BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E

Size: px
Start display at page:

Download "BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E"

Transcription

1 A PUMP HOUSE: BOQ FOR FIRE HYDRANT & FIRE ALARM SYSTEM AT T.I.E Supply, erection,testing & commissioning of Single stage, end suction / back pull-out type motor driven Jockey Pump of capacity 10.8 m³/hr, head 80 m, speed 2900 r.pm. with Mechanical Seal, C.I. Body, Bronze impeller, C 40 Shaft, Flexible Coupling & M.S. frame on concrete base / anti vibration pads - as necessary for fixing the pumps as per site conditions and approval of the Consultant. Supply, erection, testing & commissioning of Single stage, end suction / horizontal split casing / back pull-out type Motor driven Main Fire Pump of capacity 1 m³/hr, (2250 LPM), head 80 m, speed 2900 r.pm. with Mec. Seal, C.I. Body, Bronze impeller, C 40 Shaft, Flexible Coupling & M.S. frame on concrete base / anti vibration pads - as necessary for fixing the pumps as per site conditions and approval of the Consultant. Providing and fixing standby single stage horizontal centrifugal Engine driven pump set of capacity 1 m³/hr, (2850 LPM), head 80 m, speed 1800 r.pm. with Mech. Seal, CI body, bronze impeller, stainless steel shaft. The Engine would be radiator cooled. The pump shall be automatic starting along with 2 s 24 V Batteries, battery charger, panel, including MS base plate and mountings. The diesel driven pump shall be complete with diesel tank with level indicator,with panel. Supply, erection, testing & commissioning of moblock booster pump of capacity 54 m³/ hr (900 LPM), head 40 m (to get a pressure of.5 kg / cm² at the top most hydrant Point) with Bronze Impeller, C.I.Body, M.S. frame and anti vibration pads as necessary for fixing the pumps, with necessary wiring, as per site conditions and approval of the Consultant. 1 set

2 5 6 Supply, Installation, Testing & Commissioning of dust and vermin proof cubicle type Motor Control Centre (Panel), fabricated from 14 SWG MS sheet with powder coated finish and comprising of following : Incomer Main 250 Amp TPN SFU with HRC fuses. One Fully taped 400 Amp TPN aluminium busbar in seperate chamber. One 150 mm square panel type Volt meter with selector switch. One 150 mm square panel type Ammeter with C/T & selector switch. Phase indicating lamps. Outgoing : Three 250 Amp TPN SFU with HRC fuses. One 6 Amp TPN SFU with HRC fuses. Three fully automatic star delta Starter with push Button & On / Off / Trip indicating lamps for hydrant & terrace Pumps. Two fully automatic D.O.L Starter with push button & On/Off/Trip indicating lamps for terrace pumps. Five rotary type Auto / Manual /on /off selector switches. colour coded internal wiring with ferrule. Supply, installation, testing & commisioning of double flanged Isolation Sluice valves conforming to IS 14846, PN 1.6 with CI body, bonnet & brass trim parts, & having necessary companion flanges, bolts, nuts, gasket packing, support and any other spares, including indicator for open and shut position a 150 mm minal bore (NB) 2 Nos b 80 NB 2 Nos c 50 NB 2 Nos Providing and fixing MS B' class pipes conforming to IS 129 / IS : 589, part 1, with screwed on flanges / couplings with specials as necessary clamped to wall, beams ceilings as required and head anchor fastners, testing to 1.5 times working pressure, hydraulic pressure after installation and applying two coats of approved enamel paint shade as directed over a coat of primer in the following sizes: a 200 NB 6 Mtrs b 150 NB 6 Mtrs c 80 NB 12 Mtrs d 50 NB 12 Mtrs 8 Supply, installation, testing & commisioning of C.I. Non return valves, conforming to IS: 512/ Part 1, PN 1.6 with CI body, body seat ring of G.M. Neoprene Rubber seated Door for 100% leak proof. Flange drill as per IS: 158, Table-6 & having necessary companion flanges, bolts, nuts, gasket packing, support, etc. a 100 NB 2 Nos

3 b 50 NB 2 Nos Supply, Installing, Testing & Commisioning of C.I Foot Valve 9 as per IS:408, Lift type, body seat ring of G.M. and Neoprene rubber seated Disc for 100% leak proof with required flanges, nuts, bolts and gaskets etc. complete. a 150 NB 2 Nos b 80NB s Supply, Installation, Testing & Commissioning of Bourdon 10 type, Stainless Steel dial type pressure gauge including GM Isolation valve and pipe having calibration of 0-16 Kg/cm2, with accessories like Syphon tube etc. a Size 4" 4 Nos b Size 6" Supply, Installation, Testing & Commissioning of Differential type Pressure Switch suitable for operating with fire hydrant systems for working pressure of 14.0 Kg/cm2 including electrical control wiring with suitable copper conductor PVC insulated and sheathed control cable upto control panel, connections etc. complete as required. Supply, Installation, testing & commissioning of air-cushion tank (Air Vessel) 250 mmø. & 1200 mm high with dished top, made of 8 mm thick M.S. sheet and 10 mm thick dished ends with 25mm dia. brass air release valve, Pressure Gauge, Inlet Valve, Drain Valve etc. Supply, installation, testing & commissioning of Priming Tank with Capacity 500 L with inlet line and fittings Supply, Installation, Testing & Commissioning of heavy duty PVC insulated, PVC armoured aluminium conductor cables 1100 V grade, to be laid undergroung / above ground, including excavasion & back filling of excavated earth, including necessary support clamps and connection lugs, 4 Nos 1 Lot complete in all respect. a Power cable.5 core x 0 mm² 0 Mtrs b Power cable 4C x 16 mm² 110 Mtrs c Control cable copper armoured, 2C x 2.5 mm² 120 Mtrs Supply, Installation, Testing & Commissioning of Gl Earthing for all electrical equipments as per IE Rules inside Fire Water Pump House complete in all respect. Supply, installation, testing & commissioning of PVC Tank with Capacity litres. 1 Lot 1 Lot B YARD PIPING & WET RISER:

4 1 2 Supplying, Laying, Testing and Commissioning of following size (NB) ISI marked 'C' (heavy) class M.S. pipes conforming IS: 129, including cutting, screwing, welding etc. and providing all fittings such as elbows, reducers, flanges, gaskets, nuts, bolts and washers etc. including applying with one coat of readymix primer, wraping the pipe with 4 mm thick wraping tape, laying the pipe so that the top of the pipe is at a depth of one meter below ground level including excavating trenches and then refilling the soil in layers t exceeding 20 cms. in depth, consolidating each deposited layer by ramming, watering etc. complete as required. 150 N.B 24 Mtrs Supplying, Laying, Testing and Commissioning of ISI marked MS B' class pipes conforming to IS 129, part 1 with screwed on flanges / couplings with specials as necessary clamped to wall, beams ceilings as required and head anchor fastners, testing to 1.5 times working pressure hydraulic pressure after installation and applying two coats of approved enamel paint shade as directed over a coat of primer in the following sizes including cutting holes in brick or RCC walls / slabs, mending good damages: a 150 N.B 90 Mtrs b 80 N.B 24 Mtrs Supply, installation, testing and commisioning of double 4 flanged Isolation Sluice valves conforming to IS 14846, PN 1.6 with CI body, bonnet & brass trim parts, & having necessary companion flanges, bolts, nuts, gasket packing, support and any other spares, including indicator for open and shut position 150 NB 4 Nos Supply, Installation, Testing & Commissioning of Single headed GM/SS oblique type Hydrant / Landing Valve with 6 mm outlet GM instantaneous female coupling with rubber / Plastic cap and chain conforming to IS ; 5290 inclining matching flange, gasket, nuts and bolts complete. a Outdoor application 6 Nos b Indoor application 15 Nos

5 5 6 8 Supply, Installation, Testing of 6 mm dia rubberized reinforced rubber line hose pipe conforming to IS : 66 Type A, ISI marked with Gunmetal /SS male and female instantaneous coupling conforming to IS 90 bounded with 18 SWG copper revett & wire complete 15 m 42 Lgth Supply, Installation,Testing of GM/SS Branch pipe with 20 mm zzle conforming to IS: 90 complete. 2s Supply, Instillation, Testing & Commissioning of swinging type hose reel drum fabricated from 14 SWG CRCA sheets painted with red color stove paint 2 coats over 1 coat of primer with 0 m long 20 mm dia rubber hose pipe with 10kg / cm² working pressure with GM/SS shut-off zzle of 5 mm outlet fixed on wall with dash fasteners Providing and fixing fire hose cabinet of size 50x600x250 fabricated from 16 gauge MS sheet of fully welded construction with hinged double front door with locking 15 Sets arrangements and partially glazed with 5mm thick glass. a Outdoor 6 Nos b Indoor 15 Nos Revisioning of 4-way GM / SS Fire Brigade Inlet Connection 9 consisting of 6mm dia instantaneous type male coupling with built-in Check Valve and 150mm dia flanged outlet & mm dia CI double flanged Sluice Valve. Supply, Installation, Testing & Commissioning of GM/SS Fire Brigade Draw-out Connection consisting of 6mm dia instantaneous type male coupling without built-in Check 10 Valve and 150mm dia flanged outlet complete with mm dia CI Foot Valve including required piping, bolts, nuts & rubber insertions as required as per IS: 904 and complete in all respect. Supply & Installation of standard Fire Man's axe with heavy 11 insulated rubber handle conforming to IS: 926. The insulated handle shall be capable of withstanding 20,000 volts for 60 seconds. Supply,Installation,Testing & commissionig of S.S. Orifice 12 plate (6 mm thick) Supply,Installation,Testing & commissionig of Structural 1 support C SPRINKLER SYSTEM: Nos 500 Kgs

6 1 Providing and fixing MS B' class pipes conforming to IS 129 / IS : 589, part 1, with screwed on flanges / couplings with specials as necessary clamped to wall, beams ceilings as required and head anchor fastners, testing to 1.5 times working pressure, hydraulic pressure after installation and applying two coats of approved enamel paint shade as directed over a coat of primer in the following sizes: a 100 NB 6 Mtrs b 80 NB 12 Mtrs 2 Supply, installation, testing and commisioning of double flanged Isolation Sluice valves conforming to IS 14846, PN 1.6 with CI body, bonnet & brass trim parts, & having necessary companion flanges, bolts, nuts, gasket packing, support and any other spares, including indicator for open and shut position 100 NB Supplying, fixing, testing and commissioning of G.M. Globe / Stop valve ISI marked screws type tested as per IS: 8 of size: 25 NB Supplying, fixing, testing and commissioning of Butterfly valve PN 1.6, with Bronze/Gunmetal seat duly ISI marked complete with Nuts, Bolts, washers, gaskets, conforming to IS 1095 of size: 50 NB. Providing, fixing, testing and commissioning pendent / upright of 15mm dia quartzoid bulb type sprinkler set to operate at 68 C (UL/FM/FOC/TAC approved). Supply, installation and testing of installation control valve with turbine type automatic alarm gong with quarter mile hooter, also with control valve drain and test drive as per manufacturer's speicifcations. (Size 100mm dia). 1 Nos Supply, Installation,Testing & Commission of Support for sprinklers D FIRE ALARM SYSTEM Supply, Installation,Testing & Commissioning of:- Analog addressable low profile type photo electric 1 detector with mounting based LED, Address switch, complete as required. Analog addressable Multi-criteria detector with 2 mounting based LED address switch, complete as required 16 Nos 64 Nos 2 Nos

7 Analog addressable fixed temperature heat detcctor with mounting based LED, address switch, complete as 0 Nos required 4 Fault Isolator 8 Nos 5 Strobe Light for better evacuation in Fire condition 8 Nos 6 Addressable control module 4 Nos Conventional Electronic Hooter cum speaker for fire alarm / evacuation signal including base. 10 Nos 8 Break glass type manual call point with necessary supports, chipping, chaising, civil work, concealed work of cabling/conduit, cable termination, gland, hammer 12 Nos with chain 9 Response Indicators 2 Nos 10 Microprocessor based analog -addressable type fire alarm panel with 2 s. loop card. auto detector test, programmable switches, for modification in programme. automatic alarm drift level compensation. 240 volts AC power supply,the panel shall have a built in power supply and battery charger along with maintenance free 24 AH, 2 x 12 volt SMF Lead acid batteries capable of running for a minimum of 24 hours with battery charger complete as required.and as per specifications. conforming to BS589 Standards and Duly Approved by EN54/LPCB/VDS 2 Nos 11 Rigid PVC Conduit ( 20 mm) 200 Mtrs 12 2 run of 1 core flexible wire 1.5 mm2 copper conductor FRLS type. 200 Mtrs 1 For Public Address System, PA Console With 100 W amplifire & Talkback system with five s duplex type speaker de with all accessories. TOTAL (A+B+C+D) (Rs)

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Signature of Bidder 1 of 11 EPI

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) Signature of Bidder 1 of 11 EPI FIRE PROTECTION 1 G.I.PIPES Supplying, installing, testing and commissioning of G.I Pipes confirming to IS 3589 Pt - I Heavy grade with painting, suitable type of supports, anchor fasteners, bolts nuts

More information

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM

PRICE BID. UNIT QTY Rate in Figure Rate in words Amount DESCRIPTION OF ITEM D: FIRE PROTECTION SYSTEM ANNEXUREIII D: FIRE PROTECTION SYSTEM SECTION ADDRESSABLE FIRE DETECTION AND ALARM SYSTEM Supply, Installation, testing and commissioning of Analogue Addressable Fire Alarm Control panel with battery backup

More information

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) PRICED BILL OF QUANTITIES

ENGINEERING PROJECTS (INDIA) LTD. (A Govt. of India Enterprise) PRICED BILL OF QUANTITIES NAME OF PROJECT : CONSTRUCTION OF SUPER SPECIALITY HOSPITAL FOR GOVT. RAJAJI MEDICAL COLLEGE, MADURAI, TAMIL NADU - FIRE PROTECTION & FIRE ALARM SYSTEM. NIT NO. SRO/MKT/TH/290 dated 03.07.2014 Item no.

More information

CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE, PREET VIHAR, DELHI

CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE, PREET VIHAR, DELHI CENTRAL BOARD OF SECONDARY EDUCATION SHIKSHA KENDRA, 2, COMMUNITY CENTRE, PREET VIHAR, DELHI 110092 NOTICE INVITING TENDER CBSE invites sealed Item rate tender from eligible contractors who are registered

More information

SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF SPRINKLER SYSTEM AND FIRE ALARM SYSTEM FOR AIR INDIA LIMITED AT SHAMSHABAD, HYDERABAD.

SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF SPRINKLER SYSTEM AND FIRE ALARM SYSTEM FOR AIR INDIA LIMITED AT SHAMSHABAD, HYDERABAD. i 1 a SPRINKLER SYSTEM M S Pipes confirming to IS 1239 Pt - I Heavy grade with painting, suitable type of supports malleable srewed specials such as M S Reducers,Tees, elbows, flanges. Including cutting,

More information

Following are the systems proposed as per NBC & Local Fire Authority:

Following are the systems proposed as per NBC & Local Fire Authority: 1. OBJECTIVES AND STRATEGIES OF THE FIRE PROTECTION DESIGN This report describes the design parameters, system requirements of fire protection system for mixed occupancy (Assembly + Business) building

More information

1 NOS. 25mm x 4 mm thick with PVC sleeving e) 1Set, RYB, indicating lamps & CT

1 NOS. 25mm x 4 mm thick with PVC sleeving e) 1Set, RYB, indicating lamps & CT A MAIN PANEL/DB 1 Supply and Installation of main LT panel, floor mounted, front operated dead back, totally enclosed vermin proof, indoor, non drawout, cubicle type power dist. panel fabricated out of

More information

TENDER NOTICE. Kolhapur Zilla Sahakari Dudh Utpadak Sangh Ltd. B-1, M.I.D.C., Gokul Shirgaon, Tal. Karveer, Dist. Kolhapur

TENDER NOTICE. Kolhapur Zilla Sahakari Dudh Utpadak Sangh Ltd. B-1, M.I.D.C., Gokul Shirgaon, Tal. Karveer, Dist. Kolhapur TENDER NOTICE Sealed Tender offers are invited for supply, installation & commissioning of Fire Hydrant System at our Gokul Dairy Project Complex at Gokul Shirgaon Kolhapur. Only contractors having valid

More information

TR CASSETTE AC 1 NOS TR CASSETTE AC 1 NOS. Rate in words : TR HIGH WALL (3 star rated) 2 NOS.

TR CASSETTE AC 1 NOS TR CASSETTE AC 1 NOS. Rate in words : TR HIGH WALL (3 star rated) 2 NOS. BILL OF QUANTITIES FOR AIR CONDITIONING WORKS S.N. DESCRIPTION QTY UNIT VENTILATION & AIR CONDITIONING A HIGH SIDE WORKS (SUPPLY OF EQUIPMENTS) 1 DX TYPE SPLIT AIR-CONDITIONERS: Supply of Aircooled Split

More information

Technical write-up on Fire safety services

Technical write-up on Fire safety services 1. General: Technical write-up on Fire safety services Nitesh Santa Clara, proposed development is a residential apartment with multiple blocks. Document briefs on fire safety systems envisaged for the

More information

Enclosure 4- RISK ASSESSMENT

Enclosure 4- RISK ASSESSMENT Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

SECTION SPRINKLER SYSTEMS

SECTION SPRINKLER SYSTEMS SECTION 15325 SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Wet-pipe sprinkler systems. B. Preaction sprinkler systems. C. System design, installation, and certification. D. Fire department

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

Fill Point, Level Gauges, and Control Range

Fill Point, Level Gauges, and Control Range Fill Point, Level Gauges, and Control Range Page 1 Contents Fill Points, Level Gauges, and Control Equipment... 3 Fill Point Cabinets... 4 Single Tank Cabinet... 5 Twin Tank Cabinet... 6 Three Tank Cabinet...

More information

GAS FLOODING SYSTEM FOR CIFF AT BASEMENT

GAS FLOODING SYSTEM FOR CIFF AT BASEMENT CONSTRUCTION OF BUILDINGS FOR LABORATORIES AND ASSOCIATED FACILITIES INSTEM BANGALORE SCHEDULE OF QUANTITIES FOR (EQUIPMENT ROOM 3 & 4) Sl.No. Description Unit Quantity Rate (in INR) in figure HFC-227ea

More information

ECONOBOOST EB II & EB III Compact Water Booster

ECONOBOOST EB II & EB III Compact Water Booster ECONOBOOST EB II & EB III Compact Water Booster The Stokvis EB II twin pump & EB III triple pump cold water booster units meet today s need for compact, reliable, high performance equipment with modest

More information

Parts and Service Manual

Parts and Service Manual Section II Parts and Service Manual (70241A) CLARKE TECHNOLOGY Operator's Manual - MINI MAX Page -29- Frame and Front Cover Assembly Drawing 2/01 Page -30- CLARKE TECHNOLOGY Operator's Manual -MINI MAX

More information

Pressurisation units & expansion vessels

Pressurisation units & expansion vessels Pressurisation units & expansion vessels Pressurisation units The new generation of microprocessor controlled pressurisation units Standard Unit/Advanced Unit These microprocessor controlled pressurisation

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD.

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A Wholly Owned Subsidiary of SBI) CIRCLE OFFICE: 4TH FLOOR, SBI LOCAL HEAD OFFICE III/1-PANDIT J N MARG, KHARAVELA NAGAR BHUBANESWAR, ODISHA-751001 Part-II PRICE

More information

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where

More information

INSTALLATION INSTRUCTIONS John Deere One Series; 1023E, 1025R and 1026R Models A HEATER KIT. Figure 1 (General Layout and Parts I.D.

INSTALLATION INSTRUCTIONS John Deere One Series; 1023E, 1025R and 1026R Models A HEATER KIT. Figure 1 (General Layout and Parts I.D. A-11978 HEATER KIT Figure 1 (General Layout and Parts I.D.) Read these instructions and identify all components. Please retain these instructions for future reference and parts ordering information. Refer

More information

EE/ / To, Dear Sir,

EE/ / To, Dear Sir, EE/2016-17/ 03.04.2017 To, Dear Sir, Wax sealed/tamper proof quotations are invited on percentage rate basis from specialised contractors for the following work on behalf of Director, NITIE, Mumbai 87.

More information

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI Hydraulic Institute Standards. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8 City of Ottawa Project No. CR006230 Page 1 of 8 PART 1 - GENERAL 1.1 Reference Standards.1 Conform to the following:.1 Provincial and municipal building and fire regulations as approved by Provincial Fire

More information

TECHNICAL. Series 18. Pump Packages

TECHNICAL. Series 18. Pump Packages TECHNICAL S Y S T E M S Series 18 Pump Packages Series 18 Pump Packages Standard Features Close-coupled, end-suction, centrifugal pumps Mounted and wired pump starters Hand-Off-Auto switch for each pump

More information

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section PART 1 - GENERAL 1.00 GENERAL PROVISIONS A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section 1.01 DESCRIPTION OF WORK A. Work Included: Provide

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps. Issued 2006/08/01 Section 13920 Packaged Fire Pumps and Controllers Page 1 of 7 PART 1 GENERAL 1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1

More information

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 Building Services Piping. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

CT CABINET AND UTILITY METERING WELL AND BOOSTER PUMP CONTROL 12"x12" WIREWAY 200A MCB 200A, 120/208V, 3Ø, 4W BOARD TVSS CIA ALARM 400A, DOUBLE-THROW SWITCH PORTABLE GENERATOR CONNECTION ENCLOSURE EXISTING

More information

Design and Supply of Fire Equipments. External Fire Fighting Systems.

Design and Supply of Fire Equipments. External Fire Fighting Systems. Design and Supply of Fire Equipments External Fire Fighting Systems INTRODUCTION Sheyas fire Services is one of the progressive firms in the field of Fire Fighting Equipment s and Consulting Services,

More information

CMA Dishmachines Knott Avenue Garden Grove, CA Undercounter High Temperature Dishwasher. Service Replacement Parts.

CMA Dishmachines Knott Avenue Garden Grove, CA Undercounter High Temperature Dishwasher. Service Replacement Parts. CMA Dishmachines 1700 Knott Avenue Garden Grove, CA 981 Toll Free: 1- (800) 8-617 Fax: 1- (71) 89-11 Service Replacement Parts Undercounter High Temperature Dishwasher Model: UC6e M Machine Serial No.

More information

Annexure - 1. Detectors: Fire Alarm Control Panel :

Annexure - 1. Detectors: Fire Alarm Control Panel : Item 1. Supply Part This Specification includes Supply, Warranty, Installation, Testing and Commissioning and integration of the Fire Alarm System mainly consisting of the Fire Alarm Control Panel (FACP),

More information

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE SECTION 21 1313 WET-PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Wet-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.02 RELATED

More information

ADDENDUM NO. 3 March 19, 2018

ADDENDUM NO. 3 March 19, 2018 ADDENDUM NO. 3 March 19, 2018 PROJECT: MT. VIEW ELEMENTARY CASSIA SCHOOL DISTRICT NO 151 BURLEY, IDAHO The following addenda apply to the Project Manual and / or Drawings for this project and shall be

More information

SPRINKLERS TABLE OF CONTENTS

SPRINKLERS TABLE OF CONTENTS SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

SAM TURBO INDUSTRY LIMITED

SAM TURBO INDUSTRY LIMITED INSTRUCTIONS ON INSTALLATION, OPERATION AND MAINTENANACE FOR SAM TURBO PUMP TYPE MD SAM TURBO INDUSTRY LIMITED NEELAMBUR, COIMBATORE-641 014. INDIA PH: 0422-3058899(50 LINES), FAX: 3058000, E-MAIL: mktg@sampumps.com,

More information

Product Support Bulletin

Product Support Bulletin MODEL: SUBJECT: CONVENTIONAL, W/ C7 CAT ENGINE WEBASTO TSL-17 HEATER Body DATE: APRIL 13, 2004 INDEX: 6 PAGE: 1 OF 16 Before you start this procedure, perform Freightliner Service Bulletin #20-7 first.

More information

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for

More information

TENDER No /NIT NO. BECIL/FF/2014/55 RECTIFICATION / MODIFICATION OF EXISTING FIRE FIGHTING & FIRE ALARM SYSTEM WORKS

TENDER No /NIT NO. BECIL/FF/2014/55 RECTIFICATION / MODIFICATION OF EXISTING FIRE FIGHTING & FIRE ALARM SYSTEM WORKS TENDER No /NIT NO. BECIL/FF/2014/55 TENDER DOCUMENTS FOR RECTIFICATION / MODIFICATION OF EXISTING FIRE FIGHTING & FIRE ALARM SYSTEM WORKS AT M/S BROADCAST ENGINEERING CONSULTANTS INDIA LTD (A GOVERNMENT

More information

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes: Naturally

More information

TENDER DOCUMENT FOR CHECKING, TESTING AND REPAIRING OF FIRE HYDRANT AND SPRINKLER SYSTEM AT Bank Of India, STC Building, B-32, Sector-62 Noida

TENDER DOCUMENT FOR CHECKING, TESTING AND REPAIRING OF FIRE HYDRANT AND SPRINKLER SYSTEM AT Bank Of India, STC Building, B-32, Sector-62 Noida TENDER DOCUMENT FOR CHECKING, TESTING AND REPAIRING OF FIRE HYDRANT AND SPRINKLER SYSTEM AT Bank Of India, STC Building, B-32, Sector-62 Noida-201309 Website: www.bankofindia.co.in INVITATION FOR TENDER/BID

More information

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016 SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.

More information

VOLUME 2 (BOQ & Price Bid)

VOLUME 2 (BOQ & Price Bid) TENDER DOCUMENT NIT No: PAT/CON/721/01 FOR Tender for Supply, Erection & Commissioning of Refrigeration Plant for chilled water system for Ice-Cream mix section complete for 20 KLPD Ice Cream Plant at

More information

SCHEDULE OF QUANTIY S.N. DESCRIPTION QTY UNIT RATE TOTAL

SCHEDULE OF QUANTIY S.N. DESCRIPTION QTY UNIT RATE TOTAL SCHEDULE OF QUANTIY S.N. DESCRIPTION QTY UNIT RATE TOTAL SECTION - A ( PANELS & D.B's) 1 Supply, Installation, Testing & Commissioning of 125 Amps TPN SFU with 100 Amps HRC fuses in the Meter room. QRO

More information

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

INDIAN INSTITUTE OF TECHNOLOGY KANPUR INDIAN INSTITUTE OF TECHNOLOGY KANPUR Tender tice. 119/IWD/ED/644 SCHEDULE OF QUANTITY Name of work: Electrical work for: Part-A: Rewinding, overhauling and repairing of ceiling fan and exhaust fan installed

More information

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module FIRE ALARM CONTROL EQUIPMENT Addendum October 2006 Instructions for new style EN54-4 Power supply unit module MXLK-05 Issue 2.0 June 2007 INSTALLATION Safety Suppliers of articles for use at work are required

More information

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression

More information

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL DISASTER MANAGEMENT PLAN 1.0 DISASTER (EMERGENCY) A disaster or an emergency, occurring in a project is one, as a result of a malfunctioning of the normal operating procedures or an intervention of an

More information

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings. SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.

More information

Wallis & Stevens 7C. hand operated sprayer for cold bitumen emulsion. Contact: Sales at BX Plant on or

Wallis & Stevens 7C. hand operated sprayer for cold bitumen emulsion. Contact: Sales at BX Plant on or WALLIS Wallis & Stevens 7C hand operated sprayer for cold bitumen emulsion Contact: Sales at BX Plant on 0243 78970 or email: rhodge@bxplant.com Operation Instruction and Spares Parts List for Wallis &

More information

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES DIVISION 21 FIRE SUPPRESSION PART 1 GENERAL 1.01 DESCRIPTION A. Provide UL listed, FM approved listed fire protection specialties or accessories as required by either the equipment manufacturer or the

More information

A HEATER KIT With Diesel Engine Connection Fittings

A HEATER KIT With Diesel Engine Connection Fittings A-12142 HEATER KIT With Diesel Engine Connection Fittings Figure 1 (General Layout and Parts I.D.) Page 1 of 6 Read these instructions and identify all components. Please retain these instructions for

More information

MODEL 6430T, 6460 & 6460T POTATO PEELER

MODEL 6430T, 6460 & 6460T POTATO PEELER MODEL 6430T, 6460 & 6460T POTATO PEELER MODEL ML-137602 6430T ML-19630 6460 ML-137604 6460T ML-104562 6460C ML-137606 6460CT 701 S. RIDGE AVENUE TROY, OHIO 45374-0001 FORM 37005 (Apr. 2006) Installation,

More information

HRS035-MS-022-RD 22 (559mm) 19mm x 30m 310mm Fixed Manual. HRS037-GI-019-RD 19 (483mm) 19mm x 36m 350mm Swing Manual

HRS035-MS-022-RD 22 (559mm) 19mm x 30m 310mm Fixed Manual. HRS037-GI-019-RD 19 (483mm) 19mm x 36m 350mm Swing Manual FIRE HOSE REEL CertIFIeD to Bs en 671-1: 1995 Certification No: Ps005704 BRITISH STANDARDS INSTITUTION APPROVAL FIRE HOSE REELS CERTIFIED TO BS EN 671 LICENCE NO. KM 51857 Certified Product AUSTRALIAN

More information

Water Piping and Pumps

Water Piping and Pumps Technical Development Program DISTRIBUTION SYSTEMS Water Piping and Pumps PRESENTED BY: Michael Ho carriertdp@gmail.com 424-262-2144 Menu Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section

More information

1.1 This section applies to air handling units for HVAC Systems.

1.1 This section applies to air handling units for HVAC Systems. AIR HANDLING UNITS GENERAL INFORMATION 1.1 This section applies to air handling units for HVAC Systems. DESIGN REQUIREMENTS 2.1 Design Criteria a. The decision to use modular central station air handling

More information

SECTION HEATING AND AIR CONDITIONING PIPING SYSTEMS. A. Provisions of Division 01 apply to this section. 1. Chilled Water System.

SECTION HEATING AND AIR CONDITIONING PIPING SYSTEMS. A. Provisions of Division 01 apply to this section. 1. Chilled Water System. SECTION 15180 PART 1 - GENERAL 1.01 SUMMARY A. Provisions of Division 01 apply to this section B. Section Includes: Providing complete piping systems for heating, ventilating, and air conditioning systems

More information

MANUFACTURER OF LT PANELS

MANUFACTURER OF LT PANELS MANUFACTURER OF LT PANELS POWER CONTROL CENTRE PANEL(PCC): Power Control Centre is used for distribution & control of various power source used in industry. Normally PCC is installed near power source.

More information

CENTRAL AIR CONDITIONER SPLIT SYSTEM

CENTRAL AIR CONDITIONER SPLIT SYSTEM CENTRAL AIR CONDITIONER SPLIT SYSTEM WITH ELECTRONIC CONTROL SERIES: DS INSTALLATION INSTRUCTIONS INDEX GENERAL... 2 UNIT LOCATION CRITERIA... 2 DIMENSIONAL DRAWINGS... 3 INDOOR UNIT INSTALLATION... 5

More information

Model AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description

Model AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description Worldwide Contacts www.tyco-fire.com Model AV--00 Alarm Valve With and Without Model RC- Retard Chamber European Conformity Valve Trim General Description The TYCO Model AV--00 Alarm Valves DN, DN0, DN0,

More information

BILL OF QUANTITY OF AIR CONDITIONING WORK FOR SBI JASDAN BRANCH, RAJKOT

BILL OF QUANTITY OF AIR CONDITIONING WORK FOR SBI JASDAN BRANCH, RAJKOT Part 2 Price Bid BILL OF QUANTITY OF AIR CONDITIONING WORK FOR SBI JASDAN BRANCH, RAJKOT SR.NO. DESCRIPTION OF ITEMS QTY UNIT RATE AMOUNT A SITC of High Wall Air Conditioners 1 SITC of air cooled HIGH

More information

Walk in Steam Curing Chamber for Concrete Application. Detailed Working Specifications

Walk in Steam Curing Chamber for Concrete Application. Detailed Working Specifications Detailed Working Specifications The Chamber with extremely high fabrication standard, high quality of finish, which matches the performance with emphasis on reliability and economy of use. The use of the

More information

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following: SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION PART I - GENERAL 1.1 SUMMARY A. Inclusion of sprinkler and standpipe systems shall be as determined by NFPA National Fire Code pamphlet 101 and program statement.

More information

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 20 00 05 Mechanical - General Requirements.2 Section 22 05 00 Plumbing - General Requirements.3 UBC Standard Fire Hydrant Drawings.4 Section

More information

SECTION STEAM CONDENSATE PUMPS

SECTION STEAM CONDENSATE PUMPS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

PORTABLE HYDRANT PN10 1A; 2A; 1B; 2B; 1C; 2C TYPES

PORTABLE HYDRANT PN10 1A; 2A; 1B; 2B; 1C; 2C TYPES PORTABLE HYDRANT PN1 1A; 2A; 1B; 2B; 1C; 2C TYPES HP 1 page 1A (type 1) (type 2) In water supply systems for fire extinguishing or other necessities. - Design... in conformity with STAS 698; - Nominal

More information

DualPak Series FILE NO: DATE: Feb. 15, 1999 SUPERSEDES: DATE: Sept. 28, DualPak 6900 Series Booster System

DualPak Series FILE NO: DATE: Feb. 15, 1999 SUPERSEDES: DATE: Sept. 28, DualPak 6900 Series Booster System DualPak Series 6900 FILE NO: 62.11 DATE: Feb. 15, 1999 SUPERSEDES: 62.11 DATE: Sept. 28, 1995 DualPak 6900 Series Booster System D U A L P A K 6 9 0 0 Armstrong proudly presents the Series 6900 DualPak

More information

B. Section Identification for Fire Suppression Piping and Equipment.

B. Section Identification for Fire Suppression Piping and Equipment. SECTION 211300 - FIRE SUPPRESSION SPRINKLERS PART 1 GENERAL 1.1 SECTION INCLUDES A. Dry-pipe sprinkler system. B. System design, installation, and certification. C. Fire department connections. 1.2 RELATED

More information

Part: I TECHNICAL SPECIFICATION

Part: I TECHNICAL SPECIFICATION Part: I TECHNICAL SPECIFICATION GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS FOR THE WORK OF DESIGN, SUPPLY, ERECTION AND COMMISSIONING INCLUDING CIVIL WORK OF NITROGEN INJECTION

More information

Model Series. PumpAgents.com - buy pumps and parts online QUIET - FLUSH ELECTRIC TOILET. Model Series FEATURES SPECIFICATIONS INSTALLATION

Model Series. PumpAgents.com - buy pumps and parts online QUIET - FLUSH ELECTRIC TOILET. Model Series FEATURES SPECIFICATIONS INSTALLATION PumpAgents.com - Click here for Pricing/Ordering Model 37045-Series QUIET - FLUSH ELECTRIC TOILET FEATURES Very quiet flush cycle - like a household toilet Single button flush actuator - with dual function

More information

Hakki Pilke Raven spare parts manual

Hakki Pilke Raven spare parts manual 1 ENGLISH Hakki Pilke Raven spare parts manual Valimotie 1, FI-85800 Haapajärvi, FINLAND Tel. +358 8 772 7300, Fax +358 8 772 732 info@maaselankone.fi, www.maaselankone.fi 2 Table of contents 1 Upper section

More information

DC POWER DISTRIBUTION BOARD

DC POWER DISTRIBUTION BOARD DC POWER DISTRIBUTION BOARD February 2016 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

The Marine Throne. Model TMT S/37045/X-Series QUIET - FLUSH ELECTRIC TOILET. "all the comforts of home" FEATURES SPECIFICATIONS INSTALLATION

The Marine Throne. Model TMT S/37045/X-Series QUIET - FLUSH ELECTRIC TOILET. all the comforts of home FEATURES SPECIFICATIONS INSTALLATION The Marine Throne "all the comforts of home" Model TMT S/37045/X-Series QUIET - FLUSH ELECTRIC TOILET FEATURES Very quiet flush cycle - like a household toilet Single button flush actuator - with dual

More information

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems Adam Olomon, P.E. Associate Consultant Fire & Life Safety and Fire Protection Introduction Adam Olomon Licensed Professional Engineer

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

PROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES

PROJECT: NITESH PALO Bangalore FIRE SAFETY MEASURES PROJECT: NITESH PALO ALTO @ Bangalore FIRE SAFETY MEASURES System Description 1 Firewater pumping system 2 Wet riser system and hose reel system. 3 Automatic sprinkler system 4 Yard hydrant system 5 Pressurization

More information

Roto-Jet I & II Tube Cleaning Systems

Roto-Jet I & II Tube Cleaning Systems Roto-Jet I & II Tube Cleaning Systems Tube Size Tube Section Deposit Thickness of Deposit Deposit Flush 0.312 to 2.000 Straight Soft, guy, Light (7.9 to 50.8) ID Curved or organic Medium Dry Elliott Tool

More information

Datasheet. Dry-pipe Vacuum Sprinkler System, Electric Release Self contained unit. Features. FIREFLEX VACTEC description

Datasheet. Dry-pipe Vacuum Sprinkler System, Electric Release Self contained unit. Features. FIREFLEX VACTEC description FIREFLEX VACTEC description This FIREFLEX VACTEC integrated fire protection system consists of a vacuum system trim totally pre-assembled, prewired and factory tested. All electrical and mechanical components

More information

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes). Guide Specifications PART 1 GENERAL 1.01 SYSTEM DESCRIPTION Microprocessor controlled, air-cooled liquid chiller utilizing scroll compressors, low sound fans, hydronic pump system and optional fluid storage

More information

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015

AIRPORT PLUMBING DESIGN STANDARDS REV. 2 11/02/2015 1.1 GOALS The goal of this section is to provide guidance in the design of Plumbing and Fire Protection systems to LAWA standards. The LAWA Plumbing Design Standards are a compilation of general design

More information

Tender document for Supply/ Installation of New Fire extinguishers & Refilling TENDER NOTICE

Tender document for Supply/ Installation of New Fire extinguishers & Refilling TENDER NOTICE Relationship beyond banking Zonal Office, Bhopal Zone Bank of India Bhawan Jail Road, Arera Hills BHOPAL - 462011, MP. Phone. 0755-2764698 zo.bhopal@bankofindia.co.in ZOBDSDSGNFE TENDER2013-14 Dated 05.11.2013

More information

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS SECTION 15501 WET AUTOMATIC FIRE SPRINKLER SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Wet automatic fire sprinkler systems including fire pump, fire pump controller, alarms, safety devices,

More information

Discontinued Product

Discontinued Product SEE VICTAULIC PUBLICATION 10.01 FOR DETAILS The Victaulic Series 759 alarm check valve works as a check valve by preventing the reverse flow of water from the system piping to the water supply. The valve

More information

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN November 15, 2007 & CONSTRUCTION GUIDELINES SECTION 15300 FIRE PROTECTION PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. Dartmouth College is currently insured by Factory Mutual. References to the owner s insurance company in this specification

More information

Powerstock Storage Tank

Powerstock Storage Tank Powerstock Storage Tank Models ST300, ST500, ST750 & ST1000 INSTALLATION, COMMISSIONING AND SERVICING INSTRUCTIONS THE POWERSTOCK STORAGE TANK IS INTENDED FOR USE AS A COMMERCIAL APPLIANCE. PUBLICATION

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN RISK ASSESSMENT The phases of an emergency includes: 1. Risk assessment 2. Mitigation 3. Preparedness 4. Response 5. Recovery Areas of Risk includes:

More information

Submersible. Pumps Motors. 50Hz 12 Submersible Pump. Pumping Solution

Submersible. Pumps Motors. 50Hz 12 Submersible Pump. Pumping Solution Submersible Pumps Motors 50Hz 2 Submersible Pump Pumping Solution 65 Product data 2 Submersible bore well pumps Construction Submersible motor & pumps for deep wells of 2 (DN 300 mm). Sized for connection

More information

VERTICAL STACK INNKEEPER GUIDE SPECIFICATION CGC Hybrid Heat Pump System

VERTICAL STACK INNKEEPER GUIDE SPECIFICATION CGC Hybrid Heat Pump System VERTICAL STACK INNKEEPER GUIDE SPECIFICATION CGC Hybrid Heat Pump System PART 1 SYSTEM DESCRIPTION 1.1 The HVAC system is based on the CGC HYBRID Hydronic Heat Pump System. 1.2 The system will automatically

More information

UPZ PUMP POWER FOR TOP PERFORMANCE UNDER

UPZ PUMP POWER FOR TOP PERFORMANCE UNDER Submersible borehole pump People at KSB we make your world flow round! UPZ PUMP POWER FOR TOP PERFORMANCE UNDER THE TOUGHEST CONDITIONS UPZ is top choice wherever submersible borehole pumps have to satisfy

More information

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA Tel: TENDER NO: TTU/T/01A/

TAITA TAVETA UNIVERSITY P.O.BOX , VOI, KENYA   Tel: TENDER NO: TTU/T/01A/ TAITA TAVETA UNIVERSITY P.O.BOX 635-80300, VOI, KENYA EMAIL: procurement@ttu.ac.ke; Tel: 020 8150257 TENDER NO: TTU/T/01A/2017-2018 CONSTRUCTION OF PROPOSED ADMINISTRATION BLOCK- TAITA TAVETA UNIVERSITY

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps Note: The A/E must choose all design values in brackets below before using in project specifications 1 General 1.1 Provide UL listed and FM approved fire pump complete with pump, driver, controller and

More information

SECTION SECTION DESIGN REQUIREMENTS

SECTION SECTION DESIGN REQUIREMENTS SECTION 26 09 SECTION 23 05 23 DESIGN REQUIREMENTS GENERAL DUTY VALVES GENERAL INFORMATION 1.1 This section applies to valves for hydronic and steam systems. DESIGN REQUIREMENTS 2.1 Design Criteria a.

More information

CADDY CORPORATION. Utility Distribution Systems

CADDY CORPORATION. Utility Distribution Systems Food Service Equipment Air Systems Utility Distribution Systems page 1 of 2 Equipment Specifications General Specifications Caddy Corporation of America Energy Distribution and Management System, which

More information

This site is based on a but applies to all 1971-on Saab 99 and Saab 900.

This site is based on a but applies to all 1971-on Saab 99 and Saab 900. by Mark Jeter updated: December 8, 2004 originally web-published June 27, 2001 This document shows how the original waterpump in a Saab "B" engine can be eliminated and replaced with a reliable, efficient

More information

OPEN SPRINKLER SYSTEM

OPEN SPRINKLER SYSTEM OPEN SPRINKLER SYSTEM Introduction Competence and innovation driven by consistent market development and customer requirements have shaped the successful development of the SHIELD Brand. The extensive

More information