1 Module 7 Control of Smoke & Highlights of Code Requirements 1
2 Module 7 Overview This module will cover: 1. The requirements of smoke control in the Ohio Building Code Section The differences between active and passive systems 3. The components of a smoke control system 4. The requirements of smoke and heat vents per Section 910 OBC. 5. The differences between the mechanical and manual activation of smoke exhaust systems 2
3 Smoke Control Systems An engineered system that includes all methods that can be used singly or in combination to modify smoke movement Two types: Passive Active NFPA Standards 92B-09: Standard for Smoke Management Systems in Malls, Atria, and Large Spaces 3
4 Smoke Control Systems: Passive Any portion of a building or structure that provides protection from smoke without any type of system activation or movement. Use compartmentalization, reservoirs or other methods to control smoke to a predetermined habitable level Utilized when active control systems are not feasible and/or to help them function Relies on the natural buoyancy of the smoke and the stack effect to allow the smoke to exit the building. 4
5 Smoke Control Systems: Passive High Bay/ High Ceilings Act as a reservoir to contain smoke Natural ventilation The flow of air or gases created by the difference in the pressures or gas densities between the outside and inside of a vent, room, or space. Open exterior balcony or vestibule with opening 16 sq. ft. in area facing an open area that is at least 20 ft. in width. 5
6 Smoke Control Systems: Passive Operable or break-out windows Manually controlled Fusible Link Operated Vent A fusible link holds open springloaded fire-rated damper The link is designed to melt at a certain temperature When it melts the damper slams shut. Operable window 6
7 Smoke Control Systems: Active A system that uses moving mechanical or electrical parts to achieve a smoke control goal. Also known as mechanical Preferred method of smoke control 7
8 Smoke Control Systems: Active Exhaust Air removed from a space or power system and not reused. Pulls smoke from space Utilizes: Automatic detection Exhaust fans Make up air Colt International Ltd 8
9 Smoke Control Systems: Active Pressurization Uses wall and floor assemblies with pressure difference Fans create the pressure difference Default design method in the IBC Indiana University of Pennsylvania 9
10 Smoke Control Systems: Active Airflow Large airflows from adjacent compartments to fire compartment Difficult to achieve Typically utilizes air-moving device Most commonly used to stop smoke movement through open doorways and corridors 10
11 Smoke Control Systems: Components Figure 702.1(11) SMOKE BARRIER Smoke barrier A continuous membrane, or a membrane with discontinuities created by protected openings, where such membrane is designed and constructed to restrict the movement of smoke. Smoke zone: The smoke control zone in which the fire is located. NFPA Standards 92B-09: Standard for Smoke Management Systems in Malls, Atria, and Large Spaces International Building Code Commentary 11
12 Smoke Control Systems: Components Control panel Intended to communicate with fire fighters Installed in approved location adjacent to fire alarm panel KMC Controls, Inc. 12
13 Smoke Control Systems: Components Power supply The system is supplied with two sources of power Primary power shall be from the normal building power systems. Secondary power shall be from an approved standby source complying with Chapter 27 of the Building Code. 13
14 Smoke Control Systems: Components Smoke detector A device that detects visible or invisible particles of combustion issue a signal to a fire alarm control panel as part of a fire alarm system Wikimedia Commons 14
15 Smoke Control Systems: Components Fans A blower or exhauster assembly comprising blades or runners and housings or casings. Examples Pressurization Exhaust Colt Group Ltd/ 15
16 Smoke Control Systems: Components Ducts Pipes, tubes, or other enclosures used for the purpose of pneumatically conveying materials Examples Exhaust Supply LifeSafety Magazine 16
17 Smoke Control Systems: Components Make-up air inlets Controlled air vents that allow for fresh, draft-free make-up air to enter a building. Make-up air is provided for exhaust systems Replaces the air that is removed Luxury Metals LLC 17
18 Smoke Control Systems: Components Smoke Dampers A device within an air distribution system to control the movement of smoke Closes upon actuation of a listed smoke detector or detectors Wikimedia Commons 18
19 Smoke and Heat Vents Openings in the roof which are intended to vent the heat and smoke developed by a fire inside the building NFPA Standards: 204: Standard for Smoke and Heat Venting for information only, not listed in chapter 35 OBC Smye Holland Associates Limited 19
20 Unit-type vents Small openings on a structure s roof, equipped with a metal frame and housing and manual or automatic hinged dampers, which are opened in case of fire. Using mechanical openings Using gravity openings 20
21 Unit-type vents Using mechanical openings A small openings on a structure s roof, equipped with a metal frame and housing and automatic hinged dampers, which are opened in case of fire. Spring lift Pneumatic lift Electric motor-driven lift National Domelight Company 21
22 Unit-type vents Using mechanical openings: Spring Tension is maintained on a fusible link with the use of a heavy duty spring. High temperatures melt the fusible link Santa Barbara County Fire Dept 22
23 Unit-type vents Using mechanical openings: Pneumatic Lift uses a pressurized air system to open the vent automatically with a loss, or activation, of air pressure Babcock-Davis 23
24 Unit-type vents Using mechanical openings: Electric motor-driven lift equipped with electrical links that trigger the vent opening when connected to a remote smoke or fire alarm. FAKRO 24
25 Smoke and Heat Vents: Unit-type vents Using gravity openings: Plastic shrink-out panels Constructed of plastic which shrinks in the presence of heat drop-out panel HPAC Engineering 25
26 Mechanically-powered venting systems Consists of fixed, motor-driven fans that can be mounted on the roofs Rely on mechanical extraction of smoke through fans. Energy Vanguard's 26
27 Glass roof and continuous gravity vents Ordinary glass roof vents Vents in glass roofs Continuous gravity vents (ridge vents) Installed at the peak of a sloped roof which allows smoke to escape a building's attic. 27
28 Mechanical smoke- exhaust systems A dedicated or shared-duty fan system designed and suitable for the removal of heat and smoke. May be an acceptable alternative to smoke and heat vents. Colt International Licensing Ltd 28
29 Manually-activated smoke exhaust systems Operated by the fire department Are an acceptable alternate to smoke and heat vents 29
30 Why are smoke control systems are required? To improve conditions in common areas to facilitate safe escape for occupants when a fire occurs To enable the fire to be fought in its early stages 30
31 When are smoke control systems required? 1. Determine the location of the top floor above ground floor level 2. The nature of occupancy 3. Location of the building above the fire service access level, then a fire fighting core(s) is required. 31
32 Codes and Standards: OBC Smoke Control- Atriums Smoke Control- Covered malls and other mall buildings Wikimedia Commons 32
33 Codes and Standards: OBC Smoke Control- Means of egress Smoke Control- Stages Smoke Control- High Rise Buildings 33
34 Codes and Standards: OBC Smoke Control- Underground Buildings Smoke Control- Groups H-3 and H Analysis 34
35 Codes and Standards: OBC Pressurization Methods Airflow Design Method Exhaust Method System Acceptance 35
36 Codes and Standards: OBC Exhaust Method System Acceptance Special Inspection for smoke control Wikimedia Commons 36
37 Codes and Standards: OBC Special Inspection for Smoke Control Smoke and heat vents- Where required Design and installation 37
38 Codes and Standards: OBC Vent operation Sprinklered buildings Nonsprinklered buildings Vent dimensions Wikimedia Commons 38
39 Codes and Standards: OBC Draft curtains Mechanical smoke exhaust Manually activated smoke exhaust system Group F-1 and S-1 increase maximum travel distance 39
40 Codes and Standards: OFC Chapter 23: High-Piled Combustible Storage High piled storage in excess of 12 feet requires specific consideration, including fire protection design features and smoke and heat vents in order to be adequately protected. Not all high-piled storage will require the use of smoke and heat vents and draft curtains. If properly sprinklered, draft curtains aren t required. Fairfax County Va. 40
41 Code and Standards: NFPA 92B: Smoke Management Systems in Malls, Atria, and Large Spaces This standard provides methodologies for estimating the location of smoke within a large-volume space due to a fire either in the large-volume space or in an adjacent space. 41
42 Lessons learned in Module 7 1. There are two types of smoke control systems, passive and active. 2. Smoke control systems must be supplied with two sources of power. 3. Smoke control systems are designed to improve conditions in common areas, to facilitate safe escape for occupants when a fire occurs, and to enable the fire to be fought in its early stages 4. Unit type vents are small openings on a structure s roof, equipped with a metal frame and housing and manual or automatic hinged dampers, which are opened in case of fire. 5. Chapter 23 of the Ohio Fire Code regulates high piled combustible storage. 42
ICC CODE CORNER 2012 IFC Code & Commentary
SECTION 909 SMOKE CONTROL SYSTEMS 909.1 Scope and purpose. This section applies to mechanical or passive smoke control systems when they are required for new buildings or portions thereof by provisions
More informationMODULE 8. Tying the Systems Together: Emergency Control Functions and Interfaces
MODULE 8 Tying the Systems Together: Emergency Control Functions and Interfaces 1 OVERVIEW OF MODULE 8 In this module we will: Describe all components, their arrangements and how the systems work Describe
More informationBuilding & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!
Building & Fire Code Academy Building Better With Our Greatest Resource Education Welcome! Understanding the Sprinkler System Design Alternatives in the 2015 International Why inspect, test and maintain?
More informationModule 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements
Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why
More informationSCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY
SCHEDULE Essential s taken from Schedule 9 of the Building Regulations 2006 43 PART 1 BUILDING FIRE INTEGRITY 1 Building elements required to satisfy prescribed fire-resistance levels 2 Materials and assemblies
More informationNFPA 101 Code Update from 2012 Edition to the 2015 Edition
NFPA 101 Code Update from 2012 Edition to the 2015 Edition Presented by: Gary Furdell AHCA Fire Protection Specialist 1 2 2012 Update to 2015 Chapter 18 New Health Care Occupancies 4 18.1.3.2 Atrium walls
More informationSPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,
More informationICC CODE CORNER 2012 IFC Code & Commentary
SECTION 910 SMOKE AND HEAT VENTS 910.1 General. Where required by this code or otherwise installed, smoke and heat vents or mechanical smoke exhaust systems and draft curtains shall conform to the requirements
More informationGeneral Principles of Smoke Control
AMCA International General Principles of Smoke Control Patrick Janssens, Sales Manager Colt International www.coltinco.co.uk or www.coltinfo.be Air System Engineering & Technology (ASET) Conference Europe
More informationStairwell Pressurization Systems
Course No: M05-022 Credit: 5 PDH A. Bhatia Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com Introduction
More informationREVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS
REVIEW OF TECHNICAL STANDARDS AND CALCULATION METHODS FOR DIMENSIONING OF SMOKE AND HEAT CONTROL SYSTEMS IN CASE OF FIRE IN UNDERGROUND CAR PARKS Nikola TANASIĆ, Tomislav SIMONOVIĆ, Miloš IVOŠEVIĆ, Branislav
More information2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.
2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is
More informationLife Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering
Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015 Peter McDonnell, PE, LEED AP BD+C McClure Engineering UL DAMPER TEST STANDARDS UL 555 - FIRE DAMPERS UL555S SMOKE DAMPERS UL555C CEILING
More informationCHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS
CHAPTER 7 MECHANICAL VENTILATION AND SMOKE CONTROL SYSTEMS 7.1 AIR CONDITIONING & MECHANICAL VENTILATION SYSTEMS 7.1.1 General (a) Where air conditioning system is provided in lieu of mechanical ventilation
More informationBOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015
Exam ID Examination Code Part BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015 BC3-7 Level III Exam 7 BCBC Part 3 (Part 3 Buildings Classification & Construction) BC3-8 Level III Exam 8 BCBC
More informationSPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,
More informationBUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007
BUILDING CODE OF THE CITY OF NEW YORK New York City Department of Buildings 4 June 2007 Fatma Amer, PE, Deputy Commissioner, Technical Affairs James Colgate, RA, Executive Architect John Lee, RA Keith
More informationFIRE/SMOKE BARRIER FUNDAMENTALS
FIRE/SMOKE BARRIER FUNDAMENTALS William E. Koffel, P.E., FSFPE President Koffel Associates, Inc. www.koffel.com wkoffel@koffel.com Expertly Engineering Safety From Fire OBJECTIVE Identify the different
More informationPrescriptive Requirement for Smoke Control
HKIE CPD Training Course (II) 7July 2009 Organization by The Hong Kong Institution of Engineers Fire Division Co-organized by the Association of Registered Fire Services Installation contractors of Hong
More information2012 B.C. Building Code Compliance Review (Division B Part 3)
Planning and Building Department 2012 B.C. Building Code Compliance Review PROJECT NAME:.. CIVIC ADDRESS:...... PERMIT APPLICATION NO.:. DATE:... I,, have: 1. reviewed the design, plans and supporting
More informationFIRE PROTECTION SYSTEMS
CHAPTER 9 FIRE PROTECTION SYSTEMS > SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter shall specify where fire protection systems are required and shall apply to the design, installation,
More informationShort Term Accommodations Fire Code Requirements
Short Term Accommodations Fire Code Requirements 1 Foreward The following is a comprehensive reference to Retrofit 9.3 of Division B of the Ontario Fire Code (OFC). Retrofit provisions were developed to
More informationTaming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.
Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes Comparing the Codes: NFPA 101 Life Safety Code (2000) (NFPA) International Building Code (2012) (IBC) Chicago
More informationFIRE AND SECURITY CONSULTING SERVICES
FIRE AND SECURITY CONSULTING SERVICES http://fscs-techtalk.com 17 McKenna Court NOOSAVILLE QUEENSLAND, 4566 AUSTRALIA Phone: +61 (0)7 5455 5148, Mobile: 0409 399 190, Email: rafoster@bigpond.net.au MISCELLANEOUS
More informationLife Safety - Means of Egress/Exits NFPA 101
Life Safety - Means of Egress/Exits NFPA 101 Properly designed exits provide a safe path of escape from a fire or other emergency environment. The means of egress (exits) should be arranged to permit all
More information3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials
AMCA International Design Tips For Fire and Smoke Barriers William E. Koffel, P.E., FSFPE President, Koffel Associates, Inc. www.koffel.com Air System Engineering & Technology (ASET) Conference US San
More informationNFPA 45 NFPA 211 NFPA 1600
NFPA 45 NFPA 211 NFPA 1600 Prepared by: William E. Koffel, P.E., FSFPE Expertly Engineering Safety From Fire 1 Objectives Overview of the NFPA process Understand the scope and application of NFPA 45, NFPA
More informationFirst Aspen Federal Regulation Set: K LSC 2000 Health Existing
First Aspen Federal Regulation Set: K 01.01 LSC 2000 Health Existing K 0000 Title CFR Type INITIAL COMMENTS Memo K 0011 If the building has a common wall with a nonconforming building, the common wall
More informationSPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY
CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,
More informationDUCT SYSTEMS CHAPTER 6
SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter except as otherwise
More informationFIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY
FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY PLAN REVIEWS SITE PLANS: 1) Access to buildings (Volume V NC Building Code sections 602.6.1
More informationDUCT SYSTEMS CHAPTER 6
CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter
More informationFire Department HEADQUARTERS Cathedral Oaks Road Santa Barbara, CA (805) FAX: (805) CODE SUMMARY
Fire Department HEADQUARTERS 4410 Cathedral Oaks Road Santa Barbara, CA 93110-1042 (805) 681-5500 FAX: (805) 681-5563 Michael W. Dyer Fire Chief County Fire Warden Eric Peterson Deputy Fire Chief CODE
More informationSummary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016
Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016 Ohio Administrative Code Rule Number OMC Section IMC origin Reason for proposed 4101:2-2-01 Air, Makeup 2015 Modified definition Air,
More informationTechnical Information
How to design easily a smoke management system? Mechanical smoke extraction for enclosed car park Car park: specificity of the smoke extraction system Car parks are nowadays integrated directly inside
More informationGravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form
Gravity and Pneumatic Waste and Linen Handling Systems NFPA 82 Inspection Form PART 1 GRAVITY CHUTES CHUTE DESIGN AND INSTALLATION INTAKE OPENINGS LIMITED ACCESS OFFSETS DIMENSIONS VENTING CONSTRUCTION
More information2012 International Fire Code Errata (Portions of text and tables not shown are unaffected by the errata)
1 st PRINTING (8-30-12) CHAPTER 2 - DEFINITIONS [B] CARE SUITE. A group of treatment rooms, care recipient sleeping rooms and their associated support rooms or spaces and circulation space within Group
More information2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content
Based on the 2018 International Fire Code, (IFC ) The International Fire Code (IFC ), establishes minimum regulations for fire safety. This handout will identify important changes in the IFC from 2015
More informationDate: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition
Kimbalton DUSEL Preliminary Code Study CNA0402 Date: Project: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 Note: Shaded Sections not complete. PRELIMINARY CODE REVIEW Building Code: International
More informationAmerican Fire Sprinkler Association. An Introduction to the IBC and IFC
American Fire Sprinkler Association Presents An Introduction to the IBC and IFC October 13, 2005 Speaker Roland Huggins, P.E. Vice President of Engineering and Technical Services American Fire Sprinkler
More informationModule 9: Ontario Building Code Fire Fighting Provisions
Ontario Building Code (OBC) 1. Sprinklers 2. Standpipes 3. Fire Alarms 4. Entrances Ontario Building Code (OBC) 1. Sprinklers 2. Standpipes 3. Fire Alarms 4. Entrances 1. Sprinklers i) Sprinkler Systems
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST TENANT IMPROVEMENTS Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: A-Approved; AC-Approved w/comments;
More informationCHAPTER 7 ALTERATIONS LEVEL
CHAPTER 7 ALTERATIONS LEVEL 2 SECTION 701 GENERAL 701.1 Scope. Level 2 alterations as described in Section 404 shall comply with the requirements of this chapter. Exception: Buildings in which the reconfiguration
More informationFire, Smoke and Control Dampers
MANUAL Fire, Smoke and Control Dampers v100 Issue Date: 04/02/15 2015 Price Industries Limited. All rights reserved. TABLE OF CONTENTS Maintenance, Testing and Inspection Recommendations Recommended Maintenance
More informationNEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS
Mandatory Fire Safety Instruction NEW PROJECTS DOCUMENTATION FOR OCCUPATION - REGULATION 38 FIRE STRATEGIES, DRAWINGS & INFORMATION EMPLOYER S REQUIREMENTS Reference A: Reference B: Approved Document B
More informationNFPA-APSEI Fire & Security 2010
NFPA-APSEI Fire & Security 2010 Smoke control in industrial buildings Paul Compton, Colt International Ltd A brief introduction Private British Company founded in 1931 Owned by O Hea family and the Colt
More informationOVERVIEW. Increasing Awareness of Occupant Evacuation in Tall Buildings. Traditional Focus has been on Evacuation From Fire
OVERVIEW Increasing Awareness of Occupant Evacuation in Tall Buildings Traditional Focus has been on Evacuation From Fire Current Practice - Facilitate Broad Variety of Evacuation Scenarios Design to Facilitate
More informationLife Safety Code Common Discepancies Course# LSC102. EZpdh.com All Rights Reserved
Life Safety Code Common Discepancies Course# LSC102 EZpdh.com All Rights Reserved 1. K147 Electrical - Electrical wiring and equipment shall be in accordance with NFPA 70, National Electrical Code. 9.1.2
More informationInteraction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS)
Fire Protection Leaflet Interaction of Water Extinguishing Systems and Smoke and Heat Exhaust Ventilation Systems (SHEVS) 0 General Regulations and recommendations missing from this leaflet do not entitle
More informationPART 2. Basic Code Requirements - Semiconductor & Microelectronic Facilities using HPM s
PART 2 Basic Code Requirements - Semiconductor & Microelectronic Facilities using HPM s Occupancy Classifications Y A - Assembly Y B - Business Y E - Educational Y F - Factory/Industrial Y H - Hazardous
More informationThe Physical Environment Portal: Module 5, LS Leadership
The Physical Environment Portal: Module 5, LS.02.01.10 - Leadership Fire Safety: Background Fire safety impacts both the lives of the occupants and the physical structures. In the early 1900 s many buildings
More informationYORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS
YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS The York County Department of Fire Safety reviews all commercial building plan submittals for compliance with the 2015 International
More informationCOMPLIANCE ALTERNATIVES
CHAPTER 12 COMPLIANCE ALTERNATIVES SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter are intended to maintain or increase the current degree of public safety, health, and general welfare
More informationCOMPLIANCE ALTERNATIVES
CHAPTER 12 COMPLIANCE ALTERNATIVES SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter are intended to maintain or increase the current degree of public safety, health, and general welfare
More informationPROJECT: CIVIC ADDRESS:... PERMIT APPLICATION NO.: DATE:... CRP:. Certified Professional:.
2012 B.C. Building Code Checklist (Division B Part 3) This checklist is provided as a reference only. The submission of this checklist with a Building Permit application should not be considered as a substitute
More informationOpen to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP
Open to Below: A Discussion of Allowed Floor Openings Kevin S. Hastings, P.E., LEED AP Jay A. Ierardi, Ph.D., P.E., LEED AP R.W. Sullivan Engineering (617) 523-8227, Fax (617) 523-8016 http://www.rwsullivan.com
More information2015 MECHANICAL CODE REQUIREMENTS
2015 MECHANICAL CODE REQUIREMENTS ANTRIM COUNTY BUILDING DEPARTMENT PO BOX 188 205 CAYUGA STREET BELLAIRE, MI 49615 (231) 533-8373 FAX (231) 533-6041 Mechanical requirements for residential buildings per
More informationSmoke Management in High-Rise Structures
Smoke Management in High-Rise Structures Most modern building codes define a high-rise structure as a building greater than 75 feet in height from the lowest level of fire department vehicle access to
More informationPERFORMANCE COMPLIANCE METHODS
CHAPTER 13 PERFORMANCE COMPLIANCE METHODS SECTION 1301 GENERAL 1301.1 Scope. The provisions of this chapter shall apply to the alteration, repair, addition and change of occupancy of existing structures,
More informationWHITE PLAINS SMOKE CONTROL CODE PART 1. GENERAL REQUIREMENTS
WHITE PLAINS SMOKE CONTROL CODE a. Application of Code. PART 1. GENERAL REQUIREMENTS The following uniform standards and procedures shall apply to the design, installation and testing of new smoke purge
More informationPresented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com
Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC 262-945-4567 Lauzon.lsc@gmail.com Web: Lauzon-LSC.com 1 Wis Professional Engineer Experienced Facility Director Experienced AHJ WHEA Code
More informationPERFORMANCE COMPLIANCE METHODS
CHAPTER 13 PERFORMANCE COMPLIANCE METHODS SECTION 1301 GENERAL 1301.1 Scope. The provisions of this chapter ((shall)) apply to the alteration, repair, addition and change of occupancy of existing structures,
More informationOsceola County Department of Fire Rescue and Emergency Medical Services
St. Number Dir Street Name Street Type Inspected Time of Day to be Re-inspected Zip Code Occupancy Type Emergency Contact Phone (Inc. Area Code) Building Owner Building Owner Mailing Address Bldg. Owner
More informationCode Technology Committee Area of Study Balanced Fire Protection Roof Vents
Code Technology Committee Area of Study Balanced Fire Protection Roof Vents 2009/2012 Cycle Code changes related to the CTC area of study noted above The following are code changes related to the CTC Balanced
More informationAir Change, Ventilation, and Dehumidification for Multi-family Buildings
Air Change, Ventilation, and Dehumidification for Multi-family Buildings Armin Rudd Corp www.buildingscience.com for Acknowledgments: USDOE Building America Joseph Lstiburek, Peter Baker, Kohta Ueno--BSC
More informationDUCT SYSTEMS CHAPTER 6
CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter
More informationIndoor Environmental Quality
The average person spends about 90% of their time indoor, a significant amount of time. Therefore, it is essential that houses provide a healthy and comfortable interior living environment. Conditions
More informationCHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes:
More informationEl Reno Fire Department Fire Alarm Plan Review Worksheet
El Reno Fire Department Fire Alarm Plan Review Worksheet This Fire Alarm Plan Review Checklist is provided as a guide to assist with your Fire Alarm Plan Review Submittal requirements. Please contact us
More informationPERFORMANCE COMPLIANCE METHODS
CHAPTER 13 PERFORMANCE COMPLIANCE METHODS SECTION 1301 GENERAL 1301.1 Scope. The provisions of this chapter shall apply to the alteration, repair, addition and change of occupancy of existing structures,
More informationSmoke Control Design and Activation. CFAA NCA Technical Seminar 2015
Smoke Control Design and Activation CFAA NCA Technical Seminar 2015 2 Overview Principles of smoke control Codes CACF controls Programming Commissioning Testing Goals To provide an introduction to smoke
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION GUIDELINE RESIDENTIAL CARE FACILITIES 2007 CBC/CFC (R-3.1)
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION GUIDELINE RESIDENTIAL CARE FACILITIES Address: Permit #: Inspector: Date: Status: Inspector: Date: Status: This Checklist outlines
More informationFIRE PROTECTION SYSTEMS
CHAPTER 9 FIRE PROTECTION SYSTEMS SECTION 901 GENERAL 901.1 Scope. The provisions of this chapter shall specify where fire protection systems are required and shall apply to the design, installation and
More informationRISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN
RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally
More informationFIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7
FIRE-RESISTANCE-RATED CONSTRUCTION A Primer on IBC Chapter 7 NEW ENGLAND BUILDING OFFICIALS EDUCATION ASSOCIATION 48th CONFERENCE October 6-8, 2014 UMass Amherst Milton Gregory Grew, AIA Architect Building
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT A-PLUS IND LTD PLOT # 28, MILK VITA ROAD, SECTION #07, MIRPUR, DHAKA - 1216, BANGLADESH March 10, 2014 Page 2 SUMMARY was surveyed for fire safety on 3/10/2014 by Hughes Associates,
More informationSANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST
July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST FIRE AND LIFE SAFETY SYSTEMS FOR STRUCTURES FIVE OR MORE STORIES IN HEIGHT AND LESS THAN 75 FEET IN HEIGHT FROM THE POINT
More informationTop (15) Life Safety Code Deficiencies and Tips for Compliance (10/01/2011 thru 02/22/2012)
1. K62 Automatic Sprinkler Systems - Automatic sprinkler systems are continuously maintained in reliable operating condition and are inspected and tested periodically. 18.7.6, 19.7.6, 4.6.12, NFPA 13,
More informationACTIVE FIRE PROTECTION SYSTEMS OVERVIEW. Fire Protection Systems
ACTIVE FIRE PROTECTION SYSTEMS OVERVIEW ICC: International Code Council codes are updated on a 3-year revision cycle Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 Fire Protection Systems Passive
More informationNFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES
NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES Sharon S. Gilyeat, P.E., Principal Koffel Associates, Inc. www.koffel.com sgilyeat@koffel.com Expertly Engineering Safety From Fire
More informationincorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications
incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications Smoke shafts - an overview Scope of this guide Smoke shaft is the common term for
More informationFirst Revision No. 15-NFPA [ Chapter 2 ]
Page 1 of 28 First Revision No. 15-NFPA 91-2013 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard
More informationThe project scope work is 90% new construction and 10% remodel in Esslinger Hall.
CREIGHTON ENGINEERING INC. FIRE PROTECTION CONSULTING ENGINEERS 210 N. University Road, Suite 100 Spokane Valley, WA 99206 TEL: 509.921.9755 FAX: 509.921.9806 WEB: www.creightoneng.com SCOTT R. CREIGHTON,
More informationEQUIVALENT INITIAL FIRE SAFETY ASSESSMENT
EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory Nayabari, Kanchpur, Sonargaon, Narayanganj. Sonargaon Dhaka 14 Nov 2013 The Alliance for Worker Safety Page 1/15 Factory 14 Nov 2013 Introduction to the
More informationChapter Nursing Homes
Chapter 16.01 Nursing Homes Section 1. Licensing. No nursing, convalescent or old age home, as defined in Section 2 of this ordinance, shall be operated except under a license from the City Council of
More informationObjectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts
Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts Guy R. Colonna, PE Division Manager, NFPA Combustible Dust Symposium Detroit, MI September 20, 2011 1 Objectives
More informationSECTION 907 FIRE ALARM AND DETECTION SYSTEMS
SECTION 907 FIRE ALARM AND DETECTION SYSTEMS 907.1 General. This section covers the application, installation, performance and maintenance of fire alarm systems and their components in new and existing
More informationSEMICONDUCTOR FABRICATION FACILITIES
CHAPTER 18 SEMICONDUCTOR FABRICATION FACILITIES SECTION FC 1801 GENERAL 1801.1 Scope. This chapter shall govern the design, installation, operation and maintenance of semiconductor fabrication facilities
More informationCOURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE
COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE 100126 The course is organized into three bands. Band A covers HVACrelated building components and other types
More information2007 CBC & CFC Residential Care Facility Requirements (24 hour care only)
2007 & CFC Residential Care Facility Requirements (24 hour care only) Occupancy Construction Smoke Barrier I-1 Bedridden 7+non- Ambs Or bed- Ridden R-4 7+ambs (May have 6 nonambs or 6 bedridden) R-3.1
More informationTable EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c
Table 1015.1 EXIT ACCESS TRAVEL DISTANCE a WITHOUT SPRINKLER WITH SPRINKLER OCCUPANCY SYSTEM SYSTEM A, E, F-1, I-1, M, 200 250 b,d R, S-1 B 200 300 c F-2, S-2, U 300 400 c No Change to Other Entries in
More informationMECKLENBURG COUNTY FIRE MARSHAL S OFFICE
Effective Date: 11/01/02 Purpose: MECKLENBURG COUNTY To establish a set of guidelines for performance testing of all newly installed or upgraded fire alarm systems in order to ensure that all devices and
More informationConsiderations in the Design of Smoke Management Systems for Atriums
Construction Technology Update No. 48 Considerations in the Design of Smoke Management Systems for Atriums by G.D. Lougheed This Update discusses the use of an engineered approach to the design of smoke
More informationHVAC Equipment Access Equipment Location
City of Lancaster- Building Department 121 East Chestnut Street, Suite 102, Lancaster, Ohio 43130-3825 (740) 687-6649, Fax (740) 681-5030 Web site: www.ci.lancaster.oh.us/dept/building HVAC Heating, Ventilating,
More informationM E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169 7471 Phone: 617 770 3000 Fax: 617 770 0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Means of Egress
More informationWestern Firex. Heat & Smoke Ventilator. EAGLE series Natural Ventilation
Western Firex Heat & Smoke Ventilator Ventilation's Natural Solution since 1961 EAGLE series Natural Ventilation Page 1 of 8 (800) 474-3267 1351 13th Ave S. Suite 130 Jacksonville Beach, FL 32250 MoffittHVAC.com
More informationFire & Life Safety Code Compliance. Common Safety Deficiencies and Tips for Compliance for Long Term Care and Skilled Nursing Facilities
Fire & Life Safety Code Compliance Common Safety Deficiencies and Tips for Compliance for Long Term Care and Skilled Nursing Facilities LTC, Skilled Nursing Facilities COMMON LIFE SAFETY DEFICIENCIES
More informationLoss Prevention Standards
Introduction Fire compartmentation is an essential part of an effective fire safety design of a building. The primary objective of fire compartmentation or passive fire protection is to prevent a building
More informationFIRE SAFETY INSPECTION REPORT
FIRE SAFETY INSPECTION REPORT COMFORT APPAREL, ( PVT ) LTD. 96, DARUS SALAM, MIRPUR, DHAKA OTHER FACTORIES: SALMA FASHION WEARS LTD, COMFORT KNIT FASHION LTD March 27, 2014 Page 2 SUMMARY was surveyed
More informationUnit 2 Fire Safety (Zone 1)
IFE Level 3 Diploma in Fire Safety and Fire Science Unit 2 Fire Safety (Zone 1) Examiner Report March 2018 Introduction 42% of candidates attained a Pass. Half of the candidates that attained a Pass secured
More information