MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT. NFPA 1981 First Draft Meeting. March 7-9, 2016.

Size: px
Start display at page:

Download "MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT. NFPA 1981 First Draft Meeting. March 7-9, 2016."

Transcription

1 MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT NFPA 1981 First Draft Meeting March 7-9, 2016 Dallas, TX AGENDA Monday, March 7, 2016, Start Time 9:00 a.m. 1. Self-introduction of members and guests 2. NFPA Staff Liaison report Dave Trebisacci 3. Chairman s opening remarks Dan Rossos 4. Approval of the Minutes of the July 24-25, 2015 meeting Sacramento, CA (attached) 5. TIC respirator discussion (SCBAs and PAPRs vs TICs) Jason Allen 6. NFPA 1981 Review of Public Input (attached), First Revisions 7. NFPA 1989 and NFPA 1852 pre-first Draft discussions 8. Old business 9. New business 10. Upcoming Meetings a. NFPA 1989 and NFPA 1852 First Draft July/August (TBD) b. NFPA 1981 Second Draft December 9-10 (San Diego with ELS TC?) tentative 11. Adjourn at close of business, Wednesday, March 9, 2016

2 MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT JULY 2015 SACRAMENTO, CA AGENDA ITEM 1; SELF-INTRODUCTION OF MEMBERS AND GUESTS Chairman Rossos called the Committee to order at 09:10 on 24 July Chairman Rossos welcomed Committee members and guests and asked them to introduce themselves. Members Present: Dan Rossos, Chairman Steven H. Weinstein, Secretary David Trebisacci, Staff Liaison Oregon Dept. of Public Safety Stds. & Training Honeywell Safety Products NFPA Chris Anaya California State Firefighters Association David Bernzweig Columbus (OH) Firefighters Robert Sell Draeger Safety David Hodson Draeger Safety UK Ltd. Stephen T. Miles NIOSH FFFIPP Robin Gainey International Association of Fire Fighters Clint Mayhue Avon Protection William Mundy Fire Department City of New York Thomas Richardson Fire Department City of New York Brian Cox Clovis Fire Department John Kuhn Mine Safety Appliances Company Ryan Brubaker Clovis Fire Department Ed Golla TRI/Air Testing William Dickson Bauer Compressors, Inc. Beverly Gulledge Tyco/Scott Safety A. Ira Harkness U.S. Department of the Navy Stephen Sanders Safety Equipment Institute (SEI) Chad Morey Intertek Testing Services Judge Morgan Tyco/Scott Safety Jay Tarley NIOSH Marco Tekelenburg Mine Safety Appliances Company Gregory Vrablik Honeywell Safety Products Mark Trudgeon Luxfer Gas Cylinders The following guests were present: Steven Berning Mike Swofford Matthew Shannon Darin Thompson Luke Hollmann Ocenco/Interspiro Interspiro Tyco/Scott Safety Tyco/Scott Safety Ultra Electronics USSI Page 1 of 7

3 Dennis Mull Jeff Peterson Doug Ballmann Jorge Rivera Dan Kroetch John Willis Andrew Ellison Craig Gestler Paul Kelly Marv Carroll Ultra Electronics USSI NIOSH/NPPTL Breathing Air Systems Luxfer Gas Cylinders Bauer Compressors Bauer Compressors Exponent Mine Safety Appliances Company Underwriters Laboratories (via phone) Tyco/Scott Safety (via phone) AGENDA ITEM 2; CHAIRMAN S REMARKS Chairman Rossos announced the schedule for the day. He mentioned that Paul Kelly from UL will be making a presentation on intrinsic safety (HazLoc). He asked Dave Trebisacci to show the TC how TC Task Groups or TC members can submit Public Input online. Dave also reviewed the Correlating Committee s note to the TC on validating new test methods. AGENDA ITEM 3; NFPA STAFF LIAISON REPORT Staff Liaison David Trebisacci read the NFPA Committee Procedural Statement and asked attendees to sign in on the appropriate Member or Guest sign-in sheet. He reviewed the following: NFPA 1981, 1852 and 1989 cycle dates, potential reorganization of standards associated with the Project, and legal issues associated with the NFPA standards process. AGENDA ITEM 4; APPROVAL OF THE MINUTES OF THE 9-11 DECEMBER 2014 MEETING IN FT. LAUDERDALE (FL) Chairman Rossos asked the TC to review the Minutes of the Ft. Lauderdale (FL) meeting. MOTION BY ROBIN GAINEY, SECOND BY BOB SELL To approve the Minutes of the 9 11 December 2014 meeting in Ft. Lauderdale, FL. MOTION CARRIED. AGENDA ITEM 5; TASK GROUP REPORTS The Task Group on Second Stage Regulator Retention and Pneumatic Datalogging and the Task Group on Communications met consecutively during the afternoon of July 24; and the Task Group on Thermal Performance (formerly the Task Group on Lens Degradation) met during the morning of July 25. Task Group on CBRN Certification Task Group Chairman Jeff Peterson from NIOSH reported that NIOSH is developing criteria for labs to be eligible to perform CBRN testing. The criteria will be applied to the U.S. Army s Edgewood Arsenal facility to help ensure future reliability, but it can also be applied to any Page 2 of 7

4 other labs who might be interested in performing CBRN testing. However, currently there are no other labs who have expressed such interest. Task Group on Second Stage Regulator Strength of Interface Task Group Chairman Steve Miles reported that the Task Group modified its previous draft of the proposed test. A copy of the revised text is attached to these Minutes. Task Group on Pneumatic Data Logging Task Group Chairman Steve Miles reported that the Task Group modified its previous recommendations, as follows: At a minimum, the following data points shall be captured and stored internally in the SCBA and shall be retrievable: Initial air on pressure and time and date stamp Data logging interval of no more than 30 seconds for pressure, with time and date stamp Data logging of the visual information signals for breathing air cylinder content specified in Minimum 6,000 data points Minimum of 36 hours of data collection before data points are overwritten Pressure resolution of no more than 10 psig At a minimum, the following shall be provided and shall be permitted to be accessed through software provided by the manufacturer: CSV file format Breathing rate in lpm reported at least every 30 seconds with minimum 5 lpm resolution Task Group on Communications Task Group Chairman Brian Cox reported on the plans for cooperation with the TC on ESE to develop joint performance requirements for hard-wired and wireless radio communication systems. Brian will be adding members of the TC on ESE to the TC on RPE s Task Group on Communications, and he will be attending the next meeting of the TC on ESE in Colorado Springs in October, Task Group on Thermal Performance (formerly Task Group on Lens Degradation) Task Group Chairman Chris Anaya reported that he will reach out to NIST and the University of Illinois to develop a proposal for a swipe test for SCBA facepiece lenses to determine whether a field problem exists. Task Group on Personal Emergency Escape Respiratory Protection Dave Bernzweig reported that the Task Group on Personal Emergency Escape Respiratory Protection has not yet met. AGENDA ITEM 6; OLD BUSINESS There was no old business. Page 3 of 7

5 AGENDA ITEM 7; NEW BUSINESS Chairman Rossos introduced Andrew Ellison from the TC on Fire Hose, who asked members of the TC if they could offer assistance to a Task Group from that TC to perform research into the operational environment in which fire hose is used. A description of the project and Andrew s contact information are attached to these Minutes. Chairman Rossos introduced Paul Kelly, Principal Engineer with UL. Paul gave two presentations via telephone to the TC on the subject of HazLoc (using electronics safely in explosive atmospheres). Based on the presentations, the TC is considering the advisability of replacing the current ANSI/UL 913 intrinsic safety requirement with ANSI/TIA Bill Dickson gave a presentation on cylinder data logging utilizing RFID tags. Using this technology could be a method of complying with some 1989 requirements. The next TC meeting will be held during the week of March 7, 2016, in Ft. Lauderdale, FL. AGENDA ITEM 8; ADJOURNMENT MOTION BY JUDGE MORGAN; SECOND BY BILL DICKSON To adjourn. MOTION CARRIED. Chairman Rossos adjourned the meeting at 15:25 on 25 July Respectfully submitted, Steven H. Weinstein, Secretary Technical Committee on Respiratory Protection Equipment Page 4 of 7

6 7.23 Strength of Interface Between Facepiece and Second Stage Regulator Performance The SCBA facepiece and second stage regulator shall be tested for strength of interface as specified in Section 8.30, Strength of Interface Between Facepiece and Second Stage Regulator Test, and all components, with the exception of wiring components, shall remain connected Strength of Interface Between Facepiece and Second Stage Regulator Test Application. This test method shall apply to the facepiece and second stage regulator assembly Samples Samples shall be a facepiece and a second stage regulator assembly Each sample to be tested shall be as specified in Specimens One specimen shall be tested Specimen Preparation. Prior to testing, specimens shall be conditioned for a minimum of 4 hours at an ambient temperature of 22 C, ±3 C (72 F, ±5 F), with RH of 50 percent, ±25 percent Apparatus The facepiece shall be mounted to a test head and the facepiece shall be clamped to the head in a secure fashion to prevent the facepiece from pulling away from the head Measurements shall be taken with a calibrated measuring device having a resolution of better than ±5N (±1.1 lbf) Procedure A static load of 250N +10N/-0N(56.2 lbf +2.2 lbf/-0 lbf) shall be applied at a rate of 25.4 mm/min mm/min/-0 mm/min (1 in/min +.1 in/min/-0 in/min) to the second stage regulator medium pressure supply hose at a point mm (9.8 in in.) from the point at which the hose enters the second stage regulator The load shall be applied for 10 seconds +1/-0 seconds in the 5 directions shown in figure Each load applied shall commence with the second stage regulator in an as worn position The center point of the applied loads shall be the entry point of the pressure hose to the second stage regulator. The loads shall be applied perpendicular and normal to the test head face. FIGURE Directions of Force Applied for Strength of Interface Testing. Page 5 of 7

7 Report. Any disconnection or partial disconnection of any components shall be recorded and reported Interpretation. Disconnection or partial disconnection of any component shall constitute failing performance Disconnection or partial disconnection of wiring components shall not constitute failing performance. Page 6 of 7

8 The tentative Task Group Scope is: ATTACHMENT FROM ANDREW ELLISON Fire Hose Operational Environment Task Group The environment in which the fire service operates when extinguishing fires has changed dramatically over the past several years due to new material of construction, contents of buildings and more aggressive tactics. The firefighter and his or her tools are a system, the weakest component of which is the limitation on the system. Fire fighters rely on water carried through fire hose and discharged through nozzles as a component of their protection. The Task Group on Fire Hose Operational Environment should review current research on modern fire fighter operating environments to determine potential criteria for fire hose based on expected operating conditions. This Task Group should work with other technical committees responsible for equipment expected to operate in the modern firefighting environment. Initially this task group should focus on the structural firefighting environment. Below is my contact information. Thank you all for the opportunity to address your committee today. Andrew Andrew D. Ellison, P.E., CFEI Registered Professional Fire Protection Engineer in MA Lic. # 50918; ME Lic. #13623; VT Lic. #105458; NH Lic. #14473; NY Lic. # ; CT Lic. # Managing Engineer - Thermal Practice E x ponent Failure Analysis Associates 9 Strathmore Road Natick, MA Mobile: (preferred) Office: Fax: Page 7 of 7

9 1 of 19 2/12/ :46 AM Public Input No. 14-NFPA [ Section No ] This edition of the standard shall also specify the minimum requirements for the design, performance, testing, and certification of replacement parts, components, and add-on accessories for SCBA and combination SCBA/SARs certified as compliant to specific earlier to earlier editions of this standard. Statement of Problem and Substantiation for Public Input It seems out of place to go back and test to an earlier standard when product to the current standard is in field use and users of SCBAs to earlier editions will want. An example is the communications test. It would be better to give a user a comms device, which compiles to the current standard (STI). The testing to old standard (speech recognition) and compliance to the old standard does not support the user desire to get components, which perform, to new current requirements. It also allows manufactures to use current product without change and additional testing to support older product in the field. Submitter Information Verification Submitter Full Name: Robert Sell Organization: Draeger Safety, Inc. Affilliation: Draeger Safety, Inc. Street Address: City: State: Zip: Submittal Date: Wed Jan 06 14:20:38 EST 2016

10 2 of 19 2/12/ :46 AM Public Input No. 15-NFPA [ Section No ] This edition of the standard shall apply to the design, manufacturing, and certification of new open-circuit SCBA and combination SCBA/SARs and shall apply to replacement parts, components, and add-on accessories for such respirators certified as compliant to specific earlier editions of this standard. Statement of Problem and Substantiation for Public Input It seems out of place to go back and test to an earlier standard when product to the current standard is in field use and users of SCBAs to earlier editions will want. An example is the communications test. It would be better to give a user a comms device, which compiles to the current standard (STI). The testing to old standard (speech recognition) and compliance to the old standard does not support the user desire to get components, which perform, to new current requirements. It also allows manufactures to use current product without change and additional testing to support older product in the field. Submitter Information Verification Submitter Full Name: Robert Sell Organization: Draeger Safety, Inc. Affilliation: Draeger Safety, Inc. Street Address: City: State: Zip: Submittal Date: Wed Jan 06 14:25:46 EST 2016

11 3 of 19 2/12/ :46 AM Public Input No. 1-NFPA [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered part of the requirements of this document. 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 1500, Standard on Fire Department Occupational Safety and Health Program, 2013 edition. NFPA 1971, Standard on Protective Ensembles for Structural Fire Fighting and Proximity Fire Fighting, 2013 edition. NFPA 1989, Standard on Breathing Air Quality for Emergency Services Respiratory Protection, 2013 edition. 2.3 Other Publications AATCC Publications. American Association of Textile Chemists and Colorists, P.O. Box 12215, Research Triangle Park, NC AATCC 135, Dimensional Changes of Fabrics After Home Laundering, ANSI Publications. American National Standards Institute, Inc., 25 West 43rd Street, 4th floor, New York, NY ANSI B46.1, Surface Texture, (Superseded by ASME B46.1, Surface Texture (Surface Roughness, Waviness & Lay), 2009). ANSIASA S3.2, American National Standard Method for Measuring the Intelligibility of Speech over Communication Systems, 1989 For Measuring The Intelligibilty Of Speech Over Comunication Systems, 2009, reaffirmed ANSI Y1.1, Abbreviations for Use on Drawings and Text, (Superseded by ASME Y14.38, Abberiations And Acronyms For Use On Drawings And Related Documents, 2007, reaffirmed 2013). ANSI Y14.SM, Dimensioning and Tolerancing, (Superseded by ASME Y14.5) ASTM Publications. ASTM International, 100 Barr Harbor Drive, P. O. Box C700, West Conshohocken, PA ASTM B 16 B16 /B16M, Standard Specification for Free-Cutting Brass Rod, Bar and Shapes for Use in Screw Machines, , reapproved ASTM B 117 B117, Standard Test Method for Salt Spray (Fog) Testing, ASTM D 1003 D1003, Standard Test Method for Haze and Luminous Transmittance of Transparent Plastics, ASTM D 6413 D6413 /D6413M, Standard Test Method for Flame Resistance of Textiles (Vertical Test), B. ASTM E 162 E162, Standard Test Method for Surface Flammability of Materials Using Radiant Heat Energy Source, EBU Publications. EBU (European Broadcasting Union) Department of Technology & Innovation, L'Ancienne-Route 17A, CH-1218 Postal Box 45, 1218 Le Grand-Saconnex, Geneva, Switzerland. EBU Technical Recommendation R68 R 0 68, Alignment level in digital audio production equipment and in digital audio recorders, 2000.

12 4 of 19 2/12/ :46 AM EN Publications (CEN). European Committee for Standardization Central Secretariat, rue de Stassart 36, B 1050, CEN-CENELEC Management Centre, Avenue Marnix 17, B-1000, Brussels, Belgium. BS EN 136, Respiratory protective devices Full face masks Requirements, testing, marking, 1998, Corrigendum, IEC Publications. International Electrotechnical Commission, 3, rue de Varembé, P.O. Box 131, CH-1211 Geneva 20, Switzerland. IEC , Sound System Equipment Part 16: Objective Rating of Speech Intelligibility by Speech Transmission Index, ISO Publications. International Organization for Standardization, 1, rue de Varembé, Case postale 56, CH-1211 Genéve 20, ISO Central Secretariat, BIBC II, 8, Chemin de Blandonnet, CP 401, 1214 Vernier, Geneva, Switzerland. ISO 9001, Quality management systems Requirements, ISO/IEC 17011, Conformity assessment General requirements for accreditation bodies accrediting conformity assessment bodies, ISO 17021, Conformity assessment Requirements for bodies providing audit and certification of management systems, ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories, 2005, Technical Corrigendum, ISO Guide 27, Guidelines for corrective action to be taken by a certification body in the event of misuse of its mark of conformity, ISO/IEC Guide 62, General requirements for bodies operating assessment and certification/registration of quality systems, (Superseded by ISO/IEC 17021) ISO/IEC Guide 65, General requirements for bodies operating product certification systems, (Superseded by ISO/IEC 17065) ISO/IEC 17065, Conformity Assessment - Requirements For Bodies Certifiying Products, Processes And Services, UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL ANSI/ UL 913, Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III, Division 1 Hazardous (Classified) Locations,Sixth Eighth edition, 2013, revised U.S. Government Publications. U.S. Government Printing Government Publishing Office, Washington, DC North Capitol Street, NW, Washington DC, Statement of Standard for NIOSH CBRN SCBA Testing, Title 42, Code of Federal Regulations, Part 84, Respiratory Protective Devices, Tests for Permissibility, 8 June Other Publications. Merriam-Webster s Collegiate Dictionary, 11th edition, Merriam-Webster, Inc., Springfield, MA, References for Extracts in Mandatory Sections. (Reserved) Statement of Problem and Substantiation for Public Input Referenced current SDO names, addresses, standard names, numbers, and editions. Related Public Inputs for This Document

13 5 of 19 2/12/ :46 AM Related Input Public Input No. 2-NFPA [Chapter C] Relationship Submitter Information Verification Submitter Full Name: Aaron Adamczyk Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Sun Jun 14 23:07:55 EDT 2015

14 6 of 19 2/12/ :46 AM Public Input No. 11-NFPA [ Section No ] UL Publications. Underwriters Laboratories Inc., 333 Pfingsten Road, Northbrook, IL ANSI/UL 913, Standard for Intrinsically Safe Apparatus and Associated Apparatus for Use in Class I, II, and III, Division 1 Hazardous (Classified) Locations,Sixth Eighth edition, Statement of Problem and Substantiation for Public Input Referenced UL Standard has been updated/revised to a new edition. Submitter Information Verification Submitter Full Name: Ronald Farr Organization: Ul Llc Street Address: City: State: Zip: Submittal Date: Tue Jan 05 11:07:15 EST 2016

15 7 of 19 2/12/ :46 AM Public Input No. 12-NFPA [ Section No ] The certification organization shall not permit any manufacturer to label any SCBA as compliant with the 2007 edition of this standard on or after 31 August February 2014, except when replacement labels or replacement components that bear the certification organization s label are required. Additional Proposed Changes File Name Description Approved TIA _-_TIA pdf NFPA TIA 13-1, Log 1111 Statement of Problem and Substantiation for Public Input Note: This public input originates from Tentative Interim Amendment No. 13-1, Log #1111 issued by the Standards Council on August 26, 2013 and per the NFPA Regs., needs to be reconsidered by the Technical Committee for the next edition of the Document. Submitter s Substantiation: The purpose of this TIA is in response to a letter received from the National Institute for Occupational Safety and Health, National Personal Protective Technology Laboratory (NIOSH/NPPTL) dated 29 November This letter notified the Chair of the Technical Committee on Respiratory Protection Equipment of additional delays in chemical warfare agent (CWA) testing being conducted by the U.S. Army Edgewood Chemical Biological Command (ECBC) that are negatively impacting the timeliness of completion of NIOSH SCBA approvals. This new delay will in turn impact approval and certification of SCBAs by the relevant certification organization (SEI) to the 2013 edition of NFPA TIA 13-1 (Issue Date: 26 August 2013) to the 2013 edition of NFPA 1981 had changed the date specified in and from 31 August 2013 to 28 February The new 30 June 2014 date requested by this TIA is required to provide sufficient time for manufacturers new designs to have successfully completed the evaluations, and for the certification authorities to be able to issue approvals and certifications for compliance to NIOSH and NFPA standards by that date. This will also assure that SCBA units certified to the 2007 edition of NFPA 1981 will be available for procurement in case of a national emergency or catastrophic event while the 2013 edition approvals and certifications are completed. This substantiation would apply equally to both and by requiring this new date. Paragraph identifies what is not permitted on that effective date, while requires what will be required on that effective date. Emergency Nature: NIOSH testing to the Statement of Standard for Self Contained Breathing Apparatus (SCBA) with Chemical, Biological, Radiological, and Nuclear (CBRN) Protection used to Protect Emergency Responders Against CBRN Agents in Terrorist Attacks in conjunction with the National Fire Protection Association (NFPA) Standard 1981 on Open- Circuit Self-Contained Breathing Apparatus for Emergency Services contain three interlocked activities. One is NIOSH certification under 42 CFR Part 84, Subpart H; two is compliance with National Fire Protection Association (NFPA) Standard 1981 for Open-Circuit Self-Contained Breathing Apparatus for Emergency Services, current edition; and three is special tests under NIOSH 42 CFR 84.63(c): Chemical Agent Permeation and Penetration Resistance Against Distilled Sulfur Mustard (HD) and Sarin (GB), performed by the U.S. Army Edgewood Chemical Biological Center (ECBC) Testing Center and Laboratory Respirator Protection Level (LRPL), performed by NPPTL. To minimize the total time for CBRN approvals, NIOSH and SEI have a simultaneous test and approval protocol. To expedite the testing, the National Personal Protective Technology Laboratory (NPPTL) has provided funding to ECBC to setup additional CWA testing chambers. ECBC will be conducting the CWA testing using an extended work day schedule in an effort to complete the testing of SCBAs submitted for NFPA 1981, 2013 edition approval and certification by 1 April This additional delay past the 28 February 2014 date poses a significant impact on fire departments or first responder organizations planning the procurement of NFPA 1981, 2013 edition SCBAs. It would also prevent them

16 8 of 19 2/12/ :46 AM from procuring 2007 edition units if needed by their departments or organizations. Either of these situations will impact firefighter and first responder safety, by requiring additional training and creating a mixed inventory of SCBA with compromised interoperability of SCBA units. Departments may be faced with either an inadequate number of compliant SCBAs. Additionally, there is concern that without this compliance date extension, products compliant to the 2007 edition of NFPA 1981 will no longer be available after 28 February Submitter Information Verification Submitter Full Name: Tc On Fae-Rpe Organization: Nfpa Street Address: City: State: Zip: Submittal Date: Tue Jan 05 11:45:25 EST 2016

17 Reference: TIA 13-1 (SC /TIA Log #1111) Tentative Interim Amendment NFPA 1981 Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services 2013 Edition Pursuant to Section 5 of the NFPA Regulations Governing the Development of NFPA Standards, the National Fire Protection Association has issued the following Tentative Interim Amendment to NFPA 1981, Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services, 2013 edition. The TIA was processed by the Technical Committee on Respiratory Protection Equipment and the Correlating Committee on Fire and Emergency Services Protective Clothing and Equipment, and was issued by the Standards Council on August 26, 2013, with an effective date of September 15, A Tentative Interim Amendment is tentative because it has not been processed through the entire standards-making procedures. It is interim because it is effective only between editions of the standard. A TIA automatically becomes a public input of the proponent for the next edition of the standard; as such, it then is subject to all of the procedures of the standards-making process. 1. Revise and to read as follows: The certification organization shall not permit any manufacturer to label any SCBA as compliant with the 2007 edition of this standard on or after 28 February 2014, except when replacement labels or replacement components that bear the certification organization s label are required The certification organization shall require manufacturers to remove all certification labels and product labels indicating compliance with the 2007 edition of this standard from all SCBA that are under the control of the manufacturer on 28 February The certification organization shall verify that this action is taken. Issue Date: August 26, 2013 Effective Date: September 15, 2013 (Note: For further information on NFPA Codes and Standards, please see Copyright 2013 All Rights Reserved NATIONAL FIRE PROTECTION ASSOCIATION

18 9 of 19 2/12/ :46 AM Public Input No. 13-NFPA [ Section No ] The certification organization shall require manufacturers to remove all certification labels and product labels indicating compliance with the 2007 edition of this standard from all SCBA that are under the control of the manufacturer on 31 August February The certification organization shall verify that this action is taken. Additional Proposed Changes File Name Description Approved TIA pdf NFPA TIA Log No Statement of Problem and Substantiation for Public Input Note: This public input originates from Tentative Interim Amendment No. 13-1, Log No issued by the Standards Council on August 26, 2013 and per the NFPA Regs., needs to be reconsidered by the Technical Committee for the next edition of the Document. Submitter's Substantiation: The purpose of this TIA is to update on the National Institute for Occupational Safety and Health (NIOSH) testing of CBRN SCBAs. Some unanticipated delays have the potential to negatively impact the timeliness of completion of NIOSH SCBA approvals. These delays could in turn impact approvals and certification of SCBAs by the relevant certification organization (SEI) to the NFPA 1981 standard, 2013 edition. That standard states in paragraph that "The certification organizations shall not permit any manufacturer to label any SCBA as compliant with the 2007 edition of this standard on or after 31 August 2013, except when replacement labels or replacement components that bear the certification organization's label are required." The presumption in the Technical Committee choosing this date was that it would provide sufficient time for manufacturers' new designs to have successfully completed the evaluations for the certification authorities to be able to issue certifications for compliance to the NIOSH and NFPA standards by that date. Emergency Nature: NIOSH testing to the Statement of Standard for Self Contained Breathing Apparatus (SCBA) with Chemical, Biological, Radiological, and Nuclear (CBRN) Protection used to Protect Emergency Responders Against CBRN Agents in Terrorist Attacks in conjunction with the National Fire Protection Association (NFPA) Standard 1981 for Open-Circuit Self-Contained Breathing Apparatus for Fire Fighters contain three interlocked activities. One is NIOSH certification under 42 CFR Part 84, Subpart H; two is compliance with National Fire Protection Association (NFPA) Standard 1981 for Open-Circuit Self-Contained Breathing Apparatus for Fire Fighters, current edition; and three is special tests under NIOSH 42 CFR 84.63(c): Chemical Agent Permeation and Penetration Resistance Against Distilled Sulfur Mustard (HD) and Sarin (GB), performed by The US Army Edgewood Chemical Biological Center (ECBC) Testing Center and Laboratory Respirator Protection Level (LRPL), performed by NPPTL. To minimize the total time for CBRN approvals, NIOSH and SEI have a simultaneous test and approval protocol. The National Personal Protective Technology Laboratory (NPPTL) has allocated its resources provide for the completion of all 9 internally-conducted tests, evaluations and issuance of approvals for SCBA manufacturer applications submitted prior to I June 2013 by September 1st. SEI has also allocated resources to provide for completion of the NFPA 1981 compliance testing for apparatus received by the same date. However, the availability ofecbc testing resources to complete the HD and GB testing has been negatively impacted by the Federal Government Budget Sequestration. Consequently, delays are anticipated. Representatives from NPPTL and ECBC are working closely to develop a projected testing schedule. A delay past the August 31st date poses a significant impact on flre departments or first responder organizations that planned 4th quarter of20 13 purchases or need an emergency purchase of compliant SCBA. These organizations may not have access to the manufacturer of their current inventory SCBA, posing the dilemma of purchasing another manufacturers product or foregoing purchase until compliant product is available. Either of

19 10 of 19 2/12/ :46 AM these approaches will impact firefighter safety, by requiring additional training and creating a mixed inventory of SCBA with compromised interoperability of SCBA units. Departments may be faced with either an inadequate number of compliant SCBAs for operations or sending responders into a hazardous situation with safety equipment that is no longer compliant with NFPA Additionally, there is concern that without this compliance date extension, products compliant to the 2007 edition ofnfpa 1981 will no longer be available after August 31, Submitter Information Verification Submitter Full Name: Tc On Fae-Rpe Organization: Nfpa Street Address: City: State: Zip: Submittal Date: Tue Jan 05 14:46:48 EST 2016

20 Reference: TIA 13-1 (SC /TIA Log #1111) Tentative Interim Amendment NFPA 1981 Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services 2013 Edition Pursuant to Section 5 of the NFPA Regulations Governing the Development of NFPA Standards, the National Fire Protection Association has issued the following Tentative Interim Amendment to NFPA 1981, Standard on Open-Circuit Self-Contained Breathing Apparatus (SCBA) for Emergency Services, 2013 edition. The TIA was processed by the Technical Committee on Respiratory Protection Equipment and the Correlating Committee on Fire and Emergency Services Protective Clothing and Equipment, and was issued by the Standards Council on August 26, 2013, with an effective date of September 15, A Tentative Interim Amendment is tentative because it has not been processed through the entire standards-making procedures. It is interim because it is effective only between editions of the standard. A TIA automatically becomes a public input of the proponent for the next edition of the standard; as such, it then is subject to all of the procedures of the standards-making process. 1. Revise and to read as follows: The certification organization shall not permit any manufacturer to label any SCBA as compliant with the 2007 edition of this standard on or after 28 February 2014, except when replacement labels or replacement components that bear the certification organization s label are required The certification organization shall require manufacturers to remove all certification labels and product labels indicating compliance with the 2007 edition of this standard from all SCBA that are under the control of the manufacturer on 28 February The certification organization shall verify that this action is taken. Issue Date: August 26, 2013 Effective Date: September 15, 2013 (Note: For further information on NFPA Codes and Standards, please see Copyright 2013 All Rights Reserved NATIONAL FIRE PROTECTION ASSOCIATION

21 11 of 19 2/12/ :46 AM Public Input No. 16-NFPA [ Section No ] The certification organization and the manufacturer shall evaluate replacement parts, components, and add-on accessories to determine any changes affecting the form, fit, or function for SCBA certified to the edition or the edition of NFPA 1981 to permit revisions to the original certification. This permits changes to the earlier certifications to accept replacement parts, components, and add-on accessories tested and certified as compliant to this edition of the standard to be used on previously certified SCBA. Statement of Problem and Substantiation for Public Input It seems out of place to go back and test to an earlier standard when product to the current standard is in field use and users of SCBAs to earlier editions will want. An example is the communications test. It would be better to give a user a comms device, which compiles to the current standard (STI). The testing to old standard (speech recognition) and compliance to the old standard does not support the user desire to get components, which perform, to new current requirements. It also allows manufactures to use current product without change and additional testing to support older product in the field. Submitter Information Verification Submitter Full Name: Robert Sell Organization: Draeger Safety, Inc. Affilliation: Draeger Safety, Inc. Street Address: City: State: Zip: Submittal Date: Wed Jan 06 14:27:31 EST 2016

22 12 of 19 2/12/ :46 AM Public Input No. 10-NFPA [ New Section after ] SCBA Name Identifyer A highly reflective, glow in the dark, name identifyer shall be placed on the bottom of the glass portion of the full face piece, so that it is prominently visible to others in dark, smokey coditions. It shall be made of self extinguishing, fire resistive material that is both glow in the dark and reflective. It shall not unnecessarily obstruct the view of the wearer. Dimensions shall not be more than 1" in height and shall display the last name of the individual wearer. The purpose of this section is to provide a method to readily identify individuals in dark, smokey conditions, during both normal Firefighting operations and,especially, RIC operations. The glow in the dark nature of these labels will allow RIC crews to more easily find individuals in limited visibility conditions. Additional Proposed Changes File Name Description Approved identifyer_lable_1981_1.jpg glow in the dark, reflective, self extinguishing name label for facepiece identifyer_lable_1981_2.jpg glow in the dark, reflective, self extinguishing unit label for bottle Statement of Problem and Substantiation for Public Input Problem - in dark, smokey conditions, it is very difficult to see individual firefighters, let alone identify who they are. I am a Captain in Special Operations, and I constantly struggle with this. I, of course have a TIC, but it does not resolve who the individuals are, especially in a large operation with multiple crews operating. Solution - A few of my guys have shown me labels made by several companies that are glow in the dark, reflective, that are placed on the bottom of the face pieces with the individuals name. We have placed them on our SCBAs at our station. It is amazing how prominently visible the individuals are in complete darkness and also in highly smokey conditions. I am easily able to track my guys and identify who i am operating with, even without a TIC. We also did a RIC drill in a 0 visibility, highly smokey, burn building. The downed firefighter had these labels on his facepiece as well as on his helmet. As soon as we felt our way into an upstairs room, the glow in the dark labels were readily visible even in the limited visibiltiy conditions. we were able to go directly to the firefighter and assist him out. We still would have found him based on sound from pass device and blinking lights on scba, however, I believe not nearly as quickly. Some of these labels are self extinguishing, and fire resistive at 500F for 5 minutes. Submitter Information Verification Submitter Full Name: Bob Kropa Organization: Palm Beach County Fire Rescue Affilliation: Captain, Special Operations, PBCFR Street Address: City: State: Zip: Submittal Date: Sun Nov 15 15:45:10 EST 2015

23

24

25 13 of 19 2/12/ :46 AM Public Input No. 6-NFPA [ Section No ] The duration of the test as specified in Section 8.28, Lens Radiant Heat Test, shall be 24 minutes, +2/ 0 minutes be no less than 80% of the NIOSH-rated duration for the lowest volume cylinder offered for the SCBA. Statement of Problem and Substantiation for Public Input The intent of this section is intended to limit compromise to the facepiece by controlling the duration of the test through a limited air duration. The test method should specify the air volume for the test. The lens performance should be based on the 'worst case' scenario. The worst case scenario would be the lowest cylinder volume offered with the facepiece. Submitter Information Verification Submitter Full Name: DAVID BERNZWEIG Organization: The Columbus Firefighter (Union) Street Address: City: State: Zip: Submittal Date: Sat Jul 25 14:29:52 EDT 2015

26 14 of 19 2/12/ :46 AM Public Input No. 7-NFPA [ Section No ] The duration of the test as specified in Section 8.29, Elevated Temperature Heat and Flame Resistance Test, shall be 24 minutes, +2/ 0 minutes no less than 80% of the NIOSH-rated duration for the lowest volume cylinder offered for the SCBA. Statement of Problem and Substantiation for Public Input The intent of this section is intended to limit compromise to the facepiece by controlling the duration of the test through a limited air duration. The test method should specify the air volume for the test. The lens performance should be based on the 'worst case' scenario. The worst case scenario would be the lowest cylinder volume offered with the facepiece. Submitter Information Verification Submitter Full Name: DAVID BERNZWEIG Organization: Columbus (OH) Firefighter Union Street Address: City: State: Zip: Submittal Date: Sat Jul 25 14:48:18 EDT 2015

27 15 of 19 2/12/ :46 AM Public Input No. 5-NFPA [ Section No ] Application. This test method shall apply to complete SCBA facepiece(s) and, second stage regulator(s) and Supplementary Voice Communications System. Statement of Problem and Substantiation for Public Input did not include the required Supplementary Voice Communications System Submitter Information Verification Submitter Full Name: JUDGE MORGAN Organization: SCOTT SAFETY Street Address: City: State: Zip: Submittal Date: Wed Jul 22 21:55:13 EDT 2015

28 16 of 19 2/12/ :46 AM Public Input No. 3-NFPA [ Section No [Excluding any Sub-Sections] ] Testing shall be conducted in a chamber having the following minimum characteristics: (1) Minimum room dimensions: 4.6 m long 3.1 m wide 2.7 m high (15 ft long 10 ft wide 9 ft high) (2) Construction: hemi-anechoic (3) Ambient noise level inside chamber: NC-25 (4) Walls and ceiling: 90 percent absorptive for 100 Hz< f<10000 Hz Statement of Problem and Substantiation for Public Input This is to match Submitter Information Verification Submitter Full Name: JUDGE MORGAN Organization: SCOTT SAFETY Street Address: City: State: Zip: Submittal Date: Wed Jul 22 20:02:14 EDT 2015

29 17 of 19 2/12/ :46 AM Public Input No. 2-NFPA [ Chapter C ]

30 18 of 19 2/12/ :46 AM Annex C Informational References C.1 Referenced Publications. The documents or portions thereof listed in this annex are referenced within the informational sections of this standard and are not part of the requirements of this document unless also listed in Chapter 2 for other reasons. C.1.1 NFPA Publication. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 1500, Standard on Fire Department Occupational Safety and Health Program, 2013 edition. NFPA 1852, Standard on Selection, Care, and Maintenance of Open-Circuit Self-Contained Breathing Apparatus (SCBA), 2013 edition. NFPA 1989, Standard on Breathing Air Quality for Emergency Services Respiratory Protection, 2013 edition. C.1.2 Other Publications. C ANSI Publications. American National Standards Institute, Inc., 25 West 43rd Street, 4th floor, New York, NY ANSI Z88.2, Practices for Respiratory Protection, ANSI Z88.6, Respiratory Protection Respirator Use Physical Qualifications for Personnel, ANSI Z88.10, Respirator Fit Test Methods, C ASTM Publication. ASTM International, 100 Barr Harbor Drive, P. O. Box C700, West Conshohocken, PA ASTM B 16 B16 /B16M, Standard Specification for Free-Cutting Brass Rod, Bar and Shapes for Use in Screw Machines, , reapproved C ISO Publications. International Organization for Standardization, 1, rue de Varembé, Case postale 56, CH-1211 Genève 20, ISO Central Secretariat, BIBC II, 8, Chemin de Blandonnet, CP 401, 1214 Vernier, Geneva, Switzerland. ISO Guide 27, Guidelines for corrective action to be taken by a certification body in the event of misuse of its mark of conformity, ISO/IEC Guide 65, General requirements for bodies operating product certification systems, (Superseded by ISO/IEC 17065) ISO/IEC 17065, Conformity Assessment - Requirements For Bodies Certifiying Products, Processes And Services, 1st edition, C U.S. Government Publications. U.S. Government Printing Government Publishing Office, 732 North Capitol Street, NW, Washington DC, DC Title 29, Code of Federal Regulations, Part 1910 Part , Respiratory Protection, 8 January August Title 42, Code of Federal Regulations, Part 84, Respiratory Protective Devices, Tests for Permissibility, 8 June C.2 Informational References. (Reserved) C.3 References for Extracts in Informational Sections. (Reserved) Statement of Problem and Substantiation for Public Input Referenced current SDO names, addresses, standard names, numbers and editions.

31 19 of 19 2/12/ :46 AM Related Public Inputs for This Document Related Input Public Input No. 1-NFPA [Chapter 2] Relationship Referenced current SDO names, addresses, standard names, numbers, and editions. Submitter Information Verification Submitter Full Name: Aaron Adamczyk Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Jun 15 00:35:53 EDT 2015

MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT JULY 2015 SACRAMENTO, CA

MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT JULY 2015 SACRAMENTO, CA MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT 24 25 JULY 2015 SACRAMENTO, CA AGENDA ITEM 1; SELF-INTRODUCTION OF MEMBERS AND GUESTS Chairman Rossos called the Committee

More information

Public Input No. 99-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Public Input No. 99-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input 1 of 218 5/20/2016 12:24 PM Public Input No. 99-NFPA 1982-2016 [ Section No. 1.1.3 ] 1.1.3 This standard shall not specify requirements for any manufactured to previous editions of this standard To enable

More information

MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT. NFPA 1989, 1852 First Draft Meeting. August 9-10, 2016.

MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT. NFPA 1989, 1852 First Draft Meeting. August 9-10, 2016. MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT NFPA 1989, 1852 First Draft Meeting August 9-10, 2016 Quincy, MA AGENDA Tuesday, August 9, 2016, Start Time 9:00 a.m. 1. Self-introduction

More information

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016

TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES. NFPA 610 First Draft Meeting. October 17-18, 2016 TECHNICAL COMMITTEE ON SAFETY AT MOTORSPORTS VENUES NFPA 610 First Draft Meeting October 17-18, 2016 Westin Kansas City at Crown Center 1 East Pershing Road Kansas City, MO, 64108 Conference Call Access:

More information

MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT. NFPA 1989 and 1852 Second Draft Meeting. May 23-24, Virginia Beach, VA

MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT. NFPA 1989 and 1852 Second Draft Meeting. May 23-24, Virginia Beach, VA MEETING OF THE TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT NFPA 1989 and 1852 Second Draft Meeting May 23-24, 2017 Virginia Beach, VA AGENDA Conference call info: Phone: 855-747-8824 Passcode:

More information

MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT JULY 2011 MISSOULA, MT

MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT JULY 2011 MISSOULA, MT MINUTES OF THE MEETING TECHNICAL COMMITTEE ON RESPIRATORY PROTECTION EQUIPMENT 19-21 JULY 2011 MISSOULA, MT AGENDA ITEMS 1-2; SELF-INTRODUCTION OF MEMBERS AND GUESTS, NFPA COMMITTEE PROCEDURAL STATEMENT

More information

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input

Page 1 of 6 10/19/2016 9:49 AM. Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input Public Input No. 4-NFPA 111-2016 [ Section No. 1.1.4.1 ] 1.1.4.1 * This standard shall not cover the following: (1) Application of the SEPSS (2) Distribution wiring (3) Systems having total outputs less

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

12/21/2015 National Fire Protection Association Report

12/21/2015 National Fire Protection Association Report http://submittals.nfpa.org/terraviewweb/viewerpage.jsp?id=232 2012.ditamap&toc=false&draft=true 1/9 Public Comment No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

3M Personal Safety Division. Standards Update. NFPA 1981/1982, 2018 Edition. March 30, 2018

3M Personal Safety Division. Standards Update. NFPA 1981/1982, 2018 Edition. March 30, 2018 3M Personal Safety Division Standards Update NFPA 1981/1982, 2018 Edition March 30, 2018 Standards Update NFPA 1981/1982, 2018 Edition The purpose of this presentation is to provide an update on the status

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

Technical Committee on Record Protection (REA-AAA)

Technical Committee on Record Protection (REA-AAA) Technical Committee on Record Protection (REA-AAA) DATE: September 8, 2015 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Record Protection (REA-AAA) Audrey

More information

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 10-12, 2016 Dallas, TX AGENDA

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 10-12, 2016 Dallas, TX AGENDA Tuesday, March 10, 2016 NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT March 10-12, 2016 Dallas, TX AGENDA 1. 9:00 a.m. Call to Order - Chairman Bob Athanas 2. Introduction of Members and Guests

More information

M E M O R A N D U M. Technical Committee on Special Operations Protective Clothing and Equipment

M E M O R A N D U M. Technical Committee on Special Operations Protective Clothing and Equipment National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Special Operations

More information

Second Revision No. 1 NFPA [ Chapter 2 ]

Second Revision No. 1 NFPA [ Chapter 2 ] Second Revision No. 1 NFPA 232 2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be

More information

M E M O R A N D U M. Technical Committee on Flash Fire Protective Garments

M E M O R A N D U M. Technical Committee on Flash Fire Protective Garments National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Flash Fire Protective

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 10-12, 2016 Dallas, TX AGENDA

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 10-12, 2016 Dallas, TX AGENDA Tuesday, March 10, 2016 NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT March 10-12, 2016 Dallas, TX AGENDA 1. 9:00 a.m. Call to Order - Chairman Bob Athanas 2. Introduction of Members and Guests

More information

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. December 10-12, 2013 San Diego, CA AGENDA

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. December 10-12, 2013 San Diego, CA AGENDA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT December 10-12, 2013 San Diego, CA AGENDA Tuesday, December 10, 2013 1. 9:00 a.m. Call to Order - Chairman Bob Athanas 2. Introduction of Members and

More information

Homeland Security Standard Panel (ANSI-HSSP) November 9, Standards Development in Response to Terrorism Threats

Homeland Security Standard Panel (ANSI-HSSP) November 9, Standards Development in Response to Terrorism Threats Homeland Security Standard Panel (ANSI-HSSP) November 9, 2011 Standards Development in Response to Terrorism Threats NIOSH and NFPA CBRN Personal Protective Equipment (PPE) Standards Bill Haskell NIOSH

More information

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved. Public Input No. 1-NFPA 557-2012 [ New Section after 1.5.3 ] 1.6 Approved Qualifications The design shall be prepared by a person with qualifications acceptable to the AHJ. The term designer is used in

More information

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Emergency Power Supplies Kelly

More information

Public Input No. 53-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 53-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification of 96 9/25/2015 3:03 PM Public Input No. 53-NFPA 1801-2015 [ Section No. 1.3.5 ] 1.3.5 This standard shall not apply to criteria for the use of thermal imagers by the fire service, the requirements for

More information

Page 1 of 241 Public Input No. 106-NFPA 1991-2014 [ Global Input ] Change title to: "Vapor-Protective Ensembles for Hazardous Materials Emergencies and CBRN Terrorism Agents" Additional Proposed Changes

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Merchant Vessels

More information

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. Wyndham San Diego Bayside 1335 N. Harbor Drive San Diego, CA NFPA 1982 Second Draft Meeting

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. Wyndham San Diego Bayside 1335 N. Harbor Drive San Diego, CA NFPA 1982 Second Draft Meeting TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT Wyndham San Diego Bayside 1335 N. Harbor Drive San Diego, CA 92101 NFPA 1982 Second Draft Meeting December 6-8, 2016 AGENDA Meeting Start Time - 9:00

More information

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 23-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item Public Comment No. 23-NFPA 96-2015 [ Section No. 2.3.1 ] 2.3.1 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM E84, Standard Test Method

More information

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th, 2016 Meeting called to order at 8:07 AM by Chairman

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

First Draft Meeting (F2017) Agenda Friday, March 11 th, :30 AM 4:00 PM ET

First Draft Meeting (F2017) Agenda Friday, March 11 th, :30 AM 4:00 PM ET NFPA 170 Technical Committee on Fire Safety and Emergency Symbols First Draft Meeting (F2017) Agenda Friday, March 11 th, 2016 9:30 AM 4:00 PM ET 1. Call to Order: 9:30 AM 2. Introductions and Attendance

More information

IAFF DIVISION OF OCCUPATIONAL HEALTH, SAFETY AND MEDICINE

IAFF DIVISION OF OCCUPATIONAL HEALTH, SAFETY AND MEDICINE IAFF DIVISION OF OCCUPATIONAL HEALTH, SAFETY AND MEDICINE Position on the U.S. Army Soldier & Biological Chemical Command s (SBCCOM), Withdrawn 3/30 Rule and the New Guide: The Risk Assessment of Using

More information

Page 1 of 13 Second Revision No. 1-NFPA 326-2014 [ Section No. 2.3.1 ] 2.3.1 ACGIH Publications. American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Cincinnati, OH 45240-1634.

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

NFPA 77 Public Inputs with Responses Page 1 of 15

NFPA 77 Public Inputs with Responses Page 1 of 15 Public Input No. 46-NFPA 77-2016 [ Global Input ] Type your content here... Make universal change from "bonding and grounding" to "bonding or grounding". While "grounding and bonding" is ok in some context

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

Public Input No. 2-NFPA [Chapter F]

Public Input No. 2-NFPA [Chapter F] 1 of 66 1/26/2016 2:02 PM Public Input No. 19-NFPA 403-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this

More information

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM

First Revision No. 1-NFPA [ Section No ] Submitter Information Verification. Committee Statement 4/15/ :08 AM First Revision No. 1-NFPA 1403-2015 [ Section No. 1.2.1 ] 1.2.1 The purpose of this standard shall be to provide a process for conducting live fire training evolutions to ensure that they are conducted

More information

M E M O R A N D U M. NFPA 270 First Draft Technical Committee FINAL Ballot Results (F2017)

M E M O R A N D U M. NFPA 270 First Draft Technical Committee FINAL Ballot Results (F2017) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Fire Tests Kelly

More information

5.07 Air Replenishment Systems

5.07 Air Replenishment Systems 5.07 Air Replenishment Systems Reference: 2010 SFFC, Section 511.2 Definitions: CERTIFIED COMPRESSOR. A compressor used by a contractor for maintenance and testing of air replenishment systems that is

More information

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e 5.07 Air Replenishment Systems (2016) Reference: SFFC, Section 511.2. Purpose: The purpose of this bulletin is to describe the requirements for air replenishment systems intended to be used to fill firefighters'

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 35 12/3/2015 7:13 AM Public Input No. 1-NFPA 90A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI/ASHRAE

More information

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 18-19, 2014 Fort Lauderdale, FL AGENDA

NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. March 18-19, 2014 Fort Lauderdale, FL AGENDA NFPA TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT March 18-19, 2014 Fort Lauderdale, FL AGENDA Tuesday, March 18, 2014 1. 8:00 a.m. Call to Order - Chairman Bob Athanas 2. Introduction of Members

More information

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m.

NFPA Technical Committee on Building Systems. NFPA 900 First Draft Teleconference/Web Meeting AGENDA. Thursday, February 13, :00 a.m. 1. Call to Order: NFPA Technical Committee on Building Systems NFPA 900 First Draft Teleconference/Web Meeting AGENDA Thursday, February 13, 2014 11:00 a.m. Noon EDT Online meeting link: http://nfpa.adobeconnect.com/r366m2eaxx6/

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document National Fire Protection Association Report of 113 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 2/9/2016 10:50 AM Public Input No. 1-NFPA 87-2015 [ Global Input ] Throughout standard

More information

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation

M E M O R A N D U M. NFPA Technical Committee on Water Additives for Fire Control and Vapor Mitigation National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Water Additives

More information

WEB CONFERENCE TECHNICAL COMMITTEE ON MARINE FIRE FIGHTING VESSELS. NFPA 1925 First Draft Meeting. May 3, 2016

WEB CONFERENCE TECHNICAL COMMITTEE ON MARINE FIRE FIGHTING VESSELS. NFPA 1925 First Draft Meeting. May 3, 2016 WEB CONFERENCE TECHNICAL COMMITTEE ON MARINE FIRE FIGHTING VESSELS NFPA 1925 First Draft Meeting May 3, 2016 Web Access: http://nfpa.adobeconnect.com/r7brkrdzxuo/ Phone Access: 855-747-8824 Passcode 902034

More information

TECHNICAL COMMITTEE ON FIRE CODE

TECHNICAL COMMITTEE ON FIRE CODE TECHNICAL COMMITTEE ON FIRE CODE M E M O R A N D U M TO: FROM: Technical Committee on Fire Code (FCC-AAA) Gregory Harrington, P.E., Staff Liaison DATE: February 3, 2011 SUBJECT: NFPA 1124 Amended CP#2

More information

CHAPTER 6 [CE] REFERENCED STANDARDS

CHAPTER 6 [CE] REFERENCED STANDARDS CHAPTER 6 [CE] REFERENCED STANDARDS User note: About this chapter: Chapter 6 lists the full title, edition year and address of the promulgator for all standards that are referenced in the code. The section

More information

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

M E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Helicopter Facilities

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical on Laser Fire Protection Kimberly

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

Technical Committee on Portable Fire Extinguishers

Technical Committee on Portable Fire Extinguishers Technical Committee on Portable Fire Extinguishers DATE: February 29, 2016 TO: FROM: M E M O R A N D U M Principal and Alternate Members of the Technical Committee on Portable Fire Extinguishers Barry

More information

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA 90A-2016 [ Section No ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 90A-2016 [ Section No. 2.3.2 ] 2.3.2 ASTM International Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM C411, Standard

More information

MINUTES OF THE MEETING TECHNICAL COMMITTEE ON HAZARDOUS MATERIALS PROTECTIVE CLOTHING AND EQUIPMENT JANUARY SAN DIEGO, CA

MINUTES OF THE MEETING TECHNICAL COMMITTEE ON HAZARDOUS MATERIALS PROTECTIVE CLOTHING AND EQUIPMENT JANUARY SAN DIEGO, CA MINUTES OF THE MEETING TECHNICAL COMMITTEE ON HAZARDOUS MATERIALS PROTECTIVE CLOTHING AND EQUIPMENT JANUARY 20-23 2015 SAN DIEGO, CA Attendance: Principal Members/Staff: Christina Baxter U.S. Department

More information

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes

First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] Submitter Information Verification. Committee Statement and Meeting Notes First Revision No. 2-NFPA 90B-2012 [ Section No. 1.3 ] 1.3 Application. 1.3.1 This standard shall apply to all systems for the movement of environmental air in structures that serve the following, except

More information

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting March 14 15, 2012 San Diego, CA The NFPA 1521 Task Group and NFPA 1561 Task Group, established

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 15538 First edition 2001-10-01 Protective clothing for firefighters Laboratory test methods and performance requirements for protective clothing with a reflective outer surface

More information

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045

MEMORANDUM. NFPA Technical Committee on Fire Code (FCC-AAA) Subject: NFPA 1 Proposed Tentative Interim Amendment (TIA) No.1045 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Code (FCC-AAA) Gregory

More information

NOTICE. (Formulated under the cognizance of the CTA R3 Audio Systems Committee.)

NOTICE. (Formulated under the cognizance of the CTA R3 Audio Systems Committee.) CTA Bulletin Recommended Loudspeaker Safety Practices An Industry Guideline CTA-CEB19 W-2014 (Formerly CEA-CEB19 W-2014) September 2014 NOTICE Consumer Technology Association (CTA) Standards, Bulletins

More information

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD

National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting. October 10 12, 2011 Baltimore, MD National Fire Protection Association (NFPA) Fire Service Occupational Safety and Health Technical Committee Meeting October 10 12, 2011 Baltimore, MD Chairman Glenn Benarick called the meeting to order

More information

Public Comment No. 7-NFPA [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification

Public Comment No. 7-NFPA [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Comment. Submitter Information Verification 1 of 6 2/2/2017 1:09 PM Public Comment No. 7-NFPA 1026-2016 [ Section No. 2.3 ] 2.3 Other Publications. Homeland Security Presidential Directive-5 (HSPD-5), National Incident Management System, United

More information

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US

A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US A NATIONAL SET OF HYDROGEN CODES AND STANDARDS FOR THE US Rivkin, C. 1, Blake, C. 1, Burgess, R. 1, Buttner, W. 1, and Post, M. 1 1 Hydrogen Technologies and Systems Center, National Renewable Energy Laboratory,

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

Resolution: FR-1-NFPA Statement: When tests are conducted for fire reconstruction or research the items excluded above can be included.

Resolution: FR-1-NFPA Statement: When tests are conducted for fire reconstruction or research the items excluded above can be included. of 29 4/12/2016 9:32 AM Public Input No. 11-NFPA 289-2016 [ New Section after 1.1.5 ] 1.1.6 When tests are conducted for the purpose of forensic fire reconstruction or research, this test standard shall

More information

ISO INTERNATIONAL STANDARD. Protective gloves for firefighters Laboratory test methods and performance requirements

ISO INTERNATIONAL STANDARD. Protective gloves for firefighters Laboratory test methods and performance requirements INTERNATIONAL STANDARD ISO 15383 First edition 2001-09-01 Corrected version 2003-04-15 Protective gloves for firefighters Laboratory test methods and performance requirements Gants de protection pour sapeurs-pompiers

More information

Page 1 of 37 Public Input No. 1-NFPA 30A-2012 [ New Section after 1.1.2 ] 1.1.3 This code shall not apply to aircraft fuel dispensing facilities. NFPA 30A is commonly referenced, in my opinion, incorrectly,

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS 11 NCAC 05A.0901 DEFINITIONS As used in this Subchapter: (1)

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Hot Work Operations

More information

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM

First Revision No. 82-NFPA [ Section No ] Submitter Information Verification. Committee Statement. 2 of /21/2013 1:03 PM 2 of 326 11/21/2013 1:03 PM First Revision No. 82-NFPA 72-2013 [ Section No. 2.3.4 ] 2.3.4 ISO Publications. International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56, CH-1211

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 80601-2-13 First edition 2011-08-01 Medical electrical equipment Part 2-13: Particular requirements for basic safety and essential performance of an anaesthetic workstation Appareils

More information

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 496-2014 [ Section No. 5.2.2 ] 5.2.2 Where When the enclosure has been opened or if the protective gas supply has failed to maintain the required positive pressure, the enclosure

More information

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL

CHAPTER 6 REFERENCED STANDARDS. American Architectural Manufacturers Association 1827 Walden Office Square Suite 550 Schaumburg, IL CHAPTER 6 REFERENCED STANDARDS This chapter lists the standards that are d in various sections of this document. The standards are listed herein by the promulgating agency of the standard, the standard

More information

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas

Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Preliminary Agenda Technical Committee on Liquefied Petroleum Gas Tuesday, March 10; All Day Wednesday, March 11; All Day DRURY PLAZA HOTEL San Antonio Riverwalk 0. Administrative. A. Meeting Schedule.

More information

Page 1 of 190 Public Input No. 22-NFPA 55-2013 [ Global Input ] Throughout the document, delete ANSI from ANSI/ASME B31.3. Current Text: (multiple locations) ANSI/ASME B31.3 (found in Subsections: 2.3.2

More information

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems

NFPA Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems San Antonio, TX October 12-14, 2016 The following are the meeting minutes from the third meeting of the Technical Committee on Hybrid (Water and Inert Gas) Fire Extinguishing Systems held in San Antonio,

More information

Page 1 of 10 Second Revision No. 8-NFPA 600-2014 [ Section No. 3.3.17 ] 3.3.17* Incident Management System (IMS). A system that defines the roles and responsibilities to be assumed by responders and the

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13938-1 First edition 1999-08-01 Textiles Bursting properties of fabrics Part 1: Hydraulic method for determination of bursting strength and bursting distension Textiles Propriétés

More information

Throughout standard remove references to the following and replace with the following:

Throughout standard remove references to the following and replace with the following: of 105 1/21/2016 7:49 AM Public Input No. 2-NFPA 30A-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/UL and replace with UL. (2) ANSI

More information

AS/NZS 4821:2014. Protective footwear for firefighters Requirements and test methods AS/NZS 4821:2014. Australian/New Zealand Standard

AS/NZS 4821:2014. Protective footwear for firefighters Requirements and test methods AS/NZS 4821:2014. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 4821:2014 (EN 15090:2012, MOD) Protective footwear for firefighters Requirements and test methods Superseding AS/NZS 4821:2006 AS/NZS 4821:2014 This standard, is

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13937-3 First edition 2000-04-01 Textiles Tear properties of fabrics Part 3: Determination of tear force of wing-shaped test specimens (Single tear method) Textiles Propriétés

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

ISO/TS TECHNICAL SPECIFICATION

ISO/TS TECHNICAL SPECIFICATION Provläsningsexemplar / Preview TECHNICAL SPECIFICATION ISO/TS 22391-7 First edition 2011-11-15 Plastics piping systems for hot and cold water installations Polyethylene of raised temperature resistance

More information

Technical Committee on Flash Fire Protective Garments

Technical Committee on Flash Fire Protective Garments Technical Committee on Flash Fire Protective Garments Date: August 8, 2016 To: Technical Committee on Flash Fire Protective Garments From: Eric Nette, Staff Liaison/Engineer Re: Agenda Package NFPA 2112

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 13937-2 First edition 2000-04-01 Textiles Tear properties of fabrics Part 2: Determination of tear force of trousershaped test specimens (Single tear method) Textiles Propriétés

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 7240-19 First edition 2007-08-15 Fire detection and alarm systems Part 19: Design, installation, commissioning and service of sound systems for emergency purposes Systèmes de

More information

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014

M E M O R A N D U M. NFPA Technical Committee on Telecommunications. Elena Carroll, Administrator, Technical Projects. Date: July 8, 2014 National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Telecommunications

More information

ISO/TS TECHNICAL SPECIFICATION. Fire detection and alarm systems Part 9: Test fires for fire detectors

ISO/TS TECHNICAL SPECIFICATION. Fire detection and alarm systems Part 9: Test fires for fire detectors TECHNICAL SPECIFICATION ISO/TS 7240-9 First edition 2006-01-01 Fire detection and alarm systems Part 9: Test fires for fire detectors Systèmes de détection et d'alarme d'incendie Partie 9: Essais sur foyers

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached)

1. Welcome. Robert Smith, Chair. 2. Introductions and Update of Committee Roster. (attached) TECHNICAL COMMITTEE ON WATER-COOLING TOWERS NFPA 214 (F2015) Second Draft Meeting Agenda February 17, 2014 10:00 AM - 1:00 PM EST Web/Teleconference Meeting 1. Welcome. Robert Smith, Chair 2. Introductions

More information