Environment Test Report

Size: px
Start display at page:

Download "Environment Test Report"

Transcription

1 Environment Test Report Product Name: Product Model: Product Type: Power System TP48200A TP48200A-H15A3 TP48200A-H15A5 TP48200A-D15A1 Report Number: SYBH(H) Reliability Laboratory of Huawei Technologies Co., Ltd. Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, , P.R.C Tel: Fax:

2 Notice 1. The laboratory has Passed the accreditation by China National Accreditation Service for Conformity Assessment (CNAS). The accreditation number is L The laboratory has Passed the accreditation by The American Association for Laboratory Accreditation (A2LA). The accreditation number is The laboratory has been listed by the ISTA to perform Environment measurements. The accreditation numbers is ST The test report is invalid if not marked with the signatures of the persons responsible for preparing and approving the test report. 5. The test report is invalid if there is any evidence of erasure and/or falsification. 6. The test report is only valid for the test samples. 7. Content of the test report, in part or in full, cannot be used for publicity and/or promotional purposes without prior written approval from the laboratory. Page 2 of 34

3 Applicant: Address: Product Name: Product Model: Product Type: Version: Huawei Technologies Co., Ltd. Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, , P.R.C Power System TP48200A TP48200A-H15A3, TP48200A-H15A5, TP48200A-D15A1 V300R001C03 Date of Receipt Sample: Start Date of Test: End Date of Test: Test : Pass Approved by Senior Engineer: Wu Xiaozhi Date Name Signature Prepared by: Shi Feng Date Name Signature Page 3 of 34

4 Modification Record No. Last Report No. Modification Description NA NA NA Page 4 of 34

5 CONTENT 1. General Information Standard Compliance Test Location Testing Environment Test Items and s Test Instruments Auxiliary Equipment Product Specification Main Product Specification Product Configuration and Test Setup Detailed Test Data Low Temperature Storage High Temperature Storage Damp heat storage Low Temperature Operation High Temperature Operation Damp Heat Cyclic Operation Temperature Cycles Drop with Package Random vibration with package Sinusoidal vibration operation Shock operation Water Jet Test Salt Fog Test Altitude Operation Test Acoustic Test Test Photos Climatic Test Photos Mechanical and other Test Photos Appendix Abbreviations Page 5 of 34

6 1. General Information 1.1 Standard Compliance Product Standard: GR-487-CORE:2009 ETSI EN V2.1.4:2003 ETSI EN V2.1.4:2003 ETSI EN V2.1.2:2003 Test Methods: ETSI EN V2.1.2: 2000 ETSI EN V2.1.2: 1999 ETSI EN V2.2.2: 2003 IEC :2007 / GB/T :2008 IEC :2007 / GB/T :2008 IEC :2007 / GB/T :2008 IEC :1981 / GB/T :1993 IEC :2009 / GB/T :2002 IEC :2008 / GB/T :1995 IEC :2005 / GB/T :2008 IEC :1983/GB/T :2008 IEC :1983/GB/T :2008 IEC 60529:2001/GB4208:2008 ISTA 2B: Test Location Test Location 1: Address: Test Location 2: Address: Reliability Laboratory of Huawei Technologies Co., Ltd. Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, , P.R.C Shenzhen Yitong Testing Technology Co., Ltd. F/3, Block 18A, Guanlong No.1 Industrial Zone, Xili Town, Nanshan District, Shenzhen, Guangdong, China. 1.3 Testing Environment Ambient Temperature: +20 C-+25 C Relative Humidity: 45%-55% Atmospheric Pressure: 101 kpa Page 6 of 34

7 Test s 1.4 Test Items and s Table-1 Test items and results SN Test Item Standard Compliance Test Parameter Low temperature Storage High temperature Storage Damp heat Storage High temperature operation Low temperature operation Temperature cycle Damp heat cyclic operation Drop with package Random vibration with package Sinusoidal vibration operation 11 Shock operation 12 Water jet Test 13 Salt fog test 14 Altitude operation GB/T IEC ETSI EN GB/T IEC ETSI EN GB/T IEC ETSI EN GB/T IEC ETSI EN GB/T IEC ETSI EN GB/T IEC ETSI EN GB/T IEC ETSI EN ISTA 2B ETSI EN GB/T IEC ETSI EN GB/T IEC ETSI EN GB4208 IEC60529 GB/T IEC GB/T IEC Acoustic test GR-487-CORE -40, 24h PASS +70, 24h PASS +40,95%RH,96h +50, 24h PASS PASS -40, 24h PASS , 1 /min, t1=3h, 2cyclse PASS , 95%RH, 48h PASS Mass drop height 300kg 0.3m Frequency range ASD 5~20Hz, 1m 2 /s 3 ; 20~200Hz, -3dB; 3 axes, 30min/each axes. 5-9Hz:1.2mm; 9-200Hz:4m/s2; 3 axes, 5 sweep cycles per axis, 1oct/min half sine,11ms,30m/s 2,3 axes, 6 times per axis Water flow volume: 12.5L/min±5% Water pressure : 30kPa Distance: 2.5m 3m Duration of water spraying: 1 minute/m2, at least 3 minutes Diameter of the nozzle: 6.3mm +35,5%±1% Nacl solution, ph:6.5~7.2,duration of test: 192h PASS PASS PASS PASS PASS PASS +40, 55kPa,16h PASS 1.5m from the cabinet surfaces in all horizontal directions at a height of 1 m from the cabinet mounting surface PASS Page 7 of 34

8 1.5 Test Instruments Table-2 List of test instruments Test Instrument Model Manufacturer (Asset) number Calibration Date Calibration Interval (month) Climatic chamber WPH -1 Envirotronics Climatic chamber ACS-1 ACS Water Jet Test Equipment IPX5 WUXISUNAN CB Low air pressure Chongqing QD09 tester YINHE Free-drop tester AD-500 LAB Hemi-anechoic Room / BSWA TECH Acoustics Test System MF02PN Mueller BBM Tape Measure Hi-Lock 16/TAJIMA TAJIMA JL Salt fog tester YW-30F CERPREI REC-D Shock and vibration Test System DLS Auxiliary Equipment Yitong TTS-YQ Table-3 List of test auxiliary instruments Name Model Manufacturer S/N Calibration Date Calibration Interval (month) Test PIII1G/128M/30G/ Computer 15" LEGEND NA NA NA DC Load DC54V/500A GUOHUA A AC Source CHROMA 6560 CHROMA Multi-meter FLUKE LH41A FLUKE A Digital Phosphor Oscilloscope TDS5104B TEKTRONIX A Product Specification 2.1 Main Product Specification Rated Input Voltage Rated Power Dimensions of the Sample Dimensions of the Packaged Sample Weight of the Sample Weight of the Packaged Sample Input:~ V; 50/60Hz;84A MAX or ~ / V;3W+N+G; 50/60Hz; 41A MAX W 650 mm (W) 650 mm (D) 1500 mm (H) 175mm(width)x 150mm(depth)x 225mm(height) 98 kg 108 kg Page 8 of 34

9 Sample Assembly Level Quantity of the Sample Cabinet 1 set 2.2 Product Configuration and Test Setup Product Configuration TP48200A-D15A1 TP48200A-H15A5 TP48200A-H15A Test Setup Figure-1 TP48200A V300R001 configuration diagram TP 48200A V300 R Board List Figure-2 Test setup Unless otherwise noted in the report, the functional boards installed in the units shall be selected from the below list, but not means all the functional boards listed below shall be installed in one unit. Board Name Hardware Version Description WD22DLPC VER.C DC Power Lightning Protection Board PW31PCBB VER.D Power System backboard EN21DETA01 VER.E User Interface Board SMU02B VER.B Site Monitoring Unit R4850N1 VER.G Rectifier Page 9 of 34

10 EN21AFBA01 VER.F Two level of shutting down electricity in System detect black board GM51DFIU VER.D Fan Interface Unit Sub-Assembly Module Name Model Manufacture Description Cabinet TP48200A V300R001 HUAWEI Cabinet 3 Detailed Test Data 3.1 Low Temperature Storage Test Procedure and Test Curve 1) Before test, check the mechanical and electronic (initial check) 2) Turn off the power of the EUT and put it in the middle of the chamber (conditional test) 3) Decrease the temperature to -40 in the rate of 1 /min (conditional test) 4) Keep the chamber in -40 for 24h (conditional test) 5) Hoist the temperature to +25 in the rate of 1 /min, and keep for 2h. (recovery) 6) Turn on the power of the EUT and check he mechanical and electronic (finally check) Detailed Test Data SN Check Item Check Subitem 1 2 Mechanical Electrical Figure-3 Test curve of low temperature storage Table-4 Detailed test data of low temperature storage Qualification Criterion Initial Final Connectors Not broken Not broken Not broken Components Voltage accuracy ±1% ±1% ±1% System Normal Normal Normal Page 10 of 34

11 monitor function Alarm 3.2 High Temperature Storage Test Procedure and Test Curve 1) Before test, check the mechanical and electronic (initial check) 2) Turn off the power of the EUT and put it in the middle of the chamber (conditional test) 3) Hoist the temperature to +70 in the rate of 1 /min (conditional test) 4) Keep the chamber in +70 for 24h; (conditional test) 5) Decrease the temperature to +25 in the rate of 1 /min, and keep for 2h (recovery) 6) Turn on the power of the EUT and check he mechanical and electronic (finally check) Detailed Test Data SN Check Item Check Subitem 1 Mechanical Figure-4 Test curve of high temperature storage Table-5 Detailed test data of high temperature storage Qualification Criterion Initial Final Connectors Not broken Not broken Not broken Components Voltage accuracy System Electrical 2 monitor function Alarm 3.3 Damp heat storage Test Procedure and Test Curve ±1% ±1% ±1% Normal Normal Normal 1) Before test, check the mechanical and electronic (initial check) Page 11 of 34

12 2) put it in the middle of the chamber (conditional test) 3) hoist the humidity of the chamber to 95%RH in 1h with the temperature keep for +25 ; (conditional test) 4) hoist the temp of the chamber to +40 in 1h with the humidity keeping for 95% RH (conditional test) 5) keep the chamber in +40, 95%RH for 96h (conditional test) 6) recover the humidity to 50% in 1h, when recover the humidity to 50% in 0.5h, recover the temp in +25 (conditional test) 7) keep the EUT in +25, 50%RH for 2h to recover; (conditional test) 8) check the mechanical and electronic (finally check) Detailed Test Data SN Check Item Check Subitem 1 2 Mechanical Electrical REMARK: Red color for temperature and blue for humidity Figure-5 Test curve of damp heat storage Table-6 Detailed test data of damp heat storage Qualification Criterion Initial Final Connectors Not broken Not broken Not broken Components Voltage accuracy System monitor function Alarm ±1% ±1% ±1% Normal Normal Normal Page 12 of 34

13 3.4 Low Temperature Operation Test Procedure and Test Curve 1) Before test, check the mechanical and electronic (initial check) 2) Turn off the power of the EUT and put it in the middle of the chamber (conditional test) 3) Decrease the temperature to -40 in the rate of 1 min (conditional test) 4) Keep the EUT in -40 for 2h, and then turn on the power of the EUT (conditional test) 5) Keep the EUT working under -40 for 16h with the 220V power supply, 4h with the 90V power supply and 4h with the 290V power supply, check the electric during the conditional test (conditional test) 6) Hoist the temperature to +25 in the rate of 1 /min, and keep for 2h (recovery) 7) check the mechanical and electronic (finally check) Detailed Test Data SN Check Item Check Subitem 1 Mechanical Figure-6 Test curve of low temperature operation Table-7 Detailed test data of low temperature operation Qualification Criterion Initial Intermediate Final Connectors Not broken Not broken Not broken Not broken Components or or or Voltage accuracy ±1% ±1% ±1% ±1% 2 System Electrical monitor function Normal Normal Normal Normal Alarm 3.5 High Temperature Operation Test Procedure and Test Curve 1) Before the test, check mechanical and electronic (initial measurement). Page 13 of 34

14 2) Power off the EUT and put it in the middle of the chamber (conditional test). 3) Increase the temperature to +50 at a rate of 1 /min (conditional test). 4) Keep the temperature stay at +50 for 2 hours, and then turn on the EUT (conditional test). 5) Keep the temperature stay at +50 for 24 hours (conditional test). 6) Lower the temperature to +25 at a rate of 1 /min, and keep for 2 hours (recovery). 7) Check the mechanical and electronic (final measurement). Figure-7 Test curve of high temperature operation Detailed Test Data SN Check Item Check Sub-item 1 Mechanical Table-8 Detailed test data of high temperature operation Qualification Criterion Initial Intermediate Final Connectors Not broken Not broken Not broken Not broken Components or or or Voltage accuracy ±1% ±1% ±1% ±1% 2 System Electrical monitor function Normal Normal Normal Normal Alarm 3.6 Damp Heat Cyclic Operation Test Procedure and Test Curve 9) Before the test, check mechanical and electronic (initial measurement). 10) Put the EUT in the middle of the chamber (conditional test). 11) Increase the humidity of the chamber to 95%RH within 1 hour with the temperature at +25 (conditional test). 12) Increase the temperature in the chamber to +50 in 3h with the humidity stable at 95% RH (conditional test). Page 14 of 34

15 13) Keep the temperature in the chamber at +50 and 95%RH for 9 hours (conditional test). 14) Lower the temperature to +25 within 3 hours, with the humidity stable at 95% RH (conditional test). 15) Keep the temperature in the chamber at +25, 95%RH for 9 hours (conditional test). 16) Repeat steps 4) to 7). 17) Decrease the humidity to 50% within 1 hour, keep the temperature stay at +25, and check the electric during the conditional test (conditional test). 18) Keep the EUT stay at +25 and 50%RH for 2 hours (recovery). 19) Check the mechanical and electronic (final measurement) Detailed Test Data SN Check Item Check Subitem Figure-8 Test curve of damp heat cyclic operation Table-9 Detailed test data of damp heat cyclic operation Qualification Criterion Initial Intermediate Final Page 15 of 34

16 1 Mechanical Connectors Not broken Not broken Not broken Not broken Components Voltage accuracy System Electrical 2 monitor function Alarm 3.7 Temperature Cycles Test Procedure and Test Curve or or ±1% ±1% ±1% ±1% or Normal Normal Normal Normal 1) Before test, check the mechanical and electronic (initial check) 2) put it in the middle of the chamber (conditional test) 3) Decrease the temperature to -40 in the rate of 1 /min keep -40 for 3h (conditional test) 4) Hoist the temperature to +50 in the rate of 1 /min keep +50 for 3h (conditional test) 5) Do step 3) 4) again (conditional test) 6) Recover the temperature to +25, and keep +25 for 2h (recovery) 7) check the mechanical and electronic (finally check) Detailed Test Data SN Check Item Check Subitem 1 Mechanical Figure-9 Test curve of temperature cycles Table-10 Detailed test data of temperature cycles operation Qualification Criterion Initial Intermediate Final Connectors Not broken Not broken Not broken Not broken Components or or or Page 16 of 34

17 Voltage accuracy System Electrical 2 monitor function Alarm 3.8 Drop with Package ±1% ±1% ±1% ±1% Normal Normal Normal Normal The signed style for the packaged sample Surface S1, S2, S3, S4, S5, S6 (every surface) Edge E1-6 Corner C2-3-6 S4 S1 E1-6 S5 S6 S2 S3 Figure-10 The signed style for the packaged sample appointed drop height, then drop twice for each of the four edges (E3-2, E3-4, E3-5 and E3- C Test procedure 1) Before the test, check all. 2) Drop twice for each of the four corners (C2-3-5, C2-3-6, C3-4-6 and C3-4-5) at the 6) at the appointed drop height, then drop twice for each drop style of S3 (lift E2-3, lift E5-3, lift E6-3 and lift E4-3) at the appointed drop height. 3) Check all Detailed Test Data Table-11 Detailed test data of drop with package SN Check Item Check Sub-item Qualification Criterion 1 2 Packaging material Mechanical 3 Electrical Initial Final Connectors Not broken Not broken Not broken Components Surfaces No nicks No nicks No nicks Voltage accuracy System monitor function ±1% ±1% ±1% Normal Normal Normal Page 17 of 34

18 Alarm 3.9 Random vibration with package Test procedure 1) Make the initial examination and measurement before testing, and record the test data before test. 2) Verify the shaking table can achieve the random vibration test curve with the bare table. 3) Mount the EUT on the shaking table firmly with the Z axes. 4) Switch the EUT on 5) Start the vibration test and the test condition is shown in table 1. 6) After finishing the Z axes test, change the test axes from Z to X, and start the vibration test. 7) After finishing the X axes test, change the test axes from X to Y, and start the vibration test. 8) Make continuous measurement during 3 axis tests. 9) Perform the final examination and measurement including the appearance, mechanical characteristic and functional verification Detailed Test Data Figure-11 Test curve of random vibration with package Table-12 Detailed test data of random vibration with package SN Check Item Check Sub-item Qualification Criterion Initial Final or 1 Packaging material Connectors Not broken Not broken Not broken 2 Mechanical Components or Surfaces No nicks No nicks No nicks Voltage accuracy ±1% ±1% ±1% 3 Electrical System monitor function Normal Normal Normal Alarm Page 18 of 34

19 3.10 Sinusoidal vibration operation Test procedure 1) Make the initial examination and measurement before testing, and record the test data before test. 2) Verify the shaking table can achieve the sine sweep vibration test curve with the bare table. 3) Mount the EUT on the shaking table firmly with the Z axes. Place the accelerometers on the base, center and top of the EUT. 4) Start the vibration test and the test condition is shown in test parameter 5) Make continuous measurement during 3 axis tests. 6) Record the resonance frequency of the EUT. 7) Perform the final examination and measurement including the appearance, mechanical characteristic and functional verification. Figure-12 Test curve of sinusoidal vibration operation Detailed Test Data SN Check Item Check Subitem 1 2 Mechanical Electrical Table-13 Detailed test data of sinusoidal vibration operation Qualification Criterion Initial Intermediate Final Connectors Not broken Not broken Not broken Not broken Components or or or Voltage accuracy ±1% ±1% ±1% ±1% System monitor Normal Normal Normal Normal function Alarm Page 19 of 34

20 3.11 Shock operation Test procedure 1) Make the initial examination and measurement before testing, and record the test data before test. 2) Verify the shaking table can achieve the shock test curve with the bare table. 3) Mount the EUT on the shaking table firmly with the Z axes. 4) Start the shock test and the EUT is subjected to ±3 times. And test condition is shown in test parameter. 5) After finishing the Z axes test, change test axes from Z to X, and repeat ±3 times for X axes. 6) After finishing the X axes test, change test axes from X to Y, and repeat ±3 times for Y axes. 7) Make continuous measurement during test. 8) Perform the final examination and measurement including the appearance, mechanical characteristic and functional verification. Figure-13 Test curve of shock operation Detailed Test Data SN Check Item Check Subitem 1 Mechanical Table-14 Detailed test data of shock operation Qualification Criterion Initial Intermediate Final Connectors Not broken Not broken Not broken Not broken Components or or or 2 Electrical Voltage ±1% ±1% ±1% ±1% Page 20 of 34

21 accuracy System monitor function Alarm 3.12 Water Jet Test Test procedure Normal Normal Normal Normal 1) Make the initial examination and measurement before testing, and record the test data 2) Mount the EUT in the suitable position according to its normal operational attitude, set the distance 2.5~3m from the spray nozzle to the EUT surface. 3) Adjust the water pressure to the delivery rate of 12.5L/min±5% using the jet equipment request by GB Spray the each surface of the EUT that water can enter. The duration is 1min/m2 according to the surface area of the EUT(except the bottom),at least 3min. 4) Perform the final examination and measurement including the appearance, mechanical characteristic and functional verification as soon as possible Detailed test data Figure-14 Test curve of water jet test Table-15 Detailed test data of water jet test SN Check items Check sub items Qualification criterion Waterproof Salt Fog Test Test procedure Water spray test(ipx5) No water entered into the cabinet Initial measurement results No water in the cabinet Final measurement results No water in the cabinet 1) The EUT shall be visually examined and, if necessary, electrically and mechanically checked as required by the relevant specification. (initial check) Page 21 of 34

22 2) Cleaning the EUT immediately before the test; it shall also state whether temporary protective coatings shall be removed.(pre-conditioning) 3) The EUT shall be tested in their normal operating positions according to the relevant specification. They shall therefore be divided into lots, and each lot shall be tested in one of the operating positions. (conditional test) 4) Duration of spray test:8h(conditional test) 5) At the completion of the test, the EUT shall be washed by distilled, the temperature of the water used for washing shall not exceed +35, the EUT shall then be stored under standard recovery conditions for not less than 1h and not more than 2h(recovery) 6) The EUT shall be visually inspected and the result shall be recorded.(final measurement) Detailed test data SN Check Item Check Subitem 1 Mechanical Table-16 Detailed test data of salt fog test Qualification Criterion Initial Final Connectors Not broken Not broken Not broken Components Voltage accuracy System Electrical 2 monitor function Alarm 3.14 Altitude Operation Test Test procedure ±1% ±1% ±1% Normal Normal Normal 1) Before test, check the mechanical and electronic. 2) Increase the temperature to +40 in the rate of 1 /min. 3) Keep the EUT in +40 for 1h. 4) Decrease the chamber s pressure at a rate of 10kPa/h to 55kPa. 5) Maintain a condition of +40 and 55kPa for 16 hours. 6) Decrease the temperature to +25 in the rate of 1 /min, at the same time increase the chamber s pressure at a rate of 10kPa/hr to ambient, and keep for 1h. (Recovery) 7) Check the mechanical and electronic (finally check) Page 22 of 34

23 Detailed test data SN Check Item 1 Mechanical Figure-15 Test curve of altitude operation Table-17 Detailed test data of altitude operation test Check Subitem Qualification Criterion Initial Intermediate Final Connectors Not broken Not broken Not broken Not broken Components Voltage accuracy System Electrical 2 monitor function Alarm 3.15 Acoustic Test Test procedure or ±1% ±1% ±1% ±1% Normal Normal Normal Normal 1) Put the sample in the center of the hemi-anechoic room. 2) Measure the background noise. 3) Power on the EUT, and then adjust fan at full speed. 4) The locations of microphones are lay as the following figure and another location at 1.5m from the cabinet surfaces in all horizontal directions at a height of 1m from the cabinet mounting surface 5) Record the data of the measurement points, and then calculate the power level. Page 23 of 34

24 Figure-16 The locations of microphones Detailed test data Table-18 Detailed test data of acoustic test point Sound pressure level (dba) Background noise (dba) Qualification criterion Test result PASS Page 24 of 34

25 4 Test Photos 4.1 Climatic Test Photos Figure-17 Photograph of TP48200AV300R001 configuration Figure-18 Photograph of TP48200AV300R001 configuration Page 25 of 34

26 Figure-19 Photograph of TP48200AV300R001configuration 4.2 Mechanical and other Test Photos Figure-20 Photograph of TP48200AV300R001 Page 26 of 34

27 Figure-21 Drop with package Figure-22 Random vibration with package Page 27 of 34

28 Figure-23 Sinusoidal vibration operation Figure-24 Shock operation test Page 28 of 34

29 Figure-25 Salt fog test Page 29 of 34

30 Page 30 of 34

31 Figure-26 Water jet test Figure-27 Altitude operation test Page 31 of 34

32 Page 32 of 34

33 Figure-28 Acoustic t test Page 33 of 34

34 Appendix Abbreviations Abbreviation EUT Full Name Equipment Under Test END Page 34 of 34

ENVIRONMENTAL TEST REPORT

ENVIRONMENTAL TEST REPORT MECHANICAL TESTING 0839.04 Hermon Laboratories Ltd. Harakevet Industrial Zone, Binyamina 30500, Israel Tel. +972-4-6288001 Fax. +972-4-6288277 E-mail: mail@hermonlabs.com ENVIRONMENTAL TEST REPORT ACCORDING

More information

EN 60529:1991+A1:2000+A2:2013 Measurement and Test Report

EN 60529:1991+A1:2000+A2:2013 Measurement and Test Report EN 60529:1991+A1:2000+A2:2013 Measurement and Test Report For Fujian Juston Electronic Equipment Co.,Ltd No.115,117,119,Yuantai 3rd Road,Jiangnan Hi-tech Park,Licheng District, Quanzhou,Fujian,China 362000

More information

23" PANEL MOUNT INDUSTRIAL MONITOR REVISION C PRODUCT RELIABILITY TEST REPORT

23 PANEL MOUNT INDUSTRIAL MONITOR REVISION C PRODUCT RELIABILITY TEST REPORT 23" PANEL MOUNT INDUSTRIAL MONITOR REVISION C PRODUCT RELIABILITY TEST REPORT Model No. HIS-ML23- _ C Table of Contents Test Report Overview... 3 Testing Rationale...3 Test Plan...4 Test 1 Cold (Steady

More information

Product Specification Qualification Test Report

Product Specification Qualification Test Report PS 88 / DMI PC SM / 6/5 DIAMOND Test & Calibration Laboratory STS 333 / SCS 11 Product Specification Qualification Test Report DMI PC SM DIAMOND SA Via dei Patrizi 5 CH-6616 LOSONE Tel. +41 91 785 45 45

More information

CERTIFICATE of QUALITY TEST

CERTIFICATE of QUALITY TEST Testing laboratory for climatic, mechanical and corrosive environmental stress CERTIFICATE of QUALITY TEST Test report - No. 10142 / 13 Client ADDI-DATA GmbH Airpark Business Center Airport Boulevard B210

More information

Report No.: SQE Page 2 of 11 Issued: Test Report No. : EMC -- T E S T R E P O R T SQE Equipment under Test : 24Bit Barometer

Report No.: SQE Page 2 of 11 Issued: Test Report No. : EMC -- T E S T R E P O R T SQE Equipment under Test : 24Bit Barometer TEST REPORT IEC 61000-4-2-2008 Electromagnetic compatibility (EMC) - Part 4-2: Testing and measurement techniques - Electrostatic discharge immunity test Report Reference No....: SQE13090002 R/C: 60520

More information

17" UNIVERSAL MOUNT INDUSTRIAL MONITOR REVISION E, F & G PRODUCT RELIABILITY TEST REPORT

17 UNIVERSAL MOUNT INDUSTRIAL MONITOR REVISION E, F & G PRODUCT RELIABILITY TEST REPORT 17" UNIVERSAL MOUNT INDUSTRIAL MONITOR REVISION E, F & G PRODUCT RELIABILITY TEST REPORT Model No. HIS-UM17- _ E, HIS-UM17- _ F and HIS-UM17- _ G Table of Contents Test Report Overview... 3 Testing Rationale...3

More information

Vibration tests on a TNAML Luminaire

Vibration tests on a TNAML Luminaire Sebert Trillingstechniek B.V. Report M13.001-P13.001 rev.01 Date 26 august 2013 Vibration tests on a TNAML Luminaire Client Technor Benelux B.V. Veersteeg 15 4212 LR Spijk The Netherlands Contact Person

More information

/Mar/2014 Rev A

/Mar/2014 Rev A Qualification Test Report 501-93038 21/Mar/2014 Rev A MPOptimate FO Microcassette 12 fiber MPO-12xLC/PC 1. INTRODUCTION 1.1 Purpose Tests performed on MPOptimate FO Microcassette 12 fiber MPO-12xLC/PC,

More information

Sound Pressure Level Test Report Report No. : PH2_09_ Date : 2009/6/30

Sound Pressure Level Test Report Report No. : PH2_09_ Date : 2009/6/30 聲學測試實驗室 PAL Acoustics Technology Ltd. 4F, No, 388, Sec.1, Nei Hu Rd., Taipei, Taiwan. 114 Tel:886-2-2627-2515 Fax:886-2-2627-2295 www.pal-acoustics.com Sound Pressure Level Test Report Report No. : PH2_09_0227-1

More information

CE EMC Test Report EN :2015 EN :2017. Folder with powerbank ZKS E. Lieber Ouyang (Engineer) Lahm Peng (Manager)

CE EMC Test Report EN :2015 EN :2017. Folder with powerbank ZKS E. Lieber Ouyang (Engineer) Lahm Peng (Manager) CE EMC Test Report Test Standard(s): Applicant: Product Name: EN 55032 :2015 EN 55035 :2017 Goya Importacionesy Distribuciones SL B50154293 Folder with powerbank Model: 606090 Report No.: ZKS180800212E

More information

COMITÉ EUROPÉEN DES ASSURANCES

COMITÉ EUROPÉEN DES ASSURANCES COMITÉ EUROPÉEN DES ASSURANCES SECRETARIAT GENERAL 3bis, rue de la Chaussée d'antin F 75009 Paris Tél. : +33 1 44 83 11 73 Fax : +33 1 44 83 11 85 Web : cea.assur.org DELEGATION A BRUXELLES Square de Meeûs,

More information

Product Tests Report

Product Tests Report TO WHOM IT MAY CONCERN Page: 1 of 5 Product name: Model number and description: MIC IP starlight 7000i Product Tests Report MIC-7502-Z30B, PTZ camera 2MP HDR 30x IP68 IK10, black MIC-7502-Z30W, PTZ camera

More information

Product Specification EMI Shielded Duplex LC Sealed Receptacle (ODVA Conforming)

Product Specification EMI Shielded Duplex LC Sealed Receptacle (ODVA Conforming) Product Specification EMI Shielded Duplex LC Sealed Receptacle (ODVA Conforming) 02Oct08 Rev A 1. SCOPE 1.1. Content This specification, based on IEC 61753-1 Edition 1.0 tests for Category E (Extreme Environment),

More information

ETSI TS V1.2.1 ( )

ETSI TS V1.2.1 ( ) TS 100 783 V1.2.1 (2004-08) Technical Specification Transmission and Multiplexing (TM); Passive optical components; Fibre optic fusion splices for single-mode optical fibre transmission systems for indoor

More information

ETSI TS V1.2.1 ( )

ETSI TS V1.2.1 ( ) TS 101 263 V1.2.1 (2004-07) Technical Specification Transmission and Multiplexing (TM); Passive optical components; Fibre optic mechanical splices for single-mode optical fibre communications systems for

More information

E/ECE/324/Rev.1/Add.27/Amend.5 E/ECE/TRANS/505/Rev.1/Add.27/Amend.5

E/ECE/324/Rev.1/Add.27/Amend.5 E/ECE/TRANS/505/Rev.1/Add.27/Amend.5 7 February 2018 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and

More information

Draft ES V1.1.1 ( )

Draft ES V1.1.1 ( ) Standard Transmission and Multiplexing (TM); Passive optical components; Fibre optic mechanical splices for single-mode optical fibre communications systems; Common requirements and conformance testing

More information

MODULAR CONNECTOR 154 (58 AND 96) POS, WATERPROOF PRODUCT SPECIFICATION

MODULAR CONNECTOR 154 (58 AND 96) POS, WATERPROOF PRODUCT SPECIFICATION MODULAR 154 (58 AND 96) POS, WATERPROOF PRODUCT SPECIFICATION 108-18965 Product Specification 108-18965 10.02. 2011 Rev C1 MODULAR 154 (58 AND 96) POSITION, WATERPROOF CONTENT : 1 PRODUCT OVERVIEW 1.1

More information

TEMPORARY IMMERSION AND DUST TEST REPORT

TEMPORARY IMMERSION AND DUST TEST REPORT Report No. :HS1007140060A Version:A TEMPORARY IMMERSION AND DUST TEST REPORT Company :Gold Apollo Co., Ltd Address :3F.-1, No.77, Sec. 1, Xintai 5th Rd., Xizhi City, Taipei County 221, Taiwan (R.O.C.)

More information

CNBOP-PIB Standard Fire Protection

CNBOP-PIB Standard Fire Protection Centrum Naukowo Badawcze Ochrony Przeciwpożarowej im. Józefa Tuliszkowskiego Państwowy Instytut Badawczy CNBOP-PIB-BA-01E:2014 Revision 1, February 2014 CNBOP-PIB Standard Fire Protection Laboratory Tests

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Crewe Road North Contact: Mr C Marshall Crewe Toll Tel: +44 (0)131 343 4242 Edinburgh Fax: +44 (0)131 343 5420 EH5 2XS E-Mail: chris.marshall@leonardocompany.com

More information

Contact person Date Reference Page Henrik Andersson F (4) Electronics

Contact person Date Reference Page Henrik Andersson F (4) Electronics issued by an Accredited Testing Laboratory Contact person Henrik Andersson 2016-05-19 6F009034 1 (4) Electronics +46 10 516 55 74 henrik.andersson@sp.se Accred. No. 1002 Testing ISO/IEC 17025 ENOC SYSTEM

More information

FT702LT Turbine control wind sensor gives durability a new meaning FT702LT. series

FT702LT Turbine control wind sensor gives durability a new meaning FT702LT. series FT702LT Turbine control wind sensor......gives durability a new meaning FT702LT series Proven High Availability The FT702LT ultrasonic anemometer is the result of FT Technologies 10 years of experience

More information

RF TEST REPORT. ZTE Corporation SRQ-VFD510 ZTE LTE/WCDMA/GSM GPRS RXC RF07

RF TEST REPORT. ZTE Corporation SRQ-VFD510 ZTE LTE/WCDMA/GSM GPRS RXC RF07 RF TEST REPORT Applicant FCC ID Brand Product ZTE Corporation SRQ-VFD510 ZTE LTE/WCDMA/GSM GPRS Model VFD 511 Multi-Mode Digital Mobile Phone Report No. RXC1703-0087RF07 Issue Date May 24,2017 TA Technology

More information

TEMPORARY IMMERSION AND DUST TEST REPORT

TEMPORARY IMMERSION AND DUST TEST REPORT Report No. :DH1510130042A Version:A TEMPORARY IMMERSION AND DUST TEST REPORT Company Address :GradConn Ltd. :No. 139 Wuhan Rd., Longtan Township, Taoyuan County, Taiwan Sample Name :Refer to see page 2

More information

Jul07 Rev C

Jul07 Rev C Product Specification 108-2167 11Jul07 Rev C MPO and MPO SECURE Multimode Fiber Optic Connector and Adapter 1. SCOPE 1.1. Content This specification, which is based on GR-1435-CORE, covers the performance,

More information

INTERNATIONAL TELECOMMUNICATION UNION SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT

INTERNATIONAL TELECOMMUNICATION UNION SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT INTERNATIONAL TELECOMMUNICATION UNION ITU-T L.36 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (10/98) SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT

More information

Mar11 Rev B

Mar11 Rev B Product Specification 108-1576-2 11Mar11 Rev B NETCONNECT*, CHAMP* System 5 Modular Jack Patch Panel 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for NETCONNECT*

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 ARTESYN PRODUCT TESTING SERVICES 2900 South Diablo Way, Suite 190 Tempe, AZ 85282 Tom Tuttle Phone: 602 228 7869 Email: tom.tuttle@artesyn.com ELECTRICAL (EMC)

More information

CASE STUDY. History. Testing Laboratories. GHSP Testing Laboratories A2LA Accredited Testing Laboratory. United States of America

CASE STUDY. History. Testing Laboratories. GHSP Testing Laboratories A2LA Accredited Testing Laboratory. United States of America CASE STUDY GHSP Testing Laboratories A2LA Accredited Testing Laboratory United States of America Automotive Components, NVH Consultancy PULSE, Sound Quality Software, Transducers GHSP is a world leader

More information

Procedure for the Approval of New Fire Detection and Alarm Technologies

Procedure for the Approval of New Fire Detection and Alarm Technologies VdS Guidelines for Automatic Fire Detection and Fire Alarm Systems VdS 3469en Procedure for the Approval of New Fire Detection and Alarm Technologies VdS 3469en : 2016-01 (01) Publisher and publishing

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 COMPLIANCE ENGINEERING PTY LTD 90 Indian Drive Keysborough, Victoria 3173, AUSTRALIA Mr. Simon Grilj Phone: 61 3 9763 3079 Email: simon@compeng.com.au ELECTRICAL

More information

DRAFT TANZANIA STANDARD

DRAFT TANZANIA STANDARD EDC 4 (5313) P3 DRAFT TANZANIA STANDARD (Draft for comments only) Specification for Handheld Metal Detectors for Use in Weapon Detection TANZANIA BUREAU OF STANDARDS TBS 2018 First Edition 2018 0 National

More information

Hemi Anechoic Chamber Number:

Hemi Anechoic Chamber Number: 1 of 6 Hemi Anechoic Chamber Architecture: 2 of 6 * Concrete floor and walls * Control room dimensions = 20 x 15 X 10 Feet. 3 of 6 Inner View / Features (not limited to below listing): * only a representative

More information

SOUND RECEPTION SYSTEM

SOUND RECEPTION SYSTEM STANDARD FOR CERTIFICATION No. 2.9 SOUND RECEPTION SYSTEM APRIL 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous and independent foundation

More information

OPERATION MANUAL MODEL & ACCELEROMETER

OPERATION MANUAL MODEL & ACCELEROMETER OPERATION MANUAL MODEL 8011-01 & 8021-01 ACCELEROMETER TE CONNECTIVITY SENSORS///MODEL 8011-01 & 8021-01 ACCELEROMETER 05/2016 Page 1 WARRANTY Measurement Specialties, Inc. accelerometers are warranted

More information

Mar11 Rev C

Mar11 Rev C Product Specification 108-1441 11Mar11 Rev C Connector, Z-PACK*, 2 mm FB, Signal and Power 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for the Z-PACK* 2mm

More information

DUST TEST REPORT. :Gold Apollo Co., Ltd. Company Model Name :A27. Date of Received :APR. 19, 2006 Date of Tested :APR. 19, 2006

DUST TEST REPORT. :Gold Apollo Co., Ltd. Company Model Name :A27. Date of Received :APR. 19, 2006 Date of Tested :APR. 19, 2006 Report No.:RA-S9504-0992 Reliability Engineering Division Page: 1 of 5 1F, No.22, Pu-ding Rd., Hsin - chu City, Taiwan, R.O.C. http://www.isti.com.tw Company Model Name :A27 DUST TEST REPORT :Gold Apollo

More information

Application for FCC Certificate On Behalf of. TTE Technology, Inc. LCD TV or LED TV. Model Number: 55R80 FCC ID:W8U55R80

Application for FCC Certificate On Behalf of. TTE Technology, Inc. LCD TV or LED TV. Model Number: 55R80 FCC ID:W8U55R80 Application for FCC Certificate On Behalf of TTE Technology, Inc. LCD TV or LED TV Model Number: 55R80 FCC ID:W8U55R80 Prepared for : TTE Technology, Inc. Address : 2455 Anselmo Drive Suite 101 Corona

More information

Plug shell and receptacle, single cavity, floating, EN Application of modular rectangular modules and shells per EN4165

Plug shell and receptacle, single cavity, floating, EN Application of modular rectangular modules and shells per EN4165 PRODUCT SPECIFICATION Sep 22, 29 Rev. B CONNECTOR, SINGLE CAVITY, AEROSPACE, PANEL MOUNT, FLOATING, EN416 1 - SCOPE 1.1. Content This document covers the performances, tests, and quality requirements of

More information

Acoustic Verification Report

Acoustic Verification Report Acoustic Verification Report Invacare XPO 2 Portable Oxygen Concentrator Type XPO100B-EU for Date: 2013-12-10 Our reference: IS-ATC2-MUC/js Document: Report Invacare VR.600010074.002.12 - Revision 2.docx

More information

Laboratory Honeywell Technology Solutions, Bangalore-EMC Lab, 19/2, Devarabisanahalli Village, K.R. Puram, Varthur Hobli, Bangalore, Karnataka

Laboratory Honeywell Technology Solutions, Bangalore-EMC Lab, 19/2, Devarabisanahalli Village, K.R. Puram, Varthur Hobli, Bangalore, Karnataka Last Amended on 07.10.2015 Page 1 of 18 I. EMC Test Facility 1. Electrical and Electronic Products, Process Control Devices, Lighting Control Products, Sensing and Control Devices, Electromechanical Products,

More information

SGS-CSTC Standards Technical Services (Shanghai) Co., Ltd. FCC MPE REPORT

SGS-CSTC Standards Technical Services (Shanghai) Co., Ltd. FCC MPE REPORT No. 588 West Jindu Road, Songjiang District, Shanghai, China Telephone: +86 (0) 21 61915666 Fax: +86 (0) 21 61915678 ee.shanghai@sgs.com Page 1 of 8 1 Cover Page Application No.: Applicant: FCC MPE REPORT

More information

Michael J. Caron, Test Engineer. Lee R. Senne, Test Technician. Kent L. Erickson, Dynamics Division Manager

Michael J. Caron, Test Engineer. Lee R. Senne, Test Technician. Kent L. Erickson, Dynamics Division Manager Engineering Report 49820-1 Vibration Test for Crystal Group Inc. Prepared by Michael J. Caron, Test Engineer Lee R. Senne, Test Technician Approved by Kent L. Erickson, Dynamics Division Manager This document

More information

TB/T Translated English of Chinese Standard: TB/T RAILWAY INDUSTRY STANDARD

TB/T Translated English of Chinese Standard: TB/T RAILWAY INDUSTRY STANDARD Translated English of Chinese Standard: TB/T2296-2011 www.chinesestandard.net Sales@ChineseStandard.net RAILWAY INDUSTRY STANDARD TB OF THE PEOPLE S REPUBLIC OF CHINA ICS 45.020 S 60 TB/T 2296-2011 Replacing

More information

AGREEMENT CONCERNING THE ADOPTION OF UNIFORM CONDITIONS OF APPROVAL AND RECIPROCAL RECOGNITION OF APPROVAL FOR MOTOR VEHICLE EQUIPMENT AND PARTS

AGREEMENT CONCERNING THE ADOPTION OF UNIFORM CONDITIONS OF APPROVAL AND RECIPROCAL RECOGNITION OF APPROVAL FOR MOTOR VEHICLE EQUIPMENT AND PARTS Rev.1/add.27 E/ECE/TRANS/505A 31 October 1972 AGREEMENT CONCERNING THE ADOPTION OF UNIFORM CONDITIONS OF APPROVAL AND RECIPROCAL RECOGNITION OF APPROVAL FOR MOTOR VEHICLE EQUIPMENT AND PARTS done at Geneva

More information

Technical-Report for SL Lamp 5 W

Technical-Report for SL Lamp 5 W Technical-Report for SL Lamp 5 W Technical Report No. 68.184.17.478.01 Dated 2017-06-27 Client: Manufacturing place: Name: PHOCOS China Ltd. Address: 3F 1st Bldg. 4A Chang Yi Road, 266021, Qingdao, PEOPLE'S

More information

SPECIFICATION OF ELECTRET CONDENSER MICROPHONE ( TO : )

SPECIFICATION OF ELECTRET CONDENSER MICROPHONE ( TO : ) SPECIFICATION OF ELECTRET CONDENSER MICROPHONE ( TO : ) HF BFRs/CFRs/PVC - Free BFRs/CFRs/PVC - Free MODEL NO. : (R)SOB-413S44-VRC H/F DIRECTIVITY : OMNI-DIRECTIONAL Name Prepared Checked Approved Sign.

More information

Remote Conditioners. RC-Series. ZPRC Series

Remote Conditioners.   RC-Series. ZPRC Series RC-Series Remote Conditioners RC Series ZPRC Series www.cszproducts.com Remote Conditioners Two chambers for the price of one Our dual-purpose RC-Series Remote Conditioners are designed to either deliver

More information

incubator, the best in its class

incubator, the best in its class 188 188 188 EuroClone incubator, the best in its class More than a new tool: an environment with unique and unmatched features for your cell cultures. ED AN UCED I DESIGNED AND PRODUCED IN ITALY 1 The

More information

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 TO WHOM IT MAY CONCERN Product Test report Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 Product name: BOSCH FLEXIDOME IP outdoor 4000 HD/IR BOSCH FLEXIDOME IP outdoor

More information

EMC TEST REPORT for HUIZHOU FREEWAY ELECTRONIC CO., LTD. Car DVD/Navigation Player

EMC TEST REPORT for HUIZHOU FREEWAY ELECTRONIC CO., LTD. Car DVD/Navigation Player EMC TEST REPORT for HUIZHOU FREEWAY ELECTRONIC CO., LTD Car DVD/Navigation Player Model No.: DT-063F, DT-0637, DT-0635, DT-0633, DT-0632, DT-0663, DT-063H, NAV-CF 8000 Prepared for : HUIZHOU FREEWAY ELECTRONIC

More information

Jun08 Rev A

Jun08 Rev A Product Specification Terminal Block Crimp Snap Plug Assembly 108-2319 09Jun08 Rev A 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for the Tyco Electronics

More information

Remote Conditioners. RC-Series. ZPRC Series

Remote Conditioners.  RC-Series. ZPRC Series RC-Series Remote Conditioners RC Series ZPRC Series www.cszindustrial.com Remote Conditioners Two chambers for the price of one Cincinnati Sub-Zero s dual-purpose RC-Series Remote Conditioners are designed

More information

Type approval testing of miscellaneous smoke and heat detectors for marine applications

Type approval testing of miscellaneous smoke and heat detectors for marine applications We help ideas meet the real world DELTA Test Report TEST Reg. no. 19 Type approval testing of miscellaneous smoke and heat detectors for marine applications Performed for Consilium Marine AB DANAK-199842

More information

HALT & HASS Systems.

HALT & HASS Systems. HALT & HASS Systems www.haltandhass.com TIME COMPRESSOR HALT & HASS CHAMBERS Quickly Discover Design Weaknesses CSZ HALT/HASS chambers provide extreme temperature change rates and multiaxis vibration conditions

More information

FCC COMPLIANCE REPORT. SHENZHEN STARWELL TECHNOLOGY CO., Ltd. AC/DC ADAPTER

FCC COMPLIANCE REPORT. SHENZHEN STARWELL TECHNOLOGY CO., Ltd. AC/DC ADAPTER FCC COMPLIANCE REPORT SHENZHEN STARWELL TECHNOLOGY CO., Ltd. for AC/DC ADAPTER Model Number : SMS-01XXXYYY-S06 XXX Stand for output voltage; YYY Stand for output current Prepared for : SHENZHEN STARWELL

More information

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw TECHNICAL INSTRUCTIONS CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw CHGV 50 CHGV 64 CHGV 72 CHGV 80 PHRV heat pump model also available November 2007 10 12 167 - GB -

More information

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 21 to 39 kw

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 21 to 39 kw TECHNICAL INSTRUCTIONS CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 21 to 39 kw CHGV 22 CHGV 2 CHGV 32 CHGV 40 PHRV heat pump model also available September 2007 10 12 11 - GB - 02

More information

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR)

SIMPLIFIED VOYAGE DATA RECORDER (S-VDR) STANDARD FOR CERTIFICATION No. 2.9 SIMPLIFIED VOYAGE DATA RECORDER (S-VDR) APRIL 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD (DNV) is an autonomous and

More information

ANSI-ASQ National Accreditation Board/ACLASS

ANSI-ASQ National Accreditation Board/ACLASS ANSI-ASQ National Accreditation Board/ACLASS SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 Washington Laboratories, Ltd. 1, 2 7560 Lindbergh Drive, Gaithersburg, Maryland 20879 John Repella Phone: 301-216-1500

More information

OPERATION MANUAL Model 8011 & mA

OPERATION MANUAL Model 8011 & mA OPERATION MANUAL Model 8011 & 8021 4-20mA TE CONNECTIVITY SENSORS/// MODEL 8011 & 8021 4-20MA 05/2016 Page 1 WARRANTY Measurement Specialties, Inc. accelerometers are warranted during a period of one year

More information

OPERATION MANUAL MODEL 8102 ACCELEROMETER

OPERATION MANUAL MODEL 8102 ACCELEROMETER OPERATION MANUAL TE CONNECTIVITY SENSORS/// 05/2016 Page 1 WARRANTY Measurement Specialties, Inc. accelerometers are warranted during a period of one year from date of shipment to original purchaser to

More information

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616

Product Test report. Security Systems TO WHOM IT MAY CONCERN. Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 TO WHOM IT MAY CONCERN Product Test report Bosch Security Systems Torenallee 49 Eindhoven 5617 BA The Netherlands AT18-Q1616 Product name: BOSCH FLEXIDOME IP indoor 4000 HD/IR BOSCH FLEXIDOME IP indoor

More information

CERTIFICATE OF ACCREDITATION

CERTIFICATE OF ACCREDITATION CERTIFICATE OF ACCREDITATION ANSI-ASQ National Accreditation Board 500 Montgomery Street, Suite 625, Alexandria, VA 22314, 877-344-3044 This is to certify that Washington Laboratories, Ltd. 7560 Lindbergh

More information

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw

CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw TECHNICAL INSTRUCTIONS CHGV AIR COOLED WATER CHILLER WITH HYDRAULIC EQUIPMENT AIR / WATER 47 to 78 kw CHGV CHGV 64 CHGV 72 CHGV 80 PHRV heat pump model also available May 2006 10 12 167 - GB - 00 MARKING

More information

Qualification Test Report. AMP-TWIST Series Jacks for Class EA systems

Qualification Test Report. AMP-TWIST Series Jacks for Class EA systems Qualification Test Report 501-93032 14/April/2011 Rev A AMP-TWIST Series Jacks for Class EA systems 1. INTRODUCTION 1.1 Purpose Qualification testing on AMP-TWIST* Series Jacks for Class E A Systems, to

More information

15203B 25203B 35203B Uniaxial Biaxia Triaxial

15203B 25203B 35203B Uniaxial Biaxia Triaxial Uniaxial Biaxia Triaxial SPECIFICATIONS Digital Accelerometers User Configurable ±1 g to ±15 g Inertial Measurements Made Fast and Easy FEATURES AND BENEFITS User Configurable Settings The analog/digital

More information

Stability Chambers & Rooms

Stability Chambers & Rooms www.cszindustrial.com Stability Chambers & Rooms Stability Chambers CSZ Stability chambers & rooms provide a stable, temperature and/or humidity-conditioned environment for worry-free operation with a

More information

MD-MINI Dry Bath. Instruction Manual

MD-MINI Dry Bath. Instruction Manual MD-MINI Dry Bath Instruction Manual Catalog No. MD-MINI www.majorsci.com service@majorsci.com Version 01B Revision on: 2013.07.15 Packing list MD-MINI: 1x MD-MINI Dry Bath 1x MD-MINI Lid 1x Power Cord

More information

Test Report. Appliance EMF Testing

Test Report. Appliance EMF Testing Project: 11014506A Date: November 6, 2015 Model: 120V_WWF13NW Test Report On Appliance EMF Testing Copyright 2005 UL LLC UL LLC authorizes the above-named company to reproduce this Report provided it is

More information

Test Report. Shenzhen Longsin Intelligence Technology Co.Ltd.

Test Report. Shenzhen Longsin Intelligence Technology Co.Ltd. Test Report repared For : Shenzhen Longsin Intelligence Technology Co.Ltd. 4 th floor,building 2,Kaijeda Industrial Area,Huachang Road, Longhua Town,Baoan,Shenzhen. Trade Mark: Longsin roduct Name: Model

More information

NATIONAL TECHNICAL SYSTEMS

NATIONAL TECHNICAL SYSTEMS Test Report Number PR034844.CRW Testing of Test Samples PREPARED FOR: PREPARED BY: Crownduit 214 William Street Red Bank, NJ 07701 National Technical Systems 36 Gilbert Street South Tinton Falls, NJ 07701

More information

Benchtop & Compact Test Chambers

Benchtop & Compact Test Chambers MicroClimate Benchtop & Compact Test Chambers www.cszproducts.com MicroClimate Chambers These chambers are designed to provide users with a compact chamber for testing small components and products for

More information

halt & hass systems

halt & hass systems halt & hass systems www.cszindustrial.com TIME COMPRESSOR HALT & HASS CHAMBERS Quickly Discover Design Weaknesses CSZ HALT/HASS chambers provide extreme temperature change rates and multi-axis vibration

More information

USER MANUAL. Version: 1.0. ROBE Show Lighting s.r.o. Czech Republic

USER MANUAL. Version: 1.0. ROBE Show Lighting s.r.o. Czech Republic USER MANUAL Version: 1.0 ROBE Show Lighting s.r.o. Czech Republic www.robe.cz Table of contents 1.Introduction 4 2.Cautions 4 3. Unpacking & Inspection 5 4. Setup 5 5. Operation 5 5.1.Control Module Operation

More information

DIGITAL CENTRALIZED Section NANOMASKIT

DIGITAL CENTRALIZED Section NANOMASKIT Page 1 of 8 1 GENERAL 1.1 RELATED SECTIONS 1.2 REFERENCES.1 Section 16010 Electrical General Requirements.2 Section 16120 Wire and Cable.3 Section 16993 Electrical Starting and Testing General Requirements

More information

Datasheet: K-22 LO Sensor

Datasheet: K-22 LO Sensor Datasheet: K-22 LO Sensor The K- 22 LO is a CO2 sensor module designed to be built- in into stationary ventilation equipment, such as window vent or duct exhaust actuators, serving as a linear transmitter

More information

MMT. Moisture Management Tester

MMT. Moisture Management Tester MMT Moisture Management Tester An Innovative Instrument for Innovative Fabrics While performance fabrics require the typical standard tests of other fabrics, they also require an extra level of specialized

More information

OCTOBER 4, 2013 C.O.C #213041B VITA 46 VPX CONNECTORS QUALIFICATION TESTING HYPERTRONICS CORPORATION

OCTOBER 4, 2013 C.O.C #213041B VITA 46 VPX CONNECTORS QUALIFICATION TESTING HYPERTRONICS CORPORATION OCTOBER 4, 2013 C.O.C #213041B VITA 46 VPX CONNECTORS QUALIFICATION TESTING HYPERTRONICS CORPORATION APPROVED BY: THOMAS PEEL PRESIDENT AND DIRECTOR OF TEST PROGRAM DEVELOPMENT CONTECH RESEARCH, INC. ATTLEBORO,

More information

Application for FCC Certificate On Behalf of. TTE Technology, Inc. LCD TV or LED TV. Model Number: 32R20 FCC ID:W8U32R20

Application for FCC Certificate On Behalf of. TTE Technology, Inc. LCD TV or LED TV. Model Number: 32R20 FCC ID:W8U32R20 Application for FCC Certificate On Behalf of TTE Technology, Inc. LCD TV or LED TV Model Number: 32R20 FCC ID:W8U32R20 Prepared for : TTE Technology, Inc. Address : 2455 Anselmo Drive Suite 101 Corona

More information

MODEL 4000A & 4001A ACCELEROMETER

MODEL 4000A & 4001A ACCELEROMETER MODEL 4000A & 4001A ACCELEROMETER dimensions 4001A Connector Attachment SPECIFICATIONS Silicone MEMS Accelerometer Signal Conditioned Output Temperature Calibrated Low Cost, Lightweight The Model 4000A

More information

HMN-D2 Insert Series

HMN-D2 Insert Series HMN-D2 Insert Series Table of contents 1. SCOPE... 2 1.1. Content... 2 1.2. Qualification... 2 2. APPLICABLE DOCUMENTS... 2 2.1. TE Connectivity Documents... 2 2.2. Other Documents... 2 3. REQUIREMENTS...

More information

User s Manual. YTA110, YTA310, YTA320, and YTA710 Temperature Transmitters. Manual Change No

User s Manual. YTA110, YTA310, YTA320, and YTA710 Temperature Transmitters. Manual Change No User s Manual YTA110, YTA310, YTA320, and YTA710 Temperature Transmitters Manual Change No. 16-045 Please use this manual change for the manuals listed below. 1. Applicable manuals, revised item, revised

More information

Proservo NMS5- / NMS7-

Proservo NMS5- / NMS7- Functional Safety Manual Proservo NMS5- / NMS7- Tank gauge for Liquid level measurement with 4 to 20mA Output or with Alarm Relay Contact Output Application Operating minimum (e.g. dry run protection),

More information

Laser Particle Sensor Module PM2009

Laser Particle Sensor Module PM2009 Laser Particle Sensor Module PM2009 Application Air purifier, air quality monitor Ventilation system, air conditioner with purifying function Auxiliary product of consumer electronic products Environmental

More information

Test report no.: Plug and key - Damp heat test

Test report no.: Plug and key - Damp heat test r Yebotech 14405.docx Test report no.: 14405 Plug and key - Damp heat test EDITION 1 PAGE 1 OF 4 Tel: +27 (0)12 371 2000 Fax: +27 (0)12 371 2001 www.gerotek.co.za WF Nkomo Street Pretoria West P O Box

More information

Jun08 Rev C

Jun08 Rev C Product Specification Connector, Card Edge,.050 Centerline 108-14034 02Jun08 Rev C 1. SCOPE 1.1. Content This specification covers performance, tests and quality requirements for Tyco Electronics.050 centerline

More information

OPERATION MANUAL MODEL 4610 ACCELEROMETER

OPERATION MANUAL MODEL 4610 ACCELEROMETER OPERATION MANUAL MODEL 4610 ACCELEROMETER TE CONNECTIVITY SENSORS///MODEL 4610 ACCELEROMETER 05/2016 Page 1 WARRANTY Measurement Specialties, Inc. accelerometers are warranted during a period of one year

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 CENTRE TESTING INTERNATIONAL GROUP CO., LTD. 1 Building C, Hongwei Industrial Park Block 70, Bao'an District Shenzhen, Guangdong, People s Republic of China

More information

Operating Manual MS220DA

Operating Manual MS220DA ZIEHL industrie elektronik GmbH + Co KG Daimlerstraße 13, D 74523 Schwäbisch Hall + 49 791 504-0, info@ziehl.de, www.ziehl.de Temperature Relays and MINIKA Mains Monitoring Digital Panel Meters MINIPAN

More information

Fog 1550 FT USER MANUAL. Version: 1.2. ROBE Lighting s.r.o. Czech Republic

Fog 1550 FT USER MANUAL. Version: 1.2. ROBE Lighting s.r.o. Czech Republic Fog 1550 FT USER MANUAL Version: 1.2 ROBE Lighting s.r.o. Czech Republic www.robe.cz Fog 1550 FT Table of contents 1. Introduction 4 2. Cautions 4 3. Unpacking & Inspection 5 4. Setup 5 5. Operation 5

More information

www.cszindustrial.com MicroClimate Chambers Precise Temperature / Humidity Simulation in a Compact Chamber MicroClimate chambers simulate a full range of temperature and/or humidity conditions. These chambers

More information

Industrial Freezers &

Industrial Freezers & Industrial Freezers & Production Chilling Chambers www.cszindustrial.com Freezers & Chilling Chambers Built to Last for Decades Cincinnati Sub-Zero s Chilling Chambers are premier, ultralow temperature

More information

PQS Independent type-testing protocol

PQS Independent type-testing protocol PQS Independent type-testing protocol WHO/XXX Original: English Distribution: General TITLE: Wall-mounted pen recording thermometer Product verification protocol: E06/TR04VP Applies to specification ref(s):

More information

EST User Manual. (Please read this manual carefully before using)

EST User Manual. (Please read this manual carefully before using) EST-1000 Handheld Intelligent Toxic Gas Detector User Manual (Please read this manual carefully before using) ENVIRONMENTAL SENSOR TECHNOLOGY CO.INC. Contents I. Product Overview...1 II. Product Description...1

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Langer Road Contact: Mr I Frost Felixstowe Tel: +44 (0)1394 694000 Suffolk Fax: +44 (0)1394 276030 IP11 2ER E-Mail: ian.frost@itron.com Website:

More information

Contact person RISE Date Reference Page. Daniel Månsson P (13) Energy and circular economy

Contact person RISE Date Reference Page. Daniel Månsson P (13) Energy and circular economy Contact person RISE Daniel Månsson 2017-09-26 7P03172 1 (13) Energy and circular economy +46 10 516 53 28 daniel.mansson@ri.se Evinox Energy Ltd. Unit 37, Barwell Business Park Leatherhead Road, Chessington

More information

ITU-T L.404. Field mountable single-mode optical fibre connectors

ITU-T L.404. Field mountable single-mode optical fibre connectors I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T L.404 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (08/2017) SERIES L: ENVIRONMENT AND ICTS, CLIMATE CHANGE, E-WASTE, ENERGY

More information