1 PROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES System Description 1 Firewater pumping system 2 Wet riser system and hose reel system. 3 Automatic sprinkler system 4 Yard hydrant system 5 Pressurization system 6 Potable fire aid fire extinguishers. 7 Fire safety plans. 8 Public address system. 1. Fire Water pumping system Fire water to the complete building fire protection system shall be catered through an RCC Underground (UG) storage sump of capacity 360 cum. Water to these tanks shall be fed by gravity from the nearby municipal/bore well water main pipe. The following are the motor driven and diesel driven firewater pumps that shall be located adjacent to the UG storage tanks. The level switches shall be provided in the underground tank and terrace tank. Breaching inlet shall be provided at the inlet of the storage tank for quick filling by fire brigade. 2. Wet riser and Hose reel system Wet riser shall be provided at all floor landings of the staircase of the buildings. Water supply to the wet risers shall be fed directly from the motor driven wet riser pump. This system shall consist of single/double headed hydrant outlet landing valves installed at a height of 1000 mm above finished floor level and a separate tap off for hose reel associated with hoses, branch pipe and nozzles for building at each floor on each riser. The system shall be designed hydraulically to meet the MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO Bangalore
2 flow and pressure requirements as per NBC. Hydrant accessories such as hose reel, branch pipe and nozzles etc. shall be provided in separate enclosures/cabinet with glass panels. Four ways breaching inlet with sluice check valve shall be installed and connected to each wet risers. The breaching inlets shall be located at 1000mm above the ground level. The pipe material for wet risers shall be Galvanized Iron (Gi) C class as per requirements of the local fire officer from pump house to discharge to wet riser and hose reel system topmost hydrant/ hose reel. In the event of fire, if the hydrant or hose reel are opened, the pressure in the wet riser main will drop due to the resulting flow, thereby the jockey pump comes in to operation at a preset low pressure. If the pressure drops further, at a preset low pressure in the wet riser, the wet riser pump shall start automatically by getting an impulse from a pressure switch provided on the main. I n case the wet riser pump fails to start, the pressure in the main will drop further and at a preset low pressure, the standby diesel pump shall come into operation by getting an impulse from a pressure switch provided. Stopping of the pump shall be manual. 3. Automatic Sprinkler System Sprinklers are provided at lower ground floor and all upper floors. The system consists of alarm check valve, Isolation valve, piping network. All sprinklers are 68 deg. Temperature rating. The Installation Control Valve(ICV) are located outside the pump room and each ICV caters to about 500 to 750 Sprinklers having a coverage area of 9-12m 2 and are networked through GI C Class Pipes. The spacing and the pipe diameters are designed as per the norms of NFPA-13, Low Hazard Classification Requirement. 4. Pressurization System The common pressurization system of wet riser system comprises of one Jockey pump operating automatically. In the event of minor system leakages in wet riser MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO Bangalore
3 system the Jockey pump will start automatically by getting an impulse from pressure switch provided on the discharge header of the jockey pump. The jockey pump shall stop automatically once the mains pressure is resorted to original set value. All pressure switches shall have two contacts- one for starting/ stopping the jockey pump and the other for jockey pump running annunciation in the panel. The control panel shall have all necessary control and interlock for operation and control of the pumps. Jockey pump shall not be running when main pump/booster pump are under operation. 5. Yard Hydrant System The yard hydrant shall be located at various places around the building. The water supply for yard hydrant shall be tapped off from wet riser system headers. Each single headed yard hydrant shall be provided with hoses, nozzles and accessories. All hydrant accessories shall be located in a Hose box adjacent to Hydrant valve. Brick masonry valve chambers with cast iron covers shall be provided wherever required for isolating the system to enable maintenance if any without affecting the complete system. The mode of operation of the hydrant system is as follows. In the event of fire, hydrant valves are opened, at the preset low pressure the wet riser pumps shall start as furnished in wet riser system. In case of failure of wet riser pump stand by common pump shall come into operation. 6. Portable First Aid Fire Extinguishers Portable First Aid fire extinguishers such as carbon-di-oxide extinguishers, ABC type extinguishers, Mechanical foam and Fire buckets etc. shall be provided in all areas of the buildings. The type of portable fire extinguishers and their numbers shall be as per NBC. Service tags shall be provided and attached on all extinguishers installed. MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO Bangalore
4 7. Fire Safety Plans Fire escape route printed in signal red color shall be fixed near fire exit staircases, which shall show directions to the inmates for escape in case of fire. Fire order as per NBC shall be fixed near lift/ lift lobby, which shall guide action to be taken in case of ire. 8. Public Address System Two ways talk back facility will be placed at ever floor near staircase and the public address control console will be placed at the ground floor reception/ security as required by the statutory authority and local by-laws for residential building, commercial building and club house. Addition to the above talk back facility entire floors public address system shall be provided and the control console shall be placed at the ground floor reception/security. MAPLE Engg-Design Services (India)Pvt. Ltd. NITESH PALO Bangalore
5
6
7
8
9 Annexure -4 : Site Location
Technical write-up on Fire safety services
1. General: Technical write-up on Fire safety services Nitesh Santa Clara, proposed development is a residential apartment with multiple blocks. Document briefs on fire safety systems envisaged for the
More informationFollowing are the systems proposed as per NBC & Local Fire Authority:
1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building
More informationEnclosure 4- RISK ASSESSMENT
Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment
More informationDISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL
DISASTER MANAGEMENT PLAN 1.0 DISASTER (EMERGENCY) A disaster or an emergency, occurring in a project is one, as a result of a malfunctioning of the normal operating procedures or an intervention of an
More informationRISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 69 PRESIDENT SEPTEMBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: 69
More informationCHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes:
More informationDEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.
DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH. CHECK LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION FORM FOR ISSUANCE OF RENEWAL OF FIRE NO OBJECTION CERTIFICATE FOR INDUSTRIAL / HIGH RISE / COMMERICIAL
More information+91-8048078054 Laxmi Fabricators http://www.laxmifire.net/ We are considered in the market to be one of the leading manufacturers, distributors and suppliers of this impeccable range of Fire s and Safety
More informationProposed Commercial Project at Plot No. C3A, Sector-16B, Greater Noida West (U.P)
SAFETY AND DISASTER MANAGEMENT PLAN India has been traditionally vulnerable to natural disasters on account of its unique geo climatic conditions. Floods, droughts, cyclones, earthquakes and landslides
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR 75 Fox Street Building OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report:
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD STANDPIPE SYSTEMS PURPOSE This standard outlines the general requirements for the installation of standpipe systems. CODE REFERENCES
More informationUNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1
GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and
More informationFire Protection in High-rise Buildings
Fire Protection in High-rise Buildings By: Dante B. Verano 1.0 General Design Approach 1.1 All fire protection and detection systems design and installation shall be in accordance with local Authority
More informationGAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT
GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT FIRE FOR LIBRARY HOTEL OCTOBER 2014 Report for Department of Infrastructure Development Fire Services Preliminary Report: Library
More informationMaterial Design for Central Chutes
WASTE SOLUTIONS Why Central Chutes? In the rapidly growing and highly competitive world of today; high-rise buildings, large apartments serving commercial and residential, and construction buildings have
More informationA. This section includes design and performance information for fire protection and suppression systems.
SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials
More informationENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Signature of Bidder 1 of 11 EPI
FIRE PROTECTION 1 G.I.PIPES Supplying, installing, testing and commissioning of G.I Pipes confirming to IS 3589 Pt - I Heavy grade with painting, suitable type of supports, anchor fasteners, bolts nuts
More informationSchool of Fire & Safety, GSFC University
School of Fire & Safety, GSFC University Course Structure & Syllabus for Certificate Course in Fireman/ Firewoman First Month:- Fire Science: General Introduction to Science of Fire (Basics of Physics
More informationFire Sprinkler Plan Submittal Form
Contents Fire Sprinkler Plan Submittal Form... 2 Standpipe Plan Review Submittals... 4 Fire Pump Plan Submittal Requirements... 6 Fire Alarm Plan Submittal Form... 8 Kitchen Hood Wet Chemical Submittal...10
More informationPRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM
ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup
More information1.1.1 HAZARD IDENTIFICATION
1.1 RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment is determination of qualitative
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT TOYO COMPOSITE KNIT GARMENTS LTD 1, SOUTH KAMALAPUR SARDER COMPLEX, DHAKA Other Factories: Pure Cotton Ltd, Knit and Knitwear Ltd June 7, 2014 Page 2 Fire Safety Inspection
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT VINTAGE GARMENTS LTD EAST NARSHINGPUR, BURI PARA, ASHULIA, SAVAR Other Factories: ne June 1, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing complex was
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT DANNY'S KNITWEAR LTD. ACCORD ID: 12228 SURABARI, GAZIPUR, SADAR, GAZIPUR Other Factories: ne October 17, 2015 Page 2 Fire Safety Inspection Report Introduction manufacturing
More information7.2 SAFETY CODE FOR BUILDING & FIRE FIGHTING SYSTEM
CLERNCE FOR EXPNSION OF GROUP HOUSING PROJECT "ECO VILLGE - III" T PLOT NO GH-06, SECTOR - 16 B, GRETER NOID, U.P. 7. RISK SSESSMENT & DMP 7.1 INTRODUCTION The construction project involves lot of activities
More informationExplosion Protection Engineering Principles
Handbook of Fire and Explosion Protection Engineering Principles for Oil, Gas, Chemical and Related Facilities Second edition Dennis P. Nolan ELSEVIER AMSTERDAM BOSTON HEIDELBERG LONDON NEW YORK OXFORD
More informationDEPARTMENT OF FIRE & EMERGENCY SERVICES DNH.
DEPARTMENT OF FIRE & EMERGENCY SERVICES DNH. CHECK LIST OF DOCUMENTS TO BE ATTACHED WITH APPLICATION FORM FOR ISSUANCE OF FINAL NO OBJECTION CERTIFICATE FOR INDUSTRIAL / HIGH RISE / COMMERICIAL / HOTEL
More informationChecklist For Life Safety
INSPECTION CHECKLIST Date of Inspection: Location/Address: Weather Condition: Inspector: AFTER COMPLETING YOUR INSPECTION, TRANSFER YOUR CONCERNS/OBSERVATIONS TO THIS AREA Facility: Name: Staff Contact:
More informationFIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.
15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.
More informationSkilled Healthcare Documentation Requirements Life Safety and Fire Protection
DATE OF EVALUATION: FACILITY NAME: FACILITY ADDRESS: ADMINISTRATOR: MAINTENANCE DIRECTOR: All required documentation must be written and saved for at least 2 years and some documentation may be required
More informationFIRE INSPECTION CHECKLIST
Applicable Base Codes FIRE INSPECTION CHECKLIST Florida Fire Prevention Code, 5th Edition NFPA 1, Uniform Fire Code, Florida 2012 Edition NFPA 101, Life Safety Code, Florida 2012 Edition NFPA 13, 2010
More informationTRIMAX ASIA ENGINEERING & CONSTRUCTION (PG U )
TRIMAX ASIA ENGINEERING & CONSTRUCTION (PG0176866-U ) FIRE PROTECTION EQUIPMENTS PARTS CATALOGUE TRIMAX ASIA ENGINEERING & CONSTRUCTION No. 24, Jalan Pantai, 12000 Butterworth, Penang, Malaysia. Fax: +6
More informationREGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT
OVERALL COLOUR ACTION CODE RISK AMBER STATUTORY INSTRUMENT 2005:1541 REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE RISK ASSESSMENT Address of Premises: Thuurock CCG, Civic Offices New Road Grays Responsible
More informationHiren Industrial Corporation
+91-8048762355 Hiren Industrial Corporation https://www.indiamart.com/hirenindustrial/ We are reputed Manufacturers and Exporters, traders of Fire Fighting & Safety Equipment. We offer Safety Apparel,
More informationWinnipeg Fire Department Fire Prevention Branch
Winnipeg Fire Department Fire Prevention Branch Manitoba Fire Code Life-Safety Equipment Maintenance Requirements The Fire Prevention Branch of the Winnipeg Fire Department has prepared this document of
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST FIRE AND LIFE SAFETY SYSTEMS FOR STRUCTURES FIVE OR MORE STORIES IN HEIGHT AND LESS THAN 75 FEET IN HEIGHT FROM THE POINT
More informationCOGEN CONSULT. Page 1 of 23
KOJEN FIRE FIGHTING SYSTEMS DESIGN WE DESIGN EXECUTE - AS PER NFPA FOLLOWING SAFETIES METHODS ARE ASSENTIAL FOR INDUSTRIAL-OFFICES-COMMERCIAL-DOMESTIC INSTALLTIONS 1) GENERAL SURVEY AUDIT FOR FIRE TYPES
More informationSCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY
SCHEDULE Essential s taken from Schedule 9 of the Building Regulations 2006 43 PART 1 BUILDING FIRE INTEGRITY 1 Building elements required to satisfy prescribed fire-resistance levels 2 Materials and assemblies
More informationFUNDAMENTALS OF FIRE SAFETY
FUNDAMENTALS OF FIRE SAFETY BEHAVIOURAL ASPECTS AND CONTROL MITIGATIO MEASURES IN HIGH RISE BUILDINGS V RAVINDRANATH T I O N A L F I R E P R O T E C T I O N A S S O C I AT I O N, U S A, C E R T I F I E
More informationDRY POWDER FIRE EXTINGUISHER (Stored Pressure) ABC TYPE - PORTABLE
DRY POWDER FIRE EXTINGUISHER (Stored Pressure) ABC TYPE - PORTABLE Capacity: 1,, 5, 10 Kgs UFS dry powder type extinguishers are designed for protection of light and ordinary hazards. Suitable for A, B,
More information+91-8048763768 Cease Fire & Electrical Services http://www.ceasefireengineers.com/ We are the supplier, trader and service provider of fire alarm equipment, fire suppression system, fire detection system,
More informationDelhi Metro System. Emergency and Fire Safety Measures in. - by Sanjeev Kumar & Kailash Chandra Joshi. Fire Protection & Safety
Emergency and Fire Safety Measures in Delhi Metro System - by Sanjeev Kumar & Kailash Chandra Joshi 40 MARCH-APRIL 2017 FSAI Journal Delhi Metro An Introduction Delhi Metro has been incorporated in 1995
More informationGovt. of West Bengal Online Clearance for Fire Safety Certificate and Renewal (Application for Fire Safety Recommendations)
Govt. of West Bengal Online Clearance for Fire Safety Certificate and Renewal (Application for Fire Safety Recommendations) Application ID IND/WB/FES/20172018/8381 1. Details of Owner/Occupier/Proprietor/Director.
More informationPLAN REVIEW CHECKLIST
PLAN REVIEW CHECKLIST Date Documents Submitted: Log No.: File No.: Property Information Building Name: Building Address: Owner s Name: Owner s Address: Owner s Phone: Fax: E-mail: System Designer/Contractor
More informationDIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION
DIVISION 21 FIRE SUPPRESSION 21 00 00 FIRE SUPRESSION 21 01 00 Operation and Maintenance of Fire Suppression 21 01 10 Operation and Maintenance of Water Based Fire Suppression Systems 21 01 20 Operation
More informationAircraft Hangers. ft. (3,716 sq. m) per hangar construction type as defined by NFPA 409
Aircraft Hangers DESCRIPTION Considering the value of commercial and military aircraft, it has become extremely important to have a reliable fixed fire protection system in aircraft storage, servicing,
More informationEXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5
UNIT PRICING IS A "NOT TO EXCEED" PRICE EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5 Unit Pricing to perform all required Test
More informationProposed construction of National Institute of Homeopathy at Sec-A8, Narela Delhi by Ministry of Ayush. Risk Assessment
Risk Assessment Building and construction project involve high risk category having many associated hazards like trip slip and fall, falling material, height at work, electrical hazard, & fire etc. Adequate
More informationAPPLICATION FOR FIRE CERTIFICATE / FIRE CLEARANCE UNDER THE MAURITIUS FIRE AND RESCUE SERVICE ACT 2013 OFFICE USE ONLY
Mauritius Fire and Rescue Service 14, Deschartres Street, Port Louis. Tel No: 2113580; Fax: 2113258 Email: mfrs_headoffice@govmu.org FSD Form 1 File No. Date received: Received by: Signature: APPLICATION
More informationCHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY
CHAPTER 8 OCCUPATIONAL HEALTH AND SAFETY 8.1 Health and Safety Aspects Plant operation will involve storage handling and use of fuels and several chemicals. Some of these chemicals may be hazardous in
More informationDESIGN & SAFETY REQUIREMENTS OF FIRE HYDRANT IN CHEMICAL PLANT
DESIGN & SAFETY REQUIREMENTS OF FIRE HYDRANT IN CHEMICAL PLANT M.Mugesh #1, M.Vinothkumar #2, S.Kamalakannan #3,K.Visagavel #4 #1 PG Scholar, Department of Mechanical Engineering, Knowledge Institute of
More informationHDPE PIPING SYSTEMS. FIRE FIGHTING APPLICATION by POLYETHYLENE PIPE.
HDPE PIPING SYSTEMS FIRE FIGHTING APPLICATION by POLYETHYLENE PIPE HDPE PIPE (POLYETHYLENE PIPE) FOR FIRE FIGHTING PIPING SYSTEMS 1 - GENERAL PRINCIPLES OF FIRE FIGHTING SYSTEMS Fire fighting systems "The
More informationRisk assessment is a term used to describe the overall process or method where you:
RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. However, Hazard is a situation that poses a level of threat to life health
More informationFire Safety. Presenter, Kevin V Coleman September 14 th 2016
Fire Safety Presenter, Kevin V Coleman September 14 th 2016 Fire is a significant risk WHAT IS FIRE? To start or continue to burn, a fire requires: Heat; Fuel (Combustible materials); Oxygen. This is known
More informationBlack Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment
Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment February 2017 Alberta Fire Code safety equipment maintenance requirements: The Black Diamond Fire Department has
More informationHI-FOG for buildings. Technical introduction. Protecting people, property and business continuity. Jussi Tiainen
HI-FOG for buildings Technical introduction Jussi Tiainen Protecting people, property and business continuity Contents Introduction to HI-FOG...3 How HI-FOG fights fire...4 Principles of HI-FOG system
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationTECHNICAL AND USER REQUIREMENTS FOR PERSONAL ALERT SAFETY SYSTEMS
Centrum Naukowo Badawcze Ochrony PrzeciwpoŜarowej (Scientific and Research Centre for Fire Protection) Nadwiślańska 213, 05-420 Józefów, Poland Telephone (+48) 22 789 11 11 Fax.: (+48) 22 769 33 45 e-mail:
More informationProperty Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes)
Property Protect Risk Questionnaire (To be completed for all risks containing high hazard activities / processes) Insured Name: Risk Address: New Business Construction: Walls Renewal Policy Number: Building
More informationWestern Michigan University Facilities Management Engineering Division
Western Michigan University Facilities Management Engineering Division Design Guidelines for Facilities Construction: DESIGN GUIDELINE DG21-1 Fire Suppression Systems & Equipment I. GENERAL... 1 A. General
More informationRISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 1.1 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN
RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN 1.1 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN Commercial project encompasses the lives of a large number of people. It also involves installation of various
More informationFire Safety and Evacuation Plan
AUDIT OF BUILDING RESOURCES The following pages provide a description of the fire safety equipment installed in the building including: Fire Alarm and Detection Systems Central Station (Fire Alarm System
More information1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.
FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT BEQ KNIT LTD. ZIRABO, ASHULIA, SAVAR, DHAKA Other Factories: Beq Sweaters Ltd., Tammam Design Ltd. April 22, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing
More informationFIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY
FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY PLAN REVIEWS SITE PLANS: 1) Access to buildings (Volume V NC Building Code sections 602.6.1
More informationSprinkler Permit Applications
REQUIREMENTS FOR NFPA 13 SYSTEM Building Inspections Sprinkler Permit Applications A complete application for a Sprinkler Permit will comply with the requirements of Chapter 8 of NFPA 13. Hydraulic calculations
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT MULTIFABS LTD KASHIMPUR, NAYAPARA Other Factories: ne April 9, 2014 Page 2 Fire Safety Inspection Report Introduction manufacturing complex was surveyed for fire safety on
More informationPort of St Helens SIA Aircraft Hanger Scappoose, OR
Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance
More informationSECTION : FIRE PROTECTION SYSTEMS
SECTION 21 00 10: FIRE PROTECTION SYSTEMS 1. GENERAL A. This section applies to the design and performance information for fire protection and suppression systems. B. All fire protection materials and
More informationModule 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements
Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why
More informationRamp up. Ramp up. Ramp up 7,540 3,414 3,957 3,761 3,800. Fire Hose Reel. Fire. Lift Lobby Granito tiles DN DN 2,932 ENTRANCE GATE
TREATMENT TO BE UNDER GROUND FLOOR 1 7 1 1 1 TO BE 15mm CAST IRON PIPE ENCASED IN 15mm 15,6 6 6 8 8 15 HEAT/SMOKE DETECTORS 3. BREAK-GLASS FIRE ALARM SYSTEM 78 3,7 76 5LTR WATER TANK WITH A BOOSTER PUMP
More informationDIVISION 21 FIRE SUPPRESSION
Table of Contents 21 00 00 FIRE SUPPRESSION...2 A. REFERENCE ABBREVIATIONS... 2 B. GENERAL... 2 C. DESIGN REQUIREMENTS... 2 D. DOCUMENTATION... 2 21 08 00 FIRE SUPPRESSION COMMISSIONING...2 A. PIPE CLEANING...
More informationReliance Fire Protection Systems
+91-8048075998 Reliance Fire Protection Systems https://www.indiamart.com/reliance-fire-protection/ Reliance Fire has been named Licensed Agency for the purposes of Fire Protection & Life Safety Measures
More informationCHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS
CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS 61G15-32.001 61G15-32.002 61G15-32.003 61G15-32.004 61G15-32.005 61G15-32.006 61G15-32.007
More informationCertification Assessment Instrument and Guidelines
Certification Instrument Full compliance with BCA 96 will ensure passing 19 for Section 1 Do not need 100 to pass 1 SECTION 1 SAFETY (25 POINTS) Residential Fire Sprinkler System Not required to pass Section
More informationSlight Harm Moderate Harm Extreme Harm Low Trivial Risk Tolerable Risk Moderate Risk Medium Tolerable Risk Moderate Risk Substantial Risk
Fire Risk Assessment: ABC Sample House Sample Road SA1 3M2 C J Sparks Ltd 13 Alexandra Gardens Carshalton SM5 4LJ T: 02077577457 W: www.cjsparks.com E: sales@cjsparks.com Ref: 3077 Action Plan Number Action
More informationProtecting Your Property: Well Do You Know Your Fire Fire Systems Systems. Joe Szewczyk, Risk Control Consultant
Protecting Your Property: Protecting How Well Your Do Property: You Know How Your Well Do You Know Your Fire Fire Systems Systems Joe Szewczyk, Risk Control Consultant Joe Szewczyk, Risk Control Consultant
More informationInternational Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures
International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures Please note this is not an all-inclusive list. The type and complexity of your project
More informationFire Protection Coffee Break Training May 2016
Fire Protection Coffee Break Training May 2016 Introduction High-Rise Requirements Questions and Answers Agenda Overview Site Fire Access Aerial Access Power/Back-up Power Elevators and Access Sprinklers
More informationFIRE PROTECTION SYSTEMS IN BURJ KHALIFA. By NAFFCO Fire Protection
FIRE PROTECTION SYSTEMS IN BURJ KHALIFA By NAFFCO Fire Protection 8 September 2015 Company Introduction NAFFCO ( National Fire Fighting Manufacturing FZCO ) an ISO 9001:2008 certified company with its
More informationPaper Subject and Papers Examination. Duration Mark I
BHARATHIAR UNIVERSITY : COIMBATORE-46 PG DIPLOMA IN FIRE AND SAFETY MANGEMENT (With effect from 2012-13 Batches onwards) Annual pattern Scheme of Examinations Duration of the Course: 1 year Eligibility:
More informationOsceola County Department of Fire Rescue and Emergency Medical Services
St. Number Dir Street Name Street Type Inspected Time of Day to be Re-inspected Zip Code Occupancy Type Emergency Contact Phone (Inc. Area Code) Building Owner Building Owner Mailing Address Bldg. Owner
More informationBOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E
A 1 2 4 PUMP HOUSE: BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E Supply, erection,testing & commissioning of Single stage, end suction / back pull-out type motor driven Jockey Pump of capacity 10.8
More informationRULES 1978 UNDERGROUND COAL MINES FIRE PRECAUTIONS
rr. 1-3 163 UNDERGROUND COAL MINES FIRE PRECAUTIONS [Published Gazette 14 October 1978, pp. 499-504; and as amended by Rules published Gazette 26 January 1980, pp. 199-200; 30 May 1981, p. 1077; 3 December
More informationTHE MAURITIUS FIRE AND RESCUE SERVICE ACT. Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act
Government Notice 134 of 2018 THE MAURITIUS FIRE AND RESCUE SERVICE ACT Regulations made by the Minister under sections 18, 19 and 27 of the Mauritius Fire and Rescue Service Act 1. These regulations may
More informationInduction Course for new M&E Engineers
Induction Course for new M&E Engineers 14, 21 & 28 September 2013 (Saturdays only) MATRADE Exhibition and Convention Centre Jalan Khidmat Usaha, off Jalan Duta 50480 Kuala Lumpur Organised by The Association
More informationOur Ref: CD/FSSD/12/02/03/01 DID: FAX:
Our Ref: CD/FSSD/12/02/03/01 DID: 68481407 FAX: 68481493 14 Jan 2010 Registrar, Board of Architects (BOA) Registrar, Professional Engineers Board (PEB) President, Singapore Institute of Architects (SIA)
More informationNewport City Council Bettws High School Fire Fighting Performance Specification CONTRACT C1
Fire Fighting Performance Specification CONTRACT C1 Fire Fighting Performance Specification August 2008 4 Pierhead Street, Capital Waterside, CF10 4QP Tel +44 2920 473727 Fax +44 2920 472277 This report
More informationService Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT
58 Fire protection equipment requires care and maintenance at scheduled intervals to assure it will operate properly and safely when needed. Only personnel who are trained and qualified to maintain the
More informationDistribution Restriction Statement
DEPARTMENT OF THE ARMY ETL 1110-3-485 U.S. Army Corps of Engineers CEMP-ET Washington, D.C. 20314-1000 Technical Letter No. 1110-3-485 15 October 1997 Engineering and Design FIRE PROTECTION FOR HELICOPTER
More informationIMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 0171-735 7611 Fax: 0171-587 3210 Telex: 23588 IMOLDN G Ref. T4/4.01 IMO E MSC/Circ.911 4 June 1999 INTERPRETATIONS OF FIRE
More informationBALAJI FIRE PROTECTION SYSTEMS:
BALAJI FIRE PROTECTION SYSTEMS: Automatic Water Sprinkler System: One of the oldest & traditional ways of fire protection, which is water based protection system, is in the form of automatic sprinklers.
More informationLife Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99 THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7
THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #7 AGENDA: Life Safety Code Referenced Publications Overview Life Safety Code NFPA 10 NFPA 13 NFPA 25 NFPA 72 NFPA 90A NFPA 110 NFPA 99
More informationCITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS
CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS Fire Protection Systems includes the following: Alternate Fire Suppression Systems Atrium Fire Protection Systems Automatic Fire Sprinkler
More informationPRINCIPLES OF DESIGN SPRINKLER INSTALLATION FOR FIRE FIGHTING IN THE UNDERGROUND GARAGES AND SUPPLEMENTARY LEGAL ACTS
PRINCIPLES OF DESIGN SPRINKLER INSTALLATION FOR FIRE FIGHTING IN THE UNDERGROUND GARAGES AND SUPPLEMENTARY LEGAL ACTS Dragomir Aćimović 1, Nebojša Panić 2, Damnjan Radosavljevic 3 1 VPTS, Uzice, SERBIA,
More informationRISK ASSESSMENT AND HAZARD MANAGEMENT
Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that may exist in the plant. On the other hand, risk analysis deals with the identification and
More informationFire protection on chemical manufacturing sites
CFPA-E No 18:2008 Fire protection on chemical manufacturing sites FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation
More informationReview Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR FIREWATER TANKS AND PUMPS IN GAS OIL SEPARATION FACILITY
Raufeek M H, et al., International Journal on Occupational Health & Safety, Fire & Environment Allied Science ISSN 2349-977X Review Paper FIREWATER SYSTEM DESIGN AND SELECTION OF OPTIMIZED LOCATION FOR
More informationACTIVE FIRE PROTECTION SYSTEMS OVERVIEW. Fire Protection Systems
ACTIVE FIRE PROTECTION SYSTEMS OVERVIEW ICC: International Code Council codes are updated on a 3-year revision cycle Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Fire Protection Systems Passive
More information