Committee Input No. 1-NFPA [ Chapter 2 ]

Size: px
Start display at page:

Download "Committee Input No. 1-NFPA [ Chapter 2 ]"

Transcription

1 of 35 11/4/2016 6:18 PM Committee Input No. 1-NFPA [ Chapter 2 ] The committee will review and update the editions of the referenced publications to the correct edition at the Second Draft meeting. Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered part of the requirements of this document. 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 4, Standard for Integrated Fire Protection and Life Safety System Testing, 2015 edition. NFPA 72, National Fire Alarm and Signaling Code, 2016 edition. NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2015 edition. NFPA 105, Standard for Smoke Door Assemblies and Other Opening Protectives, 2016 edition. NFPA 252, Standard Methods of Fire Tests of Door Assemblies, 2012 edition. NFPA 253, Standard Method of Test for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source, 2015 edition. NFPA 257, Standard on Fire Test for Window and Glass Block Assemblies, 2012 edition. NFPA 288, Standard Methods of Fire Tests of Horizontal Fire Door Assemblies Installed in Horizontal Fire Resistance Rated Assemblies, 2012 edition. NFPA 701, Standard Methods of Fire Tests for Flame Propagation of Textiles and Films, 2010 edition. 2.3 Other Publications ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY ASME A17.1/CSA B , Safety Code for Elevators and Escalators, NFPA 80 CI Report Page 1 of 35

2 of 35 11/4/2016 6:18 PM ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM A36/A36M, Standard Specification for Carbon Structural Steel, ASTM D4157, Standard Test Method for Abrasion Resistance of Textile Fabrics (Oscillatory Cylinder Method), ASTM D5034, Standard Test Method for Breaking Strength and Elongation of Textile Fabrics (Grab Test), 2009 (2013). ASTM D6193, Standard Practice for Stitches and Seams, ASTM E119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2012a BHMA Publications. Builders Hardware Manufacturers Association, 355 Lexington Avenue, 15th Floor, New York, NY ANSI/BHMA A156.1, Standard for Butts and Hinges, ANSI/BHMA A156.4, Standard for Door Controls (Closers), ANSI/BHMA A156.17, Standard for Self Closing Hinges & Pivots, ANSI/BHMA A156.26, American National Standard for Continuous Hinges, GSA Publications. U.S. General Services Administration, 1800 F Street, NW, Washington, DC Federal Specification A-A-1923A, Shield Expansion (Lag, Machine and Externally Threaded Wedge), Federal Specification A-A-1924A, Shield, Expansion (Self Drilling Tubular Expansion Shell Bolt), Federal Specification A-A-55614, Shield, Expansion (Non-Drilling Expansion Anchors), SMACNA Publications. Sheet Metal and Air Conditioning Contractors' National Association, 4201 Lafayette Center Drive, Chantilly, VA Fire, Smoke and Radiation Damper Installation Guide for HVAC Systems, UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL ANSI/UL 9, Standard for Fire Tests of Window Assemblies, 2009, revised ANSI/UL 10A, Standard for Tin-Clad Fire Doors, 2009, revised ANSI/UL 10D, Fire Tests for Fire Protective Curtains, ANSI/UL 14C, Swing Hardware for Tin-Clad Fire Doors Mounted Singly and in Pairs, 2006, revised ANSI/UL 33, Standard for Heat Responsive Links for Fire-Protection Services, revised ANSI/UL 263, Standard for Fire Tests of Building Construction and Materials, ANSI/UL 555, Standard for Fire Dampers, 2006, revised ANSI/UL 864, Standard for Control Units and Accessories for Fire Alarm Systems, 2003, revised NFPA 80 CI Report Page 2 of 35

3 of 35 11/4/2016 6:18 PM Other Publications. Merriam-Webster s Collegiate Dictionary, 11th edition, Merriam-Webster, Inc., Springfield, MA, References for Extracts in Mandatory Sections. NFPA 72, National Fire Alarm and Signaling Code, 2016 edition. NFPA 82, Standard on Incinerators and Waste and Linen Handling Systems and Equipment, 2014 edition. NFPA 101, Life Safety Code, 2015 edition. NFPA 5000, Building Construction and Safety Code, 2015 edition. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Sep 07 10:56:53 EDT 2016 Committee Statement Committee Statement: Response Message: At the Second Draft meeting, the committee will review the referenced publications and update to the appropriate edition date. Public Input No. 48-NFPA [Section No ] Public Input No. 8-NFPA [Section No ] Public Input No. 2-NFPA [Chapter 2] NFPA 80 CI Report Page 3 of 35

4 of 35 11/4/2016 6:18 PM Committee Input No. 7-NFPA [ New Section after ] Where a swinging fire door assembly is no longer required to be rated, the door label shall be permitted to be removed or covered such that the door is no longer identified as a fire protection feature. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Sep 07 14:46:04 EDT 2016 Committee Statement Committee Statement: Some AHJ's require that doors that are no longer required to be rated (rated wall has moved to a different location of a fire barrier has been de-rated) must be maintained and tested since it is in view of the public and lack of adequate maintenance and testing therefore creates a false impression of protection. Removal of the label (or covering the label) will eliminate the false impression of protection. The change is being proposed as a Committee Input and the committee will conduct additional review prior to Second Draft. Public comment is encouraged. Public Input No. 78-NFPA [New Section after 4.2.3] NFPA 80 CI Report Page 4 of 35

5 5 of 35 11/4/2016 6:18 PM Committee Input No. 38-NFPA [ Section No. 4.7 ] Review Section 4.7 for duplicate provisions prior to the Second Draft Meeting. 4.7 Actuation Devices for Fire Doors, Fire Shutters, and Fire Windows General Actuation devices for the release of fire doors shall be permitted to be part of an overall system that releases the door, such as a fire alarm, water flow alarm, or carbon dioxide release system Actuation devices and their components shall be installed in accordance with the manufacturers' instructions When the system or arrangement of detectors for an opening is not considered to be fail-safe, fusible links shall be used to ensure automatic closing of the door in the event of a power failure Fire doors that incorporate a device that delays activation of an automatic-closing, self-closing, or emergency power operation shall not delay the initiation of the closing or reclosing of the door for more than 10 seconds, unless acceptable to the authority having jurisdiction * When actuation devices are used in conjunction with material handling systems, such as a conveyor, they shall be arranged in accordance with the following: (1) They shall stop the feed conveyor or otherwise initiate the mechanism that clears the path of the fire door. (2) They shall provide an adequate time delay to clear the opening that shall not exceed 10 seconds. (3) They shall activate the automatic- or self-closing mechanism Smoke Detectors. Where smoke detectors are used, they shall be located in accordance with NFPA Heat Detectors. NFPA 80 CI Report Page 5 of 35

6 of 35 11/4/2016 6:18 PM All heat detectors shall be placed as shown in Figure (a) and Figure (b), but in no event shall detectors be placed in the dead air space shown in Figure (a). Figure (a) Proper Placement of Heat Detectors and Fusible Links. Figure (b) Heat Detector Locations Unless otherwise acceptable to the AHJ, heat detectors shall be installed on both sides of the wall and interconnected so that the operation of any single heat detector causes the door to close Fusible Links * Except as required by and , fusible links shall be placed as shown in Figure (a) * Unless otherwise acceptable to the AHJ, fusible links shall be installed on both sides of the wall and interconnected so that the operation of any single fusible link causes the door to close * NFPA 80 CI Report Page 6 of 35

7 of 35 11/4/2016 6:18 PM Where fusible links are used, one fusible link shall be located near the top of the opening, and additional links shall be located at or near the ceiling on each side of the wall Where fusible links are installed on both sides of the wall, a sleeve shall be installed through the wall to provide an open pathway for the cable or chain connecting the fusible links The sleeve shall be 1 2 in. (13 mm) diameter galvanized steel conduit or pipe, with ends deburred, and fitted with a collar or bushing at each end to secure the sleeve around the wall and allow free movement of the cable or chain through the sleeve upon fusing of the links When the system or arrangement of detectors for an opening is not considered to be fail-safe, fusible links shall be used Where smoke detectors are used, they shall be located in accordance with NFPA Detectors and their components shall be installed in accordance with the manufacturers' instructions Unless otherwise acceptable to the AHJ, heat detectors or fusible links shall be installed on both sides of the wall, interconnected so that the operation of any single detector or fusible link causes the door to close Where fusible links are used, one fusible link shall be located near the top of the opening, and additional links shall be located at or near the ceiling on each side of the wall Where fusible links are installed on both sides of the wall, a sleeve shall be installed through the wall to provide an open pathway for the cable or chain connecting the fusible links The sleeve shall be a 1 2 in. (13 mm) diameter galvanized steel conduit or pipe, with ends de-burred, and fitted with a collar or bushing at each end to secure the sleeve around the wall and allow free movement of the cable or chain through the sleeve upon fusing of the links. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Sep 19 09:43:37 EDT 2016 NFPA 80 CI Report Page 7 of 35

8 of 35 11/4/2016 6:18 PM Committee Statement Committee Statement: Response Message: During the development of the 2016 edition of NFPA 80, Section 4.7 was reorganized and expanded. During the revision, several sections were unintentionally duplicated or not deleted after the reorganization was complete. Prior to the Second Draft the committee will review the section and recommend any further changes. The purpose of the changes are strictly editorial and the Committee Input will allow the committee further time to review the text. Sample duplicate text is shown with the deletion of Section NFPA 80 CI Report Page 8 of 35

9 of 35 11/4/2016 6:18 PM Committee Input No. 27-NFPA [ New Section after ] Where thresholds and saddles are installed under fire doors, the clearance shall be in accordance with the hardware manufacturer s installation instructions Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Sep 08 14:16:49 EDT 2016 Committee Statement Committee Statement: This requirement reflects the need for the bottom of the doors to be within the threshold s manufacturer s clearance requirements. The 3/8-inch maximum is based on the clearance allowed by the fire door tests (e.g., NFPA 252, UL 10B, and UL 10C). Response Message: NFPA 80 CI Report Page 9 of 35

10 Committee Input No. 30-NFPA [ Section No ] * Clearance under the bottom of a door shall be a maximum of in. (19 mm). Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Sep 08 15:21:11 EDT 2016 Committee Statement Committee Statement: The Fire Protection Research Foundation will be conducting a project regarding the influence of gap sizes around swinging doors on fire development. At the Second Draft meeting the committee will review the results of the research project and make changes to the standard as necessary. The background for this project is as follows: Fire development, smoke movement and ability of fire door to meet the test standards are affected by the gap sizes around the perimeter of the door, within the frame and between the bottom of the door and floor. Hence these gap sizes are regulated and the current regulations in NFPA 80 for the door clearances are from information and data gathered several years ago. Door clearances are one of the most frequently cited deficiencies on swinging doors with builders hardware. In the 2016 edition of NFPA 80, Section addresses the clearance dimensions for gaps between the door leaves and door frames for fire-rated door assemblies with steel, and wood doors, and includes provisions for door assemblies of other construction. The clearance dimension allowed for steel doors (rated up to 3 hours) and 20-minute wood doors installed in hollow metal door frames is 1/8-inch (+ 1/16 inch). A maximum clearance dimension of 1/8-inch is permitted for wood doors rated more than 20- minutes and fire door assemblies with doors and frames of other construction (of any level of fire rating). Further, paragraph permits a maximum clearance dimension of 3/4-inch under the bottom of a door, regardless of the construction of the door. Of the clearance dimensions around the perimeter of door leafs, the clearance under the doors is the most difficult to comply with when the doors are installed since the floor itself is not a component of the door assembly. Frequently, the surface of concrete floors at door assemblies is not level (across the width of the opening) or might have low spots under the door. The surface of the floor creates situations where the clearance dimension under the door is greater than 3/4-inch and therefore non-compliant with NFPA 80 s requirement. Additionally, current fire door tests in the United States (e.g., NFPA 252, UL 10B, and UL 10C) use a clearance dimension not greater than 3/8-inch under the NFPA 80 CI Report Page 10 of 35 0 of 35 11/4/2016 6:18 PM

11 1 of 35 11/4/2016 6:18 PM door(s), which is not consistent with NFPA 80 s allowance of a maximum of 3/4-inch and, more importantly, is not realistic to replicate in the field. Hence it is important to have a deeper understanding of the impact of gap sizes on fire development and smoke movement. Response Message: NFPA 80 CI Report Page 11 of 35

12 2 of 35 11/4/2016 6:18 PM Committee Input No. 55-NFPA [ Chapter 5 ] Review Chapter 5, including, but not limited to, the following sections for duplication and accuracy: A A Chapter 5 5.1* General Application * Inspection, Testing, and Maintenance This chapter shall cover the inspection, testing, and maintenance of fire doors, fire shutters, fire windows, and opening protectives other than fire dampers and fabric fire safety curtains The requirements of this chapter shall apply to new and existing installations Operability * Doors, shutters, and windows shall be operable at all times Doors, shutters, and windows shall be kept closed and latched or arranged for automatic closing Prevention of Door Blockage Door openings and their surrounding areas shall be kept clear of anything that could obstruct or interfere with the free operation of the door Where necessary, a barrier shall be built to prevent the piling of material against sliding doors Blocking or wedging of doors in the open position shall be prohibited Replacement. Where it is necessary to replace fire doors, shutters, windows or their frames, glazing materials, hardware, and closing mechanisms, replacements shall meet the requirements for fire protection and shall be installed and tested as required by this standard for new installations Field Labeling. NFPA 80 CI Report Page 12 of 35

13 3 of 35 11/4/2016 6:18 PM * Field labeling shall be performed only by individuals or companies that have been certified or listed, or by individuals or companies that are representatives of a labeling service that maintains periodic inspections of production of labeled equipment or materials and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner Individuals performing the service shall provide proof of qualifications to the authority having jurisdiction prior to performing work, as described in At a minimum, field labels shall contain the following information: (1) The words field inspected or "field labeled" (2) The words "fire door" or "fire door frame" (3) The marking of a third-party certification agency (4) The fire protection rating (5) A unique serial number (if provided by the listing agency) (6) The fire test standard designation to which the assembly was tested Field modifications shall not be permitted to be made to a non-fire-rated door assembly to achieve a fire rating unless the field modification is completed under label service Doors in which a field modification in accordance with has been completed shall be labeled When an opening with a non-fire-rated door requires a fire door, the door assembly shall be replaced Field Modifications * In cases where a field modification to a fire door or a fire door assembly is desired, and is not permitted by through , the laboratory with which the product or component being modified is listed shall be contacted through the manufacturer and a written or graphic description of the modifications shall be presented to that laboratory Field modifications shall be permitted without a field visit from the laboratory upon written authorization from that laboratory When the manufacturer is no longer available, the laboratory shall be permitted to provide an engineering evaluation supporting the field modification Removal of Door or Window. Where a fire door or fire window opening no longer functions as an opening, or the door or window is removed and not replaced, the opening shall be filled to maintain the required rating of the wall assembly. NFPA 80 CI Report Page 13 of 35

14 4 of 35 11/4/2016 6:18 PM 5.2* Inspection and Testing * Upon completion of the installation, door, shutters, and window assemblies shall be inspected and tested in accordance with * A record of all inspections and testing shall be signed by the inspector and kept for inspection by the AHJ Records of acceptance tests shall be retained for the life of the assembly * Unless a longer period is required by Section 5.4, records shall be retained for a period of at least 3 years * The records shall be on a medium that will survive the retention period. Paper or electronic media shall be permitted. [72: ] A record of all inspections and testing shall be provided that includes, but is not limited to, the following information: (1) Date of inspection (2) Name of facility (3) Address of facility (4) Name of person(s) performing inspections and testing (5) Company name and address of inspecting company (6) Signature of inspector of record (7) Individual record of each inspected and tested fire door assembly (8) * Opening identifier and location of each inspected and tested fire door assembly (9) * Type and description of each inspected and tested fire door assembly (10)* Verification of visual inspection and functional operation (11) Listing of deficiencies in accordance with 5.2.3, Section 5.3, and Section * Upon completion of maintenance work, fire door assemblies shall be inspected and tested in accordance with Acceptance Testing * Acceptance testing of fire door and window assemblies shall be performed by a qualified person with knowledge and understanding of the operating components of the type of assembly being subject to testing * Before testing, a visual inspection shall be performed to identify any damaged or missing parts that can create a hazard during testing or affect operation or resetting. NFPA 80 CI Report Page 14 of 35

15 5 of 35 11/4/2016 6:18 PM Acceptance testing shall include the closing of the door by all means of activation A record of these inspections and testing shall be made in accordance with Swinging Doors with Builders Hardware or Fire Door Hardware Fire door assemblies shall be visually inspected from both sides to assess the overall condition of door assembly As a minimum, the following items shall be verified: (1) Labels are clearly visible and legible. (2) No open holes or breaks exist in surfaces of either the door or frame. (3) Glazing, vision light frames, and glazing beads are intact and securely fastened in place, if so equipped. (4) The door, frame, hinges, hardware, and noncombustible threshold are secured, aligned, and in working order with no visible signs of damage. (5) No parts are missing or broken. (6) Door clearances do not exceed clearances listed in and (7) The self-closing device is operational; that is, the active door completely closes when operated from the full open position. (8) If a coordinator is installed, the inactive leaf closes before the active leaf. (9) Latching hardware operates and secures the door when it is in the closed position. (10) Auxiliary hardware items that interfere or prohibit operation are not installed on the door or frame. (11)* No field modifications to the door assembly have been performed that void the label. (12) Meeting edge protection, gasketing and edge seals, where required, are inspected to verify their presence and integrity. (13) Signage affixed to a door meets the requirements listed in Horizontally Sliding, Vertically Sliding, and Rolling Doors Fire door assemblies shall be visually inspected from both sides to assess the overall condition of door assembly. NFPA 80 CI Report Page 15 of 35

16 6 of 35 11/4/2016 6:18 PM At a minimum, the following items shall be verified: (1) Labels are clearly visible and legible. (2) No open holes or breaks exist in surfaces of either the door or the frame. (3) Slats, endlocks, bottom bar, guide assembly, curtain entry, hood, and flame baffle are correctly installed and intact for rolling steel fire doors. (4) Glazing, vision light frames, and glazing beads are intact and securely fastened in place, if so equipped. (5) Curtain, barrel, and guides are aligned, level, plumb, and true for rolling steel fire doors. (6) Expansion clearance is maintained in accordance with the manufacturer s listing. (7) Drop release arms and weights are not blocked or wedged. (8) Mounting and assembly bolts are intact and secured. (9) Attachments to jambs are with bolts, expansion anchors, or as otherwise required by the listing. (10) Smoke detectors, if equipped, are installed and operational. (11) No parts are missing or broken. (12)* Fusible links, if equipped, are in the location; chain/cable, s-hooks, eyes, and so forth, are in good condition; the cable or chain is not kinked, pinched, twisted, or inflexible; and links are not painted or coated with dust or grease. (13) Auxiliary hardware items that interfere or prohibit operation are not installed on the door or frame. (14) No field modifications to the door assembly have been performed that void the label. (15) Doors have an average closing speed of not less than 6 in./sec (152 mm/sec) or more than 24 in./sec (610 mm/sec) Closing Devices All fire doors, fire shutters, and fire window assemblies shall be inspected and tested to check for proper operation and full closure Resetting of the automatic-closing device shall be done in accordance with the manufacturer s instructions Rolling Steel Fire Doors Rolling steel fire doors shall be drop-tested twice The first test shall be to check for proper operation and full closure A second test shall be done to verify that the automatic-closing device has been reset correctly * Fusible links, release devices, and any other moveable parts shall not be painted or coated with other materials that could interfere with the operation of the assembly. NFPA 80 CI Report Page 16 of 35

17 7 of 35 11/4/2016 6:18 PM Periodic Inspection and Testing * Periodic inspections and testing shall be performed not less than annually As a minimum, the provisions of shall be included in the periodic inspection and testing procedure Inspection shall include an operational test for automatic-closing doors and windows to verify that the assembly will close under fire conditions The assembly shall be reset after a successful test Resetting of the release mechanism shall be done in accordance with the manufacturer s instructions * Hardware shall be examined, and inoperative hardware, parts, or other defective items shall be replaced without delay Tin-clad and kalamein doors shall be inspected for dry rot of the wood core Chains or cables employed shall be inspected for excessive wear, stretching, and binding. 5.3 Retrofit Operators The operator, governor, and automatic-closing device on rolling steel fire doors shall be permitted to be retrofitted with a labeled retrofit operator under the conditions specified in through The retrofit operator shall be labeled as such The retrofit operator shall be installed in accordance with its installation instructions and listing The installation shall be acceptable to the AHJ The retrofit operator shall be permitted to be provided by a manufacturer other than the original manufacturer of the rolling steel fire door on which it is retrofitted, provided its listing allows it to be retrofitted on that manufacturer s doors. 5.4* Performance-Based Option As an alternate means of compliance with 5.2.4, subject to the AHJ, fire door assemblies shall be permitted to be inspected, tested, and maintained under a written performance-based program. NFPA 80 CI Report Page 17 of 35

18 8 of 35 11/4/2016 6:18 PM Goals established under a performance-based program shall provide assurance that the fire door assembly will perform its intended function when exposed to fire conditions Technical justification for inspection, testing, and maintenance intervals shall be documented in writing The performance-based option shall include historical data acceptable to the AHJ. 5.5 Maintenance * Repairs shall be made, and defects that could interfere with operation shall be corrected without delay Damaged glazing material shall be replaced with labeled glazing Replacement glazing materials shall be installed in accordance with their individual listing Any breaks in the face covering of doors shall be repaired without delay Where a fire door, frame, or any part of its appurtenances is damaged to the extent that it could impair the door s proper emergency function, the following actions shall be performed: (1) The fire door, frame, door assembly, or any part of its appurtenances shall be repaired with labeled parts or parts obtained from the original manufacturer. (2) The door shall be tested to ensure emergency operation and closing upon completion of the repairs If repairs cannot be made with labeled components or parts obtained from the original manufacturer or retrofitted in accordance with Section 5.3, the fire door frame, fire door assembly, or appurtenances shall be replaced When fastener holes are left in a door or frame due to changes or removal of hardware or plant-ons, the holes shall be repaired by the following methods: (1) Install steel fasteners that completely fill the holes. (2) Fill the screw or bolt holes with the same material as the door or frame. (3) Fill holes with material listed for this use and installed in accordance with the manufacturer's procedures Holes, other than those as described by 5.5.7, shall be treated as a field modification in accordance with NFPA 80 CI Report Page 18 of 35

19 19 of 35 11/4/2016 6:18 PM 5.5.9* Upon completion of maintenance work, fire door assemblies shall be inspected and tested in accordance with A record of these inspections and testing shall be made in accordance with A record of maintenance performed on existing fire door assemblies shall be provided that includes the following information: (1) Date of maintenance (2) Name of facility (3) Address of facility (4) Name of person(s) performing maintenance (5) Company name and address of maintenance personnel (6) Signature of maintenance personnel performing the work (7) Individual listings of each inspected and tested fire door assembly (8) * Opening identifier and location of each repaired fire door assembly (9) * Type and description of each repaired fire door assembly (10)* Description or listing of the work performed on each fire door assembly Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Sep 19 13:20:25 EDT 2016 Committee Statement Committee Statement: Response Message: Much of Chapter 5 was reorganized during the 2016 revision cycle. The Committee discovered that there are sections that may be duplicated or in the incorrect location. The committee will review the provisions of Chapter 5 and propose revisions at the Second Draft meeting to correct duplicates and location of Annex material. The changes are intended to be editorial only. NFPA 80 CI Report Page 19 of 35

20 0 of 35 11/4/2016 6:18 PM Committee Input No. 39-NFPA [ New Section after ] 3.2.X Inspection Mark An identification applied to equipment or materials, denoting compliance with annual inspection and testing requirements * Inspection Mark Upon completion of inspection an inspection mark shall be permitted to be applied to the assembly. A Where a previously applied inspection mark exists, it should be updated or replaced to record the most recent inspection. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Sep 19 10:25:00 EDT 2016 Committee Statement Committee Statement: Response Message: Proposed language recognizes a practice that is common in the industry and provides guidance on that practice. The language permits an inspection mark, but does not mandate that a mark be applied. Annex language clarifies that existing marks do not have to be replaces each inspection but may be updated to reflect the current inspection. The committee is seeking additional public comment. NFPA 80 CI Report Page 20 of 35

21 1 of 35 11/4/2016 6:18 PM Committee Input No. 32-NFPA [ New Section after ] The frame shall fit the wall with a gap between the backbend return of the frame and the surface of the wall not in excess of 1/8" per side. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Sep 08 15:49:18 EDT 2016 Committee Statement Committee Statement: Response Message: The allowable clearance between the back bends of a slip-on drywall frame and the finished drywall surface are not defined in NFPA 80, UL 10B, UL 10C or a frame manufacturers published listing. This Committee Input was created to solicit feedback on the subject with the intent of defining the maximum allowable gap. NFPA 80 CI Report Page 21 of 35

22 22 of 35 11/4/2016 6:18 PM Committee Input No. 31-NFPA [ Section No ] * Clearances * Clearances dimensions between doors and frames and meeting stiles of paired doors shall be measured on the pull side of the assemblies * The clearances between the top and vertical edges of hollow metal doors and the frame, and the meeting stiles of doors swinging in pairs, shall be 1 8 in. ± 1 16 in. (3.18 mm ± 1.59 mm ) High-pressure decorative laminate (HPDL)-faced doors, 1 3 -hour-rated flush wood doors, and stile and rail wood doors installed in hollow metal door frames shall not have clearances greater than 1 8 in. ± 1 16 in. (3.18 mm ± 1.59 mm) between the door and frame and the meeting stiles of paired doors * HPDL-faced doors, flush wood doors, and stile and rail wood doors with fire ratings greater than 1 3 hour shall not have clearances greater than 1 8 in. (3.18 mm) between the door and frame, regardless of the door frame construction, and the meeting stiles of paired doors * Door leaves constructed of other materials shall not have clearances greater than 1 8 in. (3.18 mm) between the top and vertical edges of doors and meeting stiles of paired doors, unless otherwise permitted in the door frame, door, and latching hardware manufacturers published listings. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Sep 08 15:23:56 EDT 2016 Committee Statement Committee Statement: The Fire Protection Research Foundation will be conducting a project regarding the influence of gap sizes around swinging doors on fire development. At the Second Draft meeting the committee will review the results of the research project and make changes to the standard as necessary. The background for this project is as follows: NFPA 80 CI Report Page 22 of 35

23 3 of 35 11/4/2016 6:18 PM Fire development, smoke movement and ability of fire door to meet the test standards are affected by the gap sizes around the perimeter of the door, within the frame and between the bottom of the door and floor. Hence these gap sizes are regulated and the current regulations in NFPA 80 for the door clearances are from information and data gathered several years ago. Door clearances are one of the most frequently cited deficiencies on swinging doors with builders hardware. In the 2016 edition of NFPA 80, Section addresses the clearance dimensions for gaps between the door leaves and door frames for fire-rated door assemblies with steel, and wood doors, and includes provisions for door assemblies of other construction. The clearance dimension allowed for steel doors (rated up to 3 hours) and 20-minute wood doors installed in hollow metal door frames is 1/8-inch (+ 1/16 inch). A maximum clearance dimension of 1/8-inch is permitted for wood doors rated more than 20- minutes and fire door assemblies with doors and frames of other construction (of any level of fire rating). Further, paragraph permits a maximum clearance dimension of 3/4-inch under the bottom of a door, regardless of the construction of the door. Response Message: Of the clearance dimensions around the perimeter of door leafs, the clearance under the doors is the most difficult to comply with when the doors are installed since the floor itself is not a component of the door assembly. Frequently, the surface of concrete floors at door assemblies is not level (across the width of the opening) or might have low spots under the door. The surface of the floor creates situations where the clearance dimension under the door is greater than 3/4-inch and therefore non-compliant with NFPA 80 s requirement. Additionally, current fire door tests in the United States (e.g., NFPA 252, UL 10B, and UL 10C) use a clearance dimension not greater than 3/8-inch under the door(s), which is not consistent with NFPA 80 s allowance of a maximum of 3/4-inch and, more importantly, is not realistic to replicate in the field. Hence it is important to have a deeper understanding of the impact of gap sizes on fire development and smoke movement. NFPA 80 CI Report Page 23 of 35

24 4 of 35 11/4/2016 6:18 PM Committee Input No. 56-NFPA [ Section No ] Review for consistency with proposed changes from 2016, prior to Second Draft meeting * Clearances * Clearances dimensions between doors and frames and meeting stiles of paired doors shall be measured on the pull side of the assemblies * The clearances between the top and vertical edges of hollow metal doors and the frame, and the meeting stiles of doors swinging in pairs, shall be 1 8 in. ± 1 16 in. (3.18 mm ± 1.59 mm) High-pressure decorative laminate (HPDL)-faced doors, 1 3 -hour-rated flush wood doors, and stile and rail wood doors installed in hollow metal door frames shall not have clearances greater than 1 8 in. ± 1 16 in. (3.18 mm ± 1.59 mm) between the door and frame and the meeting stiles of paired doors * HPDL-faced doors, flush wood doors, and stile and rail wood doors with fire ratings greater than 1 3 hour shall not have clearances greater than 1 8 in. (3.18 mm) between the door and frame, regardless of the door frame construction, and the meeting stiles of paired doors * Door leaves constructed of other materials shall not have clearances greater than 1 8 in. (3.18 mm) between the top and vertical edges of doors and meeting stiles of paired doors, unless otherwise permitted in the door frame, door, and latching hardware manufacturers published listings. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Sep 19 13:28:30 EDT 2016 Committee Statement Committee Statement: Many changes were made to Section for the 2016 edition of the standard. The committee will review the provisions of this section and propose any changes for clarification at the Second Draft meeting. The changes are intended to be editorial only. NFPA 80 CI Report Page 24 of 35

25 5 of 35 11/4/2016 6:18 PM Response Message: NFPA 80 CI Report Page 25 of 35

26 6 of 35 11/4/2016 6:18 PM Committee Input No. 57-NFPA [ Section No ] 19.5* Periodic Testing Testing Frequency Each damper shall be tested and inspected 1 year after acceptance testing The test and inspection frequency shall then be every 4 years, except in buildings containing a hospital, where the frequency shall be every 6 years * In existing HVAC systems with fully ducted systems, periodic testing does not need to be performed for a single inaccessible damper within a rated barrier or shaft. A In existing buildings it is recognized that some dampers may have become inaccessible for various reasons. Inaccessible dampers are those that have physical barriers or limitations where one cannot perform the required inspections or tests. The testing of a single damper may not pose a significant risk to the performance of the system when the system is fully ducted. It is recommended that dampers with limited accessibility be modified with retro-fit equipment, such as an indicator switch, to comply with the remote testing requirements for future inspections Position indication functionality shall be permitted to be added to an existing damper not originally designed with position indication provided that the accuracy of the open and closed indication method is confirmed as required by section Any field modifications made to the damper shall be installed per the manufacturer s installation instructions for retro fitted equipment Test Method All tests shall be completed in a safe manner by personnel wearing personal protective equipment * Periodic Testing for Fusible Link Operated Dampers Fusible links or other moveable parts shall not be painted or coated, unless listed by the testing agency The fan shall be permitted to be shut off during testing * The fusible link shall be removed or activated with the damper in the fully open position With the fusible link removed or activated, the damper shall close completely without assistance. NFPA 80 CI Report Page 26 of 35

27 7 of 35 11/4/2016 6:18 PM Where the damper is designed with a latch to hold the damper in the fully closed position, the operation of the latch shall be confirmed At the completion of the test, the damper shall be returned to the fully open position, and the fusible link shall be reinstalled or replaced If the link appears damaged, it shall be replaced with a functionally equivalent link At the completion of the test, it shall be verified that the damper is unobstructed and in a fully operational mode Periodic Testing for Dampers that Do Not Use a Fusible Link to Operate * General. Fans shall not be permitted to be shut down during the test Dampers with Motorized Actuators. Testing of dampers with actuators shall comply with the following procedure: (1) Visually confirm that the damper is in the fully open position. (2) Verify that all obstructions, including hands, are out of the path of the damper blades and then remove electrical power or air pressure from the actuator to allow the actuator s spring return feature to close the damper. (3) Visually confirm that the damper closes completely. (4) Reapply electrical power or air pressure to reopen the damper. (5) Visually confirm that the damper is in the fully open position Documentation All inspections and testing shall be documented, indicating the location of the damper, date of inspection, name of inspector, and deficiencies discovered. The documentation shall have a space to indicate when and how the deficiencies were corrected All documentation shall be maintained for at least three test cycles and made available for review by the AHJ. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Sep 19 13:36:37 EDT 2016 NFPA 80 CI Report Page 27 of 35

28 8 of 35 11/4/2016 6:18 PM Committee Statement Committee Statement: Response Message: An all to common issue in the field today is dampers that are inaccessible. The proposed language provides guidance to the frequently asked question regarding the procedures for periodic testing of dampers (existing) that are inaccessible. Additional public comments are encouraged. NFPA 80 CI Report Page 28 of 35

29 9 of 35 11/4/2016 6:18 PM Committee Input No. 41-NFPA [ Section No ] The rate-of-rise heat detection as required in shall be ultra-fast rate-of-rise provided at the ceiling near or roof deck on the stage side of the proscenium wall and between 4 and 24 inces of the proscenium wall, installed in accordance with the prescriptive or performance-based requirements of NFPA 72. Section 4.7. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Sep 19 11:45:44 EDT 2016 Committee Statement Committee Statement: Response Message: Ultra-fast is not defined in referenced standards. Most stages do not have ceilings, but instead exposed structure and roof decks. Near neither locates the detector on the stage side nor does it provide an enforceable dimension. NFPA 72 does not provide requirements for heat detectors for door release service. NFPA 80 CI Report Page 29 of 35

30 0 of 35 11/4/2016 6:18 PM Committee Input No. 17-NFPA [ Section No ] To provide for automatic emergency release when exposed to fire, an emergency control line (fire control line) shall be provided that utilizes a minimum of 3 8 in. diameter rope or 3 32 in. (2.4 mm) diameter 7 19 specialty cord (aircraft cable) fitted with fusible links The emergency control line (fire control line) shall extend up both sides and across the top of the stage side of the proscenium opening. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Sep 08 09:06:52 EDT 2016 Committee Statement Committee Statement: Response Message: The committee is seeking additional information as to the function and necessity of this requirement. This Committee Input is also proposing deletion of "The emergency control line (fire control line) shall not be cut or severed." NFPA 80 CI Report Page 30 of 35

31 1 of 35 11/4/2016 6:18 PM Committee Input No. 29-NFPA [ Section No. A ] A Door frames should be installed following the general guidelines shown in Figure A The door frame installations shown in Figure A do not represent all types of installations but do illustrate some typical door frame installation techniques required for the proper installation of fire door frames. Figure A Typical Pressed Steel Door Frame Installations. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Thu Sep 08 15:17:09 EDT 2016 Committee Statement Committee Statement: The Committee Input is adding the word 'optional' to Figure (c) to read as follows: Frame Grouted Full (optional). The proposed change clarifies that there are a variety of installations that may meet the conditions of A The Committee will review the figures and propose newly updated illustrations to reflect various installation options at the Second Draft meeting. NFPA 80 CI Report Page 31 of 35

32 2 of 35 11/4/2016 6:18 PM Response Message: NFPA 80 CI Report Page 32 of 35

33 3 of 35 11/4/2016 6:18 PM Committee Input No. 53-NFPA [ Chapter L ] The committee will review and update the editions of the referenced publications to the correct edition at the Second Draft meeting. Annex L Informational References L.1 Referenced Publications. The documents or portions thereof listed in this annex are referenced within the informational sections of this standard and are not part of the requirements of this document unless also listed in Chapter 2 for other reasons. L.1.1 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 72, National Fire Alarm and Signaling Code, 2016 edition. NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013 edition. NFPA 80A, Recommended Practice for Protection of Buildings from Exterior Fire Exposures, 2012 edition. NFPA 82, Standard on Incinerators and Waste and Linen Handling Systems and Equipment, 2014 edition. NFPA 101, Life Safety Code, 2015 edition. NFPA 105, Standard for Smoke Door Assemblies and Other Opening Protectives, 2016 edition. NFPA 232, Standard for the Protection of Records, 2012 edition. NFPA 252, Standard Methods of Fire Tests of Door Assemblies, 2012 edition. NFPA 257, Standard on Fire Test for Window and Glass Block Assemblies, 2012 edition. NFPA 288, Standard Methods of Fire Tests of Horizontal Fire Door Assemblies Installed in Horizontal Fire Resistance Rated Assemblies, 2012 edition. Fire Protection Handbook, 20th ed., 2008, Section 18, Chap 1, Confinement of Fire in Buildings, pp to 18 20, Protection of Openings. SFPE Handbook of Fire Protection Engineering, 4th edition, L.1.2 Other Publications. L AMCA Publications. Air Movement and Control Association International, Inc., 30 West University Drive, Arlington Heights, IL AMCA 503, Fire, Ceiling (Radiation), Smoke and Fire/Smoke Dampers Application Manual, L ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY ASME A17.1/CSA B , Safety Code for Existing Elevators and Escalators, ASME A17.3/CSA B44-13, Safety Code for Existing Elevators and Escalators, NFPA 80 CI Report Page 33 of 35

34 4 of 35 11/4/2016 6:18 PM L ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM D5034, Standard Test Method for Breaking Strength and Elongation of Textile Fabrics (Grab Test), ASTM E90, Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements, ASTM E119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2012a. ASTM E413, Classification for Rating Sound Insulation, L ISO Publications. International Organization for Standardization, 1, Ch. de la Voie-Creuse, Case postale 56, CH-1211 Geneva 20, Switzerland. ISO 3009, Fire Resistance Tests Glazed Elements, 1976/Amendment 1:1984. L NAAMM/HMMA Publications. National Association of Architectural Metal Manufacturers/Hollow Metal Manufacturers Association, 8 South Michigan Avenue, Suite 1000, Chicago, IL ANSI/NAAMM-HMMA , Guide Specifications for Commercial Security Hollow Metal Doors and Frames, ANSI/NAAMM-HMMA , Guide Specifications for Detention Security Hollow Metal Doors and Frames, ANSI/NAAMM-HMMA , Guide Specifications for Stainless Steel Hollow Metal Doors and Frames, L SMACNA Publications. Sheet Metal and Air Conditioning Contractors' National Association, 4201 Lafayette Center Drive, Chantilly, VA Fire, Smoke and Radiation Damper Installation Guide for HVAC Systems, L UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL ANSI/UL 9, Standard for Safety Fire Tests of Window Assemblies, 2004, revised April ANSI/UL 10B, Standard for Safety Fire Tests of Door Assemblies, 2008, revised ANSI/UL 10C, Standard for Positive Pressure Fire Tests of Door Assemblies, ANSI/UL 10D, Standard for Fire Tests of Fire Protective Curtain Assemblies, ANSI/UL 263, Standard for Fire Tests of Building Construction and Materials, UL 752, Standard for Safety Bullet-Resisting Equipment, 2005, revised Fire Resistance Directory, L ULC Publications. ULC Standards, 7 Underwriters Road, Toronto, ON, M1R 3A9, Canada. CAN/ULC-S104-10, Standard Method for Fire Tests of Door Assemblies, CAN4-S106-M80, Standard Method for Fire Test of Window and Glass Block Assemblies, NFPA 80 CI Report Page 34 of 35

Page 1 of 31 Second Revision No. 1-NFPA 80-2014 [ Section No. 2.3.2 ] 2.3.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM A36/A36M,

More information

NFPA 80 Overview January 21, 2016

NFPA 80 Overview January 21, 2016 NFPA 80 Overview January 21, 2016 Kristin Bigda, P.E. Senior Fire Protection Engineer National Fire Protection Association Presenter Kristin Bigda, P.E. Senior Fire Protection Engineer, NFPA Building Fire

More information

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting.

NFPA 72 is in the same cycle as NFPA 80. The extracted text will be updated with a Second Revision during the second draft meeting. Input No. 7-NFPA 80-2013 [ Section No. 3.3.8 ] 3.3.8 Automatic Fire Detector. A device designed to detect the presence of a fire signature and to initiate action. For the purpose of this standard, automatic

More information

Developing a Healthcare Facility Fire Door Inspection Program

Developing a Healthcare Facility Fire Door Inspection Program Developing a Healthcare Facility Fire Door Inspection Program WELCOME Moderator: Richard Schieferdecker support.webinato.com Audio QUESTIONS How To Ask a Question: 1 POLLING There will be occasional interactive

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

About the Instructor & Presenter:

About the Instructor & Presenter: About the Instructor & Presenter: Paul G. Baillargeon, AHC, FDAI Vice President, Technical Consulting Door Security & Safety Foundation A noted veteran in the door and hardware industry, Mr. Baillargeon

More information

Fire and Smoke Door Inspections Qualified Training 02/03/17

Fire and Smoke Door Inspections Qualified Training 02/03/17 Fire and Smoke Door Inspections Qualified Training 02/03/17 Basis of Requirements NFPA 101 requires annual fire and smoke door inspections (Section 18/19.2.2.2.1) Sections 18/19.2.2.1 require compliance

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION WHAT TO EXPECT DURING A FIRE DOOR INSPECTION Basic Fire Door Inspections 1. Fire door basic function 2. Understanding codes 3. Responsibility of end user 4. Common fire door deficiencies 5. What your door

More information

Fire Rated Door Assemblies: Compliant Designs

Fire Rated Door Assemblies: Compliant Designs Fire Rated Door Assemblies: Compliant Designs Steel Door Institute www.steeldoor.org AIA Provider #G389 Course #: SDIFIRE 1 HSW CE hour 1 Credit(s) earned on completion of this course will be reported

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Swinging Egress and Fire Doors

Swinging Egress and Fire Doors Presented by: AHCA Seminar: Inspecting and Maintaining Swinging Egress and Fire Doors Current State CMS Memorandum July 28, 2017 Tuesday May, 3, 2016 CMS issued the final rule adopting the 2012 Life Safety

More information

1-300 Fire and/or Smoke Dampers to Inspect $ Fire and/or Smoke Dampers to Inspect $34.30

1-300 Fire and/or Smoke Dampers to Inspect $ Fire and/or Smoke Dampers to Inspect $34.30 Life Safety Services, LLC TXMAS Schedule Contract Number: TXMAS-12-03FAC030 Passive Fire Protection Services Authorized Federal Supply Schedule Price List Quantity of Dampers to Inspect Per Damper to Survey

More information

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 6-NFPA 90A-2012 [ Chapter NFPA ] 4.3.11.5.5 Materials within a raised floor plenum exposed to the airflow shall be (a) noncombustible or (b) exhibit a maximum flame spread index of 25

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

Second Revision No. 1 NFPA [ Chapter 2 ]

Second Revision No. 1 NFPA [ Chapter 2 ] Second Revision No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4 THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #4 WELCOME Moderator: Richard Schieferdecker support.webinato.com Audio 1 QUESTIONS How To Ask a Question: POLLING There will be occasional

More information

First Revision No. 6-NFPA [ Section No. 2.2 ]

First Revision No. 6-NFPA [ Section No. 2.2 ] Page 1 of 18 First Revision No. 6-NFPA 555-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 12, Standard on Carbon

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

Laura Frye, AHC, CSI, CCS, FDAI Technical Director, DSSF Director of Certification, DHI

Laura Frye, AHC, CSI, CCS, FDAI Technical Director, DSSF Director of Certification, DHI Laura Frye, AHC, CSI, CCS, FDAI Technical Director, DSSF Director of Certification, DHI Inspecting Swinging Fire Doors with Builders Hardware A Practical Guide for AHJs and Facility Management Personnel

More information

2012 Life Safety and Health Care Facility Codes - Door Inspections and Other Critical Inspection, Testing and Maintenance

2012 Life Safety and Health Care Facility Codes - Door Inspections and Other Critical Inspection, Testing and Maintenance 2012 Life Safety and Health Care Facility Codes - Door Inspections and Other Critical Inspection, Testing and Maintenance Will begin at 1 pm Housekeeping Announcements Problems during the call? Press *0

More information

R OL L ING F IR E DOOR T E S T ING P R OGR AM

R OL L ING F IR E DOOR T E S T ING P R OGR AM R OL L ING F IR E DOOR T E S T ING P R OGR AM Overhead Door Company of the Northland 3195 Terminal Drive Eagan, MN 55121 Phone # (651) 683-0307 Fax # (651) 683-0625 Inspection, Testing and Certifications

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

Iowa State Fire Marshal

Iowa State Fire Marshal Iowa State Fire Marshal LIFE SAFETY CODE REQUIREMENTS LONG TERM CARE Kyle R. Gorsh, Special Agent in Charge Iowa Department of Public Safety State Fire Marshal Division 2012 LSC & Applicable Standards

More information

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101

Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101 Standard Compared 2012 Changes of the International Building Code and National Fire Protection Association- 101 For the Florida Building Commission And the Fire Code Advisory Council Introduction The scope

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical self-closing device

More information

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement of 47 10/21/2015 9:37 AM First Revision No. 5041-NFPA 101-2015 [ Global Input ] Throughout the document, change electrically controlled egress door assemblies to door hardware-release of electrically locked

More information

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening. DIVISION 8 OPENINGS SECTION 08 33 23 PART 1 GENERAL 1.1 SECTION INCLUDES A. Overhead coiling counter fire doors. 1.2 RELATED SECTIONS A. Section 05500 - Metal Fabrications: Support framing and framed opening.

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 35 12/3/2015 7:13 AM Public Input No. 1-NFPA 90A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI/ASHRAE

More information

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR SECTION 08 71 13 LOW ENERGY AUTOMATIC OPERATORS Specifier Note: Coordinate and edit articles

More information

26 of 128 9/23/2014 9:25 AM

26 of 128 9/23/2014 9:25 AM 26 of 128 9/23/2014 9:25 AM Second Revision No. 105-NFPA 72-2014 [ Global Comment ] Revise the Annex F figures that include a smoke detector symbol (hexagon with a whisp of smoke) so that the new smoke

More information

SECTION Overhead Coiling Doors

SECTION Overhead Coiling Doors SECTION 08 33 00 Overhead Coiling Doors To display hidden notes to specifier, select tools/ options/ view/ hidden text. GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

Page 1 of 15 Second Revision No. 8-NFPA 82-2013 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 13, Standard for the Installation

More information

SECTION OVERHEAD COILING FIRE DOORS

SECTION OVERHEAD COILING FIRE DOORS SECTION 08331 OVERHEAD COILING FIRE DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on round Windows logo in top left corner,

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 221 Revision Cycle: A2014 Meeting Date: 5/20/2013

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES SECTION 105200 - FIRE-PROTECTION SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials. B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and

More information

STANDARD FOR FIRE RATED ROLLING DOOR ASSEMBLIES

STANDARD FOR FIRE RATED ROLLING DOOR ASSEMBLIES ANSI/DASMA 204-2004 AMERICAN NATIONAL STANDARD STANDARD FOR FIRE RATED ROLLING DOOR ASSEMBLIES Door & Access Systems Manufacturers Association, International Sponsor: 1300 Sumner Ave Cleveland, Ohio 44115-2851

More information

SECTION AIR DUCT ACCESSORIES

SECTION AIR DUCT ACCESSORIES SECTION 23 33 00 AIR DUCT ACCESSORIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes back-draft dampers, combination fire-and-smoke dampers, duct access doors, fire dampers, smoke dampers, volume control

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

SECTION COMMERCIAL-KITCHEN HOODS

SECTION COMMERCIAL-KITCHEN HOODS SECTION 23 38 13 COMMERCIAL-KITCHEN HOODS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Delete other items or paragraphs in the section that are not applicable and renumber

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement of 1 9/22/2014 1:38 PM Second Revision No. 104-NFPA 72-2014 [ Section No. 3.3.3 ] 3.3.3 Accessible, Readily (Readily Accessible). Capable of being reached quickly for operation, renewal, or inspections

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99

The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99 The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99 Sharon S. Gilyeat, P.E. Lauren Schrumpf August 8, 2018 Expertly Engineering

More information

Hands On Training for Fire Door Products and Fire Door Assemblies

Hands On Training for Fire Door Products and Fire Door Assemblies 2017 NFPA Conference & Expo Hands On Training for Fire Door Products and Fire Door Assemblies Presented by: Paul M. Goldense, FDAI Goldense Building Products, Inc. Jeffery S. Batick, FDAI Allegion Why

More information

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS SECTION 08331 OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft

More information

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ]

1 of 4 10/26/2015 1:58 PM. Committee Input No NFPA [ Section No ] National Protection Association Report http://submittals.nfpa.org/terraviewweb/formlaunch?id=/terraview/c... 1 of 4 10/26/2015 1:58 PM Committee Input No. 3514-NFPA 5000-2015 [ Section No. 8.7.2 ] National

More information

Report on First Revisions with Statement June 2014 NFPA 101

Report on First Revisions with Statement June 2014 NFPA 101 101 FR6005 SAF-BCF (32.2.1.1.2) Recommendation: 32.2.1.1.2 Where there are sleeping accommodations for more than 16 residents are provided, the occupancy shall be classified as a large facility in accordance

More information

CHAPTER 6 [CE] REFERENCED STANDARDS

CHAPTER 6 [CE] REFERENCED STANDARDS CHAPTER 6 [CE] REFERENCED STANDARDS User note: About this chapter: Chapter 6 lists the full title, edition year and address of the promulgator for all standards that are referenced in the code. The section

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL CHAPTER 6 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 16-NFPA [ Section No ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input Public Input No. 16-NFPA 211-2014 [ Section No. 2.3.1 ] 2.3.1 ASHRAE Publications. ASHRAE, Inc., 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. ASHRAE Handbook: HVAC Systems and Equipment, 2008 2012.

More information

2009 NFPA Text 2009 International Building Code Text Recommendation. NFPA IBC 2009 IBC is most recent

2009 NFPA Text 2009 International Building Code Text Recommendation. NFPA IBC 2009 IBC is most recent 2009 Changes of the Referenced Standards of the National Fire Protection Association- 101 Compared to the International Building Code- 2009 Referenced Standards For the Florida Building Commission And

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document National Fire Protection Association Report of 113 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 2/9/2016 10:50 AM Public Input No. 1-NFPA 87-2015 [ Global Input ] Throughout standard

More information

CHAPTER 5 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL

CHAPTER 5 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL CHAPTER 5 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement

6/9/ :58 PM. First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement First Revision No. 1-NFPA 259-2016 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D5865, Standard Test Method

More information

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

First Aspen Federal Regulation Set: K LSC 2000 Health Existing First Aspen Federal Regulation Set: K 01.01 LSC 2000 Health Existing K 0000 Title CFR Type INITIAL COMMENTS Memo K 0011 If the building has a common wall with a nonconforming building, the common wall

More information

NFPA 72 Code Changes vs 2013

NFPA 72 Code Changes vs 2013 NFPA 72 Code Changes - 2010 vs 2013 AFAA-NE Westborough, MA February 7, 2018 Richard Roux NFPA 72 National Fire Alarm and Signaling Code Overview and 2013 Changes NFPA 72 1993 Edition Aug 20, 1993 1996

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009. SECTION 235100 - BREECHINGS, CHIMNEYS, AND STACKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Fabricated breechings. B. Manufactured chimneys for gas fired equipment. C. Manufactured double wall chimneys for

More information

Design, Installation, Inspection, and Maintenance

Design, Installation, Inspection, and Maintenance Presents: Swinging Fire Door Assemblies with Builders Hardware Design, Installation, Inspection, and Maintenance About the Instructor & Presenter: Paul Baillargeon, AHC, FDAI A 40 year veteran in the Door

More information

NFPA 96, 2017 REVIEW SUMMARY

NFPA 96, 2017 REVIEW SUMMARY NFPA 96, 2017 REVIEW SUMMARY 1) NFPA 96 REVISION SUMMARY NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations The 2017 edition adds a new normative annex on mobile

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 08 7100 DOOR HARDWARE A. Hardware for wood, aluminum, and hollow metal doors. B. Hardware for fire-rated doors. C. Electrically operated and controlled hardware.

More information

Technical Committee on Record Protection (REA-AAA)

Technical Committee on Record Protection (REA-AAA) Technical Committee on Record Protection (REA-AAA) DATE: September 8, 2015 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Record Protection (REA-AAA) Audrey

More information

FIREFLY II PLUS RELEASE DEVICES INSTALLATION MANUAL

FIREFLY II PLUS RELEASE DEVICES INSTALLATION MANUAL FIREFLY II PLUS RELEASE DEVICES INSTALLATION MANUAL MADE IN THE U.S.A. U.L. LISTED CANADIAN LISTED CSFM: 7300-1418:100 GENERAL DESCRIPTION SERIAL NUMBER The Cookson Company FIREFLY II PLUS Time Delay Release

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Firefly II Multi Voltage RELEASE DEVICES. Firefly II & IIB-MV INSTALLATION MANUAL

Firefly II Multi Voltage RELEASE DEVICES. Firefly II & IIB-MV INSTALLATION MANUAL Firefly II Multi Voltage RELEASE DEVICES Firefly II & IIB-MV INSTALLATION MANUAL GENERAL DESCRIPTION: S/N The The Cookson Company Firefly II-MV time delay release devices are designed for use on rolling

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

Architectural Specification Sheet

Architectural Specification Sheet Architectural Specification Sheet 1. General 1.01 Summary A. commercial low energy automatic swing door operator that consists of: -Aluminum housing -Electro-mechanical motor -Operator control assembly

More information

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US Rivkin, C. 1, Blake, C. 1, Burgess, R. 1, Buttner, W. 1, and Post, M. 1 1 Hydrogen Technologies and Systems Center, National Renewable Energy Laboratory,

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE McClellan Blakemore Architects New Warehouse Facility for SECTION 08710 DOOR HARDWARE PART 1 GENERAL 1.01 SECTION INCLUDES A. Hardware for wood and hollow steel doors. B. Hardware for fire-rated doors.

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure

More information

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Services and Fire Protection Equipment Linda MacKay DATE: November 10, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Results The

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot M E M O R A N D U M TO: FROM: NFPA Technical Committee on Building Service and Fire Protection Equipment Gregory Harrington, P.E., Staff Liaison DATE: October 1, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter

More information

University of Rochester October 17, 2008 Brooks Landing Business Center

University of Rochester October 17, 2008 Brooks Landing Business Center SECTION 087100 - DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Commercial door hardware. 2. Cylinders for doors specified in other Sections. 1.2 SUBMITTALS A. Product

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

1/8/ :02 AM. Public Input No. 2-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 2-NFPA 259-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM D 5865, Standard Test Method

More information

SECTION OVERHEAD COILING FIRE DOORS 640 SERIES OVERHEAD COILING COUNTER FIRE DOORS

SECTION OVERHEAD COILING FIRE DOORS 640 SERIES OVERHEAD COILING COUNTER FIRE DOORS SECTION 08 33 23 OVERHEAD COILING FIRE DOORS 640 SERIES OVERHEAD COILING COUNTER FIRE DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft

More information

ARCHITECTURAL SPECIFICATIONS

ARCHITECTURAL SPECIFICATIONS 1 B9.1 In Ground Page 1 of 6, Aug 12 DIVISION 08 - OPENINGS SECTION 08 71 13 POWER DOOR OPERATORS Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Mercantile and

More information

THE "SS90" SERIES RELEASE DEVICES MODEL B2 INSTALLATION MANUAL

THE SS90 SERIES RELEASE DEVICES MODEL B2 INSTALLATION MANUAL S S S S S S S S 90 OLID TATE ECURITIES, INC SOLID STATE FAIL-SAFE UNIT * PATENT PENDING LISTED U 99Y9 RESET L RELEASING DEVICE SOLID STATE SECURITIES, INC. THE "SS90" SERIES RELEASE DEVICES MADE IN THE

More information

SOLID STATE SECURITIES, INC. THE "SS90" SERIES RELEASE DEVICES MADE IN THE U.S.A. SS90-WPS MODEL A/B INSTALLATION MANUAL

SOLID STATE SECURITIES, INC. THE SS90 SERIES RELEASE DEVICES MADE IN THE U.S.A. SS90-WPS MODEL A/B INSTALLATION MANUAL S S S S S S LISTED L * PATENT PENDING S S 90 OLID TATE ECURITIES, INC SOLID STATE FAIL-SAFE UNIT U 99Y9 RESET RELEASING DEVICE SOLID STATE SECURITIES, INC. THE "SS90" SERIES RELEASE DEVICES MADE IN THE

More information

Page 1 of 40 First Correlating Revision No. 15-NFPA 72-2014 [ Global Input ] 10.5.4 Plans Examiners and Inspectors. 10.5.4.1 Fire alarm system and emergency communications system plans and specifications

More information

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please

More information