1 V C A E NGINEERS CIVIL STRUCTURAL MBE DBE SBE INC COUNTY OF LOS ANGELES MIRA LOMA DETENTION CENTER th Street West. Lancaster, CA January 23, 2015 Preliminary Site Water Supply and Distribution Analysis Narrative Prepared For: DLR GROUP 3130 Wilshire Blvd., 6 th floor Santa Monica, CA Prepared by: VIRGIL C. AOANAN, P.E., S.E., QSD 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

2 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND EXISTING SITE ANALYSIS AND RESEARCH EXISTING WELLS AT THE MIRA LOMA DETENTION FACILITY RESERVOIRS AND PUMP STATIONS WATER DEMAND AND DESIGN REQUIREMENTS FIRE FLOW AND FIRE SPRINKLER DEMAND/REQUIREMENTS DOMESTIC WATER DEMAND/REQUIREMENTS SITE UTILITY WATER STORAGE AND SUPPLY, UNDERGROUND SITE WATER DISTRIBUTION AND CONNECTIONS WATER STORAGE AND SUPPLY UNDERGROUND SITE WATER DISTRIBUTION AND CONNECTION CONCLUSION AND RECOMMENDATION PREFERRED ALTERNATIVE CONNECTION ALTERNATIVE OPTION - WATER STORAGE UNDERGROUND WATER DISTRIBUTION SYSTEM ANNUAL WATER CONSUMPTION APPENDIX EXHIBIT A EXHIBIT A EXHIBIT A EXHIBIT A Medford Street, CA Michelson Dr. # 242,, CA 92612

3 CIVIL STRUCTURAL MBE DBE SBE 1.0 INTRODUCTION This report summarizes the findings of the existing water supply system, the proposed water distribution system and the water storage system to supply the needs for the Mira Loma Detention Facility. VCA will examine the existing onsite water reservoir, pump stations, water supply, water demands of the proposed detention facility, and the design requirements for the fire sprinkler system. 1.1 BACKGROUND Mira Loma Detention Center is located in the City of Lancaster at the southeast intersection of West Avenue I and West 60th Street. This narrative report is based on available as-builts, evaluation report by Psomas, our site visits and other publications of the site related to the water distribution and supply for housing fire sprinklers, site fire hydrants, domestic and irrigation water lines within AB 900 project boundary. 1.2 EXISTING SITE ANALYSIS AND RESEARCH Based on as-built drawing review and previous field inspections conducted by VCA in 2008 and on April 2014, the following information were gathered and identified. The Mira Loma Water System is comprised of one 100,000 gallon capacity elevated water storage tank, one 400,000 gallon concrete surface reservoir, two abandoned 10,000 gallon hydro-pneumatic pressure tanks, four booster pumps, Well No. 3 with a 60 H.P. motor driven pump and Well No. 4 with a 150 H.P. natural gas fueled engine. Water is being fed to the site by an 8 asbestos cement pipe. A Water Map Titled Mira Loma Sheriff s Facility Plan of Primary Water System dated March 1959 acquired from the Facility Maintenance Bureau (See Exhibit A ) indicates that the site water system is a combined system serving both Domestic and Fire Water demands. The map indicates 12 fire hydrants are located around the area with one fire hydrant serving as a Fire Department Connection. The actual number of fire hydrants will need field verification. An existing underground utilities plan done by Fluor, approved in October 1987 (Exhibit A-2) shows that there is an extensive network of water lines servicing the detention facility, employee housing area, and the High Desert Health System. A visual inspection was also done in 2008 and on April 2014, but an additional survey should be done at this time to show and validate the current number of fire hydrants that are supplied by the primary water system. Utility alignment and underground utility line verification by ground penetration radar (GPR), potholing and other means are highly recommended for this validation. Along the adjacent streets lies the City Water System that is owned and operated by the LA County Waterworks, District No. 40, Antelope Valley located at 260 E. Avenue K-8, Lancaster. The County Waterworks has a 36 diameter Cement Lined Coated Steel Transmission Water Main located 25 feet from the property line along 60th Street (See Exhibit B ). Information gathered from the County shows that recent improvements along the West Avenue I includes a 12 diameter pipe installed 14 feet north of the road centerline (See Exhibit C ). VCA Engineers Inc 3951 Medford Street, CA Tel: Fax: vca@vcaengineers inc.com inc.com

4 Miscellaneous water site features such as existing fire hydrant, backflow devices, valves, FDC, PIV and other water features within the project boundary will be removed. Those water features that are servicing other buildings such as those outside of the project boundary, if any, should be relocated. Reuse will have to be identified by design and build contractor and should consult fire department or authority having jurisdiction if the material is in compliance with the current code, regulation, standard and still feasible for reuse. 1.3 EXISTING WELLS AT THE MIRA LOMA DETENTION FACILITY According to the Report on evaluation of two Existing Wells conducted by Psomas dated September 3, 2013, the following information were gathered: Well No. 3: 700 gallons per minute (gpm). 60 horsepower (hp). 1,780 revolutions per minute (rpm). Fairly new electric motor (approximately 1.5 years old). Cycles on level of lower reservoir. Age of Well is unknown but could be from 22 to 26 years old. Well No. 3 Pump and Connection 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

5 Well No. 4: On stand-by for emergency and can pump to either the lower reservoir or the upper reservoir. 1,000 gpm natural gas engine drive (Caterpillar engine G379). From one of the representatives during Psomas site visit (Operator Mr. Lee Russ of the L.A. County Sheriff s Dept. Water System) said that the engine is very old, has oil leaks but runs well. He runs it about an hour a week to keep it lubricated and ready when it needs to be used. It has a current South Coast Air Quality Management District (AQMD) certificate. No record were available for maintenance and age of the well. There is a third Well No.2, but is abandoned. 1.4 RESERVOIRS AND PUMP STATIONS Well No. 4 / Pump Housing Lower Reservoir: Located south and adjacent to the booster pump station on the surface. 400,000 gallon (gal.) capacity Rectangular building with the roof in poor condition that it is not safe to walk on. Three internal sedimentation cells at intake on the west side Three drains on the south side that go into the site storm drain system Overflow to the street in the middle on the west side Last cleaned in Medford Street, CA Michelson Dr. # 242,, CA 92612

6 400,000 gallon Lower Reservoir Upper Reservoir: Overhead steel tank tower approximately 100 feet above ground. Capacity of 100,000 gallons. Provides a constant pressure source for the water system in the detention center. Last cleaned in ,000 gallon Upper Reservoir 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

7 Booster pump station: Has four horizontal centrifugal pumps all the same size (Booster Pump A, B, C, and D): PACO, name plate data: Model YAG 95772B; 800 gpm; 120 ft. TDH; 11 inch impeller; ; All have 50 hp motors All pumps needs to be serviced/rehabilated. Booster Pump A: 450 gpm current pumping capacity. Inlet and outlet ranges from 4-in. to 8-in. diameter. Booster Pump B: zero to 45 gpm current pumping capacity. Inlet and outlet ranges from 4-in. to 8-in. diameter. Booster Pump C: 500 gpm current pumping capacity. Inlet and outlet ranges from 4-in. to 8-in. diameter. Booster Pump D: 375 gpm current pumping capacity. Inlet and outlet ranges from 4-in. to 8-in. diameter. Booster Pump Station and Reservoirs: No maintenance information. From their report, Psomas provided Concerns and Recommendations: Existing booster station cannot provide adequate flow and pressure to meet fire flow conditions. Generally, fire authority would recommend for a public institution a fire flow of 2,000 to 4,000 gpm. The existing water supply system can only provide 1,000 gpm to 1,200 gpm in its current condition. 2.0 WATER DEMAND AND DESIGN REQUIREMENTS NFPA indicates that Authority Having Jurisdiction (AHJ) has to be consulted in designing and sizing the water tank size and capacity. Though the potable water may not be the concern of the fire department, these water demands should be included in sizing the tank and capacity since the water storage is used for both fire and potable water usage. Factors to be included are the following: 1.) Fire sprinkler water demand and fire-fighting demand. 2.) Potable water for both domestic and irrigation demands. The plumbing engineer, mechanical engineer, landscape architect and fire protection engineer have to be consulted on the accuracy of the respective water demands to include their recommendations, calculation and analysis. The MEP and fire protection engineers should include in their analysis any other existing site and building demands outside of the project boundary area that may affect the new work. LACDPW instructed DLR in their meeting last April 25, 2014 to assume that existing hospital building is closed and off-line and not contributory to the proposed demands. Its future requirements for domestic or fire protection will be addressed if and when a reuse program is identified in the future. The DB contractor shall review this situation and will eliminate hospital building in their calculations unless new direction from LACDPW is received Medford Street, CA Michelson Dr. # 242,, CA 92612

8 The design should comply with the following reference code and standards: National Fire Protection Association NFPA 13, NFPA 22, the California Fire Code (CFC) 2013 and California Plumbing Code (CBC) FIRE FLOW AND FIRE SPRINKLER DEMAND/REQUIREMENTS The buildings on facility are simple pre-engineered building and are not sprinklered, with the exception of the administrative segregation building. Building improvements for both existing and new buildings under this project will be provided with fire sprinklers. Based on the current initial site plan within the AB 900 project boundary, the floor area of the most demanding building within the project boundary is found to be about 29,000 square feet. The fire flow and fire sprinkler requirements are based on the square feet of the floor area and by categorizing of the building s construction type, to be determined by the architect and finalized by design build contractor. Based on the architect s initial analysis, the classification of the buildings is Light Hazard. Under this classification Light Hazard and based on NFPA 13, (2), a minimum of 0.10 gpm/sf will be required. Kitchen/Storage per Fire Department has to be categorized as Ordinary Hazard but detailed classification of this building needs be finalized by the design and build contractor architect, MEP and fire protection engineer. Based on analyses for the greatest demanding building it is found that the kitchen is the building that requires the greatest fire sprinkler demand. Initial determination by Fire department is to use a minimum of 0.20 gpm/sf in calculating the fire sprinkler demand for kitchen/storage building. Using the information above and taking the higher values, we calculate the estimate of fire sprinkler water demand as follows: Fire Sprinkler water demand = 0.20 gpm/sf x 29,000 sf x 90 minutes x 1.2 (20% for losses) = 417,600 gallons. Type of construction for the building were categorized as Type IIB per Architect except for kitchen building. Taking into account the most demanding building floor area of the project, the needed fire flow coverage area is 29,000 square feet approximately. Kitchen building with a total floor area of 29,000 sf will require a fire flow of 3,500 gpm at 3 hours duration. Based on 2013 CFC Appendix B, B105.1, under Exceptions, a reduction in required fire flow of up to 50%, will be allowed when the building is provided with an approved automatic sprinkler system installed in accordance with Section or The resulting fire-flow based on the 50% reduction is 1,750 gpm and larger than the minimum 1,500 gpm for the prescribed on this section. For calculation - use the reduced fire flow 1,500 gpm with the duration of 3 hours to estimate the fire flow requirement. AHJ (Fire Department and Building & Safety Fire Protection Plan checker) will have to be consulted in determining the firefighting water demand that will be needed to calculate the additional capacity of the storage tank. However, we calculate the estimate of firefighting water demand as follows: Fire Fighting water demand = 1,750gpm x 3 hours x 60 min/hour x 1.2 (20% factor of safety) = 378,000 gallons. Therefore by combing the fire sprinkler and firefighting water demand, the Total Demand for fire water supply will be 795,600 gallons. The numbers provided herewith is for reference only and as a guide in determining water demand. Design and build contractor is responsible to analyze in detail the fire water demand both for fire hydrants and fire sprinkler system and should comply fire department requirements, code requirement and other jurisdictional requirements. Based on the initial information received from MEP, the flow could range from 500 gpm (minimum) to 3,500gpm and the minimum pressure for the fire at each building should be 65 psi (automatic sprinkler at 8 psi). Design 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

9 and Build contractor is advised to identify this conditions by coordinating with Authority Having Jurisdiction (AHJ) and in accordance to the code and standards. Note that detailed fire water demand requirement for fire sprinkler will have to be confirmed by the Design and Build contractor. Parameters and other requirements have to be coordinated and discussed with AHJ (Fire Department and Building & Safety Fire Protection Plan checker, etc.) to establish accurate fire sprinkler demand and firefighting requirement. The figures provided are based on our understanding on NFPA and 2013 CFC code and standard, and may not provide AHJ specific requirement, and is for reference and for estimating the demand volume only. Detailed demand has to be verified and calculated accordingly by the design and build engineer/contractor. 2.2 DOMESTIC WATER DEMAND/REQUIREMENTS. Domestic water demand is basically the amount of water required for domestic water use for users of the building. The numbers of building facilities such as toilets, shower rooms, sink, drinking fountain, kitchen usage, other domestic water use is determined by the architect, plumbing in compliance per code and standard, and information acquired from two women s detention facilities. Las Colinas Women s Facility and Century Regional Detention Facility, information provided on table 1. Detention Facility Location Inmate Population Water Consumption (gallon/day/inmate) Las Colinas Detention and Reentry Facility Century Regional Detention Facility, San Diego, California 1,270 (1) 115 (2) Lynwood, California 2,300 (2) (2) Table 1 (1) San Diego County Sherriff s Department; (2) Information provided by County Department of Public Works; Attachment 4.0, Exhibit A 3. An estimated domestic water usage of 112 gallons/inmates/day was used based on the average usage information from other similar women s detention facilities provided by the County. The attached Exhibit A-3 also provides information for the Mira Loma Detention Center, from , when the detention facility was used by the Immigration and Customs Enforcement. This data was not included as part of the estimated domestic water usage, since the existing campus water distribution supplies the detention facility as well as the existing adjacent hospital and existing health services buildings. The program on the Mira Loma Women s Detention Housing Capacity requires that the capacity meet 1,604 beds (inmates). Number of Staffs and Guards/Officers count also have to be finalized. For the purpose of estimating the daily water usage, an estimated 225 guards/staff was provided from the facilities program. The total number of users is estimated to be 1,829 (this includes the staffs and guards/officers). The estimated number user will change ones the number of staffs and guards/officers are fully determined to be permanently dedicated to Mira Loma Women s Detention facility Medford Street, CA Michelson Dr. # 242,, CA 92612

10 Using the 1,829 estimate: 1,829 users x 112 gallons/per inmates/day = 204,848 gallons/day Domestic Water Demand: = 204,848 gallons/day Therefore, the existing storage tank capacity should be able to provide or store 204,848 gallons per day for inmates and building users. The figures provided are based on estimated daily usage per inmates and per the estimated number of users of the facility and is for reference and for estimating the demand volume only. Consultation with AHJ for specific requirement will be required by the Design and Build contractor. 2.3 SITE UTILITY WATER STORAGE AND SUPPLY, UNDERGROUND SITE WATER DISTRIBUTION AND CONNECTIONS WATER STORAGE AND SUPPLY The supply of water to the detention facility is being drawn from a well to tank and served to the detention facility. Since connection to the available street water main is not possible at this time, the water supply to the detention facility and the new proposed improvement will be drawn from the same current source. The current available supply is at 500,000 gallons for both elevated tank and the lower reservoir to supply both the fire and domestic water requirements of the entire site. Based on the initial estimate for the total water demand requirement both for fire and domestic water usage mentioned on Sections 2.1 and 2.2, the total estimated water demand for the facility is about 1,000,000 gallons, which is way higher than the existing by 500,000 gallons. An additional on-ground reservoir will be needed to provide the required of 500,000 gallons (additional) capacity. A location for this additional reservoir has to be identified at the site so that proper direction and design input can be provided. The new reservoir will draw the water supply from the existing Well# 3 and Well#4, and then supply accordingly to needs of the facility. Existing Well#3 actual capacity is at 669 gpm and operates at 54% efficiency per the study. Existing Well#3 will need to be rehabilitated with new pump so that it will work to manufacturer s recommended efficiency. On Well#4, the report shows no actual capacity was taken but on record, the well has 1,000 gpm capacity. All the recommendation mentioned on the evaluation report of the two existing well conducted by Psomas must be undertaken to improve the efficiency of the wells but this action is not limited to the Psomas recommendation. The Design and Build contractor will have to subsequently design and generate required water supply to the facility that will address the fire water, domestic water and irrigation needs. Thus, all required plumbing, mechanical and electrical components must be addressed accordingly. Based on NFPA 22, section , the tank should be able to be filled up in 8 hours. Under current condition, Well#3 alone will not be able to supply the tanks for fire water use within 8 hours. Both Well #3 and #4 should simultaneously be operating to be able to supply the required water demand within the 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

11 time frame. In order to adequately supply the building, the water distribution should provide adequate flow and pressure to meet the building demand for both fire and domestic water. Proposed Water Storage/Reservoir usage designation: Upper Reservoir (Existing 100,000 gallons Elevated Water Tank): - Designated for domestic and irrigation use. Lower Reservoir (Existing 400,000 gallons concrete reservoir) - Designated as combined use for fire, domestic and irrigation. - When the remaining stored water is at 298,400 gallons this water will be reserved for fire water usage. MEP design and build contractor to design, identify the level line of water, control and stop the water distribution when at the limit level. Proposed New Reservoir (approx. 500,000 gallons capacity) - Designated as for fire use only. - Design and build to design, calculate water requirements based on code requirement, AHJ requirement, and meet all other design criteria that were or were not mentioned on architect, civil, MEP (Mechanical, Electrical, Plumbing), Landscape narrative, basis of design and other documents. Design and build contractor is responsible to provide the required water supply and storage for the project. - Design and build to coordinate, design and confirm with AHJ (fire department and/or building and safety for fire sprinkler), all other agencies associated to water reservoir, water supply and water distribution system. Booster Pump and Fire Pump Station: Recommendation from Psomas is to upgrade all the booster pumps to provide adequate flow and pressure to meet fire flow condition and water demand. Design and Build contractor is responsible to address this requirement that will meet the site s demand. Existing booster pumps needs to be upgraded or replaced and provide new pumps as required for the new reservoir UNDERGROUND SITE WATER DISTRIBUTION AND CONNECTION FIRE WATER LINE Based on the estimated demand for fire, the new 500,000 reservoir will be designated to be used for fire use only. The existing 400,000 lower reservoir will service both for fire water, domestic and irrigation supply. Design and build contractor should design all existing and new reservoir to supply the needed flow and pressure at point of connections to building and fire hydrants within the project boundary. All necessary pumps, valves, backflow devices, mechanical systems, plumbing and electrical requirement must satisfy the intended supply and should comply with applicable code, regulation and standard requirement. A new looped fire water distribution line will be installed from the source (reservoirs) and distributed to the buildings and site fire hydrants within the AB 900 project boundary. Existing connection of the fire hydrant will be disconnected and reconnected to the new fire water line 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

12 that will be installed under this project. The new fire water line will supply the demand of fire sprinkler system for the new buildings including existing Administration building and site fire hydrants. Based on plumbing fire requirement for building, the pressure at the point of connection to the building should be at a minimum 65 psi and be able to supply the needed flow for each building. Site fire hydrant should be able to operate at a minimum 1,500 gpm at 20 psi. or 2,500 gpm at 20 psi for combined 2 hydrants flow as may be required by the Fire Department (Fire department should be consulted for the flow and pressure). Connections to building fire water line will require FDC (Fire Department Connection) and PIV (Post Indicating Valve) for each building, design and build contractor to coordinate with LA County Fire Department for all the required information and design parameters concerning PDC and PIV for the building. Connection to new Fire Hydrant has to be installed based on Fire Department requirement, initial discussion would require Fire Hydrant to install at 400 feet maximum spacing from each other. DOMESTIC WATER LINE Domestic water requirement were discussed under 2.2 section and this section will cover only on the distribution and connection of the domestic and irrigation water line. For irrigation, civil will cover only the basic connection to water use. The landscape architect will have to provide more detailed information. The proposed project new underground domestic water line will be installed and connected from the reservoir supply side (discharge) on both existing elevated reservoir and the proposed new reservoir manifolded with a separate backflow devices intended for domestic and irrigation. On new reservoir, a separate line that manifolds to fire water line will have its own backflow device. Design and build contractor should design/provide all necessary pumps, valves, backflow devices, mechanical systems, plumbing and electrical requirement that will satisfy the intended supply. All connection from the water reservoir will be reconnected to the existing water line system and new line will be provided that will supply to the proposed building plumbing point of connection under this project. Flow and pressure requirement for building will be identified by MEP during the process but as for initial design and build contractor may use the fire flow and pressure as reference Medford Street, CA Michelson Dr. # 242,, CA 92612

13 3.0 CONCLUSION AND RECOMMENDATION 3.1 PREFERRED ALTERNATIVE CONNECTION Currently the LACDPW s direction is to connect the water supply to the existing offsite 12 diameter waterline, located 14 feet north of the centerline along the West Avenue I. The design build contractors are to coordinate with the water purveyor, County Waterworks District 40 to identify the potential connection location. LA County personnel that we contacted advised that if the connection will be allowed, a new connection can only tapped along West Avenue I as the water pressure at this line is at approximately 85 psi. In order to get the actual water pressure and flow of the existing street water main line, it is recommended that a request from water purveyor be submitted for a fire flow test. 3.2 ALTERNATIVE OPTION - WATER STORAGE Since the existing site is a combined system (Fire, Domestic and Irrigation) LACDPW would like to maintain this system having the water supplied from the existing 12 line, owned by Waterworks District 40. An alternate recommendation is to provide separate lines for Fire water line that will serve on-site fire hydrant, fire sprinkler to existing building that has fire sprinkler (Administration Building) and to new proposed building improvement. The fire water line will have to be tapped from existing 400,000 gallon capacity lower reservoir and from a new 500,000 gallon water reservoir where location has to be determined by architect and the owner. Domestic and irrigation will draw its supply on existing 100,000 gallon elevated tank and from the existing 400,000 gallon water reservoir. Existing reservoir, existing booster pump and appurtenances of this existing water facility has to be upgraded and replace those fixtures, booster pumps, etc. to operate and provide needed water supply, flow and pressure. New water reservoir needs to be designed in compliance to applicable codes, regulation and standards, and approved by AHJ. Water storage/supply design should be able to provide needed demand of the facility. New booster pumps will have to be provided to the new 500,000 gallon water reservoir to deliver the desired flow and pressure to the building. Design and build contractor will have to upgrade existing well#3 and #4 and its existing pumps to achieve the desired capacity that will able to deliver water to all water reservoir within the time frame needed per code and use for fire protection. Design of water storage/reservoir and all its component shall address tank freeze protection requirement per state and county regulation and other applicable codes and standards to be approved by AHJ. Table below shows the initial estimate for the needed water supply for the facility but the estimate the information provided is for reference only and should be use as a guide in determining fire flow requirement, fire sprinkler requirement, domestic water requirement and irrigation requirement of the facility. Detailed estimate and design by the design and build contractor should be done in accordance to all applicable code, regulation, standard, other jurisdictional requirement, plan approval from AHJ Medford Street, CA Michelson Dr. # 242,, CA 92612

14 Table 1: Water Storage Item Usage Water Storage Description Capacity (Gallons) Estimated Demand (Gallons) Designation Remarks 1 Domestic Existing Elevated Water Tank 100, ,000 Domestic Water Usage Existing Reservoir 2 Combined Fire and Domestic Existing On Ground Water Reservoir 400, ,600 Fire Water Usage 104,848 Domestic Water Usage Existing Reservoir 3 Fire New On Ground Ground Water Reservoir 500, ,000 Fire Water Usage New Reservoir Note: Fire and Domestic water line estimate may change depending on AHJ requirement and Plumbing determination of the fire and domestic water demand. Irrigation estimate where not provided but allowance for domestic water use were provided to accommodate irrigation usage. Overall, exact estimate will have to be determined by Design and Build contractor UNDERGROUND WATER DISTRIBUTION SYSTEM. Domestic Water Line 1.) Existing underground combined water line will be utilized that serves building and other usage outside the project boundary. New domestic water line service improvement within the AB 900 project boundary will be design. Improvement on connection, water flow, pressure and distribution of water from the water reservoir. 2.) New domestic water line with backflow device will be installed to service all the building within AB project boundary. Connection to existing domestic water line and water storage reservoir must be planned and designed. 3.) New irrigation water line will be installed to service irrigation requirement on a separate connection with backflow device. Fire Water Line 1.) New looped fire water line will be installed dedicated only for fire water usage serving both for building fire sprinkler and site fire hydrants within the project boundary. 2.) All existing fire hydrant within the project boundary will be disconnected and removed. New fire hydrant will have to be provided along with fire lane access and placed at 400 feet spacing per Fire Department approval Medford Street, CA Michelson Dr. # 242,, CA 92612

15 3.) Each building with fire sprinkler connection shall be provided with FDC and PIV per Fire Department direction. 4.) New fire water line with backflow device will be installed to service all the building fire sprinkler within AB project boundary and the existing Administration Building. 5.) Freeze protection for all/any exposed pipes and other appurtenances should addressed by design and build contractor. 6.) Guidelines, applicable codes and regulation shall be complied by design and build contractor through the process of plan checking. Maintaining the need of fire water supply to the facility is vital to the safety of the facility personnel and users. It is important that the needed fire water supply is met. A careful analysis of the existing well, water storage, lines, new water demand and the assessment of the life, durability and maintenance of existing pipe material (asbestos cement pipe installed 1954), etc., should be done by a Water System Specialist. 3.3 ANNUAL WATER CONSUMPTION From the above sections 2.1 and 2.2, the below annual water consumption can be calculated. Total Fire Water Supply Demand = 417,600 gallons (Fire Sprinkler) + 378,000 gallons (Fire Fighting) = 795,600 Gallons x 2 (Factor of Safety) = 1,591,200 Gallons Domestic Water Demand = 1,829 users x 112 gallons/users/day = 204,848 gallons/day x 365 days = 74,769,520 Gallons Combined Water Supply Demand = 1,591,200 Gallons + 74,769,520 Gallons = 76,360,720 Gallons Approximate Annual Water Consumption = 76,360,720 Gallons / 325,851 (Conversion Factor) = 234 Acre-Ft Based on the calculation above for the proposed Mira Loma Women s Detention Facility, the approximate annual water consumption is 234 Acre - Feet Medford Street, CA Michelson Dr. # 242,, CA 92612

16 4.0 APPENDIX 4.1 EXHIBIT A-1 Concrete Reservoir Elevated tank Well No. 3 Well No Medford Street, CA Michelson Dr. # 242,, CA 92612

17 QUALITY V CA 4.2 CIVIL MBE ENGINEERS, INC. STRUCTURAL DBE SBE EXHIBIT A Medford Street, CA Tel: Fax: e mail: vca@vcaeng.com 2151 Michelson Dr. # 242,, CA Tel: Fax:

18 4.3 EXHIBIT A Medford Street, CA Michelson Dr. # 242,, CA 92612

19 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

20 4.3 EXHIBIT A Medford Street, CA Michelson Dr. # 242,, CA 92612

21 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

22 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

23 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

24 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

25 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

26 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

27 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

28 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

29 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

30 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

31 3951 Medford Street, CA Michelson Dr. # 242,, CA 92612

OXNARD FIRE DEPARTMENT 360 West Second Street Oxnard, CA (805) Fax (805)

OXNARD FIRE DEPARTMENT 360 West Second Street Oxnard, CA (805) Fax (805) OXNARD FIRE DEPARTMENT 360 West Second Street Oxnard, CA 93030 (805) 385-7722 Fax (805) 385-8009 REQUIREMENTS FIRE HYDRANT STANDARDS Fire hydrants and required access roads shall be provided prior to and

More information

City of Vista Fire Department

City of Vista Fire Department City of Vista Fire Department Development Services Section 600 Eucalyptus Avenue, Vista CA 92084 Guideline: Underground Piping for Private Fire Hydrants & Fire Sprinkler Supply. Updated: January, 2008

More information

2016 Webinar Sponsors

2016 Webinar Sponsors Copyright 2016 American Water Works Association 1 2016 Webinar Sponsors 2 printing 1 Webinar Moderator Frank Kurtz Standards Engineer No Image Available American Water Works Association Frank Kurtz is

More information

REGULATIONS GOVERNING WATER SERVICE TO CUSTOMERS OF THE EAST BAY MUNICIPAL UTILITY DISTRICT SECTION 31 WATER EFFICIENCY REQUIREMENTS

REGULATIONS GOVERNING WATER SERVICE TO CUSTOMERS OF THE EAST BAY MUNICIPAL UTILITY DISTRICT SECTION 31 WATER EFFICIENCY REQUIREMENTS PAGE NUMBER 31-A These regulations identify the types of water efficiency requirements for water service and the procedure for notification to Applicants that water efficiency measures are required. The

More information

Mechanical System Description

Mechanical System Description 1. Building Description: Mechanical System Description The building is a Type-1B construction, 9-levels, non-high rise building with 67 affordable family housing units. The first level of the structure

More information

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School North Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD INSTALLATION OF COMMERCIAL FIRE SPRINKLER SYSTEMS STANDARD #C-001 EFFECTIVE 03-25-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER') TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD Installation of Residential Fire Sprinkler Systems STANDARD #C-002 EFFECTIVE 03-19-2009 PURPOSE: To ensure that sprinkler plans submitted for review contain

More information

Distribution System Requirements for Fire Protection

Distribution System Requirements for Fire Protection Distribution System Requirements for Fire Protection AWWA MANUAL M31 Fourth Edition MANUAL OF WATER SUPPLY PRACTICES M31, Fourth Edition Distribution System Requirements for Fire Protection Copyright 1989,

More information

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT The interaction of fire protection systems can be extremely complex. The detection of a fire in a building by an automatic device

More information

WATER WISE SURV EY. Santa Barbara City College

WATER WISE SURV EY. Santa Barbara City College WATER WISE SURV EY FI N AL REPORT Santa Barbara City College August 21, 2013 Prepared By City of Santa Barbara Water Conservation Program WATER WISE SURVEY OF SANTA BARBARA CITY COLLEGE EXECUTIVE SUMMARY

More information

Ray's Well Testing Service Inc Shadowhill Dr, Santa Rosa Ca Phone Fax Lic#

Ray's Well Testing Service Inc Shadowhill Dr, Santa Rosa Ca Phone Fax Lic# Ray's Well Testing Service Inc. 4031 Shadowhill Dr, Santa Rosa Ca 95404 Phone 707 823 3191 Fax 707 317 0057 Lic# 903708 CUSTOMER INFORMATION REPORT #: 9521 - By: Matt Owens DATE OF TEST: 9/11/17 CUSTOMER

More information

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Garfield Elementary School Feasibility Study for New Library Building Project Number A C Larry Teixeira Selma Unified School District 3036 Thompson Avenue Selma, CA 93662 Subject: Feasibility Study for New Library Building Project Number A 12-8581.00 C Dear Mr. Teixeira: At your request, we

More information

1 of 12 7/26/14, 5:10 PM

1 of 12 7/26/14, 5:10 PM TIO Program Scripps Cardiovascular Institute - Tower Inc 4 Architectural, Mechanical, Plumbing, Electrical Original Approved TIO: (Download Attachment) Notice of Start of Construction Date: 2011-04-01

More information

Redlands Fire Department Fire Protection Standard

Redlands Fire Department Fire Protection Standard Title: High piled Storage Standard Number: FS-100 Revision: A Date: 10-07-2015 Scope: To provide a standard for High Piled Storage plan review submittals. Description: A standard for High Piled Storage

More information

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance Groton Heights School Mechanical Evaluation TO: FROM: Amy Vaillancourt, Project Manager Harley Langford, Project Manger Jason Curtis, P.E. DATE: February 24, 2016; Revised May 31, 2016 On Monday, December

More information

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES 2.05 PLUMBING GENERAL DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES - 2.05 It is expected that the plumbing design professional will conform to accepted good engineering design practices.

More information

Commonwealth of Virginia Department of Health Division of Onsite Sewage, Water Services, Environmental Engineering and Marina Programs

Commonwealth of Virginia Department of Health Division of Onsite Sewage, Water Services, Environmental Engineering and Marina Programs Commonwealth of Virginia Department of Health Division of Onsite Sewage, Water Services, Environmental Engineering and Marina Programs Application for Construction Permit Date Name of Establishment Address

More information

2016 Plumbing Supplemental Plan Review List

2016 Plumbing Supplemental Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Plumbing Supplemental Plan Review List POTABLE WATER SYSTEM P1. Specify which fixtures are for private use and which are for

More information

22A Belvedere Avenue, Parry Sound Sprinkler System Consulting Review

22A Belvedere Avenue, Parry Sound Sprinkler System Consulting Review Parry Sound District Social Services Administration Board Housing and Community Services October 10, 2018 c/o Andrew Ball, Properties and Capital Projects Coordinator Email:aball@psdssab.org 22A Belvedere

More information

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX: Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN 55337 Fire Marshal: 952-895-4579 FAX: 952-895-4512 2018 FIRE SUPPRESSION PERMIT APPLICATION PERMIT Wet System Dry System Cooking Hood Clean

More information

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO STORMWATER REPORT FOR WALMART SUPERCENTER STORE # 2443-00 SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO. 3286 March 1, 2012 I hereby certify that this engineering document was prepared by me

More information

RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS

RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS History: RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS Per the City adopted 2009 IRC, section R313, automatic fire sprinkler systems are required for all one and two family

More information

RESIDENTIAL FIRE SPRINKLER SYSTEMS POLICY

RESIDENTIAL FIRE SPRINKLER SYSTEMS POLICY RESIDENTIAL FIRE SPRINKLER SYSTEMS POLICY Plan Submittal and Inspection Requirements Revised 01/18/18 All residential fire sprinkler systems within the jurisdiction of the Fire Department shall meet all

More information

SECTION 5.9 Fire Protection

SECTION 5.9 Fire Protection SECTION 5.9 Fire Protection 5.9 FIRE PROTECTION This section provides an analysis of fire protection services, which is based on information provided by the Los Angeles County Fire Department (LACFD).

More information

Domestic and Residential Fire Sprinklers Design Policy

Domestic and Residential Fire Sprinklers Design Policy Domestic and Residential Fire Sprinklers Design Policy Content Section Page No 1. Background: Fire Sprinklers 3 2. Scope 3 3. Types of Fire Sprinklers 3 4. Types of Supply 4 5. Operating pressures and

More information

Diesel Fuel System Report

Diesel Fuel System Report Transbay Transit Center San Francisco, CA Prepared for: Pelli Clarke Pelli Architects 1056 Chapel Street New Haven, CT 06510 Prepared by: WSP 405 Howard Street, Suite 500 San Francisco, CA 94105 Mechanical

More information

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau 575 E. Flamingo Road, Las Vegas, NV 89119 (702) 455-7316 FAX (702) 455-7347 Permit Type: 105.7.13 Control Number: A.0 Effective Date: 11/15/11 TITLE:

More information

FRUCHTMAN & ASSOCIATES

FRUCHTMAN & ASSOCIATES FRUCHTMAN & ASSOCIATES CONSULTING MECHANICAL ENGINEERS September 27, 2018 Ocean Towers Housing Corporation 201 Ocean Avenue Santa Monica, CA 90402 Attn: Mr. Gerry Suenram General Manager Re: Ocean Towers

More information

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT State College Area School District High School South Building Prepared by CenterPoint Engineering 08 February 2013 FACILITY ASSESSMENT SUMMARY PHYSICAL PLANT General HVAC This report is a snapshot of the

More information

2. No plumbing fixture shall be replaced with fixtures which allow greater water use. C. Residential Water Efficiency Standards for New Structures.

2. No plumbing fixture shall be replaced with fixtures which allow greater water use. C. Residential Water Efficiency Standards for New Structures. RULE 142 - WATER EFFICIENCY STANDARDS A. Water Efficiency Standards. 1. All New Construction of New Structures shall install and maintain plumbing fixtures and conservation standards as set forth in this

More information

FIRE SPRINKLER SYSTEMS POLICY

FIRE SPRINKLER SYSTEMS POLICY FIRE SPRINKLER SYSTEMS POLICY VERSION 1.012/2015 FIRE SPRINKLER SYSTEMS Design and Submittal requirements All new and existing fire sprinkler systems within the jurisdiction of the City of San Mateo Fire

More information

Port of St Helens SIA Aircraft Hanger Scappoose, OR

Port of St Helens SIA Aircraft Hanger Scappoose, OR Port of St Helens SIA Aircraft Hanger Scappoose, OR AUTOMATIC FIRE SPRINKLER SYSTEM REVISION 2 MARCH 12, 2018 Scope: Furnish and install foam and water fire protection system including underground entrance

More information

McMAHON FP200 OUTAGAMIE COUNTY ADMINISTRATION CENTER S. WALNUT & W. 8TH, APPLETON, WI ALTERATION / ADDITION

McMAHON FP200 OUTAGAMIE COUNTY ADMINISTRATION CENTER S. WALNUT & W. 8TH, APPLETON, WI ALTERATION / ADDITION 4/5/017 1:58:50 PM C. 1445 DRIVE NEENAH, WI 54956 EXISTING JUSTICE CENTER IS FULLY SPRINKLED C. EXISTING FIRE PUMP BASEMENT LEVEL EXISTING FDC FOR DRY STANDPIPE IN STAIRWELL SHALL BE DEMOLISHED, SEE FP

More information

Community Development Department Commercial Permit Application

Community Development Department Commercial Permit Application Commercial Permit Application Permit # Property Project Information Address Suite # Business Name Parcel # Fire Department County Type of Improvement (check all that apply) New Addition Alteration Repair

More information

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT INTRODUCTION In recent years, the University of Cincinnati (University) has demonstrated a commitment to identifying and implementing sustainable goals and objectives throughout University s Uptown Campuses.

More information

Mobile Fire Rescue Department Bureau of Fire Prevention

Mobile Fire Rescue Department Bureau of Fire Prevention 222 Mobile Fire Rescue Department Bureau of Fire Prevention Samuel L. Jones Mayor Stephen A. Dean Fire Chief January 2011 Fire Protection Water Supply 507.1 Required water supply. An approved water supply

More information

Narrative Reports As Regulated by 780 CMR, Section 903.0

Narrative Reports As Regulated by 780 CMR, Section 903.0 EXHIBIT 20 Narrative Reports As Regulated by 780 CMR, Section 903.0 903.1.1 - FIRE PROTECTION CONSTRUCTION DOCUMENTS a. Basis (methodology) of design for the protection of the occupancy and hazard for

More information

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR KELLY HEFFERNON, ASSOCIATE PLANNER SUBJECT: CONSIDERATION OF ADOPTION OF AN ORDINANCE AMENDING CHAPTER 16.84 OF THE

More information

Private On Site Fire Hydrant N/A N/A Fire Flow Requirements Private On Site Fire Sprinkler System

Private On Site Fire Hydrant N/A N/A Fire Flow Requirements Private On Site Fire Sprinkler System APPLICATION FOR WATER SERVICE GENERAL INFORMATION (Type or print clearly in ink) Applicant s Name: Mailing Address: Contact Name (if different from Applicant): Project Name: Service Address or Location:

More information

FIRE SPRINKLER SYSTEMS POLICY

FIRE SPRINKLER SYSTEMS POLICY FIRE SPRINKLER SYSTEMS POLICY Revised 1/1/17 DESIGN AND SUBMITTAL REQUIREMENTS All new and existing fire sprinkler systems within the jurisdiction of the City Fire Department shall meet all of the applicable

More information

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS Department of Fire Rescue & Emergency Services Fire Marshal s Office Dania Beach District 103 West Dania Beach Blvd. Dania Beach, Florida 33004 Office: (954)342-4262 Fax: (954)342-4265 FIRE SPRINKLER SHOP

More information

Water Purveyor s Guide to 2006 Fire Sprinklers in Single Family Dwellings

Water Purveyor s Guide to 2006 Fire Sprinklers in Single Family Dwellings Water Purveyor s Guide to 2006 Fire Sprinklers in Single Family Dwellings Fire sprinklers have long been used in commercial buildings and large residential occupancies to provide economical life safety

More information

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions: SECTION 21 13 13 WET-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

Gulfport, Mississippi 21 May 2007

Gulfport, Mississippi 21 May 2007 G PLUMBING GENERAL REQUIREMENTS The D-BC shall design the plumbing system to comply with this criteria and the Plumbing Code. Piping shall be shown on the same plan as the fixtures being served. Pipe size

More information

Fire District Dwelling Construction Requirements

Fire District Dwelling Construction Requirements Fire District Dwelling Construction Requirements Includes Sacramento County Fire Marshals Association Standard for Residential Sprinklers City of Rancho Cordova Building & Safety Department 2729 Prospect

More information

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 SPRINKLER SHOP DRAWINGS 2007 NFPA 13 and 2007 NFPA 24 Project: Listed items require sprinkler

More information

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations) This standard applies to the design and installation of automatic fire sprinkler systems in conjunction with

More information

NYC Department of Education

NYC Department of Education Asset: MID MAN ADULT LRNG CTR (81) - M, 212 W 120TH ST, New York, 10027 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-17 8:16 AM 2018-01-17 8:17 PM Asset Data Are there fuel

More information

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Table of Contents G.1.a Water Resources - Surface Water - Drainage Table of Contents G.1.a Water Resources - Surface Water - Drainage 1. INTRODUCTION... 1335 2. ENVIRONMENTAL SETTING... 1335 a. Regional Hydrology... 1335 b. Local Hydrology... 1337 c. On-site Hydrology...

More information

Residential Water Conservation Research Brief On-Demand Hot Water Systems

Residential Water Conservation Research Brief On-Demand Hot Water Systems Overview Water heating is the second highest consumption of energy in the residential sector, accounting for 17 percent of consumed energy for the average Canadian household. Each year, residents allow

More information

THE BASICS OF BUILDING FIRE PROTECTION DESIGN. RES Symposium April 18, 2017

THE BASICS OF BUILDING FIRE PROTECTION DESIGN. RES Symposium April 18, 2017 THE BASICS OF BUILDING FIRE PROTECTION DESIGN RES Symposium April 18, 2017 PRESENTER S BACKGROUND Ted Sherwood, PE, CFPS, LEED AP 5 years as a Code Enforcement Official and Division Head supervising all

More information

PDR /21/15 Noah Beals 1/7/15 xx

PDR /21/15 Noah Beals 1/7/15 xx PDR150001 1/21/15 Noah Beals 1/7/15 xx 01.07.15 HTP Harmony Frontage Infrastructure Preliminary Design Review Project Narrative a) What are you proposing/use? The HTP Harmony Frontage Infrastructure project

More information

DOMESTIC WATER PACKAGED BOOSTER PUMPS

DOMESTIC WATER PACKAGED BOOSTER PUMPS DIVISION 22 PLUMBING 22 11 16 DOMESTIC WATER PIPING 22 11 19 DOMESTIC WATER PIPING SPECIALTIES 1. To facilitate landscape and other maintenance operations, exterior hose bibs shall be provided at 150 foot

More information

Appendix B. Facilities Assessment Report

Appendix B. Facilities Assessment Report Mile Lane Army Reserve Center Redevelopment Plan September 2008 Appendix B Facilities Assessment Report RKG Associates, Inc. Mile Lane Army Reserve Base Middletown, CT MEP System Evaluation For RKG Associates

More information

Distribution Restriction Statement

Distribution Restriction Statement DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers CEMP-ET Washington, DC 20314-1000 ETL 1110-3-489 Technical Letter No. 1110-3-489 3 April 1998 Engineering and Design DOMESTIC WATER HEATERS FOR BARRACKS

More information

Fire & Life Safety Requirements For Fire Department Access and Water Supplies

Fire & Life Safety Requirements For Fire Department Access and Water Supplies Fire & Life Safety Requirements For Fire Department Access and Water Supplies This brochure is being provided as a resource only. The items listed inside are the requirements most generally cited on plans

More information

DESIGN CRITERIA PACKAGE

DESIGN CRITERIA PACKAGE RFQ: 17-C-00003 DESIGN-BUILD SERVICES FOR THE DESIGN CRITERIA PACKAGE PREPARED BY: JAMES E. JACKSON, JR. AIA CITY ARCHITECT CONTRACT ADMINISTRATION DEPARTMENT and INTERFLOW ENGINEERING, L.L.C DESIGN CRITERIA

More information

2009 International Residential Code Draft of New Fire Sprinkler Related Requirements

2009 International Residential Code Draft of New Fire Sprinkler Related Requirements 1. IRC Sections R313 and R314, insert two new sections as follows: R313 FIRE SPRINKLER SYSTEM FOR TOWNHOUSES R313.1 Required Installation. An automatic residential fire sprinkler system shall be installed

More information

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016 Ohio Administrative Code Rule Number OPC Section IPC origin Reason for proposed 4101:3-2-01 Alternate on-site 2015 Added definition

More information

NYC Department of Education

NYC Department of Education Asset: LIBERTY HS - MANHATTAN, 250 WEST 18 STREET, New York, 10011 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-29 11:32 AM 2018-02-01 10:16 AM Asset Data Are there fuel tanks?

More information

Fire Sprinklers Working Group Final Report

Fire Sprinklers Working Group Final Report Introduction The Building Act received Royal Assent on March 25, 2015. The Act aims to establish more consistent building requirements across British Columbia and create a more robust and modern building

More information

NYC Department of Education

NYC Department of Education Asset: P.S./I.S. 194 - BRONX, 2365 WATERBURY AVENUE, New York, 10462 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-01-24 8:34 AM 2018-02-01 10:02 AM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Asset: JEFFERSON AF - BROOKLYN, 125-08 FLATLANDS AVENUE, New York, 11208 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-05-07 8:39 AM 2018-05-08 2:04 PM Asset Data Are there fuel

More information

consider rainwater harvesting and reuse DESIGN APPROACHES

consider rainwater harvesting and reuse DESIGN APPROACHES consider rainwater harvesting and reuse DESIGN APPROACHES rainwater AS A SUSTAINABLE RESOURCE D RAINWATER HARVESTING The on-site collection, treatment and storage of rainwater typically using rooftop catchment

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE 20000 Prairie St. DOT Case No. 41443 Date: November 5, 2014 To: R. Nicolas Brown, Associate Zoning Administrator Department of City Planning From:

More information

Zurn Pex, Inc. Residential Fire Protection Presentation. PEX Plumbing, Radiant Heating and Residential Fire Protection Systems

Zurn Pex, Inc. Residential Fire Protection Presentation. PEX Plumbing, Radiant Heating and Residential Fire Protection Systems Residential Fire Protection Presentation Zurn Pex, Inc PEX Plumbing, Radiant Heating and Residential Fire Protection Systems Matt Lawrence BDM-North Central Region 1 Presentation Outline I. IRC Mandate

More information

Fire & Life Safety Supplemental Rules & Regulations for New Construction & Significant Remodels

Fire & Life Safety Supplemental Rules & Regulations for New Construction & Significant Remodels DEPARTMENT OF PUBLIC SAFETY FIRE MARSHAL S OFFICE 9611 SE 36 TH ST Mercer Island, WA 98040 (206) 236-3515 direct; (206) 236-3622 FAX Rod Mandery, Fire Marshal Updated version: 03-19-2002 Fire & Life Safety

More information

Sanitary Drainage Systems

Sanitary Drainage Systems 11.1 MATERIALS See Section 3.1. Sanitary Drainage Systems 11.2 BUILDING SEWERS AND BUILDING DRAINS 11.2.1 Sewer or Drain in Filled Ground Chapter 11 Building sewers or building drains that are installed

More information

NYC Department of Education

NYC Department of Education Asset: ACHIEVEMENT FIRST ENDEAVOR CHARTER SCHOOL- BROOKLYN, 510 WAVERLY AVENUE, New York, 11238 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-14 8:42 AM 2018-03-23 10:17 AM

More information

May 1, Dear Fire Suppression System Contractor/Designer:

May 1, Dear Fire Suppression System Contractor/Designer: CITY OF BOZEMAN FIRE DEPARTMENT P.O. Box 1230 Bozeman, Montana 59771-1230 Phone (406) 582-2350 Fax (406) 582-2355 CITY OF BOZEMAN BUILDING DEPARTMENT 20 E Olive St, STE 208 Bozeman, Montana 59715-4790

More information

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET 1 SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT

More information

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS 901.6 Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective.

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 224 ANNEX - QUEENS, 221-21 CORBETT ROAD, New York, 11361 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2018-03-28 12:27 PM 2018-04-04 5:15 PM Asset Data Are there fuel tanks?

More information

NYC Department of Education

NYC Department of Education Mechanical Inspection Asset: P.S. 1 - MANHATTAN, 8 HENRY STREET, New York, 10038 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-09-28 8:39 AM 2017-10-12 5:28 PM Asset Data Are there

More information

Fire Flow Requirements Standard

Fire Flow Requirements Standard Fire Flow Requirements Standard Scope This standard documents the requirements for fire flow within the Fresno County Fire Protection District (FCFPD). This includes areas that have a water purveyor who

More information

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning CAN/ULC S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning Presentation To: Canadian Fire Alarm Association (CFAA) National Capital Region

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 10. PUBLIC SERVICES 1. FIRE PROTECTION

4. ENVIRONMENTAL IMPACT ANALYSIS 10. PUBLIC SERVICES 1. FIRE PROTECTION 4. ENVIRONMENTAL IMPACT ANALYSIS 10. PUBLIC SERVICES 1. FIRE PROTECTION 1. ENVIRONMENTAL SETTING a. Fire Stations The County of Los Angeles Fire Department (LACFD) provides fire protection and emergency

More information

Los Angeles Trade Technical College Student Employment Center PLUMBING. Full Time

Los Angeles Trade Technical College Student Employment Center PLUMBING. Full Time Job Title: Plumbing Service Technician Job Number: 4144 Hours/Days: Varies Salary: $DOE Approximate Location: Los Angeles, CA. Requirements: Skills Requirements: Experience servicing, troubleshooting,

More information

5.8 PUBLIC SERVICES FIRE PROTECTION AND EMERGENCY SERVICES

5.8 PUBLIC SERVICES FIRE PROTECTION AND EMERGENCY SERVICES 5.8 PUBLIC SERVICES FIRE PROTECTION AND EMERGENCY SERVICES 5.8.1 INTRODUCTION This section assesses the proposed projects potential impacts on fire protection services. Information for the following analysis

More information

Fire Service Manual Volume 3 Building Construction

Fire Service Manual Volume 3 Building Construction Fire Service Manual Volume 3 Building Construction Fire Service Manual Volume 3 Fire Safety: Fire Protection. Buildings (IFE 47). TSO Safety Engineering Basic. Principles of Building Construction (IFE

More information

Large Family Daycare Guideline

Large Family Daycare Guideline Moreno Valley Fire Department Fire Prevention Bureau Large Family Daycare Guideline Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: April 10, 2017 Large Family Daycare Guideline Purpose

More information

TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition. Chapter I General Provisions

TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition. Chapter I General Provisions TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition Chapter I General Provisions SECTION 1.1: TITLE. This Resolution shall be known as the Teton County Fire Protection Resolution

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- PLUMBING 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 05 93 - TESTING, ADJUSTMENT AND BALANCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

DIVISION 21 FIRE SUPPRESSION

DIVISION 21 FIRE SUPPRESSION DIVISION 21 FIRE SUPPRESSION Table of Contents 21 00 01 General 21 00 02 Scope 21 00 03 Codes 21 00 04 Design Intent Report 21 00 05 Coordination with University of Minnesota Departments 21 00 06 Access

More information

Maintaining Your Private Water System Non-Residential Properties. Water and Waste Department

Maintaining Your Private Water System Non-Residential Properties. Water and Waste Department Maintaining Your Private Water System Non-Residential Properties Water and Waste Department Your water system No fire protection A water service for potable water and/or for use in business processes,

More information

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT LOCAL AMENDMENTS INTERNATIONAL FIRE CODE 2009 December 5, 2012 1 Chapter 1 Administration Chapter 5 Fire Service Features Chapter 9 Fire Protection Systems Chapter

More information

Guidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A

Guidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A Guidelines for the Sanitary Sewer Evaluation Survey (SSES) Report PLAN A 2 nd Cycle Report Due November 12, 2012 Revision 11/05/2015 wps-pa Report Cover Letter Requirements - Sample SSES PLAN A 2nd CYCLE

More information

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

TOWN OF HILLSBOROUGH SAN MATEO COUNTY TOWN OF HILLSBOROUGH SAN MATEO COUNTY Planning Division 650/375-7422 Fax: 650/375-7415 1600 Floribunda Avenue Hillsborough California 94010 Administrative Review of Landscape Plans April 2017 WHAT TYPES

More information

EXISTING FIRE SPRINKLER SYSTEMS ARE THEY HAZARDS? HOW CAN WE APPROACH THEM?

EXISTING FIRE SPRINKLER SYSTEMS ARE THEY HAZARDS? HOW CAN WE APPROACH THEM? EXISTING FIRE SPRINKLER SYSTEMS ARE THEY HAZARDS? HOW CAN WE APPROACH THEM? PRESENTATION OUTLINE What constitutes a hazard Michigan Part 14 Cross Connection Rules Single check valves what s inside them?

More information

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015 ADDENDUM #1 ITB# 2015-09-002 Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015 1. Building #222, The UPS Building, has one (1) dry Sprinkler riser, valve. (This is a

More information

MONTECITO FIRE PROTECTION DISTRICT

MONTECITO FIRE PROTECTION DISTRICT Section 5a MONTECITO FIRE PROTECTION DISTRICT FIRE PROTECTION PLAN Residential Automatic Fire Sprinkler System Installations I Automatic Fire Sprinkler System Standards 1. Definition and Standard: An automatic

More information

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION Project Background November 19, 2007 Executive Summary The Grand Canal is an important tidal waterway in the Venice community of Los Angeles, California,

More information

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT DESIGN ASSOCIATES INC MECH/ELEC DESIGN & CONSULTING 422 Highland Ave, Cheshire, CT. 06410 (203) 271-3787, fax (203) 271-2886 Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE

More information

September 30, Dear Fire Suppression System Contractor/Designer:

September 30, Dear Fire Suppression System Contractor/Designer: CITY OF BOZEMAN FIRE DEPARTMENT P.O. Box 1230 Bozeman, Montana 59771-1230 Phone (406) 582-2350 CITY OF BOZEMAN BUILDING DEPARTMENT 20 E Olive St, STE 208 Bozeman, Montana 59715-4790 Phone (406) 582-2375

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

NYC Department of Education

NYC Department of Education Asset: P.S. 73 - BRONX, 1020 ANDERSON AVENUE, New York, 10452 Inspection Id Inspection Type Time In Last Edited ME : Mechanical 2017-11-16 8:29 AM 2017-11-28 10:59 AM Asset Data Are there fuel tanks? Total

More information

Item 10E 1 of 5

Item 10E 1 of 5 MEETING DATE: January 27, 201 PREPARED BY: Erik Steenblock, Environmental Programs Manager DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Karen P. Brust SUBJECT: STORMWATER BEST MANAGEMENT

More information