Prevention Inspection Checklist Use our inspection checklist tool to help you identify and monitor risk related to builders risk of fire on the job site. Inspection Details: Inspector
More informationRISK ENGINEERING GUIDELINE
RISK ENGINEERING GUIDELINE BUSINESS SHUTDOWNS HDI Risk Consulting Property www.hdi.global Covering risks when the business is shut down. Timely planning and implementation of appropriate safety measures
More informationSeries TY-B 2.8, 5.6, and 8.0 K-factor Upright, Pendent, and Recessed Pendent Sprinklers Standard Response, Standard Coverage General Description
Worldwide Contacts www.tyco-fire.com Series TY-B 2.8,.6, 8.0 K-factor Upright, Pendent, Recessed Pendent Sprinklers Stard Response, Stard Coverage General Description TYCO Series TY-B, 2.8,.6, 8.0 K-factor,
More informationUpdate on SFPE Design Fire Scenarios Standard. Charles Fleischmann University of Canterbury
Update on SFPE Design Fire Scenarios Standard Charles Fleischmann University of Canterbury Mission - To develop a standard on methods to create design fire scenarios for a performance-based fire protection
More informationBrighton Fire Rescue District
Brighton Fire Rescue District 500 S. 4 th Ave, 3 rd Floor Brighton, Colorado 80601 Telephone: (303) 659-4101 Fax: (303) 659-4103 Website: www.brightonfire.org. INFORMATION REVIEW AND INSPECTION FEE SCHEDULE
More informationRAM-208. Remote Multiplex Annunciator Panel. Wiring & Installation Installation Manual COMMON TROUBLE A.C. ON SIGNAL SILENCED BUZZER SILENCE
Advanced Life Safety Solutions RAM-208 Remote Multiplex Annunciator Panel A.C. ON COMMON TROUBLE SIGNAL SILENCED BUZZER SILENCE SIGNAL SILENCE LAMP TEST SYSTEM RESET Wiring & Installation Installation
More informationUltra cold freezer storage. Risk management guide for research materials
Ultra cold freezer storage Risk management guide for research materials An education establishment s research can underpin their financial strength and reputation Grants worth millions of pounds are often
More informationNew Albany Office Building. Class A Office Space Available DON MATSANOFF A.J. NORMAN West Campus Oval New Albany, OH JOHN HALL
Class A Office Space Available New Albany Office Building DON MATSANOFF +1 614 430 5000 A.J. NORMAN +1 614 430 5025 6525 West Campus Oval New Albany, OH 43054 JOHN HALL +1 614 430 5081 www.cbre.com/don.matsanoff
More informationFire Prevention Plan
Fire Prevention Plan TABLE OF CONTENTS Section Title Page 1.0 Objective. 3 2.0 Background 3 3.0 Assignment of Responsibility.. 4 4.0 Plan Implementation..... 5 5.0 Types of Hazards...... 6 6.0 Training........
More informationFM Approvals & Water Mist Systems. Paul Bardsley Engineer, FM Approvals
FM Approvals & Water Mist Systems Paul Bardsley Engineer, FM Approvals Presentation Outline Introduction to FM Global Introduction to FM Approvals FM 5560 - Water Mist Systems Who are FM Global? The largest
More informationINITIAL FIRE SAFETY ASSESSMENT
INITIAL FIRE SAFETY ASSESSMENT Factory Plot No -246-249, Adamjee EPZ, Siddhirganj, Narayanganj Narayanganj 17 Jul 2016 The Alliance for Bangladesh Worker Safety Page 1/17 Factory 17 Jul 2016 Introduction
More informationWell managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.
Record of significant findings Risk assessment for : Assessment undertaken by : Horsefair House Nigel Billing CMIOSH Date: 28/3/17 Overview of Premises: 2 buildings on 3 stories in an L shaped configuration,
More informationFire Service Training Update
Fire Service Training Update Gary Keith, Vice President Engineering Standards Manager FM Global Mutual Property Insurance Company 1835 250 Standards Technically-Based: Research Engineering Standards FM
More informationSeries DS-1 Stainless Steel Dry-Type Sprinklers 5.6K Pendent, HSW, and Extended Coverage HSW Standard and Quick Response General Description
Worldwide Contacts www.tyco-fire.com Series DS-1 Stainless Steel Dry-Type Sprinklers 5.6K Pendent, HSW, and Extended Coverage HSW Standard and Quick Response General Description TYCO Series DS-1 Stainless
More informationInformation File. Sprinklers in Warehouses. Revision 3 June 2015 BIF 5
Information File Sprinklers in Warehouses Revision 3 June 2015 BIF 5 Fires in warehouses and large single storey buildings are more frequent than is generally thought. Recent research 1 has shown that
More informationRC11 First published 1979 Version 05 Risk Control Recommendations for fire safety in the use of lift trucks
RC11 First published 1979 Version 05 Risk Control Recommendations for fire safety in the use of lift trucks administered by IMPORTANT NOTICE This document has been developed through the RISCAuthority and
More informationFire protection documentation. CFPA-E Guideline No 13:2015 F
Fire protection documentation CFPA-E Guideline No 13:2015 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation in the
More informationEnergy Efficiency Rating
Energy Performance Certificate Northern Ireland 9, Greenpark Road Rostrevor NEWRY BT34 3EY Date of assessment: 18 November 2017 Date of certificate: 19 November 2017 Reference number: 9289-3967-0219-7603-0910
More information12/14/2013. Fire alarm and emergency power SPRINKLER HEAD
Fire alarm and emergency power SPRINKLER HEAD 1 Alert signal Alarm signal Fire detector Heat detector Smoke detector Smoke alarm 1. Detector locations 1. Fire detector locations (3.2.4.11) 2. Smoke detector
More informationFoam Concentrates Test and Fire Test
This certificate replaces certificate number SNG1806023/08 issued on 03/03/2018 which is hereby cancelled. Certificate no: Page 1 of 2 SNG1806023/08/A1 Foam Concentrates Test and Fire Test Office: Singapore
More informationA Building Manager s Guide to Maintaining Fire Code Compliance
A Building Manager s Guide to Maintaining Fire Code Compliance Know your role in conducting fire protection system inspections : Fire Alarm Codes and Standards Maintaining your compliance with fire code
More information