Status Report on LHC Beam Instrumentation

Size: px
Start display at page:

Download "Status Report on LHC Beam Instrumentation"

Transcription

1 Status Report on LHC Beam Instrumentation LHC Machine Advisory Committee 6 th December 2007 Rhodri Jones on behalf of the CERN Beam Instrumentation Group

2 Overview Status of BI Systems Beam loss measurement Installation Status Beam Test Results Orbit & trajectory measurement Installation Status Use of the system for aperture checks with the RF ball Transverse Beam Size Measurement Rest Gas Ionisation Monitors Wire Scanners US-LARP Contributions Collision Rate Monitors (LBNL) Schottky Monitors (FNAL) Advances on Other Systems

3 The LHC Beam Loss System Role of the BLM system: 1. Protect the LHC from damage 2. Dump the beam to avoid magnet quenches 3. Diagnostic tool to improve performance of LHC Name Type Number Area of use Maskable with safe beam flag Time resolution BLMQI Ionisation Chamber ~3100 Arcs yes 1 turn BLMEI BLMES BLMEI BLMES BLM Ionisation Chamber SEM Ionisation Chamber SEM ACEM (phase II) ~150 ~150 ~400 ~150 ~10 Collimation regions Critical aperture limits or positions Primary collimators no no No thresholds 1 turn 1 turn bunch-bybunch

4 LHC Beam Loss Detectors Design criteria: Signal speed and reliability Dynamic range (> 10 9 ) limited by leakage current through insulator ceramics (lower) and space charge saturation (upper) Secondary Emission Monitor (SEM): Length 10 cm P < 10-7 bar ~ times smaller gain Ionization chamber: N 2 gas filling at 100 mbar over-pressure Length 50 cm Sensitive volume 1.5 l Ion collection time 85 μs Both monitors: Parallel electrodes (Al or Ti) separated by 0.5cm Low pass filter at the HV input Voltage 1.5 kv

5 Production Ionisation chambers (IC) BLM System Status 4250 produced at IHEP & delivered to CERN Relative gas gain verified at CERN-GIF (gamma irradiation facility) for 4000 Secondary Emission Monitors (SEM) 350 produced at IHEP & 250 tested so-far in proton beam at CERN Vacuum verified (< 5x10-5 bar) If too high ionisation chamber & gives ~2300 times more gain charge [pc] blm-030.dat Q SEM /Q beam = Integrated charge of 4 SPS cycles 10 Q SEM 0 Q beam *Geant4 Q SEM corrected time [s] SEM calibration in H4 20cm Cu target 300 GeV/c protons SEM/beam ratio Mean: 3.40 sigma: 0.92 SEM Calibration Q /Q SEM beam Very good production quality achieved for both Only 16 from 4000 ionisation chambers & 2 from 250 SEMs failed the tests

6 Installation Follows LHC schedule BLM System Status 66% of ionisation chambers installed 29% of SEMs installed (collimation areas missing) Electronics installed in Sector 8 1 BLM Testing Complete BLM system tests in SPS shots of protons on collimator High intensity & short duration simulated LHC transient beam impact Tested the complete LHC BLM system: hardware & software Results Cross talk observed in multi-conductor cables carrying both ionisation & SEM signals Re-cabling required in all LSS to separate IC & SEM signals (done except 5L) Cross talk observed between different ionisation chamber channels Low pass filter to reduce signal slope for straight section ICs (to be done) Next Tests EMC with injection kicker magnets & availability of installed BLMs

7 Tested: Status of Software Elements for the Data Concentrator Change of thresholds Change of beam energy Transmission to logging system Triggered data generation - 40ms, 2ms data Post mortem XPOC Collimation BLM System

8 Threshold Setting Accuracy Threshold setting accuracy depends mainly on Secondary shower simulation Quench level knowledge Secondary Shower Simulation Difficult to simulate far transverse tails Compared with HERA measurements Geant4 and FLUKA agree with each other within errors bars at 39 GeV and 920 GeV Discrepancy of factor ~2 between measurements and simulation Not unexpected from simulation uncertainties for far transverse tails Consequences for LHC: Geant4 (QGSP-BERT-HP) & FLUKA qualified for threshold simulation Can expect systematic error for the LHC simulation of 50% HERA DUMP: M. Stockner (thesis) Geant4 Geant4

9 Quench Level Simulations & Measurements Quench Level Knowledge Network model (PSpice) used to simulate thermodynamic behavior of LHC superconducting magnets in steady state Compared to measurements via quench heaters & inner coil heating Results obtained for MQM, MQY, MQ and MB magnets at 4.5K Measurements and simulation agree within 20% Qualified network model at 4.5K Quench limits simulated for beam induced energy deposition Power density deposition found to vary by up to a factor 2 compared to design value of 5 mwcm -3 I magnet [A] ΔImagnet [%] MQM 627 MQM 677 MQMC 677 MQM magnets at 4.5 K MQM 627 MQM 677 MQMC 677 P [mw/cm 2 ] Ultimate current 4650 A Nominal current 4310 A % error between measurement & simulation P [mw/cm 2 ]

10 LHC Beam Position Monitors All Installed Injection Lines: 100 Warm, Button BPMs (Buttons Recuperated from LEP)

11 LHC Beam Position Monitors All Installed 912 Button Electrode BPMs (24mm) for the Main Arcs & Dispersion Suppressors

12 LHC Beam Position Monitors All Installed 24 Directional Couplers 52 Enlarged Button & 8 Trigger BPMs Interaction Regions

13 LHC Beam Position Monitors All Installed 36 Warm BPMs - 34mm Button Electrodes

14 LHC Beam Position Monitors All Installed 54 Special BPMs for Tune & Chromaticity, Transverse Damper & RF, Beam Dump

15 LHC Beam Position Monitors All Installed All 1182 BPMs for the LHC and its Transfer Lines are now installed (Sector 7-8 BPMs have survived first thermal cycle without incident)

16 Status of BPM Acquisition System Series Production of all components nearing completion Wide Band Time Normaliser (40MHz position measurement) All 2282 front-end cards required received All 2288 front-end cards required received Delivery of all spares to be completed by end 2007 Digital Acquisition Board (DAB64x - TRIUMF) Standard for BPM, BLM, Fast BCT, Wire Scanners, Luminosity & Q measurement All 1300 BPM type modules received All 500 BLM type modules received Reception Testing 2 automated test benches constructed and manned by external personnel Used for adjustment and calibration of all Wide Band Time Normaliser Cards Beam simulator allows position & intensity linearity measurement for all cards All data stored in MTF & linked to serial number chip located on each card Over 70% of the cards have been tested so far

17 Status of BPM Acquisition System Infrastructure Nearly all fibre-optic, coaxial cable and WorldFIP control links in place LSS7 & LSS3 are equipped with radiation hard fibres (Fujikura, Japan) Tests have shown that radiation induced attenuation in this fibre for light at 1310 nm is 5 db/km after 1 MGy Installation this attenuation is reached in the standard Ge-doped fibre after only 500 Gy Tunnel installation and hardware commissioning has been completed in arcs of Sector 4L Sector 4-5 Sector 5-6 Sector 6-7 (underway) Sector 7-8 Sector 8-1

18 Aperture Restriction Localisation using the RF Mole (Ping-Pong Pong Ball) and the LHC BPM System AB/BI, TS/IC, AT/VAC Aim To find a method to quickly check for obstacles in the beam pipe at warm Principle Air flow to move a lightweight ball that contains an emitter able to trigger the LHC Beam Position Monitor (BPM) system Test location The whole continuous cryostat in each sector (~2.6km)

19 RF emitter Polycarbonate shell Diameter 34mm exterior 30mm interior Total weight ~15 g (ball 8g) RF characteristics 40MHz resonant circuit Generates 20V between copper electrodes Battery powered Over 2hr lifetime Capacitive coupling to BPM electrodes 1V ~5mV -45db Coupling BPM trigger threshold at ~3mV

20 First Test (13/09) V2 line from Q11.L8 to Q26.L8 Anemometer Air Filter Q11.L8 Pump at Q26.L8 Switched on once the cap was in place

21 BPM position Beam aperture BPM Ball Tracking Time stamp (in second) Final BPM acquisition system Missing BPM trigger in Q13? Interleaved BPMs (odd/even in arc) on separate frontend CPUs Last BPM trigger in Q22 Ball stopped between Q22 and Q23

22 Localisation by BPM Reflectometry (AB/RF) 4-8GHz signal coupled into the beampipe using BPM & associated cables Reflected signals analysed for several polarisations No clear signal of the ball location when stopped was obtained by BPM reflectometry comparing the V1 and V2 lines Test performed from Q22.L8 and Q24.L8 (ball expected to be at Q23.L8) However once the ball was sucked back away from the obstruction a very clear signal of the original ball location was observed

23 Damaged PIM in 23L8 Nothing expected at this location Re-check of the X-rays showed that 2 fingers were indeed bent into the vacuum chamber

24 8-77 Complete Sector Test (V2 line) RF Mole Results: Allows aperture check in the arc Localisation to 50m possible using BPMs Now systematically carried out on all sectors before cooldown: 5-6, 7-8 & 8-1 so far all OK Test of BPM system in final configuration

25 Measuring Beam Size Beam Profile Measurements in the LHC Workhorses Synchrotron light monitor Wire scanners for cross calibration For injection & matching OTR screens For ions Rest Gas Ionisation Monitor (BGI) Also used as back-up for SR monitor

26 Rest Gas Ionisation Monitors (BGI) Beam 1 and Beam 2 monitors were installed in early 2007 Wrong programming of the bake-out led to both horizontal and vertical beam 2 monitors being cooked at 350 C instead of baked-out at 200 C All parts of these monitors suffered The brazing material of the window (Pb/Ag alloy) completely melted The ensuing vacuum leak sucked the melted material into the vacuum chamber, polluting the chamber and detector The anti-reflective coating of the quartz widow and one prism were destroyed The Multi Channel Plate (detector) and Electron Generator Array (calibration source) were severely damaged Aluminium pieces were plasticised

27 Rest Gas Ionisation Monitors (BGI) Reconstruction began immediately salvaging as much as possible and using spare components Both tanks were chemically cleaned and could be re-used The quartz windows were re-polished All aluminium pieced were re-manufactured Two completely new detectors were built Installation of these new monitors was completed a few weeks ago The bake-out is now also complete Tests are underway to verify the correct functioning of the detector

28 Wire Scanners Open Issues from previous LHC MACs Where to place the PMT detectors? When does the wire break? Do downstream magnets quench during a scan? Where to place the PMT detectors Signal proportional to energy deposited - a lot of signal for nominal intensity Signal level at ~6m changes by less than 50% with energy Mariusz Sapinski Mariusz Sapinski Energy per interacting proton Energy per interacting proton

29 Wire Scanners When does the wire break? Simulations corroborated by SPS measurements show that a 30μm carbon wire scanned at 1ms -1 will survive ( T < 4000K ) with: 25% of nominal LHC beam at injection energy 7% of nominal LHC beam at top energy (a function of beam size not energy) Mariusz Sapinski Thermionic current plays crucial role as cooling process for temperatures above 3000 K RF-heating does not significantly affect wire temperature heat transfer plays minimal role as cooling mechanism eventual use of carbon nanotubes will not improve performance The carbon work function and wire emissivity are poorly known but are important parameters of the model.

30 Wire Scanners Do we quench during a Scan? Simulations show that: Number of events with large energy deposition is higher in Q5 than D4 The wire scanner can work to between 1 to 6 x protons at 7 TeV Less than one nominal 72 bunch PS batch Main uncertainty due to simulation of small number of interactions in small volume Mariusz Sapinski What can be done to increase this margin? Scan faster can gain up to factor 2 Reduce the wire diameter Reduces the number of interactions while reduction of signal strength no issue for PMT Add shielding Difficult as source of energy is from particles hitting the beam pipe close to & within Q5 inclusion of Schottky monitors (smaller aperture) in front of Q5 in the simulation had little effect

31 US-LARP Contributions Collision Rate Monitoring (LBNL) Detector Status 1 detector at CERN 2 detectors undergoing final testing at LBL (HV, Pressure...) 1 undergoing repair for leaky cable due at the end of December Installation Schedule Installation of dummy chamber successfully tested during 2007 Final installation of 3 detectors foreseen in Jan/Feb 2007 and one in March Electronics Status Final prototype of front-end electronics is working well & final package expected by January 2007

32 LHC TAN Collision Rate Monitor (LBNL) Results from 2007 Tests at RHIC RHIC ZDC LBL Lumi

33 US-LARP Contributions Schottky Monitoring (FNAL) Schottky Travelling Wave Structures All 4 tanks completed and installed in early 2007 Bake-out completed small Ar leak from internal cable on 1 module identified no VAC issue at this time Travelling wave structure response tested by FNAL team in May 2007 Electronics Status All Front-end electronics installed & tested by FNAL team in May 2007 Digital acquisition will be the same as for standard LHC tune measurement Front-end control currently being implemented by FNAL

34 US-LARP Contributions Schottky Monitoring (FNAL) Tevatron Tests Tevatron Schottky monitors fitted with LHC style front-end electronics Results very encouraging big improvement in S/N over current Tevatron system Triple down-mixing to baseband Reduction in instantaneous dynamic range with revolution line outside pass band of final 15kHz crystal filter Use of improved low phase noise local oscillators Old System - first LO Results New System - first LO Results

35 Advances on Other Systems Test of all instruments with beam in TI2 successful Screens BPMs & BLMs BCT Software

36 Advances on Other Systems Beam current transformers installed & baked-out in the LHC ring and the Dump Lines

37 Advances on Other Systems Fast camera for synchrotron light monitor (BSRT) successfully tested in the SPS used for SPS injection matching studies employed 4 times faster framing rate (& associated SW) Horizontal Vertical Raw Data Corrected Data

38 Advances on Other Systems Continuous chromaticity measurement via RF modulation using LHC PLL system tested in SPS Δp/p ~2x10-5 ΔQ ~1x10-4 for Q=6 Radial change of only 40μm in SPS Easily tracked by PLL at modulation frequency of 0.5Hz Resolution of better than 1x10-5 obtained for the tune measurement

39 Advances on Other Systems All 4 Cadmium Telluride collision rate monitors (for IP2 (Alice) & IP8 (LHCb) delivered by CEA-LETI Successfully tested with beam in the SPS North Area Full electronics acquisition chain developed & tested

40 Summary Over 60% of both large distributed systems (BPM/BLM) installed Complete slice of BLM system successfully tested in SPS Complete BPM system tested during aperture verifications with RF mole Issues resolved during the year Rest gas ionisation monitor accident during bake-out Huge effort by BI team responsible has enabled all monitors to be re-installed Outstanding wire-scanner issues are resolved Main limitation at top energy will be quench limit of Q5 magnet US-LARP Deliverables Use of RHIC as test bed for tune, coupling & chromaticity control very useful Despite problems delivery of LBNL luminosity monitors still on schedule Schottky collaboration with FNAL has been very effective Outlook for LHC commissioning All necessary instrumentation hardware for the start-up is now in place Most electronics is under test enabling the initial software to be written & tested The functionality will evolve through the commissioning phases

Diamond as potential CryoBLM for the LHC All results are preliminary

Diamond as potential CryoBLM for the LHC All results are preliminary Diamond as potential CryoBLM for the LHC All results are preliminary With Marcin Bartosik, Bernd Dehning, Mariusz Sapinski and acknowledgments Christoph Kurfuerst for CryoBLM Team BE-BI-BL CERN Outline

More information

SYNCHROTRON RADIATION ABSORPTION AND VACUUM ISSUES IN THE IR*

SYNCHROTRON RADIATION ABSORPTION AND VACUUM ISSUES IN THE IR* SYNCHROTRON RADIATION ABSORPTION AND VACUUM ISSUES IN THE IR* J. T. Seeman, SLAC, Menlo Park, CA 94025 USA Abstract The PEP-II B-Factory (3.1 GeV e+ x 9.0 GeV e-) at SLAC operated from 1999 to 2008, delivering

More information

ATLAS Diamond Beam Conditions Monitor

ATLAS Diamond Beam Conditions Monitor Vertex 2008 17th International Workshop on Vertex Detectors 27th July 1st August 2008, Üto, Stockholm, Sweden ATLAS Diamond Beam Conditions Monitor Irena Dolenc on behalf of the ATLAS BCM Collaboration

More information

MD456: Monitoring of abort gap population with diamond particle detectors at the BGI in IP 4

MD456: Monitoring of abort gap population with diamond particle detectors at the BGI in IP 4 CERN-ACC-NOTE-016-0011 February 15, 016 oliver.stein@cern.ch MD56: Monitoring of abort gap population with diamond particle detectors at the BGI in IP Oliver Stein / TE-MPE Keywords: abort gap, beam gas

More information

The LHCb Outer Tracker: Production & Ageing studies

The LHCb Outer Tracker: Production & Ageing studies The LHCb Outer Tracker: Production & Ageing studies Kaffeepalaver MPI-K Physikalisches Institut Physikalisches Institut 1 LHC at CERN p-p collisions beam energy 7 TeV 8.6km Four experiments: Atlas, CMS,

More information

Status Report about the TPC Detector and Module at CEPC

Status Report about the TPC Detector and Module at CEPC Status Report about the TPC Detector and Module at CEPC Huirong QI On behalf of CEPC TPC subgroup, IHEP, CAS 2016.01.19, IAS, HK Content Goals and options Some considerations Preliminary simulation Hybrid

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2016/298 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 28 October 2016 (v2, 25 November 2016)

More information

HiRadMat facility at the CERN SPS

HiRadMat facility at the CERN SPS High-Radiation to Materials HiRadMat facility at the CERN SPS More information at http://cern.ch/hiradmat Adrian Fabich IWSMT-12, Bregenz, 20 th October 2014 Motivation of HiRadMat Dedicated facility for

More information

R&D Fast and lightweight EIC integrated tracking system Barrel MicroMegas & Forward Triple-GEM

R&D Fast and lightweight EIC integrated tracking system Barrel MicroMegas & Forward Triple-GEM 1 R&D Fast and lightweight EIC integrated tracking system Barrel MicroMegas & Forward Triple-GEM Franck Sabatie (PI) Matt Posik, Maxence Vandenbroucke, Bernd Surrow (PI) Outline 2 Overview of R&D program

More information

Technological Challenges for the LHC Vacuum System. Ray VENESS CERN Technology Department Vacuum, Surfaces and Coatings Group

Technological Challenges for the LHC Vacuum System. Ray VENESS CERN Technology Department Vacuum, Surfaces and Coatings Group Technological Challenges for the LHC Vacuum System Ray VENESS CERN Technology Department Vacuum, Surfaces and Coatings Group CERN European Organization for Nuclear Research 215th LUCIO April ROSSI 2010

More information

2008 JINST 3 S The CMS experiment at the CERN LHC THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS.

2008 JINST 3 S The CMS experiment at the CERN LHC THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 9, 2008 ACCEPTED: May 18, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS The CMS experiment

More information

OPERATIONAL EXPERIENCE ON CRYOGENIC SYSTEMS FOR LARGE-SCALE ACCELERATORS AT CERN

OPERATIONAL EXPERIENCE ON CRYOGENIC SYSTEMS FOR LARGE-SCALE ACCELERATORS AT CERN OPERATIONAL EXPERIENCE ON CRYOGENIC SYSTEMS FOR LARGE-SCALE ACCELERATORS AT CERN S. CLAUDET, M. SANMARTI, L. SERIO, L. TAVIAN 1 st Workshop on Cryogenics Operations Jefferson Laboratory - Newport News

More information

Beam Loss Position Monitoring with Optical Fibres at DELTA

Beam Loss Position Monitoring with Optical Fibres at DELTA Beam Loss Position Monitoring with Optical Fibres at DELTA Frank Rüdiger M. Körfer (DESY) W. Göttmann (HMI Berlin) G. Schmidt (DELTA) K. Wille (DELTA) 24. June 2008 Frank Rüdiger 1 Table of Content 1.

More information

MERIT Experiment Status of Activities at CERN

MERIT Experiment Status of Activities at CERN MERIT Experiment Status of Activities at CERN Outline Activities in TT2/TT2A Access (material & personal) Beam line modifications Cryogenics Power supply Particle detectors Controls and timing Safety I.Efthymiopoulos,

More information

Commissioning of the Silicon Drift Detector of the ALICE experiment at the LHC

Commissioning of the Silicon Drift Detector of the ALICE experiment at the LHC Silicon Drift Detector of ALICE Commissioning of the Silicon Drift Detector of the ALICE experiment at the LHC Emanuele Biolcati for ALICE collaboration Dipartimento di Fisica dell Università di Torino

More information

The Optical Scattering Calibration System at SNO+ IOP 2015

The Optical Scattering Calibration System at SNO+ IOP 2015 The Optical Scattering Calibration System at SNO+ KRISH MAJUMDAR IOP 2015 Contents Introduction SNO+ Why and how to monitor optical scattering Hardware Overview Laser Heads and Laser Head Control Laser

More information

Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators

Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators D. Forkel-Wirth Wirth, S. Mayer, H.G. Menzel, A. Muller, T. Otto, M. Pangallo, D. Perrin, M. Rettig,

More information

Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer

Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer André Zibell Julius-Maximilians-Universität Würzburg On behalf of the ATLAS Muon Collaboration INSTR2014 Conference Novosibirsk, 2014/2/28

More information

Table of Contents. Check the LCLS Project website to verify 2 of 12 that this is the correct version prior to use.

Table of Contents. Check the LCLS Project website to verify 2 of 12 that this is the correct version prior to use. Table of Contents Summary...3 Mechanical Design Specifications...3 Vacuum...3 Materials...5 Support Requirements...5 Cabling...6 Light Path...6 BLM Synchrotron Radiation Assembly (BL11)...7 Other Requirements...9

More information

STATUS OF THE LHC EXPERIMENTS.

STATUS OF THE LHC EXPERIMENTS. STATUS OF THE LHC EXPERIMENTS. Mario Calvetti Chairman of the LHC Committee INFN and University of Florence calvetti@fi.infn.it Abstract A brief description of the status of the preparation of the large

More information

PoS(ICHEP2012)516. The status of the CMS pixel upgrade detector

PoS(ICHEP2012)516. The status of the CMS pixel upgrade detector University of California Riverside E-mail: Ferdinando.Giordano@cern.ch The present CMS pixel detector was designed for a maximum luminosity of 34 cm s. Following the Phase upgrade of the LHC, the peak

More information

Active Scanning Beam 2: Controlling Delivery

Active Scanning Beam 2: Controlling Delivery martin.grossmann@psi.ch PSI Winter School for Protons 2010 1 Active Scanning Beam 2: Controlling Delivery Martin Grossmann, C. Bula, M. Eichin, K. Jäggy, G.Martin, A. Mayor, M. Rejzek Center for Proton

More information

LHCb Rich Detectors Control and High Voltage Systems

LHCb Rich Detectors Control and High Voltage Systems LHCb Rich Detectors Control and High Voltage Systems Mario Sannino On behalf of LHCb RICH Group Rich 2007 Trieste 19.10.2007 1 Rich 2007 Trieste 19.10.2007 LHCb Rich Detectors Control and High Voltage

More information

THE LHC BEAM LOSS MONITORING SYSTEM COMMISSIONING FOR 2010

THE LHC BEAM LOSS MONITORING SYSTEM COMMISSIONING FOR 2010 THE LHC BEAM LOSS MONITORING SYSTEM COMMISSIONING FOR 2010 C. Zamantzas, B. Dehning, C. Chery, E. Effinger, J. Emery, S. Grishin, C. F. Hajdu, E. B. Holzer, S. Jackson, C. Kurfuerst, A. Marsili, A. Nordt,

More information

Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current

Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current Fengwangdong Zhang On behalf of CMS Pixel Collaboration The 9th International Workshop on Semiconductor

More information

AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS

AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS AVAILABILITY AND RELIABILITY OF CERN CRYOPLANTS on behalf of the Cryogenics for Accelerator Group Accelerator Technology Department CERN, Geneva, Switzerland Outline Introduction Cryogenic systems layout

More information

Expected needs in Electronics for the CERN Experiments. 5 October 2015

Expected needs in Electronics for the CERN Experiments. 5 October 2015 Expected needs in Electronics for the CERN Experiments 5 October 2015 Philippe.Farthouat@cern.ch 2 The LHC Experiments 3 ATLAS Detector 4 CMS Detector 5 Collaborations Last generation of HEP detectors

More information

RAMSES: THE LHC RADIATION MONITORING SYSTEM FOR THE ENVIRONMENT AND SAFETY

RAMSES: THE LHC RADIATION MONITORING SYSTEM FOR THE ENVIRONMENT AND SAFETY 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, TH3B.1-3O (2005) RAMSES: THE LHC RADIATION MONITORING SYSTEM FOR THE ENVIRONMENT AND SAFETY G. Segura

More information

Radiation Safety issues for the PF-AR in KEK

Radiation Safety issues for the PF-AR in KEK Radiation Safety issues for the PF-AR in KEK H. Nakamura, Y. Namito, K. Iijima,K. Takahashi and S. Ban High Energy Accelerator Research Organization (KEK) Contents Present status of KEK Management of radiation

More information

Injection with front ends open at the ESRF

Injection with front ends open at the ESRF Injection with front ends open at the ESRF P. Berkvens, P. Colomp and F. Bidault European Synchrotron Radiation Facility Abstract The ESRF is planning to introduce, beginning of 23, a new mode of operation

More information

Quality Assurance and Quality Control of Optical Fibres for CERN

Quality Assurance and Quality Control of Optical Fibres for CERN EN Seminar - Quality Assurance and Quality Control of Optical Fibres for CERN Elisa GUILLERMAIN and Johannes TROLLER on behalf of the Cabling and Optical Fibre Section (EN-EL-CF) Seminar Outline 2 Johannes

More information

Laser Damage Measurements

Laser Damage Measurements Laser Damage Measurements Mathias Hüther Max-Planck-Institute for Physics, Munich huether@mpp.mpg.de April 08, 2016 Workshop Laser plasma generation for particle acceleration at Wigner Research Center

More information

arxiv: v1 [physics.ins-det] 20 Mar 2017

arxiv: v1 [physics.ins-det] 20 Mar 2017 September 8, 28 :47 ws-rv9x6 Book Title AFP page Chapter arxiv:73.696v [physics.ins-det] 2 Mar 27 Prospects and Results from the AFP Detector in ATLAS Grzegorz Gach On behalf of the ATLAS Collaboration

More information

ND280 Construction Status Report

ND280 Construction Status Report ND280 Construction Status Report Overview Since the last collaboration meeting, the ND280 detector project has undergone a huge transition: January 2009: most efforts focussed at home institutions July

More information

Antoine Drouart DSM/DAPNIA/SPhN. Köln, 5 th of December,

Antoine Drouart DSM/DAPNIA/SPhN. Köln, 5 th of December, Köln, 5 th of December, 2007 1 Basic CATS/BTD mechanics Köln, 5 th of December, 2007 2 Beam Tracking Today -Detector able to cope with a few 10 5 pps -Spatial resolution (FWHM) : 0.7mm -Time resolution

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. Status of CMS Commissioning

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. Status of CMS Commissioning Available on CMS information server CMS CR-2008/045 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 21 July 2008 Status of CMS Commissioning

More information

System Test of the ATLAS Muon Spectrometer in the H8 Beam at the CERN SPS

System Test of the ATLAS Muon Spectrometer in the H8 Beam at the CERN SPS TAUP 2780-04 15 Nov 2004 System Test of the ATLAS Muon Spectrometer in the H8 Beam at the CERN SPS Erez Etzion On behalf of the ATLAS Muon Collaboration Abstract--An extensive system test of the ATLAS

More information

CO 2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN.

CO 2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN. GL2008 8 th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids 7-10 September 2008 Copenhagen, Denmark Paper number: xxx CO 2 COOLING FOR THE LHCB-VELO EXPERIMENT AT CERN. B. Verlaat*, A. Van

More information

Machine-Detector Interface

Machine-Detector Interface NLC - The Next Linear Collider Project Machine-Detector Interface LC R&D Opportunities, SLAC May 21, 2002-204 - Machine Detector Interface 500 GeV TRC Optics w/ Large Detector - 205-0.3 0.2 0.1 0-0.1-0.2-0.3

More information

US CMS Trigger. DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003

US CMS Trigger. DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003 Outline: Project Completion M&O Upgrades This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_m&o_0403.pdf

More information

ARCON/RAMSES: Current Status and Operational Risk

ARCON/RAMSES: Current Status and Operational Risk 1 ARCON/RAMSES: Current Status and Operational Risk D. Forkel-Wirth, G. Segura Milan, D. Perrin, S. Roesler; H. and Hz. Vincke, P. Vojtyla, M. Widorski (DGS, Safety Commission) Chamonix 27 th January 2010

More information

The TOTEM Detector at LHC

The TOTEM Detector at LHC The TOTEM Detector at LHC CMS TOTEM Gennaro Ruggiero /CERN-PH on the behalf of the TOTEM Collaboration TOTEM Collaboration: Bari, Budapest, Case Western Reserve, CERN, Genova, Helsinki, Penn State, Pisa/Siena,

More information

ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs

ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs K. Dehmelt, N. Feege, H. Ge, T. K. Hemmick, T. Videbaek, S. Yalçin, S. Zajac Department of Physics and Astronomy

More information

First results and developments of the multi-cell SDD for Elettra and SESAME XAFS beam lines

First results and developments of the multi-cell SDD for Elettra and SESAME XAFS beam lines First results and developments of the multi-cell SDD for Elettra and SESAME XAFS beam lines Sergio Fabiani INFN-Ts on the behalf of the INFN R&D project RedSox collaboration and Elettra Synchrotron Trieste

More information

Technical Specification PILATUS 100K Detector System

Technical Specification PILATUS 100K Detector System Technical Specification PILATUS 100K Detector System Vesion 1.0 Table of Contents 1 Document History...4 1.1 Changes...4 2 Technical specifications...5 2.1 Technical data...5 2.2 Normal operation...6 2.3

More information

Radiation Safety issues for the PF-AR in KEK

Radiation Safety issues for the PF-AR in KEK Radiation Safety issues for the PF-AR in KEK H. Nakamura, S. Ban, K. Iijima,Y. Namito and K. Takahashi High Energy Accelerator Research Organization(KEK), 1-1 Oho, Tsukuba-shi, Ibaraki-ken, 305-0801, Japan

More information

Operational aspects of the VELO cooling system of LHCb

Operational aspects of the VELO cooling system of LHCb Operational aspects of the VELO cooling system of LHCb Eddy Jans (Nikhef) on behalf of the LHCb VELO group Introduction Main components and operation principle of the system Issues: how to prevent and

More information

Maintenance and Operation for ECAL Monitoring (WBS4.3)

Maintenance and Operation for ECAL Monitoring (WBS4.3) Maintenance and Operation for ECAL Monitoring (WBS4.3) Ren-yuan Zhu California Institute of Technology Status of Monitoring Laser System WBS4.3 construction is on schedule and cost Completed monitoring

More information

XFEL Collimation and Beam Switchyard Vacuum Issues

XFEL Collimation and Beam Switchyard Vacuum Issues The European Vacuum Issues Torsten Wohlenberg Beam Dynamic Meeting 1 general remarks Lengths of the vacuum system : Collimation: total length ~ 226m Beam Switchyard: total of TL+T1+T2~150m+132m+112m~394m

More information

The superconducting TF magnetic system of Tore Supra

The superconducting TF magnetic system of Tore Supra The superconducting TF magnetic system of Tore Supra (CEA Cadarache) Association EURATOM-CEA, CEA/DSM/IRFM 0 1 1. Introduction TORE SUPRA TF system contribution The revolution of superfluid helium 1.8

More information

Performance of the Monitoring Light Source for the CMS Lead Tungstate Crystal Calorimeter

Performance of the Monitoring Light Source for the CMS Lead Tungstate Crystal Calorimeter Performance of the Monitoring Light Source for the CMS Lead Tungstate Crystal Calorimeter L. Zhang, D. Bailleux, A. Bornheim, K. Zhu, R.-Y. Zhu California Institute of Technology 1 Introduction A high

More information

FiberSystem. Fiber Optic Linear Heat Detection for Special Hazard Applications

FiberSystem. Fiber Optic Linear Heat Detection for Special Hazard Applications FiberSystem 4000 Fiber Optic Linear Heat Detection for Special Hazard Applications The Protectowire Fiber Optic System In today s complex industrial environments, the potential for down time and financial

More information

Status of the Advanced Virgo detector

Status of the Advanced Virgo detector Status of the Advanced Virgo detector F. Piergiovanni on behalf of The Virgo Collaboration GWPAW, Osaka, 06/17/2015 Talk outline The Advanced Virgo challenges Where we stand and what we are going to do

More information

Aging measurements on triple-gem detectors operated with CF 4 based gas mixtures

Aging measurements on triple-gem detectors operated with CF 4 based gas mixtures IEEE, Roma, October 2004 Aging measurements on triple-gem detectors operated with CF 4 based gas mixtures M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2, P. de Simone 1, F.Murtas 1, D. Pinci

More information

FEATURE ARTICLE. The PLCA-800 Series Inline Particle Sensor for Chemical Solutions. Yoshihito Yuhara. Abstract

FEATURE ARTICLE. The PLCA-800 Series Inline Particle Sensor for Chemical Solutions. Yoshihito Yuhara. Abstract FEATURE ARTICLE Technical Reports The PLCA-800 Series Inline Particle Sensor for Chemical Solutions Yoshihito Yuhara Front end process Sensor module Wafer preparation process Film formation Photo lithography

More information

Praetorian Fibre Optic Sensing

Praetorian Fibre Optic Sensing A Higher Level of Performance Praetorian Fibre Optic Sensing For more information, please visit > www.hawkmeasure.com 1 A Complete Pipeline Performance Monitoring System. Any pipe, anywhere Distance up

More information

LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S)

LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S) LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S) Ganibu Dambis 26, P.O.Box 33 Riga, LV-1005, LATVIA Tel. (+371)6738-3947 Fax:(+371)6738-2620 office@bsi.lv www.bsi.lv CONTENTS INTRODUCTION...

More information

EDELWEISS-III dark matter search: first results and future

EDELWEISS-III dark matter search: first results and future EDELWEISS-III dark matter search: first results and future WIN 2015 Astroparticle Session 4 Geertje Heuermann, EKP, Karlsruher Institut für Technologie KIT University of the State of Baden-Württemberg

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2017/432 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 23 November 2017 (v3, 14 December 2017)

More information

The ATLAS detector: status of the construction and installation a year before the first p-p collisions at the LHC Collider

The ATLAS detector: status of the construction and installation a year before the first p-p collisions at the LHC Collider The ATLAS detector: status of the construction and installation a year before the first p-p collisions at the LHC Collider A. Di Ciaccio Università di Roma Tor Vergata and INFN, Roma, Italy On Behalf of

More information

M700-Series Multifunction OTDR

M700-Series Multifunction OTDR M700-Series Multifunction OTDR Test, Troubleshoot and Document Single-mode and Multimode Fiber Networks Test Modes Full Auto OTDR Normal (point-to-point) fiber cable construction testing and fault location

More information

Commissioning of the ASTA Photoinjector Laser System

Commissioning of the ASTA Photoinjector Laser System Commissioning of the ASTA Photoinjector Laser System Jamie Santucci Advanced Accelerator R & D Fermi National Accelerator Laboratory DOE LSO Workshop, September 11, 2013 Outline Fermilab ASTA Photoinjector

More information

Measuring Couch Motion Accuracy with X-ray Beam Fluence

Measuring Couch Motion Accuracy with X-ray Beam Fluence Measuring Couch Motion Accuracy with X-ray Beam Fluence Rudi Labarbe, M.S. and Brett Nelson, M.S. IBA Particle Therapy, Belgium and Logos Systems, Scotts Valley, CA Introduction The accuracy of radiosurgery

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov CERN Conseil Européen pour la Recherche Nucléaire (European Council for Nuclear

More information

Diamond Windows & MCP Detectors for Synchrotron Applications

Diamond Windows & MCP Detectors for Synchrotron Applications Torr Scientific Ltd. Specialists in UHV, Optical and X-ray Components Diamond Windows & MCP Detectors for Synchrotron Applications www.torrscientific.co.uk Torr Scientific Ltd. Specialists in UHV, Optical

More information

Experimental Particle Physics PHYS6011 Joel Goldstein, RAL

Experimental Particle Physics PHYS6011 Joel Goldstein, RAL Experimental Particle Physics PHYS6011 Joel Goldstein, RAL 1. Introduction & Accelerators 2. Particle Interactions and Detectors (1/2) 3. Collider Experiments 4. Data Analysis Charged Particle Detectors

More information

February 12, PHY357 Lecture 11. Experimental Methods. Accelerators. Particle Interactions. Particle Detectors. Full experiment (eg.

February 12, PHY357 Lecture 11. Experimental Methods. Accelerators. Particle Interactions. Particle Detectors. Full experiment (eg. PHY357 Lecture 11 Experimental Methods Accelerators Particle Interactions Particle Detectors Full experiment (eg. ATLAS) Introduction! Several different general classes of particle detectors (sensors)!

More information

Status of the LHCb Detector. LHCC Open Session CERN, 27 November 2002 Werner Witzeling on behalf of the LHCb Collaboration

Status of the LHCb Detector. LHCC Open Session CERN, 27 November 2002 Werner Witzeling on behalf of the LHCb Collaboration Status of the LHCb Detector LHCC Open Session CERN, 27 November 2002 Werner Witzeling on behalf of the LHCb Collaboration Content Vertex Locator Magnet Outer Tracker RICH2 Calorimeters Muon Detector Online

More information

Omnisens DITEST TM FIBER OPTIC DISTRIBUTED TEMPERATURE & STRAIN SENSING TECHNIQUE

Omnisens DITEST TM FIBER OPTIC DISTRIBUTED TEMPERATURE & STRAIN SENSING TECHNIQUE 1 Omnisens DITEST TM FIBER OPTIC DISTRIBUTED TEMPERATURE & STRAIN SENSING TECHNIQUE Introduction Omnisens DITEST (Distributed Temperature and Strain sensing) is a distributed temperature and/or strain

More information

TPC BASED IMP. Limin Duan, Gas Detector Group. Institute of Modern Physics, CAS TPC tracker detector technology mini-workshop

TPC BASED IMP. Limin Duan, Gas Detector Group. Institute of Modern Physics, CAS TPC tracker detector technology mini-workshop TPC BASED GEM @ IMP Limin Duan, Gas Detector Group Institute of Modern Physics, CAS 2016.09.01 Beijing,IHEP TPC tracker detector technology mini-workshop Outline 2 Gas detector group GEM-readout TPC a

More information

Vacuum Quality Assurance in Practice

Vacuum Quality Assurance in Practice Vacuum Quality Assurance in Practice Matthew Cox Head of Vacuum Diamond Light Source 1 Topics What is Diamond Light Source? Why is vacuum QA important to Diamond? QA in vacuum vessel procurement Diamond

More information

EU Diagnostics: Recent progress & near-term opportunities. Frederic Le Guern on behalf of Glenn F. Counsell Programme Manager. 18 th September 2018

EU Diagnostics: Recent progress & near-term opportunities. Frederic Le Guern on behalf of Glenn F. Counsell Programme Manager. 18 th September 2018 EU Diagnostics: Recent progress & near-term opportunities Frederic Le Guern on behalf of Glenn F. Counsell Programme Manager 18 th September 2018 EU Diagnostics in a few Numbers Separate sub-systems 28

More information

FLX380-30x FlexTester OTDR

FLX380-30x FlexTester OTDR Features 3rd generation hand-held, all-in-one OTDR, Source, Power Meter, VFL Icon-based LinkMap display with pass/fail for easy network analysis Patented in- or out-of-service testing from a single port

More information

IQ-Sense. 2/2 Introduction. 2/3 IQ-Sense photoelectric sensors. 2/5 IQ-Sense ultrasonic sensors. 2/6 4 IQ-Sense sensor module for ET 200S

IQ-Sense. 2/2 Introduction. 2/3 IQ-Sense photoelectric sensors. 2/5 IQ-Sense ultrasonic sensors. 2/6 4 IQ-Sense sensor module for ET 200S / Introduction /3 photoelectric sensors /5 ultrasonic sensors /6 4 sensor module for ET 00S /6 8 sensor module for ET 00M/S7-300 Introduction Configuration/parameterization Uniform configuration tools

More information

CMS, In Brief. Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns)

CMS, In Brief. Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns) CMS, In Brief Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns) CMS, status CMS is up and running after Long Shutdown One (LS1). Yes, there will be an LS2

More information

The FEL Facility Optical Diagnostics and FEL Characterization

The FEL Facility Optical Diagnostics and FEL Characterization The FEL Facility Optical Diagnostics and FEL Characterization M. Shinn, C. Behre, S. Benson, J. Coleman, R. Evans, A. Grippo, J. Gubeli, D. Hardy, K. Jordan, G. Neil, S. Zhang G. Williams Jefferson Lab

More information

M700-Series OTDRs. or (800) , (603)

M700-Series OTDRs.  or (800) , (603) Features M700 Compact QUAD OTDR M700 OTDR with DFS1 Digital FiberScope Integrated OPM and VFL (650 nm) Inspection capable with the DFS1 FiberScope Full Auto, Expert, and Real-Time OTDR test modes Automatic

More information

M7100 Pressure Transducer

M7100 Pressure Transducer SPECIFICATIONS Performance standard on and off highway engine and vehicle OEMs Rugged for heavy equipment and outdoor use Designed specifically for high volume applications Stainless steel wetted surfaces

More information

NON-DESTRUCTIVE 2-D BEAM PROFILE MONITOR USING GAS SHEET IN J-PARC LINAC -overview & hardware construction-

NON-DESTRUCTIVE 2-D BEAM PROFILE MONITOR USING GAS SHEET IN J-PARC LINAC -overview & hardware construction- NON-DESTRUCTIVE 2-D BEAM PROFILE MONITOR USING GAS SHEET IN J-PARC LINAC -overview & hardware construction- J. Kamiya, N. Ogiwara, Y. Hikichi, Y. Yamada (Vac. Gr.) K. Okabe, A. Miura, K. Moriya (Mon. Gr.)

More information

Today s Outline - September 12, C. Segre (IIT) PHYS Fall 2016 September 12, / 21

Today s Outline - September 12, C. Segre (IIT) PHYS Fall 2016 September 12, / 21 Today s Outline - September 12, 2016 C. Segre (IIT) PHYS 570 - Fall 2016 September 12, 2016 1 / 21 Today s Outline - September 12, 2016 Detectors C. Segre (IIT) PHYS 570 - Fall 2016 September 12, 2016

More information

FRIB MACHINE PROTECTION SYSTEM DESIGN AND VALIDATION STUDIES*

FRIB MACHINE PROTECTION SYSTEM DESIGN AND VALIDATION STUDIES* Proceedings of IBIC2015, Melbourne, Australia - Pre-Release Snapshot 17-Sep-2015 10:30 MOPB070 FRIB MACHINE PROTECTION SYSTEM DESIGN AND VALIDATION STUDIES* S.M. Lidia #, M. Ikegami, Z. Li, Z. Liu, T.

More information

Development and demonstration of a diode laser sensor for a scramjet combustor

Development and demonstration of a diode laser sensor for a scramjet combustor Development and demonstration of a diode laser sensor for a scramjet combustor A thesis submitted for the degree of Doctor of Philosophy of the Australian National University Alan David Griffiths December

More information

Praetorian Fibre Optic Sensing

Praetorian Fibre Optic Sensing A Higher Level of Performance Praetorian Fibre Optic Sensing Power Cable Monitoring (Underground Infrastructure) For more information, please visit > www.hawkmeasure.com 1 Praetorian Fibre Optic Sensing

More information

Index Arc Guard Systems. Arc Guard Systems. Arc Guard Systems Industrial Automation Supply - Tel:

Index Arc Guard Systems. Arc Guard Systems. Arc Guard Systems Industrial Automation Supply   - Tel: Systems Index Systems - Systems Systems...1 -.16 General information Description...1 System description...2 Overview...3 Ordering details Arc monitor with detectors...4 Current sensing unit...5 Technical

More information

The Technical Infrastructure Group supplies experimental activities at NBI with technical

The Technical Infrastructure Group supplies experimental activities at NBI with technical TECHNICAL INFRASTRUCTURE Staff: Leif Antvorskov John Engelhardt Fin Hansen Erik Grønbæk Jakobsen Niels Lindegaard Erik Kaimer Olsen Bjørn Rasmussen Jette Sørensen Henrik Bertelsen Finn Ferrall Jimmy Cali

More information

Vacuum requirements and Beamline interface at the VUV-FEL User Facility

Vacuum requirements and Beamline interface at the VUV-FEL User Facility by Mathias Hesse Outline 1. VUV Photon Beamline 1.1 Layout 1.2 Vacuum requirements - beamlines 1.3 Vacuum interlock 2. User interface to the photon beamline 2.1 Vacuum interface 2.2 Cleaning procedure

More information

DESIGN, MANUFACTURE AND TEST RESULTS OF THE VTCS CO 2 EVAPORATOR FOR THE LHCB EXPERIMENT AT CERN.

DESIGN, MANUFACTURE AND TEST RESULTS OF THE VTCS CO 2 EVAPORATOR FOR THE LHCB EXPERIMENT AT CERN. HEFAT2010 7 th International Conference on Heat Transfer, Fluid Mechanics and Thermodynamics 19-21 July 2010 Antalya, Turkey DESIGN, MANUFACTURE AND TEST RESULTS OF THE VTCS CO 2 EVAPORATOR FOR THE LHCB

More information

Technical Manual Ionisation Chamber MUSIC80

Technical Manual Ionisation Chamber MUSIC80 Technical Manual Ionisation Chamber MUSIC80 Entwicklungsbüro Dr. R. Schneider Lärchenstraße 9 85640 Putzbrunn Tel: 089 608 533 71 Fax: 089 608 533 72 E-Mail: robert@schneider.net Entwicklungsbüro Andreas

More information

GEM detectors activity at the Laboratori Nazionali di Frascati of INFN

GEM detectors activity at the Laboratori Nazionali di Frascati of INFN GEM detectors activity at the Laboratori Nazionali di Frascati of INFN M. Alfonsi', G. Bencivenni, P. de Simone, D. Domenici, F. Murtas, M. Pistilli and M. Poli Lener Laboratori Nazionali di Frascati,

More information

SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors

SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors H. Chagani University of Minnesota for the SuperCDMS Collaboration 23 July 2012 The SuperCDMS Soudan Detector: izip interleaved Z-sensitive Ionisation

More information

GAMMA OTDR application consists of main window and menu. Using menu user can operate in different modes of application.

GAMMA OTDR application consists of main window and menu. Using menu user can operate in different modes of application. GAMMA OTDR Introduction...1 Using GAMMA OTDR...1 Application main window...1 Menu description...2 file...2 instrument...2 mode...5 events...9 view...11 Introduction GAMMA OTDR is the first Android application

More information

Laser Scan Micrometer Page 418. Laser Scan Micrometer Page 423

Laser Scan Micrometer Page 418. Laser Scan Micrometer Page 423 Laser Scan Micrometers Laser Scan Micrometer Page 418 Laser Scan Micrometer Measuring Unit and Display Unit Package Page 419 Laser Scan Micrometer Measuring Unit Page 420 Laser Scan Micrometer Page 423

More information

DSGH. Radiation-Based Detector with GEN2000 Electronics for Density Measurement QUICK REFERENCE GUIDE

DSGH. Radiation-Based Detector with GEN2000 Electronics for Density Measurement QUICK REFERENCE GUIDE DSGH Radiation-Based Detector with GEN2000 Electronics for Density Measurement QUICK REFERENCE GUIDE Revision History Revision History Version of manual Description Date 1.0 Initial release 051025 1.1

More information

Performance Analysis of the AD Detector Control System in the ALICE Experiment

Performance Analysis of the AD Detector Control System in the ALICE Experiment Performance Analysis of the AD Detector Control System in the ALICE Experiment XXXI Annual Meeting Division of Particles and Fields of the Mexican Physical Society Juan Carlos Cabanillas Noris For the

More information

New Diagnostics in the FLASH Dump Line

New Diagnostics in the FLASH Dump Line New Diagnostics in the FLASH Dump Line Nicoleta Baboi for the Dump-Diagnostics team FLASH Seminar, Dec. 1, 2009 FLASH Seminar, Dec. 1, 2009 Contents Motivation of Dump Line upgrade Problems with the old

More information

Detector infrastructures and safety systems

Detector infrastructures and safety systems Chapter 10 Detector infrastructures and safety systems The common term infrastructures includes very different systems, ranging from basic site facilities to more detector-specific and safety-related services.

More information

FT702LT Turbine control wind sensor gives durability a new meaning FT702LT. series

FT702LT Turbine control wind sensor gives durability a new meaning FT702LT. series FT702LT Turbine control wind sensor......gives durability a new meaning FT702LT series Proven High Availability The FT702LT ultrasonic anemometer is the result of FT Technologies 10 years of experience

More information

Status of the PRad Experiment (E )

Status of the PRad Experiment (E ) Status of the PRad Experiment (E12-11-106) Jefferson Lab User Group Meeting 2016 Chao Peng Duke University For the PRad Collaboration Outline PRad Physics Motivation Experimental Setup Current Status Preliminary

More information

Aging Analysis of Micromegas Detectors for ATLAS New Small Wheel

Aging Analysis of Micromegas Detectors for ATLAS New Small Wheel Aging Analysis of Micromegas Detectors for ATLAS New Small Wheel Melissa Quinnan August 15, 2015 Supervisor: Michele Bianco Abstract In preparation for the coming High Luminosity Large Hadron Collider

More information

CCD and CID solid-state detectors

CCD and CID solid-state detectors CCD and CID solid-state detectors Technical Overview 5110 ICP-OES Introduction Many of today s ICP-OES instruments have progressed from traditional photomultiplier tube (PMT) detection systems to solid-state

More information