1 of 123 6/10/2014 9:07 AM First Revision No. 117-NFPA [ Global Input ] The distances in shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking garages. Submitter Full Name: Chad Duffy Organization: National Fire Protection Assoc Submittal Date: Wed Apr 09 14:36:10 EDT 2014 : This new section will correlate with the IBC section Exception #3. Response Message: Public Input No. 92-NFPA [New Section after ]

2 of 123 6/10/2014 9:07 AM First Revision No. 118-NFPA [ Global Input ] Nonrequired stairs connecting two adjacent floors shall not require hose connections. Submitter Full Name: Chad Duffy Organization: National Fire Protection Assoc Submittal Date: Wed Apr 09 14:39:43 EDT 2014 Committee Statement: Many times a convenience stair will be located in a building that requires standpipes. Many AHJ's insist that if the stair is provided, it must be required and therefore a standpipe must be provided. Many times this stair is in a lobby or open area and providing hose outlets is difficult to accomplish. Response Message: Public Input No. 140-NFPA [New Section after ]

3 of 123 6/10/2014 9:07 AM First Revision No. 119-NFPA [ Global Input ] A single hose connections shall be permitted to be installed in the corridor or breezeway between open stairs that are not greater than 75 ft (23 m) apart. Submitter Full Name: Chad Duffy Organization: National Fire Protection Assoc Submittal Date: Wed Apr 09 14:42:34 EDT 2014 Committee Statement: Currently the standard requires hose connections in required exit stairs. A typical arrangement found on many garden style apartments is to have (2) egress stairs spaced rather close which provides occupants two means of egress. These stairwells are generally open. Many AHJ's require a standpipe for each stairwell. Since the stairs are open, allowing a single standpipe/hose connection in the corridor should not pose any greater risk. The attached PDF is for reference only to illustrate the scenario and is not intended to be used for a figure. Response Message: Public Input No. 91-NFPA [New Section after ]

4 First Revision No. 95-NFPA [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered part of the requirements of this document. 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA NFPA 13, Standard for the Installation of Sprinkler Systems, edition. NFPA 13R, Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies, edition. NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection, edition. NFPA 22, Standard for Water Tanks for Private Fire Protection, 2013 edition. NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances, edition. NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, 2014 edition. NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, edition. NFPA 72, National Fire Alarm and Signaling Code, edition. NFPA 101, Life Safety Code, edition. NFPA 170, Standard for Fire Safety and Emergency Symbols, edition. NFPA 1963, Standard for Fire Hose Connections, edition. 2.3 Other Publications ANSI Publications. American National Standards Institute, Inc., 25 West 43rd Street, 4th Floor, New York, NY ANSI Z97.1, Safety Glazing Materials Used in Buildings Safety Performance Specifications and Methods of Test, ASME Publications. American Society of Mechanical Engineers, Three Two Park Avenue, New York, NY Boiler and Pressure Vessel Code, ASME B1.20.1, Pipe Threads, General Purpose (Inch), ASME B16.1, Cast Iron Pipe Flanges and Flanged Fittings, ASME B16.3, Malleable Iron Threaded Fittings, ANSI/ASME B16.4, Gray Iron Threaded Fittings, ASME B16.5, Pipe Flanges and Flanged Fittings, ANSI/ASME B16.9, Factory-Made Wrought Steel Buttwelding Fittings, ASME B16.11, Forged Fittings, Socket-Welding and Threaded, ASME B16.25, Buttwelding Ends, ANSI/ASME B36.10M, Welded and Seamless Wrought Steel Pipe, Boiler and Pressure Vessel Code, 2010 of 123 6/10/2014 9:07 AM

5 of 123 6/10/2014 9:07 AM ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM A53/A53M, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless, ASTM A135/A135M, Standard Specification for Electric-Resistance Welded Steel Pipe, ASTM A234/A234M, Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service, 2011a. ASTM A234/A234M, Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service, 2011a. ASTM A795/A795M, Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use, ASTM B75/B75M, Standard Specification for Seamless Copper Tube, ASTM B88, Standard Specification for Seamless Copper Water Tube, ASTM B251, Standard Specification for General Requirements for Wrought Seamless Copper and Copper-Alloy Tube, AWS Publications. American Welding Society, 550 N.W. LeJeune Road, Miami, FL AWS A5.8, Specification for Filler Metals for Brazing and Braze Welding, AWS B2.1, Specification for Welding Procedure and Performance Qualification, AWWA Publications. American Water Works Association, 6666 West Quincy Avenue, Denver, CO AWWA C104, Cement-Mortar Lining for Ductile-Iron Pipe and Fittings, AWWA C110, Ductile-Iron and Gray-Iron Fittings, AWWA C115, Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded Flanges, AWWA C151, Ductile-Iron Pipe, Centrifugally Cast, for Water, AWWA C153, Ductile-Iron Compact Fittings for Water Service, IEEE Publications. Institute of Electrical and Electronics Engineers IEEE, Three Park Avenue, 17th Floor, New York, NY, IEEE/ASTM SI 10, Standard for Use of the International System of Units (SI): The Modern Metric System, Other Publications. Merriam-Webster's Collegiate Dictionary, 11th edition, Merriam-Webster, Inc., Springfield, MA, References for Extracts in Mandatory Sections. NFPA 13, Standard for the Installation of Sprinkler Systems, edition. NFPA 24, Standard for the Installation of Private Fire Service Mains and Their Appurtenances, edition. NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, edition. NFPA 101, Life Safety Code, edition. NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations, 2013 edition. NFPA 1002, Standard for Fire Apparatus Driver/Operator Professional Qualifications, 2009 edition. NFPA 5000, Building Construction and Safety Code, edition.

6 of 123 6/10/2014 9:07 AM Submittal Date: Fri Mar 14 08:56:48 EDT 2014 : Editorial revision. Response Message:

7 of 123 6/10/2014 9:07 AM First Revision No. 96-NFPA [ Section No ] * Horizontal Exit. A way of passage from one building to an area of refuge in another building on approximately the same level, or a way of passage through or around a fire barrier to an area of refuge on approximately the same level in the same building that affords safety from fire and smoke originating from the area of incidence and areas communicating therewith. [101, ] Submittal Date: Fri Mar 14 09:31:52 EDT 2014 : Editorial revision. Response Message:

8 of 123 6/10/2014 9:07 AM First Revision No. 97-NFPA [ Sections 3.3.5, ] Fire Department. An organization providing rescue, fire suppression, and related activities, including any public, governmental, private, industrial, or military organization engaging in this type of activity. [1002, ] High-Rise Building. A building where the floor of an occupiable story is greater than 75 ft (23 m) above the lowest level of fire department vehicle access. [5000, ] Submittal Date: Fri Mar 14 09:32:43 EDT 2014 : Editorial revision. Response Message:

9 of 123 6/10/2014 9:07 AM First Revision No. 1-NFPA [ Section No ] Hose Station. A combination of a hose rack or reel, hose nozzle, hose, and hose connection. Submittal Date: Tue Mar 04 11:35:51 EST 2014 : A hose reel combined with the other components is a form of a hose station. Response Message: Public Input No. 58-NFPA [Section No ]

10 0 of 123 6/10/2014 9:07 AM First Revision No. 2-NFPA [ Section No ] Express Main. A type of feed main supplying only the upper zone(s) of a standpipe system. An express main does not supply any portion of a low zone standpipe system. Submittal Date: Tue Mar 04 11:36:51 EST 2014 : Explanatory material belongs in the annex, not in the definition. Response Message: Public Input No. 59-NFPA [Section No ]

11 1 of 123 6/10/2014 9:07 AM First Revision No. 3-NFPA [ Section No [Excluding any Sub-Sections] ] An arrangement of piping, valves, hose connections, and allied associated equipment installed in a building or structure, with the hose connections located in such a manner that water can be discharged in streams or spray patterns through attached hose and nozzles, for the purpose of extinguishing a fire, thereby protecting a building or structure and its contents in addition to protecting the occupants. Submittal Date: Tue Mar 04 11:43:10 EST 2014 : Allied just doesn't seem to be the right choice of words. Response Message: Public Input No. 60-NFPA [Section No [Excluding any Sub-Sections]]

12 2 of 123 6/10/2014 9:07 AM First Revision No. 67-NFPA [ New Section after ] System Working Pressure. The maximum anticipated static (nonflowing) or flowing pressure applied to standpipe system components exclusive of surge pressures and exclusive of pressure from the fire department connection. Submittal Date: Wed Mar 05 13:02:04 EST 2014 Committee Statement: Response Message: A definition of system working pressure is need to correctly apply hydrostatic test pressures.

13 3 of 123 6/10/2014 9:07 AM First Revision No. 4-NFPA [ New Section after ] The materials or devices listing instructions shall identify and specify the existing system components, including the fluids conveyed, with which the newly listed materials, devices, or components are compatible. Submittal Date: Tue Mar 04 12:23:37 EST 2014 Committee Statement: These new sections are the same language that was added to the NFPA 13, 2010 edition and should have been made part of NFPA 14 during the 2013 revision cycle. This language will align NFPA 14 with the requirements for the current compatability of materials found in NFPA 13. Response Message: Public Input No. 151-NFPA [New Section after 4.1.3]

14 4 of 123 6/10/2014 9:07 AM First Revision No. 5-NFPA [ Section No ] 4.1.3* Components that do not affect system performance, such as drain piping, drain valves, and signs, shall not be required to be listed. Supplemental Information File Name A.4.1.3_FR_5.docx Description Edited Submittal Date: Tue Mar 04 12:32:33 EST 2014 : Examples belong in the annex. Also added gauges to the list. Insert new annex A Response Message: Public Input No. 62-NFPA [Section No ]

15 A Some common items that do not affect system performance are drain valves, drain piping, signs, gauges, etc.

16 5 of 123 6/10/2014 9:07 AM First Revision No. 6-NFPA [ Section No [Excluding any Sub-Sections] ] A one-piece reducing fitting or coupling shall be used wherever a change is made in the size of the pipe. Submittal Date: Tue Mar 04 12:33:04 EST 2014 : Grooved reducing couplings should be allowed to be used to reduce pipe size. Response Message: Public Input No. 63-NFPA [Section No [Excluding any Sub-Sections]]

17 First Revision No. 100-NFPA [ Section No ] Welding Requirements * Welds between pipe and welding outlet fittings shall be permitted to be attached by full penetration welds, partial penetration groove welds, or fillet welds. The minimum throat thickness shall be not less than the thickness of the pipe, the thickness of the welding fitting, or 3 16 in. (4.8 mm), whichever is least. [13: ] The minimum throat thickness shall be not less than the thickness of the pipe, the thickness of the welding fitting, or 3 16 in. (4.8 mm), whichever is least. [ 13: ] * Circumferential butt joints shall be cut, beveled, and fit so that full penetration is achievable. Full penetration welding shall not be required. [13: ] Full penetration welding shall not be required. [ 13: ] Where slip-on flanges are welded to pipe with a single fillet weld, the weld shall be on the hub side of the flange and the minimum throat weld thickness shall not be less than 1.25 times the pipe wall thickness or the hub thickness, whichever is less. [13: ] Face welds on the internal face of the flange shall be permitted as a water seal in addition to the hub weld required in [13: ] Tabs for longitudinal earthquake bracing shall have minimum throat weld thickness not less than 1.25 times the pipe wall thickness and welded on both sides of the longest dimension. [13: ] When welding is performed, the following shall apply: (1) Holes in piping for outlets shall be cut to the full inside diameter of fittings prior to welding in place of the fittings. (2) Discs shall be retrieved. (3) Openings cut into piping shall be smooth bore, and all internal slag and welding residue shall be removed. (4) Fittings shall not penetrate the internal diameter of the piping. (5) Steel plates shall not be welded to the ends of piping or fittings. (6) Fittings shall not be modified. (7) Nuts, clips, eye rods, angle brackets, or other fasteners shall not be welded to pipe or fittings, except as permitted in and (8) Completed welds shall be free from cracks, incomplete fusion, surface porosity greater than 1 16 in. (1.6 mm) diameter, and undercut deeper than 25 percent of the wall thickness or 1 32 in. (0.8 mm), whichever is less. (9) Completed circumferential butt weld reinforcement shall not exceed 3 32 in. (2.4 mm). [13: ] 6 of 123 6/10/2014 9:07 AM

18 7 of 123 6/10/2014 9:07 AM Submittal Date: Fri Mar 14 11:20:52 EDT 2014 Committee Statement: Response Message: No new text was added to the requirements. This is an editorial revision, revising extracted material to align with NFPA 13. Revise extracted annex sections to align with revised requirement extracts.

19 First Revision No. 101-NFPA [ Section No ] Groove Joining Methods Pipe joined with grooved fittings shall be joined by a listed combination of fittings, gaskets, and grooves., fittings, valves, and devices to be joined with grooved couplings shall contain cut, rolled, or cast grooves that are dimensionally compatible with the couplings. [13: ] Pipe, fittings, valves, devices, and couplings that conform with or are listed in compliance with standardized groove specifications shall be considered compatible. [ 13: ] Other groove dimensions and grooving methods shall be acceptable in accordance with [ 13: ] Grooves cut or rolled on pipe shall be dimensionally compatible with the fittings. [ 13: ] Grooved fittings couplings, including gaskets used on dry-pipe, preaction, and deluge systems, shall be listed for dry pipe dry service. [13: ] Submittal Date: Fri Mar 14 13:09:40 EDT 2014 Committee Statement: Response Message: The extracts of groove joining methods have been editorially updated to align with NFPA of 123 6/10/2014 9:07 AM

20 9 of 123 6/10/2014 9:07 AM First Revision No. 7-NFPA [ Section No ] Hose connections shall be equipped with threaded caps to protect the hose threads. Submittal Date: Tue Mar 04 13:06:31 EST 2014 Committee Statement: For testing purposes NFPA 14 and NFPA 25 threaded caps need to be provided for valves with hose threads. Response Message: Public Input No. 8-NFPA [New Section after 4.7.3]

21 First Revision No. 8-NFPA [ Sections 4.8.1, ] Fire department connections shall be listed for a working pressure equal to or greater than the pressure requirement of the system demand Unless the requirements of or are met, the fire department connection(s) shall have at least two in. (65 mm) connections using NH internal threaded swivel fitting(s) with NH standard thread, as specified in NFPA (See Sections 7.7 and 7.12 for design requirements.) Where local fire department connections do not conform to NFPA 1963, the AHJ shall be permitted to designate the connection to be used The use of threadless couplings shall be permitted where required by the AHJ and where listed for such use Fire department connections shall be equipped with approved plugs or caps, properly secured, and arranged for easy removal by fire departments Fire department connections shall be of an approved type Each fire department connection shall have at least two in. (65 mm) internal threaded swivel fittings having NHS threads, as specified in NFPA 1963, Standard for Fire Hose Connections. (See Sections 7.7 and 7.12 for design requirements.) Fire department connections shall be equipped with caps to protect the system from the entry of debris Where the local fire department uses fittings that differ from those specified, fittings compatible with local fire department equipment shall be used and their minimum size shall be in. (65 mm). Submittal Date: Tue Mar 04 13:14:01 EST 2014 Committee Statement: Response Message: This language does not change the intent of the section but aligns the requirements with NFPA 13 for the types of FDC's and Caps permitted. Public Input No. 55-NFPA [Section No ] Public Input No. 152-NFPA [Sections 4.8.1, 4.8.2] 0 of 123 6/10/2014 9:07 AM

22 1 of 123 6/10/2014 9:07 AM First Revision No. 9-NFPA [ Section No ] Standpipe and hose systems not required by the AHJ and not meeting the requirements of this standard shall be marked with a sign that reads FOR FIRE BRIGADE USE ONLY. Submittal Date: Tue Mar 04 13:23:28 EST 2014 : This requirement is addressing issues outside of the scope of NFPA 14. Response Message: Public Input No. 153-NFPA [Section No ]

23 2 of 123 6/10/2014 9:07 AM First Revision No. 10-NFPA [ Section No ] Pressure Gauges. Listed Approved pressure gauges conforming with Section 5.5 shall be connected as follows: (1) On the water side and air side of the dry pipe valve (2) At the air pump supplying the air receiver where one is provided (3) At the air receiver where one is provided (4) In each independent pipe from air supply to dry pipe system (5) At quick-opening devices [13:7.2.1] Submittal Date: Tue Mar 04 13:25:20 EST 2014 Committee Statement: NFPA 13 has done away with the requirement for listed gauges. NFPA 14 should correlate this requirement. Response Message: Public Input No. 64-NFPA [Section No ]

24 3 of 123 6/10/2014 9:07 AM First Revision No. 102-NFPA [ Section No ] Maintenance of Air Pressure. Air or nitrogen or other approved gas pressure shall be maintained on dry pipe systems throughout the year. [13: ] Submittal Date: Fri Mar 14 13:37:25 EDT 2014 : Editorial revision. Response Message:

25 First Revision No. 103-NFPA [ Section No ] * Air Supply. [13: ] The compressed air supply shall be from a source available at all times. [13: ] * The air supply shall have a capacity capable of restoring normal air pressure in the system within 30 minutes. [13: ] Supplemental Information File Name A _FR_103.docx Description Edited Submittal Date: Fri Mar 14 13:39:45 EDT 2014 Committee Statement: Response Message: Editorial revision to both the body of the standard and the annex language. See attached annex. 4 of 123 6/10/2014 9:07 AM

26 First Revision No. 104-NFPA [ Section No ] Air Supply Connection. [13: ] Connection pipe from the air supply shall not be less than 1 2 in. (15 mm) in diameter and shall enter the system above the priming water level of the dry pipe valve. [13: ] A check valve shall be installed in this air line, and a shutoff valve of the renewable disc type shall be installed on the supply side of this check valve and shall remain closed unless filling the system. [13: ] Submittal Date: Fri Mar 14 13:41:24 EDT 2014 : Editorial revision. Response Message: 5 of 123 6/10/2014 9:07 AM

27 6 of 123 6/10/2014 9:07 AM First Revision No. 105-NFPA [ Section No ] Relief Valve. An approved relief valve shall be provided between the air supply and the shutoff valve and shall be set to relieve pressure no less than 10 psi (0.7 bar) in excess of system air pressure provided in and shall not exceed the manufacturer's limitations. [13: ] Submittal Date: Fri Mar 14 13:42:44 EDT 2014 : Editorial revision. Response Message:

28 7 of 123 6/10/2014 9:07 AM First Revision No. 106-NFPA [ Sections , , , ] Automatic Air Maintenance. Unless the requirements of are met, where the air supply to a dry pipe system is maintained automatically, the air supply shall be from a dependable plant system or an air compressor with an air receiver, and shall utilize an air maintenance device specifically listed for such service and capable of controlling the required air pressure on, and maximum airflow to, the dry system. [13: ] Where the air compressor supplying the dry pipe system has a capacity less than 5.5 ft 3 /min (156 L/min) at 10 psig psi (0.7 bar), no air receiver or air maintenance device shall be required. [13: ] The automatic air supply to more than one dry pipe system shall be connected to enable individual maintenance of air pressure in each system. [13: ] A check valve or other positive backflow prevention device shall be installed in the air supply to each system to prevent airflow or waterflow from one system to another. [13: ] Submittal Date: Tue Mar 25 08:29:23 EDT 2014 : Editorial revision Response Message:

29 First Revision No. 107-NFPA [ Sections , , , ] System Air Pressure. [ 13: ] The system air pressure shall be maintained in accordance with the instruction sheet furnished with the dry pipe valve, or shall be 20 psi (1.4 bar) in excess of the calculated trip pressure of the dry pipe valve, based on the highest normal water pressure of the system supply. [13: ] The permitted rate of air leakage shall be as specified in [13: ] In addition to the standard hydrostatic test, an air pressure leakage test at 40 psi (2.8 bar) shall be conducted for 24 hours. Any leakage that results in a loss of pressure in excess of psi (0.1 bar) for the 24 hours shall be corrected. [13: ] Submittal Date: Tue Mar 25 08:33:14 EDT 2014 : Editorial revision. Response Message: 8 of 123 6/10/2014 9:07 AM

30 9 of 123 6/10/2014 9:07 AM First Revision No. 108-NFPA [ Section No ] Nitrogen. Where used, nitrogen shall be introduced through a pressure regulator set to maintain system pressure in accordance with [ 13: ] Submittal Date: Tue Mar 25 08:41:13 EDT 2014 : Editorial revision. Response Message:

31 0 of 123 6/10/2014 9:07 AM First Revision No. 11-NFPA [ Section No ] Pressure Gauges. Listed Approved pressure gauges conforming with Section 5.5 shall be installed as follows: (1) Above and below preaction valve and below deluge valve (2) On air supply to preaction and deluge valves [13: ] Submittal Date: Tue Mar 04 13:25:42 EST 2014 Committee Statement: NFPA 13 has done away with the requirement for listed gauges. NFPA 14 should correlate this requirement. Response Message: Public Input No. 65-NFPA [Section No ]

32 1 of 123 6/10/2014 9:07 AM First Revision No. 12-NFPA [ Section No ] Where an existing standpipe system having standpipes with a minimum diameter of 4 in. (100 mm) is to be utilized to supply a new retrofit sprinkler system, the water supply required by Sections 7.8 and 7.10 shall not be required to be provided by automatic or semiautomatic means, provided that the water supply is adequate to supply the hydraulic demand of the sprinkler system in accordance with NFPA 13, Standard for the Installation of Sprinkler Systems. Submittal Date: Tue Mar 04 13:34:27 EST 2014 Committee Statement: Response Message: By adding section 7.8 to the requirement it clarifies the exception in section to encompass both flow and pressure.

33 2 of 123 6/10/2014 9:07 AM First Revision No. 13-NFPA [ Section No [Excluding any Sub-Sections] ] Class II and Class III standpipe systems with in. (40 mm) hose stations shall be automatic wet systems unless located in a facility where piping is subject to freezing and where a fire brigade is trained to operate the system without fire department intervention, in which case an automatic dry or semiautomatic dry system shall be permitted. Submittal Date: Tue Mar 04 13:41:30 EST 2014 Committee Statement: Response Message: Class III systems utilizing 1 1.2" hose stations should adhere to these rules. However, if the Class III standpipe utilizes the reducer rule, then it should fall in line with a Class I system. Public Input No. 67-NFPA [Section No [Excluding any Sub-Sections]]

34 3 of 123 6/10/2014 9:07 AM First Revision No. 44-NFPA [ Section No ] * The automatic portion of a Class III system shall be permitted to be only what is required for a Class II system unless the Class I portion requires an automatic water supply. In a non-high-rise building, the Class I portion of a Class III system shall be permitted to be manual. The Class II portion of a Class III system shall be automatic. Submittal Date: Wed Mar 05 10:19:29 EST 2014 Committee Statement: Response Message: The language has been revised to clarify requirements for class II connections on class III standpipes.

35 4 of 123 6/10/2014 9:07 AM First Revision No. 14-NFPA [ Section No [Excluding any Sub-Sections] ] A listed An approved pressure gauge having a minimum face diameter of in. (90 mm) with a connection not smaller than 1 4 in. (6 mm) shall be connected to installed at each discharge pipe from the fire pump and the public waterworks, at the pressure tank, at each main drain connection, at the air pump supplying the pressure tank, and at the top of each standpipe. Submittal Date: Tue Mar 04 13:47:57 EST 2014 Committee Statement: This language aligns more closely with NFPA 13. NFPA 13 states: Gauges Apressure gauge with a connection not smaller than 1 4 in. (6 mm) shall be installed at the system main drain, at each main drain associated with a floor control valve, and on the inlet and outlet side of each pressure-reducing valve Each gauge connection shall be equipped with a shutoff valve and provisions for draining The required pressure gauges shall be approved and shall have a maximum limit not less than twice the normal system working pressure at the point where installed Gauges shall be installed to permit removal and shall be located where they will not be subject to freezing. Response Message: Public Input No. 68-NFPA [Section No [Excluding any Sub-Sections]] Public Input No. 154-NFPA [Section No [Excluding any Sub-Sections]]

36 5 of 123 6/10/2014 9:07 AM First Revision No. 15-NFPA [ Section No ] Gauges shall be located in a place so that water cannot freeze to permit removal and shall be located where they will not be subject to freezing. Submittal Date: Tue Mar 04 14:58:09 EST 2014 Committee Statement: We have seen more than a few pressure gauge installations in the field where the gauge was installed in a location where it was impossible to remove the gauge for inspection or replacement of the gauge. The existing text does not have anything about locating the gauge assembly as to permit removal of the gauge. if the gauge is inaccessible, this makes it more difficult to perform required testing and maintenance, and the building owner has additional costs of repairs to make the gauges accessible. NFPA : "System valves and gauges shall be accessible for operation, inspection, tests, and maintenance." NFPA : "Gauges shall be installed to permit removal and shall be located where they will not be subject to freezing." It only makes sense to have the Standpipe installation standard consistent with the Sprinkler installation standard with regards to accessibility and removal of the gauge. Response Message: Public Input No. 26-NFPA [Section No ]

37 6 of 123 6/10/2014 9:07 AM First Revision No. 16-NFPA [ Section No ] Pressure Approved pressure gauges shall be installed on the both upstream and the downstream sides of every pressure-regulating device installed in accordance with 7.2.4(6). Submittal Date: Tue Mar 04 14:59:11 EST 2014 : Correlates with other first revisions in regards to gauges. Response Message: Public Input No. 72-NFPA [Section No ]

38 7 of 123 6/10/2014 9:07 AM First Revision No. 17-NFPA [ Section No ] Except for manual dry systems, listed waterflow and control valve supervision devices shall be provided for each standpipe system. Submittal Date: Tue Mar 04 15:11:53 EST 2014 : All control valves and isolations valves within standpipe system need to be supervised. Response Message:

39 8 of 123 6/10/2014 9:07 AM First Revision No. 18-NFPA [ Section No ] 5.6.4* A test connection means for testing the waterflow device shall be provided. Submittal Date: Tue Mar 04 15:24:22 EST 2014 Committee Statement: Response Message: Test connection has been removed and replaced with means as there are various ways to activate a flow switch without requiring a specific test connection.

40 9 of 123 6/10/2014 9:07 AM First Revision No. 20-NFPA [ Section No ] Location of Dry Standpipes. Dry standpipes shall not be concealed unless the piping integrity is monitored with supervisory air pressure, in accordance with NFPA 72, National Fire Alarm and Signaling Code with supervisory air pressure. Submittal Date: Tue Mar 04 15:45:06 EST 2014 Committee Statement: Response Message: As currently written, one could construe that NFPA 72 gives guidance for the supervisory air pressure as opposed to the monitoring. Public Input No. 1-NFPA [New Section after 6.1.1] Public Input No. 73-NFPA [Section No ]

41 0 of 123 6/10/2014 9:07 AM First Revision No. 21-NFPA [ Section No ] All Horizontal piping for dry standpipes, manual dry standpipes, all dry standpipe systems and semiautomatic standpipes shall be pitched to drain at least 1 4 in. per 10 ft (2 mm/m). Submittal Date: Tue Mar 04 15:59:11 EST 2014 : All horizontal portions of standpipe systems need to be pitched for drainage. Response Message: Public Input No. 76-NFPA [Section No ]

42 1 of 123 6/10/2014 9:07 AM First Revision No. 22-NFPA [ New Section after ] The approved indicating-type valve and check valve shall be permitted to be located within the building. Submittal Date: Tue Mar 04 16:06:56 EST 2014 Committee Statement: This language allows the control valve and check valve to be loacted as near the supply as possible and still remain within the buidling. The current language has been interpreted to mean that valves must be installed at the city supply mains. The only allowance for a control valve to be in a system riser is found in the annex A (3). Response Message: Public Input No. 155-NFPA [New Section after ]

43 2 of 123 6/10/2014 9:07 AM First Revision No. 23-NFPA [ Section No ] * An approved indicating-type valve and approved check valve shall be provided in the water supply for a manual wet standpipe system. Supplemental Information File Name A _FR_23_with_SL_response.docx Description Submittal Date: Tue Mar 04 16:08:10 EST 2014 Committee Statement: Added the word approved in front of check valve. Also added explanatory language in the annex in regards to manual standpipes. This is good guidance in regards to the water supply for manual wet standpipes. There should probably be even more guidance in regards to the piping up to the standpipe and if any flow or tamper requirements should apply. Insert new annex A Response Message: Public Input No. 77-NFPA [Section No ]

44 A Manual wet standpipe systems can be installed by themselves or as part of a combination system. Usually with a combination system, there will be the required valves as part of the sprinkler system requirements from either NFPA 13, Standard for the Installation of Sprinkler Systems or NFPA 13R, Standard for the Installation of Sprinkler Systems in Low Rise Residential Occupancies. In systems with only a manual wet standpipe, connection to any readily available water source is acceptable. The control and check valves only need to be approved. A common scenario is to connect the system to the potable water system which may require some form of cross connection control which may satisfy the valving requirement. There is no minimum size requirement for this connection.

45 3 of 123 6/10/2014 9:07 AM First Revision No. 94-NFPA [ Section No ] Fire department connections shall not be provided with isolation valves. Submittal Date: Wed Mar 12 10:58:42 EDT 2014 Committee Statement: Response Message: See action taken in FR 51 clarifying no control valve is permitted in the piping between the FDC and where it connects to the system piping. Public Input No. 78-NFPA [New Section after ]

46 4 of 123 6/10/2014 9:07 AM First Revision No. 24-NFPA [ Section No ] Listed indicating-type valves shall be provided at the standpipe for controlling branch lines for remote hose stations where the distance to the remote hose station exceeds 20 ft (6 m) measured along the pipe. Submittal Date: Tue Mar 04 16:51:30 EST 2014 : A distance was required, 20 ft is a reasonable diistance. Response Message:

47 5 of 123 6/10/2014 9:07 AM First Revision No. 25-NFPA [ Section No ] Each connection from a standpipe that is part of a combined system to a sprinkler system shall have an individual control valve and check valve of the same size as the connection. Submittal Date: Tue Mar 04 17:02:23 EST 2014 Committee Statement: There should be no need to require the control and check to be the same size as the connection. If the hydraulic calculations for the sprinkler system prove it works, then the size shouldn't be regulated. An example might be where a single saddle is drilled into the standpipe and 2 1/2" is piped out and teed to a hose connection. Then the piping is reduced to 1 1/2" for the sprinkler system because it is all that is needed. As written, the sprinkler control and check would need to be 2 1/2" which makes no sense. Response Message: Public Input No. 81-NFPA [Section No ]

48 6 of 123 6/10/2014 9:07 AM First Revision No. 26-NFPA [ Section No ] Where the valve cannot be located at least 40 ft (12.2 m) from the building, it shall be installed in an approved location and where The indicating valve shall be installed where it is readily accessible in case of fire and not subject to damage. Submittal Date: Tue Mar 04 17:10:29 EST 2014 Committee Statement: This section needs to be modified. It is referring to a 40'-0" dimension that is not previously indicated. The phrase "where the valve cannot be located 40 ft." indicates that a previous section required the 40 ft. In only an "approved" location is indicated. If the 40'-0" location is a requirement, then it needs to be properly codified. The language of an approved location is redundant as that is located in Response Message: Public Input No. 82-NFPA [Section No ]

49 First Revision No. 27-NFPA [ Section No ] Where a post-indicator valves cannot be used, an underground valves with an approved roadway box, complete with T-wrench and where acceptable to the AHJ, shall be permitted The valve locations, directions for their opening, and services that they control shall be plainly marked on the buildings served. Submittal Date: Tue Mar 04 17:13:58 EST 2014 : Language was modified to be similar to NFPA 13. Response Message: Public Input No. 83-NFPA [Section No ] 7 of 123 6/10/2014 9:07 AM

50 8 of 123 6/10/2014 9:07 AM First Revision No. 28-NFPA [ Section No ] Where the standpipes are supplied from a yard main or header in another building, the connection shall be provided with a listed indicating-type valve located outside at a safe distance from the building or at the header. Submittal Date: Tue Mar 04 17:20:05 EST 2014 Committee Statement: Response Message: This section is redundant and does not offer any new information already requires the indicating valve in the water supply. Delete annex reference. Public Input No. 84-NFPA [Section No ] Public Input No. 141-NFPA [Section No. A ]

51 9 of 123 6/10/2014 9:07 AM First Revision No. 51-NFPA [ Section No ] Except for the valve required by 6.3.2, shutoff Isolation valves shall not be installed permitted between the fire department connection and the system where the fire department connection piping connects to the system piping. Submittal Date: Wed Mar 05 11:33:23 EST 2014 Committee Statement: Response Message: This more accurately describes the intent. Control valves are permitted downstream of where the fire department connection piping attaches to the system piping. Public Input No. 85-NFPA [Section No ]

52 0 of 123 6/10/2014 9:07 AM First Revision No. 29-NFPA [ Section No ] A listed check valve shall be installed in each fire department connection, including the connection in manual-dry systems, and located as near as practicable to the point where it joins the system the fire department connection piping connects to the system main piping The requirements of shall apply to manual dry systems. Submittal Date: Tue Mar 04 17:20:57 EST 2014 : Section has been modified for manual of style and reworded Response Message: Public Input No. 86-NFPA [Section No ]

53 1 of 123 6/10/2014 9:07 AM First Revision No. 30-NFPA [ Section No [Excluding any Sub-Sections] ] The fire department connection shall be installed as follows: (1) Automatic Wet and Manual Wet Standpipe Systems wet and manual wet standpipe systems. On the system side of the system control valve, check valve, or any pump, but on the supply side of any isolating valves required in by (2) Automatic Dry Standpipe Systems dry standpipe systems. On the system side of the control valve and check valve and the supply side of the dry pipe valve (3) Semiautomatic Dry Standpipe Systems dry standpipe systems. On the system side of the deluge valve (4) Manual Dry Standpipe Systems dry standpipe systems. Directly connected to system piping with a check valve in the piping as required by (2) Submittal Date: Tue Mar 04 17:21:34 EST 2014 Committee Statement: Response Message: Changed the grammar. By is more appropriate than in. Also, the reference in (4) is incorrect. (Note this reference may change again based on some other PI). Public Input No. 87-NFPA [Section No [Excluding any Sub-Sections]]

54 2 of 123 6/10/2014 9:07 AM First Revision No. 31-NFPA [ Section No ] 6.4.4* In areas subject to freezing, a listed an approved automatic drip valve that is arranged to allow drainage without causing water damage shall be installed in at the low point in the piping between the check valve and the fire department connection. Supplemental Information File Name A.6.4.4_FR_31.docx Description Edited Submittal Date: Tue Mar 04 17:24:35 EST 2014 Committee Statement: This aligns NFPA 14 with NFPA 13, providing consistency in installation requirements. Clarifies that the ball drip needs to be at the low point. Also, this correlates with NFPA 13 in that the ball drip in NFPA 13 is not required to be listed. Insert new annex A Response Message: Public Input No. 88-NFPA [Section No ] Public Input No. 157-NFPA [Section No ]

55 A In cases where water in the piping between the system side and the fire department connection check valve would be trapped, an auxiliary drain is required.

56 First Revision No. 32-NFPA [ Section No ] A sign also shall indicate the pressure required at the inlets to deliver the standpipe system demand The sign in shall not be required when the system demand pressure is less than 150 psi (10.3 bar). Submittal Date: Tue Mar 04 17:29:47 EST 2014 Committee Statement: The sign applies to the standpipe system demand only. Also, the 150 PSI requirement is found in NFPA 13E. Response Message: Public Input No. 45-NFPA [New Section after ] Public Input No. 89-NFPA [Section No ] Public Input No. 158-NFPA [New Section after ] 3 of 123 6/10/2014 9:07 AM

57 4 of 123 6/10/2014 9:07 AM First Revision No. 33-NFPA [ Section No ] * Where the static pressure at a in. (65 mm) hose connection exceeds 175 psi (12.1 bar), an approved a listed pressure-regulating device shall be provided to limit static and residual pressures at the outlet of the hose connection to no more than 175 psi (12.1 bar) Where a listed pressure regulating device is not manufactured, the AHJ shall be permitted to approve a nonlisted device. Submittal Date: Tue Mar 04 17:36:32 EST 2014 Committee Statement: Response Message: A device that is this important to fire fighter safety should be listed. If the committee feels that only having it approved is acceptable then they need to add this section to Public Input No. 90-NFPA [Section No ]

58 First Revision No. 120-NFPA [ Section No ] Global FR-118 Hide Deleted Global FR-119 Hide Deleted 7.3.2* Class I Systems. Class I systems shall be provided with in. (65 mm) hose connections in the following locations: At the main floor landing in exit stairways On each side of the wall adjacent to the exit openings of horizontal exits In other than covered mall buildings, in each exit passageway at the entrance from the building areas into the passageway In covered mall buildings, at the entrance to each exit passageway or exit corridor, and at the interior side of public entrances from the exterior to the mall At the highest landing of stairways with stairway access to a roof, or on roofs with a slope of less than 4 in 12 where stairways do not access the roof Where required to be provided, hose connections shall be located in accordance with Hose connections shall be permitted to be located at the highest intermediate landings between floor levels in exit stairways where required by the AHJ. Hose connections shall be provided at each main floor landing of required exit stairs * Where required by the AHJ or local fire department, hose connections shall be permitted to be installed at the highest intermediate floor landings between floor levels in required exit stairs * Where the most remote portion of a nonsprinklered floor or story is located in excess of 150 ft (45.7 m) of travel distance from a hose connection in or adjacent to a required exit or the most remote portion of a sprinklered floor or story is located in excess of 200 ft (61 m) of travel distance from a hose connection in or adjacent to a required exit, additional hose connections shall be provided, in approved locations, where required by the local fire department or the AHJ. Hose connections shall be provided on each side of the wall adjacent to the exit openings of horizontal exits * The distance requirements in shall not apply to the roof if it is not intended for occupancy. Hose connections on one side of a horizontal exit shall not be required where another outlet on that side of the horizontal exit can reach the portions of the building on the other side of the horizontal exit within the distances required by or that would have been protected by the outlet that was omitted The travel distance in shall be 200 ft (61 m) for sprinklered buildings The travel distance in shall be 130 ft (39.7 m) for nonsprinklered buildings Hose connections on one side of a horizontal exit shall not be required where another outlet on that side of the horizontal exit can reach the portions of the building on the other side of the horizontal exit within the distances required by that would have been protected by the outlet that was omitted. Hose connections shall be provided in each exit passageway in other than covered mall buildings This travel distance shall be 200 ft (61 m) for sprinklered buildings and 130 ft (39.7 m) for nonsprinklered buildings. The hose connections required in shall be located in the exit passageway at each entrance to the building. 5 of 123 6/10/2014 9:07 AM

59 Global FR-118 Hide Deleted Nonrequired stairs connecting two adjacent floors shall not require hose connections. Global FR-119 Hide Deleted A single hose connection shall be permitted to be installed in the corridor or breezeway between open stairs that are not greater than 75 ft (23 m) apart Hose connections shall be provided in covered mall buildings, at the entrance to each exit passageway or exit corridor, and at the interior side of public entrances from the exterior to the mall * Hose connections shall be provided at the highest landing of stairways with stairway access to a roof * The hose connection required by shall not be required where hose connections are installed in accordance with In stairways that do not access the roof, a hose connection shall be provided on the roof The hose connection required by shall not be required where the roof slope is 4 in 12 or greater The hose connection required by shall not be required where at least one hose connection in accordance with is provided in the building Where there are no hose connections as provided by , a single hose connection shall be provided on the roof * Additional hose connections shall be provided in unsprinklered buildings where the distance from connections required by through to the most remote portion or story exceeds 150 ft (45.7 m) * Additional hose connections shall be provided in buildings sprinklered in accordance with NFPA 13 or NFPA 13R where the distance from connections required by through to the most remote portion or story exceeds 200 ft (61 m) The distance in and shall be measured from the hose connection The location of additional hose connections shall be approved by the AHJ The distance in and shall not apply to the roof if the roof is not intended for occupancy Where allowed by the AHJ, the hose connections required by shall be permitted to be omitted The distances in and shall be reduced to 130 ft (39.7 m) when manual dry standpipes are installed in open parking garages. Supplemental Information File Name Description 7_3_2_edited_NW_-_CD_responses.docx Final version from SL, April 21 6 of 123 6/10/2014 9:07 AM

60 Submitter Full Name: Chad Duffy Organization: National Fire Protection Assoc Submittal Date: Wed Apr 09 14:57:42 EDT 2014 Committee Statement: Response Message: Section has been reorganized, see attached word document "Revised_Section_7.3.2". For section , and see global FR's 117, 118, and 119. Public Input No. 9-NFPA [Section No ] Public Input No. 10-NFPA [Section No ] Public Input No. 51-NFPA [Section No [Excluding any Sub-Sections]] Public Input No. 104-NFPA [Section No ] 7 of 123 6/10/2014 9:07 AM

61 8 of 123 6/10/2014 9:07 AM First Revision No. 34-NFPA [ Section No [Excluding any Sub-Sections] ] Where the a building is protected throughout by an approved automatic sprinkler system in accordance with NFPA 13, Standard for the Installation of Sprinkler Systems, or NFPA 13R, Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies, Class II hose stations for use by trained personnel shall not be required, subject to the approval of the local fire department and the AHJ, provided that each Class I hose connection is in. (65 mm) and is equipped with a in in. (65 mm 40 mm) reducer and a cap attached with a chain. Submittal Date: Tue Mar 04 17:50:18 EST 2014 Committee Statement: There is no justification that this exception should be contingent upon the approval of the fire department or AHJ. Either the code should allow the removal or it should not allow the removal. With the current langauge, neither the AHJ nor the Fire Department is provided with any guidance as to when they should allow or deny the removal. If there are specific reasons to maintain the hose line requirement, then those provisions should be codified as specific conditions in NFPA 14. Otherwise, the standard should allow for the removal. Response Message: Public Input No. 147-NFPA [Section No [Excluding any Sub-Sections]]

62 9 of 123 6/10/2014 9:07 AM First Revision No. 35-NFPA [ Section No ] The travel distance limitation of shall not apply to Class III systems. Submittal Date: Tue Mar 04 17:52:19 EST 2014 Committee Statement: Response Message: I believe that the committee's intent is that the 130 foot limitation only applies in a sprinklered building. Public Input No. 93-NFPA [Section No ]

63 First Revision No. 36-NFPA [ Section No. 7.5 ] 7.5* Interconnection of Standpipes Where two or more standpipes are installed in the same building or section of building, they shall be interconnected Where standpipes are supplied by tanks located at the top of the building or zone, the standpipes shall be interconnected at the top Where wet standpipes are interconnected at the top and bottom, check valves shall be installed at the base of each standpipe to prevent circulation Dry standpipes shall have only a single level of interconnection. Submittal Date: Tue Mar 04 18:01:30 EST 2014 Committee Statement: Requiring check valves at the base of dry standpipes creates a water trap. Dry standpipes should be limited to a single point of interconnection to prevent circulation both of water and of trapped air while being charged with water. Response Message: Public Input No. 19-NFPA [Section No. 7.5] 0 of 123 6/10/2014 9:07 AM

64 First Revision No. 37-NFPA [ Section No. 7.6 ] 7.6 Minimum Sizes for Standpipes and Branch Lines, Class I and Class III Standpipes Class I and Class III standpipes Standpipes shall be at least 4 in. (100 mm) in size Standpipes that are part of a combined system shall be at least 6 in. (150 mm) in size Where the building is protected throughout by an approved automatic sprinkler system in accordance with NFPA 13 or NFPA 13R, the minimum standpipe size shall be 4 in. (100 mm) for systems hydraulically designed in accordance with Branch lines shall be sized based on the hydraulic criteria established in Section 7.8 and Section 7.10 but not sized smaller than in. (65 mm) Where the building is protected throughout by an approved automatic sprinkler system in accordance with NFPA 13, Standard for the Installation of Sprinkler Systems, or NFPA 13R, Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies, the minimum standpipe size shall be 4 in. (100 mm) for systems hydraulically designed in accordance with Branch lines shall be sized based on the hydraulic criteria established in Section 7.8 and Section 7.10 but not less than in. (65 mm). Submittal Date: Tue Mar 04 18:36:07 EST 2014 Committee Statement: Response Message: Clarification is required to show that this requirement is for Class I and Class III Standpipes and not for a Class II Standpipe. Public Input No. 46-NFPA [Sections 7.6.2, 7.6.3] Public Input No. 103-NFPA [Section No. 7.6] 1 of 123 6/10/2014 9:07 AM

65 2 of 123 6/10/2014 9:07 AM First Revision No. 38-NFPA [ Section No [Excluding any Sub-Sections] ] Except as permitted by 7.2.4, each standpipe system zone shall be provided with a separate pump or a separate discharge outlet from a multiple-stage, multiple-port fire pump. Submittal Date: Tue Mar 04 19:03:57 EST 2014 Committee Statement: Response Message: A proposal to permit multiple stage, multiple port fire pumps was accepted by NFPA 20 at the public input committee meeting and should be added to NFPA 14. Public Input No. 30-NFPA [Section No [Excluding any Sub-Sections]]

66 3 of 123 6/10/2014 9:07 AM First Revision No. 39-NFPA [ Section No ] 7.9.3* For systems buildings with two or more zones in which any portion of the higher zones cannot be supplied by means of fire department pumpers through a fire department connection, an auxiliary means of supply in the form of high-level water storage with additional pumping equipment or other means acceptable to the AHJ shall be provided. Submittal Date: Tue Mar 04 19:04:40 EST 2014 Committee Statement: The term systems is not clear. As an example a single zone standpipe with a water storage tank and fire could be located above the pumping capacity of the fire department (example floors ) and because the "system" is a single zone, a back up supply would not be required. Using the term "building" would include all standpipe zones in the building even if there are multiple standpipe systems. Response Message: Public Input No. 28-NFPA [Section No ]

67 4 of 123 6/10/2014 9:07 AM First Revision No. 40-NFPA [ Section No ] The minimum flow rate for additional standpipes shall be 250 gpm (946 L/min) per standpipe for buildings with floor areas that do not exceed 80,000 ft 2 (7432 m 2 ) per floor. For buildings that exceed 80,000 ft 2 (7432 m 2 ) per floor, the minimum flow rate for the additional standpipes shall be 500 gpm (1893 L/min) for the second standpipe and 250 gpm (946 L/min) for the third standpipe if the additional flow is required for an unsprinklered building For buildings that exceed 80,000 ft 2 (7432 m 2 ) per floor, the minimum flow rate for additional standpipes shall be 500 gpm (1893 L/min) for the second standpipe and 250 gpm (946 L/min) for the third standpipe if the additional flow is required for an unsprinklered building. Submittal Date: Tue Mar 04 19:05:31 EST 2014 : Manual of style. Two requirements should be in separate sections. Response Message: Public Input No. 99-NFPA [Section No ]

68 5 of 123 6/10/2014 9:07 AM First Revision No. 45-NFPA [ Section No ] * Where a standpipe system has risers that terminate at different floor levels, separate hydraulic calculations shall be performed for the standpipes that exist on each level. In each case, flow shall be added only for standpipes that exist on the floor level of the calculations In each case, flow shall be added only for standpipes that exist on the floor level of the calculations. Submittal Date: Wed Mar 05 10:34:39 EST 2014 : Manual of style Response Message: Public Input No. 101-NFPA [Section No ]

69 First Revision No. 46-NFPA [ New Section after ] * Common supply piping shall be calculated and sized to provide the required flow rate for all standpipes connected to such supply piping, with the total not to exceed the maximum flow demand in Common supply piping for separate standpipe systems shall be calculated to provide flow for the most demanding system. Submittal Date: Wed Mar 05 10:41:50 EST 2014 Committee Statement: The current language requires that common supply piping be sized to provide for all standpipes connected to it. Consideration should be given when these buildings are properly separated to be considered separate. Response Message: Public Input No. 107-NFPA [New Section after ] 6 of 123 6/10/2014 9:07 AM

70 7 of 123 6/10/2014 9:07 AM First Revision No. 47-NFPA [ Section No ] The drain riser shall be equipped with tees connections that are of the same size as the discharge outlets of the pressure-regulating devices to be tested with internal threaded swivel fittings having NHS threads, as specified in NFPA 1963, Standard for Fire Hose Connections, with plugs, and shall be located on at least every other floor The drain riser connections shall be located on at least every other floor. Submittal Date: Wed Mar 05 10:45:06 EST 2014 : Manual of style. Response Message: Public Input No. 102-NFPA [Section No ]

71 8 of 123 6/10/2014 9:07 AM First Revision No. 48-NFPA [ Section No ] Where drain risers are interconnected and run to a common discharge point, all the common piping shall be sized for the combined flow. Submittal Date: Wed Mar 05 10:50:53 EST 2014 Committee Statement: Response Message: It is logical to require the common piping to be sized accordingly. By specifying all piping, this could mean upsizing piping back to all reducing valves. Public Input No. 108-NFPA [Section No ]

72 First Revision No. 49-NFPA [ Section No ] The main drain connection shall be sized in accordance with Table Table Sizing for Standpipe Drains Standpipe Size Size of Drain Connection Up to 2 in. (50 mm) 3 4 in. (20 mm) or larger in. (65 mm), 3 in. (80 mm), or in. (90 mm) in. (32 mm) or larger 4 in. (100 mm) or larger 2 in. (50 mm) only or larger Submittal Date: Wed Mar 05 10:52:06 EST 2014 Committee Statement: The drain sizes should not be limited to 2" on larger systems. Providing larger drains may save an owner time and money on system modifications. This will also permit main drain tests to more accurately reflect any changes in the water supply. Response Message: Public Input No. 159-NFPA [Section No ] 9 of 123 6/10/2014 9:07 AM

73 0 of 123 6/10/2014 9:07 AM First Revision No. 50-NFPA [ Section No ] The main drain connection shall be provided discharge at a location that permits the valve to be opened wide without causing water damage. Submittal Date: Wed Mar 05 10:57:04 EST 2014 : This reference should be to the discharge of the connection. Response Message: Public Input No. 109-NFPA [Section No ]

74 1 of 123 6/10/2014 9:07 AM First Revision No. 52-NFPA [ Section No ] Plans accurately showing the details and arrangement of the standpipe system shall be furnished submitted for approval to the authority having jurisdiction (AHJ) prior to the installation of the system. Submittal Date: Wed Mar 05 11:35:12 EST 2014 Committee Statement: Due to varying jurisdictional requirements it is not practical to require plans be approved prior to installation. Response Message: Public Input No. 52-NFPA [Section No ]

75 2 of 123 6/10/2014 9:07 AM First Revision No. 53-NFPA [ Section No ]

76 3 of 123 6/10/2014 9:07 AM 8.1.2

77 4 of 123 6/10/2014 9:07 AM Working plans shall be drawn to an indicated scale, on sheets of uniform size, and shall show those items from the following list that pertain to the design of the system: (1) Name of owner(s) and occupant(s) (2) Location, including street address (3) Point of compass (4) Name and address of installing contractor (5) For automatic and semiautomatic standpipe systems, the following: (a) (b) Size of city main in street and whether dead end or circulating; if dead end, direction and distance to nearest circulating main City main test results and system elevation relative to test hydrant (6) For automatic and semiautomatic standpipe systems, other sources of supply, with pressure and elevation (7) Approximate capacity of each dry pipe system (8) For automatic and semiautomatic standpipe systems, water supply capacity information, including the following: (a) (b) (c) (d) (e) (f) (g) (h) (i) Location and elevation of static and residual test gauge with relation to the riser reference point Flow location Static pressure [psi (bar)] Residual pressure [psi (bar)] Flow [gpm (L/min)] Date Time Name of person who conducted the test or supplied the information Other sources of water supply, with pressure or elevation (9) Pipe type and schedule of wall thickness (10) Nominal pipe size and cutting lengths of pipe (or center-to-center dimensions) (11) Type of fittings and joints and locations of all welds and bends (12) Type and location of hangers, sleeves, braces, and methods of securing piping (13) All control valves, check valves, drain pipes, and test connections (14) Make, type, model and size of alarm, dry pipe, or deluge valve (15) Type and location of alarms (16) Size and location of standpipes, hose outlets, hand hose, nozzles, cabinets, and related equipment (17) Information on the hydraulic data nameplate (18) Hydraulic reference points shown on plan that correspond with comparable reference points on the hydraulic calculation sheets (19) The setting for pressure-reducing and pressure-restricting valves (20) For automatic and semiautomatic standpipe systems, size and location of hydrants, including static and residual hydrants used in flow tests The size and location of hydrant(s) and the relation to fire department connections (21) Size, location, and piping arrangement of fire department connections (22) Scale and graphical representation of the scale (23) Hose valve manufacturer and model (24) Pressure-reducing valve(s) manufacturer and model

78 5 of 123 6/10/2014 9:07 AM (25) Required pressure at hose valve outlet (26) Location of hose valves used in the hydraulic calculations (27) Standpipe system demand (flow and pressure) at the following locations: (a) (b) (c) (d) Fire department connection (FDC) inlet Fire pump discharge flange Water supply tank discharge Water supply source if different from (a) through (c) Submittal Date: Wed Mar 05 11:50:18 EST 2014 Committee Statement: This section is somewhat redundant. The main pipe sizing and flow test results are already required by (5) and by (8). I believe the intent of this section is to show the hydrant locations for all types of standpipes in relation to the FDC. Response Message: Public Input No. 111-NFPA [Section No ]

79 6 of 123 6/10/2014 9:07 AM First Revision No. 54-NFPA [ Section No ] 8.1.4* The plans shall include specifications covering the character of materials used and shall describe all system components. Supplemental Information File Name A.8.1.4_FR_54.docx Description Edited Submittal Date: Wed Mar 05 11:55:11 EST 2014 Committee Statement: Response Message: The current requirement is appropriate, but the addition of this annex note clarifies the intent. Insert new annex A Public Input No. 160-NFPA [Section No ]

80 A Manufacturer s Material Data Sheets should be acceptable for meeting this requirement.

81 7 of 123 6/10/2014 9:07 AM First Revision No. 55-NFPA [ Section No ] 8.2.3* Hydraulic calculations shall be prepared on form sheets that include a summary sheet, detailed worksheets, and a graph sheet. [13: ] Supplemental Information File Name Figures_A.8.2.3_a_through_d_edited.docx Description edited Submittal Date: Wed Mar 05 11:55:40 EST 2014 Committee Statement: Response Message: Extract forms (a) through (d) from NFPA 13. The forms from NFPA 13 are required to be created by every computer program available. This should also be required in NFPA 14. Public Input No. 161-NFPA [Section No ]

82 8 of 123 6/10/2014 9:07 AM First Revision No. 56-NFPA [ Section No ] Summary Sheet. The summary sheet shall contain the following information, where applicable: (1) Date (2) Location (3) Name of owner and occupant (4) Building number or other identification (5) Description of hazard (6) Name and address of contractor or designer (7) Name of approving agency (8) System design requirements, as follows: (a) (b) Number of standpipes flowing Minimum rate of water application gpm (L/min) (9) Total water requirements as calculated, including allowance for inside hose, outside hydrants, and sprinklers for buildings with partial sprinkler protection individual standpipe and partial sprinkler demand [ 13: ] Submittal Date: Wed Mar 05 11:57:49 EST 2014 Committee Statement: Response Message: The extract reference should be deleted as this is not the correct section in NFPA 13 and the language differs. Revise (9) to account for standpipe demand. Public Input No. 113-NFPA [Section No ]

83 9 of 123 6/10/2014 9:07 AM First Revision No. 57-NFPA [ Section No ] Detailed Worksheets. Detailed worksheets or computer printout sheets shall contain the following information: (1) Sheet number (2) Hose connection description and discharge constant (K) (3) Hydraulic reference points (4) Flow in gpm (L/min) (5) Pipe size (6) Pipe lengths, center-to-center of fittings (7) Equivalent pipe lengths for fittings and devices (8) Friction loss in psi/ft (bar/m) of pipe (9) Total friction loss between reference points (10) Devices per (11) Elevation head in psi (bar) between reference points (12) Required pressure in psi (bar) at each reference point (13) Velocity pressure and normal pressure if included in calculations (14) Notes to indicate starting points or reference to other sheets or to clarify data shown [ 13: ] Submittal Date: Wed Mar 05 12:03:56 EST 2014 Committee Statement: The extract reference should be deleted as this is not the correct section in NFPA 13 and the language differs. Response Message: Public Input No. 114-NFPA [Section No ]

84 0 of 123 6/10/2014 9:07 AM First Revision No. 58-NFPA [ Section No ] Table shall be used to determine the equivalent length of pipe for fittings and devices unless the manufacturer's test published data indicate that other factors are more accurate. Table Equivalent Pipe Length Chart Fittings and Valves 3 4 in. 1 in. Fittings and Valves Expressed in Equivalent Feet of Pipe in in. 45 degree elbow degree standard elbow degree long-turn elbow Tee or cross (flow turned 90 degrees) Butterfly valve Gate valve Swing check* Globe (straight) hose valve Angle or hose valve For SI units, 1 in. = 25.4 mm. *Due to the variations in design of swing check valves, the pipe equivalents indicated in this table are considered to be average. 2 in in. 3 in in. 4 in. 5 in. 6 in. 8 in. 10 in. 12 in. Submittal Date: Wed Mar 05 12:06:15 EST 2014 Committee Statement: Published data is the more appropriate term as the data may or may not have come from specific testing but rather engineering.the charts are only valid for Schedule 40 pipe. Fittings attached to pipe with different internal diameters must be adjusted in accordance with a formula that is also being proposed to be added. Response Message: Public Input No. 115-NFPA [Section No ] Public Input No. 162-NFPA [Section No ]

85 1 of 123 6/10/2014 9:07 AM First Revision No. 121-NFPA [ Section No ] Differing Values. Specific friction loss values or equivalent pipe lengths for listed fittings not in Table shall be used in hydraulic calculations where these losses or equivalent pipe lengths are different from those shown in Table [13: ] Submitter Full Name: Michael Beady Submittal Date: Thu May 01 16:19:30 EDT 2014 : Update to extract citation Response Message:

86 First Revision No. 59-NFPA [ Section No ] Table indicates typical C factors that shall be used for commonly used piping materials. Table Hazen-Williams C Values Pipe or Tube C Value Unlined cast or ductile iron 100 Black steel (dry systems, including preaction ) 100 Black steel (wet systems, including deluge ) 120 Galvanized (all wet ) 120 Galvanized (dry) 100 Plastic (listed all) 150 Cement-lined cast or ductile iron 140 Copper tube or stainless steel 150 Submittal Date: Wed Mar 05 12:11:13 EST 2014 Committee Statement: Response Message: Industry data indicates that galvanized piping does not necessarily reduce corrosion in dry systems. NFPA 13 has made this modification and NFPA 14 should correlate. Public Input No. 116-NFPA [Section No ] 2 of 123 6/10/2014 9:07 AM

87 3 of 123 6/10/2014 9:07 AM First Revision No. 60-NFPA [ New Section after ] For internal pipe diameters different from Schedule 40 steel pipe [Schedule 30 for pipe diameters 8 in. (200 mm) and larger], the equivalent length shown in Table shall be multiplied by a factor derived from the following equation: [ ] The factor thus obtained shall be further modified as required by Table This table shall apply to other types of pipe listed in Table only where modified by factors from and Submittal Date: Wed Mar 05 12:15:26 EST 2014 Committee Statement: Response Message: Fittings are supposed to be adjusted when connected to pipes having internal diameters that differ from Schedule 40 pipe. Public Input No. 163-NFPA [New Section after ]

88 4 of 123 6/10/2014 9:07 AM First Revision No. 61-NFPA [ Section No ] Pipe friction losses shall be determined on the basis of the Hazen-Williams formula, as follows: [ ] where: p = frictional resistance in psi per foot of pipe (psi/ft of pipe) Q = flow in gpm (gpm) C = friction loss coefficient d = actual internal diameter of pipe in inches [13: ] Submittal Date: Wed Mar 05 12:16:11 EST 2014 : Update extract reference to current published document. Response Message: Public Input No. 117-NFPA [Section No ]

89 First Revision No. 62-NFPA [ Section No ] For SI units, the following equation shall be used: [ ] where: p = frictional resistance in bar per meter of pipe (bar/m of pipe) m Q = flow in L/min (L/min) m C = friction loss coefficient d = actual internal diameter in mm (mm) [13: ] m Submittal Date: Wed Mar 05 12:17:01 EST 2014 : Update extract reference to current published document. Response Message: Public Input No. 118-NFPA [Section No ] 5 of 123 6/10/2014 9:07 AM

90 First Revision No. 63-NFPA [ Sections 9.2, 9.3 ] 9.2 Minimum Supply for Class I, Class II, and Class III Systems. The minimum water supply shall be capable of providing the system demand established by Sections 7.8 and 7.10 for at least 30 minutes. 9.3 Minimum Supply for Class II Systems. The minimum supply for Class II systems shall be capable of providing the system demand established by Sections 7.8 and 7.10 for at least 30 minutes. Submittal Date: Wed Mar 05 12:21:15 EST 2014 Committee Statement: Editorial Change. Sections 9.2 and 9.3 state identical requirements for the minimum water supply for Class I and Class III systems as well as for Class II systems, with slightly different wording. Proposal consolidates the two sections into one, combining the slighlty different wording of "water supply" in 9.2 and "minimum supply" in 9.3 to "minimum water supply", and uses the same wording in the section heading. Response Message: Public Input No. 142-NFPA [Sections 9.2, 9.3] 6 of 123 6/10/2014 9:07 AM

91 First Revision No. 98-NFPA [ New Section after 10.1 ] Daily and seasonal flow and pressure fluctuation data shall be provided by the water purveyor, and the fire protection design must account for both high and low variations Where these data are not available, design shall be based on the available water flow data. Submittal Date: Fri Mar 14 11:01:56 EDT 2014 Committee Statement: Response Message: Because water system performance can vary significantly during different hours of the day and seasons of the year it is important to assess the water supply as accurately as possible. Public Input No. 5-NFPA [Section No. 10.1] 7 of 123 6/10/2014 9:07 AM

92 First Revision No. 99-NFPA [ Section No ] 10.1* Water Supply Evaluation. Global FR-99 Hide Deleted A waterflow test shall be conducted on the water distribution system to determine the rate of flow and pressures available for system design and for fire-fighting purposes. The volume and pressure of a public water supply shall be determined from waterflow test data or other approved method. [ 24: 5.1.2] Daily and seasonal flow and pressure fluctuation data shall be provided by the water purveyor, and the fire protection design must account for both high and low variations Where these data are not available, design shall be based on the available water flow data. Submittal Date: Fri Mar 14 11:05:51 EDT 2014 Committee Statement: Response Message: More and more water purveyors do not allow flow tests and base everything on modeling programs. Public Input No. 120-NFPA [Section No. 10.1] 8 of 123 6/10/2014 9:07 AM

93 9 of 123 6/10/2014 9:07 AM First Revision No. 112-NFPA [ Section No ]

94 0 of 123 6/10/2014 9:07 AM

95 1 of 123 6/10/2014 9:07 AM The installing contractor shall complete and sign the appropriate contractor's material and test certificate(s) as shown in Figure (a) and Figure (b). Figure (a) Sample Contractor's Material and Test Certificate for Aboveground Piping.

96 2 of 123 6/10/2014 9:07 AM

97 3 of 123 6/10/2014 9:07 AM Figure (b) Sample of Contractor's Material and Test Certificate for Underground Piping. [24:Figure ]

98 4 of 123 6/10/2014 9:07 AM

99 5 of 123 6/10/2014 9:07 AM Supplemental Information File Name Figure_11.1.3_a_- _Top_of_standpipe_pressures.docx Description Record top of standpipe pressures during hydrostatic testing.

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement Second Revision No. 20-NFPA 14-2015 [ Section No. 1.4 ] 1.4* Equivalency. Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength,

More information

Second Revision No. 3-NFPA [ Section No. 2.3 ]

Second Revision No. 3-NFPA [ Section No. 2.3 ] Second Revision No. 3-NFPA 804-2014 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three Park Avenue, New York, NY 10016-5990. ASME Boiler

More information

NFPA 14. Standard for the. Installation of Standpipe and Hose Systems Edition

NFPA 14. Standard for the. Installation of Standpipe and Hose Systems Edition NFPA 14 Standard for the Installation of Standpipe and Hose Systems 2007 Edition Copyright 2006 National Fire Protection Association. All Rights Reserved. This edition of NFPA 14, Standard for the Installation

More information

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM 1 of 11 1/18/2016 5:43 PM First Revision No. 2-NFPA 51-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) CGA C-7 Guide to Precautionary Labelling

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD STANDPIPE SYSTEMS PURPOSE This standard outlines the general requirements for the installation of standpipe systems. CODE REFERENCES

More information

Public Comment No. 20-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item

Public Comment No. 20-NFPA [ Section No ] Statement of Problem and Substantiation for Public Comment Related Item of 27 9/2/2014 9:27 AM Public Comment No. 20-NFPA 24-2014 [ Section No. 2.3.2 ] 2.3.2 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

NFPA 14. Standard for the. Installation of Standpipe and Hose Systems Edition

NFPA 14. Standard for the. Installation of Standpipe and Hose Systems Edition NFPA 14 Standard for the Installation of Standpipe and Hose Systems 2003 Edition Copyright 2003, National Fire Protection Association, All Rights Reserved This edition of NFPA 14, Standard for the Installation

More information

Report on First Revision November 2013 NFPA 750

Report on First Revision November 2013 NFPA 750 750 FR1 (Chapter 2) Recommendation: Update the following references: Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard

More information

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Solvent Extraction Plants

More information

1 Exam Prep. Questions and Answers

1 Exam Prep. Questions and Answers 1 Exam Prep NFPA 14: Standard for the Installation of Standpipe and Hose Systems Questions and Answers 1. According to the NFPA-14, class I standpipes shall be at least inches in size. A. 2" 1/2" C. 3"

More information

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment

Public Comment No. 22-NFPA [ New Section after 1.4 ] Statement of Problem and Substantiation for Public Comment of 25 5/14/2015 2:32 PM Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ] A.1.4 A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement

More information

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements Module 3 Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements 1 WATER-BASED SUPPRESSION SYSTEMS-PART TWO This module covers: 1. Ohio Building Code requirements and when and why

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 1-NFPA 36-2013 [ Global Input ] Revise the document to eliminate the use of "Exception" text. The use of "Exception" text is inconsistent with the Manual of Style. Exception text should

More information

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM SECTION 21 0000 AUTOMATIC FIRE SPRINKLER SYSTEM PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Codes and Standards: 1. FBC (Florida Building Code 2015) 2. FBC (Florida Fire Code 2015) 3. NFPA #13R (Standard for

More information

1 of /3/ :03 PM. Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ]

1 of /3/ :03 PM. Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ] 1 of 129 11/3/2016 12:03 PM Public Input No. 1-NFPA 13D-2015 [ Chapter 2 ] 2 of 129 11/3/2016 12:03 PM American Society of Mechanical Engineers Chapter 2 Referenced Publications 2.1 General. The documents

More information

SPRINKLERS TABLE OF CONTENTS

SPRINKLERS TABLE OF CONTENTS SPRINKLERS TABLE OF CONTENTS SECTION 21 13 13 WET PIPE SPRINKLER SYSTEMS SECTION 211313 - WET PIPE SPRINKLER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

First Revision No. 20-NFPA [ Section No ]

First Revision No. 20-NFPA [ Section No ] of 25 7/15/2015 8:30 AM First Revision No. 20-NFPA 56-2015 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by NFPA

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: Technical Committee on Standpipes Elena

More information

Remove the "Exception" text to be consistent with direction provided in the MOS.

Remove the Exception text to be consistent with direction provided in the MOS. of 37 1/11/2017 7:38 AM Public Input No. 9-NFPA 88A-2015 [ Global Input ] Remove the "Exception" text to be consistent with direction provided in the MOS. The current language in 88A has numerous section

More information

2. Welding Materials and Procedures shall conform to the ASME Code.

2. Welding Materials and Procedures shall conform to the ASME Code. PART 1 GENERAL 1.01 Scope of Standard A. The design guidelines contained herein include the requirements for systems, materials, fittings and valves utilized for fire protection systems at Sam Houston

More information

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS July 1, 2010 SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS Address: Permit #: Inspector: Date Inspected: Status: Inspector: Date Inspected: Status: A-Approved;

More information

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Public Input No. 4-NFPA [ Section No. 4.2 ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification Public Input No. 4-NFPA 214-2013 [ Section No. 4.2 ] 4.2 * Fire Risk Analysis. A fire risk analysis shall be conducted. The following are some of the factors that shall be considered in determining the

More information

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1 GENERAL: 1. All fire protection systems shall be installed in accordance with the International Fire Code and applicable NFPA standards. This guideline provides additional requirements for the design and

More information

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements. FIRE PROTECTION GENERAL INFORMATION 1.1 Refer to Section 230000 for General Mechanical Requirements. 1.2 Refer to Section 230529 for Hangers and Supports. 1.3 Refer to Section 230553 for Pipe and Equipment

More information

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems

M E M O R A N D U M. NFPA Technical Committee on Water Spray Fixed Systems National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M To: From: NFPA Technical Committee on Water Spray

More information

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following: SECTION 21 10 00 - WATER-BASED FIRE-SUPPRESSION PART I - GENERAL 1.1 SUMMARY A. Inclusion of sprinkler and standpipe systems shall be as determined by NFPA National Fire Code pamphlet 101 and program statement.

More information

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM

First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] Submitter Information Verification. Committee Statement 11/18/2016 2:25 PM of 28 11/18/2016 2:25 PM First Revision No. 3-NFPA 51B-2016 [ New Section after 1.5 ] 1.6 Units and Formulas. 1.6.1 The units of measure in this standard are presented first in U.S. customary units (inch-pound

More information

Committee on NFPA 15

Committee on NFPA 15 Committee on NFPA 15 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Water Spray Fixed Systems Jeanne Moreau-Correia DATE: February 8, 2010 SUBJECT: NFPA 15 A11 ROP Letter Ballot The ROP letter

More information

Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

Change all instances of flame resistant (hypobaric) to Limited-Combustible (material) in all instances in the document. 1 of 9 10/21/2015 1:22 PM First Revision No. 3-NFPA 99B-2015 [ Global Input ] Change all instances of "flame resistant (hypobaric)" to "Limited-Combustible (material)" in all instances in the document.

More information

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification Second Revision No. 2011-NFPA 101-2016 [ Section No. 14.2.2.2.4 ] 14.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked to prevent unwanted entry

More information

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement 1 of 7 3/4/2016 12:02 PM Second Revision No. 5-NFPA 56-2016 [ Section No. 1.1.2 ] 1.1.2 Nonapplication of Standard. This standard shall not apply to the following items: (1)* Piping systems covered by

More information

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University. 15500 - FIRE PROTECTION PART I DESIGN GUIDELINES A. General 1. Vertical fire pumps shall not be used at the University. 2. coupling piping shall be permitted for sprinkler and standpipe systems only. B.

More information

Public Comment No. 16-NFPA 13D-2014 [ Section No ]

Public Comment No. 16-NFPA 13D-2014 [ Section No ] of 52 9/22/2014 9:20 AM Public Comment No. 16-NFPA 13D-2014 [ Section No. 2.3.3 ] 2.3.3 ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959. ASTM

More information

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM

First Revision No. 49-NFPA 17A-2015 [ Detail ] Submitter Information Verification. Committee Statement 7/30/2015 1:35 PM of 25 7/30/2015 1:35 PM First Revision No. 49-NFPA 17A-2015 [ Detail ] Make the following change to 5.2.1.10.2: 5.2.1.10.2* The manual actuation device shall clearly identify the hazard protected and provide

More information

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint. (816) 373-4878 U1208-01/FAI29-029 (573) 751-2624 SECTION 2 105 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the

More information

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement

Second Revision No. 1-NFPA [ Section No. 2.2 ] Submitter Information Verification. Committee Statement Second Revision No. 1-NFPA 1410-2014 [ Section No. 2.2 ] 2.2 NFPA Publications. National Fire Protection Association, 1 Batterymarch Park, Quincy, MA 02169-7471. NFPA 1500, Standard on Fire Department

More information

Public Input No. 11-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input

Public Input No. 11-NFPA [ Global Input ] Additional Proposed Changes. Statement of Problem and Substantiation for Public Input of 159 6/10/2014 8:52 AM Public Input No. 11-NFPA 14-2013 [ Global Input ] Include the provision of new design proposal in the code for Fire water system. Additional Proposed Changes File Name NFPA_Public_Input_Form.pdf

More information

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 20 00 05 Mechanical - General Requirements.2 Section 22 05 00 Plumbing - General Requirements.3 UBC Standard Fire Hydrant Drawings.4 Section

More information

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040 SPRINKLER SHOP DRAWINGS 2007 NFPA 13 and 2007 NFPA 24 Project: Listed items require sprinkler

More information

First Revision No. 15-NFPA [ Chapter 2 ]

First Revision No. 15-NFPA [ Chapter 2 ] Page 1 of 28 First Revision No. 15-NFPA 91-2013 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard

More information

SPRINKLER PROTECTION OF COMBUSTIBLE CONCEALLED SPACES WITH LESS THAN 6 BETWEEN OPPOSITE FACES IN CAVITY.

SPRINKLER PROTECTION OF COMBUSTIBLE CONCEALLED SPACES WITH LESS THAN 6 BETWEEN OPPOSITE FACES IN CAVITY. STATE OF LOUISIANA DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS OFFICE OF STATE FIRE MARSHAL CODE ENFORCEMENT AND BUILDING SAFETY 8181 INDEPENDENCE BOULEVARD, BATON ROUGE, LA 70806 800-256-5452 225-925-4920

More information

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 - FIRE SUPPRESSION DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

A. This section includes design and performance information for fire protection and suppression systems.

A. This section includes design and performance information for fire protection and suppression systems. SECTION 21 00 10: FIRE PROTECTION SYSTEM DESIGN 1. SUMMARY A. This section includes design and performance information for fire protection and suppression systems. 2. GENERAL A. All fire protection materials

More information

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION SECTION 21 1301- FIRE-SUPPRESSION SYSTEMS PART 1 - GENERAL 1.1 SUMMARY: A. This Section includes fire-suppression piping and equipment for the following building systems: 1. Wet-pipe, fire-suppression

More information

WORKING DRAFT OF COMMITTEE MEETING OUTPUT

WORKING DRAFT OF COMMITTEE MEETING OUTPUT WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 221 Revision Cycle: A2014 Meeting Date: 5/20/2013

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 1314D - AUTOMATIC SPRINKLER SYSTEMS (DRY-PIPE) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS Ul611-0l SECTION 211316- DRY-PIPE SPRINKLER SYSTEMS PARTl-GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions, and Division 1 Specification

More information

SAF-BCF SECOND REVISIONS WITH STATEMENTS

SAF-BCF SECOND REVISIONS WITH STATEMENTS Page 196 of 331 32.2.1.3 ] Second Revision No. 153-NFPA 101-2013 [ New Section after 32.2.1.4 Multiple-Level Buildings. For purposes of applying requirements of this chapter that utilize the term level

More information

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and Pipe Fittings. B. Air compressor. C. Air receiver and accessories. D. Aftercooler. E. Refrigerated air dryer. F. Pressure reducing station. 1.02 RELATED

More information

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle)

MEMORANDUM. NFPA 51 First Draft Technical Committee FINAL Ballot Results (A2017 Cycle) National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM TO: FROM: Technical Committee on Industrial and Medical Gases

More information

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input

Public Input No. 88-NFPA [ New Section after ] Statement of Problem and Substantiation for Public Input of 201 1/13/2014 12:51 PM Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating

More information

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS 2006 Edition, Published January 1, 2006; Division Revision Date: June 30, 2016 21 00 00. FIRE SUPPRESSION 21 00 03. GENERAL PROVISIONS.1 PREPARATION OF CONTRACT DOCUMENTS.1.1 PLUMBING CONTRACT: Include

More information

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference

Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference Matthews, Diane Subject: Location: Start: End: Show Time As: Recurrence: Meeting Status: Organizer: Required Attendees: Adobe Connect - Invitation to NFPA 385 Second Draft Web Conference http://nfpa.adobeconnect.com/rpbmeet/

More information

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document 1 of 19 10/21/2015 1:20 PM Public Input No. 1-NFPA 99B-2015 [ Section No. 2.3 ] 2.3 Other Publications. 2.3.1 ASME Publications. American Society of Mechanical Engineers, Three ASME International, Two

More information

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS Introduction When properly installed and maintained, automatic fire sprinkler systems have proven to be the most effective means for protecting life and

More information

Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group

Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group of 36 9/22/2014 9:37 AM Second Revision No. 14-NFPA 13D-2014 [ Global Comment ] Revise the metric values throughout the standard to follow the soft conversions provided by the metric task group Supplemental

More information

B. Related Sections: The following Sections contain requirements that relate to this Section.

B. Related Sections: The following Sections contain requirements that relate to this Section. SECTION 211313- FIRE-SUPPRESSION PIPING PART1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general prov1s1ons of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. This section outlines the requirements for the nitrogen-generating sprinkler corrosion inhibiting system. The work

More information

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings. DIVISION 21 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 GENERAL 1.1 SECTION INCLUDES A. Pipe, fittings, sleeves, escutcheons, seals, and connections for sprinkler systems. 1.2 RELATED REQUIREMENTS

More information

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM

Second Revision No. 1-NFPA 17A-2016 [ Section No ] Submitter Information Verification. Committee Statement. 1 of 14 6/22/2016 3:15 PM 1 of 14 6/22/2016 3:15 PM Second Revision No. 1-NFPA 17A-2016 [ Section No. 4.3.3 ] 4.3.3 All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease vapors,

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] of 161 1/5/2017 1:34 PM First Revision No. 1-NFPA 20-2016 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this

More information

First Revision No. 82-NFPA [ Detail ] Submitter Information Verification Submitter Full Name: Organization:

First Revision No. 82-NFPA [ Detail ] Submitter Information Verification Submitter Full Name: Organization: of 176 1/25/2016 3:32 PM First Revision No. 82-NFPA 54-2015 [ Detail ] Title of 7.1: Installation of Underground Piping. Underground Title of 7.2: Installation of Aboveground Piping. Submittal Date: Thu

More information

Fire Pump Specification

Fire Pump Specification GPS Amsterdam Phase 2 Expansion Project No: 1703 Fire Pump Specification Rev. Description Date Issued by 00 First Issue 10-09-2017 1703-F02-403-001 GPS Amsterdam Phase 2 Expansion Table of Contents 1 F02-403-001

More information

SECTION DRY-PIPE SPRINKLER SYSTEMS

SECTION DRY-PIPE SPRINKLER SYSTEMS SECTION 21 1300 S PART 1 -GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University-San Marcos for automatic fire sprinkler and standpipe systems.

More information

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12.

Location of Requirements Listed Category I appliances Type B gas vent 12.7 Listed appliances equipped with. Chimney Single wall metal pipe 12. 2/18/2016 National Fire Protection Association Report Committee Input No. 70 NFPA 54 2015 [ Section No. 12.5 ] This was a First Revision that failed ballot. 12.5 Type of Venting System to Be Used. 12.5.1

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for the design and construction of standpipe systems to include combination standpipe

More information

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ]

Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Public Input No. 1-NFPA 90B-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

NFPA 15. Standard for. Water Spray Fixed Systems for Fire Protection Edition

NFPA 15. Standard for. Water Spray Fixed Systems for Fire Protection Edition NFPA 15 Standard for Water Spray Fixed Systems for Fire Protection 2007 Edition Copyright 2006 National Fire Protection Association. All Rights Reserved. This edition of NFPA 15, Standard for Water Spray

More information

Public Input No. 3-NFPA [ Chapter 2 ]

Public Input No. 3-NFPA [ Chapter 2 ] Public Input No. 3-NFPA 655-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 1314W - AUTOMATIC SPRINKLER SYSTEMS (WET PIPE SYSTEMS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri

ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1. The Curators of the University of Missouri ADDENDUM #3 DATE: August 8, 2018 Page 1 of 1 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: Women s and Children s Hospital New Water Service Main PROJECT NUMBER: CP172631 ADVERTISEMENT DATE: July

More information

WET-PIPE SPRINKLER SYSTEMS

WET-PIPE SPRINKLER SYSTEMS SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN DIVISION 21 - FIRE SUPPRESSION (REFER TO SECTION 23 05 00 FOR BASIC FIRE SUPPRESSION REQUIREMENTS) 21 05 00 Common Work Results for Fire Suppression 21 13 13 Wet-Pipe Sprinkler Systems END OF SECTION FIRE

More information

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement Second Revision No. 5501-NFPA 5000-2016 [ New Section after 29.2.1.2 ] 29.2.1.3 Bathtubs, bathtub-shower combinations, and nonemergency showers shall be provided with grab bars in accordance with the provisions

More information

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document of 79 1/27/2016 2:09 PM Public Input No. 1-NFPA 59-2015 [ Global Input ] Throughout standard remove references to the following and replace with the following: (1) ANSI/API and replace with API. (2) ANSI/UL

More information

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure.

A. Standard-Pressure Piping System Component: Listed for 175-psig minimum working pressure. SECTION 211313 - WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipes, fittings, and specialties. 2. Fire-protection valves. 3. Fire-department connections. 4. Sprinklers.

More information

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015 SECTION 211000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Related Documents: Drawings, Notice to Bidders, General Conditions, Project Coordination, RFP Format, Requested RFP Alternatives, Cutting and

More information

MSC Guidelines for Automatic Sprinkler Systems

MSC Guidelines for Automatic Sprinkler Systems S. J. Kelly, CDR, Chief of Engineering Division References a. Title 46 CFR 56.20, 56.50 & 56.60 (Subchapter F) b. National Fire Protection Association (NFPA) 13, 1996 Edition, Installation of Sprinkler

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM

Committee Input No NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of /20/ :02 AM 1 of 213 10/20/2016 11:02 AM Committee Input No. 2505-NFPA 72-2016 [ Global Input ] Change the term visible to visual where appropriate Submitter Information Verification Submitter Full Name: SIG-NAS Organization:

More information

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers. SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.

More information

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements. SECTION 21 13 13 FIRE PROTECTION SPRINKLER SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes labor and materials for the installation of a hydraulically calculated automatic, wet-pipe sprinkler

More information

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region The following sections, paragraphs, and sentences of the 2015 International Existing

More information

Page 1 of 198 Public Input No. 88-NFPA 20-2013 [ New Section after 3.3.38.10 ] Add New Defination 3.3.28.11 Multiple Stage Multiple Port Pump. A single driver pump with multiple impellers operating in

More information

For the Florida Building Commission And the Fire Code Advisory Council

For the Florida Building Commission And the Fire Code Advisory Council Life-Safety Modifications Mechanical and Existing Building Compared to the 2012 Changes of the International Building Code and National Fire Protection Association- 101 For the Florida Building Commission

More information

DIVISION 21 - FIRE SUPPRESSION

DIVISION 21 - FIRE SUPPRESSION DIVISION 21 - FIRE SUPPRESSION DESIGN CRITERIA It is the policy of UC Davis to install fire sprinkler systems in all new construction/facilities. If the building is classified as a pole barn, shed, carport,

More information

SECTION WET-PIPE SPRINKLER SYSTEMS

SECTION WET-PIPE SPRINKLER SYSTEMS SECTION 21 13 13 WET-PIPE SPRINKLER SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Design, installation and testing shall be in accordance with NFPA 13 except for specified exceptions. B. The demolition

More information

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur.

(a) Flame shall not spread to the outer extremities of the sample on the 8 ft 12 ft (2440 mm 3660 mm) wall. Flashover shall not occur. First Revision No. 1-NFPA 501-2015 [ Section No. 5.3.1.3 ] 5.3.1.3 The following conditions shall be met when an interior finish material is tested using the test protocol of NFPA 286, Standard Methods

More information

SECTION FIRE-SUPPRESSION STANDPIPES

SECTION FIRE-SUPPRESSION STANDPIPES PART 1 - GENERAL 1.1 DESCRIPTION Fire-suppression wet and manual dry standpipes. 1.2 SCOPE OF WORK SECTION 21 12 00 A. Design, installation and testing shall be in accordance with NFPA 14 except for specified

More information

Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings

Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings Review of Residential Fire Sprinkler Systems for One- and Two-Family Dwellings Reprinted with permission from NFPA 13D Installation of Sprinkler Systems in One- and two-family Dwellings and Manufactured

More information

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

9/23/ :20 AM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification of 4 9/23/2016 10:20 AM Second Revision No. 6501-NFPA 5000-2016 [ Section No. 17.2.2.2.4 ] 17.2.2.2.4* Classroom Door Locking to Prevent Unwanted Entry. Classroom doors shall be permitted to be locked

More information

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE Developed by the Midwestern Regional Work Group CONTENTS Item 15 Limited area sprinkler systems Item 20 Scope of IFC Ch 7 Item 21 Fire-resistance-rated

More information

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle)

M E M O R A N D U M. NFPA Technical Committee on Alternative Approaches to Life Safety. SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) M E M O R A N D U M TO: FROM: NFPA Technical Committee on Alternative Approaches to Life Safety Linda MacKay DATE: December 28, 2010 SUBJECT: NFPA 101A ROP TC Letter Ballot (A2012 Cycle) The ROP letter

More information

First Revision No. 1-NFPA [ Chapter 2 ]

First Revision No. 1-NFPA [ Chapter 2 ] First Revision No. 1-NFPA 499-2014 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this recommended practice

More information

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content Based on the 2018 International Fire Code, (IFC ) The International Fire Code (IFC ), establishes minimum regulations for fire safety. This handout will identify important changes in the IFC from 2015

More information

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing. 9/20/2016 2:27 PM Second Revision No. 5006-NFPA 101-2016 [ Section No. 3.3.56 ] 3.3.56 Delayed Action Closer. Self-closing device that incorporates a delay prior to the initiation of closing. Mechanical

More information

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant. SECTION 218800 - FIRE PROTECTION 1. GENERAL A. Provisions of Division 1, GENERAL REQUIREMENTS, and Section 230000, MECHANICAL GENERAL CONDITIONS, and Section 230050, SEISMIC PROTECTION are a part of this

More information

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No. SECTION 22 63 13 GAS PIPING FOR LABORATORY AND HEALTHCARE FACILITIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information