1 Master Plant List Quantity Code Coniferous Trees 24 Pg 33 Pgs 32 Ps 89 Botanic Name Common Name Spacing Size Condition Picea glauca White Spruce 3500 mm O.C. 150 cm Ht. POT Picea glauca (small) White Spruce (small) 2000 mm O.C. 60 cm Ht. POT Pinus strobus White Pine 3500 mm O.C. 150 cm Ht. POT POT TOTAL Shrubs 106 Jh Juniperus horizontalis 'Hughes' Hughes Juniper 2000 mm O.C. 3 gal Rt Ro Rhus typhina Rubus odouatus Staghorn Sumac Purple Flowering Raspberry 3000 mm O.C mm O.C. 60 cm Ht. BR 2 gal. POT 457 TOTAL

2

3 Specifications for Using Filtrexx Growth Media Blankets Filtrexx Growth Media Blanket Installation and Maintenance 1.0 Description: This work shall consist of furnishing, installing, maintaining and seeding a water permeable Growth Media Blanket (Filtrexx Growth Media Blanket) to reduce soil erosion and sediment by preventing soil particles from water moving off site into adjacent waterways or storm water drainage systems. 2.0 Growth Media Products 1. Growth Media used for Filtrexx Growth Media Blankets shall be weed free and derived from a well-decomposed source of organic matter. The media shall be produced using an aerobic composting process meeting or exceeding M.O.E. 101, C.C.M.E. Type A and Type AA regulations, and Compost Quality Assurance Program,(C.Q.A.) including time and temperature data indicating effective weed seed, pathogen and insect larvae kill. The growth media shall be free of any refuse, contaminants or other materials toxic to plant growth. Noncomposted products will not be accepted. Test methods for the items below should follow USCC TMECC guidelines for laboratory procedures: A. PH in accordance with TMECC A, Electrometric ph Determinations for Compost B. Non seeded Filtrexx Growth Media Blankets: Particle size 100% passing a 50mm{2 } sieve, 99% passing a 25mm{1 } sieve, minimum of 90% passing a 18.25mm{3/4 } sieve in accordance with TMECC B, Sample Sieving for Aggregate Size Classification. For seeded Growth Media Blankets, seed should be incorporated at the time of application in the entire depth of the growth media blanket, at rates per square foot, per square yard, per square meter, per acre or per hectare, as acceptable to the engineer. The following particle sizes shall also be followed: 100% passing a 50mm{2 } sieve, 99% passing a 25mm{1 } sieve, minimum of 60% passing a 12.5mm{1/2 }sieve. All other testing parameters remain the same. The seeding rates are generally similar or slightly higher than those used when considering application of seed via hydroseeding or other seeding methods. C. Moisture content of less than 60% in accordance with standardized test methods for moisture determination. D. Material shall be relatively free (<1% by dry weight) of inert or foreign man made materials. E. A sample shall be submitted to the engineer for approval prior to being used and must comply with all local, provincial and federal regulations. 3

4 3.0 Construction: 1. Filtrexx Growth Media Blankets will be placed at locations indicated on plans as directed by the Engineer. Unless otherwise specified, Filtrexx Growth Media Blankets should be installed at a minimum depth of 25mm {1 }. Depth requirements are indicated on CAD drawings attached. 2. Filtrexx Growth Media Blankets may be seeded at time of installation for establishment of permanent vegetation. The Engineer will specify seed requirements. 3. Filtrexx Growth Media Blankets are not to be used in direct flow situations or in runoff channels. 4. See attached schematic for Growth Media Blanket Installation. 5. If required, combining Filtrexx Growth Media Blankets with Filtrexx SiltSoxx or Filter Berms may offer additional protection from slopes that have heavy run-on water. In these situations, Filtrexx SiltSoxx, Filter Berms and Growth Media Blankets may be used in combination (see schematic attached). TM TM 4.0 Maintenance: 1. The contractor shall maintain the Filtrexx Growth Media Blanket in a functional condition at all times and it shall be routinely inspected. 2. If the Growth Media Blanket fails, it will be routinely repaired. 3. The Filtrexx Growth Media Blanket will be seeded on site, at rates and seed types as determined by the Engineer. Once vegetation is established, final seeding is not required. 4

5 5.0 Method of measurement: Bid items shall show measurement as Filtrexx Growth Media Blanket per square foot, per square yard, or per square meter. Depth to be measured at time of application. 6.0 Performance: 1. Contractor is responsible for establishing a working erosion control system and may, with approval of the Engineer, work outside the minimum construction requirements as needed. 2. If the Filtrexx Growth Media Blanket deteriorates or fails, it will be repaired or replaced. 7.0 Application guidelines: 1. Contractor shall provide the Engineer with proof that ie: a 50mm{2 } Growth Media Blanket has been applied. This rate equals approximately 270 cubic yards of compost material per acre of application area or approximately 665 cubic yards per hectare. Contractor will supply ample evidence showing this amount of material has been effectively placed (i.e., truck load tickets). 2. Contractor is required to be a certified Filtrexx Installer as determined by Filtrexx Canada Inc. ( or visit website at Certification shall be considered current if appropriate identification is shown during time of bid or at time of application. 8.0 Available Vendors Installation of Filtrexx Growth Media Blankets may be purchased from Certified Installers: Contact our website for complete list of installers in your area: or contact us directly Filtrexx Canada Inc P.O. Box 28065, North Park Plaza Brantford, Ontario N3R 7X5 Office: Fax: Toll Free: Mobile: Last updated

6 PART 1 - GENERAL 1.1 SCOPE OF WORK This section specifies the supply, installation and maintenance of plant material, soil amendments, tree support, and mulching of trees, shrubs and ground covers. 1.2 RELATED SECTIONS Section Topsoil and Finish Grading Technical Specification for Growth Media Blanket 1.3 REFERENCES Agriculture and Agri-Food Canada (AAFC).1 Plant Hardiness Zones in Canada Canadian Nursery Landscape Association (CNLA).1 Canadian Standards for Nursery Stock International Society for Horticultural Science (ISHS) 1.4 PRODUCT DATA.1 International Code of Nomenclature for Cultivated Plants Prior to planting, Contractor will provide product data for the following:.1 Fertilizer.2 Mycorise.3 Anti-desiccant.4 Mulch.5 Soil Amendments.6 Rodent repellant Product data submission to include: 1.5 SAMPLES.1 Name and address of Manufacturer.2 Name and address of Supplier.3 Product characteristics Upon request by Landscape Architect, provide samples for:.1 Mulch Page 1 of 11

7 .2 Topsoil.3 Soil Amendments Label samples with date, origin and intended use of product Reviewed and accepted samples will become the standard of material by which installed Work will be verified. 1.6 STORAGE AND PROTECTION Protect plant material from frost, excessive heat, wind and sun damage during delivery:.1 When delivery distance is less than 30 km and vehicle travels at speeds under 80 km/h, tie tarpaulins around plants or over vehicle box..2 When delivery distance exceeds 30 km or vehicle travels at speeds over 80 km/h, use enclosed vehicle where practical..3 Protect foliage and root balls using anti-desiccants and tarpaulins, where use of enclosed vehicle is impractical due to size and weight of plant material Protect stored plant material from frost, wind and sun and as follows:.1 For bare root plant material, preserve adequate moisture around roots by heeling-in or burying roots in topsoil and watering to full depth of root zone..2 For pots and containers, maintain adequate moisture level in containers..3 For fibre pots, heel-in into topsoil and maintain adequate moisture level..4 For balled and burlapped and wire basket root balls, place to protect branches from damage. Maintain adequate moisture level in root zones. 1.7 WASTE MANAGEMENT AND DISPOSAL Collect and separate for disposal all paper, plastic, polystyrene, and corrugated cardboard packaging material for recycling at appropriate recycling facilities Divert unused metal materials from landfill to metal recycling facility Divert discarded plastic plant containers materials from landfill to plastic recycling facility Dispose of unused fertilizer, anti-desiccant or other materials defined as hazardous or toxic at an official hazardous material collection site Divert unused wood and mulch materials from landfill to composting facility. 1.8 SCHEDULING Obtain approval from Landscape Architect of Planting Schedule 7 days in advance of shipment of plant material. Page 2 of 11

8 1.8.2 Schedule to include:.1 Quantity and type of plant material (including species and cultivar information)..2 Any requests for substitution submitted for approval by Landscape Architect..3 Shipping dates.4 Arrival dates on site.5 Planting Dates Plant only under conditions that are conducive to the growth and health of plants When permission from the Landscape Architect has been obtained, plant material grown in containers may be planted throughout the growing season. 1.9 WARRANTY AND INSPECTIONS For all plant material as itemized on plant list the warranty period is 24 months The Contractor hereby warrants that all plant material as itemized on plant list will remain free of defects for the full duration of the warranty period A Preliminary Inspection shall occur upon Substantial Completion of all plantings works, to initiate the start of the Warranty Period. Preliminary Acceptance will be granted provided the Landscape Architect is satisfied with the quality of the work All plant material that is not found in a satisfactory growing condition shall be replaced by the Contractor at no additional cost to the Client All replacement plantings shall be under warranty, for a minimum of 12 months, until the end of the original warranty period An Interim Inspection shall occur one year after the start of the Warranty Period to ensure that the required maintenance is being undertaken End-of-warranty inspection will be conducted by the Landscape Architect. Final Acceptance of the plantings will be granted provided that all plant materials are in healthy growing condition Landscape Architect reserves the right to extend Contractor's warranty responsibilities for an additional one year if, at end of initial warranty period, leaf development and growth is not sufficient to ensure future survival MEASUREMENT FOR PAYMENT Where measurement for payment is on a per item unit basis, each individual plant shall comprise a single unit Where payment is to be based on a Stipulated Price, the Unit Prices shall be used as the basis for adjustments due to addition or deletions. Page 3 of 11

9 The Unit Price for all trees, shrub and ground cover plantings shall include the supply of all required plant material and associated materials (ie. topsoil, mulch, mycorise inoculants, etc.), equipment and labour needed to complete the work as per the specifications, and all maintenance specified during the warranty period For the purpose of measurement for payment, plants will be grouped according to installed size (ie. caliper tree, tree whip, large shrub, small shrub, and groundcover) as specified in the drawings. The unit price shall take into consideration any cost variations between species BASIS OF PAYMENT Where payment for plant material supply and installation is to be made at item unit price bid, this shall be based on quantities identified in the Schedule of Unit Prices unless additions or deletions have been approved by the Landscape Architect Otherwise payment for plant material supply and installation is to be made at the Stipulated Price, as per the Contract documents Whether based on Unit Price or Stipulated Price, the payment at the Contract Price for the above tender items shall be full compensation for all the labour, equipment and material as needed to do the work as per the drawings, details and specifications, and all maintenance specified during the warranty period. PART 2 - PRODUCTS 2.1 PLANT MATERIAL All plant material must be nursery grown and meet the specifications set out in the latest Canadian Standards for Nursery Stock with respect to sizing, grading, quality and method of cultivation..1 Source of plant material - grown in climate and soil conditions similar to those of the installation site..2 Nomenclature of specified plants - conform to the International Code of Nomenclature for Cultivated Plants and the latest edition of the Standardized Plant Names..3 Any plant material not conforming to the above standards will be designated as collected plants and will be rejected Plant material true to name and type, free of disease, insects, defects or injuries and structurally sound with strong fibrous root system Trees - with straight trunks, well and characteristically branched for species, except where specified otherwise Bare root stock - nursery grown, in dormant stage, not balled and burlapped or container grown. Page 4 of 11

10 2.1.5 All plant material must conform to the sizes specified on the plant list, except that larger material may be used when approved by the Landscape Architect. Use of larger material will not increase the contract price Substitutions with other species or cultivars will not be accepted without the written approval of the Landscape Architect. 2.2 TOPSOIL Topsoil to be used to backfill planting holes shall be approved by Landscape Architect See Technical Specification for Topsoil and Finish Grading for further information. 2.3 WATER Free of any impurities that would inhibit plant growth. 2.4 TREE SUPPORT STAKES T-bar, steel, 40 x 40 x 5 x 2440mm, drilled to receive #11 gauge (3mm) wire. 2.5 GUYING WIRE #11 gauge (3mm) galvanized wire or 3mm diameter multi-wire steel cable. 2.6 TURNBUCKLE AND ACCESSORIES Factory galvanized wire tighteners, clamps, eye bolts and turnbuckle, with 150mm long eyes and 10mm dia. threaded opening for tightening. 2.7 GUYING COLLAR Guying collar: plastic, 13mm diameter, nylon reinforced. 2.8 TRUNK PROTECTION Plastic: perforated spiraled strip or alternative product approved by Landscape Architect. 2.9 MULCH Shredded bark mulch: varying in size from 25 to 75mm in diameter, from bark of coniferous trees Free of any chemicals or impurities that would inhibit plant growth FERTILIZER Page 5 of 11

11 Synthetic commercial type, only as recommended by soil test report and approved by the Landscape Architect MYCORISE Inoculants that contains several species of fungus which are compatible with deciduous and coniferous trees, shrubs and herbaceous plants Suggested supplier: Premier Tech, 1 Premier Avenue, Riviere-du-Loup, Quebec, G5R 6C1 Toll Free: , Fax: , Active ingredients: Endomycorrhizal fungus Glomus intraradices and Ectomycorrhizal fungus Pisolithus tinctorius..2 Available format: 30L bag..3 Storing conditions: avoid freezing and intensive heat, store in dry location, out of direct sunlight Equivalent alternates must be approved by the Landscape Architect RODENT PROTECTION Skoot or approved substitute All tree whips, shrubs and ground covers to be treated with an application of rodent repellent, prior to each winter season throughout the warranty period ANTI-DESICCANT Wax-like emulsion 2.14 SOURCE QUALITY CONTROL Obtain approval from Landscape Architect of plant material prior to planting..1 Upon request, the Landscape Architect shall have the opportunity to inspect all plant material at the nursery, before any plant material is delivered to the site..2 If not inspected at the nursery, the Landscape Architect shall inspect all plant material on site, before any planting operations begin The Landscape Architect reserves the right to reject any plant material that does not conform to specified standards Imported plant material must be accompanied with necessary permits and import licenses. Conform to federal and provincial regulations. Page 6 of 11

12 PART 3 - EXECUTION 3.1 EQUIPMENT AND ACCESS Ensure that equipment, material and vehicles remain within the approved work zone. Any access to areas outside the working limits, as defined in the Contract, must be approved in writing by the Landscape Architect. 3.2 PRE-PLANTING PREPARATION Ensure plant materials are acceptable to Landscape Architect Remove damaged roots and branches from plant material Where specified, apply anti-desiccant to conifers and deciduous trees in leaf in accordance with manufacturer's instructions. 3.3 EXCAVATION AND PREPARATION OF PLANTING BEDS Establishment of sub-grade for planting beds is specified in Section Site Grading Preparation of planting beds is specified in Section Topsoil and Finish Grading Ensure all Topsoil and Finish Grading works are complete prior to planting Where Sod Mats are specified in the same location as plantings, shrubs are to be carefully planted through installed Sod Mats (see Sod Mat detail and specification for additional information) Where Erosion Control Blankets are specified, shrubs are to be carefully planted after installation of the blanket All tree and shrub plantings shall be completed before hydro seeding operations begin For individual planting holes and planting beds:.1 Stake out location of plantings, as per drawings and accompanying details, and obtain approval from Landscape Architect prior to excavating..2 Excavate to depth and width as indicated in details..3 Remove rocks, roots, debris and toxic material from excavated material that will be used as planting soil for trees and individual shrubs. Properly dispose of any excess material..4 Scarify sides of planting hole as indicated in details Remove any water which enters excavations prior to planting. Notify Landscape Architect if water source is ground water. Page 7 of 11

13 3.3.9 Provide drainage for planting holes in heavy soil if natural drainage does not exist. Method of drainage must be approved by Landscape Architect Add Mycorise inoculants to each planting hole at a rate of 60ml per shrub. Apply a layer of Mycorise to the walls of the planting hole, so that roots are in contact with the product. Page 8 of 11

14 3.4 PLANTING For bare root stock, place mm backfill soil in bottom of hole. Plant with roots placed straight out in hole For jute burlapped root balls, cut away top one third of wrapping and wire basket without damaging root ball. Do not pull burlap or rope from under root ball For container stock or root balls in non-degradable wrapping, remove entire container or wrapping without damaging root ball Plant vertically in locations as indicated. Orient plant material to give best appearance in relation to structure, roads and walks For tree and shrub plantings:.1 Place plant material at depth equal to depth as originally grown in nursery..2 Backfill soil in 150 mm lifts. Tamp each lift to eliminate air pockets..3 When two thirds of depth of planting pit has been backfilled, fill remaining space with water..4 After water has penetrated into soil, backfill to finish grade..5 Form watering saucer as indicated For ground cover plantings, backfill soil evenly to finish grade and tamp to eliminate air pockets..1 Water plant material thoroughly..2 After soil settlement has occurred, fill with soil to finish grade Dispose of burlap, wire and container material off site as per Waste Management and Disposal. 3.5 TRUNK PROTECTION Install trunk protection on deciduous trees as indicated Install trunk protection prior to installation of tree supports where specified. 3.6 TREE SUPPORTS Install tree supports as indicated in planting details Use two (2) tree stake supports for deciduous trees greater than 2m in height and evergreens greater than 1.5m..1 Place stakes in line with prevailing winds and approximately150 mm from trunk..2 Drive stake minimum 150 mm into undisturbed soil beneath roots, taking care to avoid damage to root ball. Ensure stakes are secure and vertical. Page 9 of 11

15 3.7 PRUNING.3 Thread guying wire through guying collar tube. Twist wire to form collar and secure firmly to stake. Cut off excess wire..4 Guying collar to be installed at approximately 2/3 height for evergreens and 1/2 height for deciduous trees Plants shall be pruned after any required tree supports have been installed The amount of pruning shall be limit to the minimum necessary to remove any dead or broken branches Pruning shall be completed in such a manner as to preserve the natural character and form of the plants..1 Do not cut leader.2 Do not alter the growth habit of the plant Employ clean sharp tools and make cuts flush with main branch, smooth and sloping as to prevent accumulation of water. 3.8 MULCHING Ensure soil settlement has been corrected prior to mulching Spread mulch, or install colloidal collars, as indicated in planting details Keep mulch 100mm away from crown of plant. 3.9 MAINTENANCE DURING ESTABLISHMENT AND WARRANTY PERIOD Perform following maintenance operations from time of initial planting to end of warranty period:.1 Water once weekly for first four (4) weeks, and thereafter water sufficiently to maintain soil moisture conditions for optimum establishment, growth and health of plant material without causing erosion..2 For evergreen plant material, water thoroughly in late fall prior to freeze-up to saturate soil around root system..3 Where specified, apply anti-desiccant to evergreen plant material, or provide alternative protection against winter wind damage..4 All tree whips, shrubs and ground covers to be treated with an application of rodent repellent, prior to each winter season throughout the warranty period..5 Apply fertilizer in early spring as indicated by soil test and approved by Landscape Architect..6 Remove weeds on a monthly basis..7 Reform damaged watering saucers, and Page 10 of 11

16 .8 Replace or re-spread damaged, missing or disturbed mulch..9 If required to control insects, fungus and disease, use appropriate control methods in accordance with Federal, Provincial and Municipal regulations. Obtain product approval from Landscape Architect prior to application..10 Remove dead or broken or hazardous branches from plant material..11 Keep trunk protection and guy wires in proper repair and adjustment..12 Remove trunk protection, tree supports and level watering saucers at end of warranty period..13 Remove and replace dead plants and plants not in healthy growing condition. Make replacements in same manner as specified for original plantings Submit monthly written reports to Landscape Architect identifying:.1 Maintenance work carried out..2 Development and condition of plant material..3 Replacement plantings and date of installation..4 Preventative or corrective measures required which are outside Contractor's responsibility. END OF SECTION Page 11 of 11

17 TOPSOIL AND FINE GRADING PART 1 - GENERAL 1.1 SCOPE OF WORK This Section specifies topsoil, topsoil amendments, the stripping of topsoil, the preparation of existing grades, the placing of topsoil and finish grading. 1.2 RELATED SECTIONS Section [ Clearing and Grubbing] : Clearing of brush, weeds and grasses prior to topsoil stripping Section [ Site Grading] : Preparation of subgrade and excavation for planting beds. 1.3 MEASUREMENT PROCEDURES Preparation of sub-grade for placing of topsoil will not be measured for payment Topsoil stripping will not be measured for payment Where topsoil to be used is from existing onsite stockpile:.1 Placing of topsoil will be measured in cubic metres removed from stockpile. Stockpiles will be measured by Consultant and volume of topsoil removed calculated by average end area method..2 Supply and application of soil amendments, including fertilizer, will be measured in square metres of area treated as determined by Consultant Where topsoil is to be supplied by Contractor:.1 Supplying, placing and spreading topsoil will be measured in cubic metres as determined from actual surface area covered and depth of topsoil specified..2 Specified depth of topsoil shall be measured and approved by Consultant after settlement and consolidation as specified Finish grading will be measured in square metres from actual surface measurements as determined by Consultant. 1.4 DEFINITIONS COMPOST: A mixture of soil and decomposing organic matter used as a fertilizer, mulch, or soil conditioner. Compost is processed organic matter containing 40% or more organic matter as determined by the Walkley-Black or LOI test. Product must be sufficiently decomposed (i.e. stable) so that any further decomposition does not adversely affect plant growth (C:N ratio below 25), and contain no toxic or growth inhibiting contaminates. Composed bio-solids must meet the requirements of the Guidelines for Compost Quality, Category A produced by the Canadian Council of the Ministers of the Environment (CCME), January Page 1 of 4

18 TOPSOIL AND FINE GRADING PART 2 - PRODUCTS 2.1 TOPSOIL Topsoil for seeded areas and planting beds: mixture of particulates, micro organisms and organic matter which provides suitable medium for supporting intended plant growth..1 Soil texture, based on The Canadian System of Soil Classification, to consist of 20 to 70 % sand, minimum 7 % clay, and contain 2 to 10 % organic matter by weight..2 Contain no toxic elements or growth inhibiting materials..3 Finished surface free from:.1 Debris and stones over 50 mm diameter..2 Course vegetative material, 10 mm diameter and 100 mm length, occupying more than 2% of soil volume..4 Consistency: friable when moist. 2.2 SOIL AMENDMENTS Fertilizer:.1 Fertility: major soil nutrients present in following amounts:.1 Nitrogen (N): 20 to 40 micrograms of available N per gram of topsoil..2 Phosphorus (P): 40 to 50 micrograms of phosphate per gram of topsoil..3 Potassium (K): 75 to 110 micrograms of potassium per gram of topsoil..2 Calcium, magnesium, sulfur and micro-nutrients present in balanced ratios to support germination and/or establishment of intended vegetation..3 Ph value: 6.5 to Peatmoss:.1 Derived from partially decomposed species of Sphagnum Mosses..2 Elastic and homogeneous, brown in colour..3 Free of wood and deleterious material which could prohibit growth..4 Shredded particle minimum size: 5mm Sand: washed coarse silica sand, medium to course textured Organic matter: compost Category A, unprocessed organic matter, such as rotted manure, hay, straw, bark residue or sawdust, meeting the organic matter, stability and contaminant requirements. 2.3 SOURCE QUALITY CONTROL Page 2 of 4

19 TOPSOIL AND FINE GRADING Advise Consultant of sources of topsoil or manufactured topsoil to be utilized with sufficient lead time to allow for testing Contractor is responsible for amendments to supply topsoil as specified When required, testing of topsoil will be carried out by testing laboratory designated by Consultant..1 Soil sampling, testing and analysis to be in accordance with Provincial standards..2 Soil testing to determine soil ph, P and K amounts, and organic matter. PART 3 - EXECUTION 3.1 STRIPPING OF TOPSOIL Commence topsoil stripping of areas, as indicated on drawings or as directed by Consultant, after area has been cleared of brush, weeds and grasses and removed from site Strip topsoil to depths, as indicated on drawings or as directed by Consultant. Avoid mixing topsoil with subsoil where textural quality will be moved outside acceptable range of intended application Stockpile in locations as directed by Consultant or as indicated on drawings. Stockpile height not to exceed 2m Disposal of unused topsoil is to be in an environmentally responsible manner as directed by Consultant Protect stockpiles from contamination and compaction. 3.2 PREPARATION OF EXISTING GRADE Verify that subgrades are correct. If discrepancies occur, notify Consultant and do not commence work until instructed by Consultant Grade soil to eliminate uneven areas and low spots, and ensure positive drainage Remove debris, roots, branches, stones in excess of 50mm diameter and other deleterious materials. Remove soil contaminated with calcium chloride, toxic materials and petroleum products. Remove debris which protrudes more than 75 mm above surface. Dispose of removed material off site Cultivate entire area which is to receive topsoil to minimum depth of 100mm. Cross cultivate those areas where equipment used for hauling and spreading has compacted soil. 3.3 PLACING AND SPREADING OF TOPSOIL/PLANTING SOIL Place topsoil only after Consultant has accepted subgrade. Page 3 of 4

20 TOPSOIL AND FINE GRADING Spread topsoil in uniform layers not exceeding 150 mm For areas to be sodded keep topsoil 15 mm below finished grade Spread topsoil as indicated on drawings or to following minimum depths after settlement mm for seeded areas mm for sodded areas mm for flower beds mm for shrub beds Manually spread topsoil/planting soil around trees, shrubs and obstacles. 3.4 SOIL AMENDMENTS Soil amendments will only be added to correct any deficiencies, as determined by the soil testing of existing or supplied topsoil Soil amendments added as indicated on drawings or to following minimum depths after settlement. 3.5 FINISH GRADING mm for seeded areas mm for sodded areas mm for flower beds mm for shrub and tree beds Grade to eliminate rough spots and low areas and ensure positive drainage. Prepare loose friable bed by means of cultivation and subsequent raking Consolidate topsoil to required bulk density using equipment approved by Consultant. Leave surfaces smooth, uniform and firm against deep footprinting. 3.6 ACCEPTANCE Consultant will inspect and test topsoil in place and determine acceptance of material, depth of topsoil and finish grading. 3.7 SURPLUS MATERIAL Dispose of materials except topsoil not required as directed by Consultant. END OF SECTION Page 4 of 4

21 Master Plant List Quantity Code Coniferous Trees 24 Pg 32 Ps 56 Botanic Name Common Name Spacing Size Condition Picea glauca White Spruce 3500 mm O.C. 150 cm Ht. POT Pinus strobus White Pine 3500 mm O.C. 150 cm Ht. POT POT TOTAL Shrubs 106 Jh Juniperus horizontalis 'Hughes' Hughes Juniper 2000 mm O.C. 3 gal Rt Ro Rhus typhina Rubus odouatus Staghorn Sumac Purple Flowering Raspberry 3000 mm O.C mm O.C. 60 cm Ht. BR 2 gal. POT 457 TOTAL

This section covers the planting of seed, sod, trees and vegetation.

This section covers the planting of seed, sod, trees and vegetation. Tender 1, 2017 Page 1 of 5 1. INTENT This section covers the planting of seed, sod, trees and vegetation. 1.1 REFERENCES Agriculture and Agri-Food Canada; The Canadian System of Soil Classification, Third

More information

DIVISION II PLANTING SECTION 02950

DIVISION II PLANTING SECTION 02950 Subdivision Requirements Manual Page 1 of 9 PART I - GENERAL 1.1 Related Work.1 Topsoil and Finish Grade : Section 02212.2 Seeding : Section 02933.3 Hydraulic Seeding : Section 02934.4 Sodding : Section

More information

HALIFAX REGIONAL MUNICIPALITY

HALIFAX REGIONAL MUNICIPALITY [PROJECT NAME] PLANTING OF TREES, SHRUBS PART 1 - GENERAL 1.1 Work Included 1.2 Related Sections 1.3 Reference Standards 1.4 Quality Control 1.5 Delivery, Storage and Protection 1.6 Samples 1.7 Warranty

More information

Construction Specification for Planting

Construction Specification for Planting Engineering and Construction Services Division Standard Specifications for Road Works TS 5.30 April 2014 for Planting Table of Contents TS 5.30.01 SCOPE... 3 TS 5.30.02 REFERENCES... 3 TS 5.30.03 DEFINITIONS

More information

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Scope.1 This guideline addresses the materials, and equipment necessary for the supply, placement, and amendment of the growing medium. 1.2 Related Work:.1 Section 32 93 00

More information

SITE TOPSOIL & FINISH GRADING

SITE TOPSOIL & FINISH GRADING CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02911-1 PART 1 GENERAL 1.1 Related Work.1 Section 02311 Site Grading.2 Section 02315 Excavating, Trenching, & Backfilling.3 Section 02906 Planting of Trees,

More information

Guelph Humane Society Section PLANTING Page 1

Guelph Humane Society Section PLANTING Page 1 Page 1 Part 1 General 1.1 DESCRIPTION.1 This section describes the requirements for the supply and installation for plant material of different stock sizes and types, accessories, planting, mulching, maintenance,

More information

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging. Issued 2006/08/01 Section 02906 Planting of Trees, Shrubs and Ground Covers Page 1 of 9 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 02311 Site Grading..3 Section

More information

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 329000 PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification Sections, apply

More information

Section 815. LANDSCAPING

Section 815. LANDSCAPING 815.01 Section 815. LANDSCAPING 815.01. Description. This work consists of providing and planting trees, shrubs, and other plants, including replacements, classified as nursery stock. The Engineer may

More information

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS 808.1 Description. This work shall consist of furnishing and planting material in the locations designated on the plans or established by the engineer.

More information

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS 1.0 GENERAL 1.1 Related Work 1.1.1 Section 02210 - Site Grading Rough 1.1.2 Section 02212 - Planting Soil and Finish Grading 1.1.3 Section 02990 - Landscape Maintenance 1.2 Source Quality Control 1.2.1

More information

EXTERIOR PLANTS

EXTERIOR PLANTS c. Fertilize immediately prior to sodding or immediately after the sodding operation at a rate of.5 pounds of nitrogen per 1000 square feet. d. Work is to be done at typically accepted sodding times in

More information

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING 40.01 SCOPE: The contractor shall furnish all labor, materials, equipment, and supplies; and shall perform all work necessary for the installation of

More information

SECTION SOIL PREPARATION

SECTION SOIL PREPARATION SECTION 329113 SOIL PREPARATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Components of planting mediums. 2. Testing and certification of components. 3. Mixing of planting mediums. 4. Transporting

More information

a. Section includes planting soils specified by composition of the mixes.

a. Section includes planting soils specified by composition of the mixes. SECTION 32 9113 SOIL PREPARATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION 605 PLANTING

SECTION 605 PLANTING SECTION 605 PLANTING I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall

More information

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description Greenville County Technical Specification for EC-11 COMPOST 1.0 Compost 1.1 Description This specification covers compost produced from various organic by-products, for use as an infill material for sediment

More information

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

1. Division 2 Section Earthwork for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials. SECTION 329300 - LANDSCAPE PLANTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. SECTION 7300 LANDSCAPING 7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans. 7302 QUALITY ASSURANCE. A. Qualifications of Personnel.

More information

SECTION TREES, SHRUBS AND GROUNDCOVERS

SECTION TREES, SHRUBS AND GROUNDCOVERS SECTION 02950 TREES, SHRUBS AND GROUNDCOVERS PART 1 GENERAL 1.01 REFER TO SECTION 01000 FOR GENERAL REQUIREMENTS 1.02 APPLICABLE PUBLICATIONS A. The publications listed below form a part of this specification

More information

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for APPROVED BY COUNCIL FEBRUARY 15, 1994 CITY OF BE CONVEYED TO THE CITY The Owner will be responsible to ensure that all lands which will be transferred to the City for parkland, drainage or boulevard purposes

More information

The following general requirements will be met for all planter box installations:

The following general requirements will be met for all planter box installations: Greenville County Technical Specification for: WQ-25 PLANTER BOX 1.0 Planter Box 1.1 Description Planter boxes are designed to capture and temporarily store stormwater runoff. Planter Boxes are intended

More information

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02951 PLANTING DETAILS A. This section consists of AutoCad drawings depicting typical landscape details governing the installation of plant materials on the

More information

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE. THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.2 THE COMPLETE 2011 EDITION MAY BE FOUND AT: HTTP://WWW.SEATTLE.GOV/UTIL/ENGINEERING/STANDARD_PLANS_&_SPECS/INDEX.ASP

More information

2-B-18-UR. Revised: 3/27/2018

2-B-18-UR. Revised: 3/27/2018 Revised: 3/27/2018 Revised: 3/27/2018 GI FOR KIDS A MEDICAL OFFICE BLDG. 0000 BOARDWALK BLVD. KNOXVILLE, TENNESSEE CONSTRUCTION PRELIMINARY - NOT FOR Landscape Plan Target Publix Town Center Boulevard

More information

SECTION TREE TRANSPLANTING

SECTION TREE TRANSPLANTING SECTION 329643 TREE TRANSPLANTING PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for transplanting trees. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Qualifications:

More information

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work. PART 1 - GENERAL PLANT MATERIAL AND PLANTING 1.01 SECTION INCLUDES A. Plant Material and Planting B. Tree Drainage Wells C. Warranty for Plant Material 1.02 DESCRIPTION OF WORK A. Furnishing and installing

More information

A. Surface parking areas shall be constructed of bituminous paving.

A. Surface parking areas shall be constructed of bituminous paving. September 2008 32 12 16 Asphalt Paving 1.0 General A. Surface parking areas shall be constructed of bituminous paving. 2.0 Products A. Aggregate Base Course conform to IDOT Std. Spec. Sect. 1000, ref.

More information

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used This specification defines material and performance requirements for soils which are to be used within the Silva Cell system. The SPECIFICATION EDITOR must select the type of soil appropriate to each particular

More information

SECTION TOPSOIL AND SEEDING

SECTION TOPSOIL AND SEEDING SECTION 13400 TOPSOIL AND SEEDING DECEMBER 2015 TOPSOIL AND SEEDING Page 1 1 GENERAL... 2 DESCRIPTION... 2 RELATED SECTIONS... 2 JOB CONDITIONS... 2 INSPECTION... 2 2 PRODUCTS... 3 SEEDING PRODUCT DELIVERY,

More information

SECTION LANDSCAPE

SECTION LANDSCAPE 1 SECTION 02900 LANDSCAPE PART 1 GENERAL 1.1 Summary A. This section contains requirements relating to lawns, trees, shrubs, flowering plants and ground covers including site preparation, material installation

More information

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

ATTACHMENT A BIORETENTION SOIL SPECIFICATION 1.00 BIORETENTION SOIL ATTACHMENT A BIORETENTION SOIL SPECIFICATION Bioretention soil shall achieve an initial infiltration rate of at least 8-inch per hour nor more than 20 inches per hour in situ and

More information

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation 1.0 Purpose These guidelines are for the use of all Campus landscaping. 2.0 General Requirements 1. Native trees and shrubs appropriate for this region are strongly preferred. The university has a do not

More information

GUIDELINES AND SPECIFICATIONS FOR THE PLANTING OF MUNICIPAL TREES AND SHRUBS

GUIDELINES AND SPECIFICATIONS FOR THE PLANTING OF MUNICIPAL TREES AND SHRUBS GUIDELINES AND SPECIFICATIONS FOR THE PLANTING OF MUNICIPAL TREES AND SHRUBS 2011 EDITION COMMUNITY SERVICES DEPARTMENT PARKS DIVISION THUNDER BAY, ONTARIO Community Services Department Parks Division

More information

B. Finish Grade: Elevation of finished surface of planting soil.

B. Finish Grade: Elevation of finished surface of planting soil. SECTION 02930 - PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A.

More information

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer. Authorised by : Parks & Gardens Manager Section 5 Page 1 of 6 SECTION 5: STREET TREE PLANTING 1.0 GENERAL This section describes the work to be carried out to prepare planting sites and complete planting

More information

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. SECTION 02910 TREE RELOCATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work. B. Related Section: 1. 02900 - Landscaping.

More information

Section Seeding

Section Seeding Section 02936 Seeding PART 1 - GENERAL 1.01 SECTION INCLUDES A. Fertilizing. B. Seeding. C. Hydroseeding. D. Mulching. E. Maintenance. F. Sodding. 1.02 RELATED WORK A. Documents affecting work of this

More information

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following: SECTION 320190.13 LANDSCAPE MAINTENANCE FOR 90 DAYS PART 1 - GENERAL 1.1 SUMMARY A. Section includes requirements for 90 day landscape maintenance for the following: 1. Watering trees and grass. 2. Monitoring

More information

SECTION AMENDED TOPSOIL

SECTION AMENDED TOPSOIL SECTION 02486 AMENDED TOPSOIL PART 1 - GENERAL 1.01 SUMMARY A. Work described in this section includes requirements for soil amendments, soil preparation, preparation and finish grading of turf restoration

More information

SECTION 900 TURF ESTABLISHMENT

SECTION 900 TURF ESTABLISHMENT SECTION 900 901.0 DESCRIPTION This section covers the furnishing of all labor, materials, tools, equipment and performances of all work and services necessary or incidental to turf restoration as indicated

More information

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent: 32 00 00 EXTERIOR IMPROVEMENTS 32 90 00 PLANTING.02 Lawns and Grasses A. General 1. Intent: a. The work in this section specifies the labor, materials, and installation methods necessary to establish the

More information

ACTIVITY: Trees, Shrubs and Vines ES 10

ACTIVITY: Trees, Shrubs and Vines ES 10 Targeted Constituents Significant Benefit Partial Benefit Low or Unknown Benefit Sediment Heavy Metals Floatable Materials Oxygen Demanding Substances Nutrients Toxic Materials Oil & Grease Bacteria &

More information

Town of Fuquay-Varina

Town of Fuquay-Varina 170 LANDSCAPING 170.01 GENERAL 170.01.01 Street trees shall be provided in accordance with the Land Development Ordinance for site plans and subdivisions 170.01.02 Street trees, landscape areas, landscape

More information

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. SECTION 32 9300 PLANTS PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents. B. Related Sections: 1. Section 32 9001:

More information

SECTION TREES, PLANTS AND GROUND COVERS

SECTION TREES, PLANTS AND GROUND COVERS SECTION 02950 TREES, PLANTS AND GROUND COVERS PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Trees. 2. Plants and shrubs. 3. Ground covers. 4. Non-plant materials required to complete installation

More information

SECTION TREES, SHRUBS, AND GROUNDCOVER

SECTION TREES, SHRUBS, AND GROUNDCOVER SECTION 329313 TREES, SHRUBS, AND GROUNDCOVER PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Trees. 2. Shrubs. 3. Ground cover. 1.2 REFERENCES A. "Grades and Standards", latest edition, Texas Association

More information

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS SECTION 32 93 00 PART 1 GENERAL 1.1 SUMMARY A. The Project requires particular attention to the aesthetic and landscape architectural design elements that are incorporated into the project site plan. The

More information

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX L-1 TREE PLANTING (TYPICAL SECTION) L-2 TREE ANCHORING - TYPE A (FOR TREES LARGER THAN 2 INCHES CALIPER) L-3 TREE ANCHORING - TYPE B (FOR TREES UP

More information

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3 SECTION VI (Sub-section 241) Grassing Article Page 1. Scope of Work 241-1 2. General 241-1 3. Sprigging 241-1 4. Sodding 241-1 thru 241-3 5. Soil Amendments 241-3 6. Non Grassed Areas 241-4 7. Topsoil

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING Section 02922 PART 1 GENERAL 1.01 SUMMARY This Section includes the following: A. Restoration of existing lawn areas disturbed by construction shall be by installation of new sod. B. Planting of sod within

More information

SECTION LANDSCAPING

SECTION LANDSCAPING PART 1 -GENERAL 1.01 DESCRIPTION SECTION 32 9200 A. Furnish all labor, materials, and equipment required to complete all landscaping work indicated on the drawings and specified herein. This includes seeding,

More information

SECTION FINE GRADING AND SOIL PREPARATION

SECTION FINE GRADING AND SOIL PREPARATION SECTION 32 90 00 PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Preparation. C. Subsoil Preparation. D. Placing Topsoil. E. Soil Tests. F. Coordination of Soil Amendments. G. Fine Grading. H.

More information

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique ONE STORY RESIDENCES IN THE AREA 6610 S.W. 62 ND Court 6620 S.W. 62 ND Court (Subject Property) 6630 S.W. 62 ND Court 6700 S.W. 62 ND

More information

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers FHWA 534_J31 TEA-5A1(833), P1,M51 See Tabulation Below for Section Numbers ALL CONSTRUCTION IS TO BE PERFORMED WITHIN EXISTING RIGHT OF WAY STP-5A1(611) M51 TEA-5A1(833) RECOMMENDED FOR CONSTRUCTION 12/28/216

More information

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree! Craig R. Miller Parks & Open Space Manager www.cpnmd.org Environmental Factors to Consider: Minimum temperature the

More information

ANEW LANDSCAPE really

ANEW LANDSCAPE really Installing Woody Landscape Plants, Groundcovers, Perennials, and Annuals ANEW LANDSCAPE really approaches a finished project once plant materials have been installed. Since plants are the most admired

More information

SIUE LANDSCAPE UPGRADE

SIUE LANDSCAPE UPGRADE SIUE LANDSCAPE UPGRADE Project Introduction The Southern Illinois University Edwardsville campus was established and built in the mid-1960's, based on a landscape master plan by HOK. The landscape plan

More information

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions are in

More information

Landscape Design Standards

Landscape Design Standards Landscape Design Standards 1 Introduction.1 The following are the University of Toronto s Landscape Design Standards. The information contained within these standards must be followed except in the following

More information

University of New Hampshire Scholars' Repository

University of New Hampshire Scholars' Repository University of New Hampshire University of New Hampshire Scholars' Repository Division 32 Exterior Improvements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 329300 - Plants Sandra

More information

Planting Containerized Trees

Planting Containerized Trees Planting Containerized Trees Dig a hole Dig a hole 3 to 4 times wider than the container and only as deep as the existing root ball. The hole should have sloping sides like a saucer to allow for proper

More information

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009 SECTION 02900 - LANDSCAPING 1.1 SUMMARY A. Landscaping includes the layout, soil preparation, excavation for and planting of landscape materials, including trees, shrubs, ground covers, plants, and lawns,

More information

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office Trees and Shrubs Provide Beauty Wind protection Shade Wildlife habitat Visual Screening Topics of the Day Buying Trees Digging Holes Planting Trees Planting Landscape Trees Larry A. Sagers Extension Horticulture

More information

X X W W W W W W W W W W W W UG UG OHE OHE OHE OHE OHE OHE OHE FO UGE FO FO UGE UGE FO FO FO FO FO FO FO UGE UGE UGE UGE UGE UGE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE EXISTING

More information

2.1.4 Roof Downspout Rain Gardens

2.1.4 Roof Downspout Rain Gardens 2008 SWMM, 2010 Revision City of Tacoma 2.1.4 Roof Downspout Rain Gardens Purpose and Definition Bioretention areas are shallow stormwater retention facilities designed to mimic forested systems by controlling

More information

OVERALL LANDSCAPE PLAN

OVERALL LANDSCAPE PLAN OVERALL LANDSCAPE PLAN : LIC. NO: SM RECORD COPY BY: L.0 OVERALL LANDSCAPE PLAN Scale: " = 40'-0" 0 40' 80' Scale: " = 40' L.0 L2.0 TREE PLANTING PLAN Scale: " = 40'-0" 0 Scale: " = 40' 40' wsbeng.com

More information

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements. SECTION 329300 - PLANTS 1.1 QUALITY ASSURANCE A. Installer's Personnel Certifications: Certified Landscape Technician, CLT-Exterior. Provide at least 1 person who shall be present at all times during execution

More information

Section 917. TURF AND LANDSCAPING MATERIALS

Section 917. TURF AND LANDSCAPING MATERIALS 917.01 Section 917. TURF AND LANDSCAPING MATERIALS 917.01. General Requirements. Nursery stock, seed, sod, mulching material, and chemical fertilizer nutrients must meet the requirements of this section.

More information

SECTION TURF AND GRASSES

SECTION TURF AND GRASSES SECTION 32 92 00 TURF AND GRASSES PART 1: GENERAL 1.01 DESCRIPTION Restore all disturbed grass and landscaped areas to conditions equal to or better than before the work began and to the satisfaction of

More information

SECTION 910 LANDSCAPING

SECTION 910 LANDSCAPING SECTION 910 911.0 DESCRIPTION This section covers the furnishing of all labor, material, equipment, and performance of all work and services necessary or incidental to plant removal and installation as

More information

ATTACHMENT L. Provision C.3.c.i.(1)(b)(vi) Specification of soils for Biotreatment or Bioretention Facilities

ATTACHMENT L. Provision C.3.c.i.(1)(b)(vi) Specification of soils for Biotreatment or Bioretention Facilities ATTACHMENT L Provision C.3.c.i.(1)(b)(vi) Specification of soils for Biotreatment or Bioretention Facilities Soils for biotreatment or bioretention areas shall meet two objectives: Be sufficiently permeable

More information

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10 PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide trees, shrubs, vines and groundcover in accordance with the contract documents. 1.02 REFERENCES A. "American Standard for Nursery Stock", 1990 Edition,

More information

Specification of Soils for Biotreatment or Bioretention Facilities

Specification of Soils for Biotreatment or Bioretention Facilities Specification of Soils for Biotreatment or Bioretention Facilities Soils for biotreatment or bioretention areas shall meet two objectives: Be sufficiently permeable to infiltrate runoff at a minimum rate

More information

F. Finish Grade: Elevation of finished surface of topsoil.

F. Finish Grade: Elevation of finished surface of topsoil. January 2014, rev 00 32 9310 Trees, Shrubs and Groundcovers PART 1. - GENERAL 1.01 Section Includes A. Provide trees, shrubs, and groundcovers as shown and specified. The work includes: 1.02 Definitions

More information

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT 8 8 CONCRETE RAMP WOOD STEPS SWIMMING POOL 8 METAL POOL ENCLOSURE FENCE 9 SINGLE LEAF METAL GATE 0 LAWN HANGING CANOPY WITH DOWN LIGHTS METAL & GLASS AWNING AMENITY ROOM WITH FOLDING GLASS WALLS CONCRETE

More information

Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes

Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes Planting Trees & Shrubs Handouts: Planting and Maintaining Trees and Shrubs Study Guide Choosing Trees and Shrubs Tip: Walk around the neighborhood, see what grows in your area and bring a sample to the

More information

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO. Public Notice REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material June 22, 2018 ADDENDUM NO.: One (1) TO ALL PROSPECTIVE BIDDERS: PLEASE BE ADVISED OF THE FOLLOWING

More information

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball: Planting a Tree Select the location: Choose a spot where the tree can reach full size; note the expected mature height & spread of the species. Plant trees at least half the mature leaf crown width away

More information

SECTION SODDING

SECTION SODDING SECTION 02925 SODDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparation of subsoil. 2. Placing topsoil. 3. Fertilizing. 4. Sod installation. 5. Maintenance. B. Related Sections: 1. Drawings

More information

Don t Put a $100 Tree in a $10 Hole

Don t Put a $100 Tree in a $10 Hole Industry Standards Don t Put a $100 Tree in a $10 Hole Marcus Duck Academic Advisor, Instructor & Program Coordinator MSU s 2-year Landscape Horticulture Programs www.hrt.msu.edu/students American Association

More information

A. Contractor shall provide product data for each type of product indicated.

A. Contractor shall provide product data for each type of product indicated. 31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND TRIMMING SECTION 1 GENERAL 1.1 SUMMARY A. This section includes general protection and pruning of existing trees and plants that are affected by execution

More information

SECTION SODDING

SECTION SODDING SECTION 02924 SODDING PART 1 GENERAL 1.01 SUMMARY A. Repair lawns and grassed rights of way damaged or removed during the construction of the pump station. 1.02 RELATED WORK A. Clearing and Grubbing -

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-02 66 00 (February 2010) ----------------------------- Preparing Activity: USACE Superseding UFGS-02 66 00 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Guidelines for planting within the 100 Ft. Buffer

Guidelines for planting within the 100 Ft. Buffer CAPE COD COOPERATIVE EXTENSION PO Box 367 Barnstable, MA 02630 508 375-6690 (www.capecodextension.org) Guidelines for planting within the 100 Ft. Buffer Introduction: The Barnstable County Extension Service

More information

Planting Trees & Shrubs. and Shrubs Study Guide

Planting Trees & Shrubs. and Shrubs Study Guide Planting Trees & Shrubs Handouts: Planting and Maintaining Trees Handouts: Planting and Maintaining Trees and Shrubs Study Guide Choosing Trees and Shrubs Tip: Walk around the neighborhood, see what grows

More information

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS Van Buren Bridge Project IFB #0721-17-VBB GENERAL TREE & LANDSCAPE PROVISIONS CONSTRUCTION SPECIFICATIONS PROJECTS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS DEPARTMENT OF PUBLIC

More information

Annuals and Perennials

Annuals and Perennials Annuals and Perennials Annuals and herbaceous perennials are popular because they have flowers and foliage that is valued for their ornamental value. Annuals Annuals complete their life cycle in one growing

More information

SECTION LANDSCAPE ESTABLISHMENT

SECTION LANDSCAPE ESTABLISHMENT SECTION 02970 LANDSCAPE ESTABLISHMENT 120-day Landscape Establishment PART 1 GENERAL 1.01 SCOPE OF WORK A. A. This work shall include all labor, materials, equipment, supplies, and services to sustain

More information

SECTION LANDSCAPE PLANTING

SECTION LANDSCAPE PLANTING SECTION 32 93 23 LANDSCAPE PLANTING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Placing topsoil or site soil; soil preparation and fine grading; furnishing and installing trees, shrubs and groundcovers;

More information

2571 PLANT INSTALLATION AND ESTABLISHMENT

2571 PLANT INSTALLATION AND ESTABLISHMENT 2571 PLANT INSTALLATION AND ESTABLISHMENT 2571.1 DESCRIPTION This work consists of providing, planting, and establishing trees, shrubs, vines, and perennials of the species, variety, grade, size, or age,

More information

LAWN RENOVATION & OVERSEEDING

LAWN RENOVATION & OVERSEEDING LAWN RENOVATION & OVERSEEDING A healthy established lawn is able to out-compete many weeds and withstand a certain amount of pressure from disease and insect attack as well as drought. You can help maintain

More information

Part 3: Interior Landscape Installation and Maintenance

Part 3: Interior Landscape Installation and Maintenance Part 3: Interior Landscape Installation and Maintenance Contents 1.0. General Conditions...1 1.1. Scope and Coordination... 1 1.2. Foliage Plant Standards... 1 1.3. Guarantee and Maintenance Period...

More information

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216. L1 (NOT USED) L2 L3 L4 L5 L6 L7 L8 L9 (NOT USED) (NOT USED) L210 L211 L212 L213 L214 (NOT USED) (NOT USED) (NOT USED) L215 L215a (NOT USED) L2 (NOT USED) L217 (NOT USED) L2 (NOT USED) L218 L2 L221 L222

More information

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program Exhibit II - Expanded Scope of Work Xeriscaping / Rain Water Harvesting Sustainability Program National Guard Armory, Located at 308 North Fiske Boulevard Cocoa, FL 32922 PART 1 GENERAL 1.01 BACKGROUND

More information

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties Success with Trees in Your Yard Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties P s for Success with Trees Planning Proper selection Proper planting planting

More information

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection? GROUP ACTIVITY 2 Municipal Construction Stormwater Site Inspection Toolkit Overview You are a municipal stormwater inspector (Inspector) heading out to inspect a building development site where construction