Technical Committee on Sprinkler System Installation Criteria

Size: px
Start display at page:

Download "Technical Committee on Sprinkler System Installation Criteria"

Transcription

1 Technical Committee on Sprinkler System Installation Criteria M E M O R A N D U M DATE: May 21, 2014 TO: FROM: Principal and Alternate Members of the Technical Committee on Sprinkler System Installation Criteria Matt Klaus, Principal Fire Protection Engineer/NFPA Staff Liaison SUBJECT: AUT-SSI AGENDA PACKAGE A2015 Second Draft Meeting Enclosed is the agenda for the Second Draft meeting for NFPA 13, Standard for the Installation of Sprinkler Systems. NFPA 13 has entered the Annual 2015 revision cycle and will produce a 2016 Edition. It is imperative that you review the attached public comments in advance, with your ideas and substantiations for your views. If you have alternate suggestions for text changes, please come prepared with the words and respective substantiation. For administrative questions, please feel free to contact Elena Carroll at (617) For technical questions, please feel free to contact Matt Klaus at (617) You can also reach either of us via at ECarroll@nfpa.org or MKlaus@nfpa.org. We look forward to meeting everyone in Del Mar, CA at the San Diego Marriott Del Mar.

2 Table of Contents Part 1 - Meeting Agenda Part 2 - Committee Address List Part 3 New Process Worksheets Part 4 A2015 First Draft Meeting Minutes Part 5 - A2015 Key Dates Part 6- SSI Public Comments

3 PART 1 MEETING AGENDA

4 Technical Committee on Sprinkler System Installation Criteria Second Draft Meeting June 23-25, 2014 San Diego Marriott Del Mar El Camino Real San Diego, CA AGENDA Monday June 23, Call to Order 8:00 AM 2. Introductions of Members and Staff 3. Review and Approval of A2015 First Draft Meeting Minutes 4. Review of A2015 Revision Cycle and Meeting Schedule 5. Review of Distributed Material and Workload b. Overview of Public Comments c. Overview of Potential Committee Second Revisions 6. Task Group Reports (order subject to change) a. Metric Task Group b. Pipe Venting Task Group c. Compatibility Task Group d. Cloud Ceiling Task Group e. Galvanized Pipe Task Group (Keeping) f. Chapter 1-3 Task Group Report (Lowrey) g. Chapter 6 & 7 Task Group Report (Smith) h. Chapter 8a Task Group Report (Caputo) i. Chapter 8b Task Group Report (Bilbo) j. Chapter 25 Task Group Report (Meehan) 7. Review Public Comments Tuesday, June 23, Reconvene 8:00AM (Time Subject to Change) 9. Continue Task Group Reports/Review Public Comments/Generate Second Revisions Wednesday, June 25, 2013

5 10. Reconvene 8:00AM (Time Subject to Change) 11. Continue Task Group Reports/Review Public Comments/Generate Second Revisions 12. Adjournment TBD

6 PART 2 COMMITTEE ADDRESS LIST

7 Address List No Phone Sprinkler System Installation Criteria Automatic Sprinkler Systems Joe W. Noble Chair Noble Consulting Services, LLC 6345 South Jones Blvd., #100 Las Vegas, NV International Fire Marshals Association E 10/10/1997 AUT-SSI Roland A. Asp Principal National Fire Sprinkler Association, Inc. 40 Jon Barrett Road Patterson, NY National Fire Sprinkler Association Design Technician 05/19/2014 Matthew J. Klaus AUT-SSI M 07/29/2013 AUT-SSI Hamid R. Bahadori Principal Hughes Associates, Inc. 725 Primera Boulevard, Suite 215 Lake Mary, FL Alternate: Mark Hopkins SE 4/17/1998 AUT-SSI Weston C. Baker, Jr. Principal FM Global 1151 Boston Providence Turnpike PO Box 9102 Norwood, MA Alternate: David B. Fuller I 9/30/2004 AUT-SSI Cecil Bilbo, Jr. Principal Academy of Fire Sprinkler Technology, Inc. 301 North Neil Street, Suite 426 Champaign, IL SE 7/26/2007 AUT-SSI Pat D. Brock Principal Oklahoma State University Fire Protection & Safety Technology 1424 West Liberty Avenue Stillwater, OK Alternate: Floyd Luinstra SE 8/5/2009 AUT-SSI Phillip A. Brown Principal American Fire Sprinkler Association, Inc Merit Drive, Suite 350 Dallas, TX American Fire Sprinkler Association Installer/Maintainer Alternate: Jim Johnston IM 10/10/1997 AUT-SSI Robert G. Caputo Principal Fire & Life Safety America Consolidated Fireprotection, Inc. 657 Cantara Lane Vista, CA Alternate: Steven J. Scandaliato SE 1/16/1998 AUT-SSI Ralph D. Gerdes Principal Ralph Gerdes Consultants, LLC 5510 South East Street, Suite E Indianapolis, IN American Institute of Architects SE 10/10/1997 AUT-SSI Donald G. Goosman Principal The RJA Group, Inc. Rolf Jensen & Associates, Inc. 600 West Fulton Street, Suite 500 Chicago, IL Alternate: Belynda Miranda SE 11/2/2006 AUT-SSI Luke Hilton Principal Liberty Mutual Property Ballantyne Corporate Place, Suite 525 Charlotte, NC Alternate: Glenn E. Thompson I 1/18/2001 AUT-SSI Brian Hoening Principal Globe Fire Sprinkler Corporation 4077 Air Park Drive Standish, MI National Fire Sprinkler Association Manufacturer Alternate: Scott T. Franson M 10/18/2011 AUT-SSI 1

8 Address List No Phone Sprinkler System Installation Criteria Automatic Sprinkler Systems Elwin G. Joyce, II Principal Eastern Kentucky University 2148 Alexandria Drive Lexington, KY NFPA Industrial Fire Protection Section U 10/10/1997 AUT-SSI Larry Keeping Principal Professional Loss Control 3413 Wolfedale Road, Suite 6 Mississauga, ON L5C 1V8 Canada 05/19/2014 Matthew J. Klaus AUT-SSI SE 10/10/1997 AUT-SSI John Kelly Principal Washington DC Fire & EMS Department Office of the Fire Marshal 719 Opus Avenue Capitol Heights, MD E 08/09/2012 AUT-SSI Charles W. Ketner Principal National Automatic Sprinkler Fitters LU 669 Joint Apprenticeship & Training Committee 7050 Oakland Mills Road Columbia, MD United Assn. of Journeymen & Apprentices of the Plumbing & Pipe Fitting Industry Alternate: Michael A. Rothmier L 1/10/2008 AUT-SSI George E. Laverick Principal UL LLC 333 Pfingsten Road Northbrook, IL Alternate: Kerry M. Bell RT 10/10/1997 AUT-SSI Kenneth W. Linder Principal Swiss Re 2 Waterside Crossing, Suite 200 Windsor, CT Alternate: Todd A. Dillon I 1/1/1984 AUT-SSI David O. Lowrey Principal City of Boulder Fire Rescue rd Street Boulder, CO E 08/09/2012 AUT-SSI Rodney A. McPhee Principal Canadian Wood Council 99 Bank Street, Suite 400 Ottawa, ON K1P 6B9 Canada U 10/10/1997 AUT-SSI Michael F. Meehan Principal VSC Fire & Security 1417 Miller Store Road, Suite C Virginia Beach, VA American Fire Sprinkler Association Design Alternate: Russell B. Leavitt IM 1/16/1998 AUT-SSI David S. Mowrer Principal Babcock & Wilcox Technical Services, LLC Y-12 National Security Complex PO Box 2009, MS-8107 Oak Ridge, TN Alternate: Austin L. Smith U 10/10/1997 AUT-SSI Thomas A. Noble Principal City of Henderson, Building & Fire Safety 240 Water Street PO Box Henderson, NV E 8/5/2009 AUT-SSI Janak B. Patel Principal Savannah River Nuclear Solutions 3704 Clark Crossing Martinez, GA U 8/5/2009 AUT-SSI 2

9 Address List No Phone Sprinkler System Installation Criteria Automatic Sprinkler Systems Peter T. Schwab Principal Wayne Automatic Fire Sprinklers, Inc. 222 Capitol Court Ocoee, FL IM 3/15/2007 AUT-SSI LeJay Slocum Principal Aon Fire Protection Engineering 7230 McGinnis Ferry Road, Suite 200 Suwanee, GA Alternate: Steven M. Tomlin 05/19/2014 Matthew J. Klaus AUT-SSI I 7/20/2000 AUT-SSI William B. Smith Principal Code Consultants, Inc Woodland Parkway, Suite 300 St. Louis, MO Alternate: David J. Burkhart SE 10/27/2005 AUT-SSI Paul A. Statt Principal Eastman Kodak Company 41 Monaco Drive Rochester, NY U 1/10/2008 AUT-SSI Zeljko Sucevic Principal Vipond Fire Protection 6380 Vipond Drive Mississauga, ON L6M 3C1 Canada Canadian Automatic Sprinkler Association Alternate: Matthew Osburn IM 08/09/2012 AUT-SSI Lynn K. Underwood Principal Axis US Property 303 West Madison Street, Suite 500 Chicago, IL Alternate: Adam Seghi I 10/1/1997 AUT-SSI Terry L. Victor Principal Tyco/SimplexGrinnell 705 Digital Drive, Suite N Linthicum, MD Alternate: James E. Golinveaux M 10/3/2002 AUT-SSI Robert Vincent Principal Shambaugh & Son, L.P Opportunity Drive Fort Wayne, IN National Fire Sprinkler Association Contractor Alternate: James A. Charrette IM 4/3/2003 AUT-SSI Daniel P. Wake Principal Victaulic Company 4901 Kesslersville Road PO Box 31 Easton, PA Alternate: Peter W. Thomas M 08/09/2012 AUT-SSI Kerry M. Bell Alternate UL LLC 333 Pfingsten Road Northbrook, IL Principal: George E. Laverick RT 4/15/2004 AUT-SSI David J. Burkhart Alternate Code Consultants, Inc Woodland Parkway, Suite 300 St. Louis, MO Principal: William B. Smith SE 03/07/2013 AUT-SSI James A. Charrette Alternate Allan Automatic Sprinkler Corp. of So. California 3233 Enterprise Street Brea, CA National Fire Sprinkler Association Contractor Principal: Robert Vincent IM 7/26/2007 AUT-SSI 3

10 Address List No Phone Sprinkler System Installation Criteria Automatic Sprinkler Systems Todd A. Dillon Alternate XL Global Asset Protection Services 1620 Winton Avenue Lakewood, OH Principal: Kenneth W. Linder I 7/16/2003 AUT-SSI Scott T. Franson Alternate The Viking Corporation 210 North Industrial Park Road Hastings, MI National Fire Sprinkler Association Manufacturer Principal: Brian Hoening 05/19/2014 Matthew J. Klaus AUT-SSI M 10/29/2012 AUT-SSI David B. Fuller Alternate FM Global 1151 Boston Providence Turnpike PO Box 9102 Norwood, MA Principal: Weston C. Baker, Jr. I 7/26/2007 AUT-SSI James E. Golinveaux Alternate Tyco Fire Protection Products 1467 Elmwood Avenue Cranston, RI Principal: Terry L. Victor M 10/10/1997 AUT-SSI Mark Hopkins Alternate Hughes Associates, Inc Commerce Drive, Suite 817 Baltimore, MD Principal: Hamid R. Bahadori SE 3/4/2008 AUT-SSI Jim Johnston Alternate Inland Fire Protection 1100 Ahtanum Road Yakima, WA American Fire Sprinkler Association Installer/Maintainer Principal: Phillip A. Brown IM 03/07/2013 AUT-SSI Russell B. Leavitt Alternate Telgian Corporation 2615 South Industrial Park Avenue Tempe, AZ American Fire Sprinkler Association Design Principal: Michael F. Meehan IM 8/9/2011 AUT-SSI Floyd Luinstra Alternate Oklahoma State University 499 Cordell South Stillwater, OK Principal: Pat D. Brock SE 10/29/2012 AUT-SSI Belynda Miranda Alternate The RJA Group, Inc. Rolf Jensen & Associates, Inc Monument Drive, Suite 815 Fairfax, VA Principal: Donald G. Goosman SE 10/20/2010 AUT-SSI Matthew Osburn Alternate Canadian Automatic Sprinkler Association 335 Renfrew Drive, Suite 302 Markham, ON L3R 9S9 Canada Principal: Zeljko Sucevic IM 10/27/2005 AUT-SSI 4

11 Address List No Phone Sprinkler System Installation Criteria Automatic Sprinkler Systems Michael A. Rothmier L 1/16/1998 Alternate AUT-SSI UA Joint Apprenticeship Committee LU Berrytree Drive Sugarland, TX United Assn. of Journeymen & Apprentices of the Plumbing & Pipe Fitting Industry Principal: Charles W. Ketner Steven J. Scandaliato Alternate SDG, LLC 5961 North Mona Lisa Road Tucson, AZ Principal: Robert G. Caputo 05/19/2014 Matthew J. Klaus AUT-SSI SE 10/03/2002 AUT-SSI Adam Seghi Alternate Coda Risk Analysis 9624 Vista View Drive Austin, TX Principal: Lynn K. Underwood I 10/29/2012 AUT-SSI Austin L. Smith Alternate Babcock & Wilcox Y-12, LLC PO Box 2009, MS 8107 Oak Ridge, TN Principal: David S. Mowrer U 3/1/2011 AUT-SSI Peter W. Thomas Alternate Victaulic Company 4901 Kesslersville Road Easton, PA Principal: Daniel P. Wake M 07/29/2013 AUT-SSI Glenn E. Thompson Alternate Liberty Mutual National Accounts Property 2959 Bighorn Drive Corona, CA Principal: Luke Hilton I 10/27/2005 AUT-SSI Steven M. Tomlin Alternate Aon/Schirmer Engineering Corporation 335 Renfrew Drive, Suite 101 Markham, ON L3R 9S9 Canada Principal: LeJay Slocum I 10/27/2009 AUT-SSI Barry M. Lee Nonvoting Member Tyco International 16 Payten Street Kogarah Bay, NSW 2217 Australia M 10/10/1997 AUT-SSI Matthew J. Klaus Staff Liaison National Fire Protection Association 1 Batterymarch Park Quincy, MA /16/2010 AUT-SSI 5

12 PART 3 NEW PROCESS WORKSHEETS

13 NEW PROCESS ACTIONS AND MOTIONS Possible Action #1: Accept Public Comment (exactly as it is) Action Required Sample motion Create a Second Revision I move to create a Second Revision using PC #. Possible action #2: Reject but see (revise submitted text) Action Required Sample motion Step 1 Create a Second Revision based on a Public Comment I move to create a Second Revision based on PC # with the following changes to the text... Step 2 If the revision is related to multiple PCs, respond to all of them together using the cart function I move to create a Second Revision based on PC # and incorporating PC #s with the following changes to the text... Possible action #3: Reject (no change to the standard) Action Required Sample motion Generate a statement (substantiation) I move to reject PC # with the following substantiation... Possible Action #4: Reject but hold (new material) Action Required Sample motion Reject Public Comment for this cycle, but save for next revision cycle I move to reject PC # but hold it for consideration during the First Draft meeting next cycle.

14 PART 4 A2015 FIRST DRAFT MEETING MINUTES

15 TC on Sprinkler System Installation Criteria First Draft Meeting Union Station Hotel Nashville, Tennessee August 20-22, 2013 Attendees: See attached list of attendees. 1. Joe Noble (TC Chair) called the meeting to order at 8:00 am and began introductions. 2. The A2012 ROC minutes were approved. 3. Matt Klaus gave the staff report and a presentation on the meeting procedures. 4. Joe Noble discussed the logistics for the meeting and the order of the task group reporting. 5. The committee processed the public input that was included in the meeting agenda. See the First Draft Report for the official actions on the public input and the First Revisions created by the TC. 6. New Business: The TC discussed several topics that will be studied by task groups prior to the Second Draft Meeting. These topics and assignments are as follows: i) Pipe Venting Task Group - The NFPA 13 CC has asked that this task group look at the concept of ganged venting and whether or not the FD language supports or prohibits this concept. Will Smith TG Leader Lejay Slocum Karl Wiegand Dave Lowrey Roland Asp Dave Fuller Mark Hopkins ii) Galvanized Pipe Task Group This task group will review the FD of NFPA ed. to make sure that all of the references to galvanized pipe are consistent throughout. Larry Keeping TG Leader Les Easter

16 Mark Hopkins Will Smith Dave Fuller Russ Leavitt iii) Cloud Ceiling Task Group The Cloud Ceiling Task Group will meet via telephone conference prior to the SD meeting to discuss revisions to the proposed language regarding cloud ceilings and the associated definitions. Dave Fuller TG Leader Robert Caput Cecil Bilbo Steve Scandaliato Dave Lowrey Roland Asp Karl Wiegand iv) The individual chapter task groups will also need to meet prior to the SD meetings. This can be done over the phone or meeting space will be made available on the day before the SSI SD meeting begins. 7. The Second Draft meeting is scheduled for Summer 2014 at a date and location to be determined. 8. Meeting adjourned at 5:00 pm on August 22.

17 Attendees Principals: Joe Noble, Chair Roland Asp Weston Baker Cecil Bilbo Pat Brock Robert Caputo Donald Goosman Luke Hilton Brian Hoening Elwin Joyce Larry Keeping Kenneth Linder David Lowrey Rodney McPhee Michael Meehan Thomas Noble Peter Schwab LeJay Slocum William Smith Zelijko Sucevic Terry Victor Daniel Wake Alternates: James Charrette Scott Franson David Fuller Mark Hopkins Russell Leavitt Floyd Luinstra Steven Scandaliato Adam Seghi Matthew Klaus, NFPA Staff Liaison Guests: Audrey Goldstein Jon Hart David Royse Les Easter John Eicheland Karl Wiegand Peter Thomas

18 PART 5 A2015 KEY DATES

19 2015 ANNUAL REVISION CYCLE *Public Input Dates may vary according to standards and schedules for Revision Cycles may change. Please check the NFPA Website for the most up to date information on Public Input Closing Dates and schedules at # (i.e. and click on the Next Edition tab. Process Stage Process Step Dates for TC Dates for TC with CC Public Input Closing Date* 7/8/2013 7/8/2013 Final Date for TC First Draft Meeting 12/13/2013 9/13/2013 Public Input Posting of First Draft and TC Ballot 1/31/ /25/2013 Stage Final date for Receipt of TC First Draft ballot 7/21/ /15/2013 (First Draft) Final date for Receipt of TC First Draft ballot recirc 2/28/ /22/2013 Posting of First Draft for CC Meeting 11/29/2013 Final date for CC First Draft Meeting 1/10/2014 Posting of First Draft and CC Ballot 1/31/2014 Final date for Receipt of CC First Draft ballot 2/21/2014 Final date for Receipt of CC First Draft ballot recirc 2/28/2014 Post First Draft Report for Public Comment 3/7/2014 3/7/2014 Public Comment Closing Date for Paper Submittal* 4/11/2014 4/11/2014 Public Comment Closing Date for Online Submittal (e PC)* 5/16/2014 5/16/2014 Final Date to Publish Notice of Consent Documents (Standards that 5/30/2014 5/30/2014 received no Comments) Appeal Closing Date for Consent Standards (Standards that received 6/13/2014 6/13/2014 no Comments) Final date for TC Second Draft Meeting 10/31/2014 7/25/2014 Comment Posting of Second Draft and TC Ballot 12/12/2014 9/5/2014 Stage Final date for Receipt of TC Second Draft ballot 1/2/2015 9/26/2014 (Second Final date for receipt of TC Second Draft ballot recirc 1/9/ /3/2014 Draft) Posting of Second Draft for CC Meeting 10/10/2014 Final date for CC Second Draft Meeting 11/21/2014 Posting of Second Draft for CC Ballot 12/12/2014 Final date for Receipt of CC Second Draft ballot 1/2/2015 Final date for Receipt of CC Second Draft ballot recirc 1/9/2015 Post Second Draft Report for NITMAM Review 1/16/2015 1/16/2015 Tech Session Notice of Intent to Make a Motion (NITMAM) Closing Date 3/6/2015 3/6/2015 Preparation Posting of Certified Amending Motions (CAMs) and Consent 5/1/2015 5/1/2015 Standards (& Issuance) Appeal Closing Date for Consent Standards 5/16/2015 5/16/2015 SC Issuance Date for Consent Standards 5/26/2015 5/26/2015 Tech Session Association Meeting for Standards with CAMs 6/22 25/2016 6/22 25/2016 Appeals and Appeal Closing Date for Standards with CAMs 7/15/2015 7/15/2015 Issuance SC Issuance Date for Standards with CAMs 8/20/2015 8/20/2015 Approved October 18, 2011 _ Revised March 7, 2013

20 PART 6 PUBLIC COMMENTS

21 9 of 579 5/19/2014 1:50 PM Public Comment No. 188-NFPA [ Section No. 1.6 ] 1.6 Units and Symbols Units Metric units of measurement in this standard shall be in accordance with the modernized metric system known as the International System of Units (SI) Two units (liter and bar), outside of but recognized by SI, are commonly used in international fire protection These units with conversion factors shall be used as listed in Table Table Conversion Factors Name of Unit Unit Symbol Conversion Factor liter L 1 gal = L 1 gpm/ft 2 = mm/min = millimeter per minute mm/min (L/min)/m 2 cubic decimeter dm 3 1 gal = dm 3 pascal Pa 1 psi = Pa bar bar 1 psi = bar bar bar 1 bar = 10 5 Pa Note: For additional conversions and information, see ASTM SI 10, Standard for Use of the International System of Units (SI): The Modern Metric System If a value for measurement as given in this standard is followed by an equivalent value in other units, the first stated shall be regarded as the requirement.

22 0 of 579 5/19/2014 1:50 PM Hydraulic Symbols. The standard abbreviations in Table shall be used on the hydraulic calculation form discussed in Chapter 23. Table Hydraulic Symbols Symbol or Abbreviation p gpm q Q P t P f P e P v P n E EE Lt.E Cr T GV BV Del V ALV DPV CV WCV St psi v K C-factor Pressure in psi U.S. gallons per minute Item Flow increment in gpm to be added at a specific location Summation of flow in gpm at a specific location Total pressure in psi at a point in a pipe Pressure loss due to friction between points indicated in location column Pressure due to elevation difference between indicated points. This can be a plus value or a minus value. If minus, the (-) shall be used; if plus, no sign is needed. Velocity pressure in psi at a point in a pipe Normal pressure in psi at a point in a pipe 90-degree ell 45-degree ell Long-turn elbow Cross Tee-flow turned 90 degrees Gate valve Butterfly (wafer) check valve Deluge valve Alarm valve Dry pipe valve Swing check valve Butterfly (wafer) check valve Strainer Pounds per square inch Velocity of water in pipe in feet per second K-factor Friction loss coefficient CC NOTE: The following CC Note No. 1 appeared in the First Draft Report. The 2016 edition is moving to a soft conversion approach for metric conversions. The "metric conversion task group" must look at section 1.6 and provide guidance to the users on the conversion rules and how the conversions are being made. The metric conversion task group must review the entire first draft and provide the metric conversion for each of the values in the standard (including tables and figures). Since soft conversions are being used, the hard conversion table in section 1.6 should be removed so that it does not provide confusion allowing people start mix and match soft and hard conversions. The methodology used for making the conversions should be added to the annex, with examples. Correlating Committee Note No. 1-NFPA [Section No. 1.6]

23 1 of 579 5/19/2014 1:50 PM Submitter Full Name: CC on AUT-AAC Organization: CC on Automatic Sprinkler Systems Submittal Date: Tue Apr 29 13:43:05 EDT 2014

24 2 of 579 5/19/2014 1:50 PM Public Comment No. 149-NFPA [ Section No ]

25 3 of 579 5/19/2014 1:50 PM ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ANSI/ASTM A 53, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless, ASTM A 106, Standard Specification for Seamless Carbon Steel Pipe for High Temperature Service, ASTM A 135, Standard Specification for Electric-Resistance-Welded Steel Pipe, ASTM A 153A/153M, Standard Specification for Zinc Coating (Hot Dip) on Iron and Steel Hardware, ASTM A 234, Standard Specification for Piping Fittings of Wrought-Carbon Steel and Alloy Steel for Moderate and High Temperature Service, ASTM A 795, Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use, ASTM B 16.15, Cast Bronze Threaded Fittings, ASTM B 32, Standard Specification for Solder Metal, ASTM B 43, Specification for Seamless Red Brass Pipe, ASTM B 75, Standard Specification for Seamless Copper Tube, ASTM B 88, Standard Specification for Seamless Copper Water Tube, ASTM B 251, Standard Specification for General Requirements for Wrought Seamless Copper and Copper-Alloy Tube, ASTM B 446, Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy (UNSN 06625) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNSN 06219) Rod and Bar, ASTM B 813, Standard Specification for Liquid and Paste Fluxes for Soldering Applications of Copper and Copper-Alloy Tube, ASTM B 828, Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings, ASTM C 635, Standard Specification for the Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings, ASTM C 636, Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels, ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, ASTM E 119, Standard Test Methods for Fire Tests of Building Construction and Materials, a. ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C, ASTM F 437, Standard Specification for Threaded Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 438, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 40, ASTM F 439, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 442, Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe (SDR-PR), ASTM F 1121, Standard Specification for International Shore Connections for Marine Fire Applications, ASTM SI 10, Standard for Use of the International System of Units (SI): The Modern Metric System, standards date updates - the public input related to this was not found but the ASTM fire standards are out of date

26 4 of 579 5/19/2014 1:50 PM Public Input No. 1-NFPA [Section No ] Submitter Full Name: Marcelo Hirschler Organization: GBH International Submittal Date: Sun Apr 27 16:27:02 EDT 2014

27 5 of 579 5/19/2014 1:50 PM Public Comment No. 271-NFPA [ Section No ]

28 6 of 579 5/19/2014 1:50 PM ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ANSI/ASTM A 53/A 53M, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless, ASTM A 106/A106M, Standard Specification for Seamless Carbon Steel Pipe for High Temperature Service, ASTM A 135/A 135M, Standard Specification for Electric-Resistance-Welded Steel Pipe, (2014). ASTM A 153A/153M, Standard Specification for Zinc Coating (Hot Dip) on Iron and Steel Hardware, ASTM A 234/A234M, Standard Specification for Piping Fittings of Wrought-Carbon Steel and Alloy Steel for Moderate and High Temperature Service, e1. ASTM A 795/A 795M, Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use, ASTM B 16.15, Cast Bronze Threaded Fittings, ASTM B 32, Standard Specification for Solder Metal, ASTM B 43, Specification for Seamless Red Brass Pipe, ASTM B 75, Standard Specification for Seamless Copper Tube, ASTM B 88, Standard Specification for Seamless Copper Water Tube, ASTM B 251, Standard Specification for General Requirements for Wrought Seamless Copper and Copper-Alloy Tube, ASTM B 446, Standard Specification for Nickel-Chromium-Molybdenum-Columbium Alloy (UNSN 06625) and Nickel-Chromium-Molybdenum-Silicon Alloy (UNSN 06219) Rod and Bar, (2008)e1. ASTM B 813, Standard Specification for Liquid and Paste Fluxes for Soldering Applications of Copper and Copper-Alloy Tube, ASTM B 828, Standard Practice for Making Capillary Joints by Soldering of Copper and Copper Alloy Tube and Fittings, (2010). ASTM C 635, Standard Specification for the Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings, a12. ASTM C 636, Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels, ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, ASTM E 119, Standard Test Methods for Fire Tests of Building Construction and Materials, a. ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 C, ASTM F 437, Standard Specification for Threaded Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 438, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 40, ASTM F 439, Standard Specification for Socket-Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80, ASTM F 442/F 442M, Standard Specification for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe (SDR-PR), e1. ASTM F 1121, Standard Specification for International Shore Connections for Marine Fire Applications, (2010). ASTM SI 10, Standard for Use of the International System of Units (SI): The Modern Metric System,

29 7 of 579 5/19/2014 1:50 PM Updating year dates First Revision No. 271-NFPA [Section No. 6.4] Submitter Full Name: Steve Mawn Organization: ASTM International Submittal Date: Thu May 15 14:33:09 EDT 2014

30 Page 1 of 1 5/21/2014 Public Comment No. 371-NFPA [ New Section after ] Small Openings. Openings in the ceiling or construction features of a concealed space that allow limited amounts of heat to enter the concealed space. Small openings with any dimension greater than 4 feet may not have a least dimension greater than 8 inches. Small openings may not have a combined total area of more than 20% of the ceiling, construction feature, or plane used to determine the boundaries of the concealed space. A A return air diffuser may be 4 feet by 2 feet and meet the definition of a small opening. A linear diffuser may be longer than 4 feet but is then limited to 8 inches in width (or least dimension). Spaces between ceiling panels of architectural features that create a concealed space must meet the same criteria. Cloud Ceiling Task Group language. Committee Input No. 166-NFPA [Global Input] Submitter Full Name: Cecil Bilbo Organization: Academy of Fire Sprinkler Tech Submittal Date: Tue May 20 14:54:53 EDT 2014 Copyright Assignment I, Cecil Bilbo, hereby irrevocably grant and assign to the National Fire Protection Association (NFPA) all and full rights in copyright in this Public Comment (including both the Proposed Change and the Statement of Problem and Substantiation). I understand and intend that I acquire no rights, including rights as a joint author, in any publication of the NFPA in which this Public Comment in this or another similar or derivative form is used. I hereby warrant that I am the author of this Public Comment and that I have full power and authority to enter into this copyright assignment. By checking this box I affirm that I am Cecil Bilbo, and I agree to be legally bound by the above Copyright Assignment and the terms and conditions contained therein. I understand and intend that, by checking this box, I am creating an electronic signature that will, upon my submission of this form, have the same legal force and effect as a handwritten signature

31 8 of 579 5/19/2014 1:50 PM Public Comment No. 365-NFPA [ New Section after ] Concealed Space. An area of or space within a building that is not accessible for storage purposes and is not normally occupied by people but could be entered occasionally for brief periods. The space shall be considered a concealed space even with small openings as defined in A The concealed space most commonly referred to in this context is the space above a ceiling. This definition should not be limited to these spaces. Concealed spaces can be found inside buildings between rooms and between ceilings and floors. They can also be found outside buildings in eaves and overhangs. The space of 1 should not be part of the definition and this language has been discussed by the Cloud Ceiling Task Group. First Revision No. 76-NFPA [New Section after 3.3.6] Submitter Full Name: Cecil Bilbo Organization: Academy of Fire Sprinkler Tech Submittal Date: Mon May 19 11:13:27 EDT 2014

32 9 of 579 5/19/2014 1:50 PM Public Comment No. 116-NFPA [ Section No ] Concealed Space. That portion (s) of a building behind walls, over suspended ceilings, in pipe chases and attics, and whose size might normally range from 1 in. (44.45 mm) stud spaces and up to 8 ft (2.44 m) interstitial floor truss spaces and that might contain combustible materials such as building structural members, thermal and/or electrical insulation, and ducting. The current definition could be misinterpreted to limit attic spaces to 8'-0" max. First Revision No. 76-NFPA [New Section after 3.3.6] Submitter Full Name: Peter Schwab Organization: Wayne Automatic Fire Sprinkler Submittal Date: Fri Apr 18 09:56:12 EDT 2014

33 0 of 579 5/19/2014 1:50 PM Public Comment No. 133-NFPA [ Section No ] Reconsider and do not accept the proposed definition. Delete the proposed Section Concealed Space. That portion (s) of a building behind walls, over suspended ceilings, in pipe chases and attics, and whose size might normally range from 1 in. (44.45 mm) stud spaces to 8 ft (2.44 m) interstitial truss spaces and that might contain combustible materials such as building structural members, thermal and/or electrical insulation, and ducting. in its entirety: Additional Proposed Changes File Name LGK_NFPA_ _Comment_3-3-7.pdf Description Approved PC Form A definition for a concealed space should not contain dimensions or construction features, for example, many attic spaces can be higher than 8 ft to the peak. Those same AHJ's who did not consider an attic to be a concealed space could just as easily say that a 10 ft interstitial space would not be a concealed space either. Public Input No. 136-NFPA [New Section after 3.3.6] Submitter Full Name: Larry Keeping Organization: Professional Loss Control Submittal Date: Fri Apr 25 13:46:50 EDT 2014

34 1 of 579 5/19/2014 1:50 PM Public Comment No. 267-NFPA [ Section No ] Concealed Space. That portion (s) of a building behind walls, over suspended ceilings, in pipe chases and attics, and whose size might normally range from 1 in. (44.45 mm) stud spaces to 8 ft (2.44 m) interstitial truss spaces and that might contain combustible materials such as building structural members, thermal and/or electrical insulation, and ducting. NFPA's Building Code Development Committee (BCDC) suggests to delete the new definition in Section 3.3.7, from FR 76. The definition adds confusion to the AHJ. This standard has worked well without the definition. As the negatie comment by Mr. Meehan points out, the standard already specifies where omissions are allowed. The definition as proposed introduces a laundry list that is limiting. The definition also introduces dimensions that are limiting. Ultimately, this is less useful to the AHJ in applying the omissions in Section Section 3.1 indicates that terms not defined shall use their ordinarily accepted meaning, which suffices. Note that NFPA 96 only uses the term concealed spaces once, and its application is for lighting units on commercial cooking hoods. This is a very narrow scope for the application of this definition. This definition does not seem to be applicable for sprinkler requirements. First Revision No. 76-NFPA [New Section after 3.3.6] Submitter Full Name: Jim Muir Organization: Building Safety Division, Clark County Washington Affilliation: NFPA's Building Code Development Committee (BCDC) Submittal Date: Thu May 15 11:58:12 EDT 2014

35 2 of 579 5/19/2014 1:50 PM Public Comment No. 338-NFPA [ Section No ] Concealed Space. That portion (s) of a building behind walls, over suspended ceilings, in pipe chases and attics, and whose size might normally range from 1 in. (44.45 mm) stud spaces to 8 ft (2.44 m) interstitial truss spaces and that might contain combustible materials such as building structural members, thermal and/or electrical insulation, and ducting An area with limited or no access, not intended for building occupant use or storage, that is enclosed on all sides with 4% of the area of one side allowed to be open. There are three concerns with the proposed language: 1) The language is unenforceable. It talks about the fact that the height of the space "might" be in a certain range and that certain things "might" be in the space. We should not be using such language in a definition. 2) The definition is too focused on the space above a drop ceiling and not the hundreds of other concealed spaces in a building such as the vertical spaces within wall stud cavities, crawl spaces, attics, soffits, etc. 3) There is no mention of the space being surrounded in order to be considered "concealed". The space is being defined as "concealed" if it is above a drop ceiling. What about non-continuous drop ceilings? Those spaces would be considered concealed, which is not the intent of the standard. Our proposed definition solves these problems by forcing the space to be surrounded in order to be considered "concealed". The 4% opening limitation comes from the statement in section that allows "small openings such as those used as return air for a plenum. Such openings tend to be 2 ft x 2 ft in a ceiling grid and tend to occur about every 100 sq ft, which puts them at about 4% of the area of one side of the concealed space. First Revision No. 76-NFPA [New Section after 3.3.6] Submitter Full Name: Kenneth Isman Organization: National Fire Sprinkler Association Submittal Date: Fri May 16 14:20:22 EDT 2014

36 3 of 579 5/19/2014 1:50 PM Public Comment No. 269-NFPA [ Section No [Excluding any Sub-Sections] ] A wet pipe system using automatic sprinklers that contains a liquid solution to prevent freezing of the system, intended to discharge the solution upon sprinkler operation, followed immediately by water from a water supply. The statement "followed by water"is redundant should be deleted. Public Input No. 56-NFPA [Section No. A ] Submitter Full Name: Phillip Brown Organization: American Fire Sprinkler Associ Submittal Date: Thu May 15 13:11:58 EDT 2014

37 4 of 579 5/19/2014 1:50 PM Public Comment No. 237-NFPA [ Section No ] System Riser. The aboveground horizontal or vertical pipe between the water supply and the mains (cross or feed) that contains a control valve (either directly or within its supply pipe), pressure gauge,main drain, and a waterflow alarm device. Editorial change Public Input No. 487-NFPA [Section No ] Submitter Full Name: Phillip Brown Organization: American Fire Sprinkler Associ Submittal Date: Fri May 09 12:19:48 EDT 2014

38 3 of 579 5/19/2014 1:50 PM Public Comment No. 344-NFPA [ New Section after ] Pre-Engineered Systems. Where listed pre-engineered systems are installed, they shall be installed within the limitations that have been established by the testing laboratories. Currently NFPA 13D allows pre-engineered systems to be installed as an acceptable alternative. Under the definition of pre-engineered, the systems must have been successfully tested to the appropriate hazard. Allowing alternate systems and new technologies through sections 1.4 and 1.6 of this standard, requires engineering proof that the alternative is equal or better protection than what is in the standard. Often obtaining engineering support or approval can be difficult and expensive. This would open it up to being approved under standard review from an engineer or authority having jurisdiction. I also believe that this is also a correlating issue from 13D. Public Input No. 441-NFPA [Section No ] Submitter Full Name: Daniel Wake Organization: Victaulic Company Submittal Date: Fri May 16 14:34:49 EDT 2014

39 Public Comment No. 136-NFPA [ Section No ] * 1 When a sprinkler is removed from a fitting or welded outlet, it shall not be reinstalled except as permitted by * Dry sprinklers shall be permitted to be reinstalled where they are not removed by applying torque at the point where the sprinkler is attached to the barrel. Additional Proposed Changes File Name LGK_NFPA_ _Comment_ pdf Description Approved PC Form The idea of removing a sprinkler and thinking that it won't be damaged is a fallacy. There are more ways to damage a sprinkler than by torque. Handling and storage is the critical issue. The need for caps and straps on new sprinklers came from damage during the handling of sprinklers from right out of the manufactures cartons, so it is not possible to assure similar damage won't occur to a dry pendent sprinkler that is removed from its installed location. See the images below as examples: See uploaded file for Figures First Revision No. 66-NFPA [Section No ] Submitter Full Name: Larry Keeping Organization: Professional Loss Control Submittal Date: Fri Apr 25 13:56:42 EDT of 579 5/19/2014 1:50 PM

40 5 of 579 5/19/2014 1:50 PM Public Comment No. 352-NFPA [ New Section after ] (NEW SECTION ) Electric Resistance Welding. Horizontal pipe that is joined by welds with electric resistance methods shall be installed with the seam at the top of the pipe. Type your content here... Additional Proposed Changes File Name 13-30_NFPA_13_FMDS0200_University_of_Michigan_David_King_data_from_Factory_Mutual_for_ pdf Please accept Mr. King's original proposal. See supporting documentation. Alternatively, it could be installed as part of an Annex. Public Input No. 556-NFPA [Sections 6.3.2, 6.3.3] Description Ap To support Mr. King's original proposal, a Data Sheet from FM Global is attached herewith. Submitter Full Name: Michael Anthony Organization: University of Michigan Affilliation: University of Michigan Submittal Date: Fri May 16 15:40:46 EDT 2014

41 Public Comment No. 190-NFPA [ Section No ] 6.3.7* Nonmetallic Pipe. Nonmetallic pipe in accordance with Table shall be investigated for suitability in automatic sprinkler installations and listed for this service Listed nonmetallic pipe shall be installed in accordance with its listing limitations, including installation instructions Manufacturer's installation instructions shall include its listing limitations When nonmetallic pipe is used in systems utilizing steel piping internally coated with corrosion inhibitors, the steel pipe coating shall be listed for compatibility with the nonmetallic pipe materials When nonmetallic pipe is used in systems utilizing steel pipe that is not internally coated with corrosion inhibitors, no additional evaluations shall be required * When nonmetallic pipe is used in systems utilizing steel pipe, cutting oils and lubricants used for fabrication of the steel piping shall be compatible with the nonmetallic pipe materials in accordance with Fire-stopping materials intended for use on nonmetallic piping penetrations shall be compatible with the nonmetallic pipe materials in accordance with Nonmetallic pipe listed for light hazard occupancies shall be permitted to be installed in ordinary hazard rooms of otherwise light hazard occupancies where the room does not exceed 400 ft 2 (37 m 2 ) Nonmetallic pipe shall not be listed for portions of an occupancy classification * Listed Pipe and Tubing Other types of pipe or tube investigated for suitability in automatic sprinkler installations and listed for this service, including but not limited to CPVC and steel, and differing from that provided in Table shall be permitted where installed in accordance with their listing limitations, including installation instructions Pipe or tube listed for light hazard occupancies shall be permitted to be installed in ordinary hazard rooms of otherwise light hazard occupancies where the room does not exceed 400 ft 2 (37 m 2 ) Pipe or tube installed in accordance with shall be permitted to be installed exposed, in accordance with the listing Pipe or tube shall not be listed for portions of an occupancy classification Bending of listed pipe and tubing shall be permitted as allowed by the listing Pipe and Tube Bending Bending of Schedule 10 steel pipe, or any steel pipe of wall thickness equal to or greater than Schedule 10 and Types K and L copper tube, shall be permitted when bends are made with no kinks, ripples, distortions, or reductions in diameter or any noticeable deviations from round For Schedule 40 and copper tubing, the minimum radius of a bend shall be six pipe diameters for pipe sizes 2 in. (50 mm) and smaller and five pipe diameters for pipe sizes in. (65 mm) and larger. 6 of 579 5/19/2014 1:50 PM

42 7 of 579 5/19/2014 1:50 PM For all other steel pipe, the minimum radius of a bend shall be 12 pipe diameters for all sizes Bending of listed pipe and tubing shall be permitted as allowed by the listing Pipe and Tube Identification * All pipe, including specially listed pipe allowed by , shall be marked along its length by the manufacturer in such a way as to properly identify the type of pipe The marking shall be visible on every piece of pipe over 2 ft (610 mm) long Pipe identification shall include the manufacturer's name, model designation, or schedule. CC NOTE: The following CC Note No. 3 appeared in the First Draft Report as First Revision No The non-metallic pipe compatibility task group needs to review NFPA 13 and 13R to resolve the differences between these standards. This is a material issue that needs to be consistent in both standards. First Revision No. 270-NFPA [Section No ] Submitter Full Name: CC on AUT-AAC Organization: CC on Automatic Sprinkler Systems Submittal Date: Tue Apr 29 13:53:16 EDT 2014

43 8 of 579 5/19/2014 1:50 PM Public Comment No. 240-NFPA [ Section No ] Nonmetallic pipe listed for light hazard occupancies shall be permitted to be installed exposed in ordinary hazard rooms of otherwise light hazard occupancies where the room does not exceed 400 ft 2 (37 m 2 ). Clarification needs to be made that nonmetallic pipe can be ran exposed. Public Input No. 233-NFPA [Section No ] Submitter Full Name: Phillip Brown Organization: American Fire Sprinkler Associ Submittal Date: Fri May 09 12:56:51 EDT 2014

44 9 of 579 5/19/2014 1:50 PM Public Comment No. 11-NFPA [ New Section after ] Add new Annex. Consideration of compatibility should be provided when connecting dissimilar materials, like brass extension fittings and copper piping systems. Certain brass alloys have been known to corrodes from dezincification a phenomenon where zinc is dissolved out of brass. This is more common in stagnant water systems connected to a copper piping network. Dezincification can cause leakage or failures in the fitting. First Revision No. 60-NFPA [New Section after ] Submitter Full Name: Mark Fessenden Organization: Tyco Fire Protection Products Submittal Date: Tue Mar 11 14:21:37 EDT 2014

45 0 of 579 5/19/2014 1:50 PM Public Comment No. 117-NFPA [ Section No ] Extension Fitting The outlet diameter of the extension fitting shall be equal to the inlet diameter of the sprinkler A single extension fitting up to a maximum of 2 in. (50 mm) in length shall be permitted to be installed with a sprinkler The extension fitting shall be Extension fittings longer than 2 in. (50 mm) shall be listed Extension fittings longer than 2 in (50 mm) shall be included in the hydraulic calculations The requirement of shall not apply where the sprinkler is listed for use with the extension nipple. Testing has been performed on sprinkler extensions and it has been proven that up to 2" extensions do not impact the K Factor of the attached sprinkler beyond the ranges found in Table Greater than 2" in length should be listed and included in the hydraulic calculations. First Revision No. 60-NFPA [New Section after ] Submitter Full Name: Peter Schwab Organization: Wayne Automatic Fire Sprinkler Submittal Date: Fri Apr 18 11:02:43 EDT 2014

46 1 of 579 5/19/2014 1:50 PM Public Comment No. 366-NFPA [ Section No ] The outlet diameter of the extension fitting shall be equal to or greater than the inlet diameter of the sprinkler. None given. First Revision No. 60-NFPA [New Section after ] Submitter Full Name: Cecil Bilbo Organization: Academy of Fire Sprinkler Tech Submittal Date: Mon May 19 12:31:59 EDT 2014

47 2 of 579 5/19/2014 1:50 PM Public Comment No. 12-NFPA [ Section No ] The extension fitting shall not be included in the hydraulic calculations. NFPA (9) allows the friction loss for the fitting directly connected to a sprinkler to be excluded from the hydraulic calculation. The fitting (tee, 90 or deducing coupling) that the extension fittings piece is attached should be included. If an extension fitting is added after hydraulic calculations have been performed, calculations should be redone adding in the friction loss at each tee, 90, or reducing coupling that was originally omitted. First Revision No. 60-NFPA [New Section after ] Submitter Full Name: Mark Fessenden Organization: Tyco Fire Protection Products Submittal Date: Tue Mar 11 14:25:18 EDT 2014

48 Public Comment No. 137-NFPA [ Sections , ] Sections , The extension fitting shall be included in the hydraulic calculations The requirement of shall not apply where the sprinkler is listed for use with the extension nipple. Additional Proposed Changes File Name LGK_NFPA_ _Comment_ pdf Description Approved PC Form The requirement for hydraulic calculations is not necessary or practical. It is not needed because as per (9), friction loss can be excluded for the fitting directly connected to the sprinkler. It is not practical because no equivalent lengths have been provided for extension fittings. Also, these devices are often been referred to as "cheaters" because they are usually employed on site, as a stop gap, to make up for a short pipe length or other site condition, that was not contemplated during the design stages, when the hydraulic calculations were prepared. First Revision No. 60-NFPA [New Section after ] Submitter Full Name: Larry Keeping Organization: Professional Loss Control Submittal Date: Fri Apr 25 14:01:21 EDT of 579 5/19/2014 1:50 PM

Dave Hague NFPA Staff Liaison 12 21,

Dave Hague NFPA Staff Liaison 12 21, Technical Committee on Sprinkler System Installation First Draft Meeting Marriott Gas Lamp Hotel San Diego, CA August 9-11, 2016 1. Ray Grill TC Chair called the meeting to order at 8:00am and self-introductions

More information

Technical Committee on Sprinkler System Installation Criteria

Technical Committee on Sprinkler System Installation Criteria Technical Committee on Sprinkler System Installation Criteria M E M O R A N D U M DATE: January 17, 2010 TO: FROM: Principal and Alternate Members of the Technical Committee on Sprinkler System Installation

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: June 19, 2013 TO: FROM: and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus, Fire

More information

Public Comment No. 16-NFPA 13D-2014 [ Section No ]

Public Comment No. 16-NFPA 13D-2014 [ Section No ] of 52 9/22/2014 9:20 AM Public Comment No. 16-NFPA 13D-2014 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

Technical Committee on Sprinkler System Installation Criteria

Technical Committee on Sprinkler System Installation Criteria Technical Committee on Sprinkler System Installation Criteria M E M O R A N D U M DATE: May 30, 2017 TO: FROM: Principal and Alternate Members of the Technical Committee on Sprinkler System Installation

More information

Correlating Committee on Automatic Sprinklers

Correlating Committee on Automatic Sprinklers Correlating Committee on Automatic Sprinklers First Draft Correlating Committee Meeting December 6, 2016 MEETING MINUTES 1. Call to Order. CC Chair Ken Linder called the meeting to order at 8AM. 2. Self-Introductions

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information

Technical Committee on Sprinkler System Installation Criteria

Technical Committee on Sprinkler System Installation Criteria Technical Committee on Sprinkler System Installation Criteria First Draft Meeting August 9-12, 2016 San Diego Marriott Gaslamp Quarter 660 K Street San Diego, CA 92101 AGENDA Tuesday August 9, 2016 1.

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON WATER-COOLING TOWERS. First Draft Meeting Agenda. February 7, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON WATER-COOLING TOWERS First Draft Meeting Agenda February 7, 2014 10:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions and Update of

More information

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting

TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, :00 AM - 5:00 PM EST Web/Teleconference Meeting TECHNICAL COMMITTEE ON MANUFACTURE OF ORGANIC COATINGS First Draft Meeting Agenda March 19, 2014 9:00 AM - 5:00 PM EST Web/Teleconference Meeting 1. Welcome. George Seuss, Chair 2. Introductions and Update

More information

Technical Correlating Committee on Automatic Sprinklers

Technical Correlating Committee on Automatic Sprinklers Technical Correlating Committee on Automatic Sprinklers ROC Meeting December 6, 2011 Windows Live Meeting and Conference Call AGENDA 1. Call to Order (1:00 PM) (Acting TCC Chair Ken Linder). 2. Self-Introductions

More information

Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group

Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group of 36 9/22/2014 9:37 AM Second Revision No. 14-NFPA 13D-2014 [ Global Comment ] Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group Supplemental

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems First Draft Meeting December 6-7, 2016 Buena Vista Palace 1900 E. Buena Vista Drive Lake Buena Vista, FL 32830 AGENDA day, December 6, 2016 1. Call

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical on Fluidized Bed Boilers AGENDA Web/Teleconference 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of Members and Guests 3. Approval of Minutes from

More information

Technical Committee on Water Mist Fire Suppression Systems

Technical Committee on Water Mist Fire Suppression Systems Date: January 29, 2013 1. Call to Order. Meeting was called to order by Chair Larry Owen at 8:00 AM. 2. Building Safety Message. Building safety was discussed and exits identified by Chair Larry Owen.

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification Public Comment No. 2-NFPA 73-2014 [ Section No. 4.1.3 ] 4.1.3 Unused Openings. 4.1.3.1 Unused openings, other than those intended for the operation of equipment, those intended for mounting purposes, or

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

NFPA 550 ROP Meeting Minutes

NFPA 550 ROP Meeting Minutes NFPA 550 ROP Meeting Minutes NFPA Technical Committee on Fire Risk Assessment Methods (FIR-AAA) June 24, 2010 Microsoft Live Meeting 1. Call to order. The meeting was called to order at 1:00 PM on Monday,

More information

NFPA Technical Committee on Garages and Parking Structures. NFPA 88A Second Draft Web/Teleconference Meeting

NFPA Technical Committee on Garages and Parking Structures. NFPA 88A Second Draft Web/Teleconference Meeting NFPA Technical Committee on Garages and Parking Structures NFPA 88A Second Draft Web/Teleconference Meeting September 30, 2013 2:00 p.m. 3:30 p.m. EDT AGENDA 1. Call to Order: Call meeting to order by

More information

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO

Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Agenda Technical Committee on Initiating Devices for Fire Alarm and Signaling Systems June 24-25, 2013 Saint Louis, MO Item No. Subject 13-6-1 Call to Order (8:00 A.M) 13-6-2 Roll Call 13-6-3 Approval

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

Correlating Committee on Automatic Sprinkler Systems

Correlating Committee on Automatic Sprinkler Systems Correlating Committee on Automatic Sprinkler Systems M E M O R A N D U M DATE: May 14, 2014 TO: FROM: Principal and Alternate Members of the Correlating Committee on Automatic Sprinkler Systems Matt Klaus,

More information

Standard Procedure s for Tenant Fire Sprinkler Work

Standard Procedure s for Tenant Fire Sprinkler Work Standard Procedure s for Tenant Fire Sprinkler Work 1. Provide tenant a copy of Simon Property Group Standards for Fire Protection Systems, Section 15400, requesting they in turn would give the standards

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

2016 Annual Revision Cycle Consent Document NFPA 75

2016 Annual Revision Cycle Consent Document NFPA 75 2016 Annual Revision Cycle Consent Document NFPA 75 The Committee on Electronic Computer Systems produced a Technical Committee Report that received at least one Notice of Intent to Make a Motion (NITMAM)

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Sprinkler System

More information

Public Comment No. 20-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 20-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item of 27 9/2/2014 9:27 AM Public Comment No. 20-NFPA 24-2014 [ Section No. 2.3.2 ] 2.3.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

Technical Committee on Hanging and Bracing of Water-Based Fire Protection Systems

Technical Committee on Hanging and Bracing of Water-Based Fire Protection Systems Technical Committee on Hanging and Bracing of Water-Based Fire Protection Systems M E M O R A N D U M DATE: May 26, 2016 TO: Members of the Technical Committee on Hanging and Bracing of Water-Based Fire

More information

Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122

Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122 Technical Committee on Mining Facilities First Draft Meeting - NFPA 120 and 122 Zurich Hosted 1400 America Lane Schaumburg, Illinois May 22 23, 2013 AGENDA 1. Chair Matt Bujewski calls meeting to order

More information

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017)

MEMORANDUM. Technical Committee on Board and Care Facilities. NFPA 101 Second Draft Technical Committee FINAL Ballot Results (A2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Board and Care Facilities

More information

Technical Committee on Residential Sprinkler Systems

Technical Committee on Residential Sprinkler Systems Technical Committee on Residential Sprinkler Systems M E M O R A N D U M DATE: June 26, 2013 TO: FROM: Principal and Alternate Members of the Technical Committee on Residential Sprinkler Systems Matt Klaus,

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

1 of /3/ :03 PM. Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ]

1 of /3/ :03 PM. Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ] 1 of 129 11/3/2016 12:03 PM Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ] 2 of 129 11/3/2016 12:03 PM American Society of Mechanical Engineers Chapter 2 Referenced Publications 2.1 General. The documents

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET

FIF AAA (F2014) Second Draft Meeting Web/Teleconference Meeting Agenda March 18, :00 5:00 p.m. ET NFPA 804, Standard for Fire Protection for Advanced Light Water Reactor Electric Generating Plants, NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating

More information

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur.

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur. First Revision No. 1-NFPA 501-2015 [ Section No. 5.3.1.3 ] 5.3.1.3 The following conditions shall be met when an interior finish material is tested using the test protocol of NFPA 286, Standard Methods

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Residential Sprinkler

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

Technical Committee on Fluidized Bed Boilers

Technical Committee on Fluidized Bed Boilers Technical Committee on Fluidized Bed Boilers AGENDA NFPA Headquarters 1 Batterymarch Park Quincy, MA 02169 1. Chair s welcome, call to order, and opening remarks at 1:00 pm EST. 2. Self-Introduction of

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Page 1 of 13 Public Comment No. 2-NFPA 703-2013 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, P.O. Box C700, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. ASTM D 2898, Standard

More information

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE

FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE COMMITTEE MEMORANDUM TO: FROM: NFPA 30 Technical Committee on Storage and Warehousing of Containers and Portable Tanks R. P. Benedetti DATE: September 16, 2010 SUBJECT:

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee Renaissance Blackstone Chicago 636 South Michigan Avenue, Chicago, IL 60605 May 13-14, 2014 Chicago, IL 1. Call to Order. Call the meeting to

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

NFPA 101 SAF-RES PUBLIC COMMENTS

NFPA 101 SAF-RES PUBLIC COMMENTS Page 134 of 195 Public Comment No. 3-NFPA 101-2013 [ Section No. 28.7.6.1 ] 28.7.6.1 New draperies, curtains, and other similar loosely hanging furnishings and decorations shall be flame resistant as demonstrated

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 1-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 280 2/6/2015 12:06 PM Public Input No. 1-NFPA 58-2013 [ Global Input ] NOTE: This public input originates from Tentative Interim Amendment 58-14-1 (TIA 1079) issued by the Standards Council on August

More information

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES

NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA Technical Committee on Fire Tests FALL 2011 ROC MEETING MINUTES 1.

More information

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX

NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX NFPA Technical Committee on Fire Tests FALL 2010 ROC MEETING MINUTES April 15-16, 2010 Southwest Research Institute San Antonio, TX 1. Call to Order. The meeting of the Technical Committee on Fire Tests

More information

Technical Committee on Standpipes (SPI-AAA)

Technical Committee on Standpipes (SPI-AAA) Technical Committee on Standpipes (SPI-AAA) M E M O R A N D U M DATE: February 13, 2014 TO: FROM: Principal and Alternate Members of the Technical Committee on Standpipes (SPI-AAA) Chad Duffy, NFPA Staff

More information

NFPA Technical Committee on Air Conditioning. NFPA 90A and 90B Second Draft Web/Teleconference Meeting. September 24, :00 p.m. 2:00 p.m.

NFPA Technical Committee on Air Conditioning. NFPA 90A and 90B Second Draft Web/Teleconference Meeting. September 24, :00 p.m. 2:00 p.m. NFPA Technical Committee on Air Conditioning NFPA 90A and 90B Second Draft Web/Teleconference Meeting September 24, 2013 12:00 p.m. 2:00 p.m. EDT AGENDA 1. Call to Order: Call meeting to order by Chair,

More information

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment of 25 5/14/2015 2:32 PM Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ] A.1.4 A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement

More information

Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings

Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings Reprinted with permission from NFPA 13D Installation of Sprinkler Systems in One- and two-family Dwellings and Manufactured

More information

Technical Committee on Multiple Burner Boilers

Technical Committee on Multiple Burner Boilers Technical Committee on Multiple Burner Boilers AGENDA Salt River Project PERA Club 1 Continential Drive Tempe, AZ January 14-15, 2014 1. Chair s welcome, call to order, and opening remarks at 8:00 a.m.

More information

Technical Committee on Private Water Supply Piping Systems

Technical Committee on Private Water Supply Piping Systems Technical Committee on Private Water Supply Piping Systems M E M O R A N D U M DATE: June 26, 2013 TO: FROM: Principal and Alternate Members of the Technical Committee on Private Water Supply Piping Systems

More information

Public Comment No. 2-NFPA [ Section No ]

Public Comment No. 2-NFPA [ Section No ] Public Comment No. 2-NFPA 16-2013 [ Section No. 3.3.6 ] 3.3.6* Foam-Water Sprinkler System. A piping network connected to a source of foam concentrate and to a water supply. The piping network is equipped

More information

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12. 2/18/2016 National Fire Protection Association Report Committee Input No. 70 NFPA 54 2015 [ Section No. 12.5 ] This was a First Revision that failed ballot. 12.5 Type of Venting System to Be Used. 12.5.1

More information

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS

REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS REPORT OF THE NFPA MOTIONS COMMITTEE* ON FALL 2013 REVISION CYCLE STANDARDS I. Introduction. This is the Motions Committee Report on Standards in the Fall 2013 Revision Cycle. The report identifies Certified

More information

Technical Committee on Water Spray Fixed Systems (WAS-AAA)

Technical Committee on Water Spray Fixed Systems (WAS-AAA) Technical Committee on Water Spray Fixed Systems () M E M O R A N D U M DATE: August 21, 2015 TO: FROM: and Members of the Technical Committee on Water Spray Fixed Systems () Chad Duffy, NFPA Staff Liaison

More information

MEETING AGENDA High Rise Building Safety Advisory Committee

MEETING AGENDA High Rise Building Safety Advisory Committee MEETING AGENDA High Rise Building Safety Advisory Committee March 4, 2015 Teleconference/Web Meeting 1. Call to Order. Call the meeting to order by Chair, Jim Quiter, at 1:00 pm EST on Wednesday, March

More information

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN

Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Minutes of the Pre-ROP Meeting of the T/C on Protected Premises Signaling September 22-23, 2010 Indianapolis, IN Mr. Merton Bunker, Committee Chair, called the meeting to order at 8:05 on Wednesday September

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Cultural Resources

More information

Technical Committee on Residential Sprinkler Systems

Technical Committee on Residential Sprinkler Systems Technical Committee on Residential Sprinkler Systems M E M O R A N D U M DATE: June 10, 2016 TO: Members of the Technical Committee on Residential Sprinkler Systems FROM: David R. Hague, Fire Protection

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

NFPA Technical Committee on Unmanned Aerial Systems

NFPA Technical Committee on Unmanned Aerial Systems NFPA Technical Committee on Unmanned Aerial Systems NFPA 2400 DRAFT DEVELOPMENT MEETING (No. 2) AGENDA Renaissance Dallas Hotel 2222 Stemmons Freeway Dallas, TX 75207 May 7 9, 2017 Day One: 8:00 AM 5:00

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Residential Occupancies Kelly

More information

Technical Committee on Record Protection (REA-AAA)

Technical Committee on Record Protection (REA-AAA) Technical Committee on Record Protection (REA-AAA) DATE: September 8, 2015 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Record Protection (REA-AAA) Audrey

More information

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS Fire Protection Systems includes the following: Alternate Fire Suppression Systems Atrium Fire Protection Systems Automatic Fire Sprinkler

More information

Technical Committee on Incinerators and Waste Handling Systems

Technical Committee on Incinerators and Waste Handling Systems Technical Committee on Incinerators and Waste Handling Systems Date: April 27, 2017 To: From: Technical Committee on Incinerators and Waste Handling Systems Eric Nette, Staff Liaison/Engineer Re: Agenda

More information

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses PART 1 - GENERAL 1.1 SCOPE A. Through Class III Commodity Classification, up to 12.2m of single, double or multiple row rack storage, up to 14.6m building height (VanQuish Fire Sprinkler System). Cartoned

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure

More information

Public Comment No. 13-NFPA [ Section No ]

Public Comment No. 13-NFPA [ Section No ] Public Comment No. 13-NFPA 30-2013 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A 395/A395M, Standard

More information

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Water Spray

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 35 12/3/2015 7:13 AM Public Input No. 1-NFPA 90A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI/ASHRAE

More information

- Residential Fire Sprinkler -

- Residential Fire Sprinkler - - Residential Fire Sprinkler - Update as of September 15, 2014 The information provided is a state-by-state status of the 2009 IRC adoption and legislation activities as reported by HBA s. NAHB staff monitors

More information

NFPA 14. Standard for the. Installation of Standpipe and Hose Systems Edition

NFPA 14. Standard for the. Installation of Standpipe and Hose Systems Edition NFPA 14 Standard for the Installation of Standpipe and Hose Systems 2003 Edition Copyright 2003, National Fire Protection Association, All Rights Reserved This edition of NFPA 14, Standard for the Installation

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Sprinkler System

More information

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers

Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers Protection of Rack Stored Exposed Expanded Group A Plastics with ESFR Sprinklers and Vertical Barriers Suppression, Detection and Signaling Research and Applications Conference SupDet 2015 March 5, 2015

More information

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT

Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT Obstructions and ESFR Sprinklers Phase 2 FINAL REPORT PREPARED BY: Garner A. Palenske, P.E., and William N. Fletcher, P.E. Aon Fire Protection Engineering San Diego, CA, USA September 2015 Fire Protection

More information

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for

More information

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda])

1. Call to Order. The meeting was called to order at 1:05 PM. (See Enclosure A [Agenda]) FINAL MINUTES Healthcare Interpretations Task Force Tuesday, June 15, 2016 Mandalay Bay Convention Center South Convention Center, Level 2 Room Surf F Las Vegas, NV 1. Call to Order. The meeting was called

More information

Series EC-11 and EC-14 Sprinklers, 11.2 K and 14.0 K Upright and Pendent Extended Coverage Light and Ordinary Hazard General Description

Series EC-11 and EC-14 Sprinklers, 11.2 K and 14.0 K Upright and Pendent Extended Coverage Light and Ordinary Hazard General Description Worldwide Contacts www.tyco-fire.com Series EC-11 and EC-14 Sprinklers, 11.2 K and 14.0 K and Pendent Extended Coverage Light and Ordinary Hazard General Description TYCO Series EC-11 and EC-14 Extended

More information

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS

SECTION WET-PIPE FIRE-SUPPRESSION SPRINKLERS SECTION 13930 WET-PIPE FIRE-SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install complete wet-pipe fire sprinkler system in new addition only as specified

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION (13900) - FIRE SUPPRESSION SYSTEMS PART 1 GENERAL 1.01 SUMMARY SECTION 21 10 00 (13900) - FIRE SUPPRESSION SYSTEMS A. Section Includes: 1. Pipe and Fittings. 2. Sprinklers. B. Related Documents: 1. Marriott s Fire Protection and Life Safety

More information

NFPA Technical Committee on Deployment and Organization of Fire Prevention Activities

NFPA Technical Committee on Deployment and Organization of Fire Prevention Activities NFPA Technical Committee on Deployment and Organization of Fire Prevention Activities MEETING AGENDA Jackson Hole, WY October 3-4, 2011 1. Chair Farr calls meeting to order on October 3, 2011 at 8:00 am.

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM SECTION 21 10 00 PART 1 - GENERAL 1.1 CODES A. Work shall conform to NFPA 13 Sprinkler Systems, 2002 Edition and NFPA 24 Outside Protection, 2002 Edition. NFPA 14 Standpipe Systems, 2000 Edition and International

More information